+ All Categories
Home > Documents > Dr Phil Hodgson CEO & MD

Dr Phil Hodgson CEO & MD

Date post: 18-Dec-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
21
www.project-leilac.eu This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 654465 Dr Phil Hodgson CEO & MD Calix Limited Low Emissions Intensity Lime and Cement
Transcript
Page 1: Dr Phil Hodgson CEO & MD

www.project-leilac.eu

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 654465

Dr Phil Hodgson

CEO & MD – Calix Limited

Low Emissions Intensity Lime and Cement

Page 2: Dr Phil Hodgson CEO & MD

CaCO3

2

Limestone

~0.56 Tonne ~0.44 Tonne

Heat(~950 C)

CaO CO2

Lime

1 Tonne

+

Why does the cement industry emit so much CO2 ?

Page 3: Dr Phil Hodgson CEO & MD

Raw Cement Meal(mainly limestone)

Dilute CO2

Cement ClinkerGas flow

Solids flow

CaCO3 CaO + CO2

Pre-Heater

Rotary Kiln(Clinkering)

Where does CO2 come from in a cement plant ?

Page 4: Dr Phil Hodgson CEO & MD

4

CO2 Released

Calix has invented a new type of kiln…with Direct CO2 Separation

Page 5: Dr Phil Hodgson CEO & MD

MgCO3

5

MagnesiteHeat

(~760 C)

MgO CO2

Magnesium Oxide

+

Calix’s business in Australia…

Waste Water Aquaculture Agriculture

Page 6: Dr Phil Hodgson CEO & MD

“Low Emissions Intensity Lime and Cement” €21m Consortium – Commenced 2016

LEILAC Consortium External Advisory Board

6

€12m from

EU H2020

Page 7: Dr Phil Hodgson CEO & MD

Raw Cement MealFlue Gas

Cement ClinkerGas flow

Solids flow

CaCO3 CaO + CO2

Pre-Heater

Rotary Kiln(Clinkering)

Where does LEILAC fit in a cement plant ?

Pure CO2

No theoretical energy penalty

Page 8: Dr Phil Hodgson CEO & MD

Potential operational advantages – Lower Gas Flows

Page 9: Dr Phil Hodgson CEO & MD

Potential operational advantages – Lower Maintenance

Page 10: Dr Phil Hodgson CEO & MD

LEILAC Direct CO2 Separation Reactor Design…

CO2 Released

Product Accumulation

Nat Gas

10

Page 11: Dr Phil Hodgson CEO & MD

CO2 ReleasedCO2 Released

Product Accumulation

Nat Gas

Spot the Difference !

Australia Magnesite

BelgiumLimestone &Cement meal

Page 12: Dr Phil Hodgson CEO & MD

Refinement

HAZOP 4Refinement

HAZOP 3+/- 15%HAZOP 2

R&D Project vs Construction Project: risk management…

12

BOD Pre-FEED FEED Detailed Design / EPCm

“Standard Items”

“R&D Items”

One Option +/-

50%

+/- 30%HAZOP

Top Options

Top Options+/- 50%

+/- 15%HAZOP 2FREEZE

Top Option+/- 30%HAZOP

Page 13: Dr Phil Hodgson CEO & MD

Pre-Construction Studies

Tube materials testing Flow modelling Kinetics modelling13

Page 14: Dr Phil Hodgson CEO & MD

Building the Pilot…

14

Page 15: Dr Phil Hodgson CEO & MD

Current project status…

Pre-FEED and FEEDDetailed design and Pilot

construction

Operations and testing

Pre-FEED DecisionOct 2016

Final Investment

decisionJul 2017

Construction completeApr 2019

Verification completeDec 2020

Scale-Up Roadmap

2016 2017 2018 2019 2020

✔This first-of-a-kind plant has been built under budget and on schedule

15

Page 16: Dr Phil Hodgson CEO & MD

Measurements

Calcination level

Surface area

Output reactivity

CO2 quality & quantity

Retention time

Energy inputHeat

transfer efficiency

Tube corrosion

Insulation wear &

tear

Separation efficiency

Scaling

Creep

Operations and Testing Phase…

16

Page 17: Dr Phil Hodgson CEO & MD

Results update…successes

17

Page 18: Dr Phil Hodgson CEO & MD

18

Results update…challenges

MEASUREMENT

BLOCKAGES

Page 19: Dr Phil Hodgson CEO & MD

LEILAC Technology – Scale-Up & The Future ?

19

20%+20%

Remaining 60%

10 years ?

10 years ?

New all-electric kiln…

Electric?

Page 20: Dr Phil Hodgson CEO & MD

What is driving interest in CCUS in Europe?

Page 21: Dr Phil Hodgson CEO & MD

www.project-leilac.eu Follow us on twitter: @ProjectLEILAC

Follow LEILAC’s progress…

21


Recommended