Revision 0
SCHEDULE 1
SCHEDULE OF RATES
Note allocate item no. only to items where a price is to be submitted.
RATES SHALL BE EXCLUSIVE OF GST
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
PROVISION FOR TRAFFIC provisional sum/item
LANDSCAPE GENERAL
Location of services. provisional sum/item
Phytophthora control. item
Mundulla Yellows control. item
Removal of litter. provisional sum/item
EARTHWORKS AND TOPSOILING
Clearing and grubbing, refer Clause 3 provisional sum/item
Soil preparation.
(a) Topsoil stripping
……(± 10%)
square metre
(b) Minor trimming or levelling of subgrade
……(± 10%)
square metre
(c) Excavation and removal of unsuitable material
……(± 10%)
square metre
(d) Deep ripping
……(± 10%)
square metre
(e) Cultivation and amelioration
……(± 10%)
square metre
(f) Final levelling
……(± 10%)
square metre
Soil testing.provisional sum/item
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 1
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Supply of soil for landscape areas.
(a) DPTI Premium Soil Mix……
(± 10%)cubic metre
(b) General landscape soil 60/40……
(± 10%)cubic metre
(c) General landscape soil 80/20……
(± 10%)cubic metre
(d) Soil from off site……
(± 10%)cubic metre
(e) Topsoil from off site……
(± 10%)cubic metre
(f) Topsoil from on site……
(± 10%)cubic metre
Spreading of soil, refer Clause 7……
(± 10%)cubic metre
Soil additives:
(a) Gypsum……
(± 10%)square metre
(b) Organic compost……
(± 10%)square metre
(c) Other……
(± 10%)square metre
SUPPLY OF PLANT MATERIAL
Supply and delivery of plants.
(a) Tubestock……
(± 10%)number
(b) General nursery stock……
(± 10%)number
(c) Aquatic rubber-lined baskets……
(± 10%)number
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 2
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
(d) Aquatic flora-edge strip……
(± 10%)number
(e) Viro-cells……
(± 10%)number
(f) Viro-tubes……
(± 10%)number
Supply and delivery of advanced trees, refer Clause 4:
(a) Containers……
(± 10%)number
(b) Ball and burlapped……
(± 10%)number
(c) Root control bags……
(± 10%)number
Collection and delivery of plants supplied by the Principal:
Tubestock and nursery stock item --
Advanced trees……
(± 10%)number
PLANTING
Weed control……
(± 10%)number/square metre
Planting:
(a) Tubestock:
Planting……
(± 10%)number
Fertiliser……
(± 10%)number
Marker stakes……
(± 10%)number
Tree guards……
(± 10%)number
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 3
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Weed mats……
(± 10%)number
Mulch……
(± 10%)number
(b) General nursery stock
Planting……
(± 10%)number
Fertiliser……
(± 10%)number
Marker stakes……
(± 10%)number
Tree guards……
(± 10%)number
Weed mats……
(± 10%)number
Mulch……
(± 10%)number
Tree ties……
(± 10%)number
(c) Aquatic rubber-lined baskets
Planting……
(± 10%)number
Fertiliser……
(± 10%)number
Marker stakes……
(± 10%)number
Mulch……
(± 10%)number
(d) Aquatic flora-edge strip
Planting……
(± 10%)number
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 4
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Fertiliser……
(± 10%)number
Marker stakes……
(± 10%)number
Mulch……
(± 10%)number
(e) Viro-cells
Planting……
(± 10%)number
Fertiliser……
(± 10%)number
Marker stakes……
(± 10%)number
Tree guards……
(± 10%)number
Weed mats……
(± 10%)number
Mulch……
(± 10%)number
(f) Viro-tubes
Planting……
(± 10%)number
Fertiliser……
(± 10%)number
Marker stakes……
(± 10%)number
Tree guards……
(± 10%)number
Weed mats……
(± 10%)number
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 5
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Mulch……
(± 10%)number
(g) Advanced trees - Containers:
Planting……
(± 10%)number
Fertiliser……
(± 10%)number
Tree stakes……
(± 10%)number
Mulch……
(± 10%)number
Root control……
(± 10%)number
Soil mix……
(± 10%)number
Drainage coil……
(± 10%)number
Tree ties……
(± 10%)number
(h) Advanced trees - ball and burlapped:
Planting……
(± 10%)number
Fertiliser……
(± 10%)number
Tree stakes……
(± 10%)number
Mulch……
(± 10%)number
Root control……
(± 10%)number
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 6
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Soil mix……
(± 10%)number
Drainage coil……
(± 10%)number
Tree ties……
(± 10%)number
(i) Advanced tree root control bags:
Planting……
(± 10%)number
Fertiliser……
(± 10%)number
Tree stakes……
(± 10%)number
Mulch……
(± 10%)number
Root control……
(± 10%)number
Soil mix……
(± 10%)number
Drainage coil……
(± 10%)number
Tree ties……
(± 10%)number
Native Revegetation Area signsnumber
LAWN ESTABLISHMENT
Weed control.……
(± 10%)square metre
Ground and soil preparation.……
(± 10%)square metre
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 7
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Soil testing.……
(± 10%)square metre
Supply of soil.……
(± 10%)square metre
Spreading of soil.……
(± 10%)square metre
Soil additives.……
(± 10%)square metre
Fertiliser.……
(± 10%)square metre
Supply of seed.……
(± 10%)kg
Supply of turf.……
(± 10%)square metre
Installation of seed or turf (including establishment).……
(± 10%)square metre
Watering.……
(± 10%)square metre
PALM TRANSPLANTING/RELOCATION
Frond preparation.……
(± 10%)palm
Root preparation.……
(± 10%)palm
Root excavation.……
(± 10%)palm
Transport.……
(± 10%)palm
Planting.……
(± 10%)palm
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 8
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Supply and place imported soil.……
cubic metre(provisional quantity)
Fertiliser and/or soil additive.……
(± 10%)palm
Palm support.……
(± 10%)palm
Mulch.……
(± 10%)palm
Watering.……
(± 10%)palm
Antitranspirants.……
(± 10%)palm
Reinstatement. item
TREE TRANSPLANTING/RELOCATION
Root preparation.……
(± 10%)tree
Root excavation.……
(± 10%)tree
Transport. item
Planting.……
(± 10%)tree
Backfill.……
(± 10%)cubic metre
Watering basin.……
(± 10%)tree
Soil testing. item
Mulch.……
(± 10%)cubic metre
Watering.……
(± 10%)number
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 9
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Antitranspirants.……
(± 10%)number
Reinstatement of site. item
Maintenance.……
month
HYDROSEEDING
Supply of seed. item
Weed control.……
(± 10%)square metre
Setting out. item
Seed sowing, including fertiliser and/or other additives.
……(± 10%)
square metre
Native Revegetation Area signs. number
DIRECT SEEDING
Supply of seed and seed pre-treatment. item
Weed control.……
(± 10%)square metre
Setting out, refer Clause 4 item
Seed sowing, including fertiliser and other additives.……
(± 10%)square metre
Native Revegetation Area signs. number
PLANT RESCUE AND MAINTENANCE
Plant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial watering, initial fertiliser and antitranspirants.
……(± 10%)number
Setting out. item
Marker stakes.……
(± 10%)number
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 10
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Tree guards.
……(± 10%)number
Weed mats.……
(± 10%)number
Mulch.……
(± 10%)number
Seed collection. item
Vegetative cutting. item
Watering.……
(± 10%)number
Weed control.……
(± 10%)square metre
Pest/disease control. item/provisional sum
Marker stakes.……
number± 10%
Tree guards.……
(± 10%)number
Weed mats.……
(± 10%)number
Mulch. provisional sum
Follow-up fertiliser.……
(± 10%)number
Removal of marker stakes. item
IRRIGATION
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 11
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
TREE HOLLOW RELOCATION
Inspection and identification for tree hollows.……tree
± 10%
Tree hollow harvesting.
……number
(provisional quantity)
Tree hollow relocation installation.
……number
(provisional quantity)
Whole tree relocation.
……number
(provisional quantity)
Removal of material from site. item
Maintenance.
……number
(provisional quantity)
TREE PRUNING AND REMOVAL
Tree removal.
(a) Large trees (greater than ….m diameter)……
number± 10%
(b) Medium trees (….m - …m diameter)……
number± 10%
(c) Small trees (less than ….m diameter)……
number± 10%
Tree pruning.
(a) Thinning……
number± 10%
(b) Deadwooding……
number± 10%
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 12
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
(c) Selective pruning…...
number± 10%
(d) Formative pruning of young trees……
number± 10%
(e) Reduction pruning……
number± 10%
(f) Crown lifting……
number± 10%
(g) Pollarding……
number± 10%
(h) Remedial pruning……
number± 10%
Retention of cut branches or limbs.
……number
(provisional quantity)
Retention of tree hollows.
……number
(provisional quantity)
Disposal of excess cut material. item
Stump removal.……
number± 10%
Prevention of suckering and regrowth.……
number± 10%
Removal of material from site. item
BUSHCARE
Weed control. NOTE: weed control may be an item
(a) Cut and swab, cut and frill……
number± 10%
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 13
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
(b) Cut only……
number± 10%
(c) Hand pull……
square metre± 10%
(d) Spot spray……
square metre± 10%
(e) Wiping……
square metre± 10%
(f) Frilling only……
number± 10%
(g) Ringbarking……
number± 10%
Disposal of cut material (at a licensed waste depot). item
Native Revegetation Area signs. number
HERBACEOUS AND WOODY WEED CONTROL
Herbaceous weed control. NOTE: weed control may be an item
(a) Slash only……
square metre± 10%
(b) Slash and spray……
square metre± 10%
(c) Spot spray……
square metre± 10%
(d) Hand pull……
square metre± 10%
Woody weed control. NOTE: weed control may be an item
(a) Cut and swab……
number± 10%
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 14
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
(b) Cut only……
number± 10%
(c) Hand pull……
square metre± 10%
(d) Spot spray……
square metre± 10%
(e) Stem injection……
number± 10%
Disposal of cut material.
(a) Stockpile on site item
(b) Spread on site item
(c) Remove from site item
(d) Burning item
(e) Phytophthora areas item
INSTALLATION OF PERMEABLE PAVING FOR TREES
Site preparation, including establishment of Tree Protection Zone and excavation. item
Tree root care. Provisional Sum
Load support.……
square metre/item±10%
Paving.……
square metre±10%
MAINTENANCE OF PLANTS
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 15
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Watering (….operations).……
number± 10%
Weed control (….operations).……
number± 10%
Pest/disease control. provisional sum/item
Maintenance of marker stakes.……
number± 10%
Maintenance of tree guards.……
number± 10%
Maintenance of tree stakes.……
number± 10%
Maintenance of tree ties.……
number± 10%
Maintenance of weed mats.……
number± 10%
Maintenance of mulch.……
number± 10%
Formative pruning.……
number± 10%
Follow-up fertiliser (….operations).……
number± 10%
Removal of marker stakes and tree guards.……
number± 10%
MAINTENANCE OF HYDROSEEDED AND DIRECT SEEDED AREAS
Weed control (....operations).……
number± 10%
Pest/disease control. provisional sum/item
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 16
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Grass slashing.……
square metre± 10%
MAINTENANCE OF SEEDED AREAS AND LAWNS
Weed control (…operations).……
square metre± 10%
Pest/disease control. provisional sum/item
Cutting of lawn or seeded areas (…operations).……
square metre± 10%
Follow-up fertiliser.……
square metre± 10%
Lawn renovation.……
square metre± 10%
(a) Vertical mowing……
square metre± 10%
(b) Coring……
square metre± 10%
(c) Slicing……
square metre± 10%
(d) Topdressing……
square metre± 10%
MAINTENANCE OF NATIVE GRASSES
Watering (….operations).……
number± 10%
Weed control (….operations).……
number± 10%
Slashing.……
number± 10%
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 17
Revision 0
ITEM NO. DESCRIPTION QUANTITY AND UNIT
OF MEASUREMENTRATE
($)AMOUNT
($)
Seed collection.……kg
±10%
Pest/disease control. provisional sum/item
Maintenance of marker stakes.……
number± 10%
Maintenance of tree guards.……
number± 10%
Maintenance of weed mats.……
number± 10%
Maintenance of mulch.……
number± 10%
Follow-up fertiliser (….operations).……
number± 10%
Removal of marker stakes and tree guards.……
number± 10%
TOTAL $
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 18
Revision 0
SCHEDULE 2
WORKING TIME
I/We propose to observe the following working days and hours, vide Clause "Working Days and Hours of Work".
Working Days and Hours
Number of days to be worked per week ..............................
Number of hours to be worked per day,
Monday to Friday ..............................
Saturday ..............................
Sunday ..............................
Starting Time
Monday to Friday .........................a.m.
Saturday .........................a.m.
Sunday .........................a.m.
Finishing Time
Monday to Friday .........................p.m.
Saturday .........................p.m.
Sunday .........................p.m.
Rostered Days Off ..............................
..............................
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 19
Revision 0
SCHEDULE 4
SCHEDULE OF RATES FOR VARIATIONS
ALL RATES SHALL BE EXCLUSIVE OF GST.
ITEMNo.
DESCRIPTION UNIT OF MEASUREMENT
RATE($)
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 20
Revision 0
SCHEDULE 5
SCHEDULE OF RATES FOR DAYWORK
ALL RATES SHALL BE EXCLUSIVE OF GST.
Tenderer to list (examples shown below only).
PLANTTenderer to list (examples shown below only).
ITEM DESCRIPTION(MAKE, YEAR, MODEL)
RATE($) PER HOUR
NOTE: All Plant rates to be inclusive of operator(s)
LABOURTenderer to list (examples shown below only).
CLASSIFICATIONRATE
($) per hour
Supervisor
Leading Hand
Labourer
……………………………. …………………Tenderer's signature Date
DPTI XXCxxx Page 21