Home > Documents > DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET...

DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET...

Date post: 24-Mar-2021
Category:
Upload: others
View: 4 times
Download: 1 times
Share this document with a friend
13
NOTE: For source of fund, state if DPWH Regular Budget, Priority Development Assistance Fund, DepEd/DA/DAR Budget, Calamity Fund, MVUC Fund, etc.. The Layout of Project Billboard was based on D.O. 72 Series 2015 DPWH STANDARD PROJECT BILLBOARD ORIENTATION 45°0'0" BILLBOARD TRAFFIC DIRECTION EDGE OF ROAD R O A D GROUND LEVEL 500 1 000 1 200 1 000 DISPLAY AREA 50 x 75 VERTICAL COCO LUMBER 50 x 50 WOODEN STAKE TYPICAL FRAME ELEVATION GROUND LEVEL 2 400 DISPLAY AREA (1200 x 2400 x 12 MARINE PLYWOOD) 50 x 75 VERTICAL COCO LUMBER 50 x 75 VERTICAL COCO LUMBER GROUND LEVEL 2 400 DISPLAY AREA (TARPAULIN 1200 x 2400 x 5 MARINE PLYWOOD) 50 x 75 VERTICAL COCO LUMBER FRONT ELEVATION ( OPTION 1 ) FRONT ELEVATION ( OPTION 2 ) 50 x 50 WOODEN STAKE 50 x 50 WOODEN STAKE 500 1 000 1 200 500 1 000 1 200 CONSTRUCTION OF (Name of Project and Location) CONTRACTOR DATE STARTED CONTRACT COMPLETION DATE CONTRACT COST CONSTRUCTION CONSULTANT IMPLEMENTING OFFICE SOURCE OF FUND : : : : : : : DEPARTMENT OF 100 20 30 20 30 70 60 30 60 PUBLIC WORKS AND HIGHWAYS Text 2920 or call (02) 165-02 for any concern on this project www.dpwh.gov.ph 120 30 50 30 50 30 50 30 50 30 50 30 50 30 50 70 90 50 1310 80 40 320 1350 1274 50 60 30 60 30 390 100 690 620 WHITE BACKGROUND COLOR SHADE COMBINATION: Cyan Magenta White Key 0 7 78 0 : : : : WHITE BACKGROUND BLACK TEXT BLACK TEXT TRAIN ROAD DPWH Cavite I District Engineering Office Brgy. De Ocampo Trece Martires City Cavite Project: Location: Cost: Fund/Source/s: Implementing Agency/ies: Development Partner/s: Contractor/Supplier: Brief Description of Project: Project Details For particulars or complaints about this project please contact the regional Office or Cluster which has audit jurisdiction on thus project: COA Regional Office No./Cluster: Address: Contact No.: or Text COA Citizen's Desk at 0915-5391957 8 Ft. 8 Ft. COA BILLBOARD NOTE: FONT: HELVETICA FONT SIZE: MAIN INFORMATION 3" SUB INFORMATION 1" FONT COLOR: BLACK 12 12 SHT NO. SET NO. APPROVED BY: RECOMMENDED BY: SUBMITTED BY: REVIEWED BY: DANILO M. BAES REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION IV-A CAVITE I DISTRICT ENGINEERING OFFICE TRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER DATE: DATE: DATE: DATE: PROJECT BILLBOARD DRAFTED & PREPARED BY: ALLAN D. YURO ENGINEER II DATE: SHEET CONTENT: PROJECT NAME AND LOCATION: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE
Transcript
Page 1: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

NOTE: For source of fund, state if DPWH Regular Budget, PriorityDevelopment Assistance Fund, DepEd/DA/DAR Budget, CalamityFund, MVUC Fund, etc..The Layout of Project Billboard was based on D.O. 72 Series 2015

DPWH STANDARD PROJECT BILLBOARD

ORIENTATION

45°0'0"

BILLBOARD

TRAFFIC DIRECTION

EDGE OF ROAD

R O A D

GROUND LEVEL

500

1 000

1 200

1 000

DISPLAY AREA

50 x 75 VERTICAL

COCO LUMBER50 x 50 WOODEN

STAKE

TYPICAL FRAME ELEVATION

GROUND LEVEL

2 400

DISPLAY AREA(1200 x 2400 x 12MARINE PLYWOOD)

50 x 75 VERTICAL

COCO LUMBER

50 x 75 VERTICAL COCO LUMBER

GROUND LEVEL

2 400

DISPLAY AREA(TARPAULIN 1200 x 2400 x 5

MARINE PLYWOOD)

50 x 75 VERTICAL

COCO LUMBER

FRONT ELEVATION ( OPTION 1 )

FRONT ELEVATION ( OPTION 2 )

50 x 50 WOODEN STAKE

50 x 50 WOODEN STAKE

500

1 000

1 200

500

1 000

1 200

CONSTRUCTION OF (Name of Project and Location)CONTRACTORDATE STARTEDCONTRACT COMPLETION DATECONTRACT COSTCONSTRUCTION CONSULTANTIMPLEMENTING OFFICESOURCE OF FUND

:::::::

DEPARTMENT OF

100

20302030

70

60

30

60

PUBLIC WORKS AND HIGHWAYSText 2920 or call (02) 165-02 for any concern on this projectwww.dpwh.gov.ph

120

30

50

30

50

30

50

30

50

30

50

30

50

30

50

70

90

50

1310

80

40

320

1350 1274

50

60

30

60

30

390

100

690

620

WHITE BACKGROUNDCOLOR SHADE COMBINATION:CyanMagentaWhiteKey

07

780

::::

WHITE BACKGROUND

BLACK TEXT

BLACK TEXT

TRAINROAD

DPWH Cavite I District Engineering OfficeBrgy. De Ocampo Trece Martires City Cavite

Project:

Location: Cost:Fund/Source/s:

Implementing Agency/ies:Development Partner/s:Contractor/Supplier:Brief Description of Project:Project Details

For particulars or complaints about this project please contact the regional Office or Cluster which has auditjurisdiction on thus project:

COA Regional Office No./Cluster:Address:Contact No.: or Text COA Citizen's Desk at 0915-5391957

8 Ft.

8 Ft.

COA BILLBOARDNOTE:FONT: HELVETICAFONT SIZE: MAIN INFORMATION 3"

SUB INFORMATION 1"FONT COLOR: BLACK

12

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

DANILO M. BAES

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

PROJECT BILLBOARD

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

Page 2: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

FLOOR PLAN

10MM Ø AT 600MM O.C.BOTH WAYS

100MM X 100MMGOOD LUMBERPOST

4-10MM Ø VERTICAL BAsmS3-10MM Ø STIRRUPS

4" X 4"GOOD LUMBERPOST

100MM THK. FLOORING

1 -10MM Ø RSB

FRONT VIEW RIGHT SIDE VIEW

DETAIL OF POSTSECTION

PLAN

12" ORDINAsmY PLYWOOD

BOTH SIDE

2" X 2" GOOD LUMBER FRAME

NGLFFL

DEMOUNTABLE FIELD OFFICE

8 - 2" X 3" GOOD LUMBER PURLINSSPACED @ EVERY 500MM O.C.

GAUGE 26 CORRUGATED ROOFING WITH ROOF INSULATION4-2" X 3" GOOD LUMBER

SPACED @ EVERY 1.20M O.C.

GAUGE 26 CORRUGATED ROOFING WITH ROOF INSULATION

W1W1 D1

2" X 2" GOOD LUMBER

11

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

DANILO M. BAES

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

DEMOUNTABLE FIELD OFFICE

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

Page 3: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

10

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

DANILO M. BAES

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

BAR CUTTING LIST

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

Page 4: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

9

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

DANILO M. BAES

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

PLAN AND DETAIL OF POST TENSIONED TYPE VAASHTO GIRDER

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

Page 5: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

300 760/940

900

2935

16mmØ HOR. BAR @ 200mm

16mmØ VERT. BAR @ 150mm12mmØ BAR @ 300mm

12mmØ HOR. BAR @ 300mm

25mmØ HOR. BAR @ 200mm

100mm THK LEAN CONC.

200 SEE EXPANSION DETAIL

GIRDER

16mmØ HOR. BAR @ 200

16mmØ VERT. BAR @ 150

D

D

SECTIOND-D

4 - 16mmØ TOP & BOT BARS

4 - 20mmØ VERT BARS

10mmØ TIES. @ 200mm10mmØ STR. @ 200mm

EQUALLY SPACE EQUALLY SPACE

TOP OF SIDEWALK

5020

020

020

025

0

900

3000

4 - 12Ø ANCHOR BARS WELDEDON JOINTS AND DRAIN PIPE PAINTED

4 - 16mmØ TOP & BOT BARS 10mmØ STR. @ 200mm

4 - 20mmØ VERT BARS

10mmØ TIES @ 200mm

EGQUALLY SPACE EGQUALLY SPACE

150mmØ G.I PAINTED DRAIN PIPE

300 300

300

250

150

50

300

5020

020

020

025

0

900

50

760 / 940

50

40 C

LR.

40 C

LR.

40 CLR.

100

40 C

LR.

20 X 20CHAMFER

RAILING

4-16mmØ perRAILING

10mmØTIES @200

RAILPOST

20 X 20 CHAMFER

200 16mmØ

@ 200mm

5-12mmØ

1060 / 1240

1.0%

SLAB

PROVIDE 3 SETSHANGER 12mmØ@ 1000mm O.C.

16mmØ LONG.BAR @ 100mm

O.C.(TOP & BOT)

16mmØ @ 100mmO.C. TRANS. BAR(TOP & BOT)

..

..

INNER FACEBACKWALL

EXPA

NSI

ON

DAM

2

APPROACH4950

/ 47

70

8

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

DANILO M. BAES

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

RAILS, POST, SIDE WALK, WINGWALL, SLAB DETAILS

1A WINGWALL DETAILSCALE

2C TYPICAL RAIL POST, RAILING & DOWN SPOUT PLAN

2B SECTION ELEVATIONSCALE

2A SIDEWALK /RAILING DETAILSSCALE

1B WINGWALL PLANSCALE

3 SLAB DETAILSCALE

1:50

1:50

1:15

1:40

1:40

1:100

SCALE

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

Page 6: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

33500

COPING

1500mmØBORED PILE

1620

6300

1620

9540

1500

Ø15

00

CENTER OF GIRDER

CENTER OF GIRDER

CENTER OF GIRDER

CENTER OF GIRDER

4PLC

S

3000

1500 COPING

12mmØ BAR @200mm

12mmØ BAR @150mm

SEE APPROACH DETAIL

50mm CONC. RISER

400X700X50mm DURO NEOPRENE PADWITH DOUBLE STEEL REINFORCEMENT

SHEARBLOCK

SHEARBLOCK

SHEARBLOCK

20mmØ BAR @ 150mm25mmØ BAR @ 125mm6-25mmØ BAR

16mmØ STRS. @ 300mm

25mmØ BAR @ 125mm20mmØ BAR @ 150mm

5000

300

600

20mm PEJ FILLER

25mmØ x1000mm @

200mm O.C.

1 1/4 Ø B.I. PIPE(FILLED W/ GREASE)

500

500

16mmØ STRS.@ 300mm 28

0

1200

1200

8-25mmØDIAPHRAGM BARS

32mmØ RESTRAINTBAR @ 300mm

12mmØ@ 100mm

SEE SECTION F-F (5/D6)

100

50

32mmØ X 2400mmRESTRAINT BAR @300mm6mmØ SPIRALAT 40 PITCH

50mmØ BI PIPETO BE FILLEDWITH ASPHALT

7

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

DANILO M. BAES

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

FOUNDATION PLAN, SIDEWALK, APPROACH,DIAPHRAGM DETAIL

1 FOUNDATION PLANSCALE

2 SIDEWALK-APPROACH DETAILSCALE

3 APPROACH DETAILSCALE

4 DIAPHRAGM DETAILSCALE

5 RESTRAINING BAR EXPANSION DETAIL (SECTION F-F)SCALED6

1:100

1:40

1:50

1:25

1:5

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

Page 7: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

C C

40-36mmØVERT. BAR

12mmØ - 20@20mm,REST @ 90mmSPIRAL BAR

..

9820

EXPANSION DAM 2

APPROACH

PROVIDE 3 SETSHANGER 12mmØ@ 1000mm O.C.

16mmØ LONG.BAR @ 100mm

O.C.(TOP & BOT)

16mmØ @ 100mmO.C. TRANS. BAR(TOP & BOT)

..

..

3 SETS-12mmØ1@50, 8@75,REST 150mm

.

4 - 20mmØ WEBBAR E.F..

.

16 - 36mmØBOT. BAR

16 - 36mmØTOP BAR

16mmØ @ 300mm2 -16mmØWEB BAR E.F.

32mmØ RESTRAINTBAR @ 300 X 2400mm

SEESIDEWALK

DETAILSEEGIRDERDETAIL

16mmØ @ 100mmO.C. TRANS. BAR

(TOP & BOT)

25mmØ -STIFFENER

RING

6 -20mmØSPACER

SEE RISERDETAIL

4-16mmØ

40-36mmØVERT. BAR

12mmØ - 20@20mm,REST @ 90mm

SPIRAL BAR

Ø1500

25mmØ -STIFFENER

RING

6 -20mmØSPACER

1800

2400

019

70

210200

900

300 900 3700 30090037009800

2100 1050 210010501620 1620

1620 16206300

1500 1500

COPING

BEARING PAD

SLAB

GIRDER ( TYPE V )

50mm CONC. RISER

SHEAR BLOCK

SIDE WALK

1500mmØBORED PILE

PROVIDEPEJ FILLER

.

HAUNCH 50mm

1215 1288

300

50 50

200

CONC. RISER

BEARINGPAD

10mmØ @50mm B.W.

GIRDER

16 - 36mmØBOT. BAR

16 - 36mmØTOP BAR

4 - 20mmØWEB BAR E.F.

1500

1800

3 SETS-12mmØ1@50, 8@75,REST 150mm

..

150

100

200

100

150

75

3A BORED PILE (18m) DETAILSCALE

4 COPING DETAILSCALE

2 SLAB DETAILSCALE

1A BRIDGE ELEV. (SECTION B-B)SCALED5

1B BRIDGE ELEV. (SECTION B-B)SCALED5

D5 D5 D5

5 RISER DETAILSCALED5

3B STIFFENER DETAILSCALED5

6

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

DANILO M. BAES

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K.

IGNAOSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGNSECTION

ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

BRIDGE ELEV. (SECTION B-B), SLAB, COPING,BORED PILE, STIFFENER, RISER DETAILS

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

Page 8: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

12mmØ @ 100mmHOR. BAR

16mmØ @ 150mmVERT. BAR

CC

40-36mmØVERT. BAR

12mmØ - 20@20mm,REST @ 90mmSPIRAL BAR

..

16 - 36mmØ BOTT. BAR

16 - 36mmØ TOP BAR

4 - 20mmØWEB BAR E.F.

3 SETS-12mmØ 1@50,8@75, REST 150mm

..

16mmØ @ 200mm2 -16mmØ WEB BAR

SLAB SLAB

COPING

GIRDER(TYPE V)

SHEAR BLOCK

1500mmØBORED PILE

1732

1200

2400

0

1500

35000

INNER FACEBACKWALL

INNER FACEBACKWALL

BEARING PAD50mm CONC. RISER

32mmØ RESTRAINTBAR @ 300mm

8-25mmØ DIAPHRAGM BARS

12mmØ @ 100mm

4-16mmØ

16mmØ @ 200mm

6-16mmØ HOR. BAR

300300

A

B INNER FACEBACKWALL

INNER FACEBACKWALL

B

A

B

35000

9900

CENTER OF ROADWAYPROPOSED BRIDGE

EXPANSIO

N D

AM 2

APPROACH

EXPA

NSI

ON

DAM

2

APPROACH

4520 125

30

7520 125 X 20 CAP PLATE

PEJ FILLER

16ØX250LONG ANCHOR BARS@300 O.C(TYP.)

5

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

DANILO M. BAES

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

BRIDGE PLAN, BRIDGE ELEV. (SECTION A-A),EXPANSION DAM DETAILS

1 BRIDGE PLANSCALE

2 BRIDGE ELEV. (SECTION A-A)1:100SCALE

3 EXPANSION DAM DETAIL 2 @ APPROACH1:50SCALE

1:150

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

Page 9: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

N- VALUE0

2

4

6

8

10

DEPTH

END BH-1

Brownish gray ;Silty CLAY,Medium Stiff,high plasticity

Gray ; SandyCLAY, Very Stiffto Hard, mediumplasticity

Gray ; Silty fineSAND, VeryDense,non-plasticity

RIVER BED ELEV. = -10

MAX. FLOOD LEVEL = -1.01m

FE = 4.08m

35000

13.18

5

5

6

50/5

25

5

28

5

50/10

50/15

50/15

50/13

12

N- VALUE0

2

4

6

8

10

DEPTH

END BH-2

Brownish gray: SiltyCLAY, Soft to Medium

Stiff, high plasticity

Gray ; Sandy CLAY,Very Stiff to Hard,medium plasticity

Gray ; Silty fine SAND,Medium Dense to Very

Dense, non-plasticity

4

6

32

29

5

50/10

50/15

50/10

12

30

50/15

2400

0

3000

NGL = ELEV 0.0

NGL = ELEV 0.0

1 BRIDGE PROFILESCALE 1:150

4

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

DANILO M. BAES

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

BRIDGE PROFILE

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

Page 10: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

3

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

DANILO M. BAES

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

TOPOGRAPHIC PLAN

1 TOPOGRAPHIC PLANSCALE 1:750

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

Page 11: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

GENERAL NOTES FOR STRUCTURE

GENERAL

1. IN THE INTERPRETATION OF DRAWINGS, INDICATED DIMENSIONS SHALLGOVERN. ALL DIMENSIONS, DISTANCES AND SIZES SHALL NOT BE SCALEDFOR CONSTRUCTION PURPOSES.

2. UNLESS OTHERWISE INDICATED, ALL DIMENSION AND MEMBER SIZES AREIN MILLIMETERS.

DESIGN CRITERIA

1. DESIGN SPECIFICATIONS

1.1 THE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIAL (AASHTO)

1.2 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES, VOLUME IIBRIDGES (1997)

2. LOADING

2.1 DEAD LOADS

ITEMS WEIGHTA. CONCRETE 24.00 kN/CU.M.B. STEEL 77.00 kN/CU.M.C. EARTH 19.00 kN/CU.M.D. ASPHALT OVERLAY 1.054 kN/SQ.M.

2.2 LIVE LOADS

A. AASHTO HS-25 TRUCK AND EQUIVALENT LANE LOADINGB. SIDEWALK LOAD 2.4 kPa

2.3 IMPACT LOADS

IN ACCORDANCE WITH AASHTO SPECIFICATIONS

MATERIALS

1. CONCRETE

UNLESS INDICATED OTHERWISE ON PLANS. THE CONCRETE CLASSSTRENGTH SHALL BE AS FOLLOWS:

CONCRETE STRENGTH

2. REINFORCING STEEL

A. GREATER THAN OR EQUAL TO 16 mm Ø - GRADE60 OR 414 MPa

B. LESS THAN 16 mm Ø - GRADE40 OR 275 MPa

3. PRESTRESSING STEEL

PRESTRESSING STEEL SHALL BE SEVEN - WIRE 12.70 mm Ø UNCOATED STRESS RELIEVED STRANDS, GRADE 270

CONSTRUCTION

1. SETTING OUT

THE SETTING OUT AND THE ELEVATIONS OF THE DIFFERENT COMPONENTS OF THE STRUCTURE SHALL BE APPROVED BY THEENGINEER PRIOR TO THE START OF ANY CONSTRUCTION WORK.

2. REINFORCED CONCRETE

2.1 CONCRETE MIX AND PLACING

2.1.1 DESIGN CONCRETE MIX SHALL MEET THE DESIGNCONCRETE STRENGTH GIVEN UNDER ITEM 1 OFMATERIALS

2.1.2 CONCRETE SHALL BE DEPOSITED, VIBRATED ANDCURED IN ACCORDANCE WITH THE SPECIFICATIONS.

2.1.3 FOR CONCRETE DEPOSITED AGAINST THE GROUND.LEAN CONCRETE WITH MINIMUM THICKNESS OF 100mm SHALL BE LAID FIRST BEFORE INSTALLING THEREINFORCEMENT. THIS LEAN CONCRETE SHALL NOTCONSIDERED IN MEASURING THE STRUCTURALDEPTH OF CONCRETE SECTION.

2.1.4 THE CONTRACTOR SHALL SUBMIT TO THE ENGINEERFOR APPROVAL PLACING SEQUENCE FOR ALLCONCRETE WORK.

2.2 BAR BENDING, SPLICING, AND PLACING

2.2.1 THE CONTRACTOR SHALL SUBMIT TO THE ENGINEERFOR APPROVAL OF SHOP DRAWINGS INDICATING THEBENDING, CUTTING, SPLICING AND INSTALLATION OFALL REINFORCING BARS.

2.2.2 BARS SHALL BE BENT COLD. BARS PARTIALLYEMBEDDED IN CONCRETE SHALL NOT FIELD BENTUNLESS PERMITTED BY THE ENGINEER.

2.2.3 BAR SPLICING SHALL BE INDICATED IN THE DRAWINGS. SPLICES NOT INDICATED ON DRAWINGSSHALL USED THE FOLLOWING MINIMUM SPLICING:

Ø 12 - 480mm Ø 28 - 1120mmØ 16 - 640mm Ø 32 - 1300mmØ 20 - 800mm Ø 36 - 1500mmØ 25 - 1000mm

LAP SPLICE

12d (MIN) 15d (MAX)

VERTICAL OFFSET

d MIN

: dM

AX: d

+ 3

mm

2.2.4 WELDED SPLICES, IF APPROVED BY THE ENGINEER,SHALL DEVELOP IN TENSION ATLEAST 125% OF THESPECIFIED YIELD STRENGTH OF THE BARS

2.2.5 UNLESS OTHERWISE SHOWN ON DRAWINGS. THECLEAR DISTANCE BETWEEN PARALLEL BARS INLAYER SHALL NOT BE LESS THAN 1.5 TIMES THENOMINAL DIAMETER OF THE BAR NOR LESS THAN 1.5TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE.THE CLEAR DISTANCE BETWEEN LAYERS SHALL NOTBE LESS THAN 25mm NOR ONE BAR DIAMETER. THEBARS IN THE UPPER LAYER SHALL BE PLACEDDIRECTLY ABOVE THOSE IN.

2.2.6 HOOKS AND BENDS

DIMENSIONS OF 90 - DEGREE AND 180 - DEGREE HOOKS

d

D12d 4d OR

d

D

65 mm MIN.

90° HOOK 180° HOOK

PIN DIAMETER: D = 6d FOR Ø10 THRU Ø25D = 8d FOR Ø28 THRU Ø32

D = 10d FOR Ø36 AND LARGER

DIMENSIONS FOR STIRRUPS AND TIE HOOKS

4d OR65 mm MIN.

90° HOOK

D D

D

10d OR

100 m

m MIN

.

D D

D

135° HOOK

2.3 CONCRETE COVER TO REINFORCEMENT = 20mmCONCRETE PERMANENT EXPOSED TO EARTH = 75mmSLABS AND WALLS = 20mmBEAMS AND COLUMNS = 40mm

2.4 CONSTRUCTION JOINT

2.4.1 THE POSITION AND FORM OF ANY CONSTRUCTIONJOINT SHALL BE AS SHOWN ON DRAWINGS OR ASAGREED WITH THE ENGINEER

2.4.2 THE INTERFACE BETWEEN THE FIRST AND THESECOND POUR CONCRETES SHALL BE ROUGHENEDWITH AN AMPLITUDE OF 6mm MINIMUM.

2.5 FALSEWORK

ALL FALSE WORK SHALL BE DESIGNED BY THE CONTRACTORSUBJECT TO THE APPROVAL BY THE ENGINEER.

2.6 FORMWORK

FORMWORKS SHALL BE CONSTRUCTED SUCH THAT IT WILLNOT YIELD UNDER THE LOAD AND SHALL BE SUCH AS TOAVOID THE FORMATION OF FINE. ALL CORNERS OF CONCRETE MEMBERS SHALL BE CHAMPERED TO 20mmUNLESS NOTED OTHERWISE ON DRAWINGS. STRIPPING OFFORMS AND SHORES SHALL BE AS DESIGNATED BY THEENGINEER. THE FOLLOWING MAY USED AS A GUIDE:

MIN. TIMESHORING UNDER GIRDERS, BEAMS, FRAMES 28 DAYSDECK SLABS 14 DAYSWALLS 7 DAYSCOLUMNS 7 DAYSSIDES OF BEAMS AND ALL OTHERVERTICAL SURFACES 7 DAYS

2.7 CAMBERING

USE 100 MM OR 4" CAMBER WHEN THE FORMWORKS OF THEGIRDER ARE CONSTRUCTED

NOTES ON PRESTRESSING

1. THE TYPE OF TENDONS WHICH WILL BE USED IN THE POST TENSIONED AND ALL THE NECESSARY ADDITIONAL DETAILS INCLUDING THOSE FOR END ANCHORAGES, METHODS TO BE EMPLOYED AND PROCEDURES TO BE FOLLOWED SHALL BE ASAPPROVED BY THE ENGINEERS. THE TENDON SHALL BE DRAPEDLONGITUDINAL IN HARP LAYOUT, ALL TENDONS SHALL BE PLACEDSO THAT THEIR CENTER OF GRAVITY WILL BE AT THE POSITIONSHOWN ON THE PLANS.

2. PRESTRESSING STEEL SHALL BE SEVEN WIRE UNCOATED STRESSRELIEVED STRANDS CONFORMING TO AASHTO M203 (ASTM A416)GRADE 270.

DIAMETER 12.70 mmAREA 98.7 sq. mmBREAKING LOAD 183.7 kNMODULUS OF ELASTICITY 200 GPaULTIMATE TENSILE STRENGTH (UTS) 1860 MPaYIELD STRENGTH @ 1% EXTENSION 1670 MPaJACKING FORCE 80% UTS

3. DESIGN PARAMETERS

FRICTION CURVATURE COEFFICIENT 0.25/RADFRICTION WOBBLE COEFFICIENT 0.0015RAD/M

4. NON-PRESTRESSING STEEL, FY = 414 MPa

5. CONCRETE STRENGTH FOR PSC GIRDER @ 28 DAYS,F'C = 41.38 MPa

6. CONCRETE STRENGTH FOR PSC GIRDER @ TRANSFERF'C = 41.38 MPa

7. SHEATHING OR DUCTS SHALL BE APPROVED BY THE ENGINEER.THEY SHALL BE STRONG ENOUGH TO WITHSTAND THE VIBRATIONOF THE CONCRETE WITHOUT SUFFERING ANY DAMAGES ORDEFORMATION AND SHALL BE MORTAR TIGHT.

8. END ANCHORAGE DEVICES:

8.1 ANCHORAGE DEVICES SHALL WITHSTANDS A FORCE OF NOTLESS THAN 95% OF THE SPECIFIED MINIMUM BREAKINGSTRENGTH OF THE TENDONS WITHOUT DAMAGE OR EXCESSIVE DEFORMATION OR DRAW IN.

8.2 NO DAMAGED ANCHORAGE DEVICE SHALL BE USED. ALLSTEEL PORTIONS SHALL BE PROTECTED FROM CORROSIONAT ALL TIMES

8.3 ALL TAPPED HOLES SHALL BE PROTECTED BY SUITABLEPLUGS UNTIL USED. THE ANCHORAGE DEVICES SHALL BEKEPT FREE FROM MORTAR, LOOSE RUST, GREASE, TAR,PAINT, OIL, MUD, OR ANY COATING.

9. GROUT ALL TENDONS IN SHEATHINGS AND THE RECESSES AT ENDANCHORAGES. THE CONTRACTOR SHALL SUBMIT METHODOLOGYAND SHOPDRAWING SHOWING THE GROUTING SYSTEMS FORDESIGNERS APPROVAL.

10. IN CASE WHERE REINFORCING BARS INTERFERE WITH POST TENSIONING DUCTS AND ANCHORAGES, REBAR ARRANGEMENTSHALL BE DONE WITH THE APPROVAL OF THE ENGINEER.

1. NATIONAL STRUCTURAL CODE OF THE PHILS. (NSCP 4TH

EDITION)

2. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE

(ACI-31B-95/99)

3. MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED

CONCRETE

STRUCTURES (ACI-315)

A. REFERENCES :

B. MATERIAL SPECIFICATIONS :

CONCRETETHE MINIMUM 28 DAYS CYLINDER COMPRESSIVE STRENGTH ONCONCRETE FOR PILES SHALL BE 27.6 MPA (4,000 Psi) WITH AMAXIMUM SIZE OF COARSE AGGREGATES OF 20MM

2. REINFORCING STEELALL REBARS SHALL BE DEFORMED BARS CONFORMING TO ASTMSPECIFICATION. REBAR GRADE IS INDICATED AS FOLLOWS:

* GRADE 60: MINIMUM, Fy = 413.70 MPA (60 Ksi) (FOR ALL VERTICALBARS, Ø 16 AND LARGER)* GRADE 40: MINIMUM, Fy = 276.00 MPA (40 Ksi) (FOR ALL OTHERS, Ø12 AND SMALLER)

C. STRUCTURAL NOTES :

1. ACTUAL LENGTH OF PILES ARE DESIGNED SUCH THAT THEBOTTOM WILL BE EMBEDDED AT LEAST THREE (3) PILEDIAMETER (BUT NOT LESS THAN 3.00 METERS) INTO THE HARD/ VERY DENSE STRATUM ENCOUNTERED AT THE SITE WHICHCAN DEVELOP THE SUFFICIENT BEARING CAPACITYREQUIRED BY THE ENGINEER.

2. MAXIMUM SETTLEMENT TOLERANCE = 25.00 MM (1 INCH)

3. RANDOM IN SITU TESTING OF BORED PILES SUCH AS TWOSTATIC LOAD TEST (USE REACTION LOAD AT LEAST 2 XDESIGN CAPACITY) OR DYNAMIC PILE TEST (DPT) ISRECOMMENDED TO CHECK THE ACTUAL CAPACITY OF THEBORED PILES.

4. THE CONTRACTOR MAY OFFER ALTERNATIVE FOUNDATIONSCHEME THAT WILL SUBJECTED TO THE ENGINEER'SAPPROVAL SHOULD IT PROVE TO BE EFFECTIVE AND MOREECONOMICAL.

5. THE CONTRACTOR SHOULD SUBMIT SHOP DRAWINGSSHOWING REBAR DETAILS AND SPLICES, CONSTRUCTIONPROCEDURE AND METHODOLOGY FOR THE STRUCTURALENGINEER'S APPROVAL PRIOR TO CONSTRUCTION.

6. PILE INTEGRITY TEST IS ALSO RECOMMENDED TO DETERMINETHE ACTUAL CONDITION OF PILE E.G., PRESENCE OFCAVITIES, NECKING, ETC..

DESIGN CRITERIA FOR BORED PILE

1 GENERAL NOTESSCALE NTS

2

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

JOSE LEINOR D. PASCO

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

GENERAL NOTES FOR STRUCTURES

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

Page 12: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

SHEET NO:

DRAWING INDEX, BILL OF QUANTITIES , VICINITY PLAN

SHEET CONTENT

1/12

GENERAL NOTES FOR STRUCTURES

RAILS, POST, SIDE WALK, WINGWALL DETAILS

2/12

3/12

4/12

5/12

TOPOGRAPHIC PLAN

6/12

PLAN AND DETAIL OF POST TENSIONED TYPE VI AASHTO GIRDER

7/12

BRIDGE PROFILE

BRIDGE PLAN, BRIDGE ELEV. (SECTION A-A), EXPANSION DAM DETAILS

8/12

FOUNDATION PLAN, SIDEWALK, APPROACH, DIAPHRAGM DETAIL

BAR CUTTING LIST

9/12

FIELD OFFICE

10/12

PROJECT BILLBOARD

11/12

12/12

BRIDGE ELEV. (SECTION B-B), SLAB, COPING, BORED PILE, STIFFENER, RISER DETAILS

1 INDEX

3 LOCATION PLANSCALE NTS

1

12

SHT NO.SET NO.APPROVED BY:RECOMMENDED BY:SUBMITTED BY:REVIEWED BY:

JOSE LEINOR D. PASCO

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-A

CAVITE I DISTRICT ENGINEERING OFFICETRECE MARTIREZ CITY ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ

ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE: DATE: DATE:

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE,IMUS, CAVITE

DRAWING INDEX, BILL OF QUANTITIES , VICINITYPLAN

SCALE NTS

DRAFTED & PREPARED BY:

ALLAN D. YUROENGINEER IIDATE:

SHEET CONTENT:PROJECT NAME AND LOCATION:

PROPOSED MULAWIN BR. 235m-BRIDGE

Page 13: DPWH STANDARD PROJECT BILLBOARD...ALLAN D. YURO ENGINEER II DATE: PROJECT NAME AND LOCATION: SHEET CONTENT: CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITE FLOOR PLAN 10MM

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-ACAVITE I DISTRICT ENGINEERING OFFICE

TRECE MARTIREZ CITY

C.Y. 2020DETAILED ENGINEERING DESIGN PLAN FOR

CONSTRUCTION OF BRIDGE AT ANABU 1G BRIDGE, IMUS, CAVITEIMUS CITY, CAVITE

STA. 0 + 000 - STA. 0 + 035

NET LENGTH = 35 m.

SUBMITTED BY: RECOMMENDED BY: APPROVED BY:

ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZCHIEF, PLANNING AND DESIGN SECTIONDATE:

ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEERDATE: DATE:


Recommended