www.project-leilac.eu
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 654465
Dr Phil Hodgson
CEO & MD – Calix Limited
Low Emissions Intensity Lime and Cement
CaCO3
2
Limestone
~0.56 Tonne ~0.44 Tonne
Heat(~950 C)
CaO CO2
Lime
1 Tonne
+
Why does the cement industry emit so much CO2 ?
Raw Cement Meal(mainly limestone)
Dilute CO2
Cement ClinkerGas flow
Solids flow
CaCO3 CaO + CO2
Pre-Heater
Rotary Kiln(Clinkering)
Where does CO2 come from in a cement plant ?
4
CO2 Released
Calix has invented a new type of kiln…with Direct CO2 Separation
MgCO3
5
MagnesiteHeat
(~760 C)
MgO CO2
Magnesium Oxide
+
Calix’s business in Australia…
Waste Water Aquaculture Agriculture
“Low Emissions Intensity Lime and Cement” €21m Consortium – Commenced 2016
LEILAC Consortium External Advisory Board
6
€12m from
EU H2020
Raw Cement MealFlue Gas
Cement ClinkerGas flow
Solids flow
CaCO3 CaO + CO2
Pre-Heater
Rotary Kiln(Clinkering)
Where does LEILAC fit in a cement plant ?
Pure CO2
No theoretical energy penalty
Potential operational advantages – Lower Gas Flows
Potential operational advantages – Lower Maintenance
LEILAC Direct CO2 Separation Reactor Design…
CO2 Released
Product Accumulation
Nat Gas
10
CO2 ReleasedCO2 Released
Product Accumulation
Nat Gas
Spot the Difference !
Australia Magnesite
BelgiumLimestone &Cement meal
Refinement
HAZOP 4Refinement
HAZOP 3+/- 15%HAZOP 2
R&D Project vs Construction Project: risk management…
12
BOD Pre-FEED FEED Detailed Design / EPCm
“Standard Items”
“R&D Items”
One Option +/-
50%
+/- 30%HAZOP
Top Options
Top Options+/- 50%
+/- 15%HAZOP 2FREEZE
Top Option+/- 30%HAZOP
Pre-Construction Studies
Tube materials testing Flow modelling Kinetics modelling13
Building the Pilot…
14
Current project status…
✔
Pre-FEED and FEEDDetailed design and Pilot
construction
Operations and testing
Pre-FEED DecisionOct 2016
Final Investment
decisionJul 2017
Construction completeApr 2019
Verification completeDec 2020
Scale-Up Roadmap
2016 2017 2018 2019 2020
✔This first-of-a-kind plant has been built under budget and on schedule
✔
15
Measurements
Calcination level
Surface area
Output reactivity
CO2 quality & quantity
Retention time
Energy inputHeat
transfer efficiency
Tube corrosion
Insulation wear &
tear
Separation efficiency
Scaling
Creep
Operations and Testing Phase…
16
Results update…successes
17
18
Results update…challenges
MEASUREMENT
BLOCKAGES
LEILAC Technology – Scale-Up & The Future ?
19
20%+20%
Remaining 60%
10 years ?
10 years ?
New all-electric kiln…
Electric?
What is driving interest in CCUS in Europe?
www.project-leilac.eu Follow us on twitter: @ProjectLEILAC