Audio Instructions for Webcast: • Please follow the instructions located in your GoToWebinar control panel. • You may use the conference call number provided or use the “VoIP” system to listen to the webinar through your computer speakers. • Questions for speaker may be entered into the control panel during the presentation and will be answered during Q&A at end of the program. Managing the Information Labyrinth series: Project Innovation & Collaboration PROGRAM 4 OF 7 Speaker: Vincent Poon Director, BIM Operations, STV Inc.
Transcript
Page 1: DR15_0331_Managing the Information Labyrinth Final

Audio Instructions for Webcast:

• Please follow the instructions located in your GoToWebinar control panel.

• You may use the conference call number provided or use the “VoIP” system to listen to the webinar through your computer speakers.

• Questions for speaker may be entered into the control panel during the presentation and will be answered during Q&A at end of the program.

Managing the Information Labyrinth

series: Project Innovation & Collaboration PROGRAM 4 OF 7

Speaker:

Vincent Poon

Director, BIM Operations, STV Inc.

Page 2: DR15_0331_Managing the Information Labyrinth Final

2

Page 3: DR15_0331_Managing the Information Labyrinth Final

Learning Objectives

• The strengths, weaknesses, opportunities, and threats of BIM

implementation in the building design and construction industry.

• To identify current uses of BIM technologies in the architectural,

engineering, construction, and building management industry.

• To describe best practices for implementing BIM in an integrated

work culture or environment.

• To define the importance of integrating specification writing with

BIM workflow.

Managing the Information Labyrinth

series: Project Innovation & Collaboration PROGRAM 4 OF 7

Page 4: DR15_0331_Managing the Information Labyrinth Final

Founded in 1912 – celebrating 100 years of service

A/E/CM firm of 1750 employees

Over 30 U.S. offices

Multidisciplinary

Diverse service offerings

About STV

Page 5: DR15_0331_Managing the Information Labyrinth Final

3 Dimensional Structural design analysis since the 80’s

BIM456 Initiative: Leveraging BIM Technology for

Construction and Building Lifecycle Management

Zero to 6D Initiative: Leveraging BIM Technology to

Enable an Efficient and Reliable Integrated Project

Design and Delivery Process.

STV’s Commitment to BIM

Page 6: DR15_0331_Managing the Information Labyrinth Final

STV's BIM Commitment

Longfellow Bridge

Boston-Cambridge, MA

Iowa Women’s Correctional Facility

Mitchellville, IA

316,000 sf

SCA – Curtis High School New Addition

Staten Island, NY

Bronx Medical Health Redevelopment

Waters Place Bronx, NY 10461

170,000 sf

US Military Academy Barracks

West Point, NY

250,000 sf

US Military Academy Prep School

West Point, NY

250,000 sf

Page 7: DR15_0331_Managing the Information Labyrinth Final

WEAKNESSES

Fear of the Unknown

Academics of AECO BIM

Industry Perception

OPPORTUNITIES

Redefine AECO Practices

Improve AECO Education

Integrated Project Lifecycle

THREATS

Unrealistic BIM Expectations

Expanding Marketplace Demands

Lack of Commitment

STRENGTHS

Maturity of BIM Enabling Tools

Evolving Skills and Expertise

Evolving Technology

S W

O T

Page 8: DR15_0331_Managing the Information Labyrinth Final

Project Planning

Design and

Modeling

Clash Detection

Code Verification

QTO, Estimate

and CM

Integrated Specifications

FM/O Services

Zero to 6D Initiative

Page 9: DR15_0331_Managing the Information Labyrinth Final

Zero to 6D Initiative

Page 10: DR15_0331_Managing the Information Labyrinth Final

PROJECT PLANNING

AND DATA COLLECTIONFM/O SERVICESDESIGN MODELING CONSTRUCTION

BIM Execution Process Map

Page 11: DR15_0331_Managing the Information Labyrinth Final

Project Planning

Page 12: DR15_0331_Managing the Information Labyrinth Final

Assigning Disciplines and Responsibilities

Project Planning -

STV Model Information Matrix

Page 13: DR15_0331_Managing the Information Labyrinth Final

AIA E202 2008

AIA E203 2013

Model Element Table

Level of Development

Page 14: DR15_0331_Managing the Information Labyrinth Final

LOD 100: Conceptual Design

LOD 200: Design Development

LOD 300: Construction Document, Design Intent

LOD 400: Means and Methods, Fabrication

LOD 500: As Built

Level of Development (LOD)

Page 15: DR15_0331_Managing the Information Labyrinth Final

Preliminary Project Description

Project BIM Execution Plan

Project Planning -

STV Model Information Matrix

Page 16: DR15_0331_Managing the Information Labyrinth Final

BIM Enabled Specification

Page 17: DR15_0331_Managing the Information Labyrinth Final

Project Planning -

STV Model Information Matrix

Dimensions

System

Cost

Location

Supplier

Page 18: DR15_0331_Managing the Information Labyrinth Final

Model Validation –

Is the Information Modeled Correctly?

Page 19: DR15_0331_Managing the Information Labyrinth Final

Run Clash Detection Review Clashes

Collaborate Resolve Clashes

Model Validation –

Clash Detection and Conflict Resolution

Page 20: DR15_0331_Managing the Information Labyrinth Final

Rule Based QA-QC -

Code Verification

Page 21: DR15_0331_Managing the Information Labyrinth Final

Rule Based QA-QC -

Egress and Routing Verification

Page 22: DR15_0331_Managing the Information Labyrinth Final

Quantity Take-Off

Exterior Wall Take-Off Structural Bill of Material

Page 23: DR15_0331_Managing the Information Labyrinth Final

Cost Reporting and Design Scope Mgmt..

Page 24: DR15_0331_Managing the Information Labyrinth Final

4D/5D Simulation

Page 25: DR15_0331_Managing the Information Labyrinth Final

Progress Reporting

Page 26: DR15_0331_Managing the Information Labyrinth Final

Planned vs. Actual

Page 27: DR15_0331_Managing the Information Labyrinth Final

Space Management

Asset Management

Maintenance Management

Move Management

FM/O – IWMS, CAFM, CMMS

Page 28: DR15_0331_Managing the Information Labyrinth Final

FM/O – IWMS, CAFM, CMMS

28

Page 29: DR15_0331_Managing the Information Labyrinth Final

Project Planning

Design and

Modeling

Clash Detection

Code Verification

QTO, Estimate

and CM

Integrating Specifications

FM/O Services

Zero to 6D Initiative

Page 30: DR15_0331_Managing the Information Labyrinth Final

Question & Answer Instructions for Webcast:

• Questions for speaker may be entered into the Questions and Answers section of the Attendee Control Panel.

• Enter your question and click the Send button.

• The question will appear in the Question and Answer log. We will answer as many questions as possible.

Managing the Information Labyrinth