DQM system status. F. Bellini for the DQM core DQM meeting, 04 th October 2012. Outline. Last DQM meeting 04 th September 2012: https:// indico.cern.ch / conferenceDisplay.py?confId = 203803 Minutes: - PowerPoint PPT Presentation
12
{ DQM system status F. Bellini for the DQM core DQM meeting, 04 th October 2012
Transcript
Page 1: DQM system status

{DQM system status

F. Bellini for the DQM coreDQM meeting, 04th October 2012

Page 2: DQM system status

2DQM status

Last DQM meeting 04th September 2012:https://indico.cern.ch/conferenceDisplay.py?confId=203803

Minutes:https://indico.cern.ch/getFile.py/access?resId=minutes&materialId=minutes&confId=203803

1. System status

2. Feedback from pA pilot run

3. Detectors software status

4. DQM shifts and training

5. On-call training

Outline

04/09/12

Page 3: DQM system status

3DQM status

Latest news from P2: No major problems with DQM framework System is running smoothly Software updated regularly (thanks Adriana and Barth) Occasional crashes of T00QA, frequent crashes of ZDC01

both under investigation by experts

Implementation of thresholds – status: All detectors have thresholds and automatic checks except

PMD QAchecker still to be implemented by PMD,

TRD*(presentation today)

Propagation of quality flags to GUI color box SSD, EMC, SPD need to check and debug propagation of

quality flags T0, MTR do not have the color box

Shifts and training see dedicated slide

System status

04/09/12

Page 4: DQM system status

4DQM status

Feedback from pA pilot run

04/09/12

Run 188359 of the 13/09/2012

Thanks to Mihai!

Page 5: DQM system status

5DQM status

Pilot pA run on 12-13/09 System run smoothly no new plots were implemented dedicated general GUI layout created for the long pA data

taking event size values recorded as reference for the long pA Screenshots taken during pA for each detector have been

sent to the DQM responsibles Available information to already set thresholds and prepare documentation before the long pA

Feedback from pA pilot run

04/09/12

What’s next all detectors have to:

• Make all the necessary changes to the software before the pA

• Add a chapter in the documentation with reference for the pA run + screenshot

Preparation for pA: DEADLINE 04/12/12

Page 6: DQM system status

Detector software status - overview

04/09/12 6DQM status

Implementation status, 03.10.12

ACO

EMCAL

FMD

HMPID

MCH

MTR

PHOS

PMD

SDD

SPD

SSD

T0

TOF

TPC

TRD

V0

ZDC

DAQ

HLT

Trigger

Agents issues

*QADataMakerRec

*QAChecker (flag)

Dup. by trg classes

* * H H H * * * *

Cloning request file

* * H H H * * * *

Thresholds config file

Thresholds (macro)

Thresholds QA

Savannah open 1 1 1 1Ok In progress Not done Does not apply Waiting for porting* = duplication required in the past, not used now H = splitting requested for A-A, p-A

Page 7: DQM system status

7DQM status

EOS report subsystem not selected on the EOS reports

subscribe to the [email protected] mailing list to receive EOS report

Crash logs are now attached to EOS reports Regular cleanups of “former issues” established Blackboard cleanup every Friday by DQM on-call

established

Training 5 general training sessions / 125 people attending Strict policy for DQM training and test has helped

better trained shifters Next shifters training not planned – there are no

more people to be trained that will have shifts before the end of the year

We need more on-call people please volunteer!!! We will have soon an on-call training

DQM shifts and training

04/09/12

Page 8: DQM system status

8DQM status

Shift booking Shifts booked till the end of the year IMPORTANT change of policy by RC: shifts cannot

be released anymore by user nor SRC: need to find a substitute if cannot attend

Shifts during pA Limited duration of pA run (24 days total) RC will open pA shifts for System Coordinators to

complete Request for very experienced, very best shifters

list of possible shifters for DQM ready the same from the offline side ?

Call to sub-systems for recommendations

DQM shifts booking and shifts during pA

04/09/12

Page 9: DQM system status

9DQM status

Doodle will be set to collect name of the participants preferences for the date

Expected duration 2h Room at CERN + EVO available

DQM on-call training

04/09/12

Detector DQM experts (and volunteers) are kindly invited to the

first DQM on-call trainingduring the last 2 weeks of october

Page 10: DQM system status

10DQM status

AOB

04/09/12

Page 11: DQM system status

11DQM status 04/09/12

https://twiki.cern.ch/twiki/bin/viewauth/AliceEVE/AliceDQM

Page 12: DQM system status

Status of DQM documentation

04/09/12 12DQM status

Status on 04/10/2012

ACO

DAQ

EMCAL

FMD

HMPID

MCH

MTR

PHOS

PMD

SDD

SPD

SSD

T0

TOF

TPC

TRD

V0

ZDC

VERTEX

HLT

Trigger

AMORE

Update TWiki

Updateblackboard

Test for DQM trainees

TECH run instructions X X X X X X X X X

Verify event specie

Verify data size

Provide GUI description

Ok Not ok Does not applyIn progress X = not monitored


Recommended