"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1). August 2, 2019 City County Fiscal Year Intially Proposed Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est Useful Life Senate District Assembly District Alameda Alameda 19/20 New Road Maintenance & Rehabilitation Pavement Management This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurfacing and repair of street pavement and restoration of flowlines of associated curb and gutter in order to (A) extend the life of the street and (B) improve its ridability for cyclists and motorists. Broadway. Shore Line Dr to Otis Dr.; Broadway. Buena Vista Ave to Blanding Ave.; Grand St. Buena Vista Ave to Fortmann Way. Park St. Santa Clara Ave to Buena Vista Ave.; San Antonio Ave. Chestnut St to Park St. Construction 06/2019 11/2019 20-30 9 18 Albany Alameda 19/20 New Road Maintenance & Rehabilitation Washington Avenue Pavement Restoration Project This project will include: Paving and/or Striping Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing) Washington Avenue between San Pablo Avenue and Key Route Blvd in Albany Construction 10/2019 05/2020 10-20 9 15 Berkeley Alameda 17/18 In-Progress Road Maintenance & Rehabilitation FY 2018 Street Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | FY 2018 Street Rehabilitation Project to reconstruct up to 0.81 miles of Berkeley Streets is continuing from its FY 2019 submission due to construction timing. Segments planned for pavement reconstruction funded from SB1 include: 0.68 miles of pavement along Panoramic Way; including replacement of storm drains, retaining walls and sidewalk. Reconstruction of 0.13 miles of pavement along Prospect Street; including replacement of sidewalk and installation of curb ramps and crosswalks. Panoramic Way, from Canyon Road to the east City limit (entire street); Prospect Street, from UC Berkeley Campus to Hillside Avenue Construction 04/2019 10/2019 20-30 9 15 Berkeley Alameda 19/20 Carried Over Road Maintenance & Rehabilitation FY 2019 Street Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | FY 2019 Street Rehabilitation Project to overlay and reconstruct up to 1.01 miles of Berkeley streets. 6th Street from Allston Way to Dwight Way; Catalina Avenue from Colusa Avenue to The Alameda; Derby Street from San Pablo Avenue to Mabel Street; Dwight Crescent from 6th Street to 7th Street; Highland Place from Ridge Road to Hearst Avenue; Ridge Road from La Loma Avenue to Highland Place; Station Place from Catalina Avenue to the south end of Station Place Construction 05/2019 11/2019 10-30 9 15 Berkeley Alameda 19/20 In-Progress Complete Streets Components Shattuck Avenue Reconfiguration This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconfiguration of a three-block segment of Shattuck Avenue from Allston Way to University Avenue to improve pedestrian and bicycle safety, northbound circulation for motorists and transit vehicles, and the quality of public spaces in the Downtown core. Shattuck Avenue from Allston Way to University Avenue Construction 01/2019 09/2020 20-30 9 15 Berkeley Alameda 19/20 New Road Maintenance & Rehabilitation FY 2020 Street Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Cedar St. from 6th St. to San Pablo Ave.; Center St. from Martin Luther King Jr. Way to Milvia St.; Center St. from Milvia St. to Shattuck Ave.; Rose St. from Le Roy Ave. to La Loma Ave.; Santa Fe Ave. from Gilman St. to Cornell Ave./Page St.; Shasta Rd. from Grizzly Peak Blvd. to Park Gate.; Shasta Rd. from Park Gate to east City limit (Golf Course).; Spinnaker Way from Breakwater Dr. to Marina Blvd.; Construction 05/2020 11/2020 10-20 9 15 Dublin Alameda 19/20 New Road Maintenance & Rehabilitation Annual Street Resurfacing Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Village Parkway from Kimball Avenue to Amador Valley Blvd; Amador Valley Blvd. westbound from Stagecoach Road to Dougherty Road; Village Parkway and Clark Avenue south of Dublin Blvd; Residential streets bound by Kimball Avenue and Brighton Drive to the north, Amador Valley Blvd. to the south, Village Parkway to the east, and San Ramon Road to the west; Residential streets bound by Fenwick Way to the north, W. Vomac Road to the south, San Ramon Road to the east, and Bloomington Way to the west. Construction 06/2019 09/2019 7-10 7 16 Dublin Alameda 17/18 In-Progress Safety Iron Horse Trail Bridge at Dublin Boulevard This project will include: Environmental Study/Documents, Preliminary Design | Design and Environmental review of the Iron Horse Trail bike and ped Bridge Crossing at Dublin Blvd. | RMRA funding ($200,000) for this project was added mid-year through a budget change, which reduced RMRA funding from $300,000 to $100,000 for another project, Tassajara Road Realignment & Widening (ST0116). On Iron Horse Trail crossing at Dublin Blvd intersection with Scarlet Drive Pre-Construction 06/2017 04/2020 30-50 7 16 Dublin Alameda 19/20 In-Progress Other Dublin Boulevard Extension This project will include: Cost Estimating, Feasibility Study, Environmental Study/Documents, Preliminary Design, Right of Way, Project Scope Development | Design of a 1.5-mile extension of Dublin Boulevard from Fallon Road to North Canyons Parkway in Livermore. This is a new proposed project for FY 18/19 report. Between Fallon Road in the City of Dublin and North Canyons Parkway in City of Livermore Pre-Construction 06/2018 09/2021 30-50 7 16 **The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.
Transcript
Page 1: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Alameda Alameda 19/20 New Road Maintenance & Rehabilitation Pavement Management

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurfacing and repair of street pavement and restoration of flowlines of associated curb and gutter in order to (A) extend the life of the street and (B) improve its ridability for cyclists and motorists.

Broadway. Shore Line Dr to Otis Dr.; Broadway. Buena Vista Ave to Blanding Ave.; Grand St. Buena Vista Ave to Fortmann Way. Park St. Santa Clara Ave to Buena Vista Ave.; San Antonio Ave. Chestnut St to Park St.

Construction 06/2019 11/2019 20-30 9 18

Albany Alameda 19/20 New Road Maintenance & Rehabilitation

Washington Avenue Pavement Restoration Project

This project will include: Paving and/or Striping Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing)

Washington Avenue between San Pablo Avenue and Key Route Blvd in Albany Construction 10/2019 05/2020 10-20 9 15

Berkeley Alameda 17/18 In-Progress Road Maintenance & Rehabilitation FY 2018 Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | FY 2018 Street Rehabilitation Project to reconstruct up to 0.81 miles of Berkeley Streets is continuing from its FY 2019 submission due to construction timing. Segments planned for pavement reconstruction funded from SB1 include: 0.68 miles of pavement along Panoramic Way; including replacement of storm drains, retaining walls and sidewalk. Reconstruction of 0.13 miles of pavement along Prospect Street; including replacement of sidewalk and installation of curb ramps and crosswalks.

Panoramic Way, from Canyon Road to the east City limit (entire street); Prospect Street, from UC Berkeley Campus to Hillside Avenue Construction 04/2019 10/2019 20-30 9 15

Berkeley Alameda 19/20 Carried Over Road Maintenance & Rehabilitation FY 2019 Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | FY 2019 Street Rehabilitation Project to overlay and reconstruct up to 1.01 miles of Berkeley streets.

6th Street from Allston Way to Dwight Way; Catalina Avenue from Colusa Avenue to The Alameda; Derby Street from San Pablo Avenue to Mabel Street; Dwight Crescent from 6th Street to 7th Street; Highland Place from Ridge Road to Hearst Avenue; Ridge Road from La Loma Avenue to Highland Place; Station Place from Catalina Avenue to the south end of Station Place

Construction 05/2019 11/2019 10-30 9 15

Berkeley Alameda 19/20 In-Progress Complete Streets Components Shattuck Avenue Reconfiguration

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconfiguration of a three-block segment of Shattuck Avenue from Allston Way to University Avenue to improve pedestrian and bicycle safety, northbound circulation for motorists and transit vehicles, and the quality of public spaces in the Downtown core.

Shattuck Avenue from Allston Way to University Avenue Construction 01/2019 09/2020 20-30 9 15

Berkeley Alameda 19/20 New Road Maintenance & Rehabilitation FY 2020 Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Cedar St. from 6th St. to San Pablo Ave.; Center St. from Martin Luther King Jr. Way to Milvia St.; Center St. from Milvia St. to Shattuck Ave.; Rose St. from Le Roy Ave. to La Loma Ave.; Santa Fe Ave. from Gilman St. to Cornell Ave./Page St.; Shasta Rd. from Grizzly Peak Blvd. to Park Gate.; Shasta Rd. from Park Gate to east City limit (Golf Course).; Spinnaker Way from Breakwater Dr. to Marina Blvd.;

Construction 05/2020 11/2020 10-20 9 15

Dublin Alameda 19/20 New Road Maintenance & Rehabilitation Annual Street Resurfacing Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety)

Village Parkway from Kimball Avenue to Amador Valley Blvd; Amador Valley Blvd. westbound from Stagecoach Road to Dougherty Road; Village Parkway and Clark Avenue south of Dublin Blvd; Residential streets bound by Kimball Avenue and Brighton Drive to the north, Amador Valley Blvd. to the south, Village Parkway to the east, and San Ramon Road to the west; Residential streets bound by Fenwick Way to the north, W. Vomac Road to the south, San Ramon Road to the east, and Bloomington Way to the west.

Construction 06/2019 09/2019 7-10 7 16

Dublin Alameda 17/18 In-Progress Safety Iron Horse Trail Bridge at Dublin Boulevard

This project will include: Environmental Study/Documents, Preliminary Design | Design and Environmental review of the Iron Horse Trail bike and ped Bridge Crossing at Dublin Blvd. | RMRA funding ($200,000) for this project was added mid-year through a budget change, which reduced RMRA funding from $300,000 to $100,000 for another project, Tassajara Road Realignment & Widening (ST0116).

On Iron Horse Trail crossing at Dublin Blvd intersection with Scarlet Drive Pre-Construction 06/2017 04/2020 30-50 7 16

Dublin Alameda 19/20 In-Progress Other Dublin Boulevard Extension

This project will include: Cost Estimating, Feasibility Study, Environmental Study/Documents, Preliminary Design, Right of Way, Project Scope Development | Design of a 1.5-mile extension of Dublin Boulevard from Fallon Road to North Canyons Parkway in Livermore.

This is a new proposed project for FY 18/19 report.

Between Fallon Road in the City of Dublin and North Canyons Parkway in City of Livermore Pre-Construction 06/2018 09/2021 30-50 7 16

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 2: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Dublin Alameda 19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Construction of Dublin Boulevard from Sierra Court to Dublin Court.

This is a new proposed project for FY 18/19 report.

Between Sierra Court and Dublin Court on Dublin Blvd. Construction 09/2018 07/2019 30-50 7 16

Dublin Alameda 19/20 New Traffic Control Devices Citywide Signal Communications Upgrade

This project will include: Preliminary Design | Upgrade of the traffic signal communication system and replace existing copper communication cables with fiber optic cables.

Along Dublin Blvd. from the Civic Plaza/Sierra Court intersection to the San Ramon Road intersection.

Pre-Construction & Construction

07/2019 04/2020

02/2020 08/2021 10-20 7 16

Dublin Alameda 17/18 In-Progress Other Tassajara Road Realignment & Widening

This project will include: Environmental Study/Documents, Preliminary Design, Right of Way | Planning, right of way and environmental study, and design of Tassajara Road from North Dublin Ranch Drive to the City and Contra Costa County limit.

Funds from FY 19/20 will be used towards this project.

Tassajara Road between North Dublin Ranch Drive and the City and Contra Costa County limit. Pre-Construction 04/2017 10/2020 30-50 1 1

Emeryville Alameda 19/20 New Road Maintenance & Rehabilitation

2020 Annual Street Rehabilitation and Preventive Maintenance Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

37th St(San Pablo Ave-City Limits); 47th St(Doyle St-San Pablo Ave); 53rd St(Hollis-San Pablo Ave); 59th St(Horton St-Peladeau St); 62nd St(Overland Ave-Vallejo St); 63rd St(Overland Ave-Vallejo St); Doyle St(Ocean Ave-Powell St); Halleck St(Sherwin Ave-City Limits); Horton St(59th St-Stanford Ave); Horton St(59th St-62nd St); Overland Ave(62nd St-65th St); Peladeau St(59th St-Powell St); Vallejo St(Peabody Lane-Ocean Ave); Yerba Buena Ave(Adeline St-City Limits);

Construction 04/2020 07/2020 5-20 9 15

Emeryville Alameda 17/18 Carried Over Safety San Pablo Mid-Block Cross Walk

This project will include: Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New) | The work will include new construction of ADA pedestrian ramps, large pedestrian refuge area in the median, and highly-visible pedestrian/vehicular traffic control devices | The San Pablo Avenue Mid-Block Crosswalk Project is currently under design using local funding sources. It is expected that the City will put the project out to bid in early 2019 and construct in Spring 2019.

San Pablo Avenue between 40th Street and Adeline Street Construction 09/2019 12/2019 10-20 36 76

Fremont Alameda 19/20 New Road Maintenance & Rehabilitation 2019 Pavement Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Fremont Blvd Boxstead Cm-Beard Rd; Deep Creek Rd North of Ariel Rd-Falstaff Rd; Cabrillo Dr Gibraltar Dr-Nicolet Ave; Farwell Dr Mowry Ave-Selma Ave; Mission View Dr Fremont Blvd-Paseo Padre Pkwy; Grimmer Blvd Davis St-Fremont Blvd; Carol Ave Grimmer Blvd-Chapel Way; Las Palmas Ave Lemos Ln-Seville Pl; Olive Ave Washington Blvd-Paseo Padre Pkwy; Mission Blvd Paseo Padre Pkwy-Antelope Dr; Warm Springs Blvd Lippert Ave-Hackamore Ln & Scott Creek Rd-Mayten Way; Palm Ave Wisteria Dr. to Vernal Ave

Construction 07/2019 12/2019 10-15 8 23

Hayward Alameda 19/20 New Road Maintenance & Rehabilitation

FY20 Pavement Rehabilitation & Maintenance Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Within the limits of Hesperian Boulevard, Jackson Street/SR-92, Mission Boulevard/SR-238, & the City limits. Construction 04/2020 09/2020 10-15 2 2

Livermore Alameda 19/20 New Road Maintenance & Rehabilitation 2020 Street Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Curb and Gutter Repair Adjust Utility Boxes to Finished Grade

Project locations are estimates not yet final. The following list of preliminary street locations are subject to change and will be selected based on priority need and resources. South Vasco Road (Naylor Avenue to Preston Road) North Greenville Road (580 Overpass to Southfront Road) South S Street (Holmes Street to First Street) Pine Street (North P Street to North O Street) Bluebell Drive (Sunflower Court to Springtown Boulevard) Aaron Street (Holmes Street to South S Street)

Construction 07/2020 12/2020 20-30 7 16

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 3: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Livermore Alameda 19/20 New Road Maintenance & Rehabilitation 2020 Slurry Seal

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Adjust Utility Box to Finished Grade

All preliminary street locations are subject to change and will be selected based on priority need and resources throughout the year. First Street (South L Street to South Livermore Avenue) Holmes Street (Lexington Way to Alden Avenue) Railroad Avenue (South Livermore Avenue to First Street) East Avenue (North Mines Road to Mitra Street) Arroyo Road (Sydney Avenue to Cabernet Way)

Construction 07/2020 12/2020 7-10 12 21

Newark Alameda 19/20 New Complete Streets Components

Lindsay Tract Street and Storm Drain Improvements

This project will include: Cost Estimating, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Preparation, Feasibility Study, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Storm Drain/Culvert Installation (New)

George Avenue west of Cherry Street Mulberry Street north of Dairy Avenue Olive Street north of Dairy Avenue Magnolia Street between Dairy Avenue and Sycamore Street

Pre-Construction & Construction

09/2019 03/2021

02/2021 12/2021 20-30 12 21

Oakland Alameda 19/20 New Road Maintenance & Rehabilitation Local Street Maintenance

This project will include: Pavement Rehab/Repair (Existing), Roundabout Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Other checked to explain that City's maintenance staff perform the following activities with RMRA funding: filling potholes, performing major and minor base repair, crack sealing, sidewalk repairs, curb and gutter repairs, and cross culvert repairs. Citywide, according to a prioritized comprehensive maintenance program. Oakland maintains a work management system that inventories,catalogues and geolocates assets; assets are placed on a cyclical maintenance program.

West Oakland, Eastlake/San Antonio, Fruitvale and Elmhurst/East Oakland. Locations listed are estimates and subject to change. Additional factors for prioritizations include locations near schools, community facilities and transit, as well as locations in "communities of concern".

Construction 07/2019 06/2020 5-20 7 11

Piedmont Alameda 19/20 New Road Maintenance & Rehabilitation

Oakland Avenue Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Oakland Avenue between Grand Avenue and the westerly City Limits Construction 06/2020 08/2020 20-30 9 15

Pleasanton Alameda 19/20 New Road Maintenance & Rehabilitation

Annual Resurfacing and Reconstruction of Various Streets

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

The project will resurface 1,225,000 square feet of various streets throughout the City during the summer of 2020, including: Santa Rita Road – from Old Santa Rita to West Las Positas; Andrews Drive; Apache Drive and related courts; Mohr Avenue, from Santa Rita Road to Nursery Drive; First Street/Stanley Boulevard, from Vineyard Avenue to California Avenue; the Jensen Tract, including Alvarado Street, Graham Street, School Street, Jensen Street and Kolln Street; Downtown streets, including St. M

Construction 07/2020 12/2020 10-15 2 2

San Leandro Alameda 19/20 Carried Over Road Maintenance & Rehabilitation Sylvia Way This project will include: Pavement Rehab/Repair (Existing) | Crack seal surface from end to

end. Sylvia Way between Diletta Ave. to Sidney Ave. Construction 07/2019 11/2019 4-5 9 18

San Leandro Alameda 19/20 Carried Over Road Maintenance & Rehabilitation Andover Street This project will include: Pavement Rehab/Repair (Existing) | Crack seal surface from end to

end. Andover Street between Lewelling Blvd. to Burkhart Ave. Construction 07/2019 04/2020 4-5 9 18

San Leandro Alameda 19/20 Carried Over Road Maintenance & Rehabilitation Duzmal Avenue This project will include: Pavement Rehab/Repair (Existing) | Crack seal surface from end to

end. Duzmal Avenue from Faris Street to cul-de-sac of Kramer Street Construction 08/2019 05/2020 4-5 9 18

San Leandro Alameda 19/20 Carried Over Road Maintenance & Rehabilitation Foothill Blvd. This project will include: Pavement Rehab/Repair (Existing) | Crack seal surface from end to

end. Foothill Blvd. between Durant Avenue to Macarthur Blvd. Construction 08/2019 06/2020 4-5 9 18

San Leandro Alameda 19/20 New Other Rent-to-Own Cold Milling Machine This project will include: Procurement of Public Works Equipment | Rent-to-Own cold milling machine for use by staff on in-house paving operations. Citywide Procurement /

Operational Needs 06/2019 06/2020 15-25 9 18

San Leandro Alameda 19/20 New Road Maintenance & Rehabilitation West Ave. 133rd This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Between Menlo Street to Doolittle Drive. Construction 07/2019 10/2019 10-20 9 18

San Leandro Alameda 19/20 New Road Maintenance & Rehabilitation West Ave. 134th This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Between Menlo Street to western terminus Construction 08/2019 11/2019 10-20 9 18

San Leandro Alameda 19/20 New Road Maintenance & Rehabilitation West Ave. 135th This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Between Doolittle Drive to Aurora Drive Construction 09/2019 11/2019 10-20 9 18

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 4: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Leandro Alameda 19/20 New Road Maintenance & Rehabilitation West Ave. 136th This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Between Aurora Drive and Menlo Street Construction 10/2019 05/2020 10-20 9 18

San Leandro Alameda 19/20 New Road Maintenance & Rehabilitation Thornton Street This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Between Alvarado Street to dead end @ guardrail Construction 11/2019 06/2020 10-20 17 35

Union City Alameda 19/20 New Road Maintenance & Rehabilitation

Arterial Pavement Rehabilitation Project

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Decoto Rd.; Union city Blvd.; Alvarado Blvd. Pre-Construction & Construction

06/2019 08/2019

06/2020 08/2020 10-10 10 20

Union City Alameda 19/20 Carried Over Road Maintenance & Rehabilitation Pavement Repair Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Road maintenance of 1) Decoto Road from Union Square to south City Limits (Fremont); 2) Alvarado-Niles Road from I-880 interchange to Fredi Street; 3) Union City Boulevard from north City Limit (Hayward) to Smith Street and 4)Tamarack Drive from Mission Boulevard to Ithaca Street 5) and various streets.

Decoto Road, Alvarado-Niles Road, Union City Boulevard, Tamarack Drive, and other various streets in Union City, CA. Construction 08/2019 08/2020 10-15 10 20

Union City Alameda 19/20 New Safety Sidewalk and Curb & Gutter Replacement Project

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

3rd Street, 4th Street, 5th Street, 6th Street, 14th Street, 15th Street, Alvarado Boulevard, Balmoral Street, Baylor Street, Claremont Street, Colgate Drive, Colusa Street, Faber Street, Farrol Avenue, Florence Drive, G Street, Hollyhock Street, Hop Ranch Road, Lilac Street, Myrtle Lane, Noah Drive, Palmetto Drive, Remora Drive, San Andreas Drive, San Carvante Way, Shield Drive, Spooner Court, Torrey Pines Lane, University Drive, Watkins Court.

Construction 08/2019 08/2020 25-30 10 20

Union City Alameda 19/20 New Traffic Control Devices Annual Streetlight and Traffic Signal Maintenance

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Radar speed feedback signs

Ahern Way, Alvarado Boulevard, Alvarado-Niles Road, Central Avenue, Decoto Road, Dyer Street, Mission Boulevard, Whipple Road, Union City Boulevard. 2)Collectors: 11th Steet, Almaden Boulevard, Amaral Place, Appian Way, Arizona Street, Cabello Street, Clover Street, Deborah Drive, Delores Drive, Fredi Street, H Street, Holyleaf Lane, Jean Drive. Locations are estimates and subject to change

Construction 08/2019 07/2020 10-20 10 20

Union City Alameda 19/20 New Traffic Control Devices Install Additional Streetlights; Traffic Signal System Upgrades; and Street Sign Replacement/Upgrades

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Additional streetlights.

Project locations are City-wide on arterial and collector roadway including: Alvarado-Niles Road, Decoto Road, Whipple Road, Alvarado Boulevard, Dyer Street, Union City Boulevard, Lowry Road, and Central Avenue.

Construction 08/2019 07/2020 10-20 10 20

Amador City Amador 19/20 New Road Maintenance & Rehabilitation

Striping, painting signage, and filling potholes on all Roadways

This project will include: Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Paving and/or Striping Rehab/Repair (Existing Safety) Downtown Main Street for two blocks Construction 11/2019 06/2020 10-20 5 8

Amador City Amador 19/20 New Safety Install Bollards to Protect Historic Structure This project will include: Cost Estimating Corner of West School Street and Cross Street, and along Cross Street Pre-Construction 11/2019 06/2020 20-50 5 8

Amador City Amador 17/18 Carried Over Road Maintenance & Rehabilitation Repainting Crosswalks and Curbs This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing) Downtown Main Street for two blocks Construction 11/2019 06/2020 10-20 8 5

Ione Amador 19/20 New Road Maintenance & Rehabilitation 2020 Pavement Restoration Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Fairway drive, between Castle Oaks & Shakeley (slurry); Foothill Blvd (slurry); Raymond Circle (slurry); Raymond Drive (slurry); Quail Court (slurry); Covey Court (slurry); E. Jackson St. (S. Ione to S. Church) - 2" mill/fill; E. Market St. (S. Ione to S. Church) - 2" mill/fill

Construction 06/2020 08/2020 20-30 37 68

Jackson Amador 17/18 Carried Over Road Maintenance & Rehabilitation

Pavement Resurfacing Project/Slope Stabilization

This project will include: This project is in Design and will be using RMRA funding in support of Construction which will include: Repaving portions of Hoffman Street, and Summit Street and stabilization of the slope below Mattley Street | To be combined with FY 18/19 Funds

Hoffman Street between Oak Avenue and Sierra View Drive. Summit Street between North Street and Water Street. Slope below Mattley Street at the 49er Parking Lot.

Pre-Construction 08/2019 06/2020 10-15 31 60

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 5: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Plymouth Amador 19/20 New Road Maintenance & Rehabilitation Pavement Markings Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Pavement markings Visibility improvements by restriping local roads at multiple locations within the City of Plymouth adding signage as needed. This will include pavement markings at loading zones, cross walks and appropriate curb markings and ADA parking areas.

Main Street, Mill Street, Sheridan St., and Empire St. Construction 07/2019 09/2019 5-10 8 5

Plymouth Amador 19/20 New Safety Gerrans Street Light Installation

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | Install Street Lights to improve visibility. It has been determined by staff and from citizen input that Gerrans Street is dark and increases the risk to pedestrians and motorist. We will install streetlight(s) as needed at this specific street.

Gerrans Street area in the City of Plymouth Construction 07/2019 09/2020 30-40 8 5

Sutter Creek Amador 19/20 New Road Maintenance & Rehabilitation

Striping of Old Highway 49 & Main Street This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Old Highway 49 at Sutter Hill down to Main Street Bridge and Main Street from

Eureka to Hanford Street Construction 06/2019 08/2019 8-10 16 34

Biggs Butte 19/20 New Road Maintenance & Rehabilitation Street Pavement (pot-hole) repaires This project will include: Pavement Rehab/Repair (Existing)

B Street from 1st-12th, 2nd Street from Trent to F, 4th Street from Bannock to H, 6th Street from Dakota to H, 8th Street from Bannock to G, 10th Street from Bannock to G. Pavement repair locations are subject to change as needed.

Construction 08/2019 08/2020 1-2 4 3

Biggs Butte 19/20 New Road Maintenance & Rehabilitation B Street This project will include: Slurry seal or Micro-surface pavement surface treatment & digout

repair B Street from 1st Street to 7th Street Construction 08/2019 08/2020 5-10 4 3

Biggs Butte 19/20 New Road Maintenance & Rehabilitation 6th Street This project will include: Pavement Rehab/Repair (Existing) | Slurry seal or Micro-surface

pavement surface treatment & digout repairs 6th Street from B street south to Hamilton Slough Construction 08/2020 08/2021 5-10 4 3

Biggs Butte 19/20 Carried Over Road Maintenance & Rehabilitation C Street This project will include: Pavement Rehab/Repair (Existing) | 2" grind and overlay with Road

Fabric. About 2191 square yards in Area. From 2nd street to 4th street. Includes 3rd street intersection. Construction 08/2020 08/2021 5-10 4 3

Biggs Butte 19/20 Forecasted Road Maintenance & Rehabilitation C Street & H Street This project will include: Pavement Rehab/Repair (Existing) | 2" grind and overlay with Road

Fabric. About 2463 square yards in Area. From 4th street to 7th street. Includes 5th and 6h street intersections. Construction 08/2021 08/2022 5-10 4 3

Biggs Butte 19/20 Forecasted Road Maintenance & Rehabilitation 6th Street & 10th Street This project will include: Pavement Rehab/Repair (Existing) | 2" grind and overlay with Road

Fabric. From Hamiltion Slough to Chatfield. From B street to Bannock. Construction 08/2022 08/2023 5-10 4 3

Biggs Butte 19/20 Forecasted Road Maintenance & Rehabilitation 3rd & 7th Street This project will include: Pavement Rehab/Repair (Existing) | 2" grind and overlay with Road

Fabric. From H to C street. From Trent to F Street. Construction 08/2023 08/2024 5-10 4 3

Biggs Butte 19/20 Forecasted Road Maintenance & Rehabilitation 2nd Street & D Street This project will include: Pavement Rehab/Repair (Existing) | 2" grind and overlay with Road

Fabric. From B to F street. From 2nd to 7th street. Construction 08/2024 08/2025 5-10 4 3

Chico Butte 19/20 New Road Maintenance & Rehabilitation

Street Improvements and Maintenance (2020) Esplanade from East Ave to Eaton Road

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Project Scope Development

On Esplanade, from East Ave to Eaton Road (1.35 miles) Pre-Construction & Construction

08/2019 04/2020

12/2019 06/2020 15-20 4 3

Gridley Butte 17/18 Carried Over Road Maintenance & Rehabilitation Nevada Street Rehab This project will include: Pavement Rehab/Repair (Existing) | Repair structural failures and

Grind and Overlay, 400 L.F. full Width. Cedar Street to Laurel Street Construction 08/2019 08/2020 5-10 4 3

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 6: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Gridley Butte 17/18 Carried Over Road Maintenance & Rehabilitation Peach Street Rehab This project will include: Pavement Rehab/Repair (Existing) | Repair structural failures and

Grind and Overlay, 330 L.F. full Width. Indiana Street to Vermont Street Construction 08/2020 08/2021 5-10 4 3

Gridley Butte 19/20 New Road Maintenance & Rehabilitation Spruce Street Phase 2 Rehab This project will include: Pavement Rehab/Repair (Existing) | Repair structural failures and

Grind and Overlay,full Width. Washington -Hwy 99-Fairview Construction 08/2019 08/2020 5-10 4 3

Gridley Butte 17/18 Carried Over Road Maintenance & Rehabilitation Bridgeford Street Rehab This project will include: Pavement Rehab/Repair (Existing) | Repair structural failures and

Grind and Overlay, 427 L.F. full Width. Ohio Street to Virginia Street Construction 08/2020 08/2021 5-10 4 3

Gridley Butte 17/18 Carried Over Road Maintenance & Rehabilitation Ohio Street Rehab This project will include: Pavement Rehab/Repair (Existing) | Repair structural failures and

Grind and Overlay, 800 L.F. full Width. Spruce Street to Sycamore Street Construction 08/2021 08/2022 5-10 4 3

Gridley Butte 17/18 Carried Over Road Maintenance & Rehabilitation Kentucky Street Rehab This project will include: Pavement Rehab/Repair (Existing) | Repair structural failures and

Grind and Overlay, 800 L.F. full Width. Spruce Street to Sycamore Street Construction 08/2021 08/2022 5-10 17 35

Oroville Butte 19/20 Carried Over Road Maintenance & Rehabilitation Myers St This project will include: Pavement Rehab/Repair (Existing) | Grind and Overlay Corto St - Mesa Ave Construction 08/2019 08/2020 5-10 4 3

Oroville Butte 19/20 New Road Maintenance & Rehabilitation Mesa Ave This project will include: Pavement Rehab/Repair (Existing) Myers St - El Noble Ave Construction 08/2019 08/2020 5-10 4 3

Oroville Butte 19/20 New Road Maintenance & Rehabilitation Kitrick Ave This project will include: Pavement Rehab/Repair (Existing) Huntoon St - Meyers St Construction 08/2019 08/2020 10-20 4 3

Oroville Butte 19/20 Carried Over Road Maintenance & Rehabilitation ORO BANGOR HWY This project will include: Pavement Rehab/Repair (Existing) | Slurry Seal LINCOLN Blvd TO BURLINGTON AVE Construction 08/2019 08/2020 5-10 4 3

Oroville Butte 19/20 Carried Over Road Maintenance & Rehabilitation Nelson Ave This project will include: Pavement Rehab/Repair (Existing) | Grind and Overlay Course Gold Rd to 4TH St Construction 08/2019 08/2020 5-10 4 3

Oroville Butte 19/20 Carried Over Road Maintenance & Rehabilitation GREENVILLE ST This project will include: Pavement Rehab/Repair (Existing) | Slurry Seal LINCOLN BLVD TO BURLINGTON AVE Construction 08/2019 08/2020 5-10 19 44

Paradise Butte 17/18 Carried Over Complete Streets Components Paradise Gap Closure Complex

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | Project exemplifies the meaning of 'complete streets' effort as work will include road rehabilitation, installation of new sidewalks, bike lanes, bike paths, lighting, and drainage.

Almond Street (Pearson to Elliott); Birch Street (Skyway to Black Olive); Fir Street (Skyway to Black Olive); Elliott Road (Skyway to Almond); Black Olive (Pearson to Fir); Foster Road (Pearson to Birch);

Construction 05/2020 09/2021 10-50 4 3

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 7: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Paradise Butte 19/20 New Road Maintenance & Rehabilitation

Town Transportation Related Infrastructure Repair and Rehabilitation

This project will include: Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Systems/Databases, Procurement of Public Works Safety Materials and Gear | Due to the Camp Fire, the fiscal year 2019-20 revenues from SB 1 are proposed to be used for ongoing maintenance of public roadways with majority of funds to be held indefinitely due to the uncertain future of the Town’s transportation network. The recommended strategy for the Town is to hold all transportation funding revenues until the Town’s repair efforts can be properly planned.

Throughout Town Procurement / Operational Needs 07/2019 06/2020 5-20 33 63

Angels Camp Calaveras 19/20 New Road Maintenance & Rehabilitation

Gardner Lane Pavement Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Gardner Lane - Murphy's Grade to Easy Street Construction 04/2020 05/2020 10-15 8 5

Colusa Colusa 19/20 Carried Over Road Maintenance & Rehabilitation 5th Street Reconstruction

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Grind existing asphalt, install geo fab, repave with 4 inch new asphalt concrete.

Levee Rd - Market; Oak - Webster; Lafayette - South City Limits Construction 06/2020 08/2020 20-30 4 3

Colusa Colusa 19/20 Carried Over Road Maintenance & Rehabilitation 3rd Street Reconstruction

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Grind existing asphalt, install geo fab, repave with 4 inch new asphalt concrete.

Jay Street - Webster Construction 04/2020 06/2020 20-30 4 3

Colusa Colusa 19/20 Carried Over Road Maintenance & Rehabilitation Alley Ways (Various)

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | Segmented reconstruction of several alley ways by grinding existing asphalt, installing geo fab, repaving with 4 inch new asphalt concrete.

Carson and Sioc; 7th - 5th, 10th - 9th.; Fremont and Carson; 13th - 12th; Market and Jay; 12th - 10th Construction 08/2019 09/2019 20-30 4 3

Colusa Colusa 19/20 Carried Over Road Maintenance & Rehabilitation City Wide Cape Seal

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Cape Seal/Chip Seal (based on need and location) overlay with micro-paving.

Clay Street Between 12th - 11th; Main Street Between 8th - 6th; Fremont Street Between 5th - 3rd; 10th - 9th, and B st. - Bridge St. ; 11th Street Between Oak and Parkhill; Lafayette Street Between 7th - 6th.

Construction 09/2019 10/2019 5-10 4 3

Williams Colusa 19/20 New Other Engineering Support This project will include: Procurement of Road Maintenance and Rehab Materials | Engineering support expenditure - SB1 reporting and pavement rehabilitation project support Various City street Location Procurement /

Operational Needs 08/2019 08/2020 1-5 4 3

Williams Colusa 19/20 New Road Maintenance & Rehabilitation 2019 Pavement Repair Project This project will include: Pavement Rehab/Repair (Existing) Vann Street (north of E Street) and Vada Court Construction 08/2019 08/2020 5-10 4 4

Williams Colusa 19/20 Carried Over Road Maintenance & Rehabilitation

Husted Rd South Pavement Rehab Project (17/18 carryover)

This project will include: Pavement Rehab/Repair (Existing) | Husted Road (South) Pavement Repair & Overlay Husted Road (South) from I-5 to Abel Road Construction 08/2020 08/2021 7-10 4 4

Williams Colusa 19/20 Carried Over Road Maintenance & Rehabilitation 7th Street Rehab Project This project will include: Pavement Rehab/Repair (Existing) | Pavement Repair & Overlay 7th Street/ Frontage Road from Theater Road to Husted Road Construction 08/2021 08/2022 7-10 4 4

Williams Colusa 19/20 Forecasted Road Maintenance & Rehabilitation

Husted Rd North Pavement Rehab Project This project will include: Pavement Rehab/Repair (Existing) | Pavement Repair & Overlay Husted Road (North), from E street to State Route 20 Construction 08/2022 08/2023 7-10 4 4

Williams Colusa 19/20 Forecasted Road Maintenance & Rehabilitation E Street Rehab Project This project will include: Pavement Rehab/Repair (Existing) | Pavement Repair & Overlay E street from Husted Road to 6th Street Construction 08/2023 08/2024 7-10 2 2

Antioch Contra Costa 17/18 Carried Over Road Maintenance & Rehabilitation

Pavement Surface Treatment Program This project will include: Pavement Improvement (New)

William Reed Dr, Cataline Ave, Brisdale Pl, Stillwell Circle, Madill Circle, W. Madill St, Hawthorne Ave, Campbell Ave, Creed Ave, Newbury Ave, John Gildi Ave, Russell Dr, Lawrence Ave, Lawton St, Texas St, Gem Lane, F St - Texas to Drake, D St - SPRR to Drake, Lindburg St , Rossi Ave, E Madill St, Madill Ct, Bryan Ave, McGinley Ave, Diablo Ave, Beasley Ave, Coventry Ct, Sunset Dr, Drake St

Construction 10/2019 04/2020 10-15 7 11

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 8: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Antioch Contra Costa 19/20 Carried Over Road Maintenance & Rehabilitation 2019 Ruberized Cape Seal Project This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) |

Leveling Course (where needed) and rubberized cape seal

Various locations: Acorn Rd, Milner Rd, Matssqui Rd, Longview Ct, Kalama Rd, Langley Ct, Chrisse Ct, Nanimo Ct, Shasta Ct, Fairside Way, Primrose Ct, Morning Vale Ct, Pembroke Ct, Sandrose Ct, Wightman Ct, Washington Way, Jefferson Way, Garfield Pl, Baker Ct, Lemontree Ct, Hudson Ct, Potomac Ct, Leggett St, Medanos St, Cook St, Macauley St, Klengel St, Diamond St, H St, W. 11th, W. 12th St, W. 13th St, F St, W. 15th St, along with 27 additional locations

Construction 06/2019 10/2019 10-15 7 11

Antioch Contra Costa 19/20 New Road Maintenance & Rehabilitation

Roadway Pavement Rehabilitation at Various Locations

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Right of Way Hillcrest Ave, Buchanan Road, James Donlon Blvd, Gentrytown Drive Pre-Construction 05/2019 04/2020 15-30 7 11

Antioch Contra Costa 19/20 New Road Maintenance & Rehabilitation

Roadway Pavement Rehabilitation at Various Locations

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Hillcrest Ave, Buchanan Road, James Donlon Blvd, Gentrytown Drive Construction 04/2020 12/2020 15-30 7 11

Brentwood Contra Costa 19/20 New Road Maintenance & Rehabilitation

Pavement Management Program - 2020

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development

This is an annual Pavement Management Project. The list of streets throughout the Downtown and surrounding areas is currently being developed.

Pre-Construction & Construction

12/2019 05/2020

03/2020 08/2020 7-15 7 11

Clayton Contra Costa 19/20 Forecasted Road Maintenance & Rehabilitation

Pine Hollow Road Improvement Project

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Active Transportation Plan, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Street rehabilitation and complete streets components for Pine Hollow Road between Mt Zion/Tiffin Drives and the Western City Limit line opposite from Quiet Circle.

Pine Hollow Road, Clayton, CA Pre-Construction & Construction

05/2019 04/2020

10/2019 12/2020 7-50 11 14

Concord Contra Costa 19/20 New Road Maintenance & Rehabilitation

Citywide Pothole and Base Repair Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Ygnacio Valley Road from the City Limit (at Walnut Creek) to Alberta Way. Construction 07/2019 12/2019 5-7 7 14

Concord Contra Costa 19/20 New Road Maintenance & Rehabilitation

Citywide Arterial & Collector Maintenance Project

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Bonifacio Street from Concord Avenue to Port Chicago Highway David Avenue from Helix Drive to Oak Grove Road Laguna Street from Detroit Avenue to Galindo Street Minert Road from Weaver Lane to Oak Grove Road North Sixth Street from Esperanza Drive toWillow Pass Road Grant Street from Solano Way to East Olivera Road Landana Drive fromVillage Road to Mulberry Drive Pine Hollow Road from Classic Way to City Limits Salvio Street from East Street to Port Chicago Highway Whitman Road from Detroit Aven

Construction 07/2019 12/2019 5-7 7 14

Concord Contra Costa 17/18 In-Progress Road Maintenance & Rehabilitation

Oak Grove Road Pavement Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project will extend the recently completed pavement rehabilitation work on Oak Grove Road from Whitman Road to Treat Boulevard, likely using cold-in-place recycling, similar to the previous phase, whereby a portion of the existing roadway asphalt is removed, treated with an asphalt recycling agent, compacted in place and then covered with a new asphalt surface layer. Work will also include the installation/upgrade of curb ramps at intersections, minor concrete repairs, replacement of traffic signal loops, adjustment of pedestrian push buttons to meet accessibility standards, and restriping the roadway.

Oak Grove Road from Whitman Road to Treat Boulevard Pre-Construction & Construction

09/2018 03/2020

10/2019 12/2020 15-20 7 14

Concord Contra Costa 17/18 In-Progress Road Maintenance & Rehabilitation

Diamond Boulevard Pavement Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project will include base repairs and resurfacing of Diamond Boulevard from Willow Pass Road to the bridge over Walnut Creek and include the upgrade/replacement of accessible ramps on the north side of the intersection and at driveways, minor curb and gutter repairs, traffic signal loop replacement, and restriping the roadway.

Diamond Boulevard from Willow Pass Road to the bridge over Walnut Creek Pre-Construction & Construction

04/2018 03/2019

01/2019 09/2019 10-12 7 14

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 9: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Danville Contra Costa 19/20 New Road Maintenance & Rehabilitation

2019/20 Pavement Management Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The work generally includes, but is not limited to, preparatory tree trimming, removal and replacement of existing Portland Cement Concrete curb, sidewalk, curb ramp, removal and replacement of existing asphalt concrete pavement (dig-outs), pavement cold planning, installation of hot mix asphalt concrete, removal, removal and replacement of new traffic signal loop detectors, adjusting to grade of survey monument castings and utility covers.

Various locations within Danville including Cameo Dr, Pennington Pl, Tyburn Pl, Castleford Cir, Starview Dr, Glasgow Dr, Edinbugh Dr, Front St, Hartz Ave and Railroad Ave

Construction 07/2019 10/2019 10-20 3 4

El Cerrito Contra Costa 17/18 Carried Over Complete Streets Components Active Transportation Program

This project will include: Cost Estimating, Project Scope Development | Implement the Active Transportation Plan, adopted by the City Council in April 2016, and includes access, safety and other enhancements to pedestrian and bicycle infrastructure. | This component is specifically for preliminary engineering and design needed to leverage grant and other external funding opportunities.

Major Pedestrian & Bicycle Routes identified in the City's Active Transportation Plan (ATP) including San Pablo Ave, BART to Bay Trail connection along Fairmount Ave-Carlson Bl-Cerrito Creek path-Lassen St-San Diego St-Belmont Ave-Central Ave, Richmond St, Fairmount Ave, Key Bl and Arlington Bl. Locations have yet to be finalized and will be selected based on leveraging of other funding opportunities and grant prioritization criteria and prioritization criteria in the City's ATP.

Pre-Construction 07/2019 12/2022 7-25 9 15

El Cerrito Contra Costa 19/20 Carried Over Safety Sidewalk Infrastructure Maintenance This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Project Scope Development | Repair sidewalk areas uplifted by street tree roots, including tree root pruning or tree removal.

Locations are on major Pedestrian Routes: San Pablo Ave, Richmond St, Central Ave, Potrero Ave, and Cutting Blvd. Locations have yet to be finalized and will be selected based on a methodology that prioritizes locations on major Pedestrian Routes (designated in the City’s Active Transportation Plan), and based on their proximity to schools, the severity of the sidewalk damage and repair method, and other factors (e.g. requests received).

Pre-Construction & Construction

08/2019 02/2020

12/2019 06/2020 20-25 9 15

El Cerrito Contra Costa 19/20 Carried Over Traffic Control Devices Street Light & Traffic Signal Maintenance

This project will include: Public Works Staffing, Repair and Servicing of Public Works Equipment | Street light and traffic signal on-going maintenance

Citywide for on-going maintenance of 12 traffic signalized intersections, 1728 City-owned street light locations, and 19 flashing beacons/ in-roadway lights/ radar speed feedback signs locations.

Procurement / Operational Needs 07/2019 06/2020 10-20 9 15

El Cerrito Contra Costa 19/20 Carried Over Traffic Control Devices Street Light, Traffic Signal & Street Sign Replacement and Upgrades

This project will include: Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials | Replacement, repair and upgrades of street light equipment, traffic signal equipment and street signs includes procurement of supplies and materials.

Arterials: Carlson Bl, Central Ave, Fairmount Ave, San Pablo Ave, Ashbury Ave, Arlington Bl, Barrett Ave, Colusa Ave, Cutting Bl, Elm St, Hill St, Key Bl, Moeser Ln, Potrero Ave, Richmond St; and Collectors: Alta Punta, Ashbury Ave, Avis Dr, Buckingham Dr, Colusa Ave, Edwards Ave, Eureka Ave, Fairview Dr, Ganges Ave, Jordan Ave, King Dr, Macdonald Ave, Manila Ave, Navellier St, San Mateo St, Sea View Dr, Shevlin Dr, South 55th St, Terrace Dr, and Tulare Ave. All locations are to be finalized.

Procurement / Operational Needs 07/2019 06/2020 10-25 9 15

El Cerrito Contra Costa 19/20 Carried Over Safety Access Modifications - Streets & Sidewalks

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing) | Implement the City's American with Disabilities Act (ADA) Transition Plan, adopted by City Council in 2009 to remove physical barriers along the street right-of-way including mid-block sections of sidewalks, intersections and pedestrian signals

Locations are on major Pedestrian Routes and serving City facilities, which include: Moeser Lane and Pomona Ave adjacent to the Civic Theater and connecting to Community Center/Swim Center. Additional locations are on other major Pedestrian Routes including Arlington Blvd, Ashbury Ave, Barrett Ave, Central Ave, Colusa Ave, Cutting Blvd, Fairmount Ave, Hill St, Navellier St, Moeser Ln, Potrero Ave, Richmond St, San Pablo Ave, Schmidt Ln, Stockton Ave. Locations have yet to be finalized and will be selected based on methodology contained in the City's ADA Transition Plan (available for review at http://www.el-cerrito.org/522/ADA-Transition-Plan). These are locations along Pedestrian Routes (designated in the City’s Active Transportation Plan), locations requested by a person with disabilities, locations serving state and local government office and facilities, locations serving important transportation including pathways to schools, and locations serving commercial zones and other Title III entities.

Pre-Construction & Construction

07/2019 02/2020

12/2019 06/2020 10-25 9 15

El Cerrito Contra Costa 19/20 Carried Over Safety Central Ave & San Diego St Pedestrian Crossing Improvements

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development | Pedestrian Crossing Improvements including flashing beacons. Carlson Boulevard at San Diego St Pre-Construction &

Construction 07/2019 02/2019

12/2019 06/2020 10-25 9 15

El Cerrito Contra Costa 19/20 New Road Maintenance & Rehabilitation

Eureka Avenue and Lexington Avenue Street Improvements

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement, repair sidewalks, reconstruct and install new curb ramps, modify drainage, and restore and improve traffic signing and pavement markings at crosswalk.

Eureka Avenue from Kearney Street to Liberty Street and Lexington Avenue from Eureka Avenue to one block north ending at Fairmont Elementary School Construction 07/2019 06/2020 10-25 9 15

El Cerrito Contra Costa 19/20 New Road Maintenance & Rehabilitation

Central Avenue and Carlson Boulevard Street Improvements

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Work involving repair of sidewalks, installation of marked crosswalk at El Dorado, reconstruction and installion of new curb ramps, modificaiton of drainage, removal and replacement of street trees is being done in Fiscal Year 2018-19. The Pavement Rehabilitation component of the project will be completed in Fiscal Year 2019-20.

Central Avenue from Santa Clara Avenue to Carlson Boulevard and Carlson Boulevard from Central Avenue to the northern city limits Construction 03/2020 12/2020 10-25 9 15

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 10: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

El Cerrito Contra Costa 19/20 New Complete Streets Components

San Pablo Avenue Complete Streets Improvements

This project will include: Cost Estimating, Preliminary Design, Project Scope Development | Sidewalk replacement, pedestrian-level lighting, crosswalk improvements (curb bulb-outs, refuge islands, flashing lights, and enhanced signing and striping), new mid-block crosswalks, new bikeways (routes and lanes), bus islands, street tree planting, landscaping and street furniture/amenities as identified in the San Pablo Avenue Specific Plan, adopted in 2014.

San Pablo Avenue from southern City limits (just south of Carlson Boulevard) to northern City limits (just north of Ohio Street) and intersecting streets within the San Pablo Avenue Specific Plan Area.

Pre-Construction 07/2019 12/2021 7-25 9 15

El Cerrito Contra Costa 19/20 New Complete Streets Components

Del Norte TOD Complete Streets Improvements

This project will include: Cost Estimating, Preliminary Design, Project Scope Development | Will begin Caltrans project development process for improvements on a state highway in Fiscal Year 2019-20 | Access, circulation, safety and congestion relief improvements for bicyclists, pedestrians, local and regional bus, rapid bus, and automobiles to support BART and TOD/PDA development; accessibility improvements; and lighting, street tree and landscaping improvements. This includes new signalized ped crossings, new bicycle lanes, reduction in turning lanes/auxiliary lanes and conversion of one-way to two-way streets for improved vehicle flow, and signal changes.

San Pablo Avenue from Ohlone Greenway to Potrero Avenue, Eastshore Boulevard from Potrero Avenue to San Pablo Avenue, Hill Street from San Pablo Avenue to Liberty Street, Cutting Boulevard from I-80 to Key Boulevard, and Knott Avenue from San Pablo Avenue to Key Boulevard.

Pre-Construction 07/2019 06/2021 7-25 22 48, 49

Hercules Contra Costa 19/20 New Road Maintenance & Rehabilitation

2019 Annual Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Pheasant Drive from Starling Way to Thrush Court Construction 07/2019 10/2019 15-20 26 66

Lafayette Contra Costa 19/20 New Road Maintenance & Rehabilitation

2020 Preventative Maintenance Street Project

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Various streets within the City of Lafayette including: Acalanes Road, Deer Hill Road, Pleasant Hill Road, Beechwood Drive, Mt. Diablo Boulevard, St. Mary's Road, Reliez Valley Road, and Taylor Boulevard.

Construction 04/2020 10/2020 5-12 7 16

Lafayette Contra Costa 19/20 New Road Maintenance & Rehabilitation Pavement Maintenance

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Acalanes Rd.; Deer Hill Rd.; Taylor Blvd.; Pleasant Hill Rd.; Reliez Valley Rd.; Saint Mary's Rd. Construction 04/2020 10/2020 5-12 37 74

Martinez Contra Costa 17/18 Carried Over Road Maintenance & Rehabilitation

2019 Downtown Arterial Paving Project

This project will include: Pavement Rehab/Repair (Existing) | Base failure repair and AC overlay | multi year project, on schedule

Alhambra Ave from Jones St to Marina Vista; Pine/Court Street from Susana St to Marina Vista Construction 04/2020 12/2020 12-25 4 3

Moraga Contra Costa 19/20 New Road Maintenance & Rehabilitation 2019 Surface Seal Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Hardie Drive from Idlewood Court to Fieldbrook Place Construction 06/2019 10/2019 20-30 31 61

Oakley Contra Costa 19/20 New Road Maintenance & Rehabilitation

FY 2019/20 Street Resurfacing and Repair Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Various Neighborhoods within the City of Oakley. Summerlake Neighborhood south of E. Cypress Road, The Gardenia Neighborhood between Main St. and W. Cypress Road, and the Fall Lane Neighborhood between Mellowood Dr. and Main St.

Construction 03/2020 07/2020 15-18 36 76

Orinda Contra Costa 19/20 New Road Maintenance & Rehabilitation

2019 Annual and Measure J & L Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing)

Las Vegas Road from Via Las Cruces to St. Stephens Drive; Loma Vista Drive from El Dorado lane to El Toyonal (East); Lombardy Lane from Miner Road to Tarry Lane; Southwood Drive from Moraga Way to Tara Road; and Via Las Cruces from Honey Hill Road to Las Vegas Road

Construction 07/2019 06/2020 10-15 4 3

Pinole Contra Costa 19/20 New Road Maintenance & Rehabilitation

Annual Residential SLurry Seal Project RO1901-SB1 This project will include: Pavement Rehab/Repair (Existing), Document Preparation

Blue Jay Circle, Colina Court, Galbreth Road, Hoke Court, La Canada Court, Maiden Lane, McDonald Drive, Nob Hill Avenue, Orleans Drive, Silvercrest Court, Victor Street, Woodside Court

Pre-Construction & Construction

11/2019 03/2019

02/2020 07/2020 3-5 9 15

Pinole Contra Costa 19/20 New Road Maintenance & Rehabilitation

Arterial Rehabilitation Project RO1902-SB1

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents Tennent Avenue, Pinole Valley Road to La Salle Dr Pre-Construction &

Construction 10/2019 03/2020

02/2020 08/2020 8-12 17 35

Pittsburg Contra Costa 19/20 New Traffic Control Devices 2019/20 Traffic Signal Modification This project will include: Repair and Servicing of Public Works Equipment Citywide Procurement / Operational Needs 07/2019 06/2020 1-10 7 11, 14

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 11: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Pittsburg Contra Costa 19/20 New Road Maintenance & Rehabilitation

SB-1 2019/20 Pavement Management Project This project will include: Pavement Rehab/Repair (Existing) West Leland Road and Loveridge Road Construction 07/2019 06/2020 10-20 7 11, 14

Pittsburg Contra Costa 19/20 New Road Maintenance & Rehabilitation 2019/20 Street Maintenance Project This project will include: Pavement Rehab/Repair (Existing) Cypress Way, Roundhill Drive, and Woodland Drive plus additional streets as

funding allows. Construction 07/2019 06/2020 5-20 29 55

Pleasant Hill Contra Costa 19/20 New Road Maintenance & Rehabilitation 2019 Street Resurfacing Project This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk

Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Anelda Drive; Balboa Court; Beth Drive; Celia Dr; Dawn Dr; East Vivian Dr; Elda Court; Elda Dr; Lorenzo Dr; Marta Dr; North Marta Dr; Peggy Drive; Phylis Dr; Wendy Dr.

Construction 03/2019 08/2019 10-20 7 16

Richmond Contra Costa 19/20 In-Progress Complete Streets Components Pavement Rehabilitation Project

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Document Preparation, Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Richmond Parkway from HWY I-580 to West Gertrude Avenue; Castro Street from HWY I-580 to West Gertrude Avenue; and Castro Ranch Road from Olinda Road to the City Limit east of Country View Drive.

Pre-Construction & Construction

07/2018 07/2019

03/2020 12/2020 20-20 9 15

Richmond Contra Costa 17/18 Carried Over Road Maintenance & Rehabilitation

2018 Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement Rehabilitation | The City of Richmond's FY 2017-2018 SB 1 funds were not expended during FY 2017-2018; the FY 2017-2018 SB 1 funds were rolled over to the current fiscal year.

7th Street from Pennsylvania Avenue to Hensley Street; Castro Ranch Road from Olinda Road to the City Limit east of Country View Drive; Central Avenue from east of highway 580 to east of highway 80; Cutting Boulevard from South 49th Street to the City Limit east of Peerless Avenue; Giant Highway from Griffin Drive to Atlas Road; Marina Way from Ohio Avenue to Barrett Avenue; and South 55th Street from Carlson Boulevard to the City Limit north of Creely Avenue.

Construction 04/2020 11/2020 20-20 16 34

San Pablo Contra Costa 19/20 New Road Maintenance & Rehabilitation

Dover Avenue Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Dover Avenue Pavement Rehabilitation Project will include all the project description elements, as well as, base repairs (digouts), slurry seals, grinding and overlay.

The project sections are located at: Dover Avenue, from 17th Street to 23rd Street; Rheem Avenue, from San Pablo Ave to 36th Street; Tyler Street, from Dover Avenue to Davis Park ; Bush Street, from Rumrill Blvd. to 17th Street

Construction 12/2019 05/2020 7-10 2 10

San Rafael Contra Costa 17/18 In-Progress Complete Streets Components Lincoln Ave Curb Ramps

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | San Rafael Sanitation District performed a large sewer replacement on Lincoln Ave. Once the work underneath the roadway is complete, SRSD will resurface the roadway. Public Works will install 35 new ADA compliant curb ramps along Lincoln Ave from Mission Ave to Prospect Dr where non compliant ramps exist. Following the replacement of curb ramps the roadway will receive a micro surface treatment. Additionally, minor traffic signal upgrades will be necessary at Lincoln Ave/Paloma Ave intersection. | Project in pre-construction/design. Design contract for project awarded at 5/21/18 City Council meeting for $120,550.

Lincoln Avenue: Mission Ave to Prospect Dr Pre-Construction & Construction

06/2019 05/2020

12/2019 09/2020 15-20 2 10

San Rafael Contra Costa 17/18 In-Progress Road Maintenance & Rehabilitation

Smith Ranch and Lucas Valley Road Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | While the roadway directly under Highway 101 is Caltrans jurisdiction, per the agreement in place, the City is responsible for the maintenance of Smith Ranch road. Project in pre-construction/design. Project design is being completed in house.

Lucas Valley/Smith Ranch Road: from Los Gamos Drive on the west to Redwood Highway on the east, and includes the roadway under Highway 101.

Pre-Construction & Construction

10/2017 05/2020

12/2019 08/2020 15-20 7 16

San Ramon Contra Costa 19/20 New Road Maintenance & Rehabilitation 2020 Pavement Management Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Ascot Dr, Ascot Dr, Autumnwind Ct, Beta Ct, Burns Cir, Cameron Cir, Chaucer Cir, Chaucer Ct, De Anza Pl, Deerwood Dr, Deerwood Rd, Dolores Dr, Dunbarton Cir, Dunbarton Ct, Fallborough Ct, Fallbury Ct, Fallen Leaf Cir, Fallview St, Fife Ct, Foxboro Cir, Fryer Ct, Interlachen Ave, Lomond Cir, Mainprice Ct, Medinah Pl, Moore Ct, Northland Ave, Old Crow Canyon Rd, Omega Rd, Pinkerton Ct, Shetland Ct, Springfield Dr, Summerford Cir, Summerset Ct, Summerview Ct, Toledo Dr, Toluca Dr

Construction 06/2020 12/2020 3-25 8 31

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 12: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Walnut Creek Contra Costa 19/20 New Road Maintenance & Rehabilitation 2020 ROADWAY REHABILITATION

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The 2020 Roadway Rehabilitation project will repave Broadway from Parkside Drive to Ygnacio Valley Road and Parkside Drive from Civic Drive to San Juan Avenue. Broadway and Parkside Drive were last repaved between 1986 and 1993 perspectival and has a PCI average rating of 71. The project will perform required ADA upgrades and traffic signal upgrades as needed.

The roadway area to be repaved is estimated to be 191,000 S.F. This project will be funded by Measure J/Gas Tax and RMRA funds.

The 2020 Roadway Rehabilitation project will repave Broadway from Parkside Drive to Ygnacio Valley Road and Parkside Drive from Civic Drive to San Juan Avenue.

Construction 06/2020 07/2020 10-20 7 14, 16

Walnut Creek Contra Costa 19/20 New Road Maintenance & Rehabilitation

2021 OBAG2 YGNACIO VALLEY ROAD REHABILITATION PROJECT

This project will include: Document Preparation, Environmental Study/Documents, Preliminary Design, Project Scope Development | The 2021 OBAG2 Ygnacio Valley Road Rehabilitation Project will repave Ygnacio Valley Road from Civic Drive to San Carlos Drive. This section of Ygnacio Valley Road was last repaved in 1989 and has a PCI rating of 70. The project will perform required ADA upgrades and traffic signal upgrades as needed. The roadway area to be repaved on Ygnacio Valley Road is estimated to be 630,000 S.F. for a project cost of $3,100,000. This project will be funded in part by Federal One Bay Area Grant, and RMRA.

The 2019 OBAG2 Ygnacio Valley Road & Oak Grove Road Rehabilitation Project will repave Ygnacio Valley Road from Civic Drive to San Carlos Drive. Pre-Construction 06/2020 01/2021 10-20 16 32

Crescent City Del Norte 17/18 In-Progress Road Maintenance & Rehabilitation

Crescent City Storm Drainage Improvement and Roadway Rehabilitation Project

This project will include: Cost Estimating, Document Preparation | Install new drainage improvements, repave / resurface a minimum of 1200 LF of Roadway, install new ADA compliant Access Ramps and pedestrian improvements | It is anticipated to complete the pre-construction component for this project in July 2019.

Front Street between F Street & B Street, C Street between Howe Drive & 5th Street Pre-Construction 10/2017 07/2019 20-30 2 10

Crescent City Del Norte 17/18 Forecasted Road Maintenance & Rehabilitation

K Street Drainage Improvement and Roadway Rehabilitation Project

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Project Scope Development | Install new drainage improvements, repave / resurface approximately 300LF of Roadway, install new ADA compliant Access Ramps and pedestrian improvements | This project has been delayed due to unforeseen conditions and is foretasted for later this year.

K Street Between Front Street & 2nd Street Pre-Construction 12/2019 06/2020 20-30 2 10

Crescent City Del Norte 17/18 In-Progress Other Revenue Pass Through to Del Norte County

This project will include: Portion of City RMRA funds passed through to Del Norte County for their use in eligible projects. Based on existing annexation and revenue sharing agreement whereby City shares certain population-based state revenues with County. | This project represents City's obligation to share certain population-based revenues with Del Norte County, per an existing annexation agreement. Estimate is based on most recent 10-year RMRA funding projection but will be updated as needed.

Del Norte County Procurement / Operational Needs 07/2018 06/2020 1-50 2 2

Crescent City Del Norte 19/20 New Road Maintenance & Rehabilitation Crack Seal Project This project will include: Pavement Rehab/Repair (Existing) | Streets to be cracked sealed are

chosen through pavement management software. 9th Street from Pebble Beach to Hwy 101 and H Street from Front Street to 9th Street Construction 04/2020 06/2020 1-3 2 2

Placerville El Dorado 19/20 New Road Maintenance & Rehabilitation Utility Patch Paving This project will include: Pavement Rehab/Repair (Existing)

Various utility patches located throughout the City limits. Patching will take place on Main St, Broadway, Pine St, Baker Rd, Goldner, Duden, Acacia, Manor Dr, Fowler Way, and other locations to be determined throughout the year based on need. Exact locations will be provided upon completion.

Construction 07/2019 06/2020 10-20 1 5

Placerville El Dorado 19/20 New Road Maintenance & Rehabilitation Pavement Crack Seal and Slurry This project will include: Pavement Rehab/Repair (Existing)

Placerville Drive and Main Street. Other locations have yet to be finalized and will be selected based on need throughout the year. Exact locations will be provided upon completion.

Construction 07/2019 06/2020 5-10 3 14

South Lake Tahoe El Dorado 19/20 New Road Maintenance & Rehabilitation 2020 Road Repair Project

This project will include: Pavement Rehab/Repair (Existing) | The city anticipates a new paving fund will be created in 2019. The city plans to combine the $362,348 worth of RMRA funds with the paving fund to pave as many of these streets as possible. If no paving fund is created, then RMRA funds will be used to pave the street in the worst condition.

Bonanza Avenue*, Tata Lane*, Dedi Avenue*, Margaret Avenue , Julie Lane*, Delta Street*, B Street*, D Street*, F Street*, G Street*, H Street*, Shop Street*, Industrial Avenue* *Entire length of roadway

Construction 05/2020 10/2020 20-20 13 22

Clovis Fresno 19/20 New Road Maintenance & Rehabilitation

Armstrong Avenue Street Improvements from Tollhouse to Sierra

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design Armstrong Avenue from Tollhouse Avenue to Sierra Avenue Pre-Construction &

Construction 08/2019 04/2021

12/2020 08/2021 7-20 8 23

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 13: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Clovis Fresno 19/20 New Road Maintenance & Rehabilitation

Gettysburg Avenue Street Improvements form Sierra Vista Parkway to Clovis Avenue

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design Gettysburg Avenue from Sierra Vista Parkway to Clovis Avenue Pre-Construction &

Construction 08/2019 04/2021

12/2020 08/2021 7-20 8 23

Clovis Fresno 19/20 New Road Maintenance & Rehabilitation

Bullard Avenue Street Improvements form Armstrong to Temperance

This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design Bullard Avenue from Armstrong Avenue to Temperance Avenue Pre-Construction &

Construction 08/2019 04/2021

12/2020 08/2021 7-20 8 23

Clovis Fresno 17/18 Carried Over Road Maintenance & Rehabilitation

Fowler Street Improvements - Barstow to Shaw

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Grind and overlay existing pavement, some reconstruction. Traffic loop replacement. Minor concrete work. Stripping.

Fowler Avenue from Barstow Avenue to Shaw Avenue Pre-Construction & Construction

09/2018 05/2020

04/2020 08/2020 7-20 8 23

Clovis Fresno 17/18 Carried Over Road Maintenance & Rehabilitation

Minnewawa Street Improvements- Shepherd to Teague

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Grind and overlay existing pavement. Traffic loop replacement. Minor concrete work. Stripping.

Minnewawa Avenue from Shepherd Avenue to Teague Avenue Pre-Construction & Construction

09/2018 05/2020

04/2020 08/2020 7-20 8 23

Clovis Fresno 17/18 Carried Over Road Maintenance & Rehabilitation

Villa Street Improvements - Barstow to Shaw

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Document Preparation, Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Grind and overlay existing pavement, some reconstruction. Traffic loop replacement. Minor concrete work. Stripping.

Villa Avenue from Barstow Avenue to Shaw Avenue Pre-Construction & Construction

09/2018 05/2020

04/2020 08/2020 7-20 8 23

Coalinga Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Sunset Street Rehabilitation Project (Phase 1 & 2)

This project will include: Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Installation of curb and gutter, sidewalks, curb ramps to comply with Americans with Disabilities Act requirements, driveway approaches, alley approaches, valley gutters, A.C. pavement, aggregate base, storm drain laterals, storm drain inlets, LED street lights, electrical conduit, electrical wire, pull boxes, crosswalks, traffic striping and markings, traffic signage, bike lane striping, existing utility lid adjustment, street tree removal or trimming and construction surveying

Sunset Street from Polk Street to Washington Street Pre-Construction & Construction

01/2019 08/2019

06/2019 10/2019 15-25 12 31

Firebaugh Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Helm Canal Road Rehabilitation (north side)

This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Paving and/or Striping Rehab/Repair (Existing Safety) | Roadway rehabilitation In the City of Firebaugh between Poplar and Birch Drive Pre-Construction &

Construction 07/2019 07/2020

07/2020 07/2021 10-20 12 31

Firebaugh Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Roadway Sealing Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Roadway crack sealing and slurry sealing

At various locations in the City of Firebaugh: Birch Dr from Helm Canal to cul-de-sac, Dogwood Wy from Maple to cul-de-sac, Cypress Wy from Helm Canal to Maple, Alder Wy from Elm St to cul-de-sac, Poplar Wy from Helm Canal to Elm St, Willow Wy from Spruce to Elm St, Spruce St from Willow Wy to cul-de-sac, Maple Ct from Poplar to Dogwood Wy, Elm Street from Willow to Birch Drive, Ash Street from Alder to Dogwood Wy, Oak Street from Alder to Dogwood Wy

Construction 07/2020 07/2021 5-10 12 31

Firebaugh Fresno 19/20 New Road Maintenance & Rehabilitation Rabe Street Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Paving

and/or Striping Rehab/Repair (Existing Safety) | Roadway rehabilitation In the City of Firebaugh between Clyde Fannon and Zozaya Street Pre-Construction & Construction

05/2019 07/2019

07/2019 07/2020 10-20 1 6

Fowler Fresno 19/20 New Road Maintenance & Rehabilitation Main Street Reconstruction This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document

Preparation, Preliminary Design Main Street - 5th Street to 7th Street Pre-Construction & Construction

07/2019 04/2020

10/2019 05/2020 15-20 10 20

Fresno Fresno 19/20 New Road Maintenance & Rehabilitation

Ashlan Ave Overlay, First to Millbrook* This project will include: Pavement Improvement (New) Ashlan Ave - First Street to Millbrook Ave Construction 10/2019 06/2020 10-15 8, 14 23, 31

Fresno Fresno 19/20 New Road Maintenance & Rehabilitation

FY 19-20 Annual Slurry Seal Program This project will include: Pavement Rehab/Repair (Existing)

Olive-San Pablo-180-Blackstone Neighborhood, Olive-Palm-Fulton-Belmont Neighborhood, Olive-Fulton-Belmont-San Pablo Neighborhood, Olive-McKinley-Winery-Helm Neighborhood, Lane-Kings Canyon-Maple Neighborhood, Gettysburg-Blackstone to Fresno

Construction 02/2020 06/2020 7-10 8, 14 23, 31

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 14: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Fresno Fresno 19/20 New Road Maintenance & Rehabilitation

FY19-20 Annual Street Maintenance Program

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | location continued: Wnery-Chestnut-Olive-McKinley concrete, Clark-University-Blackstone-Weldon concrete, Dakota-Ashlan-Thesta-Fresno concrete, Ashlan-Gettysburg-Effie-Clark concrete, Englewood-Glenn concrete, Santa Fe-Indianapolis-West-Tielman paving, Atchison-Delno-California Neighborhood paving, Chestnut repaving-Herndon to Alluvial, Angus paving-Clinton to Weldon, Bremer repaving-Blackstone to Abby, Dakota-Maroa-FID Canal-Blackstone paving, Lane Overlay Chestnut-Peach, Barstow overlay-Marks

Lane-Kings Canyon-Maple Neighborhood concrete, Bullard-Sierra-Millbrook-Cedar Neighborhood concrete, Helm-Belmont to Harvey (partial County)Dakota-Hampton-Millbrook-Ninth Neighborhood paving, Clay Overlay-Peach to City/County limit, Dakota Overlay-Hughes to Marks, Figarden Loop Concrete Repairs Marks to Bullard, Marks south of Herndon (west side) concrete, Atchison-Delno-California Neighborhood Concrete, Broadway-Stanislaus to Tuolumne (concrete), Clinton & Sonora (concrete), Delno & Michigan

Construction 07/2019 06/2020 7-20 8 23

Fresno Fresno 19/20 New Traffic Control Devices Traffic Signal Left Turn Phasing Liberty Hill & Perrin*

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Intersection of Liberty Hill Drive and Perrin Avenue Construction 05/2019 09/2019 20-50 8 23

Fresno Fresno 19/20 New Traffic Control Devices Maple/Shaw Pedestrian Scramble* This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Intersection of Maple Avenue and Shaw Avenue Construction 01/2020 12/2020 20-50 14 31

Fresno Fresno 19/20 New Traffic Control Devices Traffic Signal Left Turn Phasing Butler & Cedar (PE)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Intersection of Butler Avenue and Cedar Avenue Construction 06/2020 06/2021 20-50 14 31

Fresno Fresno 19/20 New Traffic Control Devices Traffic Signal Left Turn Phasing Tulare and "U" Street (PE)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Intersection of Tulare Avenue and "U" Street Construction 06/2020 06/2021 20-50 8 23

Fresno Fresno 19/20 New Traffic Control Devices Traffic Signal Blythe & Gates (PE) This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Intersection og Blythe Avenue and Gates Avenue Construction 06/2020 06/2021 20-50 8 23

Fresno Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Marks Ave Overlay, Ashlan to Dakota (18/19 carryover)

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement overlay

Marks Ave - Ashlan to Dakota Pre-Construction & Construction

01/2019 03/2020

02/2020 08/2020 10-15 8 23

Fresno Fresno 19/20 Carried Over Traffic Control Devices Barstow and Palm Traffic Signal Left Turn Phasing (18/19 carryover)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Document Preparation | Traffic Signal Modification Barstow Ave & Palm Ave Pre-Construction &

Construction 01/2019 03/2020

02/2020 09/2020 15-30 14 31

Fresno Fresno 19/20 Carried Over Traffic Control Devices California and Walnut Traffic Signal (18/19 carryover)

This project will include: Document Preparation, Paving and/or Striping Rehab/Repair (Existing Safety) | New Traffic Signal California Ave & Walnut Ave Pre-Construction &

Construction 07/2019 09/2019

09/2019 06/2020 15-30 8 23

Fresno Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Cedar Ave Overlay, Barstow to Bullard (18/19 carryover)

This project will include: Pavement Rehab/Repair (Existing), Document Preparation | Pavement overlay Cedar Ave - Barstow to Bullard Pre-Construction &

Construction 01/2019 02/2020

01/2020 09/2020 10-15 8 23

Fresno Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Nees Ave Overlay, Fresno to Millbrook (18/19 carryover) This project will include: Pavement Rehab/Repair (Existing) | Pavement overlay Nees Ave - Fresno to Millbrook Pre-Construction &

Construction 01/2019 09/2019

09/2019 06/2020 10-15 8 23

Fresno Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Chestnut Overlay, Bullard to Herndon (18/19 carryover) This project will include: Pavement Rehab/Repair (Existing) | Pavement overlay Chestnut Ave - Bullard to Herndon Pre-Construction &

Construction 01/2019 07/2020

06/2020 06/2021 10-15 8 23

Fresno Fresno 19/20 Carried Over Traffic Control Devices Armstrong and Lane Traffic Signal (18/19 carryover)

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | New Traffic Signal Armstrong Ave & Lane Ave Pre-Construction &

Construction 01/2019 02/2020

01/2020 09/2020 15-30 8 31

Fresno Fresno 19/20 Carried Over Traffic Control Devices Clinton and Fresno Traffic Signal Left Turn Phasing (D)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Traffic Signal Modification Clinton Ave & Fresno Street Pre-Construction &

Construction 01/2019 02/2020

01/2020 09/2020 15-30 8 23

Fresno Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Bullard, First to Cedar (partial grant match) This project will include: Pavement overlay Bullard Ave - First to Cedar Pre-Construction 01/2019 06/2020 10-15 14 31

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 15: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Fresno Fresno 17/18 Carried Over Road Maintenance & Rehabilitation

North & Fig Pavement Reconstruction (17/18 Carryover)

This project will include: Pavement Rehab/Repair (Existing) | Reconstruction of North Avenue from Fig to Walnut; and Fig Avenue from North to 0.25 miles south, including pavement reconstruction and drainage facilities.

North Avenue and Fig Avenue Pre-Construction & Construction

01/2019 09/2019

08/2019 12/2021 15-20 8 23

Fresno Fresno 17/18 Carried Over Other BPMP Bride Deck Rehab Phase 2 (17/18 Carryover) This project will include: Pavement Rehab/Repair (Existing) | Bridge Deck Rehabilitation Also Senate District 14 - State Assembly District 31 - Multiple bridge deck

repairs throughout the City of Fresno Pre-Construction & Construction

01/2019 02/2020

02/2020 08/2020 20-40 8 23

Fresno Fresno 17/18 Carried Over Road Maintenance & Rehabilitation

Marks Ave Overlay, Barstow to BNSF (17/18 Carryover) This project will include: Pavement Rehab/Repair (Existing) | Pavement overlay Marks Avenue from Barstow Ave to BNSF railroad crossing Construction 08/2019 11/2019 10-15 14 31

Fresno Fresno 19/20 New Other John Muir Elementary School - Safe Routes to School This project will include: Cost Estimating, Preliminary Design, Project Scope Development Palm-Olive-Broadway-Belmont Neighborhood Pre-Construction 07/2019 06/2020 15-20 14 31

Fresno Fresno 19/20 New Other Yosemite Middle School - Safe Routes to School This project will include: Cost Estimating, Preliminary Design, Project Scope Development Floradora and 11th Street Pre-Construction 07/2019 06/2020 15-20 8 23

Fresno Fresno 19/20 New Other McKinley Elementary School - Safe Routes to School This project will include: Cost Estimating, Preliminary Design, Project Scope Development Blythe and McKinley Ave Pre-Construction 07/2019 06/2020 15-20 8 23

Fresno Fresno 19/20 New Road Maintenance & Rehabilitation

Tioga Middle School Neighborhood Improvements This project will include: Cost Estimating, Preliminary Design, Project Scope Development Santa Ana and 4th Street Pre-Construction 07/2019 06/2020 10-15 8 23, 31

Fresno Fresno 19/20 Carried Over Traffic Control Devices Harrison and Shields Traffic Signal (18/19 Carryover)

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Project Scope Development | New Traffic Signal

Harrison Ave & Shields Ave Pre-Construction & Construction

11/2019 04/2020

03/2020 12/2020 15-30 29 65

Huron Fresno 19/20 New Road Maintenance & Rehabilitation

M Street 2" Mill and HMA Overlay with Base Repairs

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing)

M St from 9th St to 11th St Pre-Construction & Construction

07/2019 03/2020

12/2019 12/2020 20-25 12 31

Huron Fresno 19/20 New Safety Lassen Avenue Bus Stop Sidewalk Replacement

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design West side of Lassen Ave north of Myrtle Ave Pre-Construction &

Construction 08/2019 01/2020

01/2020 06/2020 25-30 12 31

Huron Fresno 19/20 New Safety Apple Avenue Sidewalk Replacement This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design North side of Apple Ave between the alley and Lassen Avenue Pre-Construction &

Construction 08/2019 03/2020

02/2020 06/2020 25-30 12 31

Huron Fresno 19/20 New Safety N Street Sidewalk Replacement This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design N St from 10th St to 11th St Pre-Construction &

Construction 08/2019 02/2020

02/2020 06/2020 25-30 40 56

Kerman Fresno 19/20 New Road Maintenance & Rehabilitation Street overlay Project 20/21

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Local Streets: 8TH from Stanislaus to Sunset; Middleton & Sunset from 6th to 8th; C Street from 9th to 11th; 10th South of C Street; 11th South of D; 12th from D to California.

Construction 06/2020 09/2020 20-35 12 31

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 16: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Kerman Fresno 17/18 Carried Over Complete Streets Components Del Norte Ave Reconstruct

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Complete Reconstruction including removal and replacement of full depth pavement section.

On Del Norte 200' South of C Street to Kearney Blvd in Kerman, CA Construction 05/2019 10/2019 20-35 12 30

Kingsburg Fresno 19/20 New Road Maintenance & Rehabilitation Marion Street Cape Seal This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Marion Street - Sierra Street to Lewis Street Construction 08/2019 09/2019 10-15 25 43

Mendota Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

5th Street and Quince Street Reconstruction

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Bicycle Lane (New), Project Scope Development | In general, the project consists of reconstruction of 5th Street from Quince Street to Derrick Avenue (State Route 33) and Quince Street from 5th Street to 6th Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, driveway and alley approaches, and traffic striping and markings to add two way left turn lanes, parking/bike lanes and high visibility school zone cross walks.

5th Street from Quince to Derrick Avenue (SR 33), and Quince Street from 5th Street to 6th Street

Pre-Construction & Construction

12/2019 05/2020

03/2020 08/2020 15-30 12 31

Mendota Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Fleming, McCabe Avenue Reconstruction

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing) | In general, the project consists of reconstruction of the two streets between Rowe Avenue and Sorensen Avenue, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, driveway approaches, and traffic striping and markings to add center lane lines, parking/bike lanes and high visibility school zone cross walks.

Flemming Avenue from Rowe Avenue to Sorensen Avenue, and McCabe Avenue from Rowe Avenue to Sorensen Avenue Avenue to Sorensen Avenue

Pre-Construction & Construction

12/2020 07/2021

03/2021 11/2021 15-30 12 31

Mendota Fresno 19/20 Forecasted Road Maintenance & Rehabilitation Kate Street Reconstruction

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Project Scope Development | In general, the project consists of reconstruction of North Kate Street between Divisadero Street and I Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add center lane line and parking/bike lanes.

North Kate Street between Divisadero Street and I Street Pre-Construction & Construction

12/2023 05/2024

03/2024 08/2024 15-30 12 31

Mendota Fresno 19/20 Forecasted Road Maintenance & Rehabilitation Rio Frio Street Reconstruction

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Project Scope Development | In general, the project consists of reconstruction of Rio Frio Street between 7th Street and 8th Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes.

Rio Frio Street from 7th Street to 8th Street Pre-Construction & Construction

12/2021 05/2022

03/2022 09/2022 15-30 12 31

Mendota Fresno 19/20 Forecasted Road Maintenance & Rehabilitation Stamoules Street Reconstruction

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing) | In general, the project consists of reconstruction of Stamoules Street between 7th Street and 9th Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes.

Stamoules Street from 7th Street to 9th Street Pre-Construction & Construction

12/2023 05/2024

03/2024 09/2024 15-30 12 31

Mendota Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Marie Street & 5th Street Reconstruction

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Document Preparation, Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing) | In general, the project consists of reconstruction of Marie Street between Divisadero Street and 5th Street and 5th Street betwee Marie Street and Lolita Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add center lane line and parking/bike lanes.

Marie Street from Divisadero Street to 5th Street, and 5th Street from Marie Street to Lolita Street

Pre-Construction & Construction

12/2020 05/2021

03/2021 09/2021 15-30 12 31

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 17: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Mendota Fresno 19/20 Forecasted Road Maintenance & Rehabilitation Naples Street Reconstruction

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing) | In general, the project consists of reconstruction of Naples Street between 2nd Street and 9th Street, including demolition of existing asphalt and concrete pavements, storm drain inlets, manholes and pipes, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes.

Naples Street from 2nd Street to 9th Street Pre-Construction & Construction

12/2022 05/2023

03/2023 10/2023 15-30 12 32

Mendota Fresno 19/20 New Road Maintenance & Rehabilitation 7th Street

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | In general, the project consists of grind and overlay of 7th Street between Stamoules Street and Rio Frio Street

7th Street from Stamoules Street to Tule Street Pre-Construction & Construction

12/2019 05/2020

03/2020 08/2020 10-20 23 67

Orange Cove Fresno 19/20 New Road Maintenance & Rehabilitation City Hall Parking Lot

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

633 Sixth Street Orange Cove, CA 93646 Pre-Construction & Construction

07/2019 10/2019

09/2019 02/2020 20-25 7 16

Parlier Fresno 19/20 New Road Maintenance & Rehabilitation Zediker Avenue Reconstruction This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair

(Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Zediker Avenue between Manning Avenue and Merced Street in City of Parlier, CA Construction 06/2020 08/2020 25-30 25 41

Reedley Fresno 19/20 New Road Maintenance & Rehabilitation

I Street Heavy Maintenance Project Phase 1

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) In the City of Reedley on I Street between Reed and Dinuba Avenues Construction 05/2020 06/2020 7-10 20 47

San Joaquin Fresno 17/18 Forecasted Road Maintenance & Rehabilitation Idaho Avenue Reconstruction This project will include: Pavement Rehab/Repair (Existing) | Roadway reconstruction In the City of San Joaquin between 9th Street and Main Street. Construction 08/2020 08/2021 10-20 12 31

San Joaquin Fresno 17/18 Forecasted Road Maintenance & Rehabilitation Roadway Sealing Project This project will include: Pavement Rehab/Repair (Existing) | Roadway crack sealing and

slurry sealing.

At various locations in the City of San Joaquin; First St from Colorado to Annabella; Annabella from Helm to 4th St; Helm from Colorado to California; 2nd St from Annabella to Helm; 3rd St from Annabella to Helm; 1st St Court; 2nd St Court; 4th St from Annabella to West Nevada; West Nevada from 3rd St to 5th St; White St from 3rd St to 5th St

Construction 08/2020 08/2021 5-10 12 31

San Joaquin Fresno 17/18 Forecasted Road Maintenance & Rehabilitation Nevada Avenue Overlay This project will include: Pavement Rehab/Repair (Existing) | Roadway overlay In the City of San Joaquin between 5th Street and Main Street. Construction 08/2019 08/2020 10-20 12 31

San Joaquin Fresno 17/18 Forecasted Road Maintenance & Rehabilitation 6th Street Repairs Project This project will include: Pavement Rehab/Repair (Existing) | Roadway reconstruction In the City of San Joaquin Between Colorado Avenue and Nevada Avenue. Construction 08/2019 08/2020 10-20 12 31

San Joaquin Fresno 17/18 Forecasted Road Maintenance & Rehabilitation 11th Street Reconstruction This project will include: Pavement Rehab/Repair (Existing) | Roadway reconstruction In the City of San Joaquin Between Colorado Avenue and Nevada Avenue. Construction 08/2022 08/2023 10-20 12 31

San Joaquin Fresno 17/18 Forecasted Road Maintenance & Rehabilitation 9th Street Reconstruction This project will include: Pavement Rehab/Repair (Existing) | Roadway reconstruction In the City of San Joaquin Between Colorado Avenue and Nevada Avenue. Construction 08/2023 08/2024 10-20 12 31

San Joaquin Fresno 17/18 Forecasted Road Maintenance & Rehabilitation Oregon Avenue Reconstruction This project will include: Pavement Rehab/Repair (Existing) | Roadway reconstruction In the City of San Joaquin Between 9th Street and Pine Street. Construction 08/2024 08/2025 10-20 10, 15 25, 27, 28

Sanger Fresno 19/20 New Road Maintenance & Rehabilitation

Lyon Ave Reconstruction - 9th St to Webster Ave This project will include: Cost Estimating 9th Street to Webster Ave. Pre-Construction 07/2019 12/2019 25-30 8 31

Sanger Fresno 19/20 New Road Maintenance & Rehabilitation 2019 Street Sealing Project This project will include: Pavement Improvement (New)

The main road areas to be covered by the 2018/19 Street sealing project will be within the boundaries of the streets S. Newmark, North Ave, Church Ave and Del Ray Ave. Arterial roads within the boundaries include N. Bethel, Greenwood Ave, Jensen and Academy Ave.

Construction 09/2019 03/2020 10-15 34 72

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 18: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Selma Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Arterial Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Patch longitudinal cracking with Hot Mix Asphalt (HMA) in 4’ strips along Arterials and Major Collectors using a 4’ wide paving machine. Crack seal all joints and cracks, place Caltrans type II slurry seal over entire road width and restripe

McCall from Floral to Dinuba, Orange from Floral to Nelson, Nelson from Highland to Thompson, Rose from McCall to Country Rose, Second from E Front to High

Construction 01/2020 05/2020 20-25 14 31

Selma Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Alphabet Streets (A & E) Reconstruction Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Reconstruct and rehabilitate, upgrade ramps to current ADA standards, replace/add sidewalk where missing

Alphabet Streets (A through E) Floral Avenue to Rose Avenue in Selma, CA Construction 01/2020 08/2020 20-25 14 31

Selma Fresno 17/18 Carried Over Road Maintenance & Rehabilitation

Nebraska Avenue Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct the existing 2-lane rural roadway including widening the westbound roadway to the ultimate width, providing enhanced access in and out of downtown Selma and congestion relief at the Thompson/Highland intersection.

Nebraska Avenue from Hwy 43 to Mitchell Avenue Construction 01/2020 05/2020 20-25 14 32

Orland Glenn 19/20 New Road Maintenance & Rehabilitation

Repair commercial routes in the downtown area

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Downtown area bordered by Walker Street to the north, Colusa Street to the south, Sixth Street to the west and Third Street to the east Construction 03/2020 06/2020 15-20 4 3

Orland Glenn 19/20 Carried Over Road Maintenance & Rehabilitation Tehama Street Improvements

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Tehama Street from Woodward Avenue to East Street. Construction 07/2019 06/2020 15-20 4 3

Willows Glenn 19/20 Carried Over Safety Birch Street/Tehama Street Sidewalk renovation

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Remove and replace broken and uneven sidewalks that are trip and fall hazards or force pedestrian traffic to leave the sidewalk and travel in the street. Repair or replace curb and gutter where needed. Connect sections to encourage pedestrian travel and bring sidewalk system into ADA compliance.

South side of Birch St. from Butte St. to Tehama St. West side of Tehama St. from Birch ST. to Cedar St. Construction 08/2019 10/2019 20-50 4 3

Willows Glenn 19/20 Carried Over Safety Walnut Street/Butte Street Sidewalk renovation

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Remove and replace broken and uneven sidewalks that are trip and fall hazards or force pedestrian traffic to leave the sidewalk and travel in the street. Repair or replace curb and gutter where needed. Connect sections to encourage pedestrian travel and bring sidewalk system into ADA compliance.

South side of Walnut St. from Shasta St. to Butte St. West side of Butte St. from Walnut St. to Sycamore St. Construction 04/2020 08/2020 20-50 4 3

Willows Glenn 19/20 New Road Maintenance & Rehabilitation Sycamore Street Cape Seal This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document

Preparation, Preliminary Design, Project Scope Development Sycamore Street from Lassen Street to Villa Avenue Pre-Construction & Construction

07/2019 06/2020

08/2019 09/2020 8-15 2 2

Arcata Humboldt 19/20 New Safety Road Safety Improvements (Two Radar Feedback Signs)

This project will include: Procurement of Public Works Equipment | Purchase radar feedback signs for local streets. West End Road and LK Wood Blvd. Procurement /

Operational Needs 07/2019 12/2019 8-10 2 2

Arcata Humboldt 19/20 New Road Maintenance & Rehabilitation

Street Maintenance (Thin AC Overlay)

This project will include: Pavement Rehab/Repair (Existing) | Paving local streets using thin AC overlay

Chester Avenue and Margaret Lane between Crescent Way and Buttermilk Lane Construction 02/2020 10/2020 18-20 2 2

Arcata Humboldt 19/20 Carried Over Road Maintenance & Rehabilitation

Street Maintenance (Thin AC Overlay)

This project will include: Pavement Rehab/Repair (Existing) | Thin AC overlay work on Crescent Way. Project was originally listed for the 18/19 fiscal year and paired with thin AC overlay work on Bayside Road between Union and Crescent. 19/20 funds are being requested if 18/19 funds cannot fund Crescent Wayand Bayside Road work.

Crescent Way between Old Arcata Road and Bayside Road. Construction 02/2020 06/2020 18-20 2 2

Blue Lake Humboldt 19/20 New Road Maintenance & Rehabilitation City of Blue Lake SB 1-2019-2020

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Hatchery Road Construction 09/2019 02/2020 5-10 2 2

Blue Lake Humboldt 19/20 New Road Maintenance & Rehabilitation

Greenwood Road Seal and Pothole Repair This project will include: Pavement Rehab/Repair (Existing) Greenwood Road Construction 11/2019 03/2020 5-7 2 2

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 19: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Eureka Humboldt 19/20 New Road Maintenance & Rehabilitation Maintenance Paving 2019 This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair

(Existing) Henderson Street between D and Fairfield Streets. Portions of Downtown and Old Town including Commercial Streets Construction 08/2019 11/2019 15-20 16 26

Ferndale Humboldt 19/20 Carried Over Road Maintenance & Rehabilitation Washington Street Improvements This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert

Rehab/Repair (Existing) Washington Street Construction 07/2019 07/2020 20-30 2 2

Ferndale Humboldt 19/20 Carried Over Road Maintenance & Rehabilitation Shaw Street Improvements This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert

Rehab/Repair (Existing) Shaw Street Construction 07/2019 07/2020 20-30 2 2

Ferndale Humboldt 19/20 New Road Maintenance & Rehabilitation Arlington Avenue Improvements This project will include: Cost Estimating, Environmental Study/Documents, Storm Drain

and/or Culvert Rehab/Repair (Existing), Preliminary Design

Arlington Street, in underground storm drain system, 1000 feet west to 5th Street. North along Fairgrounds Access Road, Van Ness Street, Port Kenyon Road and Salt River, in improved drainage swales.

Pre-Construction & Construction

07/2019 12/2019

12/2019 08/2020 20-100 19 37

Fortuna Humboldt 17/18 Carried Over Road Maintenance & Rehabilitation Annual Paving Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Asphalt Concrete and replacement and leveling course to repair failing asphalt

Redwood Way between Barry Avenue and St. Joseph's Drive Construction 01/2019 12/2019 10-20 2 2

Fortuna Humboldt 17/18 Carried Over Road Maintenance & Rehabilitation Kenmar Road Reconstruction Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Asphalt Concrete and replacement and leveling course to repair failing asphalt

Kenmar Road between Church Street and Remie Court Construction 01/2019 12/2019 10-15 2 2

Fortuna Humboldt 19/20 New Road Maintenance & Rehabilitation

Riverwalk Drive Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Riverwalk Drive between Dinsmore Drive to Alamar Way Construction 01/2020 12/2020 10-20 34 72

Rio Dell Humboldt 19/20 New Road Maintenance & Rehabilitation General Maintenance and Repairs

This project will include: Public Works Staffing, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials

City-Wide Mainenance needs are the areas of Eeloa to Riverside, Including Fern St., Northwestern Ave., Ogle and Belleview Ave., Wildwood Ave., Davis St., Painter St., First, Second, Third, and Fourth Ave. including side streets of Elko, Dixie, and Columbus

Procurement / Operational Needs 07/2019 06/2020 1-5 3 11

Trinidad Humboldt 19/20 New Road Maintenance & Rehabilitation

2019 Trinidad Pavement Rehabilitation

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Parker Street, Hector Street, Edwards Street, Galindo Street Construction 05/2019 09/2019 5-15 1 1

Brawley Imperial 19/20 New Road Maintenance & Rehabilitation Rehabilitation of 2nd St

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Resurface approximately 0.4 miles of roads utilizing recycled materials

2nd Street from Malan Street to K Street, and H Street from Rio Vista Avenue to Las Flores Drive Construction 03/2020 06/2020 10-15 40 56

Calexico Imperial 19/20 New Road Maintenance & Rehabilitation Scaroni Road Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project will consist of grinding of existing asphalt concrete pavement, installation of conventional asphalt concrete leveling course, asphalt-rubber aggregate membrane, gap graded asphalt-rubber hot mix, installation of conventional asphalt concrete surface course, slurry seal, installation of curb, gutter and sidewalk, traffic striping, utility adjustments and traffic control

Scaroni Road between Highway 98 and Cole Blvd. Construction 10/2019 09/2020 10-20 40 56

Calexico Imperial 19/20 New Road Maintenance & Rehabilitation Yourman Road Improvement Project This project will include: Pavement Rehab/Repair (Existing) | The project scope involves a full

depth reclamation of the roadway section along the half-mile section of Yourman Road Yourman Road between Central Main Canal and Jasper Road Construction 10/2019 09/2020 10-20 40 56

Calexico Imperial 17/18 Carried Over Road Maintenance & Rehabilitation Second Street Bridge Widening This project will include: Pavement Rehab/Repair (Existing) | The project will consist of

widening and improving Second Street bridge Second Street Bridge Construction 10/2019 09/2020 10-20 40 56

Calipatria Imperial 19/20 Carried Over Road Maintenance & Rehabilitation

Freeman Street Rehabilitation Between Brown and Commerical Avenues

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The City will rehabilitate at least 500 lineal feet of full width improvements on Freeman Avenue.

Freeman Street Rehabilitation between Brown and Commercial Avenues. Construction 01/2020 12/2020 20-35 40 56

El Centro Imperial 19/20 New Road Maintenance & Rehabilitation

8th St. Street Overlay from Adams Avenue to Oleander Avenue

This project will include: Pavement Rehab/Repair (Existing) | Street Asphalt Overlay and Chip Seal. Project will eliminate rough riding conditions and potholes by rehabilitating street segments.

N 8th St. Located within the City of El Centro City Limits from City ROW located near Adams Ave. to Oleander Avenue North of Adams Avenue. Construction 07/2019 01/2020 15-20 9 15

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 20: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Holtville Imperial 19/20 New Road Maintenance & Rehabilitation

City Wide Street Improvement Project, Phase II (Pine Avenue Section)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The majority of the City's 17-mile street system was recently rehabilitated in Phase 1 of the Citywide Pavement Project. The streets identified in this project required a more extensive rehab effort which will be performed in the Phase II.

Segments throughout Pine Avenue, one location specifically between Fifth and Sixth Streets. Other locations may be subject to repairs and will be reported upon completion.

Construction 03/2019 08/2019 20-25 8 12

Imperial Imperial 19/20 New Road Maintenance & Rehabilitation Street Improvement Project Phase III This project will include: Pavement Rehab/Repair (Existing) | Street improvement project

asphalt rubber composite layer, overlay on designated streets. West 11th Street from North D Street to Old SR 86 Construction 10/2019 01/2020 15-25 40 78

Westmorland Imperial 17/18 Completed Road Maintenance & Rehabilitation

Streets Rehabilitation Program Phase 2

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety) | City of Westmorland is proceeding with a project for the design and installation of conventional asphalt with an asphaltic rubberized aggregate membrane. The selected streets have been in conjunction with the Pavement Management Study. The City of Westmorland has completed construction and installation of asphaltic rubberized aggregate membrane on the selected streets.

C Street from Main Street to 7th Street, D Street from 5th St to 6th St and J Street from 7th St to 8th St.

Pre-Construction & Construction

09/2017 10/2018

01/2018 11/2018 12-15 4 3

Bishop Inyo 19/20 New Road Maintenance & Rehabilitation Rose through Bush Fiber Seal This project will include: Pavement Rehab/Repair (Existing) On Rose, High, Central, Howard, and Bush Streets Construction 09/2019 10/2019 10-20 18 26

Bishop Inyo 19/20 New Road Maintenance & Rehabilitation Chamberlain Drainage This project will include: Storm Drain/Culvert Installation (New) At Chamberlain and Yaney Construction 03/2020 04/2020 75-100 18 26

Bishop Inyo 19/20 New Road Maintenance & Rehabilitation Willow Rose Ramps This project will include: Storm Drain/Culvert Installation (New), ADA Curb Ramp

Rehab/Repair (Existing) At Willow and Rose Construction 03/2020 04/2020 75-100 18 26

Bishop Inyo 19/20 New Road Maintenance & Rehabilitation 2019-2020 Cross Gutters This project will include: Storm Drain/Culvert Installation (New), ADA Curb Ramp

Rehab/Repair (Existing) East of Main Street Construction 03/2020 04/2020 75-100 18 26

Bishop Inyo 19/20 New Complete Streets Components 2019-2020 Sidewalks

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing)

On safe routes to school Construction 03/2020 04/2020 75-100 18 26

Bishop Inyo 17/18 Carried Over Road Maintenance & Rehabilitation Home Street Fog Seal This project will include: Place fog seal Home from Line to Sierra Construction 09/2019 11/2019 2-20 8 26

Bishop Inyo 17/18 Carried Over Road Maintenance & Rehabilitation Mac Iver Street Fog Seal This project will include: Place fog seal Mac Iver Construction 09/2019 11/2019 2-20 8 26

Bishop Inyo 17/18 Carried Over Road Maintenance & Rehabilitation South Second Fog Seal This project will include: Place fog seal South Second Street Construction 09/2019 11/2019 2-20 8 26

Bishop Inyo 17/18 Carried Over Road Maintenance & Rehabilitation Third and South Digouts This project will include: Replace failed pavement Third and South Construction 09/2019 11/2019 25-99 8 26

Arvin Kern 17/18 Carried Over Road Maintenance & Rehabilitation S. Hill Street Microsurfacing

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Microsurfacing pavement rehabilitation between SR-223 and Haven Drive. | Project is on hold until funds are available.

S. Hill Street between SR-223 and Haven Drive. Construction 01/2020 04/2020 5-10 14 32

Arvin Kern 17/18 Carried Over Road Maintenance & Rehabilitation Walnut Drive Microsurfacing

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Microsurfacing pavement rehabilitation on Walnut Drive (between Franklin Street and SR-223) | Project is on hold until funds are available.

Walnut Drive between Franklin and SR-223. Construction 01/2019 04/2019 5-10 14 32

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 21: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Arvin Kern 17/18 Carried Over Road Maintenance & Rehabilitation Pothole filling throughout city

This project will include: Public Works Staffing, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear | Filling potholes throughout the city, where needed. | Project is on hold until funds are available.

Throughout the city. Procurement / Operational Needs 01/2019 12/2019 1-3 14 32

Arvin Kern 17/18 Carried Over Complete Streets Components Varsity Road widening

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Preliminary Design, Storm Drain/Culvert Installation (New), Project Scope Development | Widen Varsity Road in front of high school to fully orinally planned 60 foot width by installing an additional 10 feet of pavement atop of the current shoulder, and install new curb, butter, and sidewalk. | Project is on hold until funds are available.

Varsity Road between Campus Drive and Mahin Drive. Pre-Construction & Construction

04/2019 04/2019

08/2019 08/2019 20-30 14 32

Arvin Kern 17/18 Carried Over Road Maintenance & Rehabilitation

Purchase hot mix truck and plate compactor

This project will include: Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials | City needs to purchase a hot mix truck and walk behind plate compactor to allow for more efficient and reliable patches of potholes throughout the city. | Purchasing 3-Ton Roadsaver Hot Patcher trailer Oil Jacket Dump

Applicable to entire city. Procurement / Operational Needs 01/2018 12/2018 20-20 14 32

Arvin Kern 19/20 New Road Maintenance & Rehabilitation Meyer Street Resurfacing This project will include: Pavement Rehab/Repair (Existing) Meyer Street between SR-223 and Franklin Construction 08/2019 02/2020 5-10 21 32

Arvin Kern 19/20 New Road Maintenance & Rehabilitation Hood Street Micro surfacing This project will include: Pavement Rehab/Repair (Existing) Hood Street between Commanche Drive and Meyer Construction 08/2019 02/2020 5-10 21 32

Bakersfield Kern 19/20 New Road Maintenance & Rehabilitation Pavement Rehabilitation White Lane

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Existing pavement along this roadway is in disrepair. Rehabiliation of this pavement will improve the overall rideability of the road for both passenger cars and commercial trucks. PCI of this roadway is 23.

White Lane from South H Street to Kenny Street Construction 06/2020 08/2020 20-25 16 34

Bakersfield Kern 19/20 New Road Maintenance & Rehabilitation

Pavement Rehabilitation Buena Vista Road

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Existing pavement along this roadway is in disrepair. Rehabilitation of this pavement will improve the overall rideability of the road for both passenger cars and commercial trucks. Current PCI for this roadway is 45.

Buena Vista Road from BNSF railroad (North of Harris) to White Lane Construction 08/2019 10/2019 20-25 16 34

Delano Kern 19/20 New Road Maintenance & Rehabilitation

2020 SB-1 Various Streets Pavement Resurfacing and Rehabilitation Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

High Street Between 21st Ave & Cecil Ave; Jefferson St Between Cecil Ave and Garces Hwy Construction 07/2020 12/2020 10-15 28 56

Maricopa Kern 19/20 Carried Over Road Maintenance & Rehabilitation

Street Improvement Project FY 2018-2019

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Crack Fill and Slurry Seal 8800 +/- square yards of residential streets within the city of Maricopa

Union Street, Adeline Street, Mary Street, Broadway Street, Helen Street, and Bush Street. Construction 03/2019 09/2019 5-10 17 29

McFarland Kern 19/20 Carried Over Road Maintenance & Rehabilitation

McFarland Kern Ave SB1 Road Maintenance

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repave/resurface, re-stripping of crosswalk and road on West Kern Ave from 5th Street to 6th Street.

W. Kern Ave from 5th Street to 6th Street: Construction 08/2019 12/2019 10-20 14 32

McFarland Kern 19/20 New Road Maintenance & Rehabilitation

City of McFarland Perkins Avenue and Sherwood Avenue Overpasses

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Project Scope Development City of McFarland Perkins Avenue and Sherwood Avenue Overpasses Pre-Construction 11/2019 06/2020 10-20 14 32

McFarland Kern 19/20 New Road Maintenance & Rehabilitation

6th Street from Sherwood Ave to Robertson

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

6th Street from W. Sherwood to Robertson Construction 11/2019 03/2020 10-20 14 32

McFarland Kern 17/18 In-Progress Complete Streets Components

City of McFarland_ ATP Kern Ave Elementary SR2S Connectivity Project

This project will include: Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | Complete Street Components: new sidewalks, curb, gutter, class 3 bikes lanes, and high visibility crosswalks.

Various locations- three city blocks bounded by 5th Street from W. Kern to W. Sherwood; 4th Street from W. Harlow Ave to California Ave; 3rd and 4th Place from W. Sherwood to California Ave

Construction 01/2019 08/2019 10-20 12 31

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 22: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Ridgecrest Kern 19/20 New Road Maintenance & Rehabilitation

Fall 2019 City of Ridgecrest Slurry Program This project will include: Pavement Rehab/Repair (Existing) Most of the streets in the fall project list are on the south and east side of

Ridgecrest Construction 09/2019 11/2019 6-7 16 34

Ridgecrest Kern 19/20 New Road Maintenance & Rehabilitation

Spring 2020 City of Ridgecrest Slurry Program - Part 1 This project will include: Pavement Rehab/Repair (Existing)

Phase 1 will slurry the eight streets left out of the last two seasons due to utility work, these streets are in the SE portion of the City. In addition, we will slurry 18 streets that the City has resurfaced using Federal and City funding during the last 5 to 10 years. These streets are distributed City wide.

Construction 03/2020 06/2020 6-7 16 34

Ridgecrest Kern 19/20 New Road Maintenance & Rehabilitation

Spring 2020 City of Ridgecrest Slurry Program - Part 2 This project will include: Pavement Rehab/Repair (Existing) These projects are located in the NW portion of the City and will be completed

only if all other proposed work is complete. Construction 05/2020 06/2020 6-7 2 2

Shafter Kern 19/20 New Road Maintenance & Rehabilitation

Zerker Road Sealing and Partial Resonstruction This project will include: Pavement Rehab/Repair (Existing) Zerker Road between 7th Standard Road and East Lerdo Highway in the City of

Shafter Construction 07/2019 06/2020 3-5 1 1

Taft Kern 19/20 Carried Over Safety ADA and Sidewalk Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Repair or replace broken sidewalks, curbs/ gutter, and install pedestrian ramps at various locations

10th Street between Kern Street and Front Street Construction 08/2019 06/2020 20-30 16 34

Tehachapi Kern 19/20 In-Progress Road Maintenance & Rehabilitation

Tehachapi Boulevard Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | Repave Tehachapi Boulevard from Curry Street to Hayes Street. Tehachapi Boulevard from Curry Street to Hayes Street. Pre-Construction &

Construction 06/2018 06/2019

06/2019 12/2019 15-20 16 34

Tehachapi Kern 19/20 Carried Over Road Maintenance & Rehabilitation Surface Treatment of Local Street This project will include: Pavement Rehab/Repair (Existing) | Various surface treatments

3 different areas in City limits:; 1. Boundaries are Pinon Street south to Highline and Curry Street east to Ponderosa: 10 streets; 2. Boundaries are Georgia Street south to E. Abajo Ave and Dennison Road east to city limit: 10 streets; 3. Valley Blvd north to Fir Street and Curry Street east to Clearview: 10 streets;

Pre-Construction & Construction

09/2019 04/2020

04/2020 12/2020 3-5 16 34

Tehachapi Kern 19/20 New Road Maintenance & Rehabilitation

Surface Treatment of Local Street Phase II This project will include: Pavement Rehab/Repair (Existing) Boundaries: C Street north to Tehachapi Blvd, Mill Street east to Robinson

Street; 9 streets Pre-Construction & Construction

09/2019 04/2020

04/2020 12/2020 3-5 4 2

Wasco Kern 19/20 New Complete Streets Components

19/20 SB1 Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Birch Avenue between Hwy. 46 & 6th Street and 2nd, 3rd Street & 4th Street between Poplar Ave. & Birch Avenue. Construction 04/2020 07/2020 15-20 8 12

California City Kern 17/18 In-Progress Road Maintenance & Rehabilitation South Side California City

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) I 17/18 Aspen Ave and Bay Ave Project reported in Expenditure Report now combined with 17/18 South Side Project for delivery under one contract.

Aspen Ave: 87th to Corwin; Bay Ave: S. Loop Blvd to Corwin; 87th: Aspen to Bay; 88th: CCB to Aspen; Corwin St: Aspen to Bay; Catalpa Ave; Aspen Ave; Bay Ave; Fir Ave; Corwin St.; Columbine; Xavier Ave; 89th St between N. Loop Blvd and Xavier Ave

Pre-Construction & Construction

11/2017 04/2019

12/2018 01/2021 8-10 16 36

Avenal Kings 17/18 Carried Over Road Maintenance & Rehabilitation Seventh Avenue Road Project

This project will include: Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing) | Surveying, soil sampling, project design and related engineering needed. Encroachment permits if needed. Remove and replace 4390 square yards of road. Remove and replace 400 linear feet of concrete curb and gutter. Remove and replace 1,500 square feet of concrete sidewalk. Remove and replace 200 square feet of concrete driveway. Remove and replace 8 wheel chair ramps.

Seventh Ave. from San Joaquin St. south to SR 269 (Skyline Blvd.) Pre-Construction & Construction

10/2019 04/2020

04/2020 05/2020 10-20 14 32

Avenal Kings 17/18 Carried Over Road Maintenance & Rehabilitation Mariposa Street Road Project

This project will include: Cost Estimating, ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New) | Surveying, soil sampling, project design and related engineering needed. Encroachment permits if needed. Remove and replace 7,470 square yards of road. Remove and replace 600 linear feet of concrete curb and gutter. Remove and replace 2,000 square feet of concrete sidewalk. Remove and replace 400 square feet of concrete driveway. Remove and replace 8 wheel chair ramps.

Mariposa St. from First Ave. east to Fifth Ave. Pre-Construction & Construction

08/2020 03/2021

03/2021 04/2021 10-20 14 32

Avenal Kings 17/18 Carried Over Road Maintenance & Rehabilitation Monterey Street Road Project

This project will include: Cost Estimating, ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Preliminary Design | Surveying, soil sampling, project design and related engineering needed. Encroachment permits if needed. Remove and replace 7,460 square yards of road. Remove and replace 600 linear feet of concrete curb and gutter. Remove and replace 2,000 square feet of concrete sidewalk. Remove and replace 400 square feet of concrete driveway. Remove and replace 8 wheel chair ramps.

Monterey St. from First Ave. east to Fifth Ave. Pre-Construction & Construction

09/2019 03/2020

03/2020 04/2020 10-20 14 32

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 23: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Avenal Kings 17/18 Forecasted Road Maintenance & Rehabilitation Avenal Cutoff Road Project

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Improvement (New), Preliminary Design | Surveying, soil sampling, project design and related engineering needed. Encroachment permits if needed. Grind, remove and install 45,000 square yards of 2 1/2" Asphaltic Concrete. Install 60,000 square yards of 2 1/2" Aspaltic Concrete. Haul, place and compact 45,000 square yards of Aspaltic Concrete Grindings on the shoulder of the road. Install roadway striping. Furnish traffic controls.

Avenal Cutoff Rd. from SR 269 east to the California Aqueduct overcrossing Pre-Construction & Construction

03/2022 12/2022

12/2022 03/2023 15-25 14 32

Corcoran Kings 19/20 New Road Maintenance & Rehabilitation

2019/2020 City of Corcoran SB1 Road Maintenance Projecst

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Letts Avenue: Sherman to Oregon, Sherman Avenue: Dairy Avenue to 6 1/2 Avenue Sherman Avenue: Flory Avenue to Dairy Avenue Dairy Avenue: Whitley Avenue to Oregon Avenue Oregon Avenue: King Avenue to Dairy Avenue Whitley Avenue: Dairy Avenue to 6 1/2 Avenue Otis Avenue: Orange Avenue to Brokaw Avenue

Pre-Construction & Construction

05/2019 01/2020

10/2019 04/2020 5-10 14 32

Hanford Kings 19/20 New Road Maintenance & Rehabilitation

FY 19/20 Single and Double Fiberized Micro Surface Treatment Project

This project will include: Pavement Rehab/Repair (Existing) | This project will include resurfacing a majority of the streets in our Hanford Downtown area, with a single or double fiberized micro seal treatment. The pavement preservation treatment consists of an asphalt emulsion coating with fibers added to provide structural integrity. The resurfacing of these streets will extend the useful life of the asphalt concrete pavement surface thereby prolonging the need for more expensive roadway repairs.

City of Hanford Downtown Area; including: Irwin Street, between Florinda Street and Eighth Street; Seventh Street, between 11th Avenue and 10th Avenue; Sixth Street, between 11th Avenue and 10th Avenue; Florinda Street, between Douty Street and 10th Avenue; Douty Street, between Sixth Street and Tenth Street; Various other Hanford Downtown Area Streets

Construction 04/2020 06/2020 7-10 32 63

Lemoore Kings 17/18 Carried Over Road Maintenance & Rehabilitation FY 2019-20 Slurry Seal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Document Preparation, Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Type II Slurry seal, update striping and signing

Multiple Locations Proposed - Cinnamon Drive from 19 1/2 Avenue to Holly Avenue 19 1/2 Avenue from Castle Way to Cinnamon Drive

Pre-Construction & Construction

07/2019 04/2020

03/2020 10/2020 8-10 14 32

Lemoore Kings 17/18 Forecasted Road Maintenance & Rehabilitation FY 2020-21 Slurry Seal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Type II Slurry seal, update striping and signing

Multiple Locations - Hanford-Armona Road from Hwy 41 to Fox Street; Hanford-Armona Road from Belinda Drive to the Canal; Silverado Drive from 19 1/2 Avenue to 19th Avenue; 19 1/2 Avenue from Silverado Drive to Bush Avenue

Pre-Construction & Construction

07/2019 04/2020

03/2020 10/2020 8-10 14 32

Lemoore Kings 17/18 Forecasted Road Maintenance & Rehabilitation FY 2021-22 Slurry Seal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Document Preparation, Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Type II Slurry seal, update striping and signing

Multiple Locations - Cedar Lane from 19th Avenue to Vine Street; Cinnamon Drive from Balboa to Hanford-Armona Road

Pre-Construction & Construction

07/2019 04/2020

03/2020 10/2020 8-10 1 6

Clearlake Lake 17/18 Carried Over Complete Streets Components

Highlands Park Frontage Improvements

This project will include: Preliminary Design | This project is in Design in support of the Construction: Frontage/parking lot and pedestrian sidewalk improvements, approximately 515 linear feet.

14335 Lakeshore Drive - Highlands Park Pre-Construction 03/2020 05/2020 20-25 2 4

Clearlake Lake 19/20 Carried Over Complete Streets Components Airport Road Improvements This project will include: Pavement Improvement (New), Preliminary Design | Regional

shopping center connector road from 18th Avenue east to west. 18th Avenue at State Road 53 Pre-Construction & Construction

02/2020 06/2020

05/2020 09/2020 20-25 2 4

Clearlake Lake 19/20 New Road Maintenance & Rehabilitation

Meadowbrook Area Pavement Rehabilitaiton Project This project will include: Pavement Rehab/Repair (Existing) Project is located on Meadowbrook Drive, Lakeside Drive, Stonybrook Dr,

Woodside Dr. off of Old Highway 53 in the city of Clearlake Construction 04/2020 07/2020 15-20 2 4

Clearlake Lake 19/20 New Road Maintenance & Rehabilitation

Pearl and Emory Ave. Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) This project is located in the city of Clearlake on Pearl and Emory Ave., which

runs parallel to Lakeshore Drive in the city of Clearlake Construction 05/2020 08/2020 15-20 2 4

Clearlake Lake 19/20 New Road Maintenance & Rehabilitation

San Joaquin Drainage Improvements and Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing)

This project is located on San Joaquin Drive, which is located off of Lakeshore Drive in Clearlake. Construction 06/2020 08/2020 15-20 2 4

Clearlake Lake 19/20 New Road Maintenance & Rehabilitation

Modoc St. and 2nd St. Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Modoc St. and Second St. off of Arrowhead Rd. in Clearlake Construction 07/2020 09/2020 15-20 2 4

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 24: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Clearlake Lake 17/18 Carried Over Safety Dam Road/Dam Road Extension Roundabout Project

This project will include: Environmental Study/Documents, Preliminary Design | Installation of a roundabout with multi-lane entries at all intersection approaches with a 10-foot shared use pathway and crosswalk.

Dam Road at Dam Road Extension at the intersection near Walmart. Pre-Construction 08/2019 03/2020 20-25 2 4

Lakeport Lake 19/20 Carried Over Road Maintenance & Rehabilitation Second Street Reconstruction

This project will include: Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct existing roadway and replace curb, gutter & sidewalk to meet current ADA standards

Second Street between Main Street and Park Street Pre-Construction & Construction

05/2019 10/2019

08/2019 11/2019 8-15 2 4

Lakeport Lake 19/20 Carried Over Road Maintenance & Rehabilitation

Miscelleneous roadway maintenance activities

This project will include: Public Works Staffing | Mill and Fill, dig-outs, pot-hole repairs and thin lift overlays

Project boundaries will be Lakeport Blvd. to 20th Street. This area has approximately 52 City maintained Streets within it.

Procurement / Operational Needs 09/2018 04/2019 4-8 32, 33 63

Susanville Lassen 19/20 New Road Maintenance & Rehabilitation

Fiscal Year 2019-20 Seal Coats (Various Locations)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Provide seal coats on streets overlaid in the past 3-7 years combined with crack sealing and fog seal or slurry seal as warranted.

Numa - Skyline to Cameron; Bunyan - ASH to East End; to Grand - Main to Chestnut Construction 04/2020 06/2020 7-10 8 5

Agoura Hills Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 2019/20 Annual Street Resurfacing Project

This project will include: Pavement Rehab/Repair (Existing) | Maintenance project only- all streets will have slurry seal applied, and re-striping where required.

Argos Street, Conejo View Drive. Shady Creek Drive, Woodcreek Court, Indian Ridge Court, Saddlebrook Drive, Freshwater Drive, Rustling Oaks Drive, Hollow Oak Court, Kimberly Drive, Ridgeway Drive, Lake Lindero Drive, Janlor Drive, Cape Horn Drive, Hackers Lane, Dovetail Drive, Lake Nadine Place, Sandtrap Drive, Wheelhouse Lane, Stonecrest Drive,

Construction 07/2019 09/2019 5-9 27 50

Alhambra Los Angeles 19/20 New Road Maintenance & Rehabilitation

2019/2020 SB1 Street Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) East of Atlantic Blvd; north of Valley Blvd; west of Garfield Avenue and south of

Mission Road. Construction 05/2020 10/2020 15-20 22 49

Arcadia Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Pavement Rehabilitation Program This project will include: Pavement Rehab/Repair (Existing)

Singing Wood Dr (From Hampton Rd to Glencoe Dr); Glencoe Dr (From Singing Wood Dr to Hampton Rd); Lyndon Way (From Duarte Rd to Magna Vista Ave); Magna Vista Ave (From West End of Cul-De-Sac to Ewell Ln); Ewell Ln (From Magna Vista Ave to Le Roy Ave); Camino Real Ave (From 6th Ave to 8th Ave); Tenth Ave (From El Sur Ave to Camino Real Ave);

Construction 04/2020 07/2020 20-25 22 49

Artesia Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation Residential Street Improvements

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurfacing pavement, and/or removal and replacement of asphalt, and/or cape sealing and striping

Hibbing, Ely Ave. to Norwalk Blvd.; Meadow Dr., Ely Ave. to Norwalk Blvd.; 181st St., Roseton; 188th St., Jersey to Pioneer Construction 07/2019 12/2019 25-30 32 58

Artesia Los Angeles 19/20 New Complete Streets Components Norwalk Blvd.

This project will include: Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Intersection of Metro right-of-way to Artesia Blvd. Construction 07/2019 12/2019 25-30 32 58

Artesia Los Angeles 19/20 New Road Maintenance & Rehabilitation Residential street improvements This project will include: Pavement Rehab/Repair (Existing) 169th St., Clarkdale Ave. to Elaine; 168th St., Clarkdale Ave. to city limit Construction 08/2019 11/2019 25-30 32 58

Avalon Los Angeles 19/20 In-Progress Complete Streets Components Five Corner Complete Street Project

This project will include: Roundabout Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New) | Reconstruct a 5-way intersection utilizing complete streets concepts by installing two mini roundabouts, new sidewalks, lighting, improved transit facilities and shared bicycle facilities.

Intersection of Tremont, Avalon Canyon, Country Club and Sumner roadways Construction 04/2019 10/2019 20-30 26 70

Azusa Los Angeles 19/20 New Road Maintenance & Rehabilitation

Industrial Roads Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing)

Loren Ave from Foothill Blvd to the end of the cul-de-sac, Coney Ave from Foothill Blvd to 8th St, Miller Ave from Foothill Blvd to Industrial St, Georgia Ave from Foothill Blvd to 8th St, and Industrial St from Coney Ave to Vernon Ave.

Construction 01/2020 12/2020 15-20 22 48

Azusa Los Angeles 19/20 New Road Maintenance & Rehabilitation Alley Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Several alleys bounded by 11th Street to the north, Crescent Drive to the south,

Orange Avenue to the south Construction 03/2020 07/2020 20-25 22 48

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 25: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Baldwin Park Los Angeles 19/20 New Road Maintenance & Rehabilitation Puente Avenue Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Puente Avenue between Root St and South City Limit Construction 09/2019 12/2019 10-20 22 48

Baldwin Park Los Angeles 19/20 New Road Maintenance & Rehabilitation

South Garvey Avenue/Dalewood Street Improvements

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

South Garvey Avenue/Dalewood Street between Puente Avenue and Merced Avenue in the City of Baldwin Park Construction 09/2019 12/2019 15-25 22 48

Bell Los Angeles 19/20 New Road Maintenance & Rehabilitation

Street Improvements Project FY 19-20

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design

Woodlawn Avenue-Gage Ave. to Randolph St.; California Avenue-Gage Ave. to Randolph Pl.;

Pre-Construction & Construction

07/2019 10/2019

08/2019 06/2020 15-20 33 63

Bell Gardens Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Various Street Improvement Project

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety)

Agra Street - Specht Avenue to 710 FWY, Gage Avenue - Darwell Avenue to Garfield Avenue, Gage Avenue - Garfield Avenue to Perry Road, Gage Avenue -Emil Avenue to Perry Road, Loveland Street -Darwell Avenue to Toler Avenue, Gotham Street -Jaboneria Road toGephart Avenue, Garfield Avenue - Shull Street to Eastern Avenue

Pre-Construction & Construction

11/2019 02/2020

01/2020 06/2020 10-15 33 58

Bell Gardens Los Angeles 19/20 New Road Maintenance & Rehabilitation Public Works Department This project will include: Public Works Staffing, Repair and Servicing of Public Works

Systems/Databases, Procurement of Road Maintenance and Rehab Materials Citywide Procurement / Operational Needs 07/2019 06/2020 10-15 33 58

Bellflower Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

STPLH-5348 (031) Bellflower and Alondra

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Cold mill and resurface with ARHM, remove and replace sidewalk, curb ramps, curb, gutter, drive aprons, and adjusting utilities to grade.

Bellflower Boulevard between Flora Vista and Somerset Boulevard and Alondra Boulevard between Bellflower Boulevard and East City Limit. Construction 11/2019 04/2020 10-15 32 58

Bellflower Los Angeles 19/20 New Road Maintenance & Rehabilitation

Resurfacing of Clark Avenue between Foster Road and Alondra Boulevard

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Clark Avenue between Foster Road and Alondra Boulevard Construction 06/2020 06/2021 10-15 32 58

Bellflower Los Angeles 19/20 New Road Maintenance & Rehabilitation

Bellflower Boulevard between Flower Street and Beach Street

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Bellflower Boulevard between Flower Street and Beach Street Construction 06/2020 06/2021 10-15 32 58

Beverly Hills Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation

Beverly Hills - Road Repair Improvements

This project will include: Pavement Rehab/Repair (Existing) | This project is slated for Design and may be using RMRA funding in support of the Construction. The design and construction related rehabilitation of roadway paving for multiple locations throughout the City that will include the use of recycled rubberized asphalt, whenever feasible. All project details are an estimate and are subject to change throughout the year based on priority need and resources available to the City.

Linden Drive between Whittier Drive and North Santa Monica Blvd; Burton Way (North side) between Rexford Drive and Oakhurst Drive; Rexford Dr. bet. Whitworth & Pico Bl; Crescent Dr bet. Sunset Blvd. and Lexington Rd.; Copley Place near Sunset Blvd.; Linden Drive between S. Santa Monica Blvd and Charleville Blvd.; Rexford Dr. between Olympic Blvd. and Wilshire Blvd.; Almont Dr. between Charleville Blvd. and Olympic Blvd.; Burton Way (South side) between N. Rexford Drive and N. Robertson Blvd.

Construction 01/2020 06/2022 15-20 26 50

Bradbury Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation Citywide Slurry Seal Project This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Preliminary

Design | Design & construction of Slurry Seal Project. SB1 funds total 21,623.

Bradbury Rd.; Elda Street; Fairlee Ave (Gardi Street - Col De Sac); Freeborn Dr. (Moutn Olive Drive to Col De Sac); Gardi Street (Spring Point Drive to Col De Sac – West; Spring Point Drive to Mount Olive Drive; Mount Olive Drive to Col De Sac – East) Mount Olive Lane (Mount Olive Drive to Col De Sac); Oak Shade Road (Spring Point Drive to Col De Sac); Spring Point Dr. (Gardi Street to Oak Shade Road); Winston Street (Royal Oaks Drive to Lemon Avenue); Woodlyn Lane (250 W. Mt Olive Dr to Mount

Pre-Construction & Construction

04/2019 05/2019

05/2019 06/2019 5-7 25 48

Burbank Los Angeles 19/20 New Road Maintenance & Rehabilitation Street Restoration Zones 19 and 20

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

https://gcc01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.bur bankca.gov%2Fhome%2Fshowdocument%3Fid%3D49646&data=02%7C01% 7CCeleste.Aceves%40catc.ca.gov%7C9da3aaa6030744c55c3f08d6c40e4ff5% 7C621b0a64174043cc8d884540d3487556%7C0%7C0%7C63691196309843 0785&sdata=s%2BRLznD6VMZI6rChAKgmUYMLW7ufgagt5d%2BEW6aFx3k %3D&reserved=0

Construction 04/2020 09/2020 20-20 25 43

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 26: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Calabasas Los Angeles 17/18 Carried Over Complete Streets Components Mulholland Hwy Gap Closure

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | The improvements on Mulholland Hwy adjacent to the Calabasas High School include sidewalk connecting between the eastern high school driveway on Mulholland Highway and an access road to the high school on Old Topanga Canyon Road. It will also include extending the existing Class II bike facility to Old Topanga Canyon Road. The pedestrian and bicycle facilities will end on Mulholland Highway, in front of Calabasas High School, approximately 770 feet east of the intersection. On Old Topanga

Mulholland Hwy between Old Topanga Cyn Rd and 770 feet east of Old Topanga Cyn Rd and Old Topanga Cyn Rd between Mulholland Hwy and 810 feet north of Mulholland Hwy

Construction 04/2020 12/2021 20-25 27 45

Calabasas Los Angeles 19/20 New Road Maintenance & Rehabilitation Annual Resurfacing Project This project will include: Pavement Rehab/Repair (Existing)

Various locations throughout the City will be addressed throughout this project. The following areas are being reviewed for possible inclusion in this project: Old Town Calabasas, a portion of North Las Virgenes Road and residential streets on both the east and west side of town. ; Project locations have yet to be finalized and will be reflected within expenditure reporting once in-progress

Construction 06/2020 09/2020 10-15 27 45

Calabasas Los Angeles 19/20 New Traffic Control Devices Traffic Control Devices - Battery Back-Up System at traffic signalized intersection

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Installation of back-up battery system at nine signalized intersections Various Locations Construction 01/2020 04/2020 10-15 27 45

Carson Los Angeles 19/20 New Complete Streets Components 223rd STREET REHABILITATION

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

223rd Street FROM WILMINGTON AVE. to EAST CITY LIMIT - is an East -West Main Arterial street (approx. length 3,650 L.F.) within Maintenance Zone #6 N/O Sepulveda Blvd. at the Eastern/Southern section of the City of Carson

Construction 02/2020 09/2020 15-20 35 64

Cerritos Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Residential Street Rehabilitation Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Construct asphalt removals and replacements as needed, and apply a Bituminous Slurry Coat over residential streets. Project will also include the replacement of deficient sidewalks, curbs, gutters and disabled accessible ramps, and thermoplastic striping.

The following streets will be affected: Bahia Drive, Bigelow Street, Brazil Street, Briarwood Street, Espinheira Drive, Itapetinga Lane, Jeffrey Avenue, Jeffrey Circle, Leal Circle, Madeira Court, Norah Avenue, Sabrina Avenue, Sabrina Court, San Salvador Place, and Vickie Avenue.

Construction 04/2020 05/2020 5-7 32 58

Claremont Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation Street Rehabilitation

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Overlay of streets not currently included on the City's 7-year street resurfacing schedule | Projects for FY 17-18 to be carried over to FY 18-19. $212,262 is accounted in the proposed project list for FY 18-19 already.

American Ave, Andrews Drive, Arrow Highway, Auto Center Drive, Base Line Road, Bonita Ave, Cambridge Ave, Claremont Blvd, First Street, Foothill Blvd, Indian Hill Blvd, Mills Ave, Mills Ave, Monte Vista Ave, Mountain Ave, Mt Baldy Road, Padua Ave; San Jose, Santa Fe, Sixth Street, Towne Ave, Wharton Ave, Williams Ave

Pre-Construction & Construction

04/2019 07/2019

06/2019 09/2019 15-20 25 41

Claremont Los Angeles 19/20 In-Progress Road Maintenance & Rehabilitation

Citywide Annual Roadway Improvements

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The Project consists of a grind & pave of the existing roadway surface with 2 inches of Rubberized Asphalt Concrete (RAC). Areas that are lifted, or sunken, will be removed and replaced with a deeper section to restore the surface to acceptable standards. Curb and gutter, sidewalk, street striping, and ADA ramps will be replaced as necessary to pave the roadways.

Towne Avenue from Harrison Avenue to Foothill Boulevard, Andrews Drive from Claremont Boulevard North to Claremont Boulevard South, Mt. Baldy Road from Mills Avenue to Grand Avenue, and Indian Hill Boulevard from Base Line Road to Armstrong Drive.

Pre-Construction & Construction

04/2019 08/2019

07/2019 09/2019 10-20 25 41

Commerce Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 2019/20 Pavement Rehabilitation Project

This project will include: Paving and/or Striping Installation (New Safety) | The project will provide for the pavement rehabilitation of selected streets throughout the City. The selected streets were based on the recommendations identified within the City's Pavement Management System (PMS). | The final selection and inclusion of streets can take place after bids are received. Based on budget availability, the contractor bids and Council priority, staff will be able to make final recommendations for Fiscal Year 19/20 street rehabilitation program.

Atlantic Blvd from Washington Blvd to Como St; Sheila St. from West End to East End; Triggs St. from Eastern Ave to Telegraph/Atlantic; Gage Ave. from Stauson Ave to Greenwood Ave.; Garfield Ave from Telegraph Rd. to S City limit.

Construction 09/2019 06/2020 10-25 32 58

Commerce Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation

FY 2017/18 Pavement Rehabilitation Project

This project will include: The Project will provide for the pavement rehabilitation of selected streets throughout the City. The selected streets were based on the recommendations identified within the City's Pavement Management System (PMS).

Garfield Ave from Telegraph Rd to S City limit Construction 09/2019 06/2020 15-25 32 58

Compton Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation Compton Boulevard Project - East

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New) | Installation of raised medians and Class II bicycle lanes. Remove and replace locations for ADA ramps, curb gutters, sidewalk; grind/overlay asphalt; replace all traffic markings, linework, traffic loops

Compton Boulevard from Willowbrook Avenue to eastern city limits Construction 03/2020 03/2022 10-20 35 64

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 27: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Compton Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation Residential Streets Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Remove and replace ADA ramps, curb, gutter, sidewalk; grind/overlay asphalt; replace all traffic markings, linework.

Myrrh Street-City Limit East to Oleander Avenue; Walnut Street- City Limit to City Limit; Walnut Park Drive - City Limit to City Limit; Greenleaf Drive - City Limit to Center Street; Alondra Boulevard - City Limit to City Limit; Bullis Road -Compton Boulevard to City Limit South; Greenleaf Boulevard - City Limit East to Alameda Street ; Alondra Boulevard Bridge Deck - City Limit East to Lime Street; Santa Fe Avenue - City Limit north - City Limit south

Construction 03/2020 12/2020 10-15 35 64

Compton Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation Residential Street Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing) | Remove and replace locations of ADA ramps, curb, gutter, sidewalk; grind/overlay asphalt; replace all traffic markings, and linework.

Tajuata Avenue- Rosecrans Avenue to Compton BoulevardElva Avenue- 138th Street to Parmelee Avenue ; Slater Avenue - 133rd Street to Wilmington Avenue; Grandee Avenue - City Limit North to 138th Street; Parmelee Avenue -City Limit North to 138th Street; Oris Street - Grandee Avenue to City Limit East; 135th Street - Parmelee Avenue to Elva Avenue; Compton Avenue - 130th Street 134th Place; Slater Avenue - 133rd Street to Wilmington Avenue; Tucker Street - Crane Avenue to Van Ness Avenue

Construction 03/2020 12/2020 10-15 35 64

Compton Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation Compton Boulevard Project - West

This project will include: install bike lanes and lighting along the corridor; enhance pedestrian crossings at 15 intersections. Remove and replace locations for ADA ramps, curb, gutter, sidewalk; grind/overlay asphalt; replace all traffic markings, linework, traffic detector loops.

Compton Boulevard from Willowbrook Avenue to western city limits Construction 03/2020 03/2022 10-20 35 64

Covina Los Angeles 19/20 New Complete Streets Components

East Badillo Street Rehabilitation Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

East Badillo Street, from Glendora Avenue to Barranca Avenue

Pre-Construction & Construction

08/2019 03/2020

01/2020 07/2020 10-15 33 63

Cudahy Los Angeles 19/20 New Road Maintenance & Rehabilitation

City of Cudahy Local Match Requirement for the “Cudahy Citywide Complete Streets Improvement Project” on Atlantic Avenue Corridor

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | Installation of pedestrian lighting and bus stop infrastructure (bus shelters, bus stop poles, benches, bike racks, trash cans) as well as pedestrian crosswalks improvements.

Atlantic Avenue from Florence Avenue (North City limits) to Patata Street (South City Limits). Approximate Length= 1 mile Construction 06/2020 06/2021 10-20 10 24

Diamond Bar Los Angeles 19/20 New Road Maintenance & Rehabilitation

Arterial Street Rehab (Diamond Bar Blvd from Pathfinder Road to Mountain Laurel Way)

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | As part of the City's ongoing pavement rehabilitation program, the entire width of the major arterial roadway, Diamond Bar Blvd., will be rehabilitated and ADA curb ramp improvements. This project consists of 1.09 center line miles. Pre-Construction is scheduled for March 2020 for one day and construction to follow right after.

Diamond Bar Blvd. between Mountain Laurel Way and Pathfinder Road Construction 03/2020 05/2020 10-20 29 55

Diamond Bar Los Angeles 17/18 Carried Over Other Grand Ave/Golden Springs Drive Intersection Enhancement

This project will include: As a result of the widening of the Grand/Golden Springs Drive intersection being performed by the City of Industry, pedestrian hardscape and landscape enhancements associated with crosswalks, sidewalks and parkways are being implemented.

Intersection of Grand Ave. and Golden Springs Drive Construction 07/2019 12/2020 10-20 29 55

Diamond Bar Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Arterial Street Rehabilitation (Diamond Bar Blvd. from Mountain Laurel to Clear Creek Canyon)

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | As part of the City's ongoing pavement rehabilitation program, the entire width of the major arterial roadway, Diamond Bar Blvd., will be rehabilitated and ADA curb ramp improvements. This project consists of 0.88 centerline miles. Pre-Construction is scheduled for August 2019 for one day and construction to follow right after.

Diamond Bar Blvd. between Mountain Laurel Way and Clear Creek Canyon Construction 08/2019 09/2019 10-20 14 26

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 28: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Downey Los Angeles 17/18 In-Progress Safety Paramount Blvd. Median (Firestone Blvd. to Imperial Hwy)

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Project Scope Development | Construction of a raised landscaped median island. Scope to include removal of existing striped median/pavement, installing raised concrete median island with drought tolerant landscaping and irrigation, left-turn lanes, signage/striping and the rehabilitation of existing pavement and repair of miscellaneous concrete surfaces. | The project design phase took place throughout the 2017-2019 Fiscal Years. Construction began in March 2019 and is anticipated to end in July 2019.

Paramount Blvd. Median (Firestone Blvd. to Imperial Hwy.) Pre-Construction & Construction

09/2017 05/2019

04/2019 08/2019 25-30 32 58

Downey Los Angeles 17/18 In-Progress Safety Paramount Blvd. Median (Firestone Blvd. to Florence Ave.)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Pavement Improvement (New), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Construction of a raised landscaped median island. The project consists of removing existing striped median/pavement, installing raised concrete median island, left-turn lanes, replacement of traffic loop detectors, signage/striping, and other related improvements. | The project was in the design phase throughout 2017-2019. The project is expected to start construction in August of 2019.

Paramount Blvd. (Firestone Blvd. to Florence Ave.) Pre-Construction & Construction

11/2017 08/2019

07/2019 12/2019 25-30 32 58

Downey Los Angeles 17/18 In-Progress Safety South Downey Safe Routes to School Project

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Active Transportation Plan, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Project Scope Development | Construction of sidewalks and curb ramps, signage, replacement of striping, pavement markings, install vehicle speed feedback signs along the project limit and school safety education program | The project was in the design phase during throughout 2017-2019. The project is expected to start construction in July 2020.

Blodgett Ave: Adoree St., Airport Ave., Lankin St., Quoit St., Nada St., Julius St., Pomering Rd. & Laura St.

Pre-Construction & Construction

01/2018 07/2020

07/2020 09/2020 25-50 32 58

Downey Los Angeles 17/18 Carried Over Other Lakewood/Rosemead Corridor Study

This project will include: Feasibility Study | Multijurisdictional complete street study of the Lakewood Blvd. - Rosemead corridor within the Gateway Cities sub-region. Study will analyze multiple travel modes (I.e., transit, cycling, walking, vehicles, etc.) and enhancing connectivity among said modes.

Lakewood Blvd from North City Limit to South City Limit Pre-Construction 07/2019 06/2020 50-50 32 58

Downey Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

FY 18-19 Pedestrian Improvements/ New Sidewalk/Ramp Construction & ADA Improvements

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing) | Construction of new and repair of existing pedestrian facilities (i.e. sidewalk, curb ramps) to enhance pedestrian circulation and to comply with ADA requirements

Southwest quadrant (District 2): Burns Ave., Brookshire Ave., Gardendale St., Milta Ave., Stewart & Gray Rd. & Old River School Rd. All locations are subject to change and will be selected based on priority need and resources throughout the year.

Construction 07/2019 09/2019 30-50 32 58

Downey Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

FY 18-19 Residential Street Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | Construct rubberized asphalt overlay on residential streets to extend the useful life of said streets for approximately 20 more years.

Century Blvd, Downey Av, Cole St Patton Rd, Dalen St, Donovan St, Brookshire Ave, Imperial Blvd, Imperial Hwy, Patton Rd, Stewart & Gray Rd, Patton Rd, Cleta St, Seaaca St, Washburn Rd, Regentview Ave, Washburn Rd, Woodruff Ave, Alameda St, Brookshire Ave, Cole St, Comolette St, De Palma St, Rives Ave., Horley Ave, Nada St, Planett Ave, in addition to many other locations. All listed locations are subject to change and will be selected based on priority need and resources throughout the year.

Construction 05/2019 09/2019 10-20 32 58

Downey Los Angeles 19/20 New Safety FY 2019/2020 Miscellaneous Concrete Repairs and ADA Improvements

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Annual miscellaneous concrete construction and repairs of concrete surfaces in Council District 1 and construction of ADA-compliant curb access ramps, drive approaches and sidewalks Citywide.

Southeast Quadrant of the City. Exact locations to be determined and updated in expenditure report. Construction 04/2020 06/2020 20-50 32 58

Downey Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 2019/2020 Annual Slurry Seal Program

This project will include: Pavement Rehab/Repair (Existing) | Slurry seal of aged asphalt concrete pavement on residential streets in Council District 4. The application of slurry seal on aged pavement is an effective means of preserving asphalt pavement surfaces and extending its life an average of 5 to 7 years.

Northeast Quadrant of the City. Exact locations to be determined and identified in expenditure report Construction 06/2020 09/2020 5-7 32 58

Downey Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 2019/2020 Residential Streets Pavement Rehabilitation

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Rehabilitation of pavement on various residential streets in Council Districts 3 & 4 and replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.

Northwest and Southwest Quadrants of the City. Exact locations to be determined and identified in expenditure report Construction 06/2020 09/2020 15-20 32 58

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 29: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Downey Los Angeles 19/20 New Road Maintenance & Rehabilitation 3rd Street Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Rehabilitation of asphalt pavement on 3rd Street from Old River School Road to Rives Avenue. The work includes replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.

3rd Street from Old River School Road to Rives Avenue Construction 10/2019 03/2020 15-20 25 48

Duarte Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 19/20 Street Rehabilitation Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing)

City of Duarte's FY19/20 Street Rehabilitation Project: Miltonwood Ave. from Royal Oaks Dr. to Chesson St.; 2nd St. from Highland Ave. to Miltonwood Ave.; Chesson St. from Miltonwood Ave. to Bradbourne Ave.; Dresden Ave. from Chesson St. to end of street; Chimes Ave. from Royal Oaks Dr. to Chesson St.; Atlin St. from Chimes Ave. to Bradbourne Ave.; Baylor St. from Chimes Ave. to Bradbourne Ave.; Bradbourne Ave. from Royal Oaks to end of street

Construction 01/2020 05/2020 20-25 7 16

El Monte Los Angeles 18/19 Carried Over Complete Streets Components

Merced Ave - Garvey Ave to Rio Hondo Parkway Road Diet (Traffic Calming) (18-19 carryover)

This project will include: Cost Estimating, Document Preparation, Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development | traffic calming and road diet

Merced Ave from Garvey Ave to Rio Hondo Parkway Pre-Construction & Construction

07/2019 12/2019

11/2019 06/2020 5-15 22 48, 49

El Monte Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation

Slurry Seal/Overlay Project Phase II - Montain View Rd, Magnolia St, Parkway Dr and Fineview St (17-18 carryover)

This project will include: ADA Curb Ramp Rehab/Repair (Existing) | Roadway/street slurry seal, overlay and resurfacing project Area encompassing Montain View Rd, Magnolia St, Parkway Dr and Fineview St Construction 08/2019 01/2020 10-20 22 48, 49

El Monte Los Angeles 19/20 New Road Maintenance & Rehabilitation

Federal Drive Resurfacing - Peck Rd between Valley Blvd & Ramona Blvd This project will include: Pavement Rehab/Repair (Existing) Peck Rd between Valley Blvd and Ramona Blvd Construction 06/2019 10/2019 5-10 22 48, 49

El Monte Los Angeles 19/20 New Road Maintenance & Rehabilitation

Pavement Repair - Asher St, Elliot Ave, Santa Anita Ave, Tyler Ave

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development Asher St, Elliot Ave, Santa Anita Ave, and Tyler Ave Pre-Construction &

Construction 07/2019 12/2019

11/2019 06/2020 5-10 15 33

El Segundo Los Angeles 19/20 New Road Maintenance & Rehabilitation Local Street Rehab. This project will include: Pavement Rehab/Repair (Existing) Pine Ave. – between Center St. and Whiting St.; Imperial Avenue – between

Sheldon St. and California St. Construction 06/2020 08/2020 5-15 6 9

Gardena Los Angeles 19/20 New Other Public Works Maintenance Equipment Purchase

This project will include: Procurement of Public Works Equipment | Acquisition of Street Trimming Equipment to be used to maintain trees along the roadway will ensuring the safety of both motorists and non-motorists.

City Wide Procurement / Operational Needs 11/2019 12/2019 5-20 35 62, 66

Gardena Los Angeles 19/20 New Road Maintenance & Rehabilitation Western Avenue Street Improvement

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing)

Western Avenue from Redondo Beach Blvd. to Artesia Blvd. Pre-Construction & Construction

07/2019 05/2020

02/2020 06/2020 10-15 17 30

Glendale Los Angeles 19/20 New Road Maintenance & Rehabilitation

La Crescenta Avenue Rehabilitation Project

This project will include: Cost Estimating, Maintenance Program Plan Development, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Selective removal and construction of deteriorated pavement; surface grinding and placement of ARHM, Asphalt Concrete Pavement (Leveling Course); selective reconstruction of concrete curb and gutters, cross gutters, driveway aprons, and sidewalks; construction of Portland Cement Concrete ADA curb ramps; adjustment of existing manholes and water meters to finished grade; installation of striping and other pavement markings; and modification of existing traffic signal systems.

La Crescenta Avenue Between Verdugo Road and Montrose Avenue Pre-Construction & Construction

07/2019 07/2020

06/2020 11/2020 15-20 25 43

Glendale Los Angeles 19/20 New Road Maintenance & Rehabilitation

Maintenance District 9 Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project will provide a wide range of pavement rehabilitation and preventive maintenance on various streets within the City’s Maintenance District 9.

City of Glendale Maintenance District 9, various streets located between Brand Boulevard and Grandview Avenue, north of Glenoaks Boulevard and CA-134 Freeway

Pre-Construction & Construction

07/2019 07/2020

06/2020 12/2020 5-10 25 48

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 30: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Glendora Los Angeles 19/20 New Road Maintenance & Rehabilitation

Sunflower Avenue Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

From Freeway 210 Ramps to Arrow Highway Construction 10/2019 05/2020 20-30 25 48

Glendora Los Angeles 19/20 New Road Maintenance & Rehabilitation Cullen Avenue Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Cullen Avenue from Bennett Avenue to Foothill Blvd Construction 12/2019 04/2020 15-30 25 48

Glendora Los Angeles 19/20 New Road Maintenance & Rehabilitation Loraine Avenue Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Loraine Avenue from Sierra Madre Avenue to Route 66 Construction 06/2020 08/2020 20-30 19 37

Hawaiian Gardens Los Angeles 19/20 New Road Maintenance & Rehabilitation Various Street Improvements Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project will include cold mill existing AC pavement; ARHM overlay; Remove and replace damaged curb, gutter, sidewalk, driveway; Upgrade curb ramp to ADA access; Install high visibility striping, pavement markings, crosswalks

226th St (Juan Avenue to Norwalk Blvd); Arline Ave (Civic Center Dr to Carson St); Claretta Ave (Carson St to Tilbury St); Elaine Ave (226th St to 223rd St); Wardham Ave (226th St to Brittan St); Violeta Avenue (Civic Center Dr to Carson St)

Construction 06/2020 12/2020 20-25 35 62

Hawthorne Los Angeles 19/20 New Road Maintenance & Rehabilitation

City of Hawthorne Public Works Crew Performed Rehab and Repairs 2020

This project will include: Cost Estimating, Maintenance Program Plan Development, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | This project will reconstruct selected streets from our pavement management program at various locations. The project will rehabilitate streets in areas using asphalt rubber hot mix over asphalt concrete leveling course to improve safety and drivablility. This will include full depth reconstruction of specific failed areas as well as grinding, excavation, and removal of existing pavement, new pavement, and traffic striping and marking.

This project will reconstruct selected streets at various locations. Locations that are serviced throughout the Fiscal Year will be provided during expenditure reporting.

Pre-Construction & Construction

07/2019 07/2019

06/2020 06/2020 10-22 35 62

Hawthorne Los Angeles 17/18 In-Progress Traffic Control Devices Prairie Avenue Mobility and Improvement Project Phase 1

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Upgrade traffic signal system at 10 intersections along Prairie Ave. Street widening at El Segundo Blvd. & Rosecrans Avenue.

Prairie Avenue between 116th Street and Marine Avenue. Construction 03/2019 12/2019 10-20 35 62

Hawthorne Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation

Local Streets and Roads Improvement Project 2020 (Location Set - A)

This project will include: Cost Estimating, Maintenance Program Plan Development, Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project will reconstruct selected streets from our pavement management program at various locations. The project will rehabilitate streets in areas using asphalt rubber hot mix over asphalt concrete leveling course to improve safety and drivablility. This will include full depth reconstruction of specific failed areas as well as grinding, excavation, and removal of existing pavement, new pavement, and traffic striping and marking.

The following neighborhoods may be subject to the proposed improvements described. Northeast, Bodger Park, Burleigh, and Del Air. Alley ways throughout will also be addressed.

Pre-Construction & Construction

01/2020 03/2021

12/2020 06/2022 10-20 35 62

Hawthorne Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation

Local Streets and Roads Improvement Project 2020 (Location Set - B)

This project will include: Cost Estimating, Maintenance Program Plan Development, Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project will reconstruct selected streets from our pavement management program at various locations. The project will rehabilitate streets in areas using asphalt rubber hot mix over asphalt concrete leveling course to improve safety and drivablility. This will include full depth reconstruction of specific failed areas as well as grinding, excavation, and removal of existing pavement, new pavement, and traffic striping and marking.

The following neighborhoods may be subject to the improvements described: Holly Glen, Holly Park, Moneta Gardens, and NorthWest

Pre-Construction & Construction

01/2020 03/2021

12/2020 06/2022 10-20 10 20

Hermosa Beach Los Angeles 19/20 In-Progress Safety CIP 173 8th Street Improvements

This project will include: Cost Estimating, ADA Curb Ramp Installation (New), Document Preparation, Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The project consists of improvements that will improve walkability and provide safe pedestrian access on 8th Street from Valley Drive to Hermosa Avenue. Improvements include continuous sidewalk; ADA curb access ramps on 8th Street; drainage improvements; installing crosswalks on both sides of 8th Street at intersections of: Manhattan Avenue, Monterey Blvd, Loma Drive, Cypress Avenue, Bard Street and Valley Drive.

On 8th Street between Valley Drive and Hermosa Avenue. Pre-Construction & Construction

01/2016 09/2019

08/2019 12/2019 15-30 26 66

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 31: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Hermosa Beach Los Angeles 19/20 In-Progress Road Maintenance & Rehabilitation

CIP 186 Street Improvements - Various Locations

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New) | This project proposes pavement rehabilitation of streets at various locations. The project will also address limited quantities of deteriorated concrete sidewalk, curb and gutter, curb ramps and drainage deficiencies.

24th St from Hermosa Ave to Park Ave; Streets in northern Hermosa Beach, west of Valley Dr; Prospect Ave from Artesia Blvd to 18th St Streets around Prospect Ave from Artesia Blvd to 18th St

Pre-Construction & Construction

05/2019 10/2019

09/2019 12/2019 10-20 26 66

Hermosa Beach Los Angeles 19/20 New Road Maintenance & Rehabilitation CIP 190 Annual Street Improvements

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New) | This project provides for pavement rehabilitation of streets at various locations. The project will also repair/replace deteriorated portions of sidewalk, curb & gutter and curb ramps.

Northern Hermosa Beach area, west of Valley Drive. Bayview Drive, Palm Drive, and Manhattan Avenue from Pier Avenue to 21st Street. 10th Street, 9th Street, 8th Street from Ardmore Avenue to Pacific Coast Highway. All locations listed are an estimate and have yet to be finalized.

Pre-Construction & Construction

06/2019 11/2019

10/2019 04/2020 10-20 17 59

Hidden Hills Los Angeles 17/18 Carried Over Complete Streets Components

Long Valley Road/Valley Circle/US-101 On-Ramp Improvements

This project will include: The improvement and construction of a right turn pocket on Valley Circle Boulevard; an additional traffic lane on the Long Valley Corridor ramp from Valley Circle Boulevard to Long Valley Road Intersection; ADA compliant sidewalk from Long Valley Road security gate in the City of Hidden Hills to the Valley Circle Boulevard/Ventura Boulevard intersection; the purchase and improvement of a parking/staging area on Long Valley Road in the City of Hidden Hills to alleviate traffic congestion; and the reconfiguration of the security gatehouse.

Long Valley Road in between Valley Circle Boulevard, US-101 on-ramp and City of Hidden Hills gatehouse

Pre-Construction & Construction

03/2020 07/2020

05/2020 10/2020 40-50 27 45

Hidden Hills Los Angeles 19/20 New Other Round Meadow School Student Drop-off/Pick-up

This project will include: Document Preparation, Preliminary Design, Project Scope Development | This project aims to improve traffic congestion on Round Meadow Road while providing safe student access during student drop-off and pick-up at Round Meadow Elementary School. This will be accomplished by diverting school traffic off of Round Meadow Road and onto the school site for student drop-off and pick-up. Vehicles will loop around the outer edge of an existing ball field along a permeable track. This area will have enough storage for 25-30 vehicles. In addition, much needed staff parking

Round Meadow Elementary School 5151 Round Meadow Rd, Hidden Hills, CA 91302

Pre-Construction & Construction

04/2019 07/2020

06/2020 08/2020 20-25 23 40

Huntington Park Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Various Street Improvement Project

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Albany St-Gage Ave to Laura Ave, Hill St-East City Limits to Salt Lake Ave, Mortimer Ave-West City limits to Santa Fe Ave, Santa Ana St-West City limits to California Ave, Walnut St-State St to Mountain View Ave, Mountain View Ave-Walnut St to Florence Ave

Pre-Construction & Construction

07/2019 02/2020

12/2019 06/2020 10-20 33 53, 59

Huntington Park Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Asphalt Resurfacing/Overlay grinding of streets and placing and compacting hot mix asphalt pavement, adjusting infrastructure/utility manholes, valve covers, etc. to new grade.

Florence Avenue-Santa Fe Avenue to California Avenue; Gage Avenue-Alameda Street to Salt Lake Avenue; Miles Avenue-Florence Avenue to Slauson Avenue ; Pacific Boulevard-Florence Avenue to Slauson Avenue State Street-Randolph Street to Slauson Avenue; State Street-Florence Avenue to Santa Ana Street

Construction 01/2019 06/2019 10-15 12 31

Industry Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation Arenth Avenue Reconstruction

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing) | Cold Mill Overlay, driveway approaches, improved hydrology pattern, ADA improvements, striping

Arenth Avenue from Puente Road to Nogales Street Pre-Construction & Construction

01/2019 06/2019

05/2019 02/2020 15-25 35 62

Inglewood Los Angeles 19/20 New Road Maintenance & Rehabilitation P609 Van Ness Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Van Ness from North City Limit to Manchester Construction 09/2019 04/2020 10-20 35 62

Inglewood Los Angeles 19/20 New Road Maintenance & Rehabilitation

P619 Centinela Avenue Improvements

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Landscape Safety Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Centinela from La Cienega to Florence Construction 04/2020 08/2020 10-20 35 62

Inglewood Los Angeles 19/20 New Road Maintenance & Rehabilitation

P652 South Prairie Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

S. Prairie Ave from Century Blvd to I-105 Fwy Construction 10/2019 04/2020 10-20 8 5

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 32: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Irwindale Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation 2018/2019 Resurfacing Program

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurfacing: 2" grind and overlay of AC pavement, re-striping, structural repairs where needed

Rivergrade Road, Stewart Avenue, Longden Avenue; City of Irwindale Construction 08/2019 10/2019 10-15 22 48

Irwindale Los Angeles 19/20 Forecasted Road Maintenance & Rehabilitation 2019/2020 Resurfacing Program

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurfacing: 2" grind and overlay of AC pavement, re-striping, structural repairs where needed

Irwindale Rd, Adelante St, Santos Diaz St; in the City of Irwindale Construction 07/2020 08/2020 10-15 3 11

La Canada Flintridge Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Street Resurfacing Program

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Streets include: ; Fairlawn Drive ; Lanterman Lane; Commonwealth Avenue; Hobbs Drive; Vista Place; Hilldale Drive; El Camino Corto Street; Palm Drive; Louise Drive; Palm Terrace Court; Jarvis Avenue; Journey’s End Drive; Green Lane; Flanders Road; Alta Park Lane;

Construction 09/2019 12/2019 10-15 29 55

La Habra Heights** Los Angeles 19/20 New Road Maintenance & Rehabilitation FY 19/20 Street Improvement Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement

Rehab/Repair (Existing)

Bonita Dr, Cypress St, Darlene Dr, Dorothea Rd, Ganter Rd, Mayapan Rd, Nabal Rd, Popenoe Rd, Rincon Dr, Citrus St, Hiatt St, Kashlan Rd, La Cresta Dr, Nabal Rd, Popenoe Rd, Sierra Vista Dr

Pre-Construction & Construction

09/2019 03/2020

02/2020 07/2020 10-20 32 57

La Habra Heights*T* Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation FY 18/19 Street Improvement Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Rehab/Repair (Existing) | Repair deteriorated pavement areas and resurface streets identified as priorities in the Pavement Management Program. Repair may include crack fill, slurry seal, cape seal, chip seal, asphalt concrete overlay, or remove and replace, as well as restriping and drainage facility repair and improvements.

Chota Rd (from Fullerton Rd to 1635’ w/o Fullerton Rd, 1635’ w/o Fullerton Rd Carrie Hills Ln, and Carrie Hills Ln to Kashlan Rd); Fullerton Rd (from Corral Mtwy to North City Limit); Sapota Dr (from End to Sharpless Dr); Sharpless Dr (from Skyline Vista Dr to Skyline Dr); Coban Rd (from Dorothea Rd to East Rd, and Kashlan Rd to End); Skyline Dr (from 1250 n/o Sharpless Dr to Sharpless Dr, and Sharpless Dr to Airoso Rd); Kanola Rd (from Fullerton Rd to West End)

Construction 09/2019 11/2019 10-20 32 57

La Mirada Los Angeles 19/20 In-Progress Road Maintenance & Rehabilitation Measure I Residential Street Phase V

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Project includes pavement rehabilitation, replacement of damaged curb, gutter and sidewalk, upgrades to existing and placement of new handicap curb access ramps, removal and replacement of slotted cross gutters, storm drain pipe repairs, etc.

Street rehabilitation on local, public streets bounded by Imperial Highway, Biola Avenue, Stage Road, Valley View Avenue and Milan Creek. Construction 05/2019 06/2020 20-25 29 65

La Puente Los Angeles 19/20 New Road Maintenance & Rehabilitation

Fy 19-20 Street Improvements Project

This project will include: Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design

California Ave.- Nelson Ave. to Temple Ave; Sierra Vista Ct. - Glendora Ave. to Del Valle Ave.; Fifth St.-Rowland St. to Main St.; Fifth St.-Temple Ave. to Sierra Vista Ct.; Workman St.-Fifth St. to End; Main St.-Azusa Ave. to Laura St.

Pre-Construction & Construction

05/2019 08/2019

06/2019 12/2019 15-20 28 42

La Verne Los Angeles 19/20 New Road Maintenance & Rehabilitation

Rehabilitation of Baseline Road from Foothill Boulevard to Easterly City Limits

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) Baseline Road from Foothill Boulevard to Easterly City Limits Construction 07/2019 09/2019 10-15 7 16

Lakewood Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Del Amo Blvd Rehab This project will include: Overlay with ARHM Del Amo Blvd between Paramount Blvd and Cherry Ave; Del Amo Blvd between

Paramount Blvd and Downey Ave Pre-Construction 07/2019 06/2020 12-15 32, 33 63

Lakewood Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Pavement Rehab Phase I This project will include: Overlay with ARMH Candlewood St between Fidler Ave and 400 feet west of Lakewood Blvd

Harvey Way between Bellflower and Woodruff Pre-Construction 07/2019 06/2020 12-15 32, 33 63

Lakewood Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Harvey Way Rehab This project will include: Overlay with ARHM Harvey Way between Bellflower Blvd and Woodruff Ave Pre-Construction 07/2019 06/2020 12-15 32, 33 63

Lakewood Los Angeles 19/20 Carried Over Complete Streets Components

Paramount Blvd Drainage and Landscape

This project will include: Modify existing curb and gutter and side panels (medians) to receive and retain stormwater and nuisance water runoff. (Funding by SB 1 and other sources) Paramount Blvd between Del Amo Blvd and Carson St Pre-Construction 07/2019 06/2020 20-30 32, 33 63

Lakewood Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Alley West of Lakewood Blvd Reconstruction

This project will include: Remove existing asphalt and base. Reconstruct with new base and Portland Cement Concrete (PCC) Alley west of Lakewood Blvd between Candlewood St and Hardwick Ave Pre-Construction 07/2019 06/2020 25-30 32, 33 63

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 33: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Lakewood Los Angeles 19/20 New Road Maintenance & Rehabilitation ARHM Overlay This project will include: Pavement Rehab/Repair (Existing) | ARHM Overlay

Allington to south end & La Jara & Hedda; Carson & Lakewood Blvd. NW corner alley; Carson & Paramount; Del Amo to Pioneer; On Candlewood from Paramount to Downey; Candlewood from Paramount to Railroad; Crossing (Near Deeboyar);

Pre-Construction & Construction

07/2019 07/2019

06/2020 06/2020 12-15 32, 33 63

Lakewood Los Angeles 19/20 New Road Maintenance & Rehabilitation Hardscape Repair This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing)

11535 205TH ST, 11415 205TH ST, 11407 205TH ST, 11865 205TH ST, 11831 205TH ST, 11846 205TH ST, 11628 205TH ST, 12603 206TH ST, 12603 206TH ST, 12620 206TH ST, 11523 206TH ST, 11433 206TH ST, 11861 206TH ST, 11870 206TH ST, 11627 206TH ST, 11731 206TH ST, 12302 207TH ST, 20733 207TH ST, 20737 207TH ST, 20837 207TH ST, 20927 207TH ST, 20922 207TH ST, 20922 207TH ST, 20912 207TH ST, 20912 207TH ST, 20902 207TH ST, 12328 207TH ST, 12328 207TH ST, 20802 207TH ST, 20732 207TH ST, 20720 207TH ST, 12368 207TH ST, 12416 207TH ST, 12428

Construction 07/2019 06/2020 25-50 21 36

Lancaster Los Angeles 19/20 New Road Maintenance & Rehabilitation

2020 Pavement Management Program

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

(1) Ave L - 10th St West to Sierra Hwy (2) Ave J - 10th St West to 15th St West (3) Ave K - 20th St West to 40th St West (4) Ave H - 25th St West to 40th St West (5) Neighborhood: Division St to Challenger Way; Ave J-8 to Ave K (6) Neighborhood: Lancaster Blvd to Ave J; 10th St West to 15th St West

Pre-Construction & Construction

01/2019 08/2019

07/2019 11/2019 7-30 21 36

Lancaster Los Angeles 19/20 New Road Maintenance & Rehabilitation

2019 Pavement Management Program

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety)

(1) Neighborhood: Ave I to Lancaster Blvd; 10th St West to 20th St West (2) Neighborhood: Ave J-8 to Ave K; 10th St West to Adler Ave (3) 4th St East - Ave L to Ave M (4) 30th St West - Ave M to Ave N

Construction 07/2019 10/2019 7-30 2 10

Lawndale Los Angeles 19/20 New Road Maintenance & Rehabilitation

Annual SB1-Street Improvement Project FY 19-20

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Freeman Ave between 154th Street and Marine Ave. Grevillea Ave. between 167th Street and 159th Street W.159th Street between Grevillea and Firmona Ave. W.160th Street between Grevillea Ave. to Col-De-Sac

Construction 09/2019 11/2019 20-28 38 79

Lomita Los Angeles 19/20 New Road Maintenance & Rehabilitation Slurry Seal This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Preliminary

Design

Streets throughout the northern portion of the City that calls for Cape Seal, Type II Slurry and Slurry Seal. These includes portions of 240th St., 242nd St., 243rd St, 246th St., 246th Pl., 247th St., 248th St, 249th St., 251st St., 252nd St., April Ct., Benhill Ave., Carlene Ln., Comal Ct., Dawn St., Doria Ave., Eleanor Pl, Eshelman Ave, Eshelman Way, Leola St., Olson Ln., Padron Pl., Pennsylvania Ave., Stanhurst, Walnut St., and Woodward Ave.

Pre-Construction & Construction

07/2019 08/2019

09/2019 11/2019 5-20 26 66

Lomita Los Angeles 19/20 New Road Maintenance & Rehabilitation

Walnut Street Water main and Street (from PCH to 253rd St.) Rehabilitation Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing)

Walnut Street from PCH to 253rd St. Construction 06/2019 10/2019 10-20 26 66

Lomita Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation 250th Street Roadway Rehabilitation This project will include: Street Resurfacing/Rehabilitation 250th Street between Pennsylvania Avenue and Eshelman Avenue Construction 08/2018 08/2019 10-20 19 35

Long Beach Los Angeles 19/20 New Road Maintenance & Rehabilitation Major Street Rehabilitation for FY20

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing)

Council District 2: 4th St between Cerritos Ave and Almond Ave; Temple Ave between 4th St and 7th St Council District 3: Ximeno Ave Between 4th St and 10th St. Council District 4: 10th St between Temple Ave and Obispo Ave; Bellflower Blvd between Garford St and Stearns St; Ximeno Ave between 15th St and Pacific Coast Highway. Council District 7: Cherry Ave between Wardlow Road and Bixby Road. Council District 8: San Antonio Dr between Long Beach Blvd and Atlantic Ave.

Construction 01/2020 06/2020 10-15 33 70

Long Beach Los Angeles 19/20 New Road Maintenance & Rehabilitation

Residential Street Rehabilitation for FY20

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing)

Council District 5: Lomina Avenue between Adderly Drive and Rosebay Street; Pageantry Street between Lomina Avenue and Rosebay Street; Pageantry Court between NW End and Pageantry Street; Pavo Street between Lomina Avenue and Rosebay Street. Council District 6: Linden Avenue between 20th Street and Hill Street.; Council District 9: Myrtle Avenue between Harding Street and Artesia Boulevard

Construction 01/2020 06/2020 10-15 1 6

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 34: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles Los Angeles 19/20 In-Progress Safety Branford Street - Arleta Ave to Pacoima Wash

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Storm Drain/Culvert Installation (New), Project Scope Development | This project will construct 600 linear feet of 36-inch diameter storm drain in Branford Street from the outlet at the Pacoima Wash Diversion Channel, northeasterly to Arleta Avenue to alleviate flooding and ensure vehicular and pedestrian safety.

San Fernando Valley. Council District 6: Branford Street - Arleta Ave to Pacoima Wash

Pre-Construction & Construction

04/2019 04/2021

03/2021 03/2022 20-30 30 54

Los Angeles Los Angeles 19/20 New Safety Beverlywood Street Storm Drain

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Storm Drain/Culvert Installation (New), Project Scope Development | This project will install approximately 450 feet of 24-inch diameter storm drain along Beverlywood Street between Holt Avenue and Corning Street. The scope of work also includes the installation of maintenance holes, catch basins, junction structures, and laterals. This project will alleviate flooding and ensure vehicular and pedestrian safety.

Beverlywood St, from Holt Ave to Corning Street; Council District 10 Pre-Construction & Construction

07/2019 07/2021

06/2021 06/2022 20-30 27 45

Los Angeles Los Angeles 19/20 New Safety Collier Winnetka Storm Drain

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Storm Drain/Culvert Installation (New), Project Scope Development | This project will install 300 linear feet of 48 inch storm drain, catch basins, maintenance holes, laterals and associated improvements to alleviate flooding and ensure vehicular and pedestrian safety .

Collier Street from Quakertown Ave to Winnetka Ave; in Council District 3 Pre-Construction & Construction

07/2019 07/2021

06/2021 06/2022 20-30 35 64

Los Angeles Los Angeles 19/20 New Safety Hawaiian - Opp Storm Drain

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Storm Drain/Culvert Installation (New), Project Scope Development | This project will install 1,300 linear feet of 24-inch diameter storm drain, catch basins, maintenance holes, laterals and associated improvements to alleviate flooding and ensure vehicular and pedestrian safety.

Along Hawaiian Ave betw Opp and I Streets, and along Opp Street betw King Ave and Frigate Ave; in Council District 15

Pre-Construction & Construction

07/2019 07/2021

06/2021 06/2022 20-30 18 39

Los Angeles Los Angeles 19/20 New Safety Magnolia Blvd. Storm Drain Extension

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Storm Drain/Culvert Installation (New), Project Scope Development | This project will install 700 linear feet of 36-inch diameter storm drain along Magnolia Blvd from Cartwright Avenue to Satsuma Ave to alleviate flooding and ensure vehicular and pedestrian safety.

Magnolia Blvd from Cartwright Ave to Satsuma Ave; in Council District 2 Pre-Construction & Construction

07/2019 07/2021

06/2021 06/2022 20-30

18, 24, 25, 26, 27, 30,

33, 35

38, 39, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

Los Angeles Los Angeles 19/20 New Safety Tunnel Lighting Improvement Program

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Construction 07/2019 06/2020 15-15 30 59

Los Angeles Los Angeles 19/20 New Safety Main Street Lighting Improvement Unit 1 CIP/STP

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Main St from 36th St to 43rd St; in Council District 9 Construction 07/2019 07/2020 15-20 18 46

Los Angeles Los Angeles 19/20 New Safety Riverside Dr. Lighting Improvement Unit 2 CIP/STP

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Riverside Dr from Lankershim Blvd to Camarillo Blvd, and Vineland Ave from Riverside Dr. To Hortense St.; in Council District 4 Construction 01/2020 03/2021 15-20 24 53

Los Angeles Los Angeles 19/20 New Safety 2nd St. Tunnel - Hill St. to Figueroa St. STM/STP

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) 2nd St. tunnel from Hill St. to Figueroa St. ; in Council District 14 Construction 11/2019 11/2020 15-20

18, 24, 25, 26, 27, 30,

33, 35

38, 39, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

Los Angeles Los Angeles 19/20 New Safety Safety Related Drainage Projects

This project will include: Pavement Rehab/Repair (Existing) | The projects consist of slope erosion repair, street reconstruction, installation of asphalt concrete (AC) berm or concrete berm, AC pavement, and any street remedial work to resolve or eliminate street related problems caused by improper drainage or slope sloughage.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Pre-Construction & Construction

07/2019 10/2019

06/2020 06/2020 20-30 18 39

Los Angeles Los Angeles 19/20 New Safety Fenton Ave and Terra Bella St Sidewalk Construction Project

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Preliminary Design, Right of Way, Project Scope Development | This project will improve the Right-of-Way along the North side of Terra Bella Street from Fenton Street to approximately 350 feet north east of Fenton Avenue to complete a 20-foot roadway, along with a 13-foot concrete sidewalk.

Fenton Ave and Terra Bella St; in Council District 7 Pre-Construction & Construction

10/2017 06/2019

02/2019 05/2020 20-30 18 39

Los Angeles Los Angeles 19/20 New Complete Streets Components

Sheldon Arleta Park Sidewalk Improvement - Wicks Street

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | The project will complete sidewalk improvements around Sheldon Arleta Park consisting of sidewalk, curb, gutter, street trees, street light, utilities relocation, traffic lane striping, and traffic signal modification.

Sheldon St and Wicks St; in Council District 6 Pre-Construction & Construction

07/2019 07/2020

06/2020 02/2022 20-30 18 39

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 35: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles Los Angeles 19/20 New Complete Streets Components

Sheldon Arleta Park Sidewalk Improvement - Sheldon Street

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | The project will complete sidewalk improvements around Sheldon Arleta Park consisting of acceleration and deceleration lanes, sidewalk, curb, gutter, street trees, street lights, utilities relocation, traffic lane striping, and traffic signal modification.

Sheldon St and Arleta Ave; in Council District 6 Pre-Construction & Construction

07/2019 11/2019

10/2019 06/2021 20-30 30 53

Los Angeles Los Angeles 19/20 New Safety 3rd Street Tunnel Study This project will include: The project will evaluate the structural integrity of 3rd Street Tunnel to determine if modifications, repairs, or improvements are required to ensure vehicular and pedestrian safety.

3rd St betw Hill St and Hope St; in Council District 14 Pre-Construction 11/2019 11/2020 1-5 25 43

Los Angeles Los Angeles 19/20 New Safety Durand Dr (3200) Metal Beam Guardrail at Historic Wall - Fall Hazard

This project will include: The project will construct a standard metal beam guardrail in the street pavement to ensure pedestrian safety. 3200 Durand Dr; in Council District 4 Construction 05/2020 11/2020 30-50 27 45

Los Angeles Los Angeles 19/20 New Safety Guardrail Repair on Woolsey Canyon Road

This project will include: The project will repair or replace the guardrail to ensure vehicular and pedestrian safety. Woolsey Canyon Rd, near Los Angeles County line; in Council District 12 Construction 05/2020 11/2020 30-50 18 39

Los Angeles Los Angeles 19/20 New Complete Streets Components

Sheldon Arleta Park Sidewalk Improvement - Arleta Ave

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | The project will complete sidewalk improvements around Sheldon Arleta Park consisting of acceleration and deceleration lanes, sidewalk, curb, gutter, street trees, street lights, utilities relocation, traffic lane striping, and traffic signal modification.

Sheldon St and Arleta Ave; in Council District 6 Pre-Construction & Construction

07/2019 06/2020

06/2020 02/2022 20-30 25 39

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation

La Tuna Canyon Rd Emergency Storm Drain/Embankment Repair

This project will include: Storm Drain/Culvert Installation (New) | This safety related project will reconstruct the roadway embankment and restore lateral support to La Tuna Canyon Road. Near 7900 W. La Tuna Canyon Road, 91352; in Council District 7 Construction 07/2019 11/2019 30-50 27 45

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation

Sepulveda Blvd (LAX) Tunnel Rockfall Mitigation Measures

This project will include: This safety related project will remove hazardous rock and slough from slope and install k-rail. 3100 Sepulveda Blvd, Los Angeles, 91436; in Council District 5 Construction 09/2019 03/2020 20-30 26 50

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation

Crescent Drive (8735, 8765, and 9003) Bulkheads

This project will include: This safety related project will construct steel beam and precast lagging bulkheads to restore lateral support to the street. The bulkheads at 8735, 8765, and 9003 Crescent Drive have respective lengths of 100 ft, 40 ft and 32 ft.

8735, 8765, and 9003 Crescent Drive, Los Angeles, 90046; in Council District 4 Construction 11/2019 05/2020 30-50 24 51

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation

Kinney Place (3611) and Quail Drive (656) Bulkheads

This project will include: Pavement Rehab/Repair (Existing) | This safety related project will construct new bulkheads with steel piles and concrete lagging at two locations (Kinney Place and Quail Drive), including a storm drain structure that will be constructed at Kinney Place, to provide lateral support to the roadway users.

3611 Kinney Place and 656 Quail Drive, Los Angeles, 90065; in Council District 1 Construction 11/2019 05/2020 30-50 26 50

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation

Miller Way (1451 N.) Bulkhead Replacement and Magnolia Drive (8500) Bulkhead

This project will include: This safety related project will replace the timber bulkhead at 1451 Miller Way with a new bulkhead consisting of steel piles and precast concrete lagging, and construct a new bulkhead at 8500 Magnolia Drive. The bulkheads will restore lateral support to the roadway and ensure the safety of the roadway users.

8500 Magnolia Drive and 1451 N. Miller Way, Los Angeles, CA 90046; in Council District 4 Construction 03/2020 09/2020 30-50 26 46, 50

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation

Caverna Drive (7280) Bulkhead Replacement and Utica Drive (8337) Bulkhead Extension

This project will include: This safety related project removes and replaces a portion of a deteriorating timber bulkhead and extend an existing timber bulkhead with new steel piles and precast concrete lagging to restore lateral support to the roadway and ensure the safety of roadway users.

7280 Caverna Drive and 8337 Utica Drive, Los Angeles, 90068 and 90046; in Council District 4 Construction 01/2020 07/2020 30-50 26 50

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation

Mantau Road (225-239) Retaining Wall Replacement

This project will include: This safety related project removes and replaces approximately 250 linear feet of concrete retaining wall to provide protection to the existing roadway. 225, 231, and 239 Mantua Road, Los Angeles, 90272; in Council District 11 Construction 04/2020 10/2020 30-50

18, 24, 25, 26, 27, 30,

33, 35

38, 39, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 36: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles Los Angeles 19/20 New Safety Sidewalk Repair Access Request Acceleration Strategy (Year 2 of 4)

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing) | The work consists of sidewalk repair and installation of curb ramps throughout the City.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Pre-Construction & Construction

07/2019 07/2019

10/2019 07/2020 20-30 30 59

Los Angeles Los Angeles 19/20 New Complete Streets Components

Jefferson Beautiful Complete Street Project This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Jefferson Blvd betw Vermont Ave and Western Ave; in Council District 8 Construction 01/2020 09/2021 20-30

18, 24, 25, 26, 27, 30,

33, 35

38, 39, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

Los Angeles Los Angeles 19/20 New Other Contingency for Construction This project will include: Use of this contingency funding for street improvement project(s) will be determined at a later date. The project(s) will be selected based upon priority need.

Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year. Pre-Construction 07/2019 07/2020 20-30 26 50

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation

Hollywood Blvd (8720/8730) Bulkhead

This project will include: This project will construct approximately 40 feet of bulkhead to restore lateral support to the roadway and ensure the safety of roadway users. 8720 and 8730 Hollywood Blvd; in Council District 4 Construction 01/2020 06/2020 30-50 24 51

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation

Mount Washington Drive (650) Bulkhead

This project will include: This project will repair the existing bulkhead and extend it by an additional 25 feet to restore lateral support to the roadway and ensure the safety of roadway users.

650 Mount Washington; in Council District 1 Construction 01/2020 06/2020 30-50 25 39

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation

La Tuna Canyon Stormdrain Roadway Stabilization

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | This is an existing project to stabilize the roadway slope and to repair and replace the stormdrain pipe through the slope.

Near 7900 W. La Tuna Canyon Road, 91352; in Council District 7 Construction 07/2019 03/2020 30-50 26 46

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation Solar Drive (2405) Bulkhead

This project will include: This project will construct a 72 foot bulkhead and install a curb and gutter and an 80 foot guardrail to restore lateral support to the roadway and ensure the safety of roadway users.

2405 Solar Drive; in Council District 4 Construction 01/2020 06/2020 30-50 25 39

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation Verdugo Crestline Drive (7675) This project will include: This safety project will install rock fill in order to laterally support the

roadway and ensure the safety of roadway users. 7677 Verdugo Crestline Dr; in Council District 7 Construction 07/2019 12/2019 30-50 18, 24, 25, 26, 27, 30,

33, 35

38, 39, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation Concrete Streets This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Project

Scope Development | The project will repair failed concrete streets throughout the City.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Pre-Construction & Construction

07/2019 01/2020

12/2019 06/2020 35-40

18, 24, 25, 26, 27, 30,

33, 35

38, 39, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

Los Angeles Los Angeles 19/20 New Safety Vision Zero Citywide Flashing Beacons

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Project Scope Development | The project will install flashing beacons along Vision Zero High Injury Network corridors throughout the City.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Pre-Construction & Construction

07/2019 01/2020

12/2019 06/2020 5-10

18, 24, 25, 26, 27, 30,

33, 35

38, 39, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation Failed Street Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Project Scope Development | The project will repair the most severely damaged streets throughout the City.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Pre-Construction & Construction

07/2019 01/2020

12/2019 06/2020 35-40

18, 24, 25, 26, 27, 30,

33, 35

38, 39, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

Los Angeles Los Angeles 19/20 New Safety Sidewalk Repair Contractual Services

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Procurement of contractors to perform sidewalk repair activities and improvements as needed. Locations will be selected based on priority need.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Construction 07/2019 06/2020 20-30 18, 24, 25, 26, 27, 30,

33, 35

38, 39, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

Los Angeles Los Angeles 19/20 New Safety Sidewalk Repair Engineering Consulting Services

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design | Procurement of as-needed engineering consulting services to provide design services on sidewalk repair.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Pre-Construction & Construction

07/2019 07/2019

06/2020 06/2020 1-5

18, 24, 25, 26, 27, 30,

33, 35

38, 39, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 37: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles Los Angeles 19/20 New Road Maintenance & Rehabilitation Vision Zero - Concrete Improvements

This project will include: Pavement Improvement (New), Preliminary Design, Project Scope Development | The project will repair failed concrete streets along Vision Zero High Injury Network corridors throughout the City.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Pre-Construction & Construction

07/2019 01/2020

12/2019 06/2020 35-45

18, 24, 25, 26, 27, 30,

33, 35

38, 39, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

Los Angeles Los Angeles 19/20 New Traffic Control Devices Vision Zero Traffic Signals This project will include: Procurement of Public Works Equipment | Procurement of materials to install safety improvmeents at various traffic signal locations Citywide.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Procurement / Operational Needs 07/2019 06/2020 5-10 30 53

Los Angeles Los Angeles 19/20 New Safety Vision Zero Traffic Signals Support This project will include: Public Works Staffing | Public Works-Street Lighting staff for traffic signal design work and street lighting elements of the Complete Streets and Vision Zero Program.

Citywide Procurement / Operational Needs 07/2019 06/2020 1-1 24 53

Los Angeles Los Angeles 19/20 New Other Board of Public Works This project will include: Public Works Staffing | Board of Public Works' staff for the processing of project invoices. Citywide Procurement /

Operational Needs 07/2019 06/2020 1-1 26 50

Los Angeles Los Angeles 19/20 New Safety Porto Marina Way (17806) Study This project will include: This project is to evaluate the subsidence at 17806 Porto Marina Way to determine the source of the subsidence and recommend future mitigation measures to ensure the safety of the public.

17806 W. Porto Marina Way, Los Angeles, 90272 in Council District 11 Pre-Construction 07/2019 06/2020 1-5 24 51

Los Angeles Los Angeles 19/20 New Safety Verde Street (2401) Remedial Slope Mitigation

This project will include: Preliminary Design | This project will construct approximately 200 linear feet of bulkhead to stabilize the slope and prevent further erosion into the City right-of-way.

2401 Verde Street Pre-Construction & Construction

07/2019 03/2020

02/2020 03/2021 20-30 30 64

Los Angeles Los Angeles 17/18 Carried Over Complete Streets Components Avalon from San Pedro to 120th

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety) | 3.9 lane miles of street reconstruction, 5.3 lane miles of resurfacing, and safety improvements. Street reconfiguration to one lane each way with a center lane for turning, fully protected bike lanes from 56th to Manchester, speed feedback signs, leading pedestrian intervals, rectangular rapid flash beacons (RRFB), protected left turns, curb extensions, signal timing upgrades, intersection tightening, new crosswalks with RRFB, new traffic signals, and bus stop relocation.

Avalon from San Pedro to 120th (Council Districts 8, 9, 15) Construction 07/2019 04/2023 20-25 30 64

Los Angeles Los Angeles 17/18 Carried Over Complete Streets Components Main (south) from MLK to Imperial

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety) | 3.1 lane miles of asphalt street reconstruction, 2.3 lane miles of concrete street reconstruction, 4.9 lane miles of asphalt resurfacing, and safety improvements. Speed feedback signs, leading pedestrian intervals, adding RRFBs to crosswalks, protected left turns, signal timing upgrades, new crosswalks with RRFB, new traffic signals, and bus stop relocation.

Main (south) from MLK to Imperial (Council Districts 8, 9) Construction 07/2019 04/2023 20-25 18, 27 45

Los Angeles Los Angeles 17/18 Carried Over Complete Streets Components Reseda from Parthenia to Victory

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety) | 6.2 lane miles of street reconstruction, 6.2 lane miles of resurfacing and safety improvements. Crosswalk installation or upgrades, striping modifications, curb extensions, signal phasing and timing changes, and proposals for closing a gap in the existing bike lanes, between Valerio and Vanowen.

Reseda from Parthenia to Victory (Council District 3,12) Construction 07/2019 04/2023 20-25 18 46

Los Angeles Los Angeles 17/18 Carried Over Complete Streets Components

Roscoe from the 405 Freeway to Woodman

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | 3.4 lane miles of street reconstruction, and safety Improvements. Speed feedback signs, leading pedestrian intervals, protected left turns, traffic signals and crosswalk upgrades.

Roscoe from the 405 Freeway to Woodman (Council Districts 6) Construction 07/2019 04/2023 20-25 24 51, 53

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 38: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles Los Angeles 17/18 Carried Over Complete Streets Components Temple from Beverly to Beaudry

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety) | 2.9 lane miles of street reconstruction, 1.3 lane miles of resurfacing, and safety improvements. Speed feedback signs, leading pedestrian intervals, protected left turns, signal timing upgrades, new crosswalks with RRFB, new traffic signals, and bus stop relocation.

Temple from Beverly to Beaudry (Council Districts 1, 13) Construction 07/2019 04/2023 20-25 24, 30 53, 54

Los Angeles Los Angeles 17/18 Carried Over Complete Streets Components

Venice (east) from Arlington to Figueroa

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Rehab/Repair (Existing Safety) | Complete Street Project involving 6.8 lane miles of street reconstruction, 1.6 lane miles of resurfacing, and safety improvements. Leading pedestrian intervals, adding RRFB to crosswalks, protected left turns, and new traffic signals.

Venice (east) from Arlington to Figueroa (Council Districts 1, 9, 10) Construction 07/2019 04/2023 20-25 12 21

Lynwood Los Angeles 19/20 New Road Maintenance & Rehabilitation

State Street Street Improvement Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Roundabout Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

State Street from Imperial Highway to Martin Luther King Jr. Blvd. Pre-Construction & Construction

07/2019 02/2020

12/2019 10/2020 20-30 33 63

Lynwood Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation Wright Road

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitation of street pavement. Removal and reconstruction of PCC concrete driveway, PCC sidewalk, PCC curb ramp, and 6" PCC curb and gutter. Includes traffic striping and markings, adjustment of manhole cover to grade, etc. | Design and Pre-Construction during FY18 and construction anticipated to start in FY19.

Wright Road from Fernwood Avenue to Duncan Avenue. Construction 07/2019 12/2020 20-30 33 63

Lynwood Los Angeles 19/20 New Road Maintenance & Rehabilitation Street Improvements This project will include: Pavement Rehab/Repair (Existing) Gertrude Drive; Stoneacre Avenue; Virginia Avenue Pre-Construction &

Construction 07/2019 04/2020

12/2019 12/2020 10-30 12 5

Malibu Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation 18/19 Annual Street Maintenance This project will include: Pavement Rehab/Repair (Existing)

Major maintenance to be performed on Morning View Drive, Boniface Drive, and Portshead Road. Minor maintenance to be performed on Cliffside Drive, Greenwater Road, Selfridge Drive, and Bison Court.

Construction 04/2020 06/2020 10-20 1 25

Manhattan Beach Los Angeles 19/20 New Road Maintenance & Rehabilitation

Annual Street Resurfacing Project (Cycle 1)

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

19th St. btwn. Meadows Ave. - Peck Ave.; 27th St. btwn. Laurel Ave. - Pacific Ave.; 21st St. btwn. Meadows Ave. - Herrin Ave.; Flournoy Rd. btwn. Ardmore Ave. - 19th St.; Agnes Rd. btwn. 29th St.- Marine Ave.; Chestnut Ave. btwn. 17th St. – Man. Bch. Blvd.;

Construction 02/2020 05/2020 15-20 5 12

Maywood Los Angeles 19/20 New Road Maintenance & Rehabilitation

Street Rehabilitation Project FY 2019-20 This project will include: Pavement Rehab/Repair (Existing)

57th St ,58th St, Alamo Ave, Atlantic Blvd, Fruitland Ave, Palm Ave, Fruitland Ave, Randolph St, Slauson Ave, 52nd Pl, 53rd St, 55th St, 56th St, 60th St, Everett Ave, Heliotrope Circle, Pine Ave, Walker Ave

Construction 07/2019 12/2019 5-20 18 32

Monrovia Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Huntington Drive Phase II Project

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Project Scope Development | Huntington Drive Phase II is a pavement rehabilitation and traffic signal improvement project funded through STPL Funds. This specific expense is for the City's share of inspection and project management costs. Total Project Estimate is $2,000,000

The project location is Huntington Drive between Magnolia Ave. and Shamrock Ave. Pre-Construction 01/2020 06/2020 5-15 25 41

Monrovia Los Angeles 19/20 Carried Over Safety HSIP Project

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Project Scope Development | The Highway Safety Improvement Program (HSIP) is a project that aims at adding additional traffic signals, roadway striping, and traffic signage to enhance pedestrian safety. This specific expense is for the City's share of inspection and project management costs. Project estimate is $750,000.

The project impacts three identified intersections within the City: (1) Foothill/California; (2) Foothill/Sunset; and (3) Huntington/5th. Pre-Construction 01/2020 06/2020 5-25 25 41

Monrovia Los Angeles 19/20 New Safety Bradoaks/Santa Fe - Safe Routes to School (SRTS)

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Project Scope Development | Pedestrian improvements adjacent to two schools within the City. The project includes installation of new signage, raised crosswalks, and new striping.

Lemon Avenue adjacent to Bradoaks Elementary School and El Norte/Peck Road adjacent to Santa Fe Middle School. Pre-Construction 01/2020 06/2020 5-10 25 41

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 39: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Monrovia Los Angeles 19/20 New Safety Comprehensive Old Town Upgrades

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Project Scope Development | Pedestrian improvements and public safety enhancements through the addition of bollards, EV charging stations, re-painting of all street lights, installation of in-pavement LED lighted crosswalks with raised finishes, improvements to the alleyways and walkways, and installation of enhanced landscaping.

Myrtle Avenue between Palm Avenue and Olive Avenue. Pre-Construction 01/2020 06/2020 5-10 15 28

Montebello Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 2019/20 Street Resurfacing Project - Various Streets

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Concourse Ave.; Harding St.; Allston Street; Medford St.; Kensington Way; Mills St.; CArmelita Ave.; Minson Way; Jacmar Ave.; Chapin Rd.

Pre-Construction & Construction

08/2019 11/2019

10/2019 06/2020 20-30 17 29

Monterey Park Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Various Street Resurfacing

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Cold mill asphalt concrete pavement and construct rubberized asphalt concrete overlay on various local streets. Work includes but is not limited to grind, overlay, and replacement of curb ramps.

Chandler Ave; Crest Vista Dr; De la Fuente St; Fulton Ave; Keller St; Mabel Ave; Marguerita Ave; McPherrin Ave; Mooney Dr; Moore Ave; Schoolside Ave; Vancouver Ave; Wilcox Ave

Construction 07/2019 04/2020 15-20 27 44

Norwalk Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

City Project No. 7920 Local Streets Cycle 2

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Construction work will involve approximately 2.28 linear miles of repaving among 12 of our City's local streets, including curb and gutter repairs, sidewalk repairs, slotted cross gutters replacement and installation of accessibility ramps at intersection corners.

Alora Ave, Graystone Ave, Longworth Ave, Harvest Ave, Gridley Rd, Jersey Ave, Dartmouth Dr, College Dr, Baylor Dr, 164th St, Cedarvale St, 165th St Construction 08/2019 03/2020 10-15 2 10

Palmdale Los Angeles 19/20 New Road Maintenance & Rehabilitation

Pearblossom Highway Reconstruction

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Pearblossom Highway, 25th Street East to 55th Street East Construction 08/2019 06/2020 10-40 21 36

Palmdale Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Avenue R Reconstruction and Overlay (5th East to Tierra Subida

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) Avenue R from 5th Street East to Tierra Subida Avenue Pre-Construction &

Construction 07/2019 07/2020

06/2020 04/2021 10-20 21 36

Palmdale Los Angeles 19/20 New Road Maintenance & Rehabilitation

Avenue R-8 Reconstruction and Overlay (30th East to 40th East)

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) Avenue R-8 from 30th East to 40th East Pre-Construction &

Construction 07/2019 07/2020

06/2020 07/2021 10-20 21 36

Palmdale Los Angeles 18/19 Forecasted Road Maintenance & Rehabilitation

30th Street West Overlay (Rancho Vista Blvd to P-8/Highland Avenue)

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) 30th Street West from Rancho Vista Blvd to 25th West Pre-Construction &

Construction 07/2019 07/2020

06/2020 07/2021 10-20 21 36

Palmdale Los Angeles 19/20 New Safety Division Street & Rancho Vista Blvd. Traffic Signal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Intersection of Division Street and Rancho Vista Blvd. Pre-Construction & Construction

07/2019 07/2020

06/2020 07/2021 15-30 21 36

Palmdale Los Angeles 19/20 New Road Maintenance & Rehabilitation

2019-2020 Residential Street Cape Seal/Slurry Program (ARAM System 1 or System II)

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design

Neighborhood 1 - bounded by Divison St to the east, tract boundary n/o East Avenue R-2 to the north, 3rd St. East/Kimberly Lane to the west and East Avenue R-8 to the south

Pre-Construction & Construction

09/2019 03/2020

02/2020 06/2020 5-8 21 36

Palmdale Los Angeles 19/20 New Road Maintenance & Rehabilitation 2019-2020 Arterial Overlay Project This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair

(Existing), Project Scope Development Bolz Ranch Road from Avenue N-8 to Towncenter Way Pre-Construction & Construction

10/2019 03/2020

02/2020 06/2020 10-20 13 24

Palos Verdes Estates Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 2019-2020 ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 (SB1)

This project will include: This project consists of resurfacing a section of Palos Verdes Drive West and will include the replacement of damaged or curb, gutter, sidewalks and curb ramps.

Both sides of Palos Verdes Drive West (between Via Coronel/Cloyden to the South City Limit). Pre-Construction 11/2019 01/2020 10-20 26 66

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 40: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Palos Verdes Estates Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation 2017-2018 Street Resurfacing

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project is in Design and will be using RMRA funding in support of Construction which includes: Grind and overlay roadway pavement with rubberized asphalt. CalRecycle Grant applied for due to use of recycled tires in asphalt mix to be used and to cover costs in excess of RMRA funds. CIP funds will be utilized to cover any remaining balance in construction costs and for engineering and contract administration.

Palos Verdes Drive West from Yarmouth Road to the Southerly City Limit. Construction 08/2019 09/2019 10-20 4 3

Paramount Los Angeles 19/20 New Road Maintenance & Rehabilitation

Neighborhood Street Resurfacing FY19-20 This project will include: Pavement Rehab/Repair (Existing)

Bellota Ave-s/o Paseo St to n/o Paseo St, Oliva Ave-s/o Paseo St to n/o Paseo St, Pimenta Ave-s/o Paseo St to n/o Paseo St, Paseo St-Hayter Ave to Lakewood Blvd, Hayter Ave-Somerset Blvd to Vans St, Passage Ave-n/o Alondra Blvd to CulDeSac, Perilla Ave-n/o Jefferson St to CulDeSac, Naranja Ave-n/o Jefferson St to CulDeSac, Walthall Wy-w/o Orange Ave to CulDeSac, De Bei Dr-Jackson St to Alondra Blvd

Construction 05/2019 06/2019 20-25 16 31

Pasadena Los Angeles 19/20 New Road Maintenance & Rehabilitation

Annual Citywide Street Resurfacing and ADA Improvement Program - FY 2020

This project will include: Cost Estimating, ADA Curb Ramp Installation (New), Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Orange Grove Blvd from Lincoln Ave to Sierra Madre Villa Ave. Pre-Construction & Construction

07/2019 01/2020

09/2019 07/2020 15-15 12 21

Pico Rivera Los Angeles 19/20 New Road Maintenance & Rehabilitation

Procurement/Operational Needs for Annual Road Resurfacing Work

This project will include: Public Works Staffing, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear

Citywide Procurement / Operational Needs 07/2019 06/2020 1-10 32 58

Pico Rivera Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation Telegraph Road Resurfacing Project

This project will include: Cost Estimating, Maintenance Program Plan Development, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Installation (New) | Grind and Overlay Project including safety and signage improvements. Project is multi-jurisdictional project with City of Downey taking the lead on the Project. Telegraph Road jurisdiction is 50% Downey and 50% City of Pico Rivera. Both Cities are working on the progress of this project.

Telegraph Road from Passons Boulevard to East City Limit and Telegraph Road from Manzanar Avenue to West City Limit

Pre-Construction & Construction

06/2017 11/2019

10/2019 12/2020 10-20 9 15

Pomona Los Angeles 17/18 Carried Over Other Public Works - Work Order System

This project will include: Repair and Servicing of Public Works Equipment, Procurement of Public Works Systems/Databases | Purchase and implementation of a centralized work order tracking system for maintenance and repair requests, and completion of said work for road, lighting, traffic signals and signage, and storm drain system; provide for an overall centralized database for efficient tracking of work orders, staff time, materials,etc. | Request for Qualifications were due on August 1, 2018.

Citywide Procurement / Operational Needs 07/2019 12/2020 10-15 20 52

Pomona Los Angeles 19/20 Carried Over Traffic Control Devices Traffic Signal and Street Light - Asset Managment System

This project will include: Secure consultant to provide inventory to feed into Work Order System. Inventory compilation of all city-owned lights, traffic signals, street signs and posts to integrate into a Geographic Information System.

Citywide Procurement / Operational Needs 07/2019 06/2020 1-10 20 52

Pomona Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation

Street Preservation-Local Citywide (FY19-20) Project No. 428-68560

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Street Preservation of local streets Citywide, according to pavement management program, focused primary on slurry seals, cape seals, and thin overlays. Carry Over from FY 17/18.

12th Street, 12th Street, 7th Street, Brookwin Drive, Buena Vista Ave; Butterfield Rd; Cameron Avenue; Canfield Ave; Neptune St; Dalton Court; Densmore Street; Deveron Place; Caprino Way; Surrey Lane ( Glen Ave to End), and Blakely Court (Lorrane Ave to End)

Pre-Construction & Construction

07/2019 07/2019

06/2020 06/2020 2-12 20 52

Pomona Los Angeles 19/20 New Road Maintenance & Rehabilitation Contract Landscape Maintenance

This project will include: Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New) | Provide for landscape maintenance to medians and tree wells to increase visibility for motorist and the safety of pedestrians.

Garey Avenue from Aliso Street to Foothill Boulevard Construction 07/2019 06/2020 1-1 20 52

Pomona Los Angeles 19/20 New Road Maintenance & Rehabilitation

Street Maintenance On-Call Street and Sidewalk Repair

This project will include: Contracted Asphalt and Concrete Repair Services to supplement existing field crews and provide asphalt repairs to include potholes, patchwork repairs where broken asphalt and other areas require service and repair on an as-needed basis. | Construction of new median expanding an existing median as a safety improvement to prevent vehicular crossing of an unsafe intersection.

Typical locations for repair services consist of residential and arterial roadways. This will also supplement services for repairs to sidewalks, curbs and gutters. Construction 07/2019 06/2020 1-10 19 44

Rancho Palos Verdes Los Angeles 19/20 In-Progress Road Maintenance & Rehabilitation

Hawthorne Boulevard Median Beautification Project

This project will include: Cost Estimating, Preliminary Design, Project Scope Development | The project will remove colored asphalt and replace median with drought-tolerant landscaping, with curb and gutter repairs

Hawthorne Boulevard - From PVDW to Crest Rd Pre-Construction & Construction

01/2019 07/2019

07/2019 12/2019 18-22 31 66

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 41: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Rancho Palos Verdes Los Angeles 19/20 New Road Maintenance & Rehabilitation

Crenshaw Boulevard Arterial Road Rehabilitation Project

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Project Scope Development Crenshaw Boulevard between Seacrest Dr. to city border at Silver Spur Rd. Pre-Construction 08/2019 02/2020 18-22 36 73

Redondo Beach Los Angeles 19/20 New Road Maintenance & Rehabilitation

Residential Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

The Residential Resurfacing Project is citywide but these funds will be used to resurface the residential streets south of 190th Street in the City. Construction 09/2019 12/2019 15-25 26 66

Redondo Beach Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Manhattan Beach Boulevard Resurfacing - Aviation Boulevard to Inglewood Avenue

This project will include: Pavement Rehab/Repair (Existing) | This section of Manhattan Beach Boulevard is approximately 1 mile long with a roadway width of 100 feet. This section is classified as a major arterial, carries approximately 38,000 vehicles daily, and includes a transit route between Aviation Boulevard and Redondo Beach Avenue.

Manhattan Beach Boulevard runs east-west and is located in north Redondo Beach. The project limits are Aviation Boulevard on the west and Inglewood Avenue on the east.

Construction 12/2019 06/2020 20-30 26 66

Redondo Beach Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Residential Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | The Residential Street Rehabilitation Project will resurface residential streets in Redondo Beach.

The project is citywide but these funds will be used to resurface the residential streets north of 190th Street in the City. Construction 08/2019 12/2019 15-25 14 31

Rolling Hills Estates Los Angeles 19/20 New Road Maintenance & Rehabilitation

Palos Verdes Drive North Resurfacing Project This project will include: Pavement Rehab/Repair (Existing) City of Rolling Hills Estates. Palos Verdes Drive North between eastern City

limits and Rolling Hills Rd. Construction 07/2019 08/2019 10-25 22 49

Rosemead Los Angeles 19/20 New Road Maintenance & Rehabilitation

Valley Boulevard Resurfacing Phase II

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The scope of work will include cold milling the existing asphalt concrete pavement, constructing a rubberized asphalt concrete overlay, adjusting utility manholes and vaults to the final grade, and restoring the traffic striping and pavement markings.

Valley Blvd from Rosemead Blvd to the East City Limit Construction 01/2020 05/2020 15-20 22 49

Rosemead Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation Walnut Grove Resurfacing Project

This project will include: The Project consists in ARHM pavement overlay, sidewalk replacement, striping, curb ramp installation, tree planting and appurtenances. Installation of colored concrete crosswalks at various intersections within the same limits.

Walnut Grove Ave from Marshall Street to the Northerly City Limit Construction 01/2020 05/2020 10-15 1, 4 6

San Dimas Los Angeles 19/20 Forecasted Road Maintenance & Rehabilitation

Lone Hill Ave (Cienega to Covina Blvd)

This project will include: Project will use Full Depth Reclamation technology up to 15" deep and overlay asphalt concrete . Repair and reconstruction of work will include upgrade/replacement of ADA accessible ramps, minor curb, gutter, and sidewalk panels, and striping.

Lone Hill Ave (Cienega to Covina Blvd) Construction 05/2021 06/2021 15-20 25 41

San Dimas Los Angeles 19/20 Forecasted Road Maintenance & Rehabilitation Gladstone Street (East of Amelia)

This project will include: Rehabilitation, resurfacing, and restoration of existing street. The repair work will also include upgrade/replacement of ADA accessible ramps, minor curb, gutter, and sidewalk panels, and striping.

Gladstone Street (East of Amelia) Construction 05/2025 06/2025 15-20 25 41

San Dimas Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation Covina Blvd Rehab

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Project will use Full Depth Reclamation technology up to 15" deep and overlaid with asphalt concrete. Repair and reconstruction work will include upgrade/replacement of ADA accessible ramps, minor curbs, gutter, sidewalk panels and striping. Project will require State and Railroad permits.

Covina Blvd Arrow Hwy to 57 Fwy Construction 05/2020 06/2020 15-20 25 41

San Dimas Los Angeles 17/18 Forecasted Road Maintenance & Rehabilitation Eaton Road Et Al Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitation, resurfacing and restoration of existing street. The repair work will also include upgrade/replacement of the ADA accessible ramps, minor curb, gutter, sidewalk panels and striping.

Southwest corner of Arrow Hwy and Lone Hill Construction 05/2021 06/2021 15-20 25 41

San Dimas Los Angeles 17/18 Forecasted Road Maintenance & Rehabilitation Bonita Ave Corridor

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate existing street by use of Full Depth Reclamation technology up to 15" deep and overlay asphalt concrete base and cap. Will also include upgrade/replacement of ADA accessible ramps, minor curbs, gutter, sidewalk panels and striping. Project will include grind and overlay of short adjacent cul-de-sac.

Bonita Ave from San Dimas Ave to eastern City Limits Construction 05/2022 06/2022 20-25 25 41

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 42: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Dimas Los Angeles 17/18 Forecasted Road Maintenance & Rehabilitation Arrow Highway Rehab

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitation, resurfacing and restoration of existing street. The repair work will also include upgrade/replacement of the ADA accessible ramps, minor curb, gutter, sidewalk panels and striping.

Arrow Highway; City Limit to City Limit Construction 05/2024 06/2024 15-20 18 39

San Fernando Los Angeles 19/20 New Road Maintenance & Rehabilitation

SB-1: FY 19-20 Annual Street Resurfacing Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Arroyo Avenue between Fifth Street and Glenoaks; Phillipi Street between Orange Grove and West City Limits Construction 01/2020 04/2020 10-25 22 49

San Gabriel Los Angeles 19/20 New Road Maintenance & Rehabilitation 2019-20 Street Paving Project

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Lafayette Street (Grand to Fairview) ; California Street (Grand to Chestnut); Pine Street (Mission Road to Chestnut); Palm Avenue (Valley to Wells) ; Leslie Drive (Milton to the Alley); Adelyn Drive (N. Doyle to Rosemont) ; Duane Avenue (W. Sycamore to Roses) ; Franklin Avenue (Las Tunas Dr. to Sycamore Dr.);

Pre-Construction & Construction

10/2019 04/2020

12/2019 11/2020 10-15 23 42

San Marino Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Local Street Reconstruction This project will include: Pavement Rehab/Repair (Existing) | Local Street Reconstruction Roanoke Road, Sierra Vista Avenue, Shenandoah Road, Canon Drive Construction 05/2019 08/2019 20-20 25 49

San Marino Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation Huntington Dr Pvmt Rehab This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Preliminary

Design | Resurface major arterial street Huntington Dr WB Virginia Rd to city limits Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 20-20 13 22

Santa Clarita Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

2018-2019 Overlay & Slurry Seal Program

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The annual Overlay & Slurry Seal Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention.

Copper Hill Drive from Newhall Ranch Road to Smyth Drive, McBean Parkway from 5 fwy to Singing Hills Drive, Rye Canyon Road from 5 fwy to Newhall Ranch Road, and Valencia Blvd from Magic Mountain Pkwy to Citrus Street

Construction 06/2019 11/2020 3-15 21, 27 38

Santa Clarita Los Angeles 19/20 New Road Maintenance & Rehabilitation

2019-2020 Overlay and Slurry Seal Program

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The annual Overlay & Slurry Seal Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention.

Plum Canyon Road, Railroad Avenue, Lost Canyon Road, and Soledad Canyon Road Construction 06/2019 11/2020 3-15 17 29

Santa Fe Springs Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

Santa Fe Springs Road Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New) | Removal of existing asphalt concrete pavement surface, reworking the underlying aggregate base and in situ soil material to provide a firm and stable platform for placing new asphalt concrete pavement. Removal and replacement of curb and gutter along with removal of sidewalk and driveways.

Between Los Nietos Road and rail road tracks (City boundary) Construction 03/2019 09/2019 15-20 19 35

Santa Monica Los Angeles 19/20 New Road Maintenance & Rehabilitation

Advanced Traffic Management System, Phase 5 (Montana Avenue)

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Project is located along Montana Ave from Ocean Ave to 26th St and on 26th St from San Vicente Blvd to Wilshire Blvd. Construction 07/2019 06/2020 50-50 26 50

Santa Monica Los Angeles 19/20 New Road Maintenance & Rehabilitation Traffic Signal Red Flash Prevention

This project will include: Procurement of Public Works Equipment, Procurement of Public Works Safety Materials and Gear | Purchase of hardware to prevent data storms or networking issues from making traffic signals go into four-way flash and ensure safer streets for pedestrians, motorists and cyclists.

Project is located at traffic signal intersections citywide. Procurement / Operational Needs 04/2019 06/2020 10-20 26 50

Santa Monica Los Angeles 19/20 New Road Maintenance & Rehabilitation

Sunset Park Neighborhood Traffic Calming Measures

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Implements outcome findings of the Sunset Park Neighborhood traffic study by funding traffic calming measures and devices such as highly-visible signage, pavement markings and pedestrian and bicyclist safety enhancements at crosswalk locations, speed reduction measures, traffic volume reduction measures including flexible bollards and diverters. Installed measures will be evaluated and may require adjustments, enhancements, or removals.

Project is located in the neighborhood bounded by Lincoln Blvd on the west, Pico Blvd on the north, Centinela Ave on the east, and the City of Los Angeles city limit along the south.

Construction 07/2019 06/2020 15-15 26 50

Santa Monica Los Angeles 19/20 New Other Ocean Avenue Protected Bikeway (California to Colorado) This project will include: Preliminary Design Project location will be on Ocean Avenue from California Avenue to Colorado

Avenue. Pre-Construction 09/2020 12/2021 25-25 26 50

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 43: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Monica Los Angeles 18/19 Forecasted Safety Safe Routes to School at Six Schools

This project will include: Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Design and construction of school access and safety improvements that were identified during Walk Audits conducted in the spring of 2017. The crossing improvements include, bulb-outs, high-visibility beacons, curb ramp improvements, signage and striping, and operational changes to these schools. The improvements also remove crossing barriers and provide improved visibility and legibility for students and parents, making active transportation more comfortable for students and their families. | The gap in the Pre-Construction and Construction dates is for bidding.

Edison Language Academy-2402 Virginia Ave. SMASH-2525 5th St John Muir-2526 6th St. McKinley Elementary-2401 Santa Monica Blvd. Grant Elementary-2368 Pearl St. Franklin Elementary-2400 Montana Ave.

Pre-Construction & Construction

09/2019 06/2021

09/2020 12/2021 15-25 26 50

Sierra Madre Los Angeles 19/20 New Road Maintenance & Rehabilitation 2019-20 Street Project This project will include: Project Scope Development

Acacia St.; Foothill to Valle Vista; Valle Vista; Acacia-Acacia; Auburn Ave.; Sierra Madre Blvd. – Grandview Highland Ave.; Auburn – Mt. Trail; Grandview Ave.; Baldwin to Sycamore Place; Santa Anita Ct.; Oak Meadow – Mt. Trail; Oak Meadow Cul-de-sac South Canon Cul-de-sac

Pre-Construction 11/2019 06/2020 7-20 33 70

Signal Hill Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation SB-1 RMRA 2019/20 This project will include: Pavement Rehab/Repair (Existing) | Repair City Streets

"Myrtle Avenue (1/2 Street"; "Lewis Avenue; "; Lemon Avenue; Cerritos; "; "Lemon Ave; Brayton Ave ;Gundry Avenue; "Falcon Avenue; "; "Walnut Avenue; 33rd St "; "32nd St.; "29th St.; W. City Limits To Olive Avenue; "; "Columbia St"; Paterson; Walton St;"Vernon St; "25th St.; W. City Limits To California Avenue; "; "Lewis Avenue ; "23rd St; "Dawson Avenue; Willow To 28th St.; " 21st St.; "Alliance St.; "Burnett St.;"; "Creston Avenue; Jesse Nelson cir; Gaviota Ave; Crescent St; 20th St.

Construction 09/2019 06/2020 8-12 33 70

Signal Hill Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation Spring Street Overlay Carryover This project will include: Restore paved road surfaces to add structural capacity, riding

comfort and skid resistance which add to the road's safety. Spring Street Pre-Construction & Construction

07/2019 09/2020

08/2020 12/2021 25-30 27 38

South El Monte Los Angeles 17/18 Forecasted Road Maintenance & Rehabilitation Lashbrook Ave. This project will include: Paving and/or Striping Installation (New Safety), Pavement

Rehab/Repair (Existing) | AC deep Coldmill and overlay (4") and install new striping

Strozier Avenue (Lerma Road to Rush Street and Klingerman Street to north City limits). Lashbrook Avenue (Garvey Avenue to south terminus of Lashbrook Avenue, and Garvey Avenue to north City limits)

Construction 10/2019 12/2020 10-15 22 49, 57

South Gate Los Angeles 19/20 New Road Maintenance & Rehabilitation

Citywide Residential Resurfacing Cape-Seal Program

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Project Scope Development Citywide residential streets rehabilitation Pre-Construction &

Construction 07/2019 03/2020

02/2020 06/2021 5-10 1 5

South Pasadena Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

South Pasadena Roadway Rehabilitation Project

This project will include: Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The project scope of work consists of street and highway pavement maintenance; rehabilitation, installation, construction, and reconstruction of necessary associated facilities such as drainage and traffic control devices; maintenance, rehabilitation, installation, construction, and reconstruction of facilities that expand ridership on transit systems; safety projects to reduce fatalities; or as a local match to obtain state or federal transportation funds for similar purposes.

Alpha Avenue, Alta Vista, Camino Del Sol, Pine Street, Monterey Rd (at City Limits), Orange Grove Avenue, Sterling Place Construction 05/2020 10/2020 15-17 25 41

Torrance Los Angeles 19/20 New Road Maintenance & Rehabilitation

Residential Slurry Seal Program (I-159) and Arterial Street Pavement Sealing Program (I-139)

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Sidewalk, Curb, Gutter and Pavement Repairs

Madrona Ave; Prairie Ave; Carson St; Hawthorne Blvd; Van Ness Ave; Residential area bounded by Redondo Beach Blvd, Gramercy Pl, Artesia Blvd and Hawthorne Blvd; Residential area bounded by Del Amo Blvd, Western Ave, Torrance Blvd, Van Ness Ave, Dominguez St and Crenshaw Blvd; Residential area bounded by BNSF Railroad, Crenshaw Blvd, El Dorado St, and Maple Ave

Construction 01/2019 08/2019 25-50 5 13

Vernon Los Angeles 19/20 New Safety Sign Replacement Program FY 2019/2020 This project will include: Traffic signage safety

Section 6 of the Sign Replacement Program. Leonis Boulevard on the West side, Downey Road on the east side, Leonis Boulevard on the North and the Southern City boundary line. The streets included within those limits are: Portion of Leonis Boulevard, 50th Street, portion of Fruitland Avenue, 54th Street, Slauson Avenue, Portion of Boyle Avenue, portion of Alcoa Avenue, Malburg Way and Bickett Street.

Procurement / Operational Needs 07/2019 06/2020 10-15 21 33

Walnut Los Angeles 19/20 New Road Maintenance & Rehabilitation Slurry Seal Area 7 This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk

Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Snow Creek and Timberline neighborhoods in Walnut, CA. Construction 03/2020 06/2020 7-7 7 16

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 44: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

West Covina Los Angeles 19/20 New Road Maintenance & Rehabilitation Residential Streets Rehabilitation

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New)

Aroma Dr,Citrus St, Donna Beth Ave,E Hills Dr, Hemstead Ct, Serena Dr, Andalucia Dr, Cameo Vista Dr, Casa Grande Dr,Casa Linda Dr, Castle Rock Ct, Crescent View Dr, Dancove Dr,Eddes St, Foothill Dr,Glenn Alan Ave, Heritage Dr, Hidden Valley Dr, Highlight Dr, Hillside Dr, Hillward Dr, Holiday Dr, Hollencrest Dr, Hooper Dr, La Serena Dr, Las Rosas Dr, Madero Ct, Montezuma Way, Mountain Ridge Rd, Mt Trica Ave, Promontory Place, Rio de Oro Dr, Sandy Hills Dr, Spring Meadow Dr, Sunrise Rd, Hideout Dr

Construction 02/2020 06/2020 10-20 22, 29 48, 55

West Hollywood Los Angeles 19/20 New Road Maintenance & Rehabilitation Annual Paving Project FY 2019-2020 This project will include: Pavement Rehab/Repair (Existing) | The project will grind 2" of

asphalt and overlay 2" of ARHM over existing base and sub-base.

Flores St between Fountain Ave and Santa Monica Blvd, Kings Rd between Fountain Ave and Santa Monica Blvd, Detroit Ave between Fountain Ave and Santa Monica Blvd, Olive Dr between Fountain Ave and Santa Monica Blvd, La Cienega Blvd between Holloway Dr and N/O Santa Monica Blvd, Holloway between La Cienega Blvd and Santa Monica Blvd, West Knoll Dr between Hancock Ave and Westmount Dr, Hacienda St between Fountain Ave and Santa Monica Blvd, Santa Monica Blvd various localized spots

Construction 10/2019 02/2020 15-20 6 7

Westlake Village Los Angeles 19/20 New Road Maintenance & Rehabilitation

FY 19-20 Annual Street Improvement Project This project will include: Pavement Rehab/Repair (Existing) 217,000 square feet of Agoura Road Construction 09/2019 06/2020 15-20 34 72

Whittier Los Angeles 19/20 New Road Maintenance & Rehabilitation Russel Street and Vicinity Streets

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Russell Street & Vicinity Streets including: Ancep St., Bogardus Ave., Caruthers St., Costa Glen Ave., Cullman Ave., Graceldo Ln., Grayling Ave., Gomeland Ave., Honnington St., Kentucky Ave., Larrylyn Dr., Lindesmith Ave., Lindskog Dr., Maybrook Ave., Mikinda Ct., Nearside St., Newcomb Ave., Pasada Dr., Pounds Ave., Rosin Ave., Russell St., Shady Valley Ln., Skagway St., and Tigrina Ave., for more information on project limits call Isaac Bravo at City of Whittier Public Works at (562) 567-9518.

Construction 09/2019 01/2020 15-20 32 57

Whittier Los Angeles 19/20 New Road Maintenance & Rehabilitation Janine Drive and Vicinity Streets This project will include: Paving and/or Striping Installation (New Safety), Pavement

Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Janine Drive and Vicinity Streets: Ardita Dr., Bacanora Ave., Bogardus Ave., Capulet Ave., Corella Ave., Cullman Ave., Drury Dr., El Soneto Dr., Emerado Dr., Janine Dr., La Calma Dr., Marie Ellen Ave., Melgar Dr., Mollyknoll Ave., Newcomb Ave., Padonia Ave., Pasada Dr., Pounds Ave., Prudencia Dr., Rimwood Dr., Sausalito Dr., Shiloh Ave., Solejar Dr., Villa Rita Dr., West Rd., Wheatley Dr., and Winfield Ave. For information on project limits please contact Isaac Bravo Public Works (562) 567-9518

Construction 01/2020 05/2020 15-20 28 67

Culver City Los Angeles 19/20 New Road Maintenance & Rehabilitation

Paving of Jefferson Boulevard and Centinela Avenue This project will include: Pavement Rehab/Repair (Existing) Jefferson Boulevard from Sepulveda Bl. to 405 freeway (City boundary) and

Centinela Avenue from Mesmer Avene to Bristol Parkway (eastbound direction Construction 01/2020 04/2020 15-25 2 2

Temple City Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Street Resurfacing Phase 5A This project will include: Pavement Rehab/Repair (Existing)

Alessandro Ave. from Las Tunas Dr. to Garibaldi Ave.;; Golden West Ave. from Las Tunas Dr. to Longden Ave.;; Kauffman Ave. from Garibaldi Ave. to Longden Ave.;; Lemon Ave. (N/S) from Longden Ave. to Northern City Limit;; Lemon Ave. (E/W) from Temple City Blvd. to Eastern City Limit;; Livia Ave. from Longden Ave. to Woolley St.;; Longden Ave. from Oak Ave. to Eastern City Limit;; Noel Dr. from Broadway to North End;; Primrose Ave. from Garibaldi Ave. to Flaherty St.;; Rowland Ave. from Flaherty St. to Wendon Ave.;; Trelawny Ave. from South End to Lemon Ave.;; Workman Ave. from Alley E/O TC Blvd. to Camellia Ave.;; Workman Ave. from Oak Ave. to Cloverly Ave.;

Construction 07/2019 10/2019 5-20 13 22

Temple City Los Angeles 19/20 New Road Maintenance & Rehabilitation Las Tunas Drive Resurfacing This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair

(Existing) Las Tunas Drive from western City boundary at Muscatel Avenue to eastern City boundary east of Rowland Avenue Construction 07/2019 10/2019 10-20 17 29

Temple City Los Angeles 17/18 Carried Over Road Maintenance & Rehabilitation Rosemead Boulevard Resurfacing This project will include: Pavement Rehab/Repair (Existing) | resurfacing of about 2 miles of

major arterial street with slurry seal Rosemead Boulevard from northern city boundary (just north of Calita Street) to southern city boundary (railroad grade separation south of Pentland Street) Construction 07/2019 10/2019 5-10 22 49

Chowchilla Madera 19/20 Carried Over Road Maintenance & Rehabilitation 5th Street to Road 16 Project

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Specific improvements related to this project include the , design, rehabilitation of pavement on 5th Street and installation of traffic striping, marking and signage to Road 16.

5th Street Curve from Mariposa Ave to the Chowchilla Fairground Parking Lot on Road 16. Length of project is 631 feet.

Pre-Construction & Construction

05/2019 07/2019

12/2019 01/2020 20-30 12 5

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 45: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Madera Madera 19/20 New Road Maintenance & Rehabilitation

SB 1 (RMRA) Seals/ Overlays 2019/20

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

The streets that are being considered for this project are the following:; Yosemite Ave from Q St to Gateway Dr; Sunrise Ave from B St to Lilly St; Stadium from Gamary to Olive; Sunset Ave from Doubletree Way to Sundance Lane ; Ellis from Merced to City LImits; D St from Adell to Sherwood; Schnoor from Ironwood to Kennedy; Westberry from Kennedy to Cleveland; E st from 10th to 14th; Rotan from Howard to south end; and other residential streets in south, east & west Madera;

Pre-Construction & Construction

10/2019 05/2020

03/2020 07/2020 3-15 27 50

Belvedere Marin 19/20 Carried Over Road Maintenance & Rehabilitation 2018 Pavement Rehab Project This project will include: Pavement Rehab/Repair (Existing) | Trench Restoration and

pavement resurfacing. Corinthian Parking/Overlook and portions of Belvedere Ave, Belvedere Ave, Blanding Lane, Byaview Ave, San Rafael Ave, and Acacia Ave. Construction 07/2019 06/2020 15-25 2 10

Belvedere Marin 19/20 New Road Maintenance & Rehabilitation 2019 Pavement Rehab Project This project will include: Pavement Rehab/Repair (Existing) | Crack filling and surface slurry

seal to prolong life of the roadway. Windward Road (entire length), Hilarita Circle (entire length), Community Road (Leeward Rd. to San Rafael Ave.) Construction 08/2019 11/2019 5-7 2 10

Corte Madera Marin 19/20 New Road Maintenance & Rehabilitation 2020 Road Sealant Project This project will include: Pavement Rehab/Repair (Existing) Various roads in Corte Madera including but not limited to San Clemente Dr.,

Redwood Hwy., Madera Del Presidio Blvd., and Koch Rd. Construction 04/2020 11/2020 5-15 37 74

Fairfax Marin 19/20 In-Progress Safety Parkade Pedestrian Improvements

This project will include: ADA Curb Ramp Installation (New), Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Provide matching funds for ADA improvements in Parkade parking lot in downtown.

Parkade parking lot between Sir Francis Drake Blvd. and Broadway in downtown

Pre-Construction & Construction

09/2018 02/2019

12/2018 05/2019 15-25 2 10

Fairfax Marin 19/20 In-Progress Safety Sidewalk replacement in downtown This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing)

various locations on Bolinas Rd and Broadway in downtown Pre-Construction & Construction

05/2019 07/2019

06/2019 12/2019 20-30 2 10

Fairfax Marin 19/20 In-Progress Road Maintenance & Rehabilitation

Canyon Rd Stablization and Reconstruction

This project will include: Environmental Study/Documents, Preliminary Design | retaining wall to support road portion of road at appox. 145 Canyon Pre-Construction 08/2018 08/2019 20-30 2 10

Fairfax Marin 17/18 In-Progress Road Maintenance & Rehabilitation Scenic Road Repavement

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | We have completed repave of Scenic Rd between Shapiro and Bay; we are in the prelim engineering for the upper scenic portion

Scenic Rd between Shapiro Ln and Bay Rd. between Tamalpais to Upper Scenic

Pre-Construction & Construction

08/2018 10/2018

07/2019 11/2019 15-25 3 11

Larkspur Marin 19/20 New Road Maintenance & Rehabilitation

Measure B Group 2 Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing)

Creekside Dr; Edgewater Pl; Cornell Ave; Dartmouth Dr; Harvard Dr; Stanford Ct; Tulane Dr; Yale Ave; Holly Ave; Sycamore Ave; Ajax St; Locust Ave; Cedar Ave; Hawthorne Ave; Willow Ave; Corte Del Norte; Corte Lenosa; Corte Oriental; Via Hidalgo; Owlswood Dr; Upper Admore; Corte Placida; Via Hermosa; Via La Cumbre; Redwood Hwy; Rich St; Industrial Way

Construction 04/2020 09/2020 15-25 5 13

Mill Valley Marin 19/20 New Road Maintenance & Rehabilitation 2019 Streets Rehabilitation Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

2019 Pavement Rehab at various locations such as Janes St, Montford Ave, Coach Dr, Camino Alto, Cascade Dr, Summit Ave, W Blithedale, Tamalpais Ave, Myrtle Ave, Marion Ave, Monte Vista Ave, Throckmorton Ave, Throckmorton Ln, Hazel Ave, Renz Rd, Edgewood Ave, Civic Lot on Miller

Pre-Construction & Construction

06/2019 07/2019

07/2019 09/2020 28-30 13 22

Novato Marin 17/18 In-Progress Road Maintenance & Rehabilitation

MTC Pavement Management Phase IV

This project will include: Citywide pavement condition assessment, rehabilitation project determination, and reporting All city owned/maintained streets Procurement /

Operational Needs 07/2017 06/2021 4-4 2 10

Novato Marin 17/18 Forecasted Road Maintenance & Rehabilitation

Sherman Ave. & Cain Lane Improvements This project will include: Pavement maintenance and rehabilitation Sherman Ave. & Cain Ln. between Sherman & Reichert Pre-Construction 09/2022 12/2023 15-30 2 10

Novato Marin 17/18 Carried Over Complete Streets Components Downtown SMART Station Phase III This project will include: Plan and construct improvements to unimproved downtown depot

site Grant Ave. between Scott Ct. and Railroad Ave. Pre-Construction 07/2019 06/2022 10-30 2 10

Novato Marin 17/18 In-Progress Traffic Control Devices Traffic Signal Upgrade Program This project will include: Traffic signal equipment replacement and timing/phasing modifications to improve efficiency. All City-owned traffic signals (31 total) at various locations Procurement /

Operational Needs 07/2017 06/2022 5-20 2 10

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 46: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Novato Marin 17/18 In-Progress Road Maintenance & Rehabilitation Vineyard Road Pavement Rehab

This project will include: Pavement maintenance and rehabilitation, construct sidewalks, crosswalks, and add Class 2 bike lanes where pavement width allows. Stripe Class 3 bike shared lanes where existing pavement width is restricted.

Vineyard Rd. between Wilson Ave. and Sutro Ave. Pre-Construction 07/2017 09/2019 15-30 2 10

Novato Marin 17/18 Carried Over Road Maintenance & Rehabilitation Measure A Group 10

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement preservation, maintenance and rehabilitation.

Nave Dr. and Bel Marin Keys Blvd. Construction 08/2019 05/2020 15-30 2 10

Novato Marin 17/18 Forecasted Safety San Marin/Simmons Signalization or Roundabout This project will include: Cost Estimating, Preliminary Design, Project Scope Development Intersection of San Marin Dr. and Simmons Ln. Pre-Construction 07/2020 06/2022 20-30 2 10

Novato Marin 17/18 Forecasted Road Maintenance & Rehabilitation

Measure A Group 11 (2019 Annual Paving Project)

This project will include: Cost Estimating, Environmental Study/Documents, Preliminary Design | Pavement preservation, maintenance and rehabilitation. Exact locations TBD pending pavement condition assessment Pre-Construction 07/2019 01/2020 10-20 2 10

Novato Marin 17/18 Forecasted Road Maintenance & Rehabilitation Novato Blvd. Multiuse Path

This project will include: Feasibility Study, Project Scope Development | Evaluate improvements to bike/ped access to Stafford Lake Park. May rehab or realign existing pathway.

Novato Blvd. between Sutro Ave. and Stafford Lake Pre-Construction 07/2019 06/2022 10-30 2 10

Novato Marin 17/18 In-Progress Complete Streets Components

Traffic, Bicycle, & Ped Improvements FY 14/15-18/19

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | Enhance safety, provide equal access, and reduce congestion as issues are identified

All city streets & sidewalks Pre-Construction & Construction

01/2017 08/2019

06/2024 06/2024 10-20 2 10

Novato Marin 19/20 In-Progress Road Maintenance & Rehabilitation Olive Phase III (Redwood to Railroad)

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Project Scope Development | Enhance safety of the RR crossing, pavement rehabilitation, replace failing drainage facilities

Olive Ave. between Redwood Blvd. and Railroad Ave. Pre-Construction 01/2018 06/2020 15-30 2 10

Novato Marin 17/18 In-Progress Complete Streets Components Lamont Ave Bike Lanes

This project will include: Cost Estimating, Document Preparation, Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Environmental Study/Documents, Preliminary Design, Project Scope Development | Add Class 2 bike lanes to Lamont Ave., sliver widening, pavement rehab., and new striping.

Lamont Ave. between Reichert Ave. and Franklin Ave. Pre-Construction & Construction

04/2017 08/2019

07/2019 04/2020 10-20 2 10

Novato Marin 17/18 Forecasted Road Maintenance & Rehabilitation

Citywide Bridge Assessment/Improvement (Group 1)

This project will include: Cost Estimating, Project Scope Development | Assess condition of city bridges, establish inventory, implement repairs as necessary. All city-owned/maintained bridges at various locations Pre-Construction 07/2019 06/2021 10-30 2 10

Novato Marin 19/20 In-Progress Complete Streets Components ADA RoW Transition Plan

This project will include: Procurement of Public Works Systems/Databases | Inventory accessibility of city right-of-way, identify & document access barriers per ADA Title II, document barriers in MTC StreetSaver Program to facilitate future upgrades in conjunction with the citywide Pavement Management Program.

All public paths of travel within the city right-of-way. Procurement / Operational Needs 01/2017 06/2023 10-30 2 10

Novato Marin 19/20 In-Progress Road Maintenance & Rehabilitation Grant Ave. Bridge Rehabilitation

This project will include: Cost Estimating, Document Preparation, Bridge Structure Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way Acquisition, Pavement Rehab/Repair (Existing), Bicycle Lane (New) | Bridge widening/rehabilitation, construct bicycle lanes, enhance crosswalks, and pavement maintenance/rehabilitation.

Grant Ave. between 8th St. and Virginia Ave. Pre-Construction & Construction

01/2017 01/1921

06/2020 06/2022 20-30 2 10

Novato Marin 19/20 In-Progress Safety SMART Access Improvements

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Address deficiencies in the public right-of-way (pedestrian/bike focus) near SMART stations

In the vicinity of the SMART San Marin, Hamilton, and future Downtown train stations.

Pre-Construction & Construction

07/2017 01/2018

06/2020 12/2020 10-20 2 10

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 47: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Novato Marin 19/20 Forecasted Safety Redwood & San Marin Improvements (AGP-5 & NP-1)

This project will include: Enhance safety, reduce traffic congestion, modify the interchange (including widening) San Marin Dr. at Redwood Blvd. and southbound US101 I/C Pre-Construction &

Construction 07/2021 07/2023

06/2023 12/2024 20-30 2 10

Novato Marin 19/20 Forecasted Complete Streets Components North Redwood Blvd Corridor Study This project will include: Cost Estimating, Feasibility Study, Project Scope Development |

Develop comprehensive streetscape plan with public input, determine constraints. Redwood Blvd. between Diablo Ave. and Wood Hollow Dr. Pre-Construction 07/2023 12/2024 10-30 2 10

Novato Marin 19/20 In-Progress Complete Streets Components

01-004 Novato Blvd Improvements Diablo to Grant and 12-004 Rule 20A UUD16

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Right of Way | Project includes roadway widening to add continuous turn lane, bicycle lanes, and sidewalks as well as overhead utility undergrounding and other utility replacements.

Novato Blvd. between Diablo Avenue and Grant Avenue. Pre-Construction 01/2017 12/2022 20-40 2 10

Novato Marin 19/20 New Complete Streets Components

19-009 Novato Blvd at San Marin-Sutro Intersection Improvements

This project will include: Document Preparation, Feasibility Study, Environmental Study/Documents, Project Scope Development | Consider intersection improvements to mitigate traffic operations deficiencies and provide continuous pedestrian and bicycle facilities to and through the intersection

Intersection of Novato Blvd. and San Marin Drive and Sutro Avenue Pre-Construction 07/2019 06/2022 15-40 8 12

Ross Marin 19/20 Carried Over Road Maintenance & Rehabilitation

Town of Ross FY 19/20 Pavement Rehabilitation Project

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design | Pavement dig-outs and Type III micro seal. Olive Ave and Walnut Ave in the Town of Ross, CA. Pre-Construction &

Construction 12/2018 06/2019

04/2019 08/2019 10-15 2 10

Ross Marin 17/18 Carried Over Road Maintenance & Rehabilitation

Bolinas Avenue Pavement Rehab Project

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Full Depth Reclamation of existing street Bolinas Avenue from Sir Francis Drake to Glenwood Pre-Construction &

Construction 06/2018 04/2020

07/2019 08/2020 15-25 6 7

San Anselmo Marin 19/20 Carried Over Road Maintenance & Rehabilitation 2018/2019 FY Street Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing) | Street repaving, which consists of removal of the existing pavement section and replacement with new asphalt concrete. Complete Streets elements will be analyzed and included if appropriate.

Kensington Road from Bolinas Avenue to Ross Avenue Construction 07/2019 05/2020 15-20 2 10

San Anselmo Marin 19/20 Carried Over Road Maintenance & Rehabilitation

2018/2019 FY Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New) | Street repaving, which consists of removal of the existing pavement section and replacement with new asphalt concrete. Complete Streets elements will be analyzed and included if appropriate.

Brookside Drive from Broadmoor Avenue to Cordone Drive Construction 07/2019 06/2020 15-20 2 10

San Anselmo Marin 19/20 Carried Over Road Maintenance & Rehabilitation

2018/2019 FY Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing) | Street repaving, which consists of removal of the existing pavement section and replacement with new asphalt concrete. Complete Streets elements will be analyzed and included if appropriate.

Meadowcroft Drive from Butterfield Road to Morningside Drive Construction 07/2019 06/2020 15-20 2 10

San Anselmo Marin 19/20 Carried Over Road Maintenance & Rehabilitation

2018/2019 FY Street Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Street repaving, which consists of removal of the existing pavement section and replacement with new asphalt concrete. Complete Streets elements will be analyzed and included if appropriate.

Brookside Court from Brookside Drive to end Construction 07/2019 06/2020 15-20 2 10

San Anselmo Marin 19/20 New Road Maintenance & Rehabilitation

Bolinas Avenue Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane Rehab/Repair (Existing) Bolinas Avenue between San Anselmo Avenue and Waverly Road Construction 07/2019 06/2020 15-20 21 47

Sausalito Marin 19/20 Carried Over Road Maintenance & Rehabilitation Bee St. and Bonita St. Improvements

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Remove existing concrete pavement and replace with AC pavement. Up to five new curb ramps, sanitary sewer main and lateral and storm drain improvements and sidewalk improvements as required .

Bee St. between Bonita St. and Caledonia St. Bonita St. Between Litho St. and Bee St. Construction 07/2019 10/2019 20-30 2 10

Sausalito Marin 17/18 Carried Over Road Maintenance & Rehabilitation

2019 Streets Resurfacing Project (17/18 Carryover)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | Remove exiting concrete surfacing and replace with new asphalt surface. AC overlay with attendant grinding and base repair. Elimination of exposed road base material from entering the bay during wet weather. Six new curb ramps. Elimination of potential trip hazards, drainage improvements and repair of sanitary sewer main and laterals as may be required.

Excelsior Ln, between Bulkley Ave. and Steps to Bridgeway Easterby St. between Bridgeway/Filbert and Pearl St. Locust St. between Bridgeway and the bay Girard Ave. between Johnson St. and Turney St.

Construction 07/2020 10/2020 10-30 17 29

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 48: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Tiburon Marin 19/20 In-Progress Road Maintenance & Rehabilitation

Hawthorne Undergrounding Road Resurfacing

This project will include: Pavement Rehab/Repair (Existing) | Restoration of streets following the undergrounding of overhead utilities.

Town of Tiburon, Hawthorne Drive from East End to Rock Hill, Hawthorne Drive from Wend End to Rock Hill, Rock Hill from Tiburon Blvd to Del Mar, Rock Hill from Del Mar to Cul De Sac

Construction 08/2019 12/2020 15-25 2 10

Tiburon Marin 19/20 New Road Maintenance & Rehabilitation

2020 Various Streets Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | Pavement Rehabilitation and Maintenance construction

Town of Tiburon Roads List: Barn Road, Corte Las Casas, Indian Rock Court, Karen Way, Steward Drive, Steward Drive, Baccharis Place, Benton Court, Blackfield Drive, Buckwheat Court, Corte Palos Verdes, Rancho Drive, Turtle Rock Court, Via Capistrano, Vista Tiburon

Construction 08/2019 12/2020 15-20 26 66

Corte Madera Marin 19/20 Carried Over Road Maintenance & Rehabilitation Tamal Vista Complete Streets

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Grind and Overlay of Tamal Vista Bl and improve/consolidate pedestrian crossings, add bike lanes, create ADA bus stops, sidewalks, curb cuts/ramps

Tamal Vista Bl between Madera and Fifer Avenues Construction 05/2020 10/2020 15-20 22 49

Corte Madera Marin 19/20 New Complete Streets Components

2019 Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) In Corte Madera on Montecito Dr., Meadow Ridge Dr., Manzanita Ave., Eastman

Dr., Sausalito St., Oakdale Ave., and Buena Vista Ave. Construction 08/2019 12/2019 15-25 22 49

Fort Bragg Mendocino 19/20 New Traffic Control Devices 4 New Stopped Intersections (traffic control signage and associated pavement markings)

This project will include: Public Works Staffing, Procurement of Road Maintenance and Rehab Materials | Work to be completed by own forces, include new striping and signage for 4 stopped intersections. One intersection has a round-a-bout to be removed by contractor other than City.

Maple St. at Harold, South St. at Franklin, Harrison S.t at Pine, and Fir St. at Harrison

Procurement / Operational Needs 07/2019 06/2020 4-7 2 2

Fort Bragg Mendocino 19/20 New Traffic Control Devices School Zone Improvements ( traffic control signage and associated pavement markings)

This project will include: Work to be completed by own forces, include new striping and signage for street segments.

Maple St between Corry and Harold, Chestnut St between Dana and Lincoln, N Harold St between Laurel and Pine, N Harold St between Laurel and Cedar, Ocean View Dr between Sung Harbor and Harbor Ave

Procurement / Operational Needs 07/2019 06/2020 3-7 2 2

Fort Bragg Mendocino 19/20 New Traffic Control Devices

Accessible Parking in the Central Business District (traffic control signage and associated pavement markings)

This project will include: Public Works Staffing, Procurement of Road Maintenance and Rehab Materials | Work to be completed by own forces. If we need to upgrade ADA pathway for parking lot, this will be completed by Contractor separate from City Forces.

100 Block of East Laurel and Alley N300E between Franklin and McPherson. Procurement / Operational Needs 07/2019 06/2020 3-7 2 2

Fort Bragg Mendocino 19/20 New Traffic Control Devices Signage Inventory and Replacement This project will include: Public Works Staffing, Procurement of Road Maintenance and Rehab Materials | Work to be completed by own forces, include administrative, signage inventory, and sign procurement, and labor for replacing signage.

Central Business District (including, Pine St, Laurel St, Redwood St, Franklin St, McPherson St, and two north/south allleys). Additional locations include Harold St at Fir and Park at Willow

Procurement / Operational Needs 07/2019 06/2020 7-10 1 1

Point Arena Mendocino 19/20 New Road Maintenance & Rehabilitation

Windy Hollow & Riverside Drive Repaving and Drainage Improvements

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Subsurface drainage repair in 3 locations along a 200' section of Windy Hollow Road including full dig out and reconstruction of an area approx. 205' x 27'. Digout, reconstruction & repaving of approximately 500' of Riverside Drive starting at the intersection of Main Street and going east to 70 feet east of the intersection with Windy Hollow Road. 40' of drainage ditch to be covered and connected to an existing Drain Inlet on Riverside Dr.

In Point Arena, at Riverside Drive and Windy Hollow Road. Construction 07/2019 12/2019 10-15 20 52

Ukiah Mendocino 19/20 New Road Maintenance & Rehabilitation

Pavement Reconstruction of Orchard Ave.

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Orchard Avenue from East Perkins St. to Ford St. Construction 08/2019 11/2019 20-25 25 41

Willits Mendocino 19/20 New Road Maintenance & Rehabilitation Annual Striping Program This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Various local streets throughout the City. Most streets in our city of 2.8 square miles are on a four-year rotation, with approximately 20-22 miles of paved roadway in total. All project locations are within 1.5 miles of Lat 39.400528, Lon -123.349698

Construction 04/2020 06/2020 2-4 2 2

Willits Mendocino 19/20 New Safety Main Street No Parking Zones (signage and red curbs) This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Main Street in Willits CA. Construction 04/2020 12/2020 2-5 2 2

Willits Mendocino 19/20 New Other Survey Equipment Maintenance This project will include: Repair and Servicing of Public Works Equipment City of Willits Public Works yard, 380 E. Commercial Street Willits CA 95490 Procurement / Operational Needs 07/2019 06/2020 1-5 2 2

Willits Mendocino 17/18 Carried Over Road Maintenance & Rehabilitation Creekside Road Stabilization Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Through this project we will repair drainage structures, regrade the roadway, replace approximately 80' of curb, gutter, and asphalt. | All 2017-18 funds were used on the other reported project. This project has been pushed to an outer year.

Creekside Street, between Boscabell and South Lenore Streets Construction 04/2020 06/2020 10-25 4 3

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 49: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Atwater Merced 19/20 New Road Maintenance & Rehabilitation City Wide Pavement Maintenance

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

The area within the City Limits, north of State Route 99, west of Shaffer Road, south of Fruitland Ave, all inclusive, together with the area north of Juniper Ave, west of Rancho del Rey Drive, south of Terri Drive, and east of Mary Lane, all inclusive. All locations listed are an estimate and have yet to be finalized.

Construction 01/2020 06/2020 10-15 12 21

Atwater Merced 17/18 Carried Over Complete Streets Components Winton Way Road Improvement This project will include: Pavement Improvement (New) | Winton Way will undergo a long-

term pavement upgrade to address future needs of the city. Winton Way between Broadway and Bellevue Road Construction 07/2019 06/2020 20-30 12 21

Atwater Merced 17/18 Carried Over Complete Streets Components Fruitland Avenue Road Improvement

This project will include: Roundabout Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Improvement (New) | Fruitland Avenue will undergo a long-term pavement upgrade with new traffic circles to encourage the flow of traffic while reducing emissions and increasing pedestrian safety.

Fruitland Avenue between Orchard Park and Shaffer Road Construction 09/2019 06/2020 20-30 12 21

Atwater Merced 17/18 Carried Over Other Active Transportation Plan

This project will include: Active Transportation Plan | The Active Transportation Plan will slowly adapt current transportation infrastructure to encourage the use of public transportation, bicycle paths and walking through the development of new mass transit options, protected bicycle lanes, and improved sidewalks.

Bell Dr., Olive Ave., Applegate Rd., N Winton Way., Bellevue Rd., East Bellevue Rd., Juniper Ave., East Juniper Ave., First St., Shaffer Rd., Ave One, Ave Two, N Buhach Rd., Santa Fe Dr., Green Sands Ave. and Gertrude Ave. All locations have yet to be finalized and are subject to change.

Pre-Construction 09/2019 06/2020 20-30 12 21

Dos Palos Merced 17/18 Carried Over Road Maintenance & Rehabilitation

Center Avenue North in the City of Dos Palos

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehab Streets, Sidewalks, Replace Storm Drainage, Create Bike Path & Pedestrian Walkway, Improve Safety at 7 Intersections, link to parks, multimodal transit center, senior center.

In the City of Dos Palos: Center Avenue between Marguerite Street and Loraine Street; Loraine Street between Center Avenue and Dos Palos Avenue. Construction 07/2019 12/2020 30-40 32 58

Gustine Merced 19/20 Carried Over Traffic Control Devices Hwy 33/140 Roundabout This project will include: Roundabout Installation (New) | Eliminate stop sign on State Highway 33, replacing with a Roundabout. Junction of State Highways 33 and 140. Construction 01/2020 12/2020 10-20 12 21

Gustine Merced 19/20 Carried Over Traffic Control Devices Downtown Roundabout This project will include: Roundabout Installation (New), ADA Curb Ramp Installation (New) | Replace two-way stop with Roundabout to correct site obscurement and ADA compliance issues.

Intersection of 5th Street and 4th Avenue. Construction 01/2020 12/2021 10-20 12 21

Gustine Merced 19/20 Carried Over Road Maintenance & Rehabilitation Carnation Road This project will include: Pavement Rehab/Repair (Existing) | Rehabilitate/reconstruct

dilapidated roadway Carnation Road between East Avenue and Waste Water Treatment Plant Construction 01/2020 12/2021 10-20 12 21

Gustine Merced 19/20 New Complete Streets Components Meredith Ave Bike Path Ph. 1 This project will include: Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) |

Installation of 10 feet bicycle and pedestrian pathway. Along Meredith Ave between Linden and West Ave Construction 07/2019 12/2019 15-20 12 21

Gustine Merced 19/20 Forecasted Complete Streets Components Meredith Ave Bike Path Ph. 2 This project will include: Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) |

Installation of 10 feet bicycle and pedestrian pathway. Meredith Ave from West Ave to Grove Ave Construction 01/2021 12/2021 15-20 12 21

Gustine Merced 17/18 Forecasted Safety Hwy 33/140 Intersection Upgrade This project will include: Right of Way Acquisition, Traffic Signals, Lights, and/or Signage Installation (New Safety) | Intersection expansion and upgrade. Install intersection signalization, widen, and install turn lanes.

Hwy 33/140 Intersection Construction 07/2021 11/2023 15-20 12 21

Gustine Merced 17/18 In-Progress Complete Streets Components Greenacres Project

This project will include: ADA Curb Ramp Installation (New) | Eliminate high curbs and install ADA-compliant ramps. | The City expects to use other local funding sources in addition to RMRA funds.

Sidewalks and public street near the entrance of mobile-home located in the 1400 block of Meredith Avenue. Construction 05/2019 12/2019 10-20 12 21

Gustine Merced 17/18 Forecasted Complete Streets Components Main Street/GPS Project

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Ramp, sidewalk and gutter rehabilitation to improve safety and walkability of the area. The project will replace uneven concrete that contains tripping hazards, as well as replace ramps for handicap access for all pedestrians, including all traffic in the downtown corridor.

Block on the northwest corner of 5th Street and 3rd Avenue, in the heart of the City business district and utilized extensively by the public. Construction 01/2021 11/2022 10-20 13 24

Livingston Merced 17/18 Forecasted Road Maintenance & Rehabilitation Stefani Avenue Rehabilitation This project will include: Pavement Rehab/Repair (Existing) | Reconstruction of the roadway

structural section. In the City of Livingston between Davis Street and Campbell Boulevard. Construction 08/2022 08/2023 10-20 12 21

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 50: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Livingston Merced 19/20 New Road Maintenance & Rehabilitation Winton Parkway Rehabilitation This project will include: Pavement Rehab/Repair (Existing) In the City of Livingston between Joseph Gallo Drive and State Route 99 Construction 08/2019 08/2020 10-20 12 21

Livingston Merced 19/20 New Road Maintenance & Rehabilitation Hammatt Avenue Rehabilitation This project will include: Pavement Rehab/Repair (Existing) In the City of Livingston between Campbell Boulevard and State Route 99 Construction 08/2019 08/2020 10-20 5 9

Los Banos Merced 19/20 New Road Maintenance & Rehabilitation Crack Seal This project will include: Pavement Rehab/Repair (Existing)

The City of Los Banos Crack Seal schedule for fiscal Year 19/20 includes the following areas: Verona Estates, Valley Meadows, Jo-Lin (Park Streets), Gardens, Miano School, Vineyards, Ranchwood, Somerset, Northgate Regency, and Meadowlands. A map of the streets included is provided by using the following link. http://www.losbanos.org/wp-content/uploads/2013/09/FY-2019-20-Street-Project-Map.pdf

Construction 10/2019 06/2020 5-7 12 21

Los Banos Merced 19/20 New Road Maintenance & Rehabilitation Col Mix Overlay This project will include: Pavement Rehab/Repair (Existing) Second Street from H Street to Overland Avenue Construction 05/2020 06/2020 10-20 12 21

Los Banos Merced 19/20 New Road Maintenance & Rehabilitation Col Mix Overlay This project will include: Pavement Rehab/Repair (Existing) Willmott Road from Johnson Road to First Street Construction 05/2020 06/2020 10-20 12 21

Los Banos Merced 19/20 New Road Maintenance & Rehabilitation Fog Seal This project will include: Pavement Rehab/Repair (Existing)

The City of Los Banos Fog Seal schedule for Fiscal Year 2019/2020 includes the following areas of the city: Valley Meadows, Jo-Lin (Parks Streets), Ranchwood, Gardens, Northgate Regency, Verona, Miano School, Vineyards, and Colorado Ballpark. A map of the scheduled streets can be viewed by following the link provided. http://www.losbanos.org/wp-content/uploads/2013/09/FY-2019-20-Street-Project-Map.pdf

Construction 07/2019 09/2019 5-7 15 28

Merced Merced 17/18 Carried Over Safety Sidewalk Replacement Project This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing) Various Locations Throughout the City of Merced. (K, Canal, & 8th Streets; Seville Way; East Donna Drive; Q & 4th Streets; Q & 10th Streets; R & 10th Streets; Evelyn & Julie Drive; East 22nd St & Cherry Ave)

Construction 09/2019 06/2020 10-20 12 21

Merced Merced 17/18 Carried Over Safety Curb and Gutter Replacement Project

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Curb and Gutter Replacement Project

Various Locations Throughout the City of Merced (K St; Q & 10th St; R & 10th/11th St; Evelyn Ct; East 22nd St & Cherry Ave; V & 8th St) Construction 03/2020 06/2020 10-20 12 21

Merced Merced 19/20 Carried Over Other Road Improvement - Childs Avenue This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Road widening, sidewalk, curb and gutter. Childs Avenue (Parsons Avenue to Campus Parkway) Construction 12/2019 04/2020 20-25 12 21

Merced Merced 19/20 In-Progress Road Maintenance & Rehabilitation

Road Maintenance and Rehabilitation Programs and Material Purchase

This project will include: Procurement of Road Maintenance and Rehab Materials | Road Maintenance and Rehabilitation Programs and Material Purchase.

Various locations throughout the City of Merced. Area 1 generally bounded by south of Santa Fe Avenue, north of Highway 99, east of Highway 59, and west of Yosemite Parkway. Area 2 generally bounded by south of Highway 99, north of Dickenson Ferry Road, east of Thornton Road, and west of Highway 59. See "Maintenance Area" attachment for detailed information.

Procurement / Operational Needs 07/2019 06/2020 5-7 12 21

Merced Merced 19/20 New Road Maintenance & Rehabilitation Crack Filling Projects This project will include: Pavement Rehab/Repair (Existing) Olive Avenue (Highway 59 to G Street); G Street (16th to 22nd); 16th Street (V

to G Street); Yosemite (West of R Street) Construction 03/2020 06/2020 5-7 12 21

Merced Merced 19/20 New Road Maintenance & Rehabilitation

Grind and Overlay (Yosemite Avenue) This project will include: Pavement Rehab/Repair (Existing) Yosemite Avenue (Parsons to Masionette) Construction 05/2020 06/2020 8-12 12 21

Merced Merced 19/20 New Road Maintenance & Rehabilitation Grind and Overlay (M Street) This project will include: Pavement Rehab/Repair (Existing) M Street (13th to Childs) Construction 03/2020 06/2020 8-12 12 21

Merced Merced 19/20 New Road Maintenance & Rehabilitation Roadway Slurry Seal Projects This project will include: Pavement Rehab/Repair (Existing) Canal Street (Childs to 16th); East El Portal Avenue (G St to Joerg); West 26th

Street (G to M Street); Merced Avenue (Parsons to Motel Drive) Construction 09/2019 11/2019 7-10 12 21

Merced Merced 19/20 New Road Maintenance & Rehabilitation Road Improvement - 18th Street This project will include: Pavement Rehab/Repair (Existing) 18th Street (R Street to V Street) Construction 03/2020 06/2020 20-25 12 21

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 51: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Merced Merced 19/20 New Road Maintenance & Rehabilitation Road Improvement - Glen Avenue This project will include: Pavement Rehab/Repair (Existing) Glen Avenue (Santa Fe to Bear Creek) Construction 04/2020 06/2020 20-25 12 21

Merced Merced 19/20 New Road Maintenance & Rehabilitation Road Improvement - R Street This project will include: Pavement Rehab/Repair (Existing) R Street (Olive Avenue to Northwood Drive) Construction 04/2020 06/2020 20-25 12 21

Merced Merced 19/20 New Road Maintenance & Rehabilitation Road Improvement - 26th Street This project will include: Pavement Rehab/Repair (Existing) 26th Street (Glen to 7th) Construction 06/2020 09/2020 20-25 2 10

Alturas Modoc 19/20 New Road Maintenance & Rehabilitation East Modoc Street major repair work This project will include: Pavement Rehab/Repair (Existing) East Modoc Street in the City of Alturas, starting at the cross street of Estes.

Modoc street dead ends at the Rail Road Tracks on the eats end of the street. Construction 06/2019 10/2019 7-10 1 1

Mammoth Lakes Mono 19/20 New Road Maintenance & Rehabilitation

Meridian Blvd Curb and Gutter replacement project Phase 3 This project will include: Curb and gutter replacement Meridian Blvd west of Minaret Rd Construction 06/2020 07/2020 20-30 26 66

Carmel-by-the-Sea Monterey 19/20 New Road Maintenance & Rehabilitation Road Project (FY 19/20)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Mill and overlay a 2-inch asphalt layer Type II Slurry Seal Cape Seal

Cape seal on 14 residential streets; 2-inch overlay on 3 residential streets; Type II Slurry seal on 5 residential streets Construction 04/2020 06/2020 7-20 17 29

Del Rey Oaks Monterey 19/20 Carried Over Road Maintenance & Rehabilitation

Street Reconstruction and Overlay Package

This project will include: Pavement Rehab/Repair (Existing) | Design and construct street reconstruction and overlay package, Del Rey Oaks residential streets, estimated useful life 15-20 years. Estimated completion October 2019.

Slurry seal City Streets Construction 07/2020 12/2020 15-20 14 32

Gonzales Monterey 19/20 New Road Maintenance & Rehabilitation

Gloria Road Pavement Rehab Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Gloria Road from US101 to City Limits (1,400 lineal feet) Construction 04/2020 06/2020 15-25 20 47

Greenfield Monterey 19/20 New Road Maintenance & Rehabilitation Administrative Costs

This project will include: Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Systems/Databases, Procurement of Public Works Safety Materials and Gear | Salaries, wages, fringe benefits, and related costs of Public Works employees assigned to the Streets Division and providing local street and road maintenance and repair services. Included are equipment, material and program related costs. This contribution will enhance the ability of the City to perform a greater amount of its own pothole repairs, concrete repairs, striping and other maintenance functions.

City of Greenfield Procurement / Operational Needs 07/2019 06/2020 1-1 12 30

Greenfield Monterey 19/20 New Other Pedestrian safety and accessibility improvements

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Project Scope Development

City Wide Downtown and surrounding areas will be assessed.

Pre-Construction & Construction

07/2019 03/2020

12/2019 06/2020 1-1 4 3

King City Monterey 19/20 New Road Maintenance & Rehabilitation

Design, Grind, and Overlay Ulrey ST, N Russ Ave and N Vanderhurst Ave This project will include: Pavement Rehab/Repair (Existing) Ulrey St from N Russ Ave to N Third St, N Russ Ave from King St to Collins St,

N Vanderhurst Ave form King St to Collins St Construction 08/2019 10/2019 25-30 12 31

Marina Monterey 19/20 New Road Maintenance & Rehabilitation

Annual Street Resurfacing (Phase 1-New Installation and Repair of ADA Curb Ramps and HMA Overlay)

This project will include: Cost Estimating, Maintenance Program Plan Development, Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Bostick Ave, Kona Cir, Westwood Ct, Phillip Cir, Belle Dr, Fitzgerald Cir, Huntington Pl, Max Cir, McCulloch Cir, Melanie Rd

Pre-Construction & Construction

02/2020 04/2020

04/2020 06/2020 10-15 17 29

Marina Monterey 19/20 New Road Maintenance & Rehabilitation

Annual Resurfacing Project (Phase 2-Microsurfacing and Slurry Seal)

This project will include: Cost Estimating, Maintenance Program Plan Development, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Thirteen street segments will be treated with microsurfacing, including segments on Beach Road, Hillcrest Avenue and Seacrest Avenue. 41 streets segments will be treated with a slurry seal, including segments on Abdy Way, Michael Drive and Zanetta Drive.

Pre-Construction & Construction

02/2020 05/2020

04/2020 06/2020 5-10 3 14

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 52: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Monterey Monterey 19/20 New Road Maintenance & Rehabilitation Reconstruction of Casa Verde

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Construction of concrete curbs, gutters, sidewalks, sidewalk crossings (driveway approach) and curb ramps, storm drainage, signage and striping, isolated street and driveway surface repairs, pavement grinding, street reconstruction and hot mix asphalt pavement.

Casa Verde from Fremont to Highway 1 Construction 09/2019 07/2020 20-20 22 49

Pacific Grove Monterey 19/20 New Road Maintenance & Rehabilitation

Street Rehabilitation - 2" overlay on portions of 17 Mile Drive and Central Avenue

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing)

17 Mile Drive from Del Monte Avenue to Crest Avenue; Central Avenue from 15th Street to 9th Street

Pre-Construction & Construction

07/2019 03/2020

02/2020 06/2020 15-20 13 22

Salinas Monterey 19/20 New Traffic Control Devices Traffic Signal Installation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Traffic signal installations and upgrades, including Opticom emergency controls and upgrades to existing traffic signal components at intersections when warranted

Prioritized intersection locations will be identified every 2 years and brought before the City Council for consideration, prior to project design Construction 05/2019 06/2020 15-20 12 30

Salinas Monterey 17/18 In-Progress Road Maintenance & Rehabilitation Slurry Seal Improvements

This project will include: Paving and/or Striping Installation (New Safety), Paving and/or Striping Rehab/Repair (Existing Safety) | Citywide pavement maintenance (slurry seal) and striping on major & minor arterials and local residential roads.

Constitution Blvd (E Laurel Dr to Boronda Rd); Natividad Rd (E Alvin Dr to E Boronda Rd); John St (Wood St to Alisal Rd); Freedom Pkwy (Constitution Blvd to Williams Rd); North Sanborn Rd (Del Monte Ave to Boronda Rd); East Laurel Dr (Natividad Rd to N Sanborn Rd); and residential streets citywide.

Construction 03/2019 06/2019 5-7 12 30

Salinas Monterey 17/18 Carried Over Safety Striping and Signing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Upgrade Faded Crosswalks (various locations) and Bikelanes (various locations)

Alisal St (Front Street to Madeira); Alisal St (John Street/Williams to Bardin Road); E Romie Ln; Harris Rd & Abbott St; Boronda Rd & Natividad Rd; Constitution Blvd; Laurel Drive & Natividad Road; Williams Road (Alisal St to Freedom Pkwy); Harkins Rd & Hansen St; Abbott St & Sanborn Rd. Locations listed are an estimate and have yet to be finalized.

Construction 06/2019 05/2020 5-7 12 30

Salinas Monterey 17/18 Carried Over Complete Streets Components San Juan Grade Road Improvements

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement repairs and asphalt concrete overlay on major arterial San Juan Grade Road, including striping

San Juan Grade Road, between Boronda Rd and Russell Rd. Construction 09/2019 11/2019 10-20 2 10

Seaside Monterey 17/18 In-Progress Road Maintenance & Rehabilitation

Arterial and Collector Resurfacing Project

This project will include: Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Arterial and Collector Roadways throughout the City, including but not limited to Freemont Blvd., Wheeler St., Noche Buena Ave., La Salle Ave., San Pablo Ave., and Del Monte Ave.

Pre-Construction & Construction

11/2018 07/2020

06/2020 11/2021 5-30 2 10

Soledad Monterey 19/20 New Road Maintenance & Rehabilitation FY19/20 Street Maintenance Project

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Gabilan Rd between San Vicente and Orchard Ave. Pre-Construction & Construction

09/2019 03/2020

11/2019 04/2020 10-20 19 35

Sand City Monterey 17/18 Forecasted Road Maintenance & Rehabilitation

Contra Costa Street and Sidewalk Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New) | Curb, gutter, and sidewalk improvements; and adjacent street rehabilitation with new crosswalk. (funds to be banked and combined with other funding sources).

Contra Costa Street between Elder Avenue and Shasta Avenue in Sand City, California Construction 04/2022 09/2022 20-30 13 22

American Canyon Napa 19/20 New Road Maintenance & Rehabilitation

2020 Annual Pavement Management Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Arden Court, Knightsbridge Way, Lansford Court, Linwood Lane, Park Lane, Regent Court, Strand Court, Dodd Court and Klamath Court Construction 05/2020 06/2020 10-20 3 5

Calistoga Napa 19/20 New Road Maintenance & Rehabilitation

Grant Street Rehabilitation and Pedestrian Path Project

This project will include: Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing)

Grant Street from Garnett Creek Court to City Limits Construction 08/2019 06/2020 15-20 3 4

Calistoga Napa 19/20 New Road Maintenance & Rehabilitation Washington Street Overlay

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Storm Drain/Culvert Installation (New) | Project also include new reclaimed water line and replacing of Sewer and water lines, water meters and fire hydrants.

Washington Street between North Oak Street and Berry Street Construction 08/2019 06/2020 15-20 3 4

Calistoga Napa 19/20 New Complete Streets Components

Sidewalk Repair and Replacement Project - Sector "A"

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Document Preparation, Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing)

approximately 500' in downtown area. Pre-Construction & Construction

06/2019 04/2019

09/2019 06/2020 15-20 3 4

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 53: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Calistoga Napa 19/20 New Road Maintenance & Rehabilitation

FY 20/21 Design and Engineering Services

This project will include: Cost Estimating, Maintenance Program Plan Development, Document Preparation, Feasibility Study, Environmental Study/Documents, Preliminary Design, Right of Way, Active Transportation Plan, Project Scope Development

Engineering services for FY20/21 road projects for Washington Street, Cedar Street, Grant Street and Lake Street. Pre-Construction 06/2019 06/2020 15-20 3 4

Napa Napa 19/20 New Road Maintenance & Rehabilitation

SB1 - Local Streets Pavement Maintenance Project - Road Maintenance (Crack Seal/Asphault Rejuvenation) FY2019-20

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Project Scope Development

Project locations within the City of Napa include (but are not limited to): Browns Valley West, West Park, and Downtown. Area maps are attached (AREA MAPS 1, 2, 3). All project locations listed are preliminary and may be subject to change.

Pre-Construction & Construction

07/2019 08/2019

05/2020 06/2020 2-10 3 4

Napa Napa 19/20 New Road Maintenance & Rehabilitation

SB1 - Local Streets Paving Program Project - (Ten Mile) FY2019-20

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Project locations within the City of Napa include (but are not limited to): Greenbach area (bound by Hwy 29 and Jefferson Street, south of Imola Ave). Area maps are attached (AREA MAP 5). All project locations listed are preliminary and may be subject to change.

Pre-Construction & Construction

07/2019 08/2019

05/2020 06/2020 10-25 3 4

Napa Napa 19/20 New Complete Streets Components

SB1 - Complete Streets Concrete Work Project - Westwood Project Sidewalks FY2019-20

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Project Scope Development

Project locations within the City of Napa include (but are not limited to): Westwood neighborhood. Area maps are attached (AREA MAP 4). All project locations listed are preliminary and may be subject to change.

Pre-Construction & Construction

07/2019 08/2019

05/2020 06/2020 25-50 16 33

St. Helena Napa 19/20 Carried Over Complete Streets Components

Downtown Sidewalk and Pedestrian Project

This project will include: Preliminary Design | Design downtown sidewalk and pedestrian improvements: sidewalk, curb ramps, bulb outs, landscape, furnishing, utilities. OBAG II Grant (2 year design with construction in FY20/21

Main Street (Highway 29) from Mitchell Drive to Pine Street Pre-Construction 04/2019 02/2021 15-30 29 65

Yountville Napa 19/20 New Road Maintenance & Rehabilitation

Oak Circle Curb, Gutter, Sidewalk and ADA ramp rmeove and replace

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Street rehabilitation Oak Circle Construction 05/2019 03/2020 15-50 3 4

Yountville Napa 19/20 New Road Maintenance & Rehabilitation

Annual Maintenance and Paving Program

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing)

Oak Circle Construction 05/2019 03/2020 15-50 1 1

Grass Valley Nevada 19/20 New Road Maintenance & Rehabilitation

2019/20 Annual Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Maltman Dr, Joerschke Dr, W Olympia Dr, W Empire St, Whiting St, Le Duc St, Stacey Ln Construction 05/2020 07/2020 15-20 12 30

Truckee Nevada 19/20 Carried Over Road Maintenance & Rehabilitation 2019 Slurry Seal Project

This project will include: Pavement Rehab/Repair (Existing) | The 2019 Slurry Seal Project would apply slurry seal to approximately 29 miles of local road, representing 124 roadway segments.

Roads anticipated to be slurry sealed include residential roads in Tahoe Donner, Glenshire, Donner Lake, and Gray's Crossing. Construction 05/2019 10/2019 5-15 1 1

Truckee Nevada 19/20 New Road Maintenance & Rehabilitation 2020 Slurry Seal Project This project will include: Pavement Rehab/Repair (Existing) Roads anticipated to be slurried are those within the Tahoe Donner, Armstrong

Tract, Gateway, and Glenshire neighborhoods. Construction 05/2020 10/2020 5-15 16 26

Nevada City Nevada 17/18 In-Progress Road Maintenance & Rehabilitation Commercial Street

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Sidewalk will be widened and enhanced at intersections to provide safe, convenient and efficient pedestrian access within the Downtown Historic District. Pavement improvements include replacement of deteriorated pavement and improvements to cross-slope for drainage. This project will help reduce traffic congestion and improve pedestrian safety which reduces vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals. | Completed Topographic Survey, Conducted Community Workshops, City Council directed staff to prepare traffic study and proceed with design. No costs incurred in 2017-18 other than staff time.

Commercial Street from Union Street to Broad Street Construction 08/2019 11/2020 10-20 40 79, 80

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 54: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Nevada City Nevada 17/18 In-Progress Road Maintenance & Rehabilitation Broad Street Y

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Sidewalk will be widened and enhanced at intersections to provide safe, convenient and efficient pedestrian access within the Downtown Historic District. Pavement improvements include replacement of deteriorated pavement and improvements to cross-slope for drainage. This project will help reduce traffic congestion and improve pedestrian safety which reduces vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals. | Completed Topographic Survey, Completed design for Utility Relocates, Bids were too high for Utility Work. Rebidding in 2019. No costs incurred in 2017-2018 other than staff time.

Broad Street from Commerical Street to (and including) the intersection of West Broad Street and East Broad Street. Construction 07/2019 12/2020 10-20 40 79, 80

Aliso Viejo Orange 19/20 In-Progress Road Maintenance & Rehabilitation Alicia Parkway Rehabilitation

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Sidewalk and curb ramp repairs/upgrades; patching failed pavement areas; grinding existing asphalt surface; installing new, fiber reinforced, asphalt rubber surface. Design work completed in FY 18-19, construction in FY 19-20.

Alicia Parkway - Pacific Park Drive to City Limits Pre-Construction & Construction

07/2018 07/2019

06/2019 10/2019 10-20 36 73

Aliso Viejo Orange 19/20 New Road Maintenance & Rehabilitation Pacific Park Drive Rehabilitation

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Sidewalk and curb ramp repairs/upgrades; patching failed pavement areas; grinding existing asphalt surface; installing new, fiber reinforced, asphalt rubber surface. Design work only in FY 19-20, construction in FY 20-21.

Pacific Park Drive - Aliso Viejo Parkway to Aliso Creek Road Pre-Construction & Construction

07/2019 07/2020

06/2020 06/2021 10-20 36 73

Aliso Viejo Orange 19/20 New Road Maintenance & Rehabilitation Slurry Seal Program FY 19-20

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Project Scope Development | Repair of failed areas, crack filling, installation of slurry seal.

Association areas: Pacific Ridge, Altisse, CA Renaissance, Moulton Parkway 1, 2, 3

Pre-Construction & Construction

07/2019 02/2020

01/2020 06/2020 5-7 36 73

Anaheim Orange 17/18 Carried Over Road Maintenance & Rehabilitation Acacia Neighborhood Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

(District 5) - Acacia Neighborhood bordered by Via Burton Street to the north, State College Boulevard to the east, Lincoln Avenue to the south, and East Street to the west

Construction 07/2019 11/2019 7-20 29 69

Anaheim Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Northeast Anaheim Colony (Sabina) Neighborhood Rehabilitation (Phase -2)

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

(District 3) - Sabina Neighborhood (Project - C) - bordered by La Palma Avenue to the north, East Street to the east, Sycamore Street to the south, and Pauline Street to the west

Construction 01/2020 06/2020 7-20 29 69

Anaheim Orange 17/18 Carried Over Road Maintenance & Rehabilitation

Orangewood Avenue Rehabilitation from Harbor Boulevard to Lewis Street [APUE UD #64]

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

(District 4) - Orangewood Avenue from Harbor Boulevard to Lewis Street Construction 02/2020 06/2020 10-15 34 69

Anaheim Orange 17/18 Carried Over Road Maintenance & Rehabilitation

La Palma Avenue & Magnolia Avenue Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

(District 1) - La Palma Avenue from the West City Limit to Magnolia Avenue & Magnolia Avenue from the I-5 Freeway to La Palma Avenue Construction 05/2019 07/2019 10-15 29 65

Anaheim Orange 19/20 Carried Over Road Maintenance & Rehabilitation Riverdale Avenue Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

(District 6) - Riverdale Avenue from the SR-91 Freeway to Lakeview Avenue Construction 09/2019 12/2019 10-15 37 68

Anaheim Orange 19/20 Carried Over Road Maintenance & Rehabilitation Weir Canyon Road Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

(District 6) - Weir Canyon Road from Serrano Avenue to Parkglen Place Construction 04/2020 06/2020 10-15 37 68

Anaheim Orange 19/20 New Road Maintenance & Rehabilitation

Lindacita Neighborhood Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

(District 1) - Lindacita Neighborhood bordered by Lincoln Avenue to the north, Beach Boulevard to the east, Orange Avenue to the south, and Knott Avenue to the west

Construction 09/2019 02/2020 7-20 29 65

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 55: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Anaheim Orange 19/20 New Road Maintenance & Rehabilitation Valdina Neighborhood Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

(District 1) - Valdina Neighborhood bordered by La Palma Avenue to the north, Brookhurst Street to the east, Crescent Avenue to the south, and Gilbert Street to the west

Construction 10/2019 04/2020 7-20 29 65

Anaheim Orange 19/20 New Road Maintenance & Rehabilitation

Crescent Neighborhood Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

(District 2) - Crescent Neighborhood bordered by Catalpa Avenue to the north, Euclid Street to the east, I-5 Freeway to the south, and Chippewa Avenue to the west

Construction 11/2019 06/2020 7-20 29 65

Anaheim Orange 19/20 New Road Maintenance & Rehabilitation Ball Road Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

(Districts 3 & 4) - Ball Road from West Place to Claremont Street Construction 09/2019 12/2019 10-15 29, 34 65, 69

Anaheim Orange 19/20 New Road Maintenance & Rehabilitation Broadway Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

(District 2) - Broadway from Gilbert Street to Greenwich Lane Construction 02/2020 06/2020 10-15 29 65

Brea Orange 19/20 New Road Maintenance & Rehabilitation

Country Hills Subdivision Street Rehabilitation

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

The Country Hills Subdivision of the City of Brea. 35 Street segments throughout the subdivision will be serviced. Construction 03/2020 06/2020 10-20 29 55

Buena Park Orange 19/20 New Road Maintenance & Rehabilitation Altura Boulevard Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | 1/4 mile AC roadway rehabilitation and replacement of curb & gutter, sidewalk, accessible ramps, driveway approaches, signing & striping, and other incidentals.

Altura Boulevard from Descanso Avenue to Artesia Boulevard Construction 03/2020 05/2020 10-15 32 65

Buena Park Orange 19/20 New Road Maintenance & Rehabilitation Crescent Avenue Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | 1 1/2 mile AC arterial roadway rehabilitation and replacement of curb & gutter, sidewalk, accessible ramps, driveway approaches, signing & striping, and other incidentals.

Crescent Avenue from Western Avenue to East City Limit Construction 04/2020 06/2020 10-15 32 65

Costa Mesa Orange 19/20 New Road Maintenance & Rehabilitation

S/B Newport Boulevard, from Mesa Drive to Victoria Street

This project will include: Pavement Rehab/Repair (Existing) | This project will provide major rehabilitation to City streets which are in immediate need for improvement. The project is implemented in accordance with the Pavement Management System to meet the City Council Goal to reach and maintain an average Citywide Pavement Condition Index (PCI) of 85. These RMRA funds will be used towards rehabilitation of S/B Newport Boulevard, from Mesa Drive to Victoria Street.

S/B Newport Boulevard, from Mesa Drive to Victoria Street Construction 06/2020 12/2020 10-10 3 10

Cypress Orange 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Annual Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The scope of work consists of slurry sealing over 1,360,000 SF of residential roadway and resurfacing approximately 167,000 SF of pavement using rubberized asphalt concrete (RAC). The proposed project also includes incidental items of work, such as traffic striping, traffic loops, manhole adjustments, etc.

Various residential streets bounded by Walker Street, Ball Road, Holder Street, and Katella Avenue. Construction 10/2019 01/2020 7-20 36 73

Dana Point Orange 19/20 New Road Maintenance & Rehabilitation

FY19/20 Annual Residential Resurfacing Project This project will include: Pavement Rehab/Repair (Existing) This project includes residential, residential collector and collector streets

located within the Lantern Village area as well as specific streets in Capo Beach. Construction 08/2020 11/2020 20-25 7 16

Fountain Valley Orange 19/20 New Road Maintenance & Rehabilitation

Residential Roadway Rehabilitation and Resurfacing

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Residential Roadway Rehabilitation and Resurfacing of Quadrants H3, J1 and J2

City Quadrant H3, J1, and J2 bound by Newhope Street, Harbor Boulevard, Edinger Avenue and those bound Harbor Boulevard, the Santa Ana River, Edinger Avenue and the Northern City Limit

Construction 07/2019 09/2019 10-15 12 31

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 56: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Fullerton Orange 19/20 New Road Maintenance & Rehabilitation Euclid Street Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The street is functionally classified as an arterial street and consists of four lanes (two lanes in each direction) plus a center median lane. Total length of street segment is approximately 0.75 mi. Work shall include pavement rehabilitation, repair of damaged curb and gutter, construction of missing curb and gutter, construction and/or upgrades of curb ramps, repair of damaged sidewalk, new traffic striping, and replacement of traffic signal detectors, all within existing street r/w.

Euclid Street between Williamson Way and Fern Drive Pre-Construction & Construction

04/2019 09/2019

08/2020 01/2020 10-20 5 9

Garden Grove Orange 19/20 New Other Cannery-Imperial Storm Drain (Garden Grove Blvd -Gilbert St) This project will include: Storm Drain/Culvert Installation (New) From Garden Grove Boulevard and Cannery Street to Imperial Avenue and

Gilbert Street Construction 08/2019 01/2020 50-75 35 62, 66

Huntington Beach Orange 19/20 New Road Maintenance & Rehabilitation

FY 19/20 Arterial Rehabilitation Project

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Various street segments will be rehabilitated with SB-1 and local funds as budget allows. These segments include: Slater Avenue (Goldenwest to Beach); Newland Street (Yorktown to Garfield); Atlanta Avenue (Bushard to Brookhurst); Graham Street (Warner to Springdale); Atlanta (Delaware to Beach); Garfield (Main-Delaware); Newland (Ellis to Talbert); Talbert (Springdale to Edwards); Brookhurst (Garfield to Yorktown);

Construction 08/2019 06/2020 15-25 33 53, 59

Irvine Orange 19/20 New Road Maintenance & Rehabilitation

Barranca Parkway Pavement Rehabilitation - I-5 to Alton

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Barranca Parkway Pavement Rehabilitation - I-5 to Alton Construction 07/2019 06/2020 17-62 37 74

Irvine Orange 19/20 New Road Maintenance & Rehabilitation

Campus Drive Rehabilitation -University to Carlson

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Campus Drive: University to Carlson Construction 07/2019 06/2020 17-62 22 48

La Habra Orange 19/20 Carried Over Road Maintenance & Rehabilitation

La Habra Boulevard Pavement from Beach Boulevard to Idaho Street

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project consists of grinding and overlaying the full width the street, reconstruction of damaged curb ramps, sidewalk, and curb and gutter.

La Habra Boulevard from Beach Boulevard to Idaho Street in the City of La Habra, CA Construction 09/2019 11/2019 15-15 29 55

La Habra Orange 19/20 New Road Maintenance & Rehabilitation

La Habra Blvd. from Valley Home Ave. to Beach Blvd.; Cypress St. from La Habra Blvd. to Whittier Blvd. & Palm St. from La Habra Blvd. to North City Limits

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | La Habra Boulevard from Valley Home to Beach Boulevard consists of slurry sealing the full width of the street, reconstruction of full depth pavement, damaged curb ramps, sidewalk, curb and gutter. Cypress Street from La Habra Boulevard to Whittier Boulevard and Palm Street from La Habra Blvd. to North City Limits consisting of grind and overlay the full width of the street, reconstruction of damaged curb ramps, sidewalk, curb and gutter.

La Habra Boulevard from Valley Home to Beach Boulevard; Cypress Street from La Habra Boulevard to Whittier Boulevard & Palm Street from La Habra Boulevard to North City Limits

Construction 07/2020 11/2020 5-15 38 79

La Palma Orange 19/20 Carried Over Road Maintenance & Rehabilitation Walker Street Rehabilitation

This project will include: Cost Estimating, Document Preparation, Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitation including crack sealing, dig-outs, and slurry seal. The limits have been increased to include Walker Street from the South City Limits to the North City Limits which includes the portion of La Palma to 183rd.

Revised - Crescent Avenue to 183rd Street Pre-Construction & Construction

07/2019 12/2019

11/2020 06/2020 7-10 29 65

La Palma Orange 19/20 In-Progress Road Maintenance & Rehabilitation Arterial Street Medians (Phase 1)

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Environmental Study/Documents | Rehabilitationincluding curb repairs, tree and landscape removal, irrigation, hard and soft scape installation

Citywide Project - Phase 1 locations includes La Palma Ave from WCL to ECL; Moody Street from NCL to SCL and Walker Street south of Orangethorpe

Pre-Construction & Construction

01/2018 12/2019

06/2019 12/2020 15-20 29 65

La Palma Orange 19/20 New Road Maintenance & Rehabilitation Moody Street Rehabilitation

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitation including crack sealing, dig-outs and slurry seal.

The south city limits to the north city limits. Construction 12/2019 06/2020 7-10 29 65

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 57: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

La Palma Orange 17/18 Carried Over Road Maintenance & Rehabilitation Orangethorpe Avenue Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitation including grinding, paving, and thermal striping (PW Contract). | The bid opening and award of contract are scheduled for May/June 2019. Construction begins June 2019 and completed in August 2019.

Walker Street to Valley View street Construction 06/2019 09/2019 7-10 22 57

Laguna Beach Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Zone 1 Street Slurry Seal and Rehabilitation

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation

All City maintained streets between Aliso Creek and southerly City limits, including the Coast Royal and South Laguna Village areas.

Pre-Construction & Construction

08/2019 08/2019

12/2019 12/2019 8-12 37 74

Laguna Beach Orange 19/20 New Road Maintenance & Rehabilitation

Portions of Zone 1, 10 & 11 Street Slurry Seal and Rehabilitation This project will include: Cost Estimating, Document Preparation, Preliminary Design All public streets in the Hobo Canyon, Woods Cove and Diamond/Crestview

areas. Pre-Construction 09/2020 12/2020 8-12 37 74

Laguna Beach Orange 19/20 New Road Maintenance & Rehabilitation

Zone 3 Street Concrete Rehabilitation This project will include: Cost Estimating, Document Preparation, Preliminary Design All public streets located in the area bounded by Park Avenue, Wendt Terrace,

Thalia Street and the coast. Pre-Construction 01/2020 12/2020 25-35 36 73

Laguna Hills Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Citywide Street Maintenance, CIP No. 101-K

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Pavement repairs and resurfacing of updated listing of various residential and collector streets within the City's PMP zones of "C" and "E".

Select residential streets within the City’s PMP Zone C, bounded by Alicia Pkwy, Paseo de Valencia, La Paz Rd and the westerly city limits, and within Zone E, bounded by El Toro Rd, I-5, Alicia Pkwy and the westerly city limits.

Pre-Construction 08/2019 02/2020 7-15 36 73

Laguna Niguel Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Niguel Road Pavement Rehabilitation Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Roadway Maintenance and repair including the repair of isolated areas of pavement, pavement grinding and removal, asphalt pavement overlay, associated concrete improvements including bus pads and access ramps, adjustment of surface utilities to final pavement grade, and roadway marking and striping.

Niguel Road from Marina Hills Road to Highlands Avenue Construction 10/2019 12/2019 12-15 36 73

Laguna Niguel Orange 19/20 New Road Maintenance & Rehabilitation

Citywide Concrete Improvements/Replacement Project

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Street of the Golden Lantern Corridor Construction 07/2019 06/2020 10-15 36 73

Laguna Niguel Orange 19/20 New Road Maintenance & Rehabilitation

Construction of Landscape Medians on Aliso Creek Road, La Paz Road and Cabot Road

This project will include: Landscape Safety Installation (New) Aliso Creek Road, La Paz Road and Cabot Road Construction 07/2019 06/2020 10-15 36 73

Laguna Niguel Orange 17/18 Carried Over Road Maintenance & Rehabilitation

Alicia Parkway Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Roadway maintenance and repair including the repair of isolated areas of pavement, pavement grinding and removal, asphalt pavement overlay, associated concrete improvements including bus pads and access ramps, adjustment of surface facilities to final pavement grade, and roadway marking and striping.

Alicia Parkway from Highlands Avenue to Pacific Park Drive Construction 05/2019 06/2020 12-15 37 74

Laguna Woods Orange 19/20 New Road Maintenance & Rehabilitation

Pavement Management Plan Project (Westbound El Toro Road between Avenida Sevilla and Willow Tree Center)

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project involves the rehabilitation of approximately 1,600 linear feet of pavement on westbound El Toro Road between Avenida Sevilla and Willow Tree Center, including asphalt concrete pavement cold milling and repaving.

Westbound El Toro Road between Avenida Sevilla and Willow Tree Center Pre-Construction & Construction

07/2019 02/2020

11/2019 06/2020 15-15 28 67

Lake Forest Orange 17/18 Carried Over Road Maintenance & Rehabilitation

FY 17/18 STREETRESURFACING? PortolaParkway@241 andDimension ParkwayResurfacing

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Asphalt Resurfacing of Portola Parkway within the SR-241, Caltrans Right-of-Way and Dimension Drive from Bake Parkway to Lake Forest Drive

Portola Parkway within the SR-241, Caltrans Right-of-Way and Dimension Drive from Bake Parkway to Lake Forest Drive Construction 05/2019 10/2019 15-20 37 68

Lake Forest Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Civic Center Drive from Commercentre Drive to dead-end approximately 1,400 feet to the South

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Asphalt Reconstruction on Civic Center Drive from Commercentre Drive to dead-end approximately 1,400 feet to the South.

Civic Center Drive from Commercentre Drive to dead-end approximately 1,400 feet to the South. Construction 05/2019 10/2019 15-20 37 68

Lake Forest Orange 19/20 New Road Maintenance & Rehabilitation

Annual Slurry Seal, Zone C (PW 2019-05A) This project will include: Pavement Rehab/Repair (Existing) Residential Streets generally bound Construction 08/2019 12/2019 7-10 37 68

Lake Forest Orange 19/20 New Road Maintenance & Rehabilitation

Road Rehabilitation and Slurry Seal, Ridge Route Rd, Toledo Wy, and Serrano Rd (PW 2019-05A2)

This project will include: Pavement Rehab/Repair (Existing) Ridge Route Rd from Trabuco Rd to westerly limit Toledo Wy from Bake Pkwy to El Toro Rd Serrano Rd from Toledo Wy to El Toro Rd

Construction 07/2019 09/2019 10-15 37 68

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 58: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Lake Forest Orange 19/20 New Road Maintenance & Rehabilitation

Road Rehabilitation Design for El Toro Road and Glenn Ranch Road (PW 2019-05B)

This project will include: Document Preparation, Preliminary Design El Toro Rd from Trabuco Rd to Jeronimo Rd Glenn Ranch Road from Porotla Pkwy to El Toro Rd Pre-Construction 09/2019 12/2019 15-20 2 4

Los Alamitos Orange 19/20 New Road Maintenance & Rehabilitation

Farquhar Avenue Street Rehabilitation Project (Phase 1)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Approximately 2,600 feet of street grind and overlay with rubberized asphalt concrete. The streets will be ground and resurfaced with 2- inch thick Asphalt Rubber Hot Mix , or removed and replaced. Visible cracks will be filled with rubberized crack filling material. All manhole, water valve, anode and monitoring well covers will be adjusted to grade. This project will also reinstall traffic striping, pavement markers, signing and install loop detectors at signalized intersections.

Farquhar Avenue from Los Alamitos Boulevard to Bloomfield Street. Construction 09/2019 12/2019 20-30 34 72

Los Alamitos Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Portion of Greenbrook Neighborhood Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | Design and construction of grinding and overlay of part of the Greenbrook Neighborhood on Humboldt St from Cerritos Ave to Myra Ave and San Mateo Ave from Humboldt St to end of cul-de-sac.

Humboldt St from Cerritos Ave to Myra Ave and San Mateo Ave from Humboldt St to end of cul-de-sac

Pre-Construction & Construction

07/2018 10/2019

09/2018 12/2019 20-30 13 24

Mission Viejo Orange 19/20 New Road Maintenance & Rehabilitation Residential Resurfacing (2019) This project will include: Pavement Rehab/Repair (Existing) Public residential streets bounded by La Paz Road to the north, Felipe Road to

the south and east, and Marguerite Parkway to the west. Construction 07/2019 10/2019 7-20 36 73

Mission Viejo Orange 19/20 New Road Maintenance & Rehabilitation

Arterial Highway Resurfacing (2019-2020)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Alicia Parkway from Marguerite Parkway east to Olympiad Road Jeronimo Road from Arbolitos east to Olympiad Road La Paz Road from Marguerite Parkway east to Olympiad Road

Pre-Construction & Construction

09/2019 02/2020

01/2020 05/2020 15-20 5 21

Newport Beach Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Bison Avenue, San Joaquin Hills Road and San Nicolas Drive Pavement Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | This project involves coldmilling and overlaying the existing asphalt concrete pavement with rubberized asphalt concrete. Deteriorated concrete improvements will also be reconstructed. Impacted utilities will be adjusted to grade. The new pavement will also be restriped. Final design is scheduled to be completed by Summer of 2019 and construction will be completed by Spring 2020. The estimated useful life of this project is 15 years minimum.

This project is located on Bison Avenue from Jamboree Road to State Route 73, San Joaquin Hills Road from Jamboree Road to MacArthur Boulevard, and San Nicolas Drive from Newport Center Drive to Avocado Avenue.

Pre-Construction & Construction

04/2019 09/2019

08/2019 06/2020 15-20 37 74

Newport Beach Orange 19/20 New Road Maintenance & Rehabilitation

Cameo Highlands Street Pavement Reconstruction

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project involves removing the deteriorated asphalt concrete pavement, reconstructing new asphalt concrete pavement, and reconstructing isolated failed concrete improvements such as curbs, sidewalks, driveway approaches, and access ramps. Impacted utilities will be adjusted to grade. The new pavement will also be restriped. Final design is scheduled to be completed by Spring 2020 and construction will be completed by Fall 2020. The estimated useful life of this project is 15 years minimum.

This project is located in the residential neighborhood of Cameo Highlands off Cameo Highlands Drive and East Coast Highway.

Pre-Construction & Construction

09/2019 06/2020

05/2020 10/2020 15-20 37 74

Newport Beach Orange 17/18 Carried Over Road Maintenance & Rehabilitation

MacArthur Blvd and University Dr Pavement Rehab

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project involves cold milling and and overlaying the existing asphalt concrete pavement with rubberized asphalt concrete. Deteriorated concrete improvements will also be reconstructed. Impacted utilities will be adjusted to grade. The new pavement will also be restriped. Final design was completed in March 2019. Construction is scheduled to start in May 2019 and be completed by September 2019. The estimated useful life of this project is 15 years minimum.

MacArthur Boulevard from Bonita Canyon Road to SR 73 and University Drive from Jamboree Road to State Route 73. Construction 05/2019 09/2019 15-25 31 60

Orange Orange 19/20 New Road Maintenance & Rehabilitation Annual Pavement Maintenance FY20

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Playano Ave, Juaneno Ave, Stacey Lee Ln, Brookside Ave, Lakeside Ave, Hillside Ave, Chumash St, Modoc St, Pala Place, Yurok St, Shoshone Ave, Saddlehill Trail, Tanglewood Terrace, Saddleback Drive, Horseshoe Road, Turnabout Road, Rodeo Circle, Creekview Drive, Sundance, Circle, Wildhorse Circle, Kennymead St, Mustang Ave, Wilderness Ave, Orange-Olive Road, Parker St.

Construction 04/2020 08/2020 10-15 14 31

Placentia Orange 17/18 In-Progress Other Metrolink Station & Parking Structure

This project will include: Maintenance Program Plan Development, Document Preparation, Right of Way | In partnership with the Orange County Transportation Authority, the City is constructing a 246 space parking structure and the newest Metrolink Train Station to be built in Orange County in 15 years. The parking structure will support the Metrolink station along with two existing public parking lots.

321 S. Main Street, Placentia, CA 92870 - See Attachment 3 for a project site map.

Pre-Construction & Construction

11/2017 05/2020

01/2020 12/2021 50-75 29 55

Placentia Orange 19/20 Carried Over Road Maintenance & Rehabilitation

FY 2018-19 Street Resurfacing Project Phase 1

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project will rehabilitate This project will rehabilitate 198,332 square feet of residential streets. This work involves cold milling asphalt pavement, construction of a 3” Asphalt Rubber Hot Mix pavement overlay, remove and reconstruct fully compliant ADA access ramps, removal and replacement of concrete sidewalk and curb and gutter, and placement of new pavement markings and legends.

Residential neighborhood at Bastanchury Road and McCormack on our border with the City of Yorba Linda. Please see Attachment 2 for a map of the project. Construction 06/2019 09/2019 15-20 29 55

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 59: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Placentia Orange 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Residential Slurry Seal Project This project will include: Pavement Rehab/Repair (Existing)

Seven residential neighborhoods located in the norther section of the City. The project limits are north of Bastanchury running west from Gilman Circle and east to McCormack Lane and south of Golden Avenue. Please see Attachment 4 for a map of the project.

Construction 06/2020 10/2020 5-7 1 5

Rancho Santa Margarita Orange 19/20 New Road Maintenance & Rehabilitation La Promesa Slurry Seal Project

This project will include: The project provides necessary roadway maintenance for the pavement along La Promesa. This segment was identified in the City's Pavement Management Program (PMP), as well as field verified, as being in need of repair, based on the current weighted PCI of 68 for the street. A slurry seal was identified as the appropriate maintenance application to this facility.

La Promesa, from Antonio Parkway to Richard Reese Way in Rancho Santa Margarita, CA Construction 03/2020 05/2020 5-7 36 73

Rancho Santa Margarita Orange 19/20 New Road Maintenance & Rehabilitation

Avenida de las Banderas Slurry Seal Project

This project will include: This project will provide necessary roadway maintenance for the pavement along Avenida De Las Banderas. This segment was identified in the city's PMP, as well as field verified, as being in need foe maintenance, based on the current PCI of 74 for this area. A slurry seal was identified as the appropriate maintenance application to this facility to extend the life of the pavement.

Avenida De Las Banderas from Avenida Empresa to Avenida De Las Flores in Rancho Santa Margarita Construction 03/2020 05/2020 5-7 36 73

Rancho Santa Margarita Orange 19/20 New Road Maintenance & Rehabilitation

Antonio Parkway Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Antonio Parkway from Via Ladera to Avenida De Las Banderas in Rancho Santa

Margarita Construction 10/2019 01/2020 10-15 4 3

San Clemente Orange 19/20 Carried Over Road Maintenance & Rehabilitation Camino De Los Mares Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement on Camino De Los Mares, a six-lane divided arterial street, from the I-5 freeway east to Avenida Vaquero (a distance of about 0.75 miles). The project will include repair of damaged curb, gutter and sidewalk, and upgrade of curb ramps as required by ADA.

Camino De Los Mares, from the I-5 freeway to Avenida Vaquero, in the City of San Clemente. Construction 01/2020 05/2020 20-25 38, 39, 40 77, 78, 79

San Juan Capistrano Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Meredith Canyon Neighborhood Local Streets Pavement Rehabilitation Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Meredith Canyon Neighborhood Local Streets Project is a multi-year project that will complete construction by December 2020. The project includes pavement rehabilitation by overlay or complete reconstruction of 3 miles of roadway, construction of 42 ADA compliant curb ramps, repair and reconstruction of damaged curbs and gutters, reconstruction of 12 speed humps and new roadway signing and striping.

The Meredith Canyon Neighborhood Local Streets Pavement Rehabilitation Project includes the following streets within the City - Via De Agua, Avenida Calita, Avenida La Mirada, Calle Esparanza, Calle Miramar, Avenida Pescador, Paseo De Este and Calle Don Carlo.

Pre-Construction & Construction

01/2019 07/2020

06/2020 12/2020 15-30 9 18

Santa Ana Orange 19/20 New Road Maintenance & Rehabilitation Euclid Street Rehabilitation

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing) | City's Pavement Management System has identified Euclid Street from McFadden Avenue to 1st Street as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate 0.47 miles of Euclid Street; replace damaged curbs, gutters, and sidewalks; reconstruct approximately 13 curb ramps to conform to the latest ADA standards; and incorporate bicycle lane elements.

Euclid Street from McFadden Avenue to First Street; Euclid Street from First Street to Hazard Ave.; Euclid Street from City Limit to McFadden Ave.

Pre-Construction & Construction

09/2019 06/2020

03/2020 12/2020 20-20 34 72

Santa Ana Orange 19/20 Forecasted Road Maintenance & Rehabilitation

Main Street Rehabilitation: Warner Avenue to Edinger Avenue

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | City's Pavement Management System has identified Main Street from Warner Avenue to Edinger Avenue as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate 0.76 miles of Main Street; replace damaged curbs, gutters, sidewalks, and driveway approaches; reconstruct approximately 19 curb ramps to conform to the latest ADA standards.

Main Street from Warner Avenue to Edinger Avenue Construction 01/2021 12/2021 20-20 34 72

Santa Ana Orange 19/20 New Road Maintenance & Rehabilitation

MacArthur Boulevard Rehabilitation: Santa Ana River to Harbor Boulevard

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing) | City's Pavement Management System has identified MacArthur Boulevard Rehabilitation from Santa Ana River to Harbor Boulevard as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project, in cooperation with City of Costa Mesa (lead agency), will rehabilitate 0.5 mile of MacArthur Boulevard. Once completed, the improvements will enhance the ride quality and visual appearance of the street.

MacArthur Boulevard Rehabilitation from Santa Ana River to Harbor Boulevard Pre-Construction & Construction

09/2019 06/2020

03/2020 12/2020 20-20 34 72

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 60: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Ana Orange 19/20 New Road Maintenance & Rehabilitation

MacArthur Boulevard Rehabilitation: Flower Street to Main Street

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing) | City's Pavement Management System has identified MacArthur Boulevard Rehabilitation from Flower Street to Main Street as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate 0.5 miles of MacArthur Boulevard; replace damaged curbs, gutters, and sidewalks; reconstruct approximately 4 curb ramps to conform to the latest ADA standards.

MacArthur Boulevard from Flower Street to Main Street Pre-Construction & Construction

09/2019 06/2020

03/2020 12/2020 20-20 19 37

Seal Beach Orange 19/20 New Road Maintenance & Rehabilitation

FY2019-20 Local Street Paving Program This project will include: Pavement Rehab/Repair (Existing) College Park East Neighborhood - Daily Street, Violet Street Oleander Street,

Fir Avenue Construction 12/2019 05/2020 7-10 17 29

Stanton Orange 19/20 Carried Over Road Maintenance & Rehabilitation

FY 18/19 City Wide Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Street Rehabilitation throughout the City.

Cerritos Avenue: (Dale Ave e/s - City Limit); Lampson Avenue: (City Limit -Beach Blvd w/s); Magnolia Avenue: (City Limit n/o Cerritos - City Limit n/o Syracuse), Orangewood Avenue: (Beach Blvd e/s - City Limit)

Construction 10/2019 04/2020 5-15 29 65

Stanton Orange 17/18 In-Progress Road Maintenance & Rehabilitation Knott Avenue Rehab This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Two-inch overlay of existing arterial highway Knott Avenue north of Cerritos Avenue to City limits and Knott Avenue south of Katella Avenue to City limits Construction 11/2018 05/2019 30-30 5 13

Tustin Orange 17/18 Carried Over Road Maintenance & Rehabilitation Newport Avenue Rehabilitation

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repave/resurface 1.43 miles of road, including localized removal and repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic signal detector loops, and traffic striping.

Sycamore Avenue to Holt Ave. Pre-Construction & Construction

01/2019 07/2019

06/2019 04/2020 20-30 37 68

Tustin Orange 17/18 Forecasted Road Maintenance & Rehabilitation Browning Avenue Rehabilitation

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repave/resurface 0.95 miles of road, including localized removal and repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping

El Camino Real to Irvine Blvd. Pre-Construction & Construction

01/2021 08/2021

07/2021 05/2022 20-30 37 68

Tustin Orange 17/18 Forecasted Road Maintenance & Rehabilitation Red Hill Avenue Rehabilitation

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repave/resurface 0.24 miles of road, including localized removal and repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, traffic striping, and median reconstruction to lengthen the northbound left turn pocket at Bryan Ave.

San Juan St. to Bryan Ave. Pre-Construction & Construction

02/2021 07/2021

06/2021 04/2022 20-30 37 68

Tustin Orange 17/18 Forecasted Road Maintenance & Rehabilitation Red Hill Avenue Rehabilitation

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repave/resurface 0.47 miles of road, including localized removal and repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping

Walnut Ave. to Interstate 5 Freeway Pre-Construction & Construction

02/2021 07/2021

06/2021 04/2022 20-30 37 68

Tustin Orange 17/18 Forecasted Road Maintenance & Rehabilitation Jamboree Road Rehabilitation

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repave/resurface 1.6 miles of road, including localized removal and repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping

Barranca Pkwy. to SCRRA Railroad Pre-Construction & Construction

07/2023 11/2023

10/2023 08/2024 20-30 37 68

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 61: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Tustin Orange 17/18 In-Progress Traffic Control Devices Parkcenter Lane and Bryan Avenue Traffic Signal Installation

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Rehab/Repair (Existing Safety) | Installation of new traffic signals and equipment

Parkcenter Lane / Bryan Ave. Intersection Construction 04/2019 02/2020 15-25 37 68

Tustin Orange 17/18 In-Progress Traffic Control Devices Lansdowne Road and Valencia Avenue Traffic Signal Installation

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Rehab/Repair (Existing Safety) | Installation of new traffic signals and equipment

Lansdowne Rd. / Valencia Ave. Intersection Construction 04/2019 02/2020 15-25 16 42

Villa Park Orange 19/20 New Road Maintenance & Rehabilitation

FY 2019/20 Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing)

The Project includes pavement rehabilitation for 12 streets within the City of Villa Park. The streets are: Valley Dr./Center Dr. from Cerro Villa to James Rd.; Charter Rd, Fleet Rd & James Rd.; Winn Cir. & Robbie Cir.; Janice Cir. & Robin Way.; Eastwood Cir., Villa Woods Dr. & Villa Woods Cir.; Rama St. from Valley Dr. to Cerro Villa Dr.

Construction 07/2019 06/2020 15-25 16 26

Westminster Orange 19/20 New Road Maintenance & Rehabilitation

McFadden Avenue Improvement Project

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New) | The scope of work includes the removal of existing pavement and placement of new asphalt concrete overlay; removal and replacement of damaged curb, gutter, cross gutter, spandrel, sidewalk, ADA ramps, driveway approach, bus pad; adjustment of manholes and water valves to grade; and installation of signing and striping.

McFadden Avenue from Beach Boulevard to Magnolia Street Construction 02/2020 06/2020 15-20 40 56

Yorba Linda Orange 19/20 New Road Maintenance & Rehabilitation

On Going Street Maintenance Program/Annual Pavement Preservation Program (APPP) Zone 3

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Zone 3 is located on the southwest side of the City generally bounded by the City limit on the west, Yorba Linda Blvd. on the north, Kellogg Dr. on the east, and the city boundary on the south. The Zone consist of 70 lane miles of pavement which include a combination of arterials, collectors, and local streets.

Construction 06/2020 10/2020 5-7 3 4

Auburn Placer 19/20 Carried Over Road Maintenance & Rehabilitation

City of Auburn 2019 Street Overlay Project

This project will include: Pavement Rehab/Repair (Existing) | Staff identified the proposed FY 18/19 project based on the FY 13/14 to FY 22/23 Road Overlay Report Management System.

Pavement will consist of 2-inch overlays.

Auburn Folsom Rd. from Indian Hill Rd. to Lincoln Way; Hale St. from High St. to Orange St.; Marguerite Mine Rd. from Auburn Ravine to Hwy 49; Auburn Ravine Rd. from Palm Ave. to Elm Ave; Epperle Ln. from Auburn Ravine Rd. to End; Palm Ave. from Hwy 49 to Auburn Ravine Rd; College Way from Knoll St. to High St; Knoll St. from Pleasant Ave to College Way; Landis Cir. from end to end; Los Altos Ave. from end to end; Hoffman Ave. from High St. to Landis Cir; Pleasant Ave. from Knoll st to High st;

Construction 06/2019 06/2020 20-30 1 5

Auburn Placer 19/20 New Road Maintenance & Rehabilitation

Nevada St. Pedestrian and Bicycle Facilities

This project will include: Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) Nevada St form Placer St to Fulweiler Ave Construction 06/2019 06/2020 20-30 1 2

Colfax Placer 19/20 Carried Over Road Maintenance & Rehabilitation Culver Street Reconstruction This project will include: Pavement Rehab/Repair (Existing) | This project will reconstruct up

to 600 feet of Culver Street On Culver Street from West Oak Street to Newman Street Pre-Construction & Construction

08/2019 09/2019

09/2019 05/2020 20-20 1 1

Colfax Placer 19/20 In-Progress Safety South Auburn Street & I-80 Roundabout

This project will include: Roundabout Installation (New) | This project will replace, realign, and reconstruct the existing South Auburn Street and I-80 on and off ramp intersection with a roundabout.

On South Auburn Street between Hwy 174 and Whitcomb Avenue at I-80 on and off ramps. Construction 06/2019 11/2019 20-20 1 1

Colfax Placer 19/20 New Road Maintenance & Rehabilitation

Culver Street Phase II - West Oak St. to Church St.

This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design | This project will reconstruct up to 600 feet of Culver St.

On Culver Street from West Oak to Church Street. Pre-Construction & Construction

08/2019 05/2020

09/2019 06/2020 20-20 1 1

Colfax Placer 19/20 New Road Maintenance & Rehabilitation Kneeland Street

This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design | This project will reconstruct one half a Kneeland Street in conjunction with the development of the other half by a property developer.

Kneeland Street between Depot Street and West Grass Valley Street. Pre-Construction & Construction

10/2019 01/2020

11/2019 06/2020 20-20 1 1

Colfax Placer 19/20 New Road Maintenance & Rehabilitation South Auburn Street - Best Western This project will include: Pavement Rehab/Repair (Existing) | One half of street reconstruction

approximately 800 feet of South Auburn Street in conjunction with land development. South Auburn Street from Whitcomb Ave to Dollar General Store property line. Pre-Construction & Construction

04/2020 05/2020

05/2020 06/2020 20-20 1 1

Colfax Placer 19/20 New Road Maintenance & Rehabilitation Whitcomb Avenue - Best Western This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents

| This project will reconstruct one lane of approximately 300 feet of Whitcomb Ave. Whitcomb Avenue from South Auburn Street to Corto Passi. Pre-Construction & Construction

04/2020 05/2020

06/2020 06/2020 20-20 1 1

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 62: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Lincoln Placer 19/20 New Other Auburn Ravine Bridge Replacement at McBean Park Drive

This project will include: Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New) | The bridge reconstruction will not only provide 100-year flood protection but will also be widened to provide sidewalks, bike and NEV lanes. The bridge is approximately 200 feet in length. The intersections on both sides of the bridge will also include improvements and rehabilitation to existing asphalt.

McBean Park Drive between Ferrari Ranch Road and East Avenue at Auburn Ravine Construction 06/2020 12/2022 30-40 1 6

Lincoln Placer 19/20 New Other Bridge Maintenance Project This project will include: Backfill of eroded areas between roadway and abutment, repair spalled and delaminated areas. Remove unsound concrete, blast clean rebard and patch spalls. Clean joints at bents and replace pourable joint seals. Treat deck with methacrylate.

Four different locations: Lincoln Blvd Bridge over Auburn Ravine Twelve Bridges Drive Bridge over Orchard Creek; Joiner Parkway Bridge over Auburn Ravine; Brentford Circle Bridge over Ingram Slough

Construction 08/2019 06/2020 8-10 1 6

Lincoln Placer 19/20 New Complete Streets Components Ferrari Ranch Road UPRR Crossing

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Railroad Grade Separation Rehab/Repair, Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Lincoln Blvd. and Ferrari Ranch Road Construction 05/2020 05/2021 30-40 1 6

Lincoln Placer 19/20 New Road Maintenance & Rehabilitation First Street Resurfacing Phase 1

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

First Street between O Street to Alley east of L Street. Construction 06/2019 06/2020 15-20 1 6

Lincoln Placer 19/20 New Road Maintenance & Rehabilitation Joiner Parkway Rehab Ph2 This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair

(Existing) Joiner Parkway from Moore Road to Nicolaus Road. Construction 07/2020 05/2021 15-20 1 6

Lincoln Placer 19/20 New Complete Streets Components Lincoln Blvd Phase 3 This project will include: Railroad Grade Separation Rehab/Repair, Sidewalk and/or

Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Lincoln Boulevard at 1st, 3rd, 5th, 6th and 7th Street Construction 07/2020 12/2021 30-40 1 6

Lincoln Placer 19/20 New Road Maintenance & Rehabilitation Lincoln Boulevard Repaving This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair

(Existing) Lincoln Boulevard between Auburn Ravine Bridge to Sterling Parkway. Construction 09/2019 05/2020 15-20 1 6

Lincoln Placer 19/20 New Road Maintenance & Rehabilitation Moore Road Repaving Project

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Feasibility Study, Environmental Study/Documents, Storm Drain and/or Culvert Rehab/Repair (Existing), Right of Way | The current PCI is 49 (Poor Condition). The Pavement Management Plan states the roadway's lifespan has about 5 years remaining. Full roadway reconstruction is anticipated to be necessary to rehabilitate the roadway.

Moore Road between Fiddyment Road and Sorrento Parkway Pre-Construction & Construction

07/2020 06/2021

04/2021 05/2022 15-20 1 6

Lincoln Placer 17/18 In-Progress Safety Lincoln Blvd Phase 2 & 1A

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project will maintain and preserve the local street and road system in good condition reduce drive times and traffic congestion, improve bicycle safety and make the pedestrian experience safer with the following improvements: *Phase 2 - new curb, gutter, sidewalk, drainage facilities, bulbout curb returns, including compliant curb ramps, streetscape including new trees, landscaping and irrigation; and *Phase 1A - Restriping, removal, and replacement of loop detectors(a loop detector alerts traffic lights to change in the direction you are traveling) and new traffic signals

Lincoln Blvd. from Sterling Parkway to McBean Park Drive for hte phase 1A work. Lincoln Blvd from McBean Park Drive to 2nd Street and the 1st Street Intersection for the Phase 2 work.

Construction 04/2018 07/2019 30-50 14 26

Loomis Placer 17/18 In-Progress Road Maintenance & Rehabilitation

Town Center Implementation Plan Phase 3

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | Work to consist of overlay and an additional bike trail from Del Oro High School to the Northern Town Limit. It is also intended to place and replacing bike lane, curb, gutter and sidewalk on Taylor Road from Horseshoe Bar Road to King Road.

Taylor Road from Del Oro High School to North Town Limit and Taylor Road from Horseshoe Bar Rod to King Road,

Pre-Construction & Construction

01/2019 07/2020

06/2020 10/2020 10-15 1 6

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 63: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Loomis Placer 19/20 New Traffic Control Devices Sierra College Blvd Third Lane From Brace Rd. to Taylor Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Sierra College Blvd Third Lane From Brace Rd. to Taylor Road Construction 07/2020 11/2020 20-25 34 72

Rocklin Placer 19/20 Carried Over Road Maintenance & Rehabilitation Mission Hills Reconstruction

This project will include: Pavement Improvement (New) | The removing and replacing of degraded asphalt needs to be done as part of general repairs and is necessary to preserve the roadways and prevent major rehabilitation in the coming years.

Argonaut Avenue ;Mountain View Drive, Mission Way, Capistrano Way, Verano Way, Roble Way, Mesa Court, Piedra Court, Rio Court, Antelope Argonaut Avenue to Antelope Way, Antelope Way from La Paloma Lane to Mountain View Drive, Sweetwater Drive, Sweetwater Court, Hillside Drive, Pecan Court, Baltic Circle, Chelsea Place, Chelsea Court, Lemon Hill Drive, David Court, Adam Court

Construction 07/2019 06/2020 17-20 1 4

Rocklin Placer 19/20 New Road Maintenance & Rehabilitation Annual Road Resurfacing This project will include: Pavement Rehab/Repair (Existing) Stanford Ranch, Stanford Foothills, Sierra Meadows, Granite Lake Estates,

Quarry Ridge Estates. Sunset West Lot 48. Construction 07/2019 06/2020 5-7 1 4

Rocklin Placer 17/18 Carried Over Road Maintenance & Rehabilitation Citywide Dig Outs

This project will include: Pavement Rehab/Repair (Existing) | The removing and replacing of degraded asphalt needs to be done as part of general repairs and is necessary to preserve the roadways and prevent major rehabilitation in the coming years.

Granite Drive Lonetree Blvd. (City Limit with Roseville to Sunset Blvd.); Blue Oaks Blvd.Wildcat Blvd. (West Stanford Ranch Road to City Limit with Lincoln);½ Park Drive(Stanford Ranch Road to Crest Drive); ½Sunset Blvd. (Stanford Ranch Road to Fairway Drive);½ Sunset Blvd. (Stanford Ranch Road to HWY 65);½ Sierra College Blvd. (Rocklin Road to Southside Ranch Road);½ Sierra College Blvd. (City Limit with Loomis to City Limit with Placer County) Sunset Blvd. to Stanford Ranch Road.

Construction 07/2019 06/2020 17-20 3 4

Roseville Placer 19/20 New Road Maintenance & Rehabilitation 2020 Residential Resurfacing Project

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | This project includes the removal and replacement of failed asphalt concrete roadway sections and the application of a preventative maintenance surface treatment. The surface treatment will provide a waterproof membrane to protect the existing asphalt surface and extend the life of the underlying pavement.

The work will occur along various residential streets within the Los Cerritos, Roseville Heights and Hillcrest neighborhoods. Construction 07/2020 10/2020 7-10 3 10

Portola Plumas 17/18 In-Progress Road Maintenance & Rehabilitation 2019/20 Road Maintenance Paving

This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents | Patch selected potholes - remove and replace base and asphalt pavement as required

Pacific Street (PP12), Hospital Drive (PP13), Portola Ave. (PP14) Pre-Construction & Construction

05/2019 09/2019

06/2019 10/2020 2-5 13 24

Banning Riverside 19/20 New Road Maintenance & Rehabilitation

Lincoln Street AC Overlay/Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Lincoln Street from Hargrave Avenue to Florida Street Construction 05/2020 10/2020 10-15 23 42

Banning Riverside 19/20 New Road Maintenance & Rehabilitation Hathaway Street AC Overlay This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk

Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Hathaway Street from Williams Street to George Street Construction 05/2020 10/2020 10-15 23 42

Banning Riverside 19/20 New Road Maintenance & Rehabilitation Florida Street AC Overlay This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk

Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Florida Street from Theodore Street to North End Construction 05/2020 10/2020 10-15 23 42

Banning Riverside 19/20 New Road Maintenance & Rehabilitation Hargrave Avenue AC Overlay This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk

Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Hargrave Avenue from Williams Street to Hoffer Street Construction 05/2020 10/2020 10-15 23 42

Banning Riverside 19/20 New Road Maintenance & Rehabilitation Murray Street Slurry Seal This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk

Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Murray Street from Hays Street to Nicolet Street Construction 05/2020 10/2020 5-7 23 42

Beaumont Riverside 19/20 Carried Over Road Maintenance & Rehabilitation

Beaumont Avenue Reconstruction Project This project will include: Grind and overlay street reconstruction for Beaumont Ave Beaumont Ave from 6th to 11th Street Construction 03/2020 05/2020 15-30 23 42

Beaumont Riverside 19/20 New Road Maintenance & Rehabilitation Annual Slurry Seal FY 19/20 This project will include: Pavement Rehab/Repair (Existing)

Augusta St,; Avalon Ave.; B St.; Champions Dr.; Christina St.; Crescent Moon Bay; Day Break Way; Elizabeth Ave; Lemon Ave; Palm Ave; Palm Ct; Ring Ranch Rd; All locations are estimates and are subject to change

Construction 03/2020 05/2020 5-7 23 42

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 64: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Beaumont Riverside 19/20 New Road Maintenance & Rehabilitation Annual Street rehab FY19/20 This project will include: Pavement Rehab/Repair (Existing)

Allegheny St.; Beech Pl.; California Ave.;Chestnut Ave.; Cypress St.; Lois Ln.; Mass. Ave.; Melissa Ct.; Michigan Ave.; Sequoia Dr.; 5th Street; 7th Street; 10th Street; All locations are estimates and are subject to change

Construction 03/2020 05/2020 15-30 23 42

Blythe Riverside 19/20 New Other Date Street Stormwater System and Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain/Culvert Installation (New) | Installation of 165 linear feet of underground storm water storage system; installation of catch basins to capture storm water from the street; and street reconstruction including grinding, removal and overlay of asphalt pavement, demolition and construction of curb, gutter, and sidewalk repair.

Date Street between Hobsonway and Barnard Street. Construction 10/2019 12/2019 50-100 28 56

Calimesa Riverside 17/18 Carried Over Safety County Line Road Corridor Improvements Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Joint improvement project with the City of Yucaipa to construct improvements on County Line Road from Calimesa Blvd to Bryant St including 4 intersections, sidewalk, ADA ramps, bike lanes, utility relocations and street widening. | The total cost is design thru construction. Costs are split between Cities of Yucaipa and Calimesa, by funding agreement.

County Line Road from Calimesa Blvd to Bryant St. Construction 01/2019 12/2020 25-40 23 42

Canyon Lake Riverside 19/20 New Safety Sound Wall Repairs This project will include: Repair various areas of the Railroad Canyon Road sound wall. Railroad Canyon Road - westbound from Sorrel Lane to Towne Center Drive South

Pre-Construction & Construction

11/2019 12/2019

12/2019 03/2020 10-15 28 67

Canyon Lake Riverside 18/19 Carried Over Safety Phase II & III Wrought Iron Fence Replacement This project will include: Remove and replace existing wrought iron safety fencing. Railroad Canyon Road - between Canyon Lake Drive South and Sky Link Drive -

south and north side Pre-Construction & Construction

08/2019 12/2019

11/2019 03/2020 10-15 28 67

Coachella Riverside 19/20 New Road Maintenance & Rehabilitation La Ponderosa Homes This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) La Ponderosa Dr, Naomi Ct, Perez St, Romualda Ct, Ortiz St, and Hernandez St Construction 02/2020 05/2020 20-20 28 56

Coachella Riverside 19/20 New Road Maintenance & Rehabilitation Phase II Slurry REAS This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Various streets throughout the City of Coachella North of Ave 52 and East of Cesar Chavez St Construction 09/2019 12/2019 20-20 28 56

Coachella Riverside 19/20 New Road Maintenance & Rehabilitation Vista Del Norte This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Vista Del Norte from City Limits to West side of Dillon Road Construction 01/2020 03/2020 20-20 28 56

Coachella Riverside 17/18 Carried Over Road Maintenance & Rehabilitation

Peacock Palms Neighborhood Pavement Reconstruction

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing)

Calle Leon, Paseo Laredo, Via Durango, Via Hermosa, Vera Cruz, Calle De Vega, Avenida Cortez, Pavon Palma Construction 09/2019 12/2019 20-20 28 56

Coachella Riverside 17/18 Carried Over Road Maintenance & Rehabilitation

Avenida Del Oro Neighborhood Pavement Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Avenida Del Oro, Avenida Del Parque, Corte Del Parque Construction 09/2019 12/2019 20-20 28 56

Corona Riverside 19/20 New Road Maintenance & Rehabilitation

Street Pavement Rehabilitation Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

See attached project location map. Pre-Construction & Construction

06/2020 07/2020

07/2020 10/2020 15-20 31 60

Desert Hot Springs Riverside 19/20 New Safety Palm Drive Bicycle Pedestrian Improvement Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Project will include the installation of new traffic signals, street lights, bike lanes, traffic signal synchronization facilities, grind and overlay of asphalt material, and striping and markings and addition of bike lanes marking at various segments.

Palm Drive from Camino Aventura Trail to Pierson Blvd Construction 05/2019 08/2019 5-10 28 56

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 65: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Desert Hot Springs Riverside 19/20 New Road Maintenance & Rehabilitation

2019-2020 Citywide Asphlat Grind and Overlay, Slurry, and Road Reconstruction

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Various road segments city-wide as recommended in Pavement Management Plan with PCI ratings of 65-75 as listed in the posted plan with the resolution adopting this project. Visit the following link: http://199.87.185.104/sirepub/meeting.aspx?cabinet=published_meetings&doci d=16281 to view Fiscal Year 2019-2020 Budg - EXHIBIT 2 05-07-2019 SB1 -Pavement Management Plan

Construction 03/2019 07/2019 5-10 29 55

Eastvale Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Annual Overlay Project This project will include: Cost Estimating, Document Preparation, Preliminary Design, Project

Scope Development | AC overlay including grind & overlay and traffic striping.

Citrus Street between Harrison Avenue and Sumner Avenue.; Citrus Street between Sumner Avenue and Hamner Avenue.; Sumner Avenue between Limonite Avenue and Citrus Street.; Scholar Way between Limonite Avenue and Citrus Street.; Harrison Avenue between Limonite Avenue and Chandler Street

Pre-Construction & Construction

01/2020 12/2020

11/2020 10/2021 10-15 38 71

Hemet Riverside 19/20 New Road Maintenance & Rehabilitation

2019-20 Pavement Rehabilitation Project

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Orchid St – Carnation to Rose;Tulip Ct – Orchid to End; Rose Ave – Kirby to Lilac; Carnation Ave – Orchid to Lilac; Violet St – Carnation to Rose; Bluebell Wy – Carnation to End; Ivy St – Carnation to Johnston; Wildflower Ave – Ivy to Dahlia; Clover Ct – Wildflower to End; Dahlia Ct – Wildflower to End; Lilac St – Carnation to Johnston; Aster St – Rose to Johnston; Joseph Dr – Sherry to End; Millie Dr – Fruitvale to Eaton; Gloria Dr – Sherry to Daniel; Ron Cir – Daniel to End; Will Cir – Daniel

Pre-Construction & Construction

07/2019 11/2019

09/2019 01/2020 10-20 9 15

Indian Wells Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Highway 111 Slurry Seal

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project with support the City's Pavement Management Program (PMP). The City's PMP identifies the street for scheduled slurry seal as a preventative maintenance to extend its useful life. Crack sealing will be applied prior to application of rubberized slurry seal and then pavement striping lines and markings will be installed.

Highway 111 from eastern city limits to western city limits Construction 07/2020 06/2021 5-10 28 42

Indian Wells Riverside 17/18 Carried Over Road Maintenance & Rehabilitation Cook Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project was identified in fiscal year 2017/2018 and was carried over through fiscal year 2020/2021.

Cook Street from Fairway Drive to Highway 111 Construction 07/2020 06/2021 15-20 28 42

Indian Wells Riverside 19/20 New Road Maintenance & Rehabilitation Club Drive Overlay This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Club Drive from Highway 111 to the FAMD access gate Construction 01/2020 06/2020 5-10 28 42

Indian Wells Riverside 19/20 New Road Maintenance & Rehabilitation Rancho Palmeras Overlay This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Rancho Palmeras from Highway 111 to Fairway Drive Construction 01/2020 06/2020 5-10 28 56

Indio Riverside 19/20 New Safety

Indio Boulevard Northbound Bridge over Coachella Valley Stormwater Channel Seismic Retrofit and Scour Protection

This project will include: Bridge Structure Rehab/Repair (Existing) Indio Boulevard over Coachella Valley Stormwater Channel between Madison Street and Clinton Street Construction 12/2019 12/2020 10-20 28 56

Indio Riverside 19/20 New Safety Indio Boulevard Southbound Bridge over Coachella Valley Stormwater Channel Scour Protection

This project will include: Bridge Structure Rehab/Repair (Existing) Indio Boulevard over Coachella Valley Stormwater Channel between Madison Street and Clinton Street Construction 12/2019 12/2020 10-20 28 56

Indio Riverside 19/20 New Safety Jackson Street Bridge over Coachella Valley Stormwater Channel Seismic Retrofit

This project will include: Bridge Structure Rehab/Repair (Existing) Jackson Street over Coachella Valley Stormwater Channel immediately south of Interstate 10 Construction 06/2019 06/2020 10-20 22, 29 48, 55, 57

Jurupa Valley Riverside 19/20 New Road Maintenance & Rehabilitation

Granite Hill Drive Pavement Rehabilitation

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety)

Granite Hill Drive - Pyrite to Edgewood Point Pre-Construction & Construction

07/2019 02/2020

11/2019 03/2020 10-20 31 60

Jurupa Valley Riverside 19/20 New Road Maintenance & Rehabilitation

Corey Street and Kennedy Street Pavement Rehabilitation

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety)

Corey Street - Kennedy to Limonite Kennedy St - Archer to Corey

Pre-Construction & Construction

07/2019 11/2019

10/2019 12/2019 10-20 12 31

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 66: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

La Quinta Riverside 17/18 In-Progress Complete Streets Components

La Quinta Village Complete Streets -A Road Diet Project

This project will include: Roundabout Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | Create a Complete Streets atmosphere throughout the Village by installing pedestrian and bicycle facilities by reducing the number of traveled lanes from four lanes to two. Install roundabouts at intersections including shared use paths. Install pronounced pedestrian midblock crossings including median refuges and rapid rectangular flashing | FY 17/18 RMRA Funds were expended on preliminary engineering, environmental and right of way. Construction is anticipated in June 2019.

The three major streets affected include: Calle Tampico, from Eisenhower Dr. to Washington St.; Eisenhower Dr., from Calle Tampico to Calle Sinaloa; and Calle Sinaloa/Ave 52, from Eisenhower Dr. to Washington St.

Pre-Construction & Construction

06/2017 06/2019

05/2019 10/2020 20-30 28 42

La Quinta Riverside 19/20 Carried Over Complete Streets Components

Jefferson Street at Avenue 53 Roundabout - Road Diet

This project will include: Roundabout Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New) | Carryover of $357,500 from FY 2018/19. The project will create a complete streets atmosphere between Avenue 52 and Avenue 54 on Jefferson Street by installing a modern roundabout at Jefferson St and Avenue 53, reducing travel lanes from six to four, and provide for enhanced pedestrian, bicycle and golf cart access.

Jefferson Street at the intersection of Avenue 53. Pre-Construction & Construction

12/2018 03/2020

11/2019 07/2020 20-30 25 41

Lake Elsinore Riverside 19/20 New Road Maintenance & Rehabilitation

Downtown Pavement Rehabilitation Project Phase I

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | Pavement Rehabilitation of Downtown area street pavement. The project consists of Slurry Seal Type II treatment or 2", or 3" mill and overlay depending on PCI and condition of road segment.

Downtown Area Lake Elsinore, CA

Pre-Construction & Construction

10/2019 01/2020

12/2019 06/2020 10-12 37 68

Menifee Riverside 17/18 Carried Over Road Maintenance & Rehabilitation

Sherman Rd and Ethanac Rd Street Resurfacing

This project will include: Pavement Rehab/Repair (Existing), Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety) | reconstruct 1.2 miles of local major road, address minor storm drain related issues.

Sherman Road from Ethanac Road to Jackson Avenue; Ethananc Road from Trumbell Road to Mathews Road Construction 09/2019 10/2019 20-25 23 67

Menifee Riverside 17/18 Forecasted Road Maintenance & Rehabilitation Goetz Road Resurfacing This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | resurface 2.7 miles of major road Goetz Road from Vista Way to Northerly City limits Construction 04/2020 06/2020 10-15 13 24

Moreno Valley Riverside 19/20 In-Progress Road Maintenance & Rehabilitation

Citywide Pavement Rehabilitation Program

This project will include: Pavement Rehab/Repair (Existing) | Surface Remove/Replace and Slurry Seal

John F Kennedy Dr - Heacock St to Indian St; Iris Ave - Perris Blvd to Kitching St; Iris Ave - Kitching St to Lasselle St; Sunnymead Blvd - Frederick St to Heacock St; Pigeon Pass Rd - Sunnymead Blvd to Swan St; Moreno Beach Dr - Via Del Lago to John F Kennedy Dr; Hemlock Ave - Pigeon Pass Rd to Heacock St; Alessandro Blvd - Lasselle St to West of Darwin Dr; ; Alternative Streets:; Moreno Beach Dr - Auto Mall Dr to Cottonwood Ave; Pigeon Pass Rd - Swan St to Western Ridge Dr; Moreno Beach Dr - Ironwood Ave to Locust Ave; Elder Ave - Morrison St to Foxhound Cir; Iris Ave - Indian St to Perris Blvd;

Construction 06/2019 09/2019 5-10 31 61

Moreno Valley Riverside 19/20 New Road Maintenance & Rehabilitation

Citywide Pavement Rehabilitation Program FY 19/20

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Project Scope Development

Alessandro:Nason-Oliver; Bay:Moreno Beach-Peyton; Bay:Lasselle-Regis; Cactus:Moreno Beach-1970 ft east; Cactus:1980 ft west-Redlands; Chippewa:Davis-Quapaw; Clark:Tennyson-Box Springs; Cottonwood:Heacock-Indian; Cottonwood:Graham-Heacock; Cottonwood:Oliver-Moreno Beach; Dracaea:Kitching-Morrison; Frederick:Brodiaea-Cactus; Gentian:Canyonstone-Indian; Graham:Ironwood-David; Heacock:Cottonwood-Alessandro; Heacock:Sandbow-Ironwood; Hidden Springs:Pigeon Pass-County Gate;

Pre-Construction & Construction

07/2019 07/2020

06/2020 10/2020 5-10 17 29, 30

Murrieta Riverside 19/20 New Road Maintenance & Rehabilitation

Pavement Resurfacing of Murrieta Hot Springs Road from Madison Avenue to Alta Murrieta Drive

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Murrieta Hot Springs Road from Madison Avenue to Alta Murrieta Drive Pre-Construction &

Construction 11/2019 04/2020

03/2020 06/2020 10-15 3 4

Norco Riverside 19/20 New Road Maintenance & Rehabilitation

Hamner Avenue Rehabilitation Project

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Hamner Avenue between Third Street and Hidden Valley Parkway. Pre-Construction & Construction

07/2019 10/2019

08/2019 12/2019 15-25 31 60

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 67: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Norco Riverside 19/20 New Road Maintenance & Rehabilitation Pedley Avenue Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This street rehabilitation project and SB1 funding is being added to an existing storm drain project that is being funded by the local Flood Control District.

Pedley Avenue between Eighth Street to the northerly end at the Santa Ana River. Construction 06/2019 08/2019 15-25 31 60

Norco Riverside 17/18 In-Progress Road Maintenance & Rehabilitation

Second St Widening and Dual Right Turn Lanes onto I-15 FWY (Alternate Project Pending Fund Availability)

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Project Scope Development | Street widening and improvement project on Second Street (between Hamner Avenue and I-15 Freeway) to add dual right turn lanes onto the I-15 southbound Freeway | This project is listed as an alternative project for SB1 funding should any existing SB1 funding not be required for any of the selected primary projects.

The street improvements will be located on Second St between Hamner Ave and the I-15 Freeway

Pre-Construction & Construction

01/2018 11/2019

07/2019 06/2020 15-25 31 60

Norco Riverside 17/18 In-Progress Road Maintenance & Rehabilitation

Sixth St Widening and Dual Right Turn Lanes onto I-15 FWY (Alternate Project Pending Fund Availability)

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development | Street widening and improvement project on Sixth Street (between Hamner Avenue and I-15 Freeway) to add dual right turn lanes onto the I-15 southbound Freeway | This project is listed as an alternative project for SB1 funding should any existing SB1 funding not be required for any of the selected primary projects.

The street improvements will be located on Sixth St between Hamner Ave and the I-15 Freeway

Pre-Construction & Construction

01/2019 03/2020

12/2019 06/2020 15-25 32 57, 58

Palm Desert Riverside 19/20 New Road Maintenance & Rehabilitation

Portola Avenue - Highway 111 to Fred Waring Drive

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Regrade street to reduce crossfall. A survey will be conducted to establish the limits of repair. The asphalt will be milled down and cross gutters will be removed and replaced at the correct grade. The street will be capped with warm mix asphalt.

Portola Avenue between Highway 111 and Fred Waring Drive Pre-Construction & Construction

03/2019 04/2019

04/2019 05/2019 25-30 28 42

Palm Springs Riverside 19/20 New Road Maintenance & Rehabilitation

Annual Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

The project will rehabilitate approximately 51 city streets including collector, locals and possibly arterial including the following streets: EAST PALM CANYON FRONTAGE ROAD, COMPADRE ROAD, VIA ESCUELA, AVENIDA ORTEGA, etc..

Construction 10/2019 04/2020 15-20 21 36

Perris Riverside 19/20 In-Progress Road Maintenance & Rehabilitation 2019 Citywide Street Improvements This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Preliminary

Design, Paving and/or Striping Rehab/Repair (Existing Safety)

Goetz Road (between Ethanac Rd and Souther City Limit) Ellis Ave (between Redlands Ave and Case Rd) Indian Ave (between Romona Expressway and Morgan Street) Indian Ave (between Rider St and Orange Ave) Perris Blvd(between Nuevo Rd and Jarvis Street)

Pre-Construction & Construction

02/2019 07/2019

06/2019 11/2019 7-10 31 61

Perris Riverside 19/20 New Road Maintenance & Rehabilitation 2020 Citywide Street Improvements This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Preliminary

Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Murrieta Rd(San Jacinto Ave to Nuevo Rd) Case Rd(Perris Blvd to Ellis Ave) Orange Ave(Perris Blvd to Wilson Ave) Frontage Rd (Placentia Ave to Nuevo Rd) Various Downtown Streets

Pre-Construction & Construction

01/2020 05/2020

04/2020 08/2020 7-10 3 10

Rancho Mirage Riverside 18/19 Carried Over Road Maintenance & Rehabilitation

Monterey Avenue Street Pavement Rehabilitation

This project will include: Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project will include a full rehabilitation of existing pavement for ¾ of a mile on the southbound lanes of Monterey Avenue between Hovley Lane and the north edge of the bridge at the Whitewater Channel. The existing pavement has deteriorated over numerous years and is in poor condition over the entire length of the subject area. The City plans to utilize a cold in-place recycling method with a hot mix top course to reconstruct the ¾ mile stretch of roadway.

Monterey Avenue, west side, from Hovley Lane to the north edge of the bridge at the Whitewater Channel (Total distance: 0.75 miles)

Pre-Construction & Construction

04/2019 07/2019

07/2019 12/2019 10-20 26 66

Riverside Riverside 19/20 New Road Maintenance & Rehabilitation

2019-2020 SB-1 Road Maintenance and Rehabilitation

This project will include: Paving and/or Striping Installation (New Safety), Right of Way, ADA Curb Ramp Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Project Scope Development, Document Preparation, Sidewalk and/or Crosswalk Installation (New), Environmental Study/Documents, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design | The Road Maintenance and Rehabilitation project will consist of resurfacing 2.97 miles of arterial and 4.20 miles of residential streets. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate potential tripping hazards and pedestrian ramps will be replaced to comply with current ADA standards.

Carlingford (N); Londonderry Dr; Ainsworth Pl; Hardwicke Dr; Ramona, Magnolia-City College; City College Dr; MLK, Chicago to I-215; De Grazia Rd; Hawarden, Mary-De Grazia; Karendale Ci; Rockwell Rd; Oleander Ct; Whistler Wy; Ravenswood, Woodvale-Overlook; Treeview Ln; Rimroad; Orozco, Rimroad-Overlook; Coco Ct; Adams, Victoria-Indiana; Warren, EOS-Orlando; Orlando Dr; Citadel Ct; Temecula Pl; Galway Ct; Silverado Pl; Remington, Challen-EOS; Modesto Dr; Daniel Dr; La Sierra, Hole-Gramercy

Pre-Construction & Construction

09/2019 04/2020

03/2020 09/2020 15-20 31 60, 61

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 68: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Riverside Riverside 19/20 New Traffic Control Devices 2019-2020 SB-1 Maintenance and Traffic Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Document Preparation, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Traffic Signal Modifications will upgrade the facilities to current industry and City standards. Improvements include replacing equipment cabinets, signal rewiring to replace individual conductors with signal cable, replacing controllers, and new cabinet foundations. Traffic Signal Installation projects help pedestrians, bicyclists, motorists, and public transit to enter intersections. Traffic signals reduce overall intersection delay and reduce emissions and congestion. | Rapid Flashing Beacons enhance safety by reducing accidents between vehicles and pedestrians by increasing driver awareness. A Pedestrian HAWK Signal project is a pedestrian beacon designed to stop traffic flow to allow pedestrians to cross safely. Constructing a dedicated merge lane will reduce overall intersection delay by improving vehicular circulation.

Magnolia & Jurupa (Sig Mod); Van Buren & Victoria (Sig Mod);E La Cadena & I-215 - (New Sig); Barnwood & Millpond (Beacon); Arizona & Viewcrest (Beacon); Irving & Victoria (Beacon); Meredith & Kenyon (Beacon); Massachusetts & Agatha (Beacon); Aptos & Gumtree (Beacon); Archdale & Avondale (Beacon); Ottawa & MLK (Beacon) Shaker & Lynridge (Beacon); Sugarloaf & Highlander (Beacon); City College & Saunders (HAWK); Madison & Freda (HAWK); Arlington & Jones (HAWK); Victoria & Washington (Merge Lane)

Pre-Construction & Construction

09/2019 04/2020

03/2020 09/2020 15-20 31 60, 61

San Jacinto Riverside 19/20 New Road Maintenance & Rehabilitation Citywide Slurry Seal Program This project will include: Pavement Rehab/Repair (Existing) Citywide - various locations to be identified by city staff as distress pavement. Construction 09/2019 11/2019 5-8 23 42

San Jacinto Riverside 19/20 New Other Pavement Condition Inventory (study) This project will include: Procurement of Public Works Systems/Databases Citywide. Procurement /

Operational Needs 11/2019 05/2020 10-20 23 42

San Jacinto Riverside 19/20 Carried Over Road Maintenance & Rehabilitation

Mountain Road from Seventh to Esplanade

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Mountain Road from Seventh to Esplanade. Pre-Construction & Construction

02/2019 11/2019

09/2019 04/2020 7-10 12 31

Temecula Riverside 19/20 New Road Maintenance & Rehabilitation

Commerce Center Drive/Rider Way/Enterprise Circle West and South

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

City of Temecula - Commerce Center Drive/Rider Way/Enterprise Circle West and South

Pre-Construction & Construction

02/2019 08/2019

05/2019 11/2019 10-20 28 75

Temecula Riverside 19/20 New Road Maintenance & Rehabilitation Rancho Vista Road

This project will include: Cost Estimating, Document Preparation, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Rancho Vista Road, Paseo Goleta to Butterfield Stage Road, including 200 feet of Meadows Parkway north and south of the Rancho Vista intersection and about 800 additional feet along the northbound lanes of Meadows Parkway north of Rancho Vista Road)

Pre-Construction & Construction

02/2019 08/2019

05/2019 12/2019 10-20 28 75

Temecula Riverside 19/20 In-Progress Road Maintenance & Rehabilitation Meadowview Area and Loop

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Meadowview area and loop including Via Norte, Del Rey, Avenida Barca, and other residential streets.

Pre-Construction & Construction

01/2019 06/2019

04/2019 10/2019 10-20 27 37

Wildomar Riverside 19/20 New Road Maintenance & Rehabilitation

Street Rehabilitation Project (FY 2019-20)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Central St. (from Grand Ave. to Palomar St.), Grand Ave. (from South Pasadena St. to McVicar St.), Bryant St. (from Grand Ave. to Union St.), Dunn St. (from Central St. to South Pasadena St.), Darby St. (from Central St. to South Pasadena St.)

Construction 12/2019 06/2020 17-30 28 67

Wildomar Riverside 19/20 New Road Maintenance & Rehabilitation Crack Seal This project will include: Pavement Rehab/Repair (Existing) Citywide Streets (to be determined) from residential, local, circulation plan

streets, etc. Visit the City Circulation Plan available on the City's website. Construction 12/2019 06/2020 5-10 4 3

Cathedral City Riverside 19/20 Forecasted Road Maintenance & Rehabilitation

Avenida Ximino Neighborhood Street Reconstruction

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

The Project area is generally bound by 30th Avenue to the north, McCallum Way to the south, Whispering Palms Trail to the west, and Avenida Alvera to the east.

Pre-Construction & Construction

07/2019 09/2019

09/2019 12/2019 15-20 28 56

Cathedral City Riverside 19/20 Forecasted Road Maintenance & Rehabilitation

Landau Boulevard and McCallum Way Intersection Traffic Signal Construction

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing)

The Project is an alleyway located between Vista Chino to the north and McCallum Way to the south, parallel to Landau Blvd.

Pre-Construction & Construction

04/2020 06/2020

06/2020 08/2020 15-20 2 10

Sacramento Sacramento 19/20 New Road Maintenance & Rehabilitation

Regency Park neighborhood slurry seal

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Regency Park neighborhood bounded by Elkhorn Boulevard to the north, Club Center Drive to the south, Natomas Boulevard to the west, and Amnest Way to the east

Construction 06/2019 11/2019 15-15 6 7

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 69: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Sacramento Sacramento 19/20 New Road Maintenance & Rehabilitation

Creekside Neighborhood road rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Creekside neighborhood bounded by Elkhorn Boulevard to the north, Del Paso Road to the south, E Commerce Way to the west, and Maybrook Drive/Broadwater Drive to the east.

Construction 06/2020 11/2020 15-15 6 7

Sacramento Sacramento 19/20 New Road Maintenance & Rehabilitation Tahoe Park road rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Tahoe Park neighborhood bounded by T Street to the north, Broadway to the south, 57th Street to the west, 65th Street to the east. Construction 06/2020 11/2020 15-15 6 7

Sacramento Sacramento 19/20 New Road Maintenance & Rehabilitation

Upper Land Park roadway rehabilitation

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Upper Land Park neighborhood bounded by McClatchy Way to the north, 10th Avenue to the south, Santa Buena Way/5th Street to the west, and Riverside Boulevard to the east.

Construction 06/2020 11/2020 15-15 6 9

Sacramento Sacramento 19/20 New Road Maintenance & Rehabilitation Franklin Boulevard

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Franklin Boulevard from Mack Road to Cosumnes River Boulevard Construction 06/2019 11/2019 15-15 6 9

Sacramento Sacramento 19/20 New Road Maintenance & Rehabilitation

Franklin Boulevard Roadway Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Franklin Boulevard from Cosumnes River Boulevard to City Limits Construction 06/2019 11/2019 15-15 6 9

Sacramento Sacramento 19/20 New Road Maintenance & Rehabilitation Florin Road roadway rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Florin Road from Greenhaven Drive to Riverside Boulevard Construction 06/2019 11/2019 15-15 6 7

Sacramento Sacramento 19/20 New Road Maintenance & Rehabilitation

El Camino Avenue roadway rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

El Camino Avenue from Steelhead Creek bridge deck to Del Paso Boulevard Pre-Construction & Construction

12/2019 06/2020

04/2020 12/2020 15-15 6 7

Sacramento Sacramento 19/20 New Road Maintenance & Rehabilitation

Stockton Boulevard roadway rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Stockton Boulevard from McMahon Drive to Patterson Way Pre-Construction & Construction

12/2019 06/2020

04/2020 12/2020 30-30 6 7

Sacramento Sacramento 19/20 New Road Maintenance & Rehabilitation

Del Paso Boulevard roadway rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Installation (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Del Paso Boulevard from Marysville Boulevard to Arcade Boulevard Pre-Construction & Construction

12/2019 06/2020

04/2020 12/2020 30-30 6 7

Sacramento Sacramento 17/18 Carried Over Road Maintenance & Rehabilitation

Folsom Boulevard (former Jackson Hwy)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Placement of Hot Mix Asphalt (HMA) over the existing pavement structure to extend the life of the street and avoid major street reconstruction in the future. Project is former state highway recently relinquished to the City of Sacramento. | The City did not have adequate funding to complete this project in 2018 or 2019. To obtain additional funding, this project is included in 2019 Local Partnership Formulaic Program approved by CTC at its October 17-18, 2018, meeting.

Folsom Boulevard from Power Inn Road to Florin Perkins Road Pre-Construction & Construction

12/2019 07/2020

04/2020 12/2020 30-30 12 30

Citrus Heights Sacramento 19/20 New Road Maintenance & Rehabilitation 2019/2020 Road Resurfacing Project This project will include: Pavement Rehab/Repair (Existing)

Blowing Wind Way, Big Arrow to Flaming Arrow; Carol Ave, Scribner to Cedar; Celestial, Capricorn to End; Covewood, Brockwood to Cul-de-sa; Creekmont, Starflower to Sunwood; Flaming Arrow, Verner to Indian River; Forbs. Stacey Hills to Poppyfield; Glass Slipper, Midnight to Carriage; Hatfield, Beckwith to Cul-de-sac; Maidstone, Bartig to Fleetwood; Picnic, Gumwood to Cul-de-sac; Scribner, Holly to Carol Avenue; Sudden Wind, Broken Bow to End.

Construction 05/2020 08/2020 10-30 4 8

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 70: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Elk Grove Sacramento 19/20 New Road Maintenance & Rehabilitation

2020 Pavement slurry seal and resurfacing project (WPR020)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

WPR019, WPR020 and WTC015 - All locations listed are an estimate and have yet to be finalized. For all street locations, please see the City's online map of the areas. http://www.elkgrovecity.org/city_hall/departments_divisions/public_works/pavem ent_management_program

Construction 07/2019 12/2020 5-15 6 9

Elk Grove Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

2019 Pavement Slurry Seal and Resurfacing

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Approximately 752,800 square feet of asphalt overlay streets. All non compliant ramps will be corrected as part of the asphalt overlay project. Approximately 6.7 million square feet of slurry or chip seal streets. All the above mentioned areas will receive new traffic striping. | All overlay & slurry seal streets will be reviewed for pedestrian and bike uses. All non-compliant ramps on overlay streets will be brought compliance with this project. In addition, the City will review all the striping and make the necessary adjustments to improve the pedestrian land bike uses. By slurry sealing streets, the City is extending the usable life and thus reducing the to perform a complete reconstruction. The City will review all methods and materials.

Please visit the following link to see the locations that may receive the work citywide. Additionally, exact segments proposed can be found in the City Council's adopted resolution posted on the City's website adopted on April 10, 2019. http://www.elkgrovecity.org/city_hall/departments_divisions/public_works/capital _improvements/current_projects

Construction 06/2019 10/2019 7-20 6 9

Elk Grove Sacramento 17/18 Carried Over Road Maintenance & Rehabilitation

Bond Road Median Improvements and Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | The project will provide a two-inch overlay for the entire roadway from East Stockton Blvd. to the bridge at Laguna Creek (~4300 feet) including new striping, markings and traffic loops. The project will also construct about 2100 feet of raised center median on Bond Road, between E. Stockton Blvd. and Egret Dr. and provide an EB left turn pocket into the shopping center's eastern driveway.

Bond Road between East Stockton Blvd. & bridge at Laguna Creek. Raised Center Median: E. Stockton Blvd. to Egret Dr. to create a physical separation between eastbound and westbound traffic.

Construction 08/2019 12/2020 15-25 9 15

Folsom Sacramento 19/20 New Road Maintenance & Rehabilitation

Pavement Resurfacing Project FY 19-20

This project will include: Pavement Rehab/Repair (Existing) | Pavement rehabilitation of various locations

•Lexington Hills Silberhorn Drive, Wallingford Lane, Penwood Lane, Wenham Way, Fayette Way, Biscayne Way, Waterboro Square, Rockport Circle, Clemsford Square, Hingham Square, Penry Square, Fitchburg Square, Province Lane, Kempton Square, Trowbridge Lane, Chambersburg Way, Wolcot Court, Trefton Court, Allerton Court •American River Canyon Crow Canyon Drive, Puffer Way, Burnt Creek Way, Spring Water Way, Little Court, South Fork Way, Buck Circle, Horn Court, Blue Canyon Way, Gold Mine Court, Mid

Construction 07/2019 06/2020 25-40 1 6

Folsom Sacramento 19/20 New Other Lexington Hills Storm Drain Lining This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Various locations as required in Lexington Hills neighborhood Construction 06/2019 06/2020 25-50 1 6

Folsom Sacramento 17/18 Carried Over Road Maintenance & Rehabilitation Plaza Drive Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing) | 2" asphalt overlay of distressed pavement on Plaza Drive. Includes 1,200 tons of asphalt, 10,300 square yards of pavement fabric and adjusting of manholes and valves.

Plaza Drive between Blue Ravine Road Construction 07/2019 06/2020 25-40 20 47

Galt Sacramento 19/20 New Road Maintenance & Rehabilitation

2019 Street and Pedestrian Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Locations Are Listed As Available Options For The Current Years. Not All Locations Will Have Improvements Due To Limited Budget. The Locations Of Improvements Per City Council Approval And Sb1 Project List:; Lake Canyon Ave From Bay Shore Dr. To West End (Athy Court); Industrial Dr. From Live Oak Ave To Pringle Ave; Oak Ave From Elm Ave To A St; Ranch Rd From Lincoln Wy To The East End; Glendale AveFrom Fairway Dr. To Meladee Ave; Casado Dr From Meladee Ave Toglendale Ave;

Construction 08/2019 10/2019 5-15 34 65, 69

Isleton Sacramento 17/18 Carried Over Road Maintenance & Rehabilitation

Jackson Blvd. Ext. from 4th St to 6th St.

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Installation (New), Project Scope Development

Jackson Blvd. Ext. from 4th St to 6th St. Pre-Construction & Construction

08/2019 08/2019

10/2019 10/2019 15-20 3 11

Isleton Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

3rd St from Jackson to C Street (2017-2018 Carryover)

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Installation (New), Project Scope Development | Grind and Overlay - 680' x 25' Grind and Overlay and 10 Handicap upgrades

3rd St from Jackson to C Street Pre-Construction & Construction

10/2019 03/2019

04/2020 05/2019 15-30 3 11

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 71: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Isleton Sacramento 19/20 In-Progress Road Maintenance & Rehabilitation

Everything West of Delta Avenue (2017-2018 Carryover)

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Installation (New), Project Scope Development

Everything West of Delta Avenue Pre-Construction & Construction

01/2019 06/2019

05/2019 05/2020 15-20 8 5

Rancho Cordova Sacramento 19/20 New Complete Streets Components

Folsom Boulevard Enhancement Phase V

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Installation (New), Pavement Improvement (New) | This project will construct complete streets components on Folsom Boulevard from Horn Road to Bradshaw Road including road rehabilitation, landscaped medians, construction of sidewalks, and streetscape improvements at intersections. The project will also include storm drain upgrades as necessary.

Folsom Boulevard between Horn Road and Bradshaw Road. Construction 07/2019 06/2020 15-20 4, 8 8

Rancho Cordova Sacramento 19/20 New Road Maintenance & Rehabilitation Mather Field Road Rehabilitation

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing)

Mather Field Road from Folsom Blvd to International Drive Construction 09/2020 02/2021 15-20 23 40, 41

Hollister San Benito 19/20 New Road Maintenance & Rehabilitation

Road Rehabilitation Program 2019-2020 This project will include: Pavement Rehab/Repair (Existing)

Rustic Street-south of Maple to north of Santa Ana. McCarthy Street-east of Alvarado Street to west of Chappell Road. Fifth Street-east of Powell Street to west of Monterey Street. Fifth Street-east of College and west of Powell Street. Washington Street- south of South Street and north of Hawkins Avenue.

Construction 03/2020 09/2020 10-20 40 56

San Juan Bautista San Benito 19/20 New Road Maintenance & Rehabilitation

3rd Muckelemi and Polk Street Pavement Rehavibilitaion Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

"Third Street - Tahualami to Muckelemi Street; Muckelemi Street - Monterey to Fourth Street; Polk Street - Second to Third Street" Construction 04/2019 12/2019 15-20 36 73

San Bernardino San Bernardino 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Citywide Road Maintenance and Rehabilitation Project

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Accessibility improvement will be installed or upgraded as part of the project. This will increase estimated useful life of 20 years to the street. Project is anticipated to start July 2019 and completed by June 2020.

Segments along the following locations may be subject to these improvement: Crestview Avenue; Electric Avenue; 5th Street; Victoria Avenue; 7th Street; Mt. Vernon Avenue; Commercenter Drive; Highland Avenue; Little Mountain Drive; Arden Avenue

Pre-Construction & Construction

08/2019 01/2020

10/2019 06/2020 7-20 13 22

Adelanto San Bernardino 17/18 Carried Over Road Maintenance & Rehabilitation

Pavement Repair and Rehabilitation Project, Phase I

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Apply crack seal & type II slurry over 237,000 square feet of existing asphalt pavement. Re-install all pavement markings.

-Muskrat Ave, Joshua St, Dennis St, Panther Ave. and Janine St. between Jay St. and Kay St. -Jay St. between Racoon Ave. and Muskrat Ave. -Kay St. between Janine St. and Muskrat Ave.

Construction 06/2020 07/2020 3-5 21 33

Adelanto San Bernardino 17/18 Forecasted Road Maintenance & Rehabilitation

Pavement Repair and Rehabilitation Project, Phase II

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Apply crack seal & type II slurry over 184,000 square feet of existing asphalt pavement. Re-install all pavement markings.

-Stevens St. and Aster Rd. between Chamberlaine Way and Vintage Road. -Vintage Rd. and Chamberlaine Wy. Between Stevens St. and Aster Rd. -The east half of Mendicino Rd. between Stevens St. and Aster Rd. -Sonoma Rd, Zinfadel Dr, Bouquet Ave. and Napa

Construction 06/2021 07/2021 3-5 21 33

Adelanto San Bernardino 17/18 Forecasted Road Maintenance & Rehabilitation

Pavement Repair and Rehabilitation Project, Phase III

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Apply crack seal & type II slurry over 290,000 square feet of existing asphalt pavement. Re-install all pavement markings.

Aster Rd. between Bartlett Ave. and Inyo St.; Chevron Ct, Florence Ct, Leisure Rd, Lee Ave, Arlette Ct. and Inyo Ct. from Aster Rd. to cul-de-sac. Construction 06/2022 07/2022 3-5 21 33

Adelanto San Bernardino 17/18 Forecasted Road Maintenance & Rehabilitation

Pavement Repair and Rehabilitation Project, Phase IV

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Apply crack seal & type II slurry over 65,900 square feet of existing asphalt pavement. Re-install all pavement markings.

Panther Ave. from Chamberlaine Wy end of pavement.; Franklin Ct from Panther Ave. to cu-de-sac.; Colonial Ave. and Payne Ct. Construction 06/2023 07/2023 3-5 21 33

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 72: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Adelanto San Bernardino 19/20 New Road Maintenance & Rehabilitation

Poppy Road and Fremont Street Pavement Repair and Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Apply ARAM System 1 over 310,000 square feet of existing asphalt pavement. Re-install all pavement markings.

- Poppy Road between Jonathan St and Pearmain St.- Fremont St, Cool Water St, Maywood St, Galewood St, Cloverlawn Ct, Broad Oak Ct, Highgrove Ct, Branch Ct. and Desert Glen St.

Construction 08/2019 09/2019 3-5 21 33

Apple Valley San Bernardino 19/20 Carried Over Road Maintenance & Rehabilitation Yucca Loma Road Resurfacing This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface

Yucca Loma Road from Apple Valley Road to Kiowa Road (2 miles). Yucca Loma Road from Apple Valley Road to Kiowa Road Construction 08/2019 10/2019 7-10 21 33

Apple Valley San Bernardino 19/20 Carried Over Road Maintenance & Rehabilitation Riverside Drive Resurfacing This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface

Riverside Drive from Shoshonee Road to Branding Iron (2.2 miles). Riverside Drive from Shoshonee Road to Branding Iron Construction 08/2019 10/2019 7-10 21 33

Apple Valley San Bernardino 19/20 New Road Maintenance & Rehabilitation Resurfacing 2019-02

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Project generally consists of providing necessary labor, equipment and materials for the application of Cape Seal, Micro surface, and thermoplastic striping on local and collector roads within the Town of Apple Valley

Rancherias Road from Highway 18 to Flathead Road; Rancherias Road from Flathead Road to Yucca Loma Road; Waalew Road from Dale Evans Parkway (E) to Navajo Road; Waalew Road from Navajo Road to Central Road; Symeron Road from Yanan Road to Riverside Drive; Mondamon Road from Outer Highway 18 South to Apple Valley Road; Dale Evans Parkway from Otoe Road to Waalew Road; Tonawanda Road from Jicarilla Road to Seneca Road; Outer Highway 18 South from Flathead Road to Yucca Loma Road

Construction 08/2019 10/2019 7-10 21 33

Barstow San Bernardino 17/18 Carried Over Road Maintenance & Rehabilitation

West Section 7 Rehabilitation Project - Construction

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct pavement approximately 23,401 center line feet of roadway.

West Section 7 is defined north of Rimrock Road, east of Agarita Avenue, south of Interstate 15, and West of Barstow Road (Route 247) Construction 08/2020 10/2020 15-20 16 33

Barstow San Bernardino 17/18 Carried Over Road Maintenance & Rehabilitation Pavement Preservation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Placement of pavement preservation techniques on existing roadways.

The project location is defines as east of Muriel Drive, South of East Main Street, and north of Interstate 15.

Construction 08/2019 09/2019 3-5 16 33

Big Bear Lake San Bernardino 19/20 Forecasted Road Maintenance & Rehabilitation FY 19/20 Street Improvements This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert

Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Moonridge Road- Clubview Drive to Sheephorn Road; Monterey Street- Sonoma Drive to Sunset Drive; Ridgecrest Drive- Sand Canyon Road to End; Colusa Drive- Sheephorn Road to Wolf Road; Colusa Lane- Colusa Drive to End; Colusa Way- Colusa Drive to End

Construction 07/2019 07/2020 10-25 23 33

Chino San Bernardino 19/20 In-Progress Road Maintenance & Rehabilitation

Street Rehabilitation and TSM FY2018-19 - Riverside Drive

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Street Grind and Overlay of Riverside Drive which also includes construction of ADA accessibility ramps, ROW acquisition, and full depth reconstruction of some areas. Project will also include traffic signal modifications for three signalized intersections. Project may be phased due to utility relocations. | Utility relocation and ROW acquisition required.

Riverside Drive (Central Ave. to 250 LF e/o Oaks St.) and traffic signal modifications @ Riverside Dr./Benson Ave and Riverside Dr./10th St. and Riverside Dr./Oaks Ave.

Pre-Construction & Construction

07/2018 08/2019

07/2019 08/2020 10-15 20 52

Chino San Bernardino 19/20 In-Progress Road Maintenance & Rehabilitation

FY 2018-19 Street rehabilitation Project - County Co-Op

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Pipeline Avenue (Chino Ave. to Phillips St.), Chino Avenue (Pipeline Ave to SR-71) and access ramps on East End Avenue (Riverside Drive to Philadelphia St.)

Pre-Construction & Construction

03/2018 09/2019

07/2019 04/2020 10-15 20 52

Chino San Bernardino 19/20 In-Progress Complete Streets Components

TDA Bicycle, Pedestrian and Transit Accessibility Improvements

This project will include: Cost Estimating, Document Preparation, ADA Curb Ramp Installation (New), Bicycle Lane (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | Construction of pedestrian and transit ADA accesibility ramps along with bicycle lanes which will include construction of sidewalk, street, curb & gutter, cross-gutter and spandrels for proper drainage. Installation/relocation of streetlight poles, vaults, valves, manholes and street signs to ensure safe, clear and compliant paths of travel for active transportation purposes.

B Street and C Street, Washington Ave., Park Place, Serene Ave., 10th St, 12th St., Sequoia Ave, Rosario St.

Pre-Construction & Construction

02/2019 11/2019

09/2019 05/2020 20-25 20 52

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 73: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Chino San Bernardino 17/18 In-Progress Road Maintenance & Rehabilitation El Prado Reconstruction Project

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Project Scope Development | Reconstruction including but not limited to: grind and overlay of asphalt; selected removal of replacement of asphalt; concrete curb; gutter; spandrel and cross gutter; signing and striping, and accessible ramps, traffic signal equipment modifications due to access ramp improvements at El Prado Rd./Central Ave. | Geotechnical work and design work ongoing since FY 17/18. Construction is estimated to begin in Spring of 2019.

El Prado Road (Central Avenue to Kimball Avenue) Pre-Construction & Construction

02/2017 06/2019

05/2019 07/2020 10-15 20 52

Chino Hills San Bernardino 19/20 New Road Maintenance & Rehabilitation

Mystic Canyon Drive Pavement Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Mystic Canyon Drive from Butterfield Ranch Road to Shady View Drive, Chino Hills Construction 02/2020 04/2020 10-15 29 55

Chino Hills San Bernardino 19/20 New Road Maintenance & Rehabilitation

Pine Avenue Pavement Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Pine Avenue from Butterfield Ranch Road to SR 71, Chino Hills Construction 04/2020 06/2020 10-15 29 55

Colton San Bernardino 19/20 New Road Maintenance & Rehabilitation

Riverside Avenue Asphalt Paving Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Riverside Avenue - M. Bustamante to Agua Mansa Rd. – east side only Construction 07/2019 06/2020 10-15 20 47

Colton San Bernardino 19/20 New Road Maintenance & Rehabilitation

Santo Antonio Drive (west of Mt. Vernon Ave.) Asphalt Paving Project. This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Santo Antonio Drive - Mt. Vernon Ave. to Washington Street Construction 07/2019 06/2020 10-15 20 47

Colton San Bernardino 19/20 New Road Maintenance & Rehabilitation C Street Asphalt Paving Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) C Street from 7th Street to La Cadena Dr. Construction 07/2019 06/2020 10-15 20 47

Colton San Bernardino 19/20 New Road Maintenance & Rehabilitation Fairway Drive Asphalt Paving Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Fairway Drive from Auto Center to Cross Road – south side Construction 07/2019 06/2020 10-15 20 47

Colton San Bernardino 19/20 New Road Maintenance & Rehabilitation

Meridian Avenue Asphalt Paving Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Meridian Ave. from San Bernardino Ave. to Randall Ave. Construction 07/2019 06/2020 10-15 20 47

Colton San Bernardino 19/20 New Road Maintenance & Rehabilitation

Pennsylvania Ave. Asphalt Paving Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Pennsylvania Ave. from C St. to Olive St. Construction 07/2019 06/2020 10-15 20 47

Fontana San Bernardino 19/20 New Road Maintenance & Rehabilitation PVMT REHAB-SB1 RMRA 1920 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Foothill Blvd - Tokay Ave to Hemlock Ave, Foothill Blvd - Sierra Ave to Maple

Ave and Arrow Blvd - Sierra Ave to Maple Ave Construction 07/2019 06/2020 10-15 2 2

Grand Terrace San Bernardino 19/20 New Road Maintenance & Rehabilitation Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair

(Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Fremontia Ave from Reed Ave to W. Main St, Terrace Ave from Vivienda Ave to Walnut Ave, De Soto St from Warbler Ave to Oriole Ave, Grand Terrace Ct from Grand Terrace Rd to Cul De Sac, Carhart Ave from Vivienda Ct to Canal St, Oriole Ave from La Paix St to De Berry St, Garden Ave Cul De Sac to Pico St, Minona Dr from Eton Dr to Preston St, Walnut Ave from Terrace Ave to Burns Ave, Pico St from Mount Vernon Ave to Oriole Ave

Construction 07/2019 09/2019 20-25 20 47

Grand Terrace San Bernardino 19/20 New Road Maintenance & Rehabilitation Pavement Rehabilitation CIP year 3 This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair

(Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Barton Road from Glendora to City Limit Construction 09/2019 10/2019 27-80 1 1

Hesperia San Bernardino 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Street Improvement Project This project will include: Pavement Rehab/Repair (Existing) Main Street from Escondido Avenue to Topaz Avenue Construction 04/2020 06/2020 20-25 17 59

Hesperia San Bernardino 19/20 New Road Maintenance & Rehabilitation FY 2019-20 Slurry Seal Project This project will include: Pavement Rehab/Repair (Existing) Arrowhead Lake Road from Rock Springs Rd. to City limits; Rocks Springs Rd.

from Main St. to City limits Construction 04/2020 06/2020 5-10 17 59

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 74: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Hesperia San Bernardino 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Annual Chip Seal Project This project will include: Pavement Rehab/Repair (Existing) Various streets near Escondido Avenue and Cedar Street Construction 04/2020 06/2020 3-5 27 45

Highland San Bernardino 19/20 New Road Maintenance & Rehabilitation City-wide Minor Street Maintenance This project will include: Pavement Rehab/Repair (Existing) City-wide with emphasis on major arterial and collector streets. Construction 07/2019 06/2020 2-5 23 40

Highland San Bernardino 19/20 New Safety City-wide Pavement Striping and Marking This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) City-wide, on arterial and collector streets, and on streets abutting school

campuses. Construction 07/2019 06/2020 3-7 23 40

Highland San Bernardino 19/20 New Safety City-wide Traffic Signal Maintenance This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) City-wide, various locations as needed based on maintenance schedule Construction 07/2019 06/2020 10-30 23 40

Highland San Bernardino 19/20 New Safety City-wide Sidewalk Repairs Services This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

City-wide, at locations where there's heavy pedestrian traffic, such as school campuses, shopping centers, churches, etc. These locations are mostly on the east side of the City, east of the 210 Freeway.

Construction 07/2019 06/2020 10-20 23 40

Highland San Bernardino 19/20 New Safety Replacement of Traffic Signal Battery Backup Systems

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Seventeen (17) traffic signal intersections as follows: Base Line/Palm Ave., Base Line/Church Ave., Base Line/Walgreen Pharmacy, Base Line/Boulder Ave., Base Line/McKinley St., Base Line/Sterling Ave., Base Line/Victoria Ave., Base Line /Central Ave., Victoria Ave./Pacific St., Victoria Ave./9th Street, Victoria Ave./5th Street, Victoria Ave./3rd Street, Sterling Ave./9th Street, Boulder Ave./Albertson Market, Boulder Ave./Beaver Hospital, , Del Rosa Dr./5th Street, and Church Ave./5th Street.

Construction 07/2019 06/2020 7-10 23 40

Highland San Bernardino 19/20 New Safety Purchase of Spare Traffic Signal Controllers and Video Detection Systems

This project will include: Procurement of Public Works Safety Materials and Gear Spare traffic signal components to be stored at City's Corporate Yard located at 7935 Central Ave., Highland, CA 92346

Procurement / Operational Needs 07/2019 06/2020 10-15 23 40

Highland San Bernardino 19/20 New Road Maintenance & Rehabilitation

Pavement Preventive Maintenance of 117 Street Segments

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

117 Street segments located in Sector B of the City's Pavement Management Program. Sector B composes of streets located south of the north city limits, east of Lankershim Ave., north of Base Line and west of the 210 Freeway. Locations are shown in Attachment "B"

Construction 07/2019 06/2020 5-7 13 22

Loma Linda San Bernardino 19/20 New Road Maintenance & Rehabilitation

Citywide Repaving/Resurfacing FY 2019-20

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repave/Resurface 2.0 miles of roadways throughout the City.

Richardson Street from Huron St - Lawton Ave.; Acacia Street from Huron St. - Lawton Ave.; Hillcrest Street from Huron St. - Lawton Ave.; Crestview Drive from South-end to Poplar St.; Richmont Road from Crestview Dr.. - Lawton Ave.; Shepardson Drive from Mound St, - Benton St.; Poplar Street from Prospect Ave. - Shepardson Dr.; Bellaire Street from Barton Rd. - Sharpardson Dr.; Le Mar Road from Bellarie St. - Benton St.; Taylor Street from Bellarie St. - Benton St.

Construction 07/2019 10/2019 7-15 26 66

Montclair San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation

Holt Boulevard Street Improvement Project

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Pavement Rehab/Repair (Existing) | Holt Boulevard Street Improvement Project would repair and replace uplifted curb, gutter, and sidewalk; replace non-compliant pedestrian ramps; and resurface Holt Boulevard from Mills Avenue to Ramona Avenue

4000-4400 blk Holt Boulevard Construction 10/2019 02/2020 15-20 20 52

Montclair San Bernardino 18/19 Carried Over Traffic Control Devices North Montclair Traffic Signal Interconnect Improvement Project- Design Only

This project will include: Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Design services for the installation of new conduit, fiber and traffic control hardware associated with a new traffic signal interconnect system north of the Interstate 10. This project will ultimately make a complete interconnect system Citywide.

Monte Vista Avenue, Moreno Street, Arrow Hwy and Central Avenue Pre-Construction & Construction

07/2019 01/2020

01/2020 04/2020 15-20 20 52

Ontario San Bernardino 19/20 Carried Over Road Maintenance & Rehabilitation

2019 Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Grind & overlay asphalt street, repair fail asphalt areas, repair sidewalk, repair curb & gutter, upgrade all ramps to current ADA standards, restripe roadway.

Archibald Avenue - SR 60 and Riverside Drive (17/18 Carryover) Philadelphia Street - Archibald Avenue to Haven Avenue (17/18 carryover) Concourse Avenue - Haven Avenue to Milliken Avenue Cedar Street - Campus Avenue to Euclid Avenue

Construction 02/2019 06/2019 15-25 20 52

Ontario San Bernardino 19/20 Carried Over Complete Streets Components

TCC Mission Boulevard Improvements

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | 5 miles of bike lanes and street improvements (curb & gutter, sidewalk, ADA ramps, street lights.

Mission Boulevard between Benson Avenue & Bon View Avenue Pre-Construction 02/2019 02/2020 15-25 20 52

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 75: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Ontario San Bernardino 19/20 Carried Over Traffic Control Devices 2018 Traffic Signal Improvements This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Grove Avenue and Francis Street Vineyard and Sixth Street Construction 07/2019 12/2019 15-25 20 52

Ontario San Bernardino 19/20 New Road Maintenance & Rehabilitation

FY 2019/20 Pavement Rehabilitation Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Turner Avenue - Philadelphia Street to Mission Boulevard Construction 02/2020 06/2020 15-20 20 52

Ontario San Bernardino 19/20 New Traffic Control Devices FY 2019/20 Traffic Signal Improvement Program

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

McCleve Way & Merrill Avenue Riverside Drive & Colonial Avenue Construction 02/2020 06/2020 20-30 20 52

Ontario San Bernardino 19/20 New Complete Streets Components ATP Cycle 4 (Design) This project will include: Cost Estimating, Document Preparation, Environmental

Study/Documents, Preliminary Design, Right of Way | Pedestrian Access Improvements Various Locations Pre-Construction 04/2019 12/2020 20-30 37 68

Rancho Cucamonga San Bernardino 19/20 Carried Over Road Maintenance & Rehabilitation

FY18/19 SB1 Non-Local Street Pavement Rehabilitation at Two Locations

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project includes cold planning, localized asphalt repair, crack sealing, asphalt rubber hot mix overlay, video detection signal upgrades, ADA ramp upgrades, utility adjustments and pavement striping for approximately 1.70 miles of roadway.

Hermosa Avenue from Banyan Street to 300 feet N/O Wilson Avenue; and Highland Avenue from Archibald Avenue to Haven Avenue Construction 05/2020 06/2020 20-30 23 40, 41

Rancho Cucamonga San Bernardino 19/20 New Road Maintenance & Rehabilitation

FY19/20 SB1 Local Street Pavement Rehabilitation at Various Locations

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project includes cold planning, localized asphalt repair, crack sealing, asphalt concrete overlay, ADA ramp upgrades, utility adjustments and pavement striping for approximately 3.10 miles of roadway.

Ambrosia,Harmony-End;Aurora,Sunburst-Harmony;Beechwood,End-Peridot;BoulderCyn,Haven-Northwind;BrokenArrow,BoulderCyn-DeerCyn;Canistel,DeerCyn-Hillside;Carol,End Beechwood;Cobblestone,BoulderCyn-DeerCyn;DeerCyn,End-Canistel;Della,End-Beechwood;Harmony,Aurora-Ambrosia;Highgrove,Wildrose-OrgBlossom;Moonstone,End-Lemon;Northwind,BoulderCyn-Wilderness;Opal,End-Lemon;OrgBlossom,Highgrove-Ambrosia;Orchard,End-Pearl;Pearl,Turquoise-Hillside;Sacramento,End-Lemon;Sunstone,End-Lemon;Sunstone,End-Sunstone

Construction 05/2020 06/2020 10-20 28 42

Redlands San Bernardino 17/18 Carried Over Road Maintenance & Rehabilitation PARIS Program - 2019

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The City of Redlands PARIS program is a citywide rehabilitation of all City streets within the City. The PARIS program will resurface 2/3 of the City streets over the first five years of the program.The City will be using RMRA funding to supplement additional funding to rehabilitate City streets in the 5th year of the program which falls in Fiscal Year 2019-20.

Various locations in the City of Redlands for the remaining streets within the City Limits - South of Santa Ana River, West of Wabash, North of Live Oak Canyon Road, and East of Mountain View Avenue. Street segments within the limits will be subject to the described improvements for this project.

Construction 01/2020 08/2020 30-30 26 66

Rialto San Bernardino 19/20 In-Progress Road Maintenance & Rehabilitation Annual Street Overlay Project

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Project Scope Development | 1. Pavement rehabilitation of the indicated existing street segments using one or more of the following methods: (1) Cold Milling and Asphalt Concrete (AC) Surface Course; (2) Full Depth AC removal and re-construction; (3) Full Depth Reclamation including in-place pulverization and mixing of the existing pavement to create a stablized base, followed by construction of AC Base and Surface Course; (4) Cold In-Place Recycling of existing pavement, followed by construction of an AC Surface Course. 2. Addition of new and/or repair/upgrade of curbs and gutters, cross gutters, catch basins, and culverts. 3. Addition of new and/or repair/upgrade of ADA curb ramps; and addition of new sidewalks and/or repair/replacement of damaged sidewalks. 4. Replacing/Upgrading traffic striping and pavement markings.

Lilac Ave. from Tahoe St. to Walnut Ave.; Linden Ave. from Riverside Ave. to 155' south of Candlewood Ave.; Linden Ave. from 374' south of Persimmon Ave. to Casmalia St.; Locust Ave. from Riverside Ave. to Casa Grande Dr.; Locust Ave. from Lowell St. to Casmalia St.; Pepper Ave. from Baseline Rd. to Etiwanda Ave.; Pepper Ave. from Foothill Blvd. to 2nd St.; Summit Ave. from Maple Ave. to Apple Ave.; Willow Ave. from Walnut Ave. to Chaparral St.;

Pre-Construction & Construction

07/2019 01/2020

12/2019 09/2020 7-20 20 47

Rialto San Bernardino 19/20 New Road Maintenance & Rehabilitation Annual Street Overlay Project

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Project Scope Development

Pepper Ave. from Etiwanda Ave. to Foothill Blvd.; Pepper Ave. from 2nd St. to 680 ft. south of 2nd St.; Riverside Ave. from UPRR Bridge to South City Limit

Pre-Construction & Construction

07/2019 01/2020

12/2019 09/2020 7-20 9 15

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 76: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Twentynine Palms San Bernardino 19/20 New Road Maintenance & Rehabilitation Street overlay 2019/20 This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety)

El Paseo (Mesquite Springs-Split Rock) length 2177 width 36; El Paseo/Civic Center (Split-Adobe) Length 1118X Width 36; Sun Valley (Adobe- Sunnyvale) Length 4800 X Width 34; Sunnyvale (Morongo-Larrea) Length 3246 X Width 26; & El Paseo (Lupine-Larrea) Length 3676 X Width 24

Construction 10/2019 05/2020 9-12 2 2

Upland San Bernardino 17/18 In-Progress Road Maintenance & Rehabilitation 3rd Avenue Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | 0.58 miles of water main replacement, asphalt concrete pavement resurfacing, rock curb and gutter repairs, sidewalk repairs, handicap ramp upgrades, and roadway striping.

A Street to 11th Street. Pre-Construction & Construction

02/2018 03/2019

10/2018 08/2019 10-20 25 41

Upland San Bernardino 17/18 Carried Over Road Maintenance & Rehabilitation 14th Street Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | 0.69 miles of asphalt pavement rehabilitation, replacement of damaged curbs, gutters, sidewalks, handicap ramps, and re-striping.

Campus Ave. to Grove Ave. Construction 04/2020 06/2021 10-20 25 41

Upland San Bernardino 17/18 In-Progress Road Maintenance & Rehabilitation 9th Street Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | 0.38 miles of water main replacement, asphalt concrete pavement resurfacing, rock curb and gutter repairs, sidewalk repairs, handicap ramp upgrades, and roadway restriping.

3rd Ave. to e/o Campus Ave. Pre-Construction & Construction

02/2018 02/2019

01/2019 08/2019 10-20 25 41

Upland San Bernardino 17/18 In-Progress Road Maintenance & Rehabilitation Arrow Highway Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | 1.13 miles of asphalt pavement rehabilitation, replacement of damaged curbs, gutters, sidewalks, handicap ramps, and re-striping.

Benson Ave. to San Antonio Ave. Pre-Construction & Construction

06/2018 08/2019

06/2019 06/2020 10-20 25 41

Upland San Bernardino 17/18 Carried Over Road Maintenance & Rehabilitation Mulberry Avenue Reconst.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | 0.17 miles of water main replacement and asphalt pavement rehabilitation,replacement of damaged curbs, gutters, sidewalks, handicap ramps, and re-striping.

Foothill Blvd. to Pine Street. Construction 06/2019 06/2020 20-30 3 11

Victorville San Bernardino 19/20 New Road Maintenance & Rehabilitation

Industrial Blvd. (Bear Valley Rd. To Silica Dr.) 0.50 miles

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement reconstruction will involve removing and reusing existing road base and asphalt concrete and constructing a new pavement section with road base and asphalt concrete pavement. Access ramps will be reconstructed to meet Americans with Disabilities Act (ADA) current standards.

Industrial Blvd. (Bear Valley Rd. To Silica Dr.) 0.50 miles; Construction 01/2020 06/2020 20-30 21 33

Victorville San Bernardino 19/20 New Road Maintenance & Rehabilitation

Silica Rd. (Industrial Blvd. to Hesperia Rd.) , 0.45 miles

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Pavement reconstruction will involve removing and reusing existing road base and asphalt concrete and constructing a new pavement section with road base and asphalt concrete pavement. Access ramps will be reconstructed to meet Americans with Disabilities Act (ADA) current standards.

On Silica Road from Industrial Blvd. To Hesperia Road. Construction 01/2020 06/2020 20-30 21 33

Victorville San Bernardino 19/20 New Road Maintenance & Rehabilitation

Third Ave. (Nisqualli Rd. To Green Tree Blvd.) 1 miles

This project will include: Pavement Rehab/Repair (Existing) | Pavement reconstruction will involve removing and reusing existing road base and asphalt concrete and constructing a new pavement section with road base and asphalt concrete pavement.

On Third Avenue from Nisqualli Road to Green Tree Boulevard. Construction 03/2020 06/2020 20-30 21 33

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 77: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Victorville San Bernardino 19/20 Carried Over Road Maintenance & Rehabilitation

Arrowhead Drive / 7th Avenue Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement reconstruction, asphalt overlays, widening at certain locations, restriping, and reconstructing access ramps to meet ADA current standards.

Arrowhead/7th Avenue from Green Tree Boulevard to Bear Valley Road, a distance of approximately 2.1 miles. Construction 06/2020 07/2021 20-25 37 68

Yucaipa San Bernardino 17/18 Carried Over Complete Streets Components

Avenue E Intersection Improvements, Bryant Street to 5th Street

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Rehabilitation of asphalt and curb/gutter at intersections as part of the construction of roundabouts. Avenue E from Bryant Street to 5th Street Construction 11/2019 06/2020 25-25 8 42

Yucaipa San Bernardino 19/20 New Road Maintenance & Rehabilitation Pavement Management Program This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety)

Wildwood Canyon Rd(Oak Mesa Dr to Morning Side Dr);17th St (Yucaipa Blvd to Dunlap Ave);2nd St (Persimmon Ave to Acacia Ave);Ave D (16th St to 14th St);Eureka Ave (6th St to End);Nebraska St (7th Pl to Wildwood Canyon Rd);11th St (Yucaipa Blvd to 14th St);Date Ave (Adams St to Bryant St);Custer St (End to Mountain View St);Ave E (End to 8th St);Golden Gate Dr (End to Highland Ave);Holly Ave (Simi Dr to End) 1st St (Cedar Ave to Beech Ave);Sharon Way (Village Rd to Mesa Grande Dr);Blossom Ave

Construction 07/2019 06/2020 1-25 8 42

Yucaipa San Bernardino 19/20 New Complete Streets Components Yucaipa Blvd. Improvements This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert

Rehab/Repair (Existing) 15 St. to I-10 Construction 07/2019 06/2020 1-25 16 42

Yucca Valley San Bernardino 19/20 New Road Maintenance & Rehabilitation Town-wide Slurry Seal This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety)

Upper Sky Harbor:; Cibola Trail: Mountain View to Zuni Trail; Del Monte: Santa Maria to Santa Barbara; Carmelita Circle; Carmelita Court; Carmelita Place; Carmelita Way; Piedmont Drive: End to Joshua Lane; Piedmont Drive: Joshua Lane to Santa Barbara; Santa Barbara: Cul-de-Sac to End; Santa Maria Drive: Del Monte to End; San Marino;

Construction 06/2019 09/2019 6-9 16 36

Del Mar San Diego 17/18 In-Progress Complete Streets Components

Del Mar 6 (DM06) Sidewalk, Streets and Drainage Improvements

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Landscape Safety Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Landscape Safety Installation (New) | Sidewalk, roadway, pedestrian lighting and bike lane improvements, paving and new striping. | Work performed -Completed designs, plans, advertised for bids on Streetscape Project

North and South bound Camino Del Mar from 9th to 15th Street Construction 02/2019 08/2019 50-75 39 78

San Diego San Diego 19/20 New Road Maintenance & Rehabilitation Slurry Seal Group 1924 This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair

(Existing)

- -Centre City, Clairemont Mesa, Eastern Area, Greater North Park, Kensington Talmadge, La Jolla, Linda Vista, Midway Pacific Highway, Mira Mesa, Miramar Ranch North, Mission Valley, Normal Heights, Otay Mesa, -Pacific Beach, Peninsula, Rancho Penasquitos, Sabre Springs, San Ysidro, Serra Mesa, Skyline Paradise Hills, Southeastern San Diego, Tierrasanta, University, Uptown

Construction 06/2019 11/2019 3-7 38, 39, 40 77, 78, 79

San Diego San Diego 19/20 New Road Maintenance & Rehabilitation Slurry Seal Group 1925 This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair

(Existing)

Carmel Valley, Centre City, City Heights, College Area, Eastern Area, Encanto, -Greater North Park, Linda Vista, Mira Mesa, Navajo, Normal Heights, Ocean Beach, Otay Mesa Nestor, Pacific Beach, Peninsula, Rancho Bernardo, Rancho Penasquitos, Serra Mesa, Southeastern San Diego, Torrey Highlands, Torrey Hills, Torrey Pines, Uptown

Construction 08/2019 01/2020 3-7 38, 39, 40 77, 78, 79

San Diego San Diego 19/20 New Road Maintenance & Rehabilitation Slurry Seal Group 2021 This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair

(Existing)

Barrio Logan, Carmel Mountain Ranch, Clairemont Mesa, College Area, Eastern -Area, Encanto, Greater Golden Hill, La Jolla, Linda Vista, Mira Mesa, Navajo, -Otay Mesa Nestor, Peninsula, Rancho Bernardo, San Ysidro, Serra Mesa, Skyline Paradise Hills, Southeastern San Diego, Torrey Pines, University, Uptown

Construction 10/2019 03/2020 3-7 38, 39, 40 77, 78, 79

San Diego San Diego 19/20 New Road Maintenance & Rehabilitation Slurry Seal Group 2022 This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair

(Existing)

Centre City, City Heights, Clairemont Mesa, College Area, Encanto, Greater -Golden Hill, Greater North Park, Kearny Mesa, La Jolla, Linda Vista, Mira Mesa, -Navajo, Otay Mesa, Otay Mesa Nestor, Peninsula, Rancho Bernardo, Sabre Springs, San Ysidro, Serra Mesa, Skyline Paradise Hills, Southeastern San Diego, Tierrasanta, University

Construction 12/2019 05/2020 3-7 38, 39, 40 77, 78, 79

San Diego San Diego 19/20 New Road Maintenance & Rehabilitation AC Overlay 1902

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

-Balboa Park, Barrio Logan, Clairemont Mesa, Greater Golden Hill, Greater North Park, Ocean Beach, Otay Mesa Nestor, Peninsula, San Ysidro, Uptown Construction 10/2019 08/2020 20-20 25 41

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 78: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Carlsbad San Diego 19/20 New Road Maintenance & Rehabilitation Pavement Management Program This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair

(Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

The boundaries of the city's PMP are roughly from La Costa Ave to Interstate 78 and from the coast to Vista and San Marcos to the east. Specific streets selected for resurfacing are based on modeling analysis, prioritization, and engineering judgement. Each year, approximately 17 centerline miles of pavement is resurfaced as part of this program.

Construction 11/2019 06/2020 5-20 36 76

Chula Vista San Diego 19/20 In-Progress Road Maintenance & Rehabilitation

RMRA Major Pavement Rehabilitation - FY2018/19 (STM396)

This project will include: Cost Estimating, Document Preparation, Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Project includes street overlays and street reconstruction on various streets in the City. The major rehabilitation treatments are based on the recommendations of the City's Pavement Management System.

E Naples St (Crescent Dr - Medical Ctr Dr); Third Av (N Fourth Av - D St); Naples St (Fourth Av - Third Av); Oxford St (Tobias Dr - Hilltop Dr) Third Av (L St - Naples St); F St (Fourth Av - Third Av); Third Av (Orange Av - Anita St) L St (Third Av - First Av); First Av (H St- I St); Hilltop Dr (Telegraph Cyn Rd - E L St); I St (Second Av - Hilltop Dr); Bonita Rd; City Limit (@ Willow St - Allen School Rd)

Pre-Construction & Construction

06/2019 11/2019

11/2019 07/2020 20-25 40 79, 80

Chula Vista San Diego 19/20 New Road Maintenance & Rehabilitation

RMRA Major Pavement Rehabilitation - FY2019/20

This project will include: Cost Estimating, Document Preparation, Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety)

Roadway segments located the northwest, Montgomery, Rancho Del Rey, Sunbow, Otay Ranch, Rolling Hills Ranch and Eastlake areas of the City of Chula Vista.

Pre-Construction & Construction

11/2019 05/2020

05/2020 12/2020 20-25 40 79, 80

Coronado San Diego 17/18 Carried Over Road Maintenance & Rehabilitation

Street, Curb and Gutter Improvements FY18/19

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Removal and replacement of 2-3" of existing asphalt surface; replacement of base material as necessary; replacement of damaged curb and gutter; required replacement of adjacent pedestrian ramps that do not meet current ADA regulations

Entire length of Adella Avenue; Jamaica Village Road; Spinnaker Way; and Flora Avenue Construction 11/2019 09/2020 20-30 39 78

Coronado San Diego 19/20 New Road Maintenance & Rehabilitation

Street, Curb and Gutter Improvements Fiscal Year 2019-20 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) B Avenue, from 2nd to 8th Streets Construction 11/2019 09/2020 20-30 39 78

El Cajon San Diego 19/20 New Road Maintenance & Rehabilitation Overlay 2020 This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety),

Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Decker St, Dominguez Way, E Madison Ave, E Main St, El Rancho Dr, Granite Hills Dr, Grape St, Greenfield Dr, Janich Ranch Ct, Luke Ln, Oakdale Ave, Oakdale Ln, S Anza St, Sterling Dr

Pre-Construction & Construction

07/2019 01/2020

12/2019 06/2020 13-20 38 71

El Cajon San Diego 19/20 New Road Maintenance & Rehabilitation Slurry 2020

This project will include: Paving and/or Striping Installation (New Safety), Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Project Scope Development

Aladdin Ln, Alveda Ave, Ballard St, Balsam Ct, Balsam Dr, Bartram Way, Bearing Ln, Brighthaven Ave, Cloverleaf Dr, Constancia Way, Cosmo Ave, Dehesa Rd, Ditcher St, Dilman St, Doncarol Ave, Dumar Ave, E Lexington Ave, Ellen Ln, Fernview St, Galt Dr,Glenhill Rd, Glenway Dr, Goldstone St, Gustavo St, Harry St, Ivory Ct, Joliet Ct, Joliet St, Kristie Ln, Mahogany Dr, Markerry Ave, Mulgrew St, N 3rd St, N Gina Ave, N Ivory Ave, Norran Ave, Nothomb St, Pebble Pl, Rancho Valle Ct, Raynell Way, Redwood

Pre-Construction & Construction

07/2019 01/2020

12/2019 06/2020 5-8 40 56

Encinitas San Diego 19/20 New Road Maintenance & Rehabilitation

Street Overlay & Slurry Seal Project - FY 2019-20

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

There are 31 street segments as part of the overlay portion of this project, and 51 segments as part of the slurry seal portion of this project throughout the city. The proposed locations are attached to the resolution included with this submittal.

Construction 10/2019 02/2020 5-20 5 12

Escondido San Diego 19/20 New Road Maintenance & Rehabilitation

2019 Street Rehabilitation and Maintenance Project

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Maintenance zone bounded to the south of the 78 Freeway, and west of Interstate 15. 11th Ave, Avenida Del Diablo, Del Dios Rd, Enterprise St, Eucalyptus Ave, Hale Ave, Aero Way, Aldergrove Ave, Alhudson Dr, Alpine Way, Amethyst Way, Briargate Pl, Buckskin Dr, Cambria Pl, Candlelight Ave, Canyon Oak Pl, Chardonney Way, Claudan Rd, Continental Ln, Cortina Circle, Dexter Pl, Don Lee Pl, Fleetwood St, Glade Ln, Industrial Ave, Mandevelle Pl, Opper St, along with 25 additional street segments

Construction 07/2019 10/2019 7-15 1 1

Imperial Beach San Diego 19/20 New Road Maintenance & Rehabilitation

Imperial Beach Boulevard Enhancement Project

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing)

Imperial Beach Boulevard Construction 07/2019 02/2020 10-20 40 78

Imperial Beach San Diego 19/20 New Road Maintenance & Rehabilitation 2020 Roadway Paving Project

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

5th Street, 8th Street, Calla Avenue, Carnation Avenue, Connecticut Street, Delaware Street, Elkwood Avenue, Florida Street, Imperial Beach Boulevard Construction 02/2020 06/2020 10-20 28 42

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 79: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

La Mesa San Diego 19/20 New Road Maintenance & Rehabilitation

Spring St - Between Palm Ave and Caltrans SR-94 This project will include: Pavement Rehab/Repair (Existing) | Overlay Spring St - Between Palm Ave and Caltrans SR-94 Construction 02/2020 05/2020 10-20 39 78

La Mesa San Diego 19/20 New Road Maintenance & Rehabilitation

Fletcher Pkwy – between Baltimore Dr and Caltrans I-8 This project will include: Pavement Rehab/Repair (Existing) | Overlay Fletcher Pkwy – between Baltimore Dr and Caltrans I-8 Construction 02/2020 05/2020 10-20 39 78

La Mesa San Diego 19/20 New Road Maintenance & Rehabilitation

University Ave – between 69th St and Harbinson Ave This project will include: Pavement Rehab/Repair (Existing) | Overlay University Ave – between 69th St and Harbinson Ave Construction 02/2020 05/2020 10-20 39 78

La Mesa San Diego 19/20 New Road Maintenance & Rehabilitation

University Ave – between La Mesa Blvd and Baltimore Dr This project will include: Pavement Rehab/Repair (Existing) | Overlay University Ave – between La Mesa Blvd and Baltimore Dr Construction 02/2020 05/2020 10-20 39 78

La Mesa San Diego 19/20 New Road Maintenance & Rehabilitation

Jackson Dr – between Fletcher Pkwy and La Mesa Blvd This project will include: Pavement Rehab/Repair (Existing) | Overlay Jackson Dr – between Fletcher Pkwy and La Mesa Blvd Construction 02/2020 05/2020 10-20 39 78

La Mesa San Diego 19/20 New Road Maintenance & Rehabilitation

La Mesa Blvd – between Jackson Dr and Glen St This project will include: Pavement Rehab/Repair (Existing) | Overlay La Mesa Blvd – between Jackson Dr and Glen St Construction 02/2020 05/2020 10-20 39 78

La Mesa San Diego 19/20 New Road Maintenance & Rehabilitation Zone 3 Residential Streets This project will include: Pavement Rehab/Repair (Existing) | Slurry Seal Zone 3 Residential Streets - Various Streets in the City of La Mesa Construction 02/2020 05/2020 5-7 39 78

La Mesa San Diego 19/20 New Road Maintenance & Rehabilitation Zone 4 Residential Streets This project will include: Pavement Rehab/Repair (Existing) | Slurry Seal Zone 4 Residential Streets - Various Streets in La Mesa Construction 02/2020 05/2020 5-7 38 79

La Mesa San Diego 19/20 In-Progress Road Maintenance & Rehabilitation La Mesa Blvd Rehab Project 2A This project will include: Pavement Rehab/Repair (Existing) | Asphalt Mill & Overlay La Mesa Blvd from Normal Ave to Acacia Ave Construction 01/2019 06/2019 15-25 38 79

La Mesa San Diego 19/20 In-Progress Road Maintenance & Rehabilitation La Mesa Blvd Rehab Project 2B This project will include: Pavement Rehab/Repair (Existing) | Asphalt Mill & Overlay La Mesa Blvd - From Randlett Dr. to Grossmont Blvd Construction 01/2019 06/2019 15-25 38 79

La Mesa San Diego 19/20 In-Progress Road Maintenance & Rehabilitation La Mesa Blvd Rehab Project 2C This project will include: Pavement Rehab/Repair (Existing) | Asphalt Mill & Overlay La Mesa Blvd - From Grossmont Blvd to I-8 Construction 01/2019 06/2019 15-25 38 79

La Mesa San Diego 19/20 In-Progress Road Maintenance & Rehabilitation Spring Street Rehab Project 2 This project will include: Pavement Rehab/Repair (Existing) | Asphalt Mill & Overlay Spring St - From the Southern City Limit to I-8 Construction 01/2019 06/2019 15-25 32 57

Lemon Grove San Diego 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Street Rehabilitation Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

The FY 2019-20 street list tentatively includes: Adams St. (Washington to Golden); Alton Dr. (Englewood to Skyline); Angelus Ave (Canton Dr to Southern City Limit); Baldwin (Roy to Washington); Bonita St (Mt. Vernon to Beryl St); Cameron (Canton Dr to Osage); Central (Cypress to Olive); Central (Olive St to Main St); Central (Chateau to Mass); Citronella (Cds to Cypress); College (South End to Federal); Cuyamaca (New Jersey to Buena Vista); Daytona

Construction 07/2019 06/2020 5-10 38 79

Lemon Grove San Diego 19/20 In-Progress Other Storm Drain Master Plan

This project will include: Cost Estimating, Project Scope Development | This project will complete the City's storm drain assessment, inventory, and prioritization for repairs. This project will complete the progress from the FY 2018-19 update to the storm drain master plan. Specific tasks for completion will include creating an interim solution(s) for CMP segments, identifying necessary segments sizes for repair, provide construction cost estimates, and prioritize recommended improvements to support future CIP project.

The City’s existing storm drain system is located at multiple locations in the 3.88 square miles of the City, with approximately 60 miles of storm drain pipes of that make up the entire system. Street boundaries include Lemon Grove Way to Zemco Dr, and Camino De Las Palmas to Federal Blvd. All locations listed are an estimate and have yet to be finalized.

Pre-Construction 07/2019 06/2020 5-10 14 32

Needles San Diego 17/18 Carried Over Road Maintenance & Rehabilitation

Shore Street to Jack Smith Park entrance rehabilitation project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Crack seal and slurry Shore Street to Jack Smith Park entrance Construction 01/2020 02/2020 5-10 16 33

Needles San Diego 19/20 New Road Maintenance & Rehabilitation Colorado River Bridge This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design,

Project Scope Development Colorado River Bridge at North K Street, Colorado River and Arizona state line Pre-Construction & Construction

06/2019 08/2019

07/2019 06/2020 20-25 16 33

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 80: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Needles San Diego 17/18 Carried Over Road Maintenance & Rehabilitation Five Mile Road Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Removed project in Expenditure Report 17/18(no longer RMRA funded). Intended to use FY 19/20 RMRA funds.

City's portion of Five Mile Road by County of San Bernardino Construction 09/2019 10/2019 20-25 16 33

Needles San Diego 19/20 New Road Maintenance & Rehabilitation

North Needles Highway Crack, Seal & Slurry

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) North Needles Highway (David Drive to City limits) Construction 05/2020 06/2020 10-15 10 25

Oceanside San Diego 19/20 Carried Over Road Maintenance & Rehabilitation Asphalt Overlay

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Preparatory work including patching, crack sealing. Asphalt overlaying to repair mainly arterial streets as they often carry truck traffic. Replace striping and pavement markings. San Ramon AvenueNorth End; San Ramon Avenue; San Lorenzo Court; San Lorenzo CourtSan Pablo Avenue; San Ramon Avenue Rancho Del Oro DrWest End; San Pablo Avenue San Dimas Avenue West End; San Lorenzo Court; San Dimas Avenue North End; San Lorenzo CourtSan Dimas Ave

Rancho Hermosa Tract Subdivision Industry Street Construction 08/2019 12/2019 8-12 36 76

Oceanside San Diego 19/20 New Other Storm Drain Improvements This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) Neptune at Coast Highway; Lomita and Crouch; Various at Sleeping Indian Rd Construction 10/2019 07/2020 40-50 36 76

Oceanside San Diego 19/20 New Safety ADA for Overlay This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

San Dimas Ave; San Ramon Ave; San Pablo Ave; San Lorenzo court, San Miguel Court, Arthur Avenue; Charles Dr; Parker St.

Pre-Construction & Construction

07/2019 10/2019

09/2020 06/2020 12-20 19 37

Poway San Diego 19/20 New Road Maintenance & Rehabilitation 19/20 Street Maintenance Project This project will include: Pavement Rehab/Repair (Existing)

Project encompasses streets within the street maintenance zone 3, that is generally south of Twin Peaks Road, east of and including Pomerado Road, north of Poway Road and west of Community Road.

Construction 07/2019 09/2019 5-8 4, 8 8

San Marcos San Diego 19/20 Carried Over Road Maintenance & Rehabilitation

West San Marcos Boulevard Slope Reconstruction Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Reconstruction of the embankment supporting the eastbound lanes of West San Marcos Boulevard from Acacia Drive to Viewpoint Drive. The existing embankment is moving to the south endangering the eastbound lanes, sidewalk, street lights, and fire hydrants.

In the City of San Marcos, on West San Marcos Boulevard, from Acacia Drive to Viewpoint Drive

Pre-Construction & Construction

11/2018 10/2019

10/2019 03/2020 25-50 38 75

San Marcos San Diego 19/20 Carried Over Road Maintenance & Rehabilitation Annual Surface Seal

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Use of a Pavement Preservation Strategy in the placement of a Surface Seal of Roadways. This is a carryover of a FY 17/18 approved project that will be complete in FY18/19.

Mission Road, Twin Oaks Valley Road Construction 01/2019 06/2019 5-8 38 75

San Marcos San Diego 19/20 New Road Maintenance & Rehabilitation FY19-20 Annual Surface Seal Project This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Project

Scope Development In the Richland Neighborhood and the Barham/Discovery Communities in the southwest area of the City

Pre-Construction & Construction

01/2020 02/2020

02/2020 07/2020 5-12 25 49

Santee San Diego 17/18 Carried Over Road Maintenance & Rehabilitation

Pavement Repair and Rehabilitation Citywide

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repair and rehabilitate streets as recommended by the City's Pavement Management Analysis Report. The project will focus on overlays and full reconstruction. | Project is continued and is planned for construction in the summer of FY2020/21

Includes streets identified in the City's Pavement Management Analysis Report within Zones BF, BB, BF, AA, CG, EE. BD, EB, CB, CD, FC, CI, CE, ED, AND EF.

Construction 01/2020 09/2020 20-25 38 71

Santee San Diego 17/18 Forecasted Road Maintenance & Rehabilitation Bridge Restorations Citywide

This project will include: Bridge Structure Rehab/Repair (Existing) | Provide maintenance and repairs to City owned bridges. Including bridge joint seals, deck sealing, and minor patching | Project is forecasted to begin in future years as funds accrue.

Magnolia Avenue Bridge, Cayamaca Street Bridge, Carlton Hills Boulevard Bridge, Mast Boulevard Bridge, and Prospect Avenye Bridge. Construction 04/2020 12/2025 25-30 38 71

Santee San Diego 17/18 Carried Over Road Maintenance & Rehabilitation

Pavement Roadway Maintenance Citywide

This project will include: ADA Curb Ramp Installation (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Conduct pavement maintenance on streets as recommended by the City's Pavement Management Analysis Report. The project will focus on crackfilling and slurry sealing. | Project is in construction.

Includes streets identified in the City's Pavement Management Analysis Report within Zones BF, BB, BF, AA, CG, EE. BD, EB, CB, CD, FC, CI, CE, ED, AND EF.

Construction 02/2020 10/2020 10-15 15 27

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 81: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Solana Beach San Diego 19/20 New Road Maintenance & Rehabilitation

2019 Street Maintenance and Repair Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

On portions of South Cedros Avenue, Lomas Santa Fe Drive and various residential streets. Construction 08/2019 11/2019 15-25 12 30

Vista San Diego 17/18 Carried Over Road Maintenance & Rehabilitation

Citywide Storm-drain Relining/ Replacement

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Repair or replace storm-drain culverts that have reached the end of their useful life, have failed as identified in the storm-drain inventory, or where needed prior to overlay or other pavement rehabilitation work.

Crestview Rd; Decision St; Eklund Ct; El Miraso; Engineer St; Hambaugh Way; Hawthorne Cir; Las Palmas Dr; Manzanita Ct; McGavran Dr; Mullen Way; Pala Vista Dr; Pecan Ct; Peters Dr; Pioneer Av; Primrose Av; Prospect Pl; Rancho Vista Pl; Rincon St; Santa Fe Pl; Seaview Pl; Sunset Dr; Tower Dr; Tower Pl; Venus View Dr; Yettford Rd

Construction 06/2019 11/2019 40-50 36 76

Vista San Diego 17/18 Carried Over Road Maintenance & Rehabilitation

Street Rehabilitation, Construction, and Overlay-Biennial

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruction of deteriorated streets, including asphalt overlay of greater than one-inch in thickness. Construction includes curb ramps; repair of distressed curbs, gutters, and sidewalks; and re-striping.

Breeze Hill Rd; Business Park Dr; Crestview Rd; Decision St; Eklund Ct; El Miraso; Engineer St; Hambaugh Wy; Hawthorne Cir; Las Palmas Dr Manzanita Ct; Matagual Dr; McGavran Dr; Mercantile St; Mullen Way; Pala Vista Dr; Pecan Ct; Peters Dr; Pioneer Av; Primrose Av; Progress St; Prospect Pl; Rancho Vista Pl; Rincon St; Santa Fe Pl; Seaview Pl; Sunset Dr;Tower Dr;Tower Dr;Tower Pl; Venus View Dr; Yettford Rd; Via Christina;Palomar Airport Rd.

Construction 06/2019 11/2019 10-20 36 76

Vista San Diego 19/20 New Road Maintenance & Rehabilitation

Street Maintenance and Slurry Seal - Biennial

This project will include: Cost Estimating, Maintenance Program Plan Development, Document Preparation, Environmental Study/Documents, Preliminary Design | Repair and maintenance sealing of street surfaces using slurry seal, cape seal, chip seal, and asphalt concrete overlay less than one inch in thickness, where identified as priorities in the Pavement Management System 5-Year Maintenance Plan.

Streets in the northerly zones of the City that are identified as the highest priority based on the updated Pavement Management Forecast Maintenance Report, to be provided in September 2019

Pre-Construction & Construction

07/2019 06/2020

06/2020 06/2021 4-6 29 55

National City San Diego 19/20 Carried Over Road Maintenance & Rehabilitation Euclid Avenue Street Resurfacing

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing) | Provide pavement rehabilitation, grind and overlay on Euclid Avenue between Cervantes Avenue and E. 24th Street

Euclid Avenue between Cervantes Avenue and E. 24th Street Construction 08/2019 06/2020 10-15 13 22

National City San Diego 19/20 Carried Over Road Maintenance & Rehabilitation Palm Avenue Street Resurfacing

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Provide pavement rehabilitation, grind and overlay on Palm Avenue between Division Street and E. 18th Street

Palm Avenue between Division Street and E. 18th Street Construction 07/2019 06/2020 10-15 13 22

National City San Diego 19/20 New Traffic Control Devices Citywide Radar Speed Feedback Installations This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety)

D Avenue between 24th Street and 30th Street, Harbison Avenue between Division Street and 4th Street, Plaza Bonita Center Way between Valley Road and Sweetwater Road, Valley Road between Sweetwater Road and Calle Abajo, Valley Road between PLaza Bonita Center Way and San Miguel Court, Cleveland Avenue between Bay Marina Drive and Civic Center Drive

Construction 09/2019 06/2020 10-15 40 79, 80

National City San Diego 17/18 In-Progress Safety

FY 2018 Safe Routes to School (SRTS) Pedestrian and Bicycle Enhancements - Harbison Avenue Traffic Calming, Division Street to E. 4th Street

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Construct traffic calming measures and bike sharrows on Harbison Avenue between Division Street and E. 4th Street | Project design 90% complete. Advertise project for construction bidding in November 2018.

Harbison Avenue between Division Street and E. 4th Street Construction 04/2019 07/2019 20-30 40 79, 80

National City San Diego 17/18 Carried Over Complete Streets Components

FY 2018 SRTS Pedestrian and Bicycle Enhancements - Division Street Traffic Calming, Euclid Avenue to Harbison Avenue

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Provide street resurfacing and restriping to include a "road diet" for traffic calming converting four travel lanes to two travel lanes with a two-way left-turn center lane, Class II bike lanes, and new pedestrian curb ramps for ADA compliance on Division Street between Euclid Avenue and Harbison Avenue

Division Street between Euclid Avenue and Harbison Avenue Construction 10/2019 06/2020 10-15 40 79, 80

Escalon San Joaquin 19/20 New Road Maintenance & Rehabilitation Slurry Seal Various Streets This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety)

Various Streets within the City of Escalon; Elizabeth Street, Brayton Avenue, Jill Avenue, Dias Street, Arroya Street, Blossom Avenue, Mission Street, Fisk Avenue - Adjustments to streets may be required when project bids are received based on funding.

Construction 09/2019 12/2019 5-10 38 75

Lathrop San Joaquin 19/20 New Road Maintenance & Rehabilitation

CIP PS 18-01 Citywide Pavement Repair Program

This project will include: Cost Estimating, Maintenance Program Plan Development, Document Preparation, Pavement Rehab/Repair (Existing), Feasibility Study, Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety)

E. Louise Ave between Harlan Road and 5th Street Pre-Construction & Construction

05/2019 01/2020

12/2019 12/2020 10-15 35 62

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 82: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Lodi San Joaquin 19/20 New Road Maintenance & Rehabilitation

2019/2020 Citywide Pavement Repair Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Citywide bound by Lower Sacramento Road to the west, CCTC to the east, Turner Road to the north, and Harney Lane to the South Construction 07/2019 06/2020 3-5 23 40

Manteca San Joaquin 17/18 In-Progress Road Maintenance & Rehabilitation

Yosemite Avenue: Main Street to Cottage Avenue Improvement Project

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Document Preparation, Bicycle Lane (New), Pavement Improvement (New), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | This project will rehabilitate, replace, or restore approximately 35,000 square yards of pavement that is aging, or beginning to fail. This project also includes the installing 10,000 linear feet of bicycle lanes. | Currently out to bid for construction.

The Project is located on Yosemite Avenue, between Main Street and Cottage Drive.

Pre-Construction & Construction

03/2019 05/2019

04/2019 12/2019 15-25 5 12

Manteca San Joaquin 17/18 In-Progress Road Maintenance & Rehabilitation

Main Street: Yosemite Avenue to Atherton Drive Improvement Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | This project will rehabilitate, replace, or restore approximately 42,000 square yards of pavement that is aging, or beginning to fail. This project also includes the installing 12,000 linear feet of bicycle lanes.

The Project is located on Main Street, between Yosemite Avenue to Atherton Drive. Construction 03/2019 12/2019 15-25 5 12

Manteca San Joaquin 19/20 Carried Over Road Maintenance & Rehabilitation

2019 Annual Pavement Maintenance Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project will rehabilitate, replace, and/or restore pavement that is aging or beginning to fall. The project will include a combination of pavement maintenance methods including asphalt overlays, slurry seals, dig outs, base repair, crack seal, cape seal and/or microsurfacing at various locations throughout the region in accordance with the recommendations of the City Pavement Management Program (PMP).

Manteca Woodbridge Senior Community 1451 Americana St, Manteca, CA 95336 Construction 07/2019 06/2020 10-20 5 12

Manteca San Joaquin 19/20 Carried Over Road Maintenance & Rehabilitation

Mayor's Park Subdivision Pavement Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project will entail pavement repair including asphalt overlays, base repairs, crack seal, cape seal, microsurfacing, and other pavement repairs at the Mayor’s Park Subdivision. The project is consistent with the recommendation of the City Pavement Maintenance Program (PMP).

Mayor's Park Subdivision located at 1440 Kelley Drive, Manteca, CA 95336 Construction 03/2020 06/2021 10-20 5 12

Manteca San Joaquin 17/18 Carried Over Road Maintenance & Rehabilitation

Springtime Estates Improvement Project

This project will include: Pavement Rehab/Repair (Existing) | Pavement maintenance of 65,000 square yards of road surface. This could include asphalt overlays, slurry seals, dig outs, base repair, and other pavement repairs in accordance with the recommendations of the City Pavement Management Program.

This project area is East of Main Street, North of Louise Avenue, and Southwest of State Highway 99.

Construction 07/2019 06/2020 15-25 16 34

Ripon San Joaquin 17/18 Carried Over Road Maintenance & Rehabilitation River Road Overlay

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Includes a grind and overlay on major arterial River Road for approximately 5,200 feet, isolated dig out and repair sections and striping.

River Road between Jack Tone Road and North Ripon Road Construction 09/2019 11/2019 15-25 5 12

Ripon San Joaquin 19/20 Carried Over Road Maintenance & Rehabilitation

Mulholand/California Resurface Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Includes a micro-slurry and an asphalt rubber cape seal with isolated dig out and repair sections and striping

Mulholand Drive, California Avenue and surrounding roads Construction 06/2019 08/2019 10-15 5 12

Ripon San Joaquin 19/20 Carried Over Road Maintenance & Rehabilitation Orange/Palm Resurface Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Includes an asphalt rubber cape seal with isolated dig out and repair sections and striping

Orange Avenue, Palm Avenue and surrounding roads Construction 08/2020 10/2020 10-15 5 12

Ripon San Joaquin 19/20 Carried Over Road Maintenance & Rehabilitation Denise/Baily Resurface Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Includes an asphalt rubber cape seal with isolated dig out and repair sections and striping

Denise Drive, Baily Drive and surrounding areas Construction 05/2021 07/2021 10-15 5 12

Stockton San Joaquin 19/20 New Road Maintenance & Rehabilitation Local Street Resurfacing

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Street segments within City Council Districts 1, 2, 3, 4, 5, and 6 will be resurfaced. Final street segments will be reported upon completion in the expenditure report. City Council District map can be found at the following link: http://www.stocktongov.com/government/council/districtMap.html

Pre-Construction & Construction

08/2019 07/2020

02/2020 12/2020 5-7 5 13

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 83: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Stockton San Joaquin 19/20 New Road Maintenance & Rehabilitation

Curb, Gutter, and Sidewalk Replacement

This project will include: Cost Estimating, ADA Curb Ramp Installation (New), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing) | Relocation of drainage inlet/lateral and relocate and or replace pedestrian push buttons as needed to comply with ADA standards for wheelchair ramps.

Segments of curb, gutter, and sidewalk (including wheelchair ramps) within City Council Districts 1, 2, 3, 4, 5, and 6 will be subject to these improvements. Final locations will be reported upon completion in the expenditure report. City Council District map can be found at the following link: http://www.stocktongov.com/government/council/districtMap.html

Pre-Construction & Construction

08/2019 07/2020

02/2020 12/2020 5-50 5 13

Stockton San Joaquin 19/20 New Other Bridge Maintenance Plan This project will include: Maintenance Program Plan Development Various bridge locations within the City of Stockton Pre-Construction 08/2019 12/2020 1-20 5 13

Stockton San Joaquin 19/20 New Road Maintenance & Rehabilitation

Alexandria Place Culvert Replacement

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents Alexandria Place at Five Mile Slough Pre-Construction 09/2019 12/2020 5-20 5 13

Stockton San Joaquin 19/20 New Other Airport Way Bridge Repair This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents Airport Way at Mormon Slough Pre-Construction &

Construction 07/2019 11/2019

11/2019 08/2020 5-20 5 13

Stockton San Joaquin 19/20 New Other Wilson Way Bridge Repair This project will include: Cost Estimating, Document Preparation, Bridge Structure Rehab/Repair (Existing), Environmental Study/Documents Wilson Way at Mormon Slough Pre-Construction &

Construction 07/2019 11/2019

11/2019 08/2020 5-20 3 11

Tracy San Joaquin 17/18 Carried Over Road Maintenance & Rehabilitation

Street Patch and Overlay Project FY 2018-19

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Due to modest damage to the existing pavement structure, a 261,000 square foot overlay will be applied.

Beverly Place (from Holly Drive to Mae Avenue); Hollywood Avenue (from Holly Drive to Mae Avenue); Beverly Place (from Bessie Avenue to Parker Avenue); Grant Line Road (from Lincoln Boulevard to Tracy Boulevard) All locations are estimates.

Construction 09/2019 12/2019 10-15 5 13

Tracy San Joaquin 19/20 New Road Maintenance & Rehabilitation

Street Patch & Overlay Project FY 2019-2020

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Due to modest damage to the existing pavement structure, overlays will be applied. Approximately 300,000 square feet of overlay will be applied.

Naglee Road (from Grant Line Road to Pavillion Parkway); Lowell Avenue (from Lincoln Boulevard to Orchard Parkway); Duncan Drive (from Lincoln Boulevard to Chester Drive)

Construction 05/2020 01/2021 10-15 2 2

Arroyo Grande San Luis Obispo 19/20 New Road Maintenance & Rehabilitation Street Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair

(Existing), ADA Curb Ramp Rehab/Repair (Existing) James Way and/or West Branch Street Construction 07/2019 12/2019 7-15 17 35

Atascadero San Luis Obispo 19/20 New Road Maintenance & Rehabilitation El Camino Real Resurfacing - South

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement maintenance and rehabilitation of approximately 1.90 miles of arterial roadway to improve deteriorated pavement conditions and better define roadway configuration for all roadway users, including motorists, bicyclists, and pedestrians.

El Camino Real from the South City Limit of Atascadero to El Bordo Avenue. Pre-Construction & Construction

06/2020 06/2021

06/2021 12/2021 10-22 17 35

Atascadero San Luis Obispo 17/18 Completed Road Maintenance & Rehabilitation

El Camino Real Rehabilitation -North

This project will include: Cost Estimating, Document Preparation, Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Project Scope Development | Major pavement rehabilitation for approximately 0.78 miles of arterial roadway to improve deteriorated pavement conditions and define roadway configuration for all roadway users, including motorists, bicyclists, and pedestrians. Project constructed approximately 250 feet of a “missing link” section of sidewalk on the west side to provide better pedestrian connectivity along the corridor. | Funds from FY 2019-20 will be used to reimburse the City for other funds used to advance the project prior to apportionment being received, per SHC 2034(c).

El Camino Real from San Anselmo Road (East) to San Benito Road Pre-Construction & Construction

08/2017 08/2018

07/2018 01/2019 15-25 17 35

El Paso de Robles San Luis Obispo 19/20 New Road Maintenance & Rehabilitation

2019 West Side Street Rehab DPW 19-02

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

10th St--Spring to Vine; 6th St--Spring to Pine; 9th St-Pine to Park; Park St-6th to 9th Construction 10/2019 08/2020 5-10 26 62

Grover Beach San Luis Obispo 19/20 New Road Maintenance & Rehabilitation

CIP 2283 Major Street Maintenance Program

This project will include: Maintenance Program Plan Development, Document Preparation, ADA Curb Ramp Installation (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate local major streets to improve driver and pedestrian safety and meet the City's Circulation Plan.

Oak Park Blvd, West Grand Avenue, N 4th Street, El Camino Real, Farroll Rd, The Pike

Pre-Construction & Construction

07/2019 10/2019

10/2019 06/2020 5-20 19 35

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 84: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Morro Bay San Luis Obispo 19/20 New Road Maintenance & Rehabilitation

2019-20 Pavement Maintenance Project

This project will include: Cost Estimating, Maintenance Program Plan Development, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing)

166,125 sq ft of Chip Seal Azure St, Cuesta St, Ironwood Ct, La Jolla St, Marina St, Olive St, Pelican Dr, Shasta Ave, and Yerba Buena St

Pre-Construction & Construction

08/2019 04/2020

03/2020 06/2020 7-9 4 1

Pismo Beach San Luis Obispo 17/18 In-Progress Complete Streets Components Shell Beach Streetscape

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Installation (New) | Streetscape project resurfacing an existing road, providing separate bike/pedestrian lane, bulbouts, landscaping, street furniture, etc. | Project was pushed to FY 18/19 and is currently underway.

Shell Beach Road, Pismo Beach, CA 93449 Construction 08/2018 06/2020 20-50 7 11, 14

San Luis Obispo San Luis Obispo 17/18 Carried Over Safety

Safe Routes to School Implementation: Anholm Greenway Implementation (Construct Foothill Crossing and Class I)

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | This project will construct bicycle and pedestrian improvements as part of a Safe Routes to School Plan for the Pacheco and Bishop Peak Elementary Schools. The project will construct improvements at the intersection of Foothill/Ferinni that includes additional traffic control, sidewalk, curb & gutter changes, increased traffic warning devices and a Class I Pathway. This project has been renamed to Anholm Greenway Implementation.

Intersection of Foothill Boulevard and Ferrini Road Construction 07/2019 12/2019 18-20 17 35

San Luis Obispo San Luis Obispo 19/20 New Road Maintenance & Rehabilitation Broad Street Paving This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), ADA Curb

Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Broad Street from Tank Farm to Farm House Lane Construction 07/2019 12/2019 25-40 38 75

San Mateo San Mateo 19/20 New Road Maintenance & Rehabilitation

Citywide Street Reconstruction 18-19 Phase I

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Birch Ave, fr Delaware St to Sunnybrae Blvd; Franklin St, fr Crystal Springs Rd to Parrott Dr; Turner Terrace, fr E. Poplar Ave to E. Bellevue Ave; Sunnybrae Blvd, fr Delaware St to Amphlett Blvd; Dakota Ave, fr Rand St to Patricia Ave; Fairfax Ave, fr Franklin St to Alameda de las pulgas, Fleetwood Dr, fr Grant St to Folkstone Ave; Rand St, fr Dakota Ave to Newbridge Ave; Delamar Wy, fr Portola Dr to Hacienda St and Fulton Rd, fr Bromfield Rd to end.

Construction 04/2020 06/2021 10-30 9 15

Atherton San Mateo 19/20 New Road Maintenance & Rehabilitation 2020 Street Overlay Project This project will include: Pavement Rehab/Repair (Existing) Pohemus Avenue - Selby Ln to Euclid Construction 04/2020 12/2020 7-10 13 24

Belmont San Mateo 19/20 In-Progress Road Maintenance & Rehabilitation

2020 Pavement Reconstruction Project

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Project Scope Development | The project will provide for the preparation of contract documents and the construction costs for the reconstruction of the following streets for FY 19/20: Beresford Avenue (from Hillcrest Drive to Lower Lock Avenue), Sussex Court (from Hiller Street to End), Terrace Drive (from Hillman Avenue to Mezes Avenue), Valerga Drive (from Alameda de las Pulgas to End)

Various street in Belmont, Ca including the following: Beresford Avenue (from Hillcrest Drive to Lower Lock Avenue), Sussex Court (from Hiller Street to End), Terrace Drive (from Hillman Avenue to Mezes Avenue), Valerga Drive (from Alameda de las Pulgas to End)

Pre-Construction & Construction

06/2018 06/2020

05/2020 09/2020 15-20 13 22

Brisbane San Mateo 19/20 New Road Maintenance & Rehabilitation Slurry Seal of Various City Streets This project will include: Slurry seal (preventative maintenance surface treatment) of various

city streets

Marina Blvd from Sierra Point Pkwy (west) to Sierra Point Pkwy (east), Bayshore Blvd from city limit to 4789 ft. south of Old County Rd, South Hill Dr from West Hill Pl to Valley Dr, West Hill Dr from West Hill Pl to Valley Dr, West Hill Pl from West Hill Dr to end, and North Hill Dr from Valley Dr to Guadalupe Canyon Pkwy

Construction 04/2020 06/2020 2-7 13 22

Burlingame San Mateo 19/20 New Road Maintenance & Rehabilitation Street Resurfacing Program 2020

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | asphalt concrete "dig-out" repairs, surface milling, asphalt concrete overlay, traffic markings, traffic striping, concrete improvements and other related work as applicable.

Various Streets in the City of Burlingame, locations have yet to be finalized but may include: Atwater Dr., Albemarle Way, Arguello Dr., Benito Ave, Castenda Dr., Coronado Way, Dolores Way, Drake Ave, Lassen Way, Los Montes Dr., Marco Polo Way, Margarita Avenue, Mills Canyon Crt., and Queseda Way.

Construction 07/2020 02/2021 15-24 13 22

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 85: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Colma San Mateo 17/18 Carried Over Complete Streets Components

Mission Road Bike/Pedestrian Improvements

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Project Scope Development | Install high visibility mid-block crosswalks with rectangular rapid flashing beacons. Stormwater curb extension with bioretention/ infiltration basins for stormwater treatment. | An additional crosswalk with RRFB has been considered into the scope of the project. This proposed improvement on Mission Road was requested through the participants in the community workshop that Town conducted for this project in January 2019.

Mission Road, between El Camino Real and Lawndale Boulevard. Pre-Construction & Construction

10/2018 04/2020

10/2019 10/2020 10-20 11 19

East Palo Alto San Mateo 17/18 Carried Over Road Maintenance & Rehabilitation ST-07 Street Resurfacing Program

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project provides for the resurfacing of City streets during the ten-year life of the CIP. Roughly $1,000,000 needs to be expended annually on street resurfacing.

Abelia Way, Addison Ave, Alberni St, Annapolis St, Aster Way, Avelar St, Azalia Dr, Baines St, Bay Rd, Baylor St, Beech St, Bell Ct, Bell St, Blue Jay Ct, Bradley Way, Brentwood Ct, Buchanan Ct, Camellia Ct, Camellia Dr, Camphor Way, Capitol Ave, Carole Ct, Circle Dr, Clarence Ct, Clarke Ave, Cypress St, Daisy Ln, Daphne Ct, Daphne Way, Demeter St, Donohoe St, Drew Ct, Dumbarton Ave, East Bayshore Rd, East O’keefe St, Emmett Way, Euclid Ave, and Euclid Pl along with 77 additional streets.

Construction 02/2020 12/2027 20-40 13 24

East Palo Alto San Mateo 19/20 Carried Over Complete Streets Components ST-05A Bay Road Improvements

This project will include: Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | The Bay Road project will include street repaving; bicycle and pedestrian improvements; landscaping improvements; and replacement of storm drain and water trunk lines.

0.7 miles of Bay Road from Clarke Avenue to Cooley Landing Construction 10/2019 12/2020 20-40 13 24

East Palo Alto San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

ST-08 University Ave Resurfacing & Signal Upgrade

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | This project provides for pavement resurfacing, restriping, upgrading of traffic signals and various other improvements on University Avenue.

University Avenue from Woodland Avenue to Notre Dame Avenue Construction 06/2020 12/2022 5-40 13 24

East Palo Alto San Mateo 19/20 Carried Over Safety ST-09 Bicycle & Pedestrian Improvements

This project will include: Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | This project is for the installation of street improvements to enhance vehicular, pedestrian and bicycle safety throughout the City.

University Ave, Pulgas Ave, Clarke Ave, Cooley Ave, Bay Rd, Newbridge Ave, East Bayshore Rd, West Bayshore Rd, Woodland Avenue, Donohoe St, Weeks St

Construction 12/2019 12/2020 5-40 13 24

East Palo Alto San Mateo 19/20 Carried Over Complete Streets Components

ST-14 University Avenue Interchange

This project will include: Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Pavement Improvement (New) | This project will provide for the widening of the University Avenue/US 101 overpass to provide safer pedestrian and bicycle travel and more efficient vehicle travel. The project will include the widening of the overpass bridge and construction of a new diagonal off-ramp from southbound (SB) 101 onto SB University Avenue

University Avenue from Woodland Avenue to Donohoe Street Construction 06/2020 12/2021 20-40 13 24

East Palo Alto San Mateo 19/20 Carried Over Traffic Control Devices ST-12 Traffic Calming Program

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | This project provides for the planning and construction of speed bumps, bulb-outs and other traffic calming devices to reduce speed through residential zones and to increase safety.

Pulgas Avenue, Clarke Avenue, Cooley Avenue, Bay Road, East Bayshore Rd, West Bayshore Rd, Woodland Avenue, Weeks Street, Runnymede St Construction 08/2019 12/2022 20-40 13 24

East Palo Alto San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

ST-13 Major Street Reconstruction - Annual Project 2018-19

This project will include: Pavement Rehab/Repair (Existing) | This project provides for the reconstruction of damaged City streets during the ten-year life of the CIP Runnymede Street, Bay Road, Woodland Avenue Construction 12/2019 12/2027 20-40 13 24

East Palo Alto San Mateo 19/20 Forecasted Complete Streets Components ST-17 New Loop Road

This project will include: Roundabout Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | This project is to develop a new loop road around the north and east of the University Village neighborhood that will connect University Avenue to the Ravenswood Business District (RBD) and include a Class I bicycle and pedestrian trail.

Loop Road (new) - north and east of the University Village neighborhood that will connect University Avenue to the Ravenswood Business District (RBD) Construction 09/2020 12/2027 20-40 13 24

East Palo Alto San Mateo 19/20 Forecasted Traffic Control Devices ST-19 Runnymede/ University Avenue Signal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrading of traffic signals and various other improvements Runnymede/University Avenue Construction 12/2020 12/2021 10-20 31 60

Half Moon Bay San Mateo 19/20 New Road Maintenance & Rehabilitation

Pavement Management and Traffic Safety Program

This project will include: Maintenance Program Plan Development, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing)

Mill Street, San Benito Street, Pullman Avenue, Alameda Avenue, and Poplar Street

Pre-Construction & Construction

07/2019 01/2020

12/2019 06/2020 15-30 13 24

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 86: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Half Moon Bay San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

Pavement Management & Traffic Safety Program

This project will include: Maintenance Program Plan Development, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project will look to reconstruct and preserve pavement throughout the City. Carryover from FY 18-19, the project will look at reconstruction of approximately 1 miles of pavement, reconstruct 6 ADA ramps, and other related improvements as funding becomes available.

Belleville Boulevard, Seymour Street, based on available funding. Pre-Construction & Construction

07/2019 01/2020

12/2019 06/2020 15-30 14 32

Hillsborough San Mateo 19/20 New Road Maintenance & Rehabilitation 2019 Street Resurfacing Project

This project will include: Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The 2019 Street Resurfacing Project consists of street resurfacing and rehabilitation work for approximately 15 miles of rubberized asphalt and asphalt mill & fill, microsurfacing, crack seal treatments, and striping on roadway segments within the Town limits.

Selected streets are located in various areas within the Town's limit (80 Total Streets, 15 Total Miles). To see a map of these location follow the link below: https://www.hillsborough.net/204/Public-Bids-RFPs

Construction 05/2019 09/2019 3-30 12 30

Menlo Park San Mateo 19/20 New Road Maintenance & Rehabilitation 2019 Street Resurfacing Project This project will include: Pavement Rehab/Repair (Existing)

Alma Street; Bieber Avenue; Bohannon Drive; Bohannon Drive; Cathy Place; Eastridge Avenue; Grace Drive; Hamilton Avenue; Harkins Avenue; Haven Avenue; Henderson Avenue; Hillview Place; Hollyburne Avenue; Market Place; Market Place; Marsh Road; Noel Drive; O'Brien Drive; San Mateo Drive; Santa Monica Avenue; Shirley Way; Sonoma Avenue; Tioga Drive; Trinity Drive NB; Trinity Drive NB; Valparaiso Avenue; Wallea Drive; For specifics see 2019 Street Work Locations uploaded file;

Construction 07/2019 10/2019 12-15 12 21

Millbrae San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation Larkspur Drive Repaving

This project will include: Cost Estimating, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Larkspur Drive between Crestview Ave to Helen Drive Pre-Construction & Construction

08/2018 01/2019

11/2019 12/2020 20-29 13 22

Millbrae San Mateo 19/20 New Road Maintenance & Rehabilitation

Broadway, Hillcrest Blvd, and La Cruz Ave Repaving Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Overlay of Broadway from Millbrae Avenue to Meadow Glen Ave, Hillcrest Blvd from Magnolia Ave to El Camino Real, La Cruz Avenue from Magnolia to El Camino Real. Work includes signage striping, pavement legend, sidewalk replacement, and curb ramps upgrade.

Broadway from Millbrae Avenue to Meadow Glen Ave Hillcrest Blvd from Magnolia Ave to El Camino Real La Cruz Avenue from Magnolia to El Camino Real

Pre-Construction & Construction

07/2019 03/2020

02/2020 12/2020 20-29 13 22

Millbrae San Mateo 19/20 New Road Maintenance & Rehabilitation

Sequoia Avenue, Loree Lane, and La Mancha Place Repaving Project

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Overlay of Sequoia Avenue from Murchison Dr to Maple Place, Loree Lane, and La Mancha Place. Work includes signage striping, pavement legend, sidewalk replacement, and wheel chair curb ramps upgrade.

Sequoia Avenue from Murchison Dr to Maple Place, Loree Lane, and La Mancha Place

Pre-Construction & Construction

07/2019 01/2020

12/2019 12/2020 20-29 13 22

Millbrae San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

Crestview Drive and Clearfield Drive Repaving project 2019

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Overlay of Crestview Drive and Clearfield Drive. Work includes signage striping, pavement legend, sidewalk replacement, and wheel chair curb ramps upgrade.

Crestview Drive from Larkspur to Clearfield Drive Clearfield Drive from Crestview Drive to End

Pre-Construction & Construction

11/2019 06/2020

05/2020 02/2021 20-29 13 22

Millbrae San Mateo 19/20 New Road Maintenance & Rehabilitation Skyline Boulevard Repaving Project

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New) | Overlay of Skyline Blvd from Millbrae Avenue to Riverton Drive. Work includes signage, striping, pavement legend, sidewalk and median replacement, and wheel chair curb ramps upgrade.

Skyline Blvd from Millbrae Avenue to Riverton Drive Pre-Construction & Construction

06/2019 01/2020

12/2019 10/2020 20-29 13 22

Millbrae San Mateo 19/20 New Road Maintenance & Rehabilitation

Various Location Pavement Maintenance Project

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Various Locations to be determined. Pre-Construction & Construction

06/2019 01/2020

12/2019 10/2020 7-10 10 25

Pacifica San Mateo 17/18 Carried Over Complete Streets Components Palmetto Sidewalk Project

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New) | The project consists of the construction of 1,400 feet of sidewalk, curb and gutter along the west side of Palmetto Avenue.

Palmetto Avenue from Westline Drive to 100 Palmetto Avenue Construction 03/2020 04/2020 20-30 13 22

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 87: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Pacifica San Mateo 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | The FY 2019-20 Pavement Rehabilitation Project will rehabilitate the pavement along Monterey Road from Oceana Boulevard to Hickey Boulevard to by placing 2 inches of asphalt overlay. This project will also include pavement grinding for base repair as well as installation of thermoplastic traffic striping, markings, and pavement markers.

Monterey Road, Pacifica, CA Construction 08/2019 10/2020 15-20 28 42

Portola Valley San Mateo 19/20 New Road Maintenance & Rehabilitation

Town of Portola Valley street resurfacing project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

In the Town of Portola Valley:Alpine Road: Hillbrook Drive to Portola Road; Portola Road: Alpine Road to Portola Green Circle; Golden Oak Drive: Alpine Road to Beargulch Drive; Grove Drive: Portola Road to Tinturn Lane; Saddleback: Entire length

Construction 05/2020 12/2020 4-15 38 77

San Bruno San Mateo 19/20 New Road Maintenance & Rehabilitation 2019-20 Street Rehabilitation

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Projects are located as follows: Santa Helena Avenue between San Antonio Avenue and El Camino Real, Mills Avenue between Kains Avenue and San Bruno Avenue, Eastburn Court between Whitman Way and Cul-de-sac, Poplar Avenue between Crystal Springs Ave and Allen Elementary.

Pre-Construction & Construction

05/2019 06/2020

05/2020 08/2020 15-15 13 22

San Carlos San Mateo 19/20 New Road Maintenance & Rehabilitation

2019 Pavement Rehabilitation/Resurfacing Phase I

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Prospect Street, Elm Street, Cordilleras Avenue, Pine Avenue, Dale Avenue, Manor Drive, Rogers Avenue, Brook Street, Edgehill Drive, Belmont Avenue, Oak Creek Lane, Roland Avenue, Bromley Drive, Orange Avenue, Elizabeth Street, Hemlock Street, Belle Avenue

Pre-Construction & Construction

08/2019 08/2019

07/2020 07/2020 10-25 36 73

South San Francisco San Mateo 19/20 New Complete Streets Components

Linden Avenue/Spruce Avenue Traffic Calming Improvements (Phase 2)

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Installation (New) | The project will design improvements along Linden Avenue from Aspen Avenue to Miller Avenue and Spruce Avenune from Lux to Miller. Elements include new intersection bulb-outs with Low Impact Development (LID) treatments and landscaping, high visibility crosswalks, ADA curb ramps, pedestrian crossings, median pedestrian refuge islands, and installation of a Class II bike lane with signage.

Linden Avenue from Aspen Avenue to Miller Avenue and Spruce Avenune from Lux to Miller Construction 09/2019 12/2019 10-30 13 22

South San Francisco San Mateo 19/20 New Traffic Control Devices Commercial and Spruce Signalized Intersection

This project will include: This project will improve traffic operations and pedestrian facilities by installing a new traffic signal with pedestrian countdown timers and accompanying ADA curb ramps.

Commercial Ave and Spruce Ave Intersection Construction 01/2019 06/2019 15-30 13 22

South San Francisco San Mateo 19/20 Carried Over Complete Streets Components

Grand Boulevard Initiative Phase 2 (Kaiser Way to McLellan Dr.)

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Landscape Safety Installation (New) | This project will improve El Camino Real between Kaiser Way and the South San Francisco BART station by installing enhanced pedestrian crossings, with corner curb bulbouts and median refuge, expanded bus stop/ waiting areas, and a new landscaped median.

El Camino Real between Kaiser Way and McLellan Drive. Construction 06/2018 02/2020 10-30 13 22

South San Francisco San Mateo 19/20 In-Progress Complete Streets Components South Connectivity Bicycle Lanes

This project will include: Bicycle Lane (New), Preliminary Design | This project will install Class II bike lanes along South Airport Boulevard in the northbound and southbound directions from Mitchell Avenue to North Access Road.

South Airport Blvd from Mitchell Ave to North Access Rd Pre-Construction & Construction

08/2018 11/2019

11/2019 02/2020 5-10 13 22

South San Francisco San Mateo 17/18 In-Progress Complete Streets Components

North Access Road Bike and Pedestrian Improvements

This project will include: Cost Estimating, Document Preparation, Feasibility Study, Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development | Widen approximately 1,000 feet of bike and pedestrian pathways.

North Access Road beginning at South Airport Boulevard Pre-Construction & Construction

07/2017 08/2019

08/2019 09/2019 15-20 13 19, 22

South San Francisco San Mateo 17/18 In-Progress Complete Streets Components

Grand Boulevard Project Phase 3 (Arroyo Drive to Kaiser Way)

This project will include: Cost Estimating, Document Preparation, Feasibility Study, Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Installation (New), Environmental Study/Documents, Preliminary Design, Project Scope Development | Improve El Camino Real between Arroyo Drive and Kaiser Way by installing enhanced pedestrian crossings, bike lanes, corner bulbout and median refuges, expanded bus stop/waiting areas, a new landscaped median, and green infrastructure.

El Camino Real between Arroyo Drive and Kaiser Way Pre-Construction & Construction

07/2017 05/2021

04/2021 02/2022 20-30 3 4

Woodside San Mateo 19/20 New Road Maintenance & Rehabilitation 2020 Road Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Mountain Home Rd., Old La Honda Rd., Portola Rd., Kings Mountain Rd. Construction 07/2020 10/2020 5-15 29 55

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 88: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Daly City San Mateo 19/20 New Road Maintenance & Rehabilitation

Original Daly City/Civic Center Street Slurry Seal

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Application of latex-modified asphalt slurry seal on selected streets citywide per the 7-year Street Slurry Seal Master Plan.

Abbot Ave., Acton St., Alexander Ave., Alp Ave., Atlanta St., Bellevue Ave., Beta Ave., Bismarck St., Blossom Ct., Bonnie St., Brunswick Ct., Brunswick St., Castle St., Chelsea Ct., Clayton Ct., Cobblestone Ct., Como Ave., Cottonwood Dr., County St., Craig Ct., Deanne Ln., E. Cavour St., East Market St., East Moltke St., East Vista Ave., Eastlake Ave., Edgemar St., Edgewood Ct., Evergreen Ave., First Ave., Fisher St., Florence St., Ford St., Frankfort St., Gambetta St., Garibaldi St., Garwood Dr

Pre-Construction & Construction

09/2019 03/2020

12/2019 09/2020 5-8 2 2

Daly City San Mateo 19/20 New Road Maintenance & Rehabilitation 2018-19 Street Resurfacing

This project will include: Cost Estimating, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Guadalupe Canyon Parkway, Valley Street, 1st Avenue, 2nd Avenue, 3rd Avenue, Bismark St, and Westmoor Avenue.

Pre-Construction & Construction

09/2019 03/2020

12/2019 09/2020 20-25 30 54

Foster City San Mateo 17/18 In-Progress Road Maintenance & Rehabilitation

Annual Pavement Rehabilitation Project

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Project consists of pavement grinding, base repair, asphalt overlay, thermoplastic traffic striping and pavement markings, and new access. | Project was open to the public in November 2018 and is now awaiting official closeout status.

East Hillsdale Boulevard and Beach Park Boulevard Construction 09/2018 11/2018 15-20 11 19

Foster City San Mateo 19/20 New Road Maintenance & Rehabilitation Street Rehabilitation (FY 2019-2020) This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair

(Existing) Vintage Park Drive between Lakeside Drive and Chess Drive Construction 07/2019 09/2019 10-20 11 19

Foster City San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

Street Rehabilitation - OBAG2 (2018-2019)

This project will include: Street rehabilitation including localized asphalt concrete repairs, surface overlays, and installation of bicycle route sharrow symbols, legends, and signage. The project also includes ADA ramp upgrades, and curb and gutter and sidewalk repairs as necessary, and pedestrian crosswalk improvements. | Delay in federal funding changes the start date of this project to FY 20/21.

East Hillsdale Boulevard from the Rainbow Bridge to Gull Avenue, and Edgewater Boulevard from Beach Park Boulevard to East Hillsdale Avenue. Pre-Construction 07/2020 10/2020 10-20 13 22

Redwood City San Mateo 17/18 Carried Over Road Maintenance & Rehabilitation Hopkins Avenue Overlay Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Hopkins Avenue, El Camino Real to Upland Road Construction 03/2020 06/2020 8-15 1 1

Redwood City San Mateo 19/20 New Road Maintenance & Rehabilitation 2019 Microsurfacing Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Marine Parkway, City Limit to Corriente Pointe Drive; Alameda de las Pulgas, Woodside Road to City Limits; Vera Avenue, Alameda de las Pulgas to El Camino Real

Construction 06/2019 12/2019 5-7 1 1

Redwood City San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

FY2018-19 Pavement Management Program

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This program addresses ongoing roadway pavement repair and replacement needs. The Roadway Management Program inventories, assesses, and tracks maintenance of the City’s roadways. Each year, streets are prepared for resurfacing with crack sealing and spot repairs before being resurfaced with an “overlay,” “cape seal,” or “slurry seal”. In Fiscal Year 2018-19, the City intends to use RMRA funding to overlay the below listed street locations.

Chestnut Street, El Camino Real to Railroad; Middlefield Road, Jefferson Avenue to Main Street; Spring Street, Woodside Road to Douglas Street; Warwick Street, Edgewood Road to City Limits

Construction 01/2020 12/2020 8-15 13 22

Santa Barbara Santa Barbara 19/20 New Road Maintenance & Rehabilitation Bath and Castillo Streets Overlay

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Bath Street from Micheltorena Street to Mission Street Castillo Street from Micheltorena Street to Mission Street Construction 06/2020 11/2020 15-20 10 25

Buellton Santa Barbara 19/20 New Road Maintenance & Rehabilitation

FY 2019/20 Road Maintenance Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

City of Buellton:Central Avenue (north of Highway 246), Jonanta Park Road, Second Street (Central Ave to Ave of Flags), First Street, City Hall Parking Lot, Post Office Parking Lot, River View Park Parking Lots

Construction 01/2020 08/2020 15-20 19 37

Carpinteria Santa Barbara 17/18 Carried Over Road Maintenance & Rehabilitation

Parking Lot No. 2 and Cactus Lane Improvements

This project will include: Reconstruction of Roadway Structural Section, Pedestrian Facilities, Drainage Structures, and Curb and Gutter Cactus Lane from Carpinteria Avenue to Wullbrandt Way Construction 11/2019 06/2020 5-20 19 37

Carpinteria Santa Barbara 17/18 Carried Over Road Maintenance & Rehabilitation Street Maintenance Program This project will include: Road Maintenance & Rehabilitation

6th St.; 8th St.; 9th St.; Elm Ave.; Holly Ave.; Juniper Pl..; Linden Ave.; Wullbrandt Wy. ; Yucca Ln.; 6th St.; Cactus Ln. ; Citrus Pl.; Maple Ave.; Olive Ave.; Walnut Ave.; Carpinteria Ave.; Casitas Pass Rd.; Via Real; Cramer Cir.; Santa Ynez Ave.

Construction 04/2019 07/2019 5-20 19 37

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 89: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Carpinteria Santa Barbara 19/20 New Road Maintenance & Rehabilitation Street Rehabilitation This project will include: Pavement Rehab/Repair (Existing)

Carpinteria Ave. (7th St./Santa Ynez Ave. to Sandyland Cove Rd.); Carpinteria Ave. (Sandyland Cove Rd. to US 101 Off Ramp); 8th St. (Elm Ave. to Linden Ave.); 8th St. (Linden Ave. to Maple Ave.); Sawyer Ave. (Linden Ave. to Holly Ave.); Holly Ave. (Sawyer Ave. to Carpinteria Ave.); Nipomo Dr. (Linden Ave. to Tomol Dr.)

Construction 03/2020 06/2020 5-20 19 37

Goleta Santa Barbara 19/20 Carried Over Road Maintenance & Rehabilitation

FY 18/19 Pavement Rehabilitation Project.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Staff is proposing that all the SB 1 funding programmed for FY 18/19 and FY 19/20 to be used to fund the FY 18/19 Pavement Rehabilitation Project. The proposed list of project includes deep lift road reconstruction with an approximate new 5.5-inch asphalt surface.

Evergreen Drive - between Cathedral Oaks Drive and Brandon Drive, Hillview Drive - Evergreen to Evergreen, Forest Drive - Evergreen to Evergreen Construction 01/2020 12/2020 20-30 12 30

Guadalupe Santa Barbara 19/20 New Road Maintenance & Rehabilitation 2020 Pavement Maintenance Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Crack Fill & Slurry Seal (Type B) and localized 4" removal and replacement of HMA on City roads as outlined in City's Pavement Management System document (2013) and any roads deferred from previous years.

Streets included but not limited to: West Main Street from Hwy 166 to City Limits, Sanchez Dr., Eleventh St. west of Gularte Ln., Pacheco St., Ninth St. east of Pacheco St., Obispo St. north of 10th St.

Construction 05/2020 11/2020 3-5 12 21

Lompoc Santa Barbara 19/20 New Traffic Control Devices Maintenance of Traffic Control Signs, Striping, and Markings.

This project will include: Procurement of Public Works Safety Materials and Gear | Maintenance of City owned traffic control signs, painting of lane line striping and roadway markings (arrows, stop bars, speed limit, etc.) by City Maintenance workers. | Units of measure for labor are in hours and material are in dollars.

Citywide Procurement / Operational Needs 07/2019 06/2020 2-5 19 35

Lompoc Santa Barbara 19/20 New Road Maintenance & Rehabilitation Pavement Repair

This project will include: Procurement of Road Maintenance and Rehab Materials | Various pavement repairs of the City roadway network by City Maintenance workers. | Units of staffing are in hours and material units are in dollars.

Citywide Procurement / Operational Needs 07/2019 06/2020 1-20 33, 34 70

Santa Maria Santa Barbara 19/20 Carried Over Road Maintenance & Rehabilitation

East Alvin Avenue and South College Drive Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project will place a standard 2-inch asphalt overlay over two distressed street sections. Work will include digging out and repairing failed pavement areas with new hot mix asphalt concrete, grinding down surface of the roadways, a glass grid will be placed followed by the hot mix asphalt, and installation of new striping and pavement markings. | Approximately 165,000 SF of roadway, equivalent to 2 lane miles, will be renewed.

East Alvin Avenue from College Drive to Bradley Drive South College Drive from Stowell Road to Enos Drive Construction 08/2019 12/2019 15-25 19 35

Santa Maria Santa Barbara 19/20 Carried Over Road Maintenance & Rehabilitation

North Miller Street Pavement Rehabilitation (2017/18)

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project will place a standard 2-inch asphalt overlay over a severely distressed section of Miller Street. Work will include digging out and repairing failed pavement areas with new hot mix asphalt concrete, grinding down surface of the roadways, a glass grid will be placed followed by hot mix asphalt, installation of new striping and pavement markings. Approximately 70,000 SF of roadway, equivalent to 0.8 lane miles, will be renewed. | Drainage improvements have been added: repair of existing drop inlets, addition of new drop inlets, and addition of new storm drain.These costs were not part of the original cost and are not reflected in the estimated total project cost. The project cost just reflects the pavement rehab portion of the project.

North Miller Street from Chapel Street to Alvin Avenue Construction 10/2019 12/2019 15-25 19 35

Santa Maria Santa Barbara 19/20 New Road Maintenance & Rehabilitation

2019 Surface Seal Street Maintenance Project

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Sonya Lane from A Street to Thornburg Street, Boone Street from Blosser Road to Broadway, Hanson Way from Main Street to Stowell Road, Camino Colegio from the west end to Miller Street, Palm Court east of Broadway, Orcutt Road from Ocotillo Avenue to Waller Lane, and many more.

Construction 08/2019 11/2019 4-10 19 35

Santa Maria Santa Barbara 19/20 New Road Maintenance & Rehabilitation

2019 Thin Maintenance Overlay Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Potential streets for the Thin Maintenance Overlay include Pine Street from West Grant Street to West Monroe Street, Barrington Drive from West Gaylene Drive to West Creston Street, Creston Street from North Western Avenue to North Railroad Avenue, El Camino Street from North Miller Street to North College Drive, Las Flores Way from South Superior to South Railroad Avenue, Superior Street from West Camino Colegio to West Liberty Street, Pershing Street from South Superior Street to South Railroa

Construction 08/2019 04/2020 7-12 19 37

Solvang Santa Barbara 19/20 Carried Over Road Maintenance & Rehabilitation

South Alisal Rd Full Depth Reclamation Paving Project FY 2020-21

This project will include: Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct South Alisal Road by recycling the existing asphalt pavement and road base using a process known as full depth reclamation. Bicycle sharrows and bicycle signage will also be included.

South Alisal Road from the Santa Ynez River to the southerly City Limits. Construction 09/2020 05/2021 25-40 3 10

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 90: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Clara Santa Clara 19/20 New Road Maintenance & Rehabilitation

Annual Street Maintenance and Rehabilitation Program

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Document Preparation, Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety)

Kiely Blvd(Stevens Creek-Pruneridge);Kiely Blvd(Pruneridge-Homestead);Kiely Blvd (Homestead-Benton);Kiely Blvd(Benton-El Camino);Monroe St(Cabrillo-Warburton);Monroe St(Warburton-El Camino);Monroe St(El Camino-Harrison);Monroe St(Harrison-Benton);Monroe St(Benton-Homestead);Lick Mill Blvd(Montague-East River);Lick Mill Blvd(East River-Tasman)

Pre-Construction & Construction

08/2019 04/2020

04/2020 12/2020 3-20 21, 27 38

Campbell Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation

ANNUAL STREET MAINTENANCE -WINCHESTER BLVD

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Install asphalt concrete overlay, perform isolated pavement digout repair, reconstruct pork-chop islands, remove and replace pavement striping and markings, install new ADA compliant curb ramps and passageways, relocate/install new traffic signal poles as need, adjust utility appurtenances to grade, and other incidental work (ie. traffic control and public notification).

Winchester Blvd from northern city limit located 171' north of the centerline intersection with Rosemary Ln to the southern city limit at the intersection with Knowles Drive, and a portion of W. Campbell Ave from Winchester Blvd to 82' west of the centerline intersection with Jeffers Way.

Construction 08/2019 12/2020 10-15 15 28

Cupertino Santa Clara 19/20 In-Progress Road Maintenance & Rehabilitation

2019 Pavement Maintenance Phase 1

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Residential Asphalt Overlay

Hanford Dr., Moltzen Dr., Rodrigues Ave from Western Ave to De Anza Blvd, Paradise Dr., Leola Ct, N Portal Ave, Drake Ct, Stonydale Dr., Degas Ct, Voss Ave, El Prado Way, Salem Ave, Poppy Dr., Ruppell Pl,

Pre-Construction & Construction

01/2019 06/2019

05/2019 11/2019 25-25 15 28

Cupertino Santa Clara 19/20 New Road Maintenance & Rehabilitation

2020 Pavemement Maintenance Phase 1

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

City of Cupertino Various Streets including portions of E Estates Dr, La Mar Ct, La Mar Dr, Lansdale Ave, Linsay Ave, Malvern Ct, Oakville Ave, Bandly Dr, Dunbar Dr, Fargo Dr, and Saich Way.

Pre-Construction & Construction

10/2019 06/2020

02/2020 11/2020 25-25 29 65

Gilroy Santa Clara 17/18 Carried Over Road Maintenance & Rehabilitation

FY 19 Pavement Maintenance Project

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement maintenance project, including digouts, crack seal, and rubberized cape seal surface treatment

In the City of Gilroy, on the following street segments: Farrel Ave (from Wren to Monterey), Eight St (from Princevalle to Church), Martin St (from Monterey to Chestnut), Murray Ave (from I.O.O.F. to Leavesley), Monterey Rd (from Cohansey Ave to Leavesley Rd), Camino Arroyo (from Holloway Rd to Pacheco Pass Hwy), and Chestnut St (from 10th St to 450 ft North of Martin St).

Construction 08/2019 06/2020 6-8 25 43

Los Altos Santa Clara 19/20 New Road Maintenance & Rehabilitation

Street Rehabilitation Project (FY 2019-20)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Covington Rd (Springer Rd to El Monte Ave) and Almond Ave (N San Antonio Rd to N El Monte Ave) Construction 03/2020 08/2020 10-15 13 24

Los Altos Hills Santa Clara 19/20 Carried Over Complete Streets Components Summerhill Pathway Project (Design)

This project will include: Cost Estimating, Document Preparation, Preliminary Design | This project is to construct a pathway connecting Summerhill Avenue between El Monte Road and Nicole Lane to City of Los Altos. The pathway connection will improve pedestrian safety from high traffic speeds due to Summerhill Avenue being used as an alternate arterial road. This project is DESIGN only. Actual construction will be budgeted and scheduled beyond FY 2019-20

Summerhill Ave at Los Altos Hills side Pre-Construction 05/2019 05/2020 20-30 13 24

Los Altos Hills Santa Clara 19/20 Carried Over Complete Streets Components Estacada Way Pathway Project

This project will include: Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Installation (New) | This project is to construct a pathway on DeBell Road connecting Miranda and Manuella Road. The pathway connection will provide a safer route to school and improve pedestrian safety.

DeBell Road, Los Altos Hills Construction 05/2019 09/2019 20-30 13 24

Los Altos Hills Santa Clara 19/20 Carried Over Complete Streets Components

Fremont Road to Redwood Grove Pathway Project

This project will include: Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Installation (New) | This project is to construct an off-road native pathway connecting Fremont Road and Redwood Grove in City of Los Altos. The pathway connection will improve pedestrian safety and connection to neighboring towns and existing routes.

Fremont Road Construction 05/2019 12/2019 20-30 13 24

Los Altos Hills Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation

Streets Operations and Maintenance Budget

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This budget will support the necessary work on Various street repairs and maintenance throughout town on as needed basis

This streets operation and maintenance will cover town-wide public streets (total 216 streets) in general, the approximate boundary streets are listed below: Page Mill Road - Arastradero Road - Foothill Expressway - Edith Ave - Fremont Road - O'Keefe Ln - El Monte Road - Summerhill Avenue - Magdalena Avenue -Eastbrook Avenue - W Loyola Drive - Stone Brook Drive - Moody Road Then back on Page Mill Road.

Construction 05/2019 06/2020 5-10 13 24

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 91: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Altos Hills Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation

Storm Drain Operating and Maintenance Budget

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | This budget will support the necessary work on various storm drain (public streets road side and a few facilities) cleaning and maintenance repairs throughout town on as needed basis

The storm drain operation, repair, annd maintenance will cover town-wide storm drainage on public streets (total 216 streets) and facilities, the approximate boundary streets are listed below: Page Mill Road - Arastradero Road - Foothill Expressway - Edith Ave - Fremont Road - O'Keefe Ln - El Monte Road - Summerhill Avenue - Magdalena Avenue -Eastbrook Avenue - W Loyola Drive - Stone Brook Drive - Moody Road Then back on Page Mill Road.

Construction 05/2019 06/2020 10-15 13 24

Los Altos Hills Santa Clara 19/20 Carried Over Complete Streets Components

Pathways Operating and Maintenance Budget

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | This budget will support the necessary work on various street side pathway maintenance throughout town on as needed basis for drainage and safety purposes

The pathways operation, repair, and maintenance will cover town-wide pathways along public streets (total 216 streets) in general, the approximate boundary streets are listed below: Page Mill Road - Arastradero Road - Foothill Expressway - Edith Ave - Fremont Road - O'Keefe Ln - El Monte Road - Summerhill Avenue - Magdalena Avenue -Eastbrook Avenue - W Loyola Drive - Stone Brook Drive - Moody Road Then back on Page Mill Road.

Construction 05/2019 06/2020 5-10 13 24

Los Altos Hills Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation

2019 Pavement Rehabilitation and Storm Drain Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This is an annual street resurfacing project that includes 1.5” and 2” overlay with digouts, microsurfacing, microsurfacing and digouts, 4” AC deep lift patching, 4” full grind and paving, pavement markings replacement, and micro-surfacing throughout various streets within Town limits. (See attached exhibit for street names.) The selected streets were determined by the recommendation from the StreetSaver Pavement Management Program.

Selection is ongoing, but potential roadways include: Altamont Road, Alto Verde Lane, Baleri Ranch Road, Bentley Court, Berkshire Drive, Dianne Drive, Edith Avenue, Elena Road, La Loma Drive, Old Page Mill Road, Ortega Drive, Page Mill Road, Rancho Manuella Lane, Robleda Road, Stirrup Way

Construction 05/2019 12/2019 5-20 13 24

Los Altos Hills Santa Clara 19/20 New Safety Natoma (Poor Claires) Pathway Project This project will include: Cost Estimating, Document Preparation

This project includes grading and construction of a 4’ retaining wall and pathway to connect an existing pathway at the intersection of Natoma/Elena Road.$80,000.

Pre-Construction 05/2019 12/2019 5-30 18 39

Los Gatos Santa Clara 17/18 Forecasted Road Maintenance & Rehabilitation Street Repair & Resurfacing This project will include: Pavement Rehab/Repair (Existing) | Placement of rubber cape seal

to maintain pavement surface. Union Avenue from Blossom Hill Road to Los Gatos-Almaden Road Construction 04/2022 10/2022 10-25 15 28

Los Gatos Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation Street Repair & Resurfacing (2020) This project will include: Pavement Rehab/Repair (Existing) | Placement of rubber cape seal

or overlay to maintain pavement surface. Knowles Drive from Dardanelli Lane to Dell Avenue. Pollard from Knowles to West Parr Construction 04/2020 10/2020 10-25 15 28

Los Gatos Santa Clara 19/20 Forecasted Road Maintenance & Rehabilitation Street Repair & Resurfacing (2022) This project will include: Pavement Rehab/Repair (Existing) | Placement of rubber cape seal

or overlay to maintain pavement surface. Quito Road from Bicknell Road to Woodbank Way. Construction 04/2023 10/2023 10-25 15 28

Los Gatos Santa Clara 19/20 New Road Maintenance & Rehabilitation Street Repair & Resurfacing This project will include: Pavement Rehab/Repair (Existing) | Placement of rubber cape seal

or overlay to maintain pavement surface. Winchester from Lark to Blossom Hill Construction 04/2021 10/2021 10-25 1 1

Milpitas Santa Clara 19/20 In-Progress Road Maintenance & Rehabilitation Street Resurfacing Project 2019

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Roadway pavement repair including pavement maintenance treatments, AC overlay and reconstruction. Additionally, the project includes replacement and upgrade of curb, gutter, driveway, sidewalk, signage, striping, installation of ADA ramps, and implementation of bike facilities per the 2009 Bikeway Master Plan.

Roadway rehabilitation of McCarthy Boulevard from northern city limit to Tasman Drive, Murphy Ranch Road, Sandisk Drive, and Technology Drive in City of Milipitas

Construction 07/2019 12/2019 10-15 10 25

Milpitas Santa Clara 19/20 New Road Maintenance & Rehabilitation Street Resurfacing 2020

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Dempsey Rd from Landess Ave to S. Park Victoria Dr; Piedmont Rd from E Calaveras Rd to Landess Ave; N Hillview Dr from Berryessa Creek to Jacklin Rd; S Abbott Ave from W Calaveras Rd to Southern end; Sycamore Dr from McCarthy Blvd to Barber Ln; Buckeye Dr from Sycamore Dr to Cotton Dr; Cottonwood Dr from McCarthy Blvd to Barber Ln; Hammon Way; Sinnot Ln; Bothelo Ave; Great Mall Parkway from I-880 ramps to Eastern city limits

Construction 06/2020 09/2020 5-15 36 73

Monte Sereno Santa Clara 19/20 New Road Maintenance & Rehabilitation Constitution Avenue Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert

Rehab/Repair (Existing) Constitution Avenue from Daves Avenue to End west Construction 04/2020 05/2020 10-15 32 58

Morgan Hill Santa Clara 19/20 New Road Maintenance & Rehabilitation Street Rehabilitation Projects This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) East Dunne Avenue between Thomas Grade and the City Limit; La Crosse Drive from/to Vineyard Boulevard Construction 04/2020 11/2020 5-10 17 35

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 92: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Mountain View Santa Clara 19/20 New Complete Streets Components SB-1 Streets Project

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

ADA ramps and intersections along downtown Castro Street in Mountain View, CA

Pre-Construction & Construction

07/2021 07/2022

04/2022 04/2023 20-50 28 67

Palo Alto Santa Clara 19/20 New Road Maintenance & Rehabilitation FY 2020 Asphalt Paving Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The FY 2020 Asphalt Paving Project includes the replacement of broken sidewalks, driveways, damaged PCC slabs, and uplifted curb and gutter; installation of valley gutters and curb ramps; resurfacing of asphalt pavement and installation of new signage and striping.

FY 2020 Asphalt Paving Project: portions of Cerrito Way, Chaucer Street, El Cerrito Road, Emerson Street, Florales Drive, Fulton Street, Harker Avenue, Home Avenue, James Road, Julie Court, La Donna Street, Oxford Avenue, Ramona Street, San Jude Avenue, Webster Street, and Ventura Court. The detail street portions are included in the resolution.

Construction 02/2020 08/2020 20-30 26 66

San Jose Santa Clara 19/20 New Road Maintenance & Rehabilitation 2020 Resurfacing Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

7th St S From Alma Av To Tully Rd; Bollinger Rd From Miller Av To Lawrence Ex; Hostetter Rd From Lundy Av To Morill Av; Murphy Av From Oakland Rd To Lundy Av

Construction 02/2020 05/2020 15-20 10, 15, 17 25, 27, 28, 29

San Jose Santa Clara 19/20 New Road Maintenance & Rehabilitation 2020 Street Sealing Project

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Refer to attached memorandum "List of Projects" and "Description of Elements Box" for full limits. 10th St, 11th St, 1st St, Bascom Av, Basking Ridge Av, Bernal Rd, Bollinger Rd, Capitol Av, Eden Av, Edenvale Av, Flickinger Av, Foxworthy Av, Fruitdale Av, Hostetter Rd, Kiely Bl, Lean Av, Mclaughlin Av, Meridian Av, Miyuki Dr,Old Tully Rd, Pearl Ave,Prevost St,Quito Rd, Redmond Av, Saddle Brook Dr, Senter Rd, Silver Creek Rd, Snow Dr, St John St, Stokes St, Story Rd, Thornwood,White,Yerba Buena

Construction 02/2020 05/2020 5-7 12 30

Saratoga Santa Clara 19/20 New Road Maintenance & Rehabilitation

Annual Roadway Improvements 2019-20

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Locations are subject to change based on annual need and resources. Seagull Wy from Cox Ave to Saratoga-Sunnyvale Rd, Arroyo De Arguello from Arroyo De Arguello to End, Corte De Arguello (N) from Arroyo De Arguello to End, Corte De Arguello (S) from Arroyo De Arguello to End, Comer Dr from Arroyo De Arguello to Diamonds Oaks Ct, Michaels Dr from Canyon View Dr to End, Montalvo Heights Dr from Montalvo Rd to End, Old Tree Way from Braemar Dr to Howen Dr, Lancaster Wy from Austin Wy to City Limits

Construction 07/2020 11/2020 10-20 2 10

Sunnyvale Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation

ST 18-10 Pavement Overlay of City Streets This project will include: Pavement Rehab/Repair (Existing) | Pavement Overlay

Noranda Dr - Homestead to west end; Mango Dr - Heathersone s/s to Knickerbocker n/s; Britton Ave. - Wolfe to Taylor; Taylor Ave. - Fair Oaks e/s to Britton; Old San Francisco Road (OSFR) Fair Oaks e/s to Gail ; OSFR - Gail to Wolfe w/s; Murphy - Olive s/s to El Camino Real n/s of island; Murphy - Iowa s/s to Olive n/s

Construction 01/2019 12/2019 10-20 13 24

Sunnyvale Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation

ST 18-10 Slurry Seal of Arterial Streets 2019B This project will include: Pavement Rehab/Repair (Existing) | Type 3 Slurry Seal

TASMAN DR: Fair Oaks e/s to Vienna - Vienna to Lawrence Expwy - Lawrence expwy e/s to Birchwood - Birchwood to Adobe Wells - Adobe Wells to Reamwood - Reamwood to w/side channel; WOLFE RD: Evelyn to reed/OSFR - Reed/OSFR to Iris - Iris to Gary - Gary to Maria - Maria to El Camino Real; JAVA DR: Mathilda to Bordeaux - Bordeaux to Borregas - Borregas to Geneva -Geneva to Crossman - Crossman to 237 overpass

Construction 01/2019 12/2019 10-20 1 1

Santa Cruz Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation

Arterial and Collector Street Reconstruction

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | Reconstruct portions of River Street and Water Streets, both arterial streets near Downtown Santa Cruz. Projects includes new access ramps,CIR paving, green bike lanes, and crosswalks.

River Street, between Water and Highway and Water Street, between Branciforte and Pacific. Construction 07/2019 06/2020 15-20 17 29

Santa Cruz Santa Cruz 19/20 New Other Catch Basin Replacement Citywide FY 19/20

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing) | Upgrade old catch basins within the city street system to reduce flooding and improve road user safety

Chestnut Street; May Avenue; Beach Flats neighborhood; West Cliff; Water Street; River Street Construction 07/2019 06/2020 30-50 17 29

Santa Cruz Santa Cruz 19/20 New Other Corrugated Metal Pipe (CMP) Replacement Citywide FY 19/20

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Replace deteriorated CMP storm drains within the city street system to reduce flooding, street caveins and improve road user safety. There are 54 miles of storm drains and approximately 10% are CMP.

Chestnut Street; May Avenue; Beach Flats neighborhood; West Cliff; Water Street; River Street Construction 07/2019 06/2020 30-50 17 29

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 93: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz Santa Cruz 19/20 New Road Maintenance & Rehabilitation Storm Damage FY 19/20

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Local match funding for FEMA and OES eligible federal storm damage restoration projects on the City street and multi-use path system. | These locations were initially proposed from FY 17/18/ Project was completed but these locations were not fulfilled in the completion.

West Cliff Drive at San Jose, East Cliff Drive at 3rd Ave Construction 07/2019 06/2020 30-50 32 57

Capitola Santa Cruz 19/20 New Complete Streets Components Park Avenue Sidewalks

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

The north side of Park Avenue between McCormick Avenue and Cabrillo Street. Construction 06/2019 11/2019 50-50 17 29

Scotts Valley Santa Cruz 19/20 New Road Maintenance & Rehabilitation

Kirkorian Court, Burlwood Drive, Sunset Terrace, Victor Square, Alto Solo Court, Lunar Court.

This project will include: Cost Estimating, Maintenance Program Plan Development, Document Preparation

Kirkorian Court, Burlwood Drive, Sunset Terrace, Victor Square, Alto Solo Court, Lunar Court. Pre-Construction 10/2019 04/2020 10-15 34 72

Watsonville Santa Cruz 17/18 Carried Over Road Maintenance & Rehabilitation

Green Valley Rd (Freedom Blvd to City Limits)

This project will include: Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Green Valley Rd from Freedom Blvd to City Limits Construction 07/2019 06/2020 20-20 17 30

Watsonville Santa Cruz 19/20 Forecasted Road Maintenance & Rehabilitation

Airport Blvd Pavement Reconstruction

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Includes design, environmental documentation and construction.

Airport Blvd from Freedom Blvd to 600 feet west Pre-Construction & Construction

01/2019 07/2019

06/2019 06/2020 20-20 2 4

Anderson Shasta 17/18 Carried Over Road Maintenance & Rehabilitation North Street Cape Seal Project This project will include: Pavement Rehab/Repair (Existing) North Street from SR 273 to the North Street Bridge Construction 09/2019 06/2020 8-10 1 1

Anderson Shasta 17/18 Carried Over Road Maintenance & Rehabilitation City Wide Grinder Dig-out Project

This project will include: Pavement Rehab/Repair (Existing) | Conduct grinder dig-outs on sections of failing pavement. Dig-outs will vary between 4' wide and 12' wide depending on width of pavement failure for length of failure. Depth will vary between 3" and 6" depending on roadway Traffic Index number.

May include North Street, South Street, Riverside Avenue, Bruce Street, Stingy Lane, Balls Ferry Road, Silver Street, Diamond Street, Briggs Street, First Street, Marmac Road, Bay Street, McMurray Drive, East Street, and Oak Street.

Construction 09/2019 06/2020 15-20 1 1

Anderson Shasta 17/18 Carried Over Road Maintenance & Rehabilitation Anderson Heights Cape Seal Project This project will include: Pavement Rehab/Repair (Existing) | Cape Seal streets in Anderson

Heights neighborhood. Pinion, Larch, Lodgepole, Aspen, Spruce, Hemlock and Jefferies Streets and Avenues Construction 09/2019 06/2020 8-10 1 1

Anderson Shasta 19/20 Carried Over Road Maintenance & Rehabilitation City Wide Grinder Dig-out This project will include: Pavement Improvement (New) | Remove and replace sections of

failing pavement. South Street from Emily Drive to SR273 and North Street from North Way to Sharron Avenue Construction 09/2019 06/2020 20-30 1 1

Redding Shasta 19/20 Carried Over Road Maintenance & Rehabilitation 2018-19 Cape/Slurry Seal This project will include: Pavement Rehab/Repair (Existing) | Residential cape and slurry seal.

Servicing at minimum 7 streets Canby Rd., Browning St.,Old Alturas Rd., Victor Ave., Woodside Meadows, Alfreda Way, Reservoir Ln., and various other streets. Construction 06/2020 09/2020 5-12 1 1

Redding Shasta 19/20 In-Progress Safety Bonnyview Safe Routes to School

This project will include: Document Preparation, Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Active Transportation Plan, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | Widen Bidwell Lane and North Bonnyview Road to add bicycle and pedestrian facilities including sidewalk and enhanced crosswalks to/from Bonnyview Elementary School.

Bidwell Lane and North Bonnyview road to East Bonnyview Road. Pre-Construction & Construction

01/2015 05/2020

09/2019 09/2020 15-30 1 1

Redding Shasta 19/20 New Road Maintenance & Rehabilitation General Maintenance

This project will include: Public Works Staffing, Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear | General Maintenance to include, but not limited to pothole patching, crack sealing, street signs, street striping, etc.

Citywide Procurement / Operational Needs 07/2019 06/2020 1-5 1 1

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 94: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Redding Shasta 17/18 In-Progress Complete Streets Components Bechlli Lane ATP Improvements

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Active Transportation Plan, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Project includes a road diet, sidewalk gap closure, ADA curb ramps, buffered bike lanes and enhanced pedestrian crossings

Bechelli Lane from Cypress Avenue on the North to Riverview Country Club. Bechelli; Ln. from S. Bonnyview to Cypress Ave.; (2.3 mi). Loma Vista Dr. from Bechelli Ln; to Churn Creek Rd. (.5 mi)

Pre-Construction & Construction

03/2018 08/2021

05/2021 05/2022 10-15 23 40

Shasta Lake Shasta 17/18 Carried Over Other Moody Creek Bridge Replacement

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Bridge Structure Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, Right of Way, Project Scope Development | Replace bridge.

Cascade Boulevard @ Moody Creek Pre-Construction & Construction

06/2018 04/2022

03/2022 08/2025 50-75 1 1

Shasta Lake Shasta 19/20 New Road Maintenance & Rehabilitation

Pine Grove Avenue Improvements 2019 This project will include: Pavement Rehab/Repair (Existing) Pine Grove Avenue between Ashby Road and Interstate 5, Shasta Lake, CA Construction 07/2019 12/2019 10-20 27 41

Loyalton Sierra 17/18 Carried Over Road Maintenance & Rehabilitation Rail Road and Lewis This project will include: Preparation and plans and specification to repair curbs and roadway

damaged in the flood of 2017. Railroad Ave and Lewis Ave Pre-Construction 08/2019 08/2020 3-5 1 1

Loyalton Sierra 19/20 Carried Over Road Maintenance & Rehabilitation City of Loyatlon

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing) | Chip Seal and Slurry on all city streets, New Stop Signs, Fix pothole on city streets

Street Boundaries Include: Poole Ln, Beckwith Rd, White St, Jones St, Zollinger St, Meeker St, 1st St, 2nd St, 3rd St, 4th St, E 2nd St, W 3rd St, N 5th St, Church St, Court Ln, Pine St, Railroad Ave, School St, Front St, E Lewis St, Mill St, Taylor Ave, Granite Ave, Patterson Ave, Cemetery Rd, Hill St. All locations have yet to be finalized and are subject to change. Each location will be selected based on priority need and resources throughout the year.

Construction 08/2019 08/2020 5-10 33 63

Dorris Siskiyou 17/18 Carried Over Road Maintenance & Rehabilitation 2018-19 Street Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Rehabilitation & maintenance of a local roadway E. Fourth Street from Pine to Center Juniper St. from Hwy 97 to Hazen St. Construction 06/2019 09/2019 20-30 12 21

Dunsmuir Siskiyou 19/20 Carried Over Road Maintenance & Rehabilitation Asphalt crack sealing This project will include: Pavement Rehab/Repair (Existing) | Crack seal existing streets

Various streets in Dunsmuir as funds allow. From east to west, the streets would include from “Castle” to “Sacramento.” And from south to north, the streets would include from “Vernie” to “Linda Place.” This area includes approximately 40 streets. The Public Works Director has a list of streets with the highest priority need for crack fill projects - with streets Gray, Branstetter, and Fourth having the most need.

Construction 07/2019 06/2020 3-3 1 1

Dunsmuir Siskiyou 19/20 New Safety Sidewalk repairs This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing) Along Dunsmuir Ave. between Spruce and Branstetter Construction 07/2019 06/2020 1-10 1 1

Dunsmuir Siskiyou 19/20 New Safety Bike/Pedestrian Safety Project This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Bicycle Lane (New), ADA Curb Ramp Rehab/Repair (Existing) Dunsmuir Ave bike lane, and Sacramento Ave bike lane Construction 07/2019 06/2020 1-10 13 24

Etna Siskiyou 17/18 Carried Over Road Maintenance & Rehabilitation City of Etna - Street Repair 2019

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitation & maintenance of a local roadway | The City of Etna - Street Repair 2019 consists of two projects previously adopted in separate Fiscal Years that have been combined for delivery and cost effectiveness.

Main Street, Charles Street, Bryan Street, Cleveland Street Construction 06/2019 06/2020 20-40 2 2

Fort Jones Siskiyou 17/18 Carried Over Road Maintenance & Rehabilitation

Town of Fort Jones Strategic Paving, Preventive and Planning project;

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing) | Crack sealing, surface sealing, removal and replacement of failed roadway sections and associated work on various Town streets to maintain good condition | While the Town has a recent PCI survey for reference, determining the most effective use of limited funds requires actual observation of the streets and prioritizing to achieve the best use of funds.

Possible locations include but are not limited to: Main St, Scott River Rd, Dale Ave, Mittan Way, Mathews St, Serpa Ln, Bridge St, Carlock St, Newton St, East St, Sterling St, Diggles St, Bower St, Butte St, Oak Miller Dr, High St, Sterling St, Pine St, Jane Dr, Fern Way, Allison Way, Cowan St, Don St, Douglas St, Marble View Dr, North Main St, Fort Jones Rd. All locations listed are an estimate and have yet to be finalized.

Construction 01/2019 02/2019 5-15 2 2

Montague Siskiyou 19/20 New Road Maintenance & Rehabilitation Chip Seal This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair

(Existing Safety), Pavement Rehab/Repair (Existing) Webb Street Construction 07/2019 06/2020 5-10 1 1

Mount Shasta Siskiyou 19/20 New Road Maintenance & Rehabilitation 2019/20 Chip Seal Project This project will include: Pavement Rehab/Repair (Existing)

Southwest quadrant of the City on the west side of, and including portions of, North and South Mt. Shasta Boulevard; Northeast quadrant East of Mt. Shasta Boulevard and North of Lake Street; McCLoud Avenue; and Lake Street.

Construction 07/2019 09/2019 5-10 13 24

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 95: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Tulelake Siskiyou 19/20 New Road Maintenance & Rehabilitation

2019-2020 Crack Seal, Chip Seal, Oil & Fog Seal - Highway and Siskiyou Streets

This project will include: Pavement Rehab/Repair (Existing) City of Tulelake- Road surface repair of crack seal, oil and fog seal of Highway Street between First Street and Siskiyou Street. Crack seal, chip seal, oil and fog seal Siskiyou Street between Highway Street and B Street.

Construction 07/2019 08/2019 15-20 8 12

Weed Siskiyou 19/20 New Road Maintenance & Rehabilitation Davis Street Rehab This project will include: Pavement Rehab/Repair (Existing) Davis Street Weed CA Pre-Construction &

Construction 10/2019 05/2020

11/2019 08/2020 5-15 26 50

Yreka Siskiyou 19/20 New Road Maintenance & Rehabilitation

City of Yreka 2019 Strategic Paving, Preventive and Planning project

This project will include: Pavement Rehab/Repair (Existing) | Strategic chipsealing and other appropriate maintenance of City of Yreka streets.

Gold St.; French St.; Meadowlark St.; Evergreen St.; Lawrence St.; Sunrise Ave.; Shadow Lane; Lewis St.; Dawn St.; Emerson St.; Shasta Ave.; South St.; Lane St.; S. West St.; West St.; Miner St.

Construction 07/2019 06/2020 5-15 23 42

Benicia Solano 17/18 Carried Over Road Maintenance & Rehabilitation Street Resurfacing 2019 Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Grind, overlay, adjust utility valves, and striping

Noyes Ct (Industrial Way to end of court); Bayshore Rd (East Channel Rd to Industrial Way); East Channel Rd (Channel Rd to Bayshore Rd); Denfield Ave (Military West to 650ft north of Military West); West 2nd St (W-N St to Raymond Dr); Harbor Vista Ct West 5th (Military to W-J St); West 6th (Cove Way to W-K St); East 3rd (I780 to Hillcrest); Shirley Dr (Raymond Dr to Bridgeview Ct); West I St (W-6th to W-5th)

Construction 07/2019 10/2019 20-25 3 14

Dixon Solano 19/20 New Road Maintenance & Rehabilitation

Fiscal Year 2019/20 Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | Slurry seal, crack seal and asphalt dig-out repairs and replacement of traffic striping on various streets within the City of Dixon.

North part of the town's local streets from Alexander Ct to Yeomen Ct. Complete list of streets is presented in the attached Resolution No. 19-062.

Pre-Construction & Construction

09/2019 04/2020

04/2020 09/2020 5-7 1 1

Fairfield Solano 19/20 New Road Maintenance & Rehabilitation 2019 Pavement Maintenance Project This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair

(Existing)

Capitola Way (Waterman Blvd to Woodcreek Dr),; Woodcreek Drive (Capitola Wy to Oliver Rd),; Intersection of Air Base Parkway and Heath Drive; Travis Boulevard (Eisenhower St to Sunset Ave).

Construction 07/2019 06/2020 12-20 14 26

Rio Vista Solano 19/20 New Road Maintenance & Rehabilitation McCormick Road Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The County of Solano will be delivering this project as they will reconstruct the entire roadway which includes about 1/2 mile within the city limits and 7 miles of roadway in the county.

City of Rio Vista section of McCormick Road about 1/2 mile Construction 07/2020 06/2021 30-40 5 12

Suisun City Solano 19/20 New Road Maintenance & Rehabilitation Crack Seal and Slurry Seal This project will include: Cost Estimating, Maintenance Program Plan Development,

Document Preparation, Pavement Rehab/Repair (Existing)

Floyd Ct (Craven Ct to Cul-de-sac), Capistrano Dr (Montebello to Bella Vista), Catamaran Wy, Harbor Park Dr, Breakwater Cir, Catalina Cir, Anderson Dr (E Flood Channel to Lawler Ranch Pkwy), Hoyt Ct, Main St ( Lotz Wy to Cordelia St), Lawler Ranch Pkwy (Mayfield Cir to Potrero St), Village Dr (Leafwood Ct to Railroad Ave)

Pre-Construction & Construction

07/2019 04/2020

03/2020 06/2020 20-50 3 11

Suisun City Solano 19/20 New Road Maintenance & Rehabilitation

Cape Seal, Digouts, ADA Ramp Upgrades

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Heron Dr (620' S of Blue Jay Dr to Blue Jay Dr), Emperor Ct, Brian Ct, Charles Wy (Worley Rd to Philip Wy), Winters Wy (E of Hidden Cove Wy to Westwind Wy), Olive Ave (E Tabor to 613 ft S E Tabor)

Pre-Construction & Construction

07/2019 04/2020

03/2020 06/2020 10-30 3 11

Suisun City Solano 19/20 New Road Maintenance & Rehabilitation

Rubberize Cape Seal, Digouts, ADA Ramp Upgrades

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Whispering Bay Ln (Driftwood Dr to Francisco Dr), Village Dr (Leafwood Ct to Hwy 12)

Pre-Construction & Construction

07/2019 04/2020

03/2020 06/2020 10-30 13 24

Vacaville Solano 19/20 New Road Maintenance & Rehabilitation Vacaville AC Overlay

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Vaca Valley Parkway (Various sections from Browns Valley Parkway to I-80); Orchard Avenue (north of Fruitvale Rd); Monte Vista Ave (Chandler St. to Orchard Ave.); Alamo Drive (Various sections west of I-80); Beelard Road (Peabody Rd to Marshall Rd); Davis Street (Hume Wy to Alamo Dr);

Construction 06/2020 10/2021 10-25 3 14

Vallejo Solano 19/20 New Road Maintenance & Rehabilitation

Citywide Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing)

Wilshire Ave, Saunders Dr, Delwood St, Barcelona St, Dillon Dr, Rome Dr, Lorenzo Dr, Diana Dr, Benson Ave, Scenic Way, Mayo Ave, Thirteenth St, Calaveras St, Castlewood Dr, Florence Ct, Valle Vista Ave, Moorland St

Construction 07/2019 06/2020 15-20 3 14

Vallejo Solano 19/20 New Road Maintenance & Rehabilitation Pavement Rehab - Mini Drive This project will include: Pavement Rehab/Repair (Existing) Mini Drive between Jack London Drive and Echo Summit Road Pre-Construction &

Construction 07/2019 04/2020

12/2019 06/2020 10-20 19 37

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 96: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Cloverdale Sonoma 19/20 Forecasted Road Maintenance & Rehabilitation

4th Street Reconstruction - 18/19 Carryover

This project will include: Pavement Rehab/Repair (Existing) | Reconstruct 4th Street from North Jefferson Street (eastern boundary) to street end (western boundary) with new AC paving - 18/19 Carryover.

City of Cloverdale, 4th Street from North Jefferson Street (eastern boundary) to street end (western boundary). Construction 11/2019 10/2020 15-20 2 2

Cotati Sonoma 19/20 New Road Maintenance & Rehabilitation

2019 Street Construction and Improvements

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Linden Avenue from Lincoln Avenue to Larch Avenue. Construction 07/2019 09/2019 8-10 22 48

Healdsburg Sonoma 19/20 New Road Maintenance & Rehabilitation

Pavement Preservation Maintenance Project 2020 This project will include: Pavement Rehab/Repair (Existing) Within the City limits of Healdsburg, CA:; Grove Street from Dry Creek Road to

Chiquita Road; Highland Circle - Entire limits Construction 06/2019 08/2019 5-7 23 42

Petaluma Sonoma 19/20 New Road Maintenance & Rehabilitation Pavement Restoration 19/20

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This project includes approximately 24,525 SY of Full Depth Reclamation reconstruction, 33,231 SY of High-Volume Slurry Seal treatment and 9,600 LF of crack sealing. This project will also include asphalt dig outs, new curb ramps, sidewalk repair, striping and signage. On average, crack sealing will extend useful life 2 to 4 years, high volume slurry seal treatment 5 to 8 years, and full depth reclamation reconstruction 18 – 20 years.

Maria Drive, Sonoma Mountain Pkwy to Rainier; B Street, Fifth St to Webster; Caulfield Lane, Lakeville St to Railroad Tracks; Crinella Drive, McGregor Ave to Bungalow Ln; East Madison St, McDowell Blvd to Maria Dr; Magnolia Ave, Petaluma Blvd to Samuel Dr; Washington St, Howard St to River; Caulfield Ln, McDowell Blvd to Saint Francis Dr;

Construction 05/2020 10/2020 3-20 32 58

Rohnert Park Sonoma 17/18 In-Progress Road Maintenance & Rehabilitation East Cotati Avenue Rehabilitation

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement rehabilitation (asphalt overlay with pavement fabric reinforcement), replacement of existing Class 2 bike lanes | This timing of this project is highly dependent on the undergrounding of PG&E utilities along the project segment.

East Cotati Avenue (Snyder Lane to City Limit at Sunflower Way, east of SMART railroad tracks)

Pre-Construction & Construction

03/2019 03/2020

02/2020 07/2020 20-30 3 4

Rohnert Park Sonoma 19/20 New Traffic Control Devices Traffic Signal Component Upgrades This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety)

Rohnert Park Expressway - Labath Avenue to Knight Road; Golf Course Drive -Dowdell Avenue to Hillview Way; Commerce Boulevard - Redwood Drive to Avram Avenue; Snyder Lane - Circulo Grande to East Cotati Avenue

Pre-Construction & Construction

08/2019 01/2020

12/2019 07/2022 6-9 3 4

Rohnert Park Sonoma 19/20 New Complete Streets Components

Rohnert Park Expressway / State Farm Traffic Improvements Project

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Project Scope Development

Rohnert Park Expressway between Commerce Boulevard and SMART Pathway; State Farm Drive from Rohnert Park Expressway to Enterprise Drive; Enterprise Drive from Seed Farm Drive to State Farm Drive

Pre-Construction & Construction

07/2019 07/2020

06/2020 10/2021 12-17 3 4

Rohnert Park Sonoma 19/20 Carried Over Road Maintenance & Rehabilitation

2019-2022 Pavement Management (Cape Seal Project)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety)

Golf Course Drive between Country Club Drive and Hillview Way Pre-Construction & Construction

10/2019 07/2020

07/2020 10/2020 6-10 3 4

Rohnert Park Sonoma 19/20 In-Progress Road Maintenance & Rehabilitation

2019-2022 Pavement Management (Asphalt Overlay)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Asphalt overlay, which is a new pavement section (generally 1.5″ – 2″ thick) placed over the top of an existing pavement surface. Also partial base reconstruction.

Country Club Drive between Rohnert Park Expressway and Eleanor Avenue Pre-Construction & Construction

03/2019 06/2019

05/2019 08/2019 6-10 26 66

Santa Rosa Sonoma 19/20 New Road Maintenance & Rehabilitation

Sonoma Avenue Pavement Rehabilitation - Bobelaine Drive to E St

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing)

Sonoma Avenue between Bobelaine Drive and E St Pre-Construction & Construction

08/2021 03/2022

02/2022 09/2022 20-20 38 71

Sebastopol Sonoma 19/20 Carried Over Complete Streets Components ADA Curb Ramps

This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing) | Bring curb ramps at crosswalks and intersections to current ADA standards. This is a necessary first step prior to repaving then adding bicycle lanes on the same streets, which are separate but integral parts of a larger project. | Design was completed 03/2017 and submitted to Caltrans for approval. Design and encroachment permit approved by Caltrans 03/2019. Expected to go to bid 05/2019-06/2019 with construction to begin during FY 19/20

30 crosswalk locations along SR 116: Gravenstein Highway, Main Street, Healdsburg Avenue, Petaluma Avenue, all in Sebastopol, CA Construction 12/2019 12/2020 8-20 14 31

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 97: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Sonoma Sonoma 19/20 New Road Maintenance & Rehabilitation 2019 Citywide Slurry Seal Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project will provide slurry seal street surface treatment for various street segments throughout the City of Sonoma. Auxiliary work in support of the slurry seal treatment includes surface preparation; crack seal; removal and replacement of pavement striping markings; protection of existing utility structures, curb and gutter, and cross gutter; and other related work.

Various street segments throughout the City of Sonoma. Street segments could include the following: Sanders Drive (from Brockman Lane to Fifth Street East), Andrieux Street (Third Street West to Second Street West), Linda Drive (Fifth Street West to Fourth Street West), Andrieux Street (Cul de Sac to Fifth Street West), Spain Street (First Street East to First Street West), West Spain Street (Sonoma Hwy to Junipero Serra Drive), and West MacArthur Street (First Street West to Broadway).

Construction 09/2019 11/2019 3-5 8 5

Windsor Sonoma 19/20 New Road Maintenance & Rehabilitation

2019-2020 Town-Wide Street Resurfacing Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Residential streets in the southeast quadrant of the town, the Elsbree neighborhood in the northeast, and the old downtown area of Windsor. Construction 07/2019 10/2019 5-10 2 2

Windsor Sonoma 19/20 New Safety Windsor River Road/Windsor Road Intersection Improvements

This project will include: Roundabout Installation (New), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Environmental Study/Documents, Preliminary Design | The project will improve vehicular, bicycle and pedestrian circulation.

Intersection of Windsor River Road and Windsor Road Pre-Construction & Construction

04/2019 07/2020

11/2019 09/2021 15-20 3 4

Ceres Stanislaus 19/20 New Complete Streets Components

Whitmore Ave. Rehab and Improvements

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing)

Generally located in east Ceres on Whitmore Avenue between Mitchell Road and Faith Home Road. Construction 08/2019 11/2019 15-35 12 21

Ceres Stanislaus 19/20 New Road Maintenance & Rehabilitation Pine/Park Street Improvements

This project will include: Roundabout Installation (New), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Document Preparation, Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Generally in Central Ceres. Pine and Park Streets between Central Ave. and 9th Street.

Pre-Construction & Construction

07/2019 06/2020

03/2020 11/2020 15-35 12 21

Hughson Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Whitmore Avenue Slurry Seal This project will include: Cost Estimating, Document Preparation Whitmore Avenue from east of Tully Road to Charles Street Pre-Construction 09/2019 10/2019 5-7 8 12

Hughson Stanislaus 17/18 Carried Over Safety Whitmore Avenue Pedestrian Improvement Project and Overlay

This project will include: Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New) | Construct new pedestrian and bicycle improvements on Whitmore Avenue, including sidewalk and bicycle lane, across BSNF Rail Lines

Whitmore Avenue from east of Tully Road to Charles Street Construction 05/2020 08/2020 10-30 8 12

Hughson Stanislaus 19/20 New Road Maintenance & Rehabilitation

Santa Fe Avenue 2" Overlay Project-Phase II This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) Santa Fe Avenue from Whitmore Avenue to 7th Street Construction 10/2019 12/2019 10-15 8 12

Hughson Stanislaus 19/20 New Complete Streets Components Locust Street Improvement

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Installation (New), Pavement Improvement (New)

Locus Street between Orchard Lane and Euclid Avenue Construction 07/2019 08/2019 40-60 37 74

Modesto Stanislaus 19/20 New Road Maintenance & Rehabilitation Residential Slurry Seal Type II This project will include: Pavement Rehab/Repair (Existing)

Monticello/Crater Area; Ustick Rd, Hatch Rd, Crater Ave; Crater Ave, Ustick Rd, Dead End; Cartwright Ct., Crater Ave, End of Court; Feather River Ct., Crater Ave, End of Court; Bollinger Ct., Crater Ave, End of Court; Seine Dr., Crater Ave, Fall River Dr.; Fall River Rd., Seine Dr., Dead End; Mawana Ct., Fall River Rd., End of Court; Maura Ct., Fall River Rd., End of Court; Dallas St., Crater Ave, Hatch Rd.; Danuba Ct., Dallas St., End of Court; Crater Ct., Crater Ave, End of Court; Malos Ct.

Construction 05/2019 09/2019 5-7 5 21

Modesto Stanislaus 19/20 New Road Maintenance & Rehabilitation Crack seal and asphalt digout repairs This project will include: Pavement Rehab/Repair (Existing)

Wade Ave, Paradise, Rouse; Rouse Ct, Wade, End; White Dove Ct, Rouse Ave, End; Rouse Ave, Wade, Sutter; Hammond, Rouse Ave, Rodertson; Toya Ct, Hammond, End; Guthmiller, Hammond, Walnut; Theron, Hammond, Walnut; Cynthia, Hammond, Walnut; Walnut, Rouse Ave, Red Pine; Red Pine, Hammond, Crippen; MiMi Wy, Walnut, Crippen; Crippen Ave, Yellow Pine, Kirschen Dr; Lone Pine, Crippen, Bristlecone wy; Bristlecone wy, Lone Pine, Kirschen Dr; Kirschen Dr, Crippen, Pine Tree; Stone Pine, Bristlecone wy, Ye

Construction 10/2019 04/2020 5-7 5 21

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 98: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Modesto Stanislaus 19/20 New Safety Traffic signal and street lighting maintenance

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Signals and lighting throughout Modesto Exact locations will be provided as projects are completed Construction 07/2019 06/2020 8-10 5 21

Modesto Stanislaus 19/20 New Safety High voltage street light maintenance This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Neighborhoods throughout Modesto Exact location will be provided as projects are completed. Construction 07/2019 06/2020 8-10 5 21

Modesto Stanislaus 19/20 New Safety Traffic sign and striping maintenance This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Exact location will be provided as projects are completed. Construction 07/2019 06/2020 5-7 25 41

Newman Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation 2018-19 SB-1 This project will include: Pavement Rehab/Repair (Existing) | Crack seal, slurry and stripe.

Small pavement replacement (potholes).

T Street from Yolo Avenue to Inyo Avenue; Kern Street from Main Street to T Street; Fresno Street from Main Street to T Street; Tulare Street from Main Street to T Street; Mariposa Street from Main Street to T Street

Construction 08/2019 05/2020 5-10 12 21

Newman Stanislaus 19/20 New Complete Streets Components 2019-20 SB-1 This project will include: Pavement Rehab/Repair (Existing) | Crack seal various local roads

The City of Newman maintains 41 miles of streets/roads all located within the city limits of the City. Street boundaries include Sherman Parkway to Great Basin Drive and Hills Ferry Road to Tamarack Court. All locations listed for crack sealing are an estimate and have yet to be finalized.

Construction 08/2019 05/2020 5-10 37 74

Oakdale Stanislaus 19/20 New Road Maintenance & Rehabilitation Area 1 Slurry Seal This project will include: Pavement Rehab/Repair (Existing) | Local streets to be slurry sealed Bounded generally by J street to the north, Sierra Road to the south, Orsi Road

to the east and Buccaneer Avenue to the west. Construction 07/2019 08/2019 5-7 8 12

Oakdale Stanislaus 19/20 New Road Maintenance & Rehabilitation South Yosemite Avenue Cape Seal This project will include: Pavement Rehab/Repair (Existing) | Apply rubberized cape seal in

the drive lanes South Yosemite Avenue, south of Warnerville Road to the south City Limit line Construction 09/2019 10/2019 5-7 9 18

Patterson Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation

FDR 2" HMA/9" AB - Streets Submitted FY 18/19

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | FDR 2" HMA/9" AB

Poppy:clover to Del Puerto;Canyon: Poppy to end; Hansen: Poppy to end; Kinshire: Clover to Del Puerto; Klopping: Kinshire to end; S 9th: Kinshire to Sperry; De Lash: Kinshire to end; Agadoni: Kinshire to end; Clover: Poppy to Sperry; Del Puerto: Poppy to Sperry; Amberina CT: Ambernia to end; Ambernina Dr: Ambernia Ct to Del Puerto; Bonneau: 9th to end; *All locations subject to change, and will be selected based on priority, need and resources throughout the year.

Construction 10/2019 08/2020 15-20 12 21

Patterson Stanislaus 19/20 In-Progress Road Maintenance & Rehabilitation

2.5" AC Overlay - Streets Submitted FY 18/19

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | 2.5" AC Overlay Street Segments throughout E Las Palmas Ave; Sperry Ave Construction 10/2019 08/2020 10-15 31 61

Riverbank Stanislaus 19/20 New Road Maintenance & Rehabilitation Road Reconstruction This project will include: Pavement Rehab/Repair (Existing) Santa Fe Street - 4th Street to 8th Street Construction 02/2020 04/2020 7-10 5 12

Riverbank Stanislaus 19/20 New Road Maintenance & Rehabilitation Double Fiber Slurry This project will include: Pavement Rehab/Repair (Existing)

Santa Fe Street - 4th Street to 8th Street, Stanislaus Street - 3rd to 6th, Sierra Street - 1st to 8th, Aspen Lane - S. Rosebrook to Green Oaks Drive, Aspen Court - S. Rosebrook to End, Green Oaks Drive - S. Rosebrook to South End, Green Oaks Court - S. Rosebrook to End, S. Rosebrook - Roselle Avenue to Pierce lane, Santa Fe Street - Claus Road to 300 ft. East

Construction 02/2020 04/2020 7-10 1 4

Turlock Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Road Maintenance Worker 1 This project will include: Public Works Staffing Citywide Procurement /

Operational Needs 07/2019 06/2020 1-10 8 12

Turlock Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Road Maintenance Worker 2 This project will include: Public Works Staffing Citywide Procurement /

Operational Needs 07/2019 06/2020 1-10 8 12

Turlock Stanislaus 19/20 In-Progress Road Maintenance & Rehabilitation Hot Mix Asphalt This project will include: Material costs for road maintenance (pot hole). Citywide Procurement /

Operational Needs 07/2019 06/2020 1-10 8 12

Turlock Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Hot Mix Truck and Trailer This project will include: Procurement of Public Works Equipment | Equipment costs for road

maintenance (pot hole)(Truck and trailer for hauling and placing HMA) Citywide Procurement / Operational Needs 07/2019 06/2020 10-20 8 12

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 99: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Turlock Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Thermoplastic Trailer This project will include: Procurement of Public Works Equipment | Equipment costs for

thermoplastic (striping)(increase visibility of striping) Citywide Procurement / Operational Needs 07/2019 06/2020 10-20 8 12

Turlock Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Thermoplastic Material This project will include: Procurement of Road Maintenance and Rehab Materials | Material

costs for thermoplastic (striping)(increase visibility of striping) Citywide Procurement / Operational Needs 07/2019 06/2020 5-10 8 12

Turlock Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Lander and Hawkeye Rehab

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Road rehabilitation (inlay and overlay) of Lander Avenue and Hawkeye. Install missing segments of sidewalk and reconstruct curb ramps. Install new stripping and crosswalks.

On Lander Avenue from South Ave. to Glenwood and on Hawkeye Ave. from Olive to Daubenberger. Construction 07/2019 06/2020 15-25 8 12

Turlock Stanislaus 19/20 New Road Maintenance & Rehabilitation Slurry Seal This project will include: Pavement Rehab/Repair (Existing)

Slurry Seal on streets City Wide, generally bounded by Taylor Road to the north, Washington Road to the west, Glenwood Avenue to the south and Daubenberger Road to the east

Construction 07/2019 06/2020 5-7 8 12

Turlock Stanislaus 19/20 New Traffic Control Devices Maintain Transportation Facilities -Traffic Signals

This project will include: Repair and Servicing of Public Works Equipment | Maintain Traffic Signals City Wide

Streets bounded by Taylor Road to the north, Washington Road to the west, Glenwood Avenue to the south and Daubenberger Road to the east

Procurement / Operational Needs 07/2019 06/2020 5-7 8 12

Turlock Stanislaus 19/20 New Traffic Control Devices Maintain Transportation Facilities -Street Lights

This project will include: Repair and Servicing of Public Works Equipment | Maintain Street Lights City Wide

Streets bounded by Taylor Road to the north, Washington Road to the west, Glenwood Avenue to the south and Daubenberger Road to the east

Procurement / Operational Needs 07/2019 06/2020 5-7 37 68

Waterford Stanislaus 19/20 New Road Maintenance & Rehabilitation 2019/2020 Slurry Seal Project This project will include: Pavement Rehab/Repair (Existing) Various Locations in town west of F street Construction 06/2019 08/2019 7-12 17 30

Live Oak Sutter 19/20 Carried Over Road Maintenance & Rehabilitation Kola Street Reconstruction

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct and improve Kola St from Larkin Rd to N St in coordination with the Highway 99 Streetscape Project beginning in 2020

Kola Street from Larkin Rd to N St Construction 07/2019 07/2020 20-20 4 3

Live Oak Sutter 19/20 New Road Maintenance & Rehabilitation Highway 99 Widening This project will include: Preliminary Design | Utility Relocation and Repair Highway 99 Ash Street to Ramsdell Pre-Construction &

Construction 12/2017 01/2020

12/2019 12/2020 20-20 4 3

Live Oak Sutter 17/18 Carried Over Road Maintenance & Rehabilitation

Pennington Road Complete Streets Rehabilitation

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct Pennington Road between Connecticut Ave and Broadway after the installation of a new water main.

Pennington Road between Connecticut Avenue and Broadway Pre-Construction & Construction

10/2015 01/2020

12/2019 10/2020 20-40 7 16

Yuba City Sutter 19/20 New Road Maintenance & Rehabilitation Franklin Avenue Improvements

This project will include: Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | 3"-5" mill and AC overlay, roadway widening for bicycle lanes, installation of curb and gutter, parkway strip, sidewalk, ADA-compliant curb ramps, drainage improvements, striping and signage improvements.

Palora Avenue to Gray Avenue Construction 10/2019 04/2020 20-30 4 3

Yuba City Sutter 19/20 New Road Maintenance & Rehabilitation Bridge Street Widening

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Installation (New), Bicycle Lane (New), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain/Culvert Installation (New) | Widening and complete reconstruction, installation of curb and gutter, ADA-compliant curb ramps, shared-use sidewalk, landscaped medians, and striping improvements.

Gray Avenue to Cooper Avenue Construction 03/2020 04/2021 30-50 4 3

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 100: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Corning Tehama 17/18 In-Progress Road Maintenance & Rehabilitation

Annual Maintenance/Rehabilitation Project

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Hoag Street between Solano and Tehama Street,; Colusa Street between Houghton Ave. and 3rd Street,; Tommes Avenue between Solano Street and Blackburn Ave; 2nd Street between Solano Street and Fig Lane, and South Street between 2nd Street and Marguerite Ave.

Pre-Construction & Construction

05/2019 04/2020

09/2019 06/2020 7-18 4 3

Red Bluff Tehama 19/20 New Road Maintenance & Rehabilitation South Jackson Street Reconstruction

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

South Jackson Street between Oak Street and Luther Road Pre-Construction & Construction

06/2019 09/2019

08/2019 12/2019 5-7 4 3

Red Bluff Tehama 19/20 New Road Maintenance & Rehabilitation South Main Street Reconstruction

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

South Main Street between Oak Street and Luther Road Pre-Construction & Construction

06/2019 03/2020

08/2019 06/2020 5-7 4 3

Red Bluff Tehama 17/18 Carried Over Road Maintenance & Rehabilitation Walnut Ave. Overlay

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents | Microsurfacing of halfwidth of Walnut Street between Paskenta and David. Complete the resurfacing that has occurred as part of Courthouse project.

Walnut Street between Paskenta and David Pre-Construction & Construction

03/2019 08/2019

06/2019 09/2019 5-7 1 1

Tehama Tehama 19/20 New Other Concreted Rock Slope Protection: East Gyle

This project will include: Addition of concrete / rock shoulder protection to prevent washouts every time the area has sheet flooding. | Part of this area was repaired last year, but not adequately to keep it was washing out again with 3 different flood events. We plan to add additional rock and concrete to a larger area.

East Gyle in City of Tehama Construction 07/2019 10/2019 20-30 28 75

Dinuba Tulare 17/18 Carried Over Road Maintenance & Rehabilitation Pamela Avenue Reconstruction

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design | Reconstruction of roadway | This project is being carried over to FY 18/19 for Design and Construction.

On Pamela Ave. from Lillie Ave. to Quail Run Dr. Pre-Construction & Construction

12/2018 04/2019

02/2019 06/2019 20-30 14 26

Dinuba Tulare 17/18 Carried Over Road Maintenance & Rehabilitation M Street Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | Grind and

overlay | This project will be carried over to FY 18/19 for design and FY 19/20 for construction On 'M' Street from Tulare St. to Fresno St. Pre-Construction & Construction

07/2019 09/2019

08/2019 12/2019 20-30 14 26

Dinuba Tulare 17/18 Carried Over Road Maintenance & Rehabilitation Kamm Ave. Grind and Overlay This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | Grind and

Overlay | This project will be carried over to FY 19/20 On Kamm Ave. from Alta Ave. to College Ave. Pre-Construction & Construction

08/2019 11/2019

09/2019 02/2020 20-30 14 26

Dinuba Tulare 19/20 Carried Over Road Maintenance & Rehabilitation Olive Way Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | Street

Reconstruction Olive Way from Crawford Ave. to Randle Ave Pre-Construction & Construction

11/2019 02/2020

12/2019 04/2020 20-30 14 26

Dinuba Tulare 19/20 Carried Over Road Maintenance & Rehabilitation

Nebraska & Crawford Avenue Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | Street Reconstruction Intersection of Nebraska Avenue & Crawford Avenue , Dinuba CA Pre-Construction &

Construction 01/2020 05/2019

02/2020 07/2019 20-30 14 26

Dinuba Tulare 17/18 Carried Over Road Maintenance & Rehabilitation Monte Vista Avenue Reconstruction This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | Road

reconstruction | This project will be carried over to FY 19/20 for design and construction. Monte Vista Ave. from El Monte Ave. to 800 feet south Pre-Construction & Construction

08/2019 12/2019

10/2019 02/2020 20-30 14 26

Dinuba Tulare 19/20 New Road Maintenance & Rehabilitation Kamm Ave Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Preliminary Design Kamm Ave from Alta Avenue to College Avenue Pre-Construction &

Construction 06/2020 01/2021

08/2020 04/2021 20-30 14 26

Dinuba Tulare 19/20 New Road Maintenance & Rehabilitation Sierra Way Reconstruction This project will include: Pavement Rehab/Repair (Existing), Preliminary Design Sierra Way from Monte Vista Drive to Alta Avenue Pre-Construction &

Construction 07/2020 11/2020

10/2020 03/2022 20-30 14 26

Dinuba Tulare 19/20 Carried Over Road Maintenance & Rehabilitation Euclid Avenue Reconstruction This project will include: Pavement Rehab/Repair (Existing), Preliminary Design Euclid Avenue from Bloomingdale to Saginaw Avenue Pre-Construction &

Construction 07/2020 11/2020

10/2020 03/2022 20-30 3 4

Exeter Tulare 19/20 Carried Over Road Maintenance & Rehabilitation

Downtown Streets Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitation of streets with Type 2 Slurry Seal and striping

Pine Street (F Street to Kaweah Ave), Rocky Hill Drive (between Kaweah and C Street), B-F Street (between Palm and Maple) Construction 08/2019 10/2019 8-10 2 10

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 101: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Farmersville Tulare 17/18 Carried Over Complete Streets Components W. Walnut Ave. Street Components

This project will include: Right of Way Acquisition, Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing) | Street components to be added are a 5 foot wide bike lane, a 100 foot median for the pedestrian refuge area, a new drive approach, and 6 reconstructed ADA curb returns.

The project is located in the City of Farmersville on W. Walnut Ave between N. June St. and Farmersville Blvd. This project is located in a residential zone. Construction 09/2019 02/2020 20-25 14 26

Farmersville Tulare 19/20 Carried Over Road Maintenance & Rehabilitation CAPE Seal Project

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | road maintenance to be performed using a chip seal and slurry seal known as a Cape Seal. All ramps within the area will be upgraded to ADA standards (approximately 23)

The project is located in the City of Farmersville, CA. the project is on the east side of S. Farmersville Blvd. The project is located within the boundaries of E. Oakland St. which runs east to west and S. Camelia Ave which runs north to south. The interior streets are as follows; S. Rose Ave and South Avery Ave, both North to South running streets and are to the east of S. Camelia Ave E. Fresno St, E. Kirkland St., Grove St. and E. Tulare St. are all east to west running and are located south of E. Oakland St. The location is the most southeastern part of the City and is at the City Limits. The project is located in a residential area.

Pre-Construction 01/2020 06/2020 8-10 14 26

Farmersville Tulare 19/20 Carried Over Complete Streets Components

West Walnut Ave Full Depth Reconstruction Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

The project is located in the City of Farmersville, CA along W. Walnut Ave between N. June Ave to the west and Farmersville Blvd to the east. Cross streets from west to east are N. Matthew Ave, Carolyn St., N. Ventura Ave, Franquette Ave, and Hartley Ave. This project is located in a residential zone.

Construction 09/2019 02/2020 25-30 14 26

Farmersville Tulare 17/18 Carried Over Complete Streets Components E. Walnut Ave/Southern Part of Road

This project will include: ADA Curb Ramp Installation (New), Pavement Improvement (New) | Construct 1,000 LF of a 10' sidewalk, curb and gutter, a 7' foot bike lane, an additional 12' lane, 5 street lights, 1 new ADA curb return /ramp, and a storm drain inlet.

The project is located in Farmesville, CA on E. Walnut Ave. between Farmersville Blvd. and N. Freedom Dr. The project is located next to Farmersville High School, around residential and some commercial.

Construction 06/2020 10/2020 20-25 2 2

Lindsay Tulare 19/20 Carried Over Road Maintenance & Rehabilitation Ashland/Frazier/Eastwood This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Surface seal 0.28 miles and restripe effected area Ashland/Frazier/Eastwood Streets Construction 04/2020 06/2021 5-8 14 26

Lindsay Tulare 19/20 Carried Over Road Maintenance & Rehabilitation Burem Lane Renovation

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Recycle and rehabilitate 0.1 miles and renovate concrete curbs, gutters and sidewalks

Burem Lane, west of Westwood Avenue Construction 04/2020 10/2021 15-18 4 3

Porterville Tulare 19/20 Carried Over Road Maintenance & Rehabilitation Henderson Avenue Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruction of roadway section of four-lane arterial roadway, 0.35 miles in length and 64 feet of width.

Located between Second Street and Plano Street. Construction 04/2020 08/2020 15-20 14 26

Porterville Tulare 19/20 Carried Over Road Maintenance & Rehabilitation Henderson Avenue Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitation of asphalt surface of four-lane arterial roadway, 0.5 miles in length and 64 feet of width.

Located between Balmayne Drive and Patsy Street. Construction 04/2020 08/2020 15-20 14 26

Porterville Tulare 19/20 Carried Over Road Maintenance & Rehabilitation Newcomb Street Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruction of roadway section of four-lane arterial roadway, 0.5 miles in length and 64 feet of width.

Located between Olive Avenue and Morton Avenue. Construction 05/2019 07/2019 15-20 1 1

Tulare Tulare 17/18 In-Progress Road Maintenance & Rehabilitation Cross Avenue Improvements

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way Acquisition, Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Feasibility Study, Sidewalk and/or Crosswalk Installation (New), Project Scope Development | Pavement Management System project that includes ADA concrete work.

On Cross Avenue @ West St. to approx. 1,000' west of the intersection. Pre-Construction & Construction

07/2017 08/2019

06/2019 06/2020 20-30 16 26

Tulare Tulare 19/20 Carried Over Complete Streets Components Sonora Ave. Improvements

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement Management System project to reconstruct Sonora Avenue between West Street and E Street. Includes ADA Concrete work, and improvements to the Water, Sewer and Surface Water infrastructure.

Sonora Avenue between West Street and E Street in the City of Tulare. Construction 04/2019 12/2019 20-25 16 26

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 102: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Tulare Tulare 19/20 New Road Maintenance & Rehabilitation

Sacramento Street and Maple Avenue Improvements

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

On Sacramento Street between Bardsley Avenue and Pleasant Avenue; On Maple Street between Sacramento Street and E Street. Construction 05/2019 06/2020 20-30 16 26

Tulare Tulare 17/18 In-Progress Road Maintenance & Rehabilitation Cartmill/Hillman Improvements

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, Right of Way, Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way Acquisition, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Feasibility Study, Landscape Safety Installation (New), Sidewalk and/or Crosswalk Installation (New), Project Scope Development | Pavement Management System / Traffic Safety project on Cartmill Avenue between the Cartmill/Highway 99 Interchange and De La Vina Street. Includes ADA Concrete work, signal upgrades, street reconstruction and improvements to the Water, Sewer and Surface Water infrastructure.

On Cartmill Avenue between the Cartmill Avenue Interchange at Highway 99 to De La Vina St.

Pre-Construction & Construction

06/2017 04/2019

04/2019 06/2020 20-30 1 1

Visalia Tulare 19/20 New Road Maintenance & Rehabilitation

Caldwell Avenue Improvements from Akers St. to Shady St.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Right of Way Acquisition, Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Storm Drain/Culvert Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Improvements will be made to Caldwell Avenue on segments from Akers Street to Shady Street. Construction 05/2020 12/2020 15-20 36 76

Woodlake Tulare 19/20 Carried Over Complete Streets Components

North Valencia Blvd Extension Improvement Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety)

The project is located in Woodlake, CA in a high residential area along N Valencia Blvd (SR 245) towards the northern part of town. The cross streets are Sequoia Ave which is the northern cross street and Sierra Ave which is the southern cross street. One block to the west along Palm St is Woodlake Valley Middle School and all around the project site is residential. To the east is a proposed development site for more residential homes.

Construction 02/2020 07/2020 15-20 14 26

Sonora Tuolumne 19/20 New Road Maintenance & Rehabilitation

Storm Drain Outfall Line Emergency Repair and Replacement This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Sunrise Hills at Morning Star Drive Construction 07/2019 09/2019 30-30 33 63

Ventura Ventura 19/20 In-Progress Road Maintenance & Rehabilitation

Victoria Avenue (Telephone to HWY 126)

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | This project consists of resurfacing Victoria Avenue from Telephone Road to HWY 126. The project includes cold milling, pavement repairs, manhole and valve adjustments to grade, upgrading street signs, re-striping, replacement of traffic inductive loops, concrete work, and asphalt overlay.

Along Victoria Avenue from Telephone Road to HWY 126 ramps Pre-Construction & Construction

03/2019 03/2020

03/2020 06/2020 15-20 19 37

Ventura Ventura 19/20 In-Progress Road Maintenance & Rehabilitation Ralston Street (Portola to Victoria)

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | This project consists of resurfacing Ralston Street from Portola Road to Victoria Avenue. The project includes cold milling, pavement repairs, manhole and valve adjustments to grade, upgrading street signs, re-striping, replacement of traffic inductive loops, concrete work, and asphalt overlay.

Along Ralston Street from Portola Road to Victoria Avenue Pre-Construction & Construction

03/2019 03/2020

03/2020 06/2020 15-20 19 37

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 103: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Ventura Ventura 19/20 New Road Maintenance & Rehabilitation

Telephone Road (Partridge to Ramelli)

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | This project consists of resurfacing Telephone Road from Partridge Drive to Ramelli Avenue. The project includes cold milling, pavement repairs, manhole and valve adjustments to grade, upgrading street signs, re-striping, replacement of traffic inductive loops, concrete work, and asphalt overlay.

Along Telephone Road from Partridge Drive to Ramelli Avenue Pre-Construction & Construction

07/2019 06/2020

06/2020 09/2020 15-20 19 37

Ventura Ventura 19/20 New Road Maintenance & Rehabilitation

Telephone Road (Victoria to Partridge)

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | This project consists of resurfacing Telephone Road from Victoria Avenue to Partridge Drive. The project includes cold milling, pavement repairs, manhole and valve adjustments to grade, upgrading street signs, re-striping, replacement of traffic inductive loops, concrete work, and asphalt overlay.

Along Telephone Road from Victoria Avenue to Partridge Drive Pre-Construction & Construction

07/2019 06/2020

06/2020 09/2020 15-20 33 53

Camarillo Ventura 19/20 New Road Maintenance & Rehabilitation Annual Resurfacing

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Several locations throughout the City of Camarillo for project ST-5017 Annual Resurfacing as described in detail in the attached Resolution No. 2019-49 including but not limited to Glenbrook Neighborhood, Charter Oak Neighborhood, Amber Neighborhood, Antonio Neighborhood, Fortuna Neighborhood, Germain Neighborhood, Carmen Dr from Paseo Camarillo to Las Posas Rd, Anacapa Dr from Las Posas Rd to City Limit, W Loop Dr from Las Posas Rd to City Limit, and Temple Av from Ponderosa Dr to Las Posas Rd.

Construction 08/2019 05/2020 7-10 19 44

Fillmore Ventura 19/20 New Complete Streets Components Mountain View Sidewalk Project

This project will include: Cost Estimating, ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Mountain View St from Ventura Street (SR126) to Santa Clara Street Pre-Construction & Construction

07/2019 11/2019

10/2019 06/2020 30-50 12 31

Moorpark Ventura 19/20 In-Progress Road Maintenance & Rehabilitation Pavement Preservation This project will include: Preliminary Design | General maintenance including but not limited

to pavement maintenance and repairs and repairs to adjacent facilities due to the work. Downtown area between Spring Road and Moorpark Avenue, north of Los Angeles Avenue and south of Wicks Road Pre-Construction 08/2019 10/2019 5-10 27 44

Moorpark Ventura 19/20 New Road Maintenance & Rehabilitation Pavement Preservation This project will include: Preliminary Design | General maintenance including but not limited

to pavement maintenance and repairs and repairs to adjacent facilities due to the work. The areas that is from Maureen Lane east to McFadden Avenue, north of Los Angeles Avenue and south of Poindexter Avenue Pre-Construction 04/2020 07/2020 5-10 7 16

Ojai Ventura 19/20 New Road Maintenance & Rehabilitation 2019 Road Rehabilitation Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The work comprises of street overlays, including cold planning, milling, placing Rubberized Asphalt Concrete (RAC), concrete work, striping, and ADA curb ramps.

Palomar Rd. Tico Rd., Rincon St., Oak St., Ayers Ave., Fairway Lane, Summer St., McKee St., N. Montgomery St., Aliso St., Matilija St., Grandview Ave., Douglas St., Buena Vista Dr., Gregory St., Oak Glen Ave., Park Rd., Signal St., Cuyama Rd., Franklin Dr., Stuart Ct., Topa Topa St., Bryant St., Emily St.

Construction 09/2019 01/2020 15-25 20 52

Oxnard Ventura 19/20 New Road Maintenance & Rehabilitation Vineyard Avenue Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Vineyard Avenue from Oxnard Boulevard, through Patterson Road to Gonzales Road Construction 04/2019 09/2019 10-15 19 44

Oxnard Ventura 19/20 New Road Maintenance & Rehabilitation

Wilson Neighborhood Street Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface existing asphalt concrete pavement, street overlay, ADA improvement, concrete work, traffic striping.

Wilson Neighborhood streets within City of Oxnard. Construction 04/2020 09/2020 10-15 19 44

Oxnard Ventura 19/20 New Road Maintenance & Rehabilitation

Hobson Park East Neighborhood Street Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface existing asphalt concrete pavement, street overlay, ADA improvement, concrete work, traffic striping.

Hobson Park East Neighborhood streets within the City of Oxnard Construction 03/2020 07/2020 10-15 19 44

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 104: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Oxnard Ventura 19/20 New Road Maintenance & Rehabilitation

Five Points Neighborhood Street Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface existing asphalt concrete pavement, street overlay, ADA improvement, concrete work, traffic striping.

Five Points Northeast Neighborhood streets within the City of Oxnard. Construction 08/2019 12/2019 10-15 19 44

Oxnard Ventura 19/20 New Road Maintenance & Rehabilitation

Commercial Central Neighborhood Street Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface existing asphalt concrete pavement, street overlay, ADA improvement, concrete work, traffic striping.

Pacific Avenue in the Commercial Area Neighborhood within the City of Oxnard. Construction 08/2019 12/2019 10-15 19 44

Oxnard Ventura 19/20 New Road Maintenance & Rehabilitation

Golf Course and Victoria Estates Street Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface existing asphalt concrete pavement, street overlay, ADA improvement, concrete work, traffic striping.

Golf Course and Victoria Estates neighborhood streets within the City of Oxnard. Construction 09/2019 01/2020 10-15 19 44

Oxnard Ventura 19/20 New Road Maintenance & Rehabilitation

College Park Neighborhood Street Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface existing asphalt concrete pavement, street overlay, ADA improvement, concrete work, traffic striping.

College Park Neighborhood within the City of Oxnard. Construction 08/2019 12/2019 10-15 19 44

Oxnard Ventura 19/20 New Road Maintenance & Rehabilitation Rice Avenue Street Resurfacing

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Rice Avenue from Fifth Street to Gonzales Road/Sturgis Road to HWY 101 Construction 06/2023 12/2023 10-15 19 44

Oxnard Ventura 19/20 New Road Maintenance & Rehabilitation

Cooper Road Roadway Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface existing asphalt concrete pavement, street overlay, ADA improvement, concrete work, traffic striping.

Cooper Road from Oxnard Boulevard to Juanita Avenue. Construction 06/2020 12/2020 10-15 17 29

Port Hueneme Ventura 17/18 In-Progress Road Maintenance & Rehabilitation Ventura Road (17/18 Carryover)

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Crack fill and slurry

Various locations along Ventura Road from Port Hueneme Road to Channel Islands Blvd Construction 04/2019 11/2019 15-20 19 44

Port Hueneme Ventura 19/20 In-Progress Road Maintenance & Rehabilitation

Grind & Overlay for Select Streets (18/19 Carryover)

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | This is a project from FY 18/19. It is a carryover. In that fiscal year, the project was submitted and in the project title it stated it was a "17/18 carryover", that is incorrect, it was a new project for the 18/19 fiscal year.

Intersection of Park Ave & Ventura Rd. to Intersection of Park Ave & Bard Rd, residential streets bounded by City of Oxnard boundary to the north, east, pleasant valley rd to the south and the Navy Base Boundary to the west.;Intersection of Joyce Dr. & N. 5th St. to Intersection of Joyce Dr. & Myrna Dr; Intersection of Myrna Dr. & Florence Ave to Intersection of Myrna Dr. & S. J St.; Intersection of Scott St. & N. Ventura Rd. to Intersection of Scott St. & Willowbrook St.

Construction 06/2019 09/2020 2-10 19 44

Port Hueneme Ventura 19/20 New Road Maintenance & Rehabilitation

Hueneme Bay Asphalt Concrete Repair & Slurry

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Hueneme Bay Area and W. Channel Islands Construction 07/2019 11/2019 5-10 19 44

Port Hueneme Ventura 19/20 New Road Maintenance & Rehabilitation

Ventura Road Phase II Crack Fill and Slurry Seal

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Ventura Road Between Channel Islands & Hueneme Road Construction 07/2019 11/2019 5-10 19 44

Port Hueneme Ventura 19/20 New Road Maintenance & Rehabilitation Overlay/Slurry Seal Projects Phase II

This project will include: Maintenance Program Plan Development, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Residential Streets Bounded by Pleasant Valley to the north, J Street to the East, Ventura Rd to the West, Hueneme Rd to the South

Pre-Construction & Construction

07/2019 07/2019

11/2019 11/2019 5-10 19 44

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 105: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Port Hueneme Ventura 17/18 In-Progress Safety Citywide Pedestrian Safety (17/18 Carryover)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bridge Structure Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Replacement of Cracked Sidewalks. Repair or replacement of uplifted sidewalks. Add additional Curb ramps in compliance with CALDAG and ADA.

Surfside Drive, Market Street, Ventura; Road, Bard, Hueneme,; Bolker Area, Beach Area along Surfside,; Hueneme Rd, Clara,; Bubbling Springs Area, N. Ventura Rd,; Cindy, Bolder Drive, Patterson, West; Channel Islands Blvd, Pleasant Valley,; All project locations are not final, each; location will be selected based on priority; need and resources throughout the year.; Locations may be subject to change based; on priority need and resources.;

Construction 07/2019 07/2020 8-10 14 26

Santa Paula Ventura 19/20 New Road Maintenance & Rehabilitation

2019-20 Pavement Slurry Seal and Rehabilitation

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Area B: Dana Dr, Glade Dr, Manor Ridge, Monte Vista Dr, Monterey Pl, Vista Grande Dr, Vista Pointe Pl, Weston Ct. Area C: April Ln, Cherry Hill Rd, Elderberry Ct, Honeywood Ct, Stonegate Rd.

Pre-Construction & Construction

09/2019 03/2020

12/2019 06/2020 10-15 2 10

Simi Valley Ventura 19/20 New Road Maintenance & Rehabilitation

FY 2019-20 Annual Minor Streets Rehabilitation Program

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Various Streets for paving and slurry seal in the following areas within the City: Lake Park Drive area, Between Justin Avenue and Sycamore Drive north of Cochran Street, Between Erringer Road and Sycamore Drive north of Arroyo Simi, Between Heitter Avenue and Goddard Avenue, Between Wanda Avenue to Woodrow Drive North of Alamo St., Elizando St., Shenandoah Ave., Brandon Ave., Trail Rock Ct., Harrington Rd., Wilson Dr., Oak Haven Ave, and Hampton Ave.

Construction 08/2019 09/2020 5-20 39 78

Thousand Oaks Ventura 19/20 New Road Maintenance & Rehabilitation

2020 Pavement Overlay and Resurfacing Program

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Erbes Rd, Borchard Rd, Wendy Dr, Newbury Rd, Haigh Rd, Gainsborough Rd, Hampshire Dr, Rancho Dos Vientos, La Granda, Agoura Rd Area numbers are for each neighborhood we are proposing, a map is available on our website: Area 36, Area 82, Area 87, Area 139, Area 132, Area 168, Area 108, Area 179, Area 354, Area 203, Area 257, Area 307, Area 280, Area 329, Area 335, Area 275, Area 334, Area 286

Pre-Construction & Construction

08/2019 04/2020

03/2020 11/2020 7-25 2 10

Davis Yolo 19/20 New Road Maintenance & Rehabilitation

Transportation Infrastructure Rehab – Street Absorbing Membrane Interlayers (SAMI) Rehabilitation Package

This project will include: Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Astoria Street from Oyster Bay Ave to Morro Bay Ave; Chesapeake Bay Ave from East to West End; Farallon St from Seabright Ave to Morro Bay Ave; Magellan St from Marina Cir to Oyster Bay Ave; Seabright Ave

Construction 07/2019 09/2019 8-10 3 4

Davis Yolo 17/18 In-Progress Complete Streets Components

Fourteenth Street / Villanova Drive Improvements

This project will include: Cost Estimating, Document Preparation, Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Right of Way, Active Transportation Plan, Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Project Scope Development | These improvements have been designated "High Priority" safety improvements for North Davis ES from the Walk Bike Audit Report and street resurfacing. Includes buffered bike lanes, intersection curb extensions, pedestrian refuge islands, restriping crosswalks, green bike lane striping alongside loading zones.

Fourteenth Street from F Street to Oak Avenue; and Villanova Drive from Anderson Road to Sycamore Lane

Pre-Construction & Construction

06/2018 07/2019

06/2019 12/2019 8-10 3 4

Davis Yolo 19/20 In-Progress Road Maintenance & Rehabilitation Transportation Infrastructure Rehab

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This CIP provides for a pavement management design and construction throughout the City. This is a multimillion dollar a year project to focus on maintaining and repairing streets throughout the City. This program includes pavement rehabilitation (slurry seal, overlay and FDR), sidewalk repairs, and bike path repairs. | This rehab (overlay and FDR) and bike path packages are being carried over and will be constructed in FY 19/20. The slurry seal package started in 18/19.

Various locations/streets throughout Davis Construction 07/2018 12/2019 10-20 17 29

West Sacramento Yolo 17/18 In-Progress Road Maintenance & Rehabilitation

States Streets Neighborhood Pavement Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate the local street network including storm drainage repairs, ADA accessibility upgrades and pavement rehabilitation in an Old West Sacramento Neighborhood. | Project is currently under design. Construction is planned to begin in Spring 2020

The project limits is bound by 15th Street (North), Jefferson Blvd (East), Stone Blvd (South) and Park Blvd (West). The streets within that boundary include Maryland Ave, Delaware Ave, Pennsylvania Ave, Alabama Ave, Virginia Ave Vermont Ave, Carolina Ave, Circle St, Alameda St, 16th St, 17th St, Regent St, Euclid St and 19th St.

Pre-Construction & Construction

02/2018 05/2020

12/2019 12/2020 5-20 6 7

West Sacramento Yolo 17/18 In-Progress Road Maintenance & Rehabilitation

West End of West Capitol Avenue Rehabilitation

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Active Transportation Plan, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing)

West Capitol Avenue: I-80 to Enterprise Blvd Pre-Construction & Construction

04/2018 07/2019

06/2019 10/2020 5-30 27 44

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.

Page 106: Draft City List of Projects FY 2019-20...19/20 In-Progress Other Dublin Boulevard Improvements -Sierra Court to Dublin Court This project will include: Traffic Signals, Lights, and/or

"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

August 2, 2019

City County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Winters Yolo 17/18 Carried Over Road Maintenance & Rehabilitation 2019-20 Street/Road Rehabilitation

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Orchard Lane (All), Almond Drive (All), Edwards Street (Main Street to Railroad Avenue), Adams Lane (Taylor Street to Valley Oak Drive), Hampshire Court (All), Dutton Street (East Grant Avenue to Walnut Park), First Street (All), Dry Creek Lane (All), Cody Lane (All), Wolfskill Street (All), Westwood Court (All), Riverview Court (All)

Construction 05/2020 06/2020 5-7 14 26

Woodlake Yolo 19/20 New Complete Streets Components West Naranjo Blvd. Extensioni

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety)

The project is located in Woodlake, CA in a high residential and commercial area along W Naranjo Blvd (SR 216) towards the west part of town. The cross streets are Palm St and Acacia St. Three blocks to the south sits the Woodlake Unified School District and all around the project site is residential and commercial.

Construction 06/2020 12/2020 15-20 3 4

Woodland Yolo 17/18 Carried Over Road Maintenance & Rehabilitation 2020 Road Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing) | Project will increase pedestrian and bicycle safety. Project will improve access to shopping, school and neighborhoods within and through the project area. The City plans to contract with a designer and construct the project once we have enough SB1 funding, which is estimated to be in FY 21/22.

Matmor Road from E. Main Street to Gibson E. Road and Gum Avenue from East Street to Matmor Road.

Pre-Construction & Construction

04/2018 04/2021

04/2021 12/2022 15-20 13 24

Marysville Yuba 19/20 Carried Over Road Maintenance & Rehabilitation Ramirez, E 22nd, Yuba Street This project will include: Document Preparation Yuba St. - 6th - 10th St. 12 St. - 17th St.; Ramirez Street - 12th to 24th Street; E.

22nd St. - Ramirez Street to Huston St. Pre-Construction 05/2020 08/2020 15-20 4 3

Marysville Yuba 19/20 Carried Over Road Maintenance & Rehabilitation Preventative Maintenance Program

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping -Rehab/Repair (Existing Safety) | Phase 1 includes sealing and maintenance repairs on roadway segments that are the highest traffic. Slurry seal project. H Street 3rd Street to 14th Street

-

H Street 3rd Street to 14th Street; F St. - 3rd to 10th St.; D St. 3rd - 5th St.; E. 17th St. - chestnut St. to SR20 Construction 07/2019 09/2019 15-20 33 63

Wheatland Yuba 19/20 New Other Pavement Management Program (PMP) Implementation

This project will include: Public Works Staffing, Procurement of Public Works Systems/Databases | This project is planned to implement a city-wide pavement management program based upon a widely-used software program (MTC's StreetSaver®), including the survey and condition ratinq of all the City's, maintained mileage. This program will enable full compliance with SB 1 requirements and provide the basis for efficient, cost-effective identification and delivery of pavement maintenance work for the City.

City Wide Procurement / Operational Needs 07/2019 03/2020 10-20 4 3

Wheatland Yuba 19/20 In-Progress Road Maintenance & Rehabilitation Hooper Street Pavement Resurfacing

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New) | This project will reconfigure and resutiace Hooper Street in front of Wheatland Elementary School at State Highway 65 to improve public safety for pedestrian and vehicular traffic and repair severely failed portions of the pavement. The improvements would benefit residents as well as those who drop their children off at the, elementary school.

On Hooper Street between Hwy 65 and Olive Street. Pre-Construction & Construction

02/2019 07/2019

06/2019 08/2019 20-50 32 57

**The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019.