DRAFT DISTRICT
MEDIUM TERM
DEVELOPMENT PLAN PROGRAMMES AND ACTIVITIES FOR 2014-2017
PLAN WAS DRAWN WITH GUIDELINES FROM THE NATIONL DEVELOPMENT PLANNING AUTHORITY IN LINE WITH THE
THEMATIC AREAS SET OUT IN THE GHANA SHARED GROWTH AND DEVELOPMENT AGENDA(GSGDA II)
Wa West District Medium Term Dev’t Plan 2014-2017 Page 1
WA WEST DISTRICT ASSEMBLY
MEDIUM TERM DEVELOPMENT PLAN 2014 - 2017
LIST OF ABBREVIATIONS
BASIC EDUCATION CERTIFICATE EXAMINATION BECE
CHRISTIAN HEALTH ASSOCIATION OF GHANA CHAG
CHRISTIAN RELIEF SERVICE CRS
COMMISSION ON HUMAN RIGHTS AND ADMINISTRATIVE JUSTICE CHRAJ
COMMUNITY BASED ORGANISATION CBO
COMMUNITY HEALTH PLANNING OFFICER CPO
COMMUNITY HEALTH PLANNING SERVICE CHPS
COMMUNITY WATER AND SANITATION AGENCY CWSA
COMMUNITY-BASED RURAL DEVELOPMENT PROJECT CBRDP
DEVELOPMENT PARTNERS DP
DISTRICT ASSEMBLY COMMON FUND DACF
DISTRICT ASSEMBLY DA
DISTRICT HEALTH MANAGEMENT TEAM DHMT
DISTRICT MEDIUM TERM DEVELOPMENT PLAN DMTDP
DISTRICT PLANNING AND COORDINATION UNIT DPCU
DISTRICT WATER AND SANITATION TEAM DWST
DISTRICT-WIDE ASSISTANCE PROJECT DWAP
ECONOMIC COMMUNITY OF WEST AFRICAN STATES ECOWAS
Wa West District Medium Term Dev’t Plan 2014-2017 Page 2
EUROPEAN UNION EU
GHANA EDUCATION SERVICE GES
GHANA HEALTH SERVICE GHS
GHANA SHARED GROWTH AND DEVELOPMENT AGENDA GSGDA
GOVERNMENT OF GHANA GOG
HEAVILY INDEBTED POOR COUNTRY HIPC
INFORMATION AND COMMUNICATION TECHNOLOGY ICT
INTERNAL GENERATED FUND IGF
JAPAN INTERNATIONAL CO-OPERATION AGENCY JICA
LIQUIFIED PETROLLEUM GAS LPG
LOCAL ECONOMIC DEVELOPMENT LED
MEDIUM TERM DEVELOPMENT POLICY FRAMEWORK MTDPF
MEMBER OF PARLIAMENT MP
MILLENIUM DEVELOPMENT GOALS MDG
MINISTRY OF FOOD AND AGRICULTURE MOFA
MINISTRY OF WOMEN AND CHILDREN MOWAC
MONITORING AND EVALUATION M&E
MULTI-SECTORAL HIV AND AIDS PROJECT MSHAP
NATIONAL COMMISSION FOR CIVIC EDUCATION NCCE
NATIONAL DEVELOPMENT PLANNING COMMISSION NDPC
NATIONAL HEALTH INSURANCE SCHEME NHIS
NATIONAL YOUTH EMPLOYMENT PROGRAMME NYEP
Wa West District Medium Term Dev’t Plan 2014-2017 Page 3
NON-GOVERNMENTAL ORGANISATION NGO
OPEN DEFECATION FREE ODF
OUT-PATIENT DEPARTMENT OPD
PARENT-TEACHER ASSOCIATION PTA
POTENTIALS, OPPORTUNITIES, CONSTRAINS, CHALLENGES POCC
REGIONAL COORDINATING COUNCIL RCC
REGIONAL PLANNING COORDINATING UNIT RPCU
RURAL ACTION AID PROGRAMME RAAP
SAVANNA ACCELERATED DEVELOPMENT AGENCY SADA
SCHOOL MANAGEMENT COMMITTEE SMC
SEXUALLY TRANSMITTED DISEASES STDS
SMALL TOWN WATER SUPPLY SYSTEM PROJECT STWSSP
SOCIAL SECURITY AND NATIONAL INSURANCE TRUST SSNIT
STRATEGIC ENVIRONMENTAL ASSESSMENT SEA
UNITED NATIONS INTERNATIONAL CHILDREN’S EMERGENCY FUND UNICEF
VOLUNTARY COUNSELLING AND TESTING VCT
WA WEST DISTRICT ASSEMBLY WWDA
WATER AND SANITATION WATSAN
WECHIAU COMMUNITY HIPPO SANCTUARY WCHS
Wa West District Medium Term Dev’t Plan 2014-2017 Page 4
EXECUTIVE SUMMARY
1.0 GENERAL BACKGROUND TO THE PREPARATION OF THE DISTRICT MEDIUM
TERM DEVELOPMENT PLAN
The preparation of this Medium-Term Development Plan (DMTDP, 2014-2017), is in fulfillment of
the constitutional mandate, which requires every district to develop a Medium Term Development
Plan.
The District Planning Coordinating Unit (DPCU) adopted a participatory approach in preparing the
2014 - 2017 Medium Term Development Plan. The following steps were adopted:
1. To engender participation, a Plan Preparation Team was formed comprising all the
departments of the Assembly. Through the instrumentality of the RCC, a facilitator was
engaged to give technical support to the planning team.
2. Both secondary and primary data were collected to facilitate the preparation of the DMTDP.
The outcome of the data collected is the review report of the 2010-2013 DMTDP and the
updating of spatial maps of facilities in the district.
3. The data collected were analyzed to form the bases for the projections. Objectives and
strategies were determined through a two day stakeholder meeting. During the review,
technical support was given by the RPCU.
4. Community needs assessment was carried out for all communities with the assistance of
elected assembly members. This enabled the Assembly to identify and categorize the
issues/gaps from each area council. These area council issues were further integrated into the
district key development issues.
5. To enhance participation, two public hearings were conducted in all the five area councils in
the district. This was to validate the plan and give the citizenry the opportunity to make inputs
into the plan. A total of 372 people participated in the public hearings of which 136 were
female and 236 were male. The analysis underscored the need for more involvement of women
in decision making. Find attached the list of attendance as APPENDIX 1.
Motivation
The major motivations came from the zeal of the plan preparation team to serve the communities even
though faced with major challenges such as inadequate funds. The planning team was also motivated
by the constant technical support from the RPCU. The availability of the needed leadership (both
administrative and political) was also timely and helped a lot.
Wa West District Medium Term Dev’t Plan 2014-2017 Page 5
Support
Without support, the planning process would have been in jeopardy. Technical and financial support
in the area of capacity and data collection was provided by the District Assembly. The technical
support was through the faciltatoship of Eric Bannye of SNV. The District Assembly also provided
financial and leadership support.
Challenges
The plan preparation was not without challenges. A major constraint has been the weak database of
the District Assembly and inadequate funding. Technical capacities in Planning in the district is also
low. This has made the few staff with planning skills to be overburden with work which has serious
implication for the output of the process. This constraint was mitigated by the introduction of the
concept of mentorship.
In many respects, this medium-term development plan seeks to address the challenges and set-backs of
the immediate past plan (2010-2013 DMTDP). The 2014-2017 DMTDP is anchored on the following
themes:
1. Ensuring and Sustaining Macroeconomic Stability
2. Enhancing Competitiveness of Ghana’s Private Sector
3. Accelerated Agricultural Modernisation and Sustainable Natural Resource Management
4. Oil and Gas Development
5. Infrastructure and Human Settlements
6. Human Development, Productivity and Employment
7. Transparent and Accountable Governance
The district goal is “To improve the quality of life of the people through the provision of basic
infrastructure and socio-economic services”. Enhanced competiveness in Ghana’s private sector
thematic focuses on increase tourist visit to the Wechiau Hippo Sanctuary. With the Accelerated
agricultural modernisation and natural resource management thematic area, emphasis is on increasing
major crops and animal production, reduction in the rate of bush fires and strengthening disaster
prevention.
Wa West District Medium Term Dev’t Plan 2014-2017 Page 6
Under the Infrastructure, energy and human settlements development thematic area, the main focus of
the plan is to extend electricity to many communities, increase access to ICT, improve the road
network, and develop planning schemes among others.
With the Human development, employment and productivity thematic area, the focus is reducing
maternal mortality, infant mortality and HIV AIDS rates, increase NHIS coverage, improve teacher-
pupil ratio, gross enrolment rate and school infrastructure situation. Water and Sanitation is also
emphasized.
Women participation in decision making, security, local economic development and internal generated
fund took centre stage in the Transparent and Accountable Governance thematic area.
2.0 SCOPE AND DIRECTION OF THE DEVELOPMENT PROGRAMMES AND
PROJECTS FOR 2014-2017
This document is divided into six chapters. Chapter one deals with the review of the previous plan and
the analysis of the situation as pertained in 2013. The review shows that there were marginal increases
in many of the achievements as compared to the targets. Prominent among the factors that worked
against the district development targets include the drought in 2010, the floods in 2011 and 2013 for
the agricultural sector. In the education sector, enrolment figures at the basic level are still low, and
teacher-pupil ratio has not also seen any improvement. Health indicators such as NHIS coverage,
HIV/AIDS prevalence rate, maternal mortality etc show marginal improvement. Sanitation situation
in the district is also not encouraging. However, water coverage has shown marked improvement.
The situational analysis unearthed development problems from water and sanitation, health,
agriculture, education, performance of the local governance system, tourism among others.
Chapter two presented the prioritized issue. These problems are then subjected to the analysis of
Potentials, Opportunities, Constraints and Challenges in respect of the MTDPF (2014-2017).
The outcome of this chapter is that there are enough opportunities and potentials in the district to
solving the development problems identified in chapter one.
Wa West District Medium Term Dev’t Plan 2014-2017 Page 7
Chapter three highlights the district goal, objectives and strategies to tackle the development problems
in the district. For effective objective setting, projections are made. It is assumed among others that:
• The population growth rate will not exceed 1.7% per annum;
• Migration rate will also remain unchanged.
In chapter four, the Programme of Action analysis reveals that the total cost of financing the Medium
Term Development Plan (2014 – 2017) stands at Forty one million, four hundred and seventy seven
thousand, four hundred and eight Ghana Cedis (GH¢41,477,408) against an Indicative Financial
Budget of nineteen million, one hundred and sixty three thousand, five hundred and thirty four Ghana
Cedis (GH¢19,163,534). This reveals a financial gap of Twenty two million, three hundred and
thirteen thousand, eight hundred and seventy four Ghana Cedis (GH¢22,313,874).
Strategies to fill in financing the gap include the following;
Scaling up the volume of IGF through market tolls and cattle rate collection.
Putting mechanism to blocking all revenue leakages by providing accurate data on properties,
efficient and reliable revenue collection method and well trained and motivated staff.
Marketing the plan to Development Partners to support the district assembly.
Chapter five translated the composite programme of action into annual plans for effective
implementation.
Chapter six deals with Monitoring and Evaluation. Monitoring and Evaluation (M&E) is an integral
part of the plan formulation and implementation process in the district. The output of the M&E
process is used for informing district development planning; enhancing transparency and
accountability in the management of resources.
With this background, an efficient M&E system is required to respond to these needs adequately.
These notwithstanding, the district M&E system continues to be challenged by severe financial
constraints in addition to institutional, operational and technical capacity constraints as well as
uncoordinated information flow, particularly at the sector level. Technical issues also revolve round
the difficulties in getting decentralized departments to prepare their respective Sector Plans
Wa West District Medium Term Dev’t Plan 2014-2017 Page 8
To address these challenges, the current institutional arrangements will be reinforced with adequate
capacity to support and sustain effective monitoring and evaluation, existing M & E mechanisms will
be strengthened, harmonized and effectively coordinated. In addition, an efficient system for
generating relevant, reliable and timely quantitative and qualitative information as well as an effective
feedback mechanism that makes statistical information available in useable form to the district
assembly, private sector and civil society organizations will be involved; and participatory M&E
processes will be developed.
Chapter seven deals with Communication as it is key to the promotion of transparency and
accountability. It is also seen as a way of promoting team spirit and team work since every actor in the
particular activity is aware of what is going on.
In view of the above, the Wa West District Assembly as part of the DMTDP 2014-2017 has developed
a communication strategy in order to enable all responsible agencies and persons are abreast with the
contents of the DMTDP and the role they are expected to play. This would be done by disseminating
the DMTDP throughout the district.
It is our hope that this document would meet the development aspirations of our people and serve as a
platform for accelerated growth and poverty reduction in the years to come.
We wish to thank District Planning and Coordinating Unit and all those who contributed in diverse
ways towards the completion of this document.
……………………………………….
(HON. DASSANA N. ADAMU)
DISTRICT CHIEF EXECUTIVE
WA WEST DISTRICT ASSEMBLY
Wa West District Medium Term Dev’t Plan 2014-2017 Page 9
CHAPTER ONE
1.0 PERFORMANCE REVIEW/DISTRICT PROFILE
The current situation of the District includes a review of the Performance of the District in implementing
programmes and projects in the 2010-2013 District Medium-Term Development Plan (MTDP) under the
GSGDA 1 thematic areas.
1.1 PERFORMANCE REVIEW OF THE 2010-2013 DMTDP
The aim of the review of the 2010-2013 DMTDP is to determine the status of the implementation of the plan, its
achievements, challenges and constraints to implementation, key issues/gaps associated with the planned
objectives and targets and its implications towards the development of the district. The results will serve as
lessons for the 2014-2017 DMTDP.
Sectoral objectives and targets set for the District under the GSGDA1 thematic areas were used for the review
and information sources included Departmental reports, APRs for 2010 - 2013 and data collected on the field.
The details of the review have been presented under the seven thematic areas of the GSGDA1 as shown in
Table 1 below:
8. Ensuring and Sustaining Macroeconomic Stability
9. Enhancing Competitiveness of Ghana’s Private Sector
10. Accelerated Agricultural Modernization and Sustainable Natural Resource Management
11. Oil and Gas Development
12. Infrastructure and Human Settlements
13. Human Development, Productivity and Employment
14. Transparent and Accountable Governance
Wa West District Medium Term Dev’t Plan 2014-2017 Page 10
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 10
Table 1.1 Summary of the review
THEMATIC AREA:PRIVATE SECTOR
COMPETITIVENESS
CROP PRODUCTION
OBJECTIVE: To facilitate farmers' adoption of improved technologies for increased production
CROP(Mt/Annu
m)
2009 2010 2011 2012 2013
Achievemen
t
Achievemen
t
Targe
t
Achievemen
t
Target Achievemen
t
Target Achievemen
t
Maize 5,850 6832 6,201 6,528 6,573 6,970 6,968 6,960
Rice 3,500 3,190 3,820 2,436 3,849 2,490 4,080 2,560
Sorghum 6,270 7,100 6,178 4,523 6,551 4,838 6,944 4,176
Groundnut 30,260 29,280
32,36
0 26,642
34,301 29,115 36,359 25,674
Millet 5,040 3,590 5,393 2,735 5,717 2,885 6,060 2,243
ANIMAL PRODUCTION
LIVESTOCK
2009 2010 2011 2012 2013
Achievement Achievement Target Achievement Target Achievement Target Achievement
Cattle 29,653 15113 30,543 13,700 31,450 15,000 32,343 15,750
Sheep 17,472 12,050 17,996 13,200 18,620 16,000 19,344 15,200
Goats 131,819 20,000 135,774 26,470 140,224 20,228 144,674 19,200
Pigs 14,466 11,370 14,900 10,221 15,434 12,763 16,068 12,500
Poultry 39,793 32,000 34,600 35,000
NB: Due to inadequate funds and limited staff, livestock census could not be conducted for the last three years.
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 11
THEMATIC AREA: PRIVATE SECTOR COMPETITIVENESS
TOURISM PERFORMANCE
Objective: To increase the number of tourists to the district by 50% by 2013
2010 2011 2012 2013
TARGET ACHIEVE
MENT
TARGET ACHIEVE-
MENT
TARGET ACHIEVE-
MENT
TARGET ACHIEV-
MENT
Foreign N/A 512 N/A 673 N/A 797 N/A 931
Domestic N/A 1,144 N/A 1,183 N/A 1,018 N/A 1,339
REMARKS: No targets were set for the tourism sector. However, the achievements showed a consistent increase from 2006 to 2009.
THEMATIC AREA: PRIVATE SECTOR COMPETITIVENESS
ELECTRICITY SUPPlY
Objective: To connect 30 communities to the National grid by 2013
2010 2011 2012 2013
TARGET ACHIEVE
MENT
TARGET ACHIEVE
MENT
TARGET ACHIEVE
MENT
TARGET ACHIEVE
MENT
No. of communities 5 2 5 3 5 8 5 15
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 12
THEAMATIC AREA; HUMAN RESOURCE DEVELOPMENT
EDUCATION
Objective 1: To increased enrolment by 90% by 2013
Objective 2: To reduce PTR to 1:45 by 2016
KINDERGARTEN 2010 2011 2012 2013
TARGET ACHIVEMENT TARGET ACHIVEMENT TARGET ACHIVEMENT TARGET ACHIVEMENT
Gross Enrolment Rate(GER) 80.50 97.19 84.50 86.43 63.5 89.3 83.7 91
Gender Parity Index(GPI) 0.98 1.10 0.98 0.98 1.03 0.99 1.03 1.15
Percentage of trained in teachers public kindergarten 20.0 13.79 20.0 17.39 22.1 20.0 22.1 22.0
Pupil Teacher Ratio in public kindergarten 26:1 56:1 26:1 41:1 45:1 108:1 45:1 93:1
Remarks: About 49% of children who are supposed to be in K.G. are not in school .This has serious implication for the development of the District’s human resource e development. Gender parity also experience marginal decline throughout the period. The trained teacher pupil ratio has not improved as there are still very few trained at the K.G level
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 13
PRIMARY SCHOOLS PERFORMANCE
PRIMARY 2010 2011 . 2012 2013
TARGET ACHIVEMENT TARGET ACHIVEMENT TARGET ACHIVEMENT TARGET ACHIVEMENT
Gross Enrolment Rate(GER) 93.50 93.20 93.50 96.0 163.5 412.1 163.5 143.50
Gender Parity Index(GPI) 0.90 0.86 0.92 0.88 0.90 1.07 0.92 1.52
Percentage of trained in teachers Public Primary School
50.25 37.69 50.25 43.19 25.8 23.10 25.8 26.5
Pupil Teacher/Pupils Ratio in public kindergarten 40:1 68:1 40:1 54:1 45:1 45:1 45:1 39:1
JHS LEVEL PERFORMANCE
JHS ACCESS
2010 2011
TARGET ACHIVEMENT TARGET ACHIVEMENT TARGET ACHIVEMENT TARGET ACHIVEMENT
Gross Enrolment Rate(GER) 40.72 36.62 40.72 40.23 90.5 90.7 90.5 98.8
Gender Parity Index(GPI) 0.64 0.62 0.64 0.66 0.89 0.90 0.99 1.01
Percentage of trained in teachers Public JHS
76.92 31.51 76.92 72.32 34.9 33.2 34.9 34.9
Pupil Teacher Ratio in public JHS 31:1 15:1 31:1 54:1 45:1 20:1 45:1 22:1
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 14
THEMATIC AREA: HUMAN RESOURCE DEVELOPMENT
HEALTH SECTOR PERFORMANCE
Health indicators
performance
2010 2011 2012 2013
TARGET ACHIEVEM
ENT
TARGE
T
ACHIEVE
MENT
TARGE
T
ACHIEVE
MENT
TARGE
T
ACHIEVE
MENT
Under 5 mortality rate 176/100,0
00
No data 176/100,
000
No data 176/100,
000
208 absolute
death
176/100,
000
112 absolute
deaths
Maternal mortality rate 0 3 0 3 0 4 0 5
Skilled delivery 35% (648) 29.2% 40% (861)
38.1%
50% (943) 41.1% 55% (1237)
53.2%
Family planning
acceptance
30% 44% 35% 45.8% 40% 36.4% 45% 42%
Incidence of malaria 45% 49.6% 45% 69.9% 40% 68.20% 35% 45.1%
NHIS Coverage - - 75% 80% 85%
REMARKS: almost all targets were not met. This has implication for meeting health related MDGs
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 15
THEMATIC AREA: HUMAN RESOURCE DEVELOPMENT
WATER AND SANITATION SECTOR PERFORMANCE
Water and sanitation
performance
2010 2011 2012 2013
TARGET ACHIEVEMENT TARGET ACHIEVEMENT TARGET ACHIEVEMENT TARGET ACHIEVEMENT
Water coverage 80% 60.35% 80% 73.23% 80% 74.50% 80% 74.07%
Sanitation coverage 30% 30% 30% 30% 19%
REMARKS: the district can achieve the MDG for water coverage. However, the same story cannot be told for sanitation. The current level of 19% need
to be addressed.
THEMATIC AREA: GOOD GOVERNANACE
SECTOR FINANCES
2010 2011 2012 2013
TARGET ACHIEVEMENT TARGET ACHIEVEMENT TARGET ACHIEVEMENT TARGET ACHIEVEMENT
FUNDS
INFLOW
926,910.00 755,263.11 1,324,526.68 1,312,802.11 1,708,328.91 1,569,443.73 3,007,751.72 885,029.56
REMARKS: apart from 2009, financial inflows are impressive for all sectors. The 2009 figure is low because some of the inflows came in 2010.
Data on financial outflows could not be collated from the departments due to a lot of inconsistencies in them.
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 16
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 10
1.2 ISSUES ARISING OUT OF THE 2010-2013 DMTDP REVIEW
• Inadequate household latrine
• Inadequate funding for DWST activities
• Inadequate capacities for DWST members
• Irregular maintenance and usage of household latrines
• Delayance of some households in building the structures for house hold latrines
• Residents in communities closer to Wa still prefer Wa municipal health insurance
• Most communities inaccessible during the raining season
• Inadequate logistics
• Ineffective community health insurance committees
• There is also a high incidence of migration among the inhabitants particularly the Brifor
across the western borders to Burkina Faso
• High disease burden – geographical location
• maternal and infant mortality
• Low utilization of services
• Cultural/traditional beliefs
• Geographical inaccessibility
• Inadequate technical staff especially midwives
• Residential, office and service provision accommodation – DHMT not well routed in
Wechiau
• Poor documentation
• Inadequate CHPS compounds
• Inadequate funding for monitoring and supervision
• Dwindling donor support
• No office space for agric
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 11
• Irregular releases of DACF
• Low IGF
• Weak data management
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 12
1.2 DISTRICT PROFILE
1.2.1 GEO-PHYSICAL CHARACTERISTICS
1.2.1.1 Location and Size
The Wa West District is one of the eleven districts that make up the Upper West Region created
in 2004 by legislative instrument 1751. The District is located in the western part of the Upper
West Region, approximately between Longitudes 9º40’N and 10º10’N and also between latitudes
2º20W and 2º50’W. It shares borders to the south with Northern Region, North-West by Nadowli
District, East by Wa Municipal and to the West by Burkina Faso. The total area of the district is
approximately 1,856 square km. This constitutes about 10 % of the region’s total land area, which
is estimated at 18,478square km. Based on the location and the nature of the economic activities
of the district, it is the food basket of the Wa Municipality. This means market for the district
agricultural produce exist. There are very little commercial and no political activities between the
district and Burkina Faso. The proximity of Wa West District to Burkina Faso however places it
in a good position to take advantage of suggestions made by the “Savannah Accelerated
Development Authority “ which proposes the promotion of a Savannah-Sahel Regional Market
amongst other initiatives.
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 13
Wa West District in National Context
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 14
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 15
1.2.1.2 Relief/Topography, Drainage and Geology/Soils
The Wa West District topography is gently rolling with a few hills ranging between 180 and 300
meters above sea level. It is drained by one main river – the Black Volta, to the west marking the
boundary between the district and the Republic of Burkina Faso.
The Black Volta and its tributaries is the main drainage system in the District. The Black Volta
and its several feeder tributaries present opportunities for irrigation in the district that can promote
all year round farming. Most of the tributary streams are seasonal, thus disrupting communication
during the rainy season along all the major roads to the District capital.
The soils in the district are mostly Leptosols, Lixisols and Vertisols. There are also strips of
Fluvisols along the flood plains of the Black Volta as well as sandy loams along some of its
tributaries. The general nature of the soils, coupled with the traditional land use practices and
limited rainfall, tend to have adverse effect on crop production. This forces the youth to look for
sustenance elsewhere at the expense of their lives or health.
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 16
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 17
1.2.1.3 Climate and Vegetation
The Wa West District lies within the Guinea Savannah Zone which is characterized mainly by
short grasses and only few woody shrubs and trees. Common trees in the District consist of
drought and fire resistant trees such as baobab, dawadawa, shea trees and kapok. Commercial
tress such as Cashew and Mangoes are also found in the district. The vegetation is very congenial
for livestock production, which contributes significantly to household incomes in the District.
The greatest influence on the vegetation is the prolonged dry season. During this period, the grass
becomes dry and the subsequent bush burning leaves the area patched and mostly bare of
vegetation. Consequently, the torrential early rains cause soil erosion. Bush burning reduces the
vegetative cover and adversely affects rainfall. Transpiration is reduced considerably and this
affects average annual rainfall totals.
The climate of the district is tropical continental type with the mean annual temperature ranging
between 22.5°C to 45°C. A lesser known and used environmental resource is what is referred to
as diurnal temperature variation. The Wa West District, like most of the other districts of the three
northern regions have the comparative advantage during the months of November to February
(the harmattan period) of having relatively cool night temperatures of between 18°C to 22°C and
rather hot day temperatures of as high as 38°C to 40°C. The relatively cool nights are very
suitable for stimulating good flowering in fruits and vegetables, heavy fruit setting and good
ripening and colour turning in fruits. This gives the northern part of Ghana that comparative
advantage of this type of less known climatic resource for generating other economic benefits;
and Wa West District should not hesitate to take full advantage of this. The period between
February and April is the hottest. Between April and October, the Tropical Maritime air mass
blows over the area which gives the only wet season in the year; with the suitable rainfall for
agriculture being effectively only four to month in a year. The poor rainfall pattern leads to the
migration of the youth, a factor associated with the underdevelopment of the human resource base
of the district.
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 18
1.2.2 THE ENVIRONMENT
1.2.2.1 Condition of Natural Environment
Large tracts of the natural tree vegetation are disappearing in the District due largely to human
activities in the form of cultivation, over-grazing, bush fires and charcoal burning. This situation
must be checked to avoid environmental degradation and the destruction of important soil micro-
organisms. Traditional farming practices such as slash and burn, shifting cultivation, road
construction, sand and gavel winning also degrade the land in the district. Farming along water
courses has led to the silting of many streams and other water bodies. There is therefore the need
to desilt these water bodies in order to make water available for dry season farming and other
domestic purposes. The activities of Fulani herdsmen on the environment cannot be
overemphasized. They take advantage of the ECOWAS Protocol and bring in herds of alien
cattle in to the district. Apart from the overgrazing done by their cattle, they also cut down
economic trees such as shea trees to feed their cattle. Worse still, they allow their cattle to graze
on farms. This has often resulted in reduction of farm yields and income levels of farmers and
women in the district who are the major pickers of the sheanuts.
To forestall environmental degradation, there is the need to establish tree plantation such as
cashew, mango, sheanuts and also curb the activities of the alien Fulani herdsmen.
1.2.2.2 Condition of Built Environment
The complete absence of development control in the district, especially the district capital,
Wechiau has led to disorganized development in the district. There are no planning schemes in
the district. This has resulted in misuse as well as under use of the land. Poor sanitation and
personal hygiene practices such as indiscriminate defecation are major factors that impact
negatively on the environment. Sensitization of the people to use the few sanitation facilities and
the enforcement of environmental bye laws need to be reinforced along side with the provision of
household latrines and other sanitation facilities.
The erection of store structures including kiosks and metal structures along the streets of the
major towns have greatly blighted the beauty of the district.
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 19
Plans are far advanced to developed planning schemes for all the major towns in the district for
organized development. With the introduction of street- naming and property addressing systems
put in place, most urban areas in the District will be well planned and beautified if compileted
1.3 DEMOGRAPHIC CHARACTERISTICS
1.3.1 Population Size and Growth Rate
Population Size and Distribution
The 2010 Population and Housing Census (PHC) recorded a population size of 81,348 for the Wa
West District, representing 11.6 percent of the regional popultion. Table 2.1 shows the population
by age, sex and type of locality in the district. From the table it can be seen that the total
population of males is 40,227 (49.5%) and female is 41,121 (50.5%). Wa West is basically a rural
district.
Table 2.1: Population size by locality of residence by district, region and sex ratio
All Localities Urban Rural
Region/District/ Sex Number Percent Number Percent Number Percent
Upper West
702,110
100
114,653
16.3
587,457
100
Wa West
81,348
100 - -
81,348
100
Male
40,227
49.5 - -
40,227
49.5
Female
41,121
50.5 - -
41,121
50.5
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.3 Age-Sex Structure
The age and sex structure of the population is influenced by birth and death rates, as well as
internal and international migration. Table 2.2 shows the age- sex structure of the district. From
the table it shows that there are more female in the district than male.
The district has a sex ratio of 97.8 which is greater than the regional sex ratio of 94.5. The age
group 5-9 has the highest population of females with a figure of 7069 whilst the male group has a
population of 6326 in that age group. Whereas the age group 15-19 has the highest sex ratio of
130.5 that of 35-39 indicated the lowest (60.4).
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 20
Table 2.2: Age structure by sex
Both Sexes Males Females
Sex Ratio Age Group Number Percent Number Percent Number Percent
All Ages 81,348 100 40,227 100 41,121 100
97.8
0 - 4 11,265 90.9 5,672 83.9 5,593 99.5
101.4
5 - 9 13,395 108.1 7,069 104.5 6,326 112.5 111.7
10 - 14 12,387 100.0 6,764 100.0 5,623 100.0
120.3
15 - 19 9,435 76.2 5,342 79.0 4,093 72.8
130.5
20 - 24 5,289 42.7 2,685 39.7 2,604 46.3
103.1
25 - 29 4,340 35.0 1,901 28.1 2,439 43.4
77.9
30 - 34 4,176 33.7 1,631 24.1 2,545 45.3
64.1
35 - 39 3,787 30.6 1,426 21.1 2,361 42.0
60.4
40 - 44 3,527 28.5 1,365 20.2 2,162 38.4
63.1
45 - 49 2,798 22.6 1,206 17.8 1,592 28.3
75.8
50 - 54 2,592 20.9 1,216 18.0 1,376 24.5
88.4
55 - 59 1,522 12.3 700 10.3 822 14.6
85.2
60 - 64 2,102 17.0 960 14.2 1,142 20.3
84.1
65 - 69 1,122 9.1 518 7.7 604 10.7
85.8
70 - 74 1,354 10.9 659 9.7 695 12.4
94.8
75 - 79 748 6.0 377 5.6 371 6.6
101.6
80 - 84 832 6.7 394 5.8 438 7.8
90.0
85 + 677 5.5 342 5.1 335 6.0 104.4
Source: Ghana Statistical Service, 2010 Population and Housing Census.
1.3.2 Religious Composition/Ethnicity
Religious Composition
Traditionalists are the largest religion with 29.5% of the people. Islam is the second dominant
religion with 23.5% and followed by Christianity. Christian dominations in the district include
Catholics, Pentecostal/Charismatics and Protestant (Anglican Lutheran, etc).
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 21
ECONOMY
Majority of the people are subsistence farmers whilst a few along the banks of the Black Volta
engage in fishing. Most of the women engage in pito brewing, petty trading and shea butter
extraction. The most predominant tribe in the District is the Brefor with dialectical variations,
followed by Waales and Dagaabas. There are other minor tribes such as the Hausa, Asantes, etc.
They co-exist peacefully and inter-marry.
There are 44,301 persons 15 years and older of which 72.1 percent are economically active. The
Economically active population (employed and unemployed) has the highest proportion 79
percent and economically not active 21.9 percent. For the economically active category a higher
proportion (98.4%) is employed with a lower proportion (1.6%) are unemployed.
Agricultural, forestry and fishery workers are the biggest occupational group (8.0%) in the
districts. Manufacturing (6.9%) is second largest group in the district. Females dominate the
manufacturing sector (11.3%) while males dominate plant and machine operators and assemblers,
technicians and associate professionals, and professional groups.
The self-employed (without employees) are the biggest (56.8%) in terms of employment status.
males dominate the self-employed and casual worker, while females dominate the contributing
family worker and domestic employee categories.
The private informal sector accounts for 97.0 percent in the districts, followed by public
(government) (2.2%) and the private formal sector (0.4%) accounting for the employment sectors
in the district.
In general, females are employed more 16432 (52.3%) than males 14,994 (47.7%). More females
are economically not active 6,857 (55.4%) than males 5,514 (44.6%).
1.3.3 Migration
The 2010 Population and Housing Census sought information on place of birth in relation to
locality of enumeration. Birthplace and migratory pattern are, therefore, analysed by comparing
locality of birth with locality of enumeration. Persons born in the locality of enumeration are
assumed not to have had any migratory history.
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 22
This may not necessarily be the case since some people who might have moved outside their
locality of birth could have returned to that locality for the census or on visit or on retirement.
Their migratory movements would thus be lost. Birthplace in relation to place of enumeration is,
therefore, only a crude measure of migration. The information is restricted to Ghanaians by birth
and therefore does not capture the true volume of movement into the district.
Table 2.4 shows the birthplace by duration of residence of migrant. A total of 6,713 people in the
district were born outside the District as shown in table 2.1. Those born elsewhere in the Upper
West Region constitute (57.0%). About (43.0%) were born elsewhere outside the Upper West
Region. Of those born elsewhere in the Region, majority (12.5%) was born in the Ashanti Region.
Also, of those born in the Region, the majority (36.1%) lived there for 20 or more years and the
least (12.3%) staying between 5-9 years.
Fertility
Fertility refers to the number of life births per women during her reproductive life span. Fertility
is determined by a number of factors, including the physiological capacity of the woman to
reproduce. These, in turn, are affected by a variety of social, cultural, health, economic and other
environmental factors.
Table 2.5 shows the general fertility rate, crude birth rate and total fertility rate of all the districts
in the region. The crude birth rate for the Wa West District is 24.32 births per 1000 population.
This is lower than the regional figure of 23.06 per 1,000 populations.
The general fertility rate for the district is 111.15. This implies that, in the district about
111children are born in a year to 1000 women. The district figure is greater than the regional
figure of 97.41. The table also shows the number of women 15-49 years in the district is 17, 796
representing (10.7%) of that regional population. Furthermore, the district has a total of 1978
number of births in the last 12 months preceding the census.
Reported total fertility rate, general fertility rate and crude birth rate by districts
District Population
Number of
women 15-49
years
Number of
births in last 12
months
Total Fertility
Rate
General
Fertility Rate
Crude Birth
Rate
All Districts 702,110 166,230 16,193 3.45 97.41 23.06
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 23
Wa West 81,348 17,796 1,978 4.06 111.15 24.32
Wa Municipal 107,214 29,396 2,429 3.30 82.63 22.66
Wa East 72,074 15,523 1,776 3.88 114.41 24.64
Sissala East 56,528 14,216 1,219 2.89 85.75 21.56
Nadowli 94,388 21,895 1,998 3.37 91.25 21.17
Jirapa 88,402 20,604 2,064 3.48 100.17 23.35
Sissala West 49,573 11,264 1,397 4.33 124.02 28.18
LambussieKarni 51,654 11,990 1,339 3.87 111.68 25.92
Lawra 100,929 23,546 1,993 3.02 84.64 19.75
Source: Ghana Statistical Service, 2010 Population and Housing Census.
Literacy and Education
Literacy is the ability to read and write. The inability to do so is called illiteracy or analphabetic.
The primary sense of literacy represents the lifelong, intellectual process of gaining meaning from
a critical interpretation of the written or printed text.
The UNESCO defines literacy as the “ability to identify, understand, interpret create,
communicate and compute using print and written materials associated with varying context.”
Table 11 shows the population 11 years and older by sex, age and literacy status. It shows the
population who are literate, not literate and English only among other languages.
Table 3.9 below shows that 33,613 people are not literate in the district, with 19,465 persons
being literate. Six thousand, six hundred and ninety (6690) could write and speak English only,
1,048 with Ghanaian language only, 13 were literate in English and French, and 54 were literate
in English, French and Ghanaian language.
There are a large number of people between the age group 15-19 who are literate (36.1%), and
those who could speak English and Ghanaian (37.2%). The age group 20-65+ had figures in the
not literate group greater than the literate group. The male and female distribution presents
another interesting picture about the district.
There are more none literate female (57.7%) than literate male (42.2%), but the female non
literate (19,408) is rather more than twice greater than the literate (8131). This should be a greater
concern to policy maker since it implies that there are more males who are educated than females.
The age groups for male and female are almost similar as there are more none literate than literate
in all but three age groups 11-14, 15-19 and 20-24.
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 24
Figure 3.2 Literacy Status
Source: Ghana Statistical Service, 2010 Population and Housing Census.
The level of education which one attains is very important in determining the educational status of
an individual. People who attain higher educational levels are revered and respected most in our
societies.
Table 3.10 shows the population 3 years and older by level of education, school attendance and
sex. Out of a total population of 27,287, 10.7% are currently attending nursery, 60.3 percent in
primary, SSS/SHS have a percentage of 5.1 whilst post middle/secondary and tertiary had low
figure of 0.4% each who are currently attending school. This does not augur well for the
educational sector in the district since it depicts that majority of the youth after completion of
JHS do not make it to the secondary and subsequently the tertiary level.
The sex distribution of those currently attending school also have a similar pattern of people
dropping at the lower levels. 18.9% of males are currently in JSS/JHS, whilst the female figure is
15.2%. The male currently attending school is greater than the female attending school that is
14,810 and 12,477 respectively.
A total of 4,899 people have attended school in the past, out of that a greater percentage of them
made it to the primary school (47.3%), the rest of the educational levels had percentages less than
English only
34%
Ghanaian
language only
6%
English and
Ghanaian
language
60%
English and
French
0%
English, French
and Ghanaian
language
0%
Other
0%
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 25
ten apart from JSS/JHS 21.0% and SSS/JHS 11.2%. the male sex had more people than female in
all the educational level in those who attended school in the past.
1.3.4 Culture
The major ethnic groups in the district are the Dagaaba, Waala and Brefor. These ethnic groups
have enjoyed peaceful co-existence among themselves. Dialectical variation among the Dagaaba,
Waala and Brefor is quite negligible. The presence of ethnic homogeneity has the potential of
promoting socio-cultural development. Some of the negative practices include female elopement,
scarification, female genital mutilation, widowhood inheritance. These have the tendency to
spread STDs.
Staging of corpse for days is another negative practice. This can cause outbreak of diseases
depending on the sickness through which the person dies. Even though the district is
heterogeneous in terms of ethnicity, there is relative peace in the District. However, there are a
few instances of chieftaincy and land disputes. The relative peace enables the people to go about
their normal daily routine activities without any hindrance.
INFORMATION COMMUNICATION TECHNOLOGY
5.1 Introduction
Information and Communication Technology (ICT) means computer-based management of data
or ideas. Communication serves as an important tool in the economic and social lives of people.
Business is transacted through communication, and the availability of effective and reliable
communication channels can enhance economic activity and improve incomes. Recent
developments in communication include the use of mobile phones and desktop or laptop
computers and the internet. (GSS, 2010 PHC).
Household Ownership of Fixed Telephone Lines
Table 5.3 shows the households having desktop/laptop computer and fixed telephone lines by sex.
The Wa West District has a total of 11,486 households with only 8 (0.1 percent) having fixed
telephone lines. The fixed telephone lines are owned by only male headed households. A small
proportion (0.5 %) of households have desktop/laptop computer while 0.1 has fixed lines.
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 26
DISABILITY
Introduction
Persons with disability (PWDs) is defined as “those who are unable to or are restricted in the
performance of specific tasks/activities due to loss of function of some part of the body as a
results of impairment or malformation” (GSS 2012). People with disability are mostly regarded as
less productive and not capable of contributing to development compared to their non-disabled
counterparts.
Accordingly, they are often seen as a burden on society and their unfortunate circumstances are
viewed sometimes as a curse or punishment. Furthermore, they have poorer health status, lower
educational achievements, less economic participation and higher levels of poverty than people
without disabilities (WHO, 2011).
This chapter analyses the distribution of the population in Wa West by disability type, sex and
level of education. It is however worth noting that within the population with disability, some
individuals have multiple disability conditions hence the computed percentages of disability types
in table 6.2 may not necessarily add up to 100 percent.
6.2 Population with Disability
Population by type of locality, disability type and sex is shown in Table 6.1. The Wa West has a
total population of 81,348 of which 3.0 percent had different forms of disability according to 2010
Population and Housing Census. For PWDs, sight had the highest proportion of 33.6 percent,
physical 25.1 percent, hearing 15.9 percent and the least speech recording 10.6 percent.
Males have a higher proportion of 31.7 percent for sight and whiles females recorded 35.5
percent. Physical form of disability is high among females with 27.6 percent and 22.8 percent for
males. Hearing disability is the third highest among the types of disability with 15.9 percent and
15.8 percent for both males and females respectively. Intellectual disability has a proportion of
15.5 percent for males and 15.7 percent for females as well as emotion having a proportion of
14.4 percent for males and 12.6 percent for females. Speech disability is the least with a
proportion of 12.1 percent for males and 9.0 percent for females.
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 27
Wa West is predominately rural area and hence there is no data showing the distribution of people
with disability in urban areas in the district.
Type of Disability
The Wa West district has a total population of 81,348 of which only 2,453 (3.0%) have different
form of disability. Sight has the highest proportion (33.6%), followed by physical disability
(25.1%) and hearing disability (15.9%) in the order. Intellect and emotion form of disabilities
constitute 15.6 and 13.5 percent respectively. Speech disability is the least (10.6%) in the district.
Type of Disability
Source: Ghana Statistical Service, 2010 Population and Housing Census.
Access to Utilities and Household Facilities
Main Source of Lighting
Nature of the source of lighting is one of the indicators of quality of life. As a society improves
the source of lighting shifts from use of low quality sources such as fuel wood to more efficient
ones, such as electricity. Households were asked about their main sources of domestic lighting.
As indicated in Table8.8, the main source of lighting for households in the district is flash
lights/touch accounting for 61.6 per cent. Kerosene lamp constitute (25.0%) of lighting source,
Sight 33.6
Hearing 15.9
Speech 10.6Physical 25.1
Intellect 15.6
Emotion 13.5
Other 12.8
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 28
while electricity (mains) is used by (9.5%) of households and constitute the third main source of
lighting in households.
Gas lamp (0.2%) and crop residue (0.2%) account for the lower proportion. of households with
main source of lighting while candle has the least proportions of (0.1%).
Table 8.8: Main source of lighting of dwelling unit by type of locality
Main source of light
Total
country Region
District
Total Urban Rural
N % % %
Total 5,467,054 110,174 11,486 100.0 - 100.0
Electricity (mains) 3,511,065 34,044 1,095 9.5 - 9.5
Electricity (private generator) 36,142 613 80 0.7 - 0.7
Kerosene lamp 971,807 21,455 2,871 25.0 - 25.0
Gas lamp 9,378 303 25 0.2 - 0.2
Solar energy 9,194 804 53 0.5 - 0.5
Candle 41,214 333 10 0.1 - 0.1
Flashlight/Torch 858,651 49,606 7,077 61.6 - 61.6
Firewood 13,241 1,332 213 1.9 - 1.9
Crop residue 4,623 361 28 0.2 - 0.2
Other 11,739 1,323 34 0.3 - 0.3
Source: Ghana Statistical Service, 2010 Population and Housing Census.
Figure 8.1 below shows the source of energy or power by type of locality. the main source of
lighting for dwelling units is flash lights/touch was the most common source of lighting,
accounting for a proportion of (61.6%)of the sources of light in households in the district.
Kerosene lamp constituted (25.0%) of lighting source while Electricity (mains) were used by
(9.5%) of households and was the third main source of lighting in households.
Gas lamp and crop residue have the lower proportion of (0.2%) each of households with main
source of lighting while candle has the least proportions (0.1%).
Figure Source of Energy or Power
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 29
Source: Ghana Statistical Service, 2010 Population and Housing Census
8.6.2 Main Source of Cooking Fuel
Figure 8.2 provides information on the types of fuel used for cooking in the Wa West District.
They include wood, crop residue, gas, electricity, kerosene and charcoal.
Overall, the main source of cooking fuel in the district was wood (91.1%), followed by charcoal
(4.2%) and crop residue (2.0%). The least used fuel for cooking were kerosene and gas (0.1%)
each.
The usage of wood as main source of cooking fuel may be due to the nature of economic
activities( farmers) in those areas and the forest nature of the those areas.
Fig 8.2 Main Source of Cooking Fuel
Electricity
(mains)
9.5
Electricity
(private
generator)
0.7
Kerosene lamp
25.0
Gas lamp
0.2
Solar energy
0.5Candle
0.1
Flashlight/Torc
h
61.6
Firewood
1.9
Crop residue
0.2
Other
0.3
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 30
1.3.5 Spatial Analysis
The spatial analysis of the district demonstrates the human and economic activities of the district.
It provides an understanding of the district’s space economy and an insight into the adequacy of
the functions performed by the various settlements. Specifically, the spatial analysis is centered
on the type and distribution of infrastructure and services in the various communities of the
district. Using the functional model of classifying settlements, it is possible to establish the
hierarchy of settlements as well as their distribution in space which would provide basis for
injecting equity and efficiency into the space economy.
In all 21 services and facilities were considered in constructing the scalogram. The settlements
that have been included in the scalogram were selected based on the population size, agriculture
extension service, boreholes and primary school. Settlements that have population above 600
were considered. The populations of the various settlements were used in the scalogram analysis.
The table below shows the scalogram for the district.
1.2
91.1
1.0 0.3 0.14.2 2.0 0.0 0.0 0.0
0.0
20.0
40.0
60.0
80.0
100.0
Source of cooking fuel
Per
cen
tag
e
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 21
Scalogram using Population
600 and above
Faci
lity
/ser
vic
e
Nu
rser
y
Pri
m
JSS
Hea
lth
cen
tre
Cli
nic
/CH
PS
Ag
ric
Ex
t st
atio
n
Ag
rice
xt
Ser
vic
e
Bo
reh
ole
KV
IP (
Pu
bli
c)
Tru
nk
ro
ad
Fee
der
ro
ad
Are
a C
ou
nci
l
DA
Ad
min
Po
lice
Sta
tio
n
Ele
ctri
city
Wee
kly
Mk
t
To
tal
No
. o
f se
rv
ices
To
tal
Cen
tra
lity
% o
f T
ota
l C
entr
ali
ty
Ord
er o
f S
ettl
emen
t
Weight 1 2 3 3 2 2 1 1 1 2 1 1 2 1 1 1
Settlement Pop
WECHAU
(WECHIAU)
1,966 * * * * * * * * * * * * * * 14 506 94 1st
DOORMAN
1,130
* * * * * * * * * * * 11 186 35 4th
GA
1,552
* * * * * * * * * * * 11 157 29 4th
GURUNGU
(TODOYIRI/YOUNRI)
973
* * * * * * * * * * 10 142 27 4th
VIERI
1,914 * * * * * * * * * * 10 121 23 4th
NYOLI (YIPENIBOR)
1,694 * * * * * * * * * * 10 119 22 4th
PONYENTENGA
1,116 * * * * * * * * 8 116 22 4th
KANDEO
816
* * * * * * * 7 62 16 5th
DORNYE
1,444
* * * * * * * 7 64 12 5th
TOKALI
839 * * * * * * * * 8 63 12 5th
VARINPARE
703 * * * * * * * 7 62 12 5th
CHOGSIA
1,491
* * * * * * 6 50 9 5th
METIAW
1,760 * * * * * * 6 50 9 5th
5th
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 22
KUUKYILETENG
1,097
* * * * 4 44 8 5th
BAKPONG (GADI)
730
* * * * * * 6 42 8 5th
BERINYASE
784
* * * * * 5 39 7 5th
BAMKPAMA
717
* * * * * * 6 28 5 5th
BULI
1,452
* * * * * * 6 28 5 5th
DOMANGILI
1,347
* * * * * * 6 28 5 5th
GBACHE
862
* * * * * * 6 28 5 5th
KAKALAPARI
640
* * * * 4 29 5 5th
KAWU
1,064
* * * * * * 6 28 5 5th
KPANFA
776
* * * * * * 6 28 5 5th
KWACHIYIRI
1,158
* * * * * * 6 28 5 5th
NAHA
723 * * * * * * 6 28 5 5th
NYAGLI
847 * * * * * 5 25 5 5th
WECHEA-BAO
802 * * * * * * 6 28 5 5th
TENDOMA
WELIYIRI
774 * * * * * * 6 28 5 5th
WOLIYIRI (GORA)
792 * * * * *
5 24 4
5th
KANGBA
768
* * * * * 5 24 4 5th
BORO
633
* * * * * 5 18 3 5th
Wa West District Medium Term Dev’t Plan 2014- 2017 Page 23
BULINZIN
952
* * * * 4 15 3 5th
CHABARE
(BANDANYIRI)
887
* * * * 4 15 3 5th
KANTU
709
* * * * 4 15 3 5th
NAHA DA-ETENG
1,016 * * * * * 5 18 3 5th
METII
800 * * * 3 10 2 5th
SAGU
691 * * * 3 10 2 5th
DARIGUOYIRI
(DELIGOYIRI)
697
* * * 3 10 2 5th
DOMAWA
651
* * 2 6 1 5th
LASIA TUOLE
1,065 * * * * * * * * * 9 7 1 5th
SIIRA
855 * * 2 7 1 5th
No. Of settlements 29 37 30 5 8 10 39 40 4 11 27 5 1 1 4 7
Centrality Index
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
Weighted Centrality
Score 3 5 10 60 25 20 3 3 25 18 4 20 200 100 25 14 535
24 | P a g e
1.3.6 Hierarchy and Distribution of Settlements
To understand the existing hierarchy of settlement, the scalogram technique was employed. By
this, the settlements were ranked based on the population, and the number of services they offer.
In delineating the settlements into the various hierarchies, the following criteria were used.
1st Order Settlement: Settlements with centrality indices of 80% and above of the total centrality
of 535
2nd Order settlement: Settlements with centrality indices between 60 and 79% of the total
Centrality of 535
3rd Order settlement: Settlements with centrality indices between 40 and 59% of the total
Centrality of 535
4th Order settlement: Settlements with centrality indices below 20 and 39 % of the total
Centrality of 535
5th Order settlement: Settlements with centrality indices below 20 % of the total
Centrality of 535
The scalogram analysis indicates that the district has only four orders namely; 1st order, 4th order
and 5th order settlements. The table below shows the various orders and the settlements within the
orders.
25 | P a g e
Hierarchy of Settlements in Wa West District
ORDER NO.
COMMUNITIES
POP. WITHIN
THE ORDER
NAMES OF COMMUNITIES.
1st 1 1,966 Wechiau
2nd Nil Nil Nil
3rd Nil Nil Nil
4th 6 8,379 DORIMON, GA, GURUNGU,
(TODOYIRI/YOUNRI), VIERI, NYOLI
(YIPENIBOR), PONYENTENGA
5th The rest of
settlements
With regards to the district capital, Wechiau, the construction of facilities such as police station,
Health centre has elevated it to 1st order. However, there is a wide gap between Wechiau, the
district capital and the rest of the settlements in terms of centrality as there is no settlement in the
2nd and 3rd order category. The predominance of settlements in the 5th order indicates that facilities
and services are not adequate in the district. As such efforts should be made to improve the
situation to avoid migration to the higher order settlements.
26 | P a g e
1.4 DISTRICT ECONOMY
The major economic activities in the district include agriculture, commerce rural industry, tourism
and other services.
1.4.1 Agriculture
Agriculture accounts for 80% of the Wa West District economy. Most farmers undertake a
combination of crops and animal production. The main crops grown by the farmers are maize,
millet, maize, cowpea and groundnut. Of these the District has comparative advantage in
groundnuts and cowpea production. However, productivity of crops is low due to a combination
of factors such as inadequate rainfall, low fertility, poor cultural practices and low technology
application. For example rainfall distribution and amount in the district are concentrated in within
the second and third quarters of the year. Since the district is dependent on rainfall agriculture, the
implication of such rainfall pattern is low crop productivity and inability to produce all year
round, hence there is a high risk of food insecurity. Low crop productivity is one of the major
causes of poverty in the District. With current weather changes, rainfall volumes have reduced
considerably which can be attributed to the degrading of the environment probably due to climate
This situation calls for the need to enhance the provision of water for dry season gardening and
improved agricultural technologies. It is therefore strongly recommended that irrigated
agriculture should be increased substantially in all parts of Wa West District; by taking advantage
of the perennial water of Black Volta, developing irrigation water bodies from its feeder
tributaries and from the available underground water; as well as rain water harvesting. Through
the GSOP Program, two dams have been rehabilitated at Boro and Poloe with ongoing
rehabilitations at Nako, Dorimon and Laadayiri through the MPs Common Fund, the Nyoli
dugout has been rehabilitated by the MP to harvest water for watering of plants and pasturing of
animals during the dry season
1.4.1.1 Crop Production and Food Balance
Available gross crop production in metric tons (MT) for the major crops have been reported for
2013 in table 1.2.
27 | P a g e
Table 1.2 Crop Production Levels for 2013
Type of crop Maize Rice Sorghum Groundnut Millet
2013 output 5850 3500 6270 30260 5040
Source: Wa West District Agricultural Development Unit, 2013
1.4.1.2 Livestock Development
The second most important type of primary agricultural production in Wa West District is
livestock production. The livestock sub-sector continues to make steady but moderate gains as it
is now becoming the most lucrative investment in the midst of low income levels emanating from
crop production.
1.3 Table Livestock Production Levels (No.) for 2013
Type of Animal Cattle Sheep Goats pigs
2013 29,653 17,472 131,819 14,466
Source: Wa West District Agricultural Development Unit, 2013
The District has the potential to develop fully the livestock sub-sector. The livestock sub-sector
despite the potentials and achievement is faced with many problems. Some of these areas are:
1. Low genetic potential of the local breed of small ruminants and poultry
2. High incidence of pests and disease on livestock and poultry
3. High cost of veterinary drugs and charges
4. Inadequate veterinary drugs and equipment
5. High cost of feeding pigs
6. Lack of supplementary feeding for ruminants in the dry season
7. Inadequate veterinary staff
28 | P a g e
The above problem calls for district and national support towards the full development of the
livestock sector to boost the private sector investment potential. This could be achieved through
funds from both the Assembly, the government and in collaboration with MOFA
1.4.1.3 Fisheries
The district is blessed with a number of water bodies including the Black Volta. Inland fishing is
practiced as an economic activity in the district. The sale of fish is to supplement household
income, though it is on a small scale.
1.4.1.4 Irrigation Infrastructure
The Wa West District Assembly places a high priority on irrigation facilities to enhance dry
season gardening. There are sixteen dams and dugouts in various communities in the District.
However, few of them are used for irrigation purposes. The total land area under irrigation in the
District is 84Ha. This shows that irrigation is highly underdeveloped in the districts, despite its
critical role in the farming activities and poverty reduction strategies of the people. There is need
to expand the irrigatable area through appropriate technologies like creating small water retention
reservoirs during road construction as well as construction of dug-outs and check dams along
water ways. Such small dams will not only support dry season gardening on a small scale but
also provide water for animals, particularly during the dry season. The advantage of such small
dams located in various communities rather than one big dam is the spread of benefits across the
district.
1.4.2 Tourism
The tourism potential of the Wa West District is found in its rich natural, cultural, historical and
man-made attractions. These, however, have not received the needed support and development to
exert their competitiveness within the private sector. The most significant of them is the Wechiau
Community Hippo Sanctuary which is18km from Wechiau.
Wechiau Hippo Sanctuary is a community-based conservation initiative aimed at providing the
Wechiau catchment area inhabitants with a source of revenue and improved quality of life while
simultaneously offering protection to the flora and fauna found within the designated lands.
29 | P a g e
Marketed as an eco-tourismdestination, of particular interest is the hippopotamus population
resident along this stretch ofriver. One of only two remaining hippo populations within Ghana, a
group consisting ofapproximately 20 individuals represents an important conservation priority.
Management of the Hippo Sanctuary lies squarely in the hands of the local residents. Though the
efforts of the District Assembly and the Ghana Social Opportunities Project(GSOP) a tree
plantation has been established in the Community (Talawonaa) to conserve the natural beauty of
the sanctua.ry
30 | P a g e
31 | P a g e
Other potential tourism sites that could provide income to the district are the Ga crocodile pond,
the Lobi Architecture, a three hundred year old Mosque and indigenous grinding mills.
Besides these natural and man-made sites, the culture of the people is also captivating. When
coordinated well, these attractions could make the Wa West District a good tourist destination for
local and foreign tourists.
The major challenges the Sanctuary faces include:
Inadequate accommodation for visitor
Lack of recreational facilities at the site
Lack of canteen to serve visitors
Unreliable transportation system
Poor roads network
1.4.3 Market Centres
There are eight major marketing outlets in the district. These are Dorimon, Dabo, Taanvare,
Wechiau, Vieri, Ponyentanga, Nyoli and Gurungu. These markets are organized on a 6-day cycle.
Agro-products and inputs are readily sold and purchased in these markets. Marketing of food
crops and household commodities is mostly done by women. The purchase and sale of livestock
is however, in the hands of men. Physical access to markets is however poor due to poor road
network and condition. Thus the improvement of infrastructure has the potential of increasing the
district revenue base which will impact grately on the socio economic development of the
District.
32 | P a g e
33 | P a g e
1.4.4 Financial Services
There are a few banking services in the district. This has made access to credit very difficult
thereby adversely affecting all aspects economic activities. Thus all workers receive their salaries
in Wa. The only banking service in the district is First National Ltd which is a private
business/banking firm with a Workers Credit Union also in operation
1.4.5 Road Network
Good road infrastructure is one of the key needs for the development of any district, region or
country. The nature of the road network can affect the quality of life and progress of the people
and thereby influence their overall human development. Poor road conditions has the tendency to
cut off population from the main marketing, health and educational centers whenever there is
heavy rainfall.
The total feeder road network in the district is about 456.30km. The District enjoys only about
20km of Bitumen road. Generally, a large chunk of the District is inaccessible, especially during
the raining season.
Table 1.4 Road network and categorization.
TYPE OF ROAD GRAVEL
LENGTH(KM)
EARTH
LENGTH(KM)
TOTAL
LENGTH (KM)
Engineered 149.05 17.8 166.85
Partially Engineered 810 74.15 84.15
Non-Engineered - - 205.30
Grand Total 456.30
SOURCE: Department of Feeder Roads, 2013
34 | P a g e
Table 1.5 Road Condition of the District.
TYPE OF ROAD GOOD(KM) FAIR(KM) POOR(KM) TOTAL
LENGTH
(KM)
Engineered 72.55 94.30 - 166.85
Partially
Engineered
10 74.15 - 84.15
Non-Engineered 205.30 205.30
Grand Total 82.5 456.30
SOURCE: Department of Feeder Roads, 2009
The only tarred portion of the district roads are the Wechiau township roads and the Wa-Ga road.
Generally, road infrastructure in the district is of average to poor quality. This have a negative
impact on economic activities and investment potentials.
1.4.6 Energy
The Wa West District has recognized that extension of electricity to many communities would
greatly improve the quality of life of the people; as the facility is being used for other industrial
works such as carpentry workshops, blacksmithing, welding, vulcanizing, fitting shops and agro
processing (shea butter and groundnut extraction). This helps to generate some employment as
well. Twenty (20) communities have been connected to the national grid whilist five (5) others
were being looked on. There is also a plan to extend the national grid are currently to more
communities in the district in the near future. The district hopes that this would help create
businesses thereby reducing the out migration of the youth to the south in search of non-existing
jobs.
35 | P a g e
The use of LPG is unpopular to majority of the people living in the district. The minimum use of
LPG can be attributed to the high cost of equipment and also the unavailability of gas service
station in the District.
This has therefore resulted in the wanton cutting of trees for domestic fuel. Economic trees such
as Shea trees are mostly affected in this venture. This has the potential of further reducing the
already low incomes of the people, especially women thereby exacerbating the poverty situation
in the area.
1.5 SOCIAL SERVICES
1.5.1 Education
1.5.1.1 Institutions and Education Enrolment in the District
These are four levels of education in the district. These are the Kindergarten, Primary, Junior
High School and Senior High School. The focus of this resulted oriented plan is on the basic
schools. As such Senior High Schools are not part of this plan. Table 1 below shows the number
of institutions within each level as well as the corresponding enrolment.
Table 1.6 Institutions: Levels and Enrolment in the District.
Level Indicator 2010/2011 2011/2012 2012/2013 Number of
Schools 2012/13
Kindergaten Enrolment 3,290 1,985 5,246 64
GER 84.43 63.5 89.3
Primary Enrolment 16,200 33 17,449 81
GER 96.0 88.5 121.1
Junior High
School
Enrolment 3,867 2,824 5,064 51
GER
Total 23,257 13,842 27,759 196
The high enrolment especially in primary is due to sustained school feeding programme,
disbursements however call for complementary provision of infrastructure, teaching and learning
36 | P a g e
materials as well as teachers to ensure that children have access to quality education in the
district.
1.5.1.2 Teaching Staffing in the District
The quality and quantity of teaching staff remain key factors in education delivery. In the district,
teaching staff comprises the trained and untrained teachers. Table 2 shows the teaching staff
situation in the district.
Table 1.7 Teaching Staff Situation in the District (2012/13)
Level Total
Enrolment
Trained
Teacher
Untrained
Teachers
Total Teachers Teacher Pupil
ratio
Kindergaten 5,246 9 36 45 1:582
Primary 17,449 90 299 389 1:184
Junior High
School
5,064 82 165 247 1:62
Total 27,759 181 500 681 1:153
As indicated in table 1.7, the high number of untrained teachers implies that teaching skills are
limited and this affects quality delivery across levels.
The untrained teachers include Government appointed pupil teachers, National Youth
Employment Teachers and National Voluntary Service Teachers. These categories of teachers
require In-service training to enable them improve their teaching skills.
37 | P a g e
1.5.1.3 Educational Infrastructure
Quality education delivery requires adequate infrastructure (classrooms, workshops and furniture)
for both the pupils and the teachers. At the primary level, there are 324 classrooms. With the
current enrolment, there is a backlog 84 classrooms. There are 121 classrooms in all the Junior
High Schools in the district with a backlog of 10 classrooms. A relatively low number of
classrooms are needed in the JHS because of low enrolment at the level. However, 74 classrooms
and 153 classrooms at the JHS and primary respectively need major repairs. In the district, 40
JHS do not have workshops for practical work.
In terms of furniture, the kindergarten has a backlog of 1,444 dual desks. At the primary and JHS
level, the backlog stands at 3,571 dual desks and 3,990 dual desks respectively.
38 | P a g e
39 | P a g e
1.5.1.4 Educational Performance (BECE)
Quality education is partially measured by the performance rate of students and that of the
transition rate. In the 2012/2013 academic year, 708 candidates (students) were presented for the
Basic Education Certificate Examination. Out of this number, 704 actually wrote the examination
and 369 candidates passed, representing 52.41%. This implies that 47.59% of the students were
not qualified to enter the next stage of education (Senior High School) and stand the risk of socio-
economic vices. This has negative effects on the human resource development of the district and
nation at large.
1.5.1.5 Education Sector Problems
There are a lot of development problems within the education sector. An analysis of these
problems identified the causes of the problems as presented below. These problems collectively
lead to poor quality of education.
i. Inadequate infrastructure especially classrooms for all levels and workshops for the
Junior High Schools.
ii. Low school enrolment
iii. Inadequate teachers, especially trained teachers. The district has the highest number of
untrained teachers in the region.
iv. Poor monitoring and supervision due to inaccessibly road to schools.
v. Low pupils retention/high school dropout especially at JHS level due to elopement.
As part of efforts to solve these problems, stakeholders in the sector including Ghana Education
Service, development partners, District Assembly/Government of Ghana to make the following
interventions within the sector. These include;
i. provision of schools infrastructure
ii. Recruitment of teachers especially untrained ones as a short term measure
iii. Sponsorship and bonding of teacher trainees
iv. Sensitization of communities on the need to enroll children and retain that, especially
the girl child
v. Provision of teacher accommodation
40 | P a g e
1.6 HEALTH
1.6.1 Health Infrastructure
A summary of the total numbers of health centers, maternity homes and community health
compounds in Wa West District is provided in Table 1.8 below. Wa West District has a total of
24 health institutions made up of 5 public health Centre, 1 public maternity, 1 private maternity
home, 1CHAG facility and 14 Community-based Health Planning and Services (CHPS) Centre
that have community health officers’ compounds (CPOs).
Table 1.8 Health Facilities by Sub-district.
AREA COUNCIL Health Centre Maternity Home CHAG
CHPS
Compounds
TOTAL
WECHIAU 1 1 0 2 4
DORIMON 2 0 0 4 6
VEIRI 0 0 1 4 5
GA 1 1 0 4 6
GURUNGU 1 0 0 2 3
TOTAL 5 2 1 16 24
41 | P a g e
42 | P a g e
1.6.2 Clinical Care
Comparatively, utilization of facilities increased tremendously from 55700 in 2013 as against
54096 in 2012 and 44168 in 2011 then 30793 in 2010 for insured clients whilst general utilization
for all clients appreciated with OPD attendance par-capita increasing from 0.37 in 2010,0.53 in
2011 and 0.64 in 2012 then to 0.65 in 2013..
A number of factors accounted for the increase in services utilization such as education on early
care seeking, insurance facility improved financial accessibility, and the creation of more CHPS
zones which improved geographical access to health facilities
Table ;showing total OPD attendance visa-vis per capital attendance
0
20000
40000
60000
2010 2011 2012 2013
Total OPD attendance 30793 44168 54096 55700
Per capita 0.37 0.53 0.64 0.65
OPD ATT. vrs PER CAPITAL
Year Total OPD attendance Per capita
2010 30793 0.37
2011 44168 0.53
2012 54096 0.64
2013 55700 0.65
43 | P a g e
1.6.3 Top Ten Causes of OPD Attendance
Despite the implementation of many interventions towards reducing the incidence of malaria, it is
still ranked the top cause of OPD attendance across the health facilities. There was also an
increase in the number of cases compared to previous years. The top four diseases, Malaria, acute
respiratory tract infection, skin disease and other ulcers, Diarrhoea remains constant over the
period. Although the number of cases increased, the percentage increase is not following the
pattern
Table 1.9 Top Ten Causes of OPD Attendance 2010 – 2013
2010 2011 2012 2013
Conditi
on /
Disease
No.
Cas
es
Rank
/%
Conditio
n /
Disease
No.
Cas
es
Rank
/%
Condit
ion /
Diseas
e
No.
Cas
es
Ra
nk
Conditio
n /
Disease
No.
Cas
es
Ran
k/
%
Malaria 197
53 54.8 Malaria
261
17 58.3
Malari
a
283
48
42.
1 Malaria
395
23
45.
1
ARI 423
9 11.8 ARI
547
2 12.2 ARI
111
20
16.
5 ARI
126
00
14.
4
Skin
Disease
s
238
2 6.6
Skin
Diseases
309
4 7
Skin
Diseas
es
442
2 6.6
Skin
Diseases
460
5 5.3
Diarrho
ea
124
6 3.5
Diarrhoe
a
221
7 5
Diarrh
oea
429
4 6.4
Diarrhoe
a
459
5 5.2
Eye
infectio
n
726 2 Eye
Infection
134
1 3
Eye
Infecti
on
152
6 2.3
Eye
Infection
190
5 2.1
Total OPD Cases INSURED NON-INSURED
Series1 55700 48883 6817
0
10000
20000
30000
40000
50000
60000A
xis
Titl
e
44 | P a g e
Ear
Infectio
n
569 1.6 Ear
Infection 800 1.8
Ear
infecti
on
130
4 1.9 Anaemia
164
9 1.9
Pneum
onia 471 1.5
Intestina
l Worms 686 1.5
Intesti
nal
Worm
s
114
7 1.7
Rheumat
ism &
Joint
Pains
158
1
1.8
Snake
Bite 469 1.4
Pneumo
nia 655 1.4
Anaem
ia
109
6 1.6
Acute
Ear
infection
151
6 1.7
Home
Acciden
ts
466 1.3
Home
Accident
s
504 1.1
Home
Accide
nts and
I
624 0.9 Intestina
l Worms
108
6 1.2
RTA 356 1 Rheumat
ism 25 0.1 RTA 466 0.7 UTI 794 0.9
Source: Wa West District Health Directorate, 2013
1.6.4 Malaria Control
Malaria, the leading cause of morbidity in the district as usual, brought 19,184 patients for care.
That is 49.3 percent of the 38,875 out-patient attendance for 2013. The malaria cases for 2011
was 26,117 (58.3%), 19,753 (54.8%) in 2010. Confirmed cases for 2012 were x (%).
As in previous years children under five bore the biggest brunt of this scourge accounting for
47.3% of all the malaria cases. Pregnant women with malaria were 318 (1.7%). The district
carried out Indoor Residual Spraying in collaboration with AGAMAL and also hanged Long
Lasting Insecticide Treated Nets in almost all rooms in collaboration with UNICEF.
The district is implementing the Intermittent Preventive Treatment policy using Sulphadoxine-
Pyrimethamine (SP) combination. Systematic public education was intensified with the objective
of increasing awareness about the causes of malaria and the role of individuals and the general
public in its prevention
. The use of the RDTs has reduced the over diagnoses of every febrile condition as malaria hence
the reduction in the malaria cases.
45 | P a g e
1.6.4.1 ITN
ITN was also promoted in an attempt to combat the malaria menace. Health promotion messages
were given to house holds on the importance of the use of the ITNS
1.6.5 Under-Five Mortality
One of the MDG indicators seeks to reduce by two-thirds, between 1990 and 2015, the under-five
mortality rate from 208 to 112.. Unfortunately the district has no hospital and for that matter
records are not available.
1.6.6 MATERNAL DEATHS
Unfortunately, these deaths occurs in the Regional Hospital 4 institutional maternal deaths were
recorded at Wa Regional Hospital originating from the district and one community death
recorded .the incidence of maternal death in the district is now on the increase, the year 2013
recorded 5 maternal deaths, 2012 recorded 4, 2011 recorded 3 and 2010 recorded 3.
Unfortunately, the district recorded a community maternal death in the year 2013 which should
not have happened given a large coverage of health education on maternal health.
This development is a major setback and a threat to the achievement of MDGs goal 5, with a
target of to three quarters the maternal mortality ratio by 2015. This situation implies more
efforts in terms of human, material, and structural requirements are needed to meeting MDG 4
and 5.
1.6.7 Guinea Worm
Guinea worm is of public health importance due to itsimpact on development. Guinea worm
recorded.
The last Guinea Worm case recorded was in 2006 and it originated from outside the district. Two
suspected case were recorded investigated and in 2013 similarly, two rumor cases investigated
and discarded in 2012. Household surveillance has continued in endemic communities and public
awareness created in all communities. Documentation was strengthened towards certification and
the Cash reward system awareness creation is ongoing.
1.6.7 Leprosy Prevalence
46 | P a g e
The prevalence of leprosy cases in the district is on the increase, this call for concern. Eleven new
cases were recorded in 2013, 2012 recorded zero case while 2011 registered 13 patients of which
all were multibacillary and no paucibacillary cases for 2011 were treated and cured.
1.6.8 HIVAIDS
TABLE SHOWING HCT SERVICES FOR 2010-2013
SUB-
DISTRI
CT
2010 2011 2012 2013
# Tested # Pos # Tested # Pos # Tested # Pos # Tested # Pos
M F M F M F M F M F M F M F M F
DISTRI
CT 188 128 9 11 111
2
3
4
5 14 10
3 153 5 8 14
1
5 1 2
TOTAL 316 20 345 19 256 13 29 3
FIGURE; DEPICTING HCT SERVICES FOR 2010-2013
2010 2011 2012 2013
TESTED 316 345 256 29
POSITIVE 20 19 13 3
0
100
200
300
400
Axi
s Ti
tle
HCT SERVICES
47 | P a g e
TABLE; SHOWING PREVENTIO OF MOTHER TO CHILD TRANSMISSION SERVICES
FOR 2010-2013
CATEGORY 2010 2011 2012 2013
PREG. WOMEN 2323 2368 3034 1856
TESTED 2169 2029 2918 1560
POSITIVE 17 6 11 16
FIGURE; DEPICTING PMTCT SERVICES FOR 2010-2013
Tabl 1.10 Summary Table of Wa West District HIV/AIDS Situation
2010 2011 2012 2013
PREG. WOMEN 2323 2368 3034 1856
TESTED 2169 2029 2918 1560
POSITIVE 17 6 11 16
0
500
1000
1500
2000
2500
3000
3500
Axi
s Ti
tle
PMTCT SERVICES
2010 2011 2012 2013
SCREENED 5343 2374 3174 1589
POSITIVE 37 25 24 19
PREVALENT RATE 0.7 1.1 0.8 1.2
0200040006000
Axi
s Ti
tle
Chart Title
2010 2011 2012 2013
PREG. WOMEN 2323 2368 3034 1856
48 | P a g e
Table; 1.11 showing cases and prevalent rate
The sixth MDG is to halt and reverse the spread of HIVAIDS. It is in line with this that the Wa
West District has intensified efforts in this area as a priority. Over the years there has been a
gradual reduction of cases as indicated in the graph. This was as a result of awareness creation on
the disease; largely through the support of Ghana AIDS Commission and some voluntary
organizations operating in the district
TESTED 2169 2029 2918 1560
POSITIVE 17 6 11 16
2010 2011 2012 2013
SCREENED 5343 2374 3174 1589
POSITIVE 37 25 24 19
PREVALENT RATE 0.7 1.1 0.8 1.2
2010 2011 2012 2013
TOTAL 37 25 24 19
PMTCT 17 6 11 16
HCT 20 19 13 3
0
10
20
30
40
50
60
70
80
FRQ
HIV STATUS
49 | P a g e
Table 1.10 and 1.11 shows that the an unstable prevalence rate of clinical cases flachulating from
0.7 % in 2010 to 1.1% 2011 and 0.8% in 201 to 1.1% which is lower than the national average
and therefore does not constitute a major threat to achieving MDGs goal 6.
Notwithstanding this low prevalence rate, the implication of the current situation, especially on
the economically productive age group is that man-work hours as well as production will be
affected, leading to low productivity either in food production, income generation or salary
earned jobs leading to poor feeding due to lack of money. This also affects other services such as
education, health, good housing etc due to low-income levels of parents/ guardians. The gross
impact is increase in poverty in the district.
1.6.9 National Health Insurance Scheme
In addition to infrastructure and human resources, one major resource that ultimately determines
the access and quality of health care delivery is financing. The heavy burden of this has been
greatly alleviated by the National Health Insurance Scheme which has been established in every
district in Ghana. The Wa West District Health Insurance Scheme commenced operation in
January 2007.
Records from the District Health Insurance Scheme indicate that in 2009, 55,268 people
registered with the scheme, representing 67% of the population. This is quite good even though
it falls short of the national target of 70% coverage.
1.6.9.1 Health Challenges
Looking at the table above, out of the total OPD clients of 55700 in 2013, 48883 (87.8%) of
them were insured and 6817 (12.2%) non-insured. OPD Utilization by Insurance has continued
to increase from year to year as the noon insurance continued to decrease accordingly.
1.6.9.1 Health Challenges
Poor physical accessibility to health services notwithstanding the increased outreach
stations and static health facilities in the district.
Inadequate equipment for Health facilities
50 | P a g e
Patient and staff accommodation is inadequate to meet current demands
Communication between communities and health delivery outlets remains poor
Low pace of CHPS construction
• Low skilled delivery
• Inadequate and aged midwives in the district.
• Maternal and infant death on the increase
• Dabo dilapidated CHPS compound
• Jenbob collapsed CHPS compound
• No accommodation for a medical doctor and district director and other critical staff for
starting a hospital
These are all critical issues, which needs immediate attention by the DA and the District Health
Directorate as they could threaten the ability of the district to provide good quality health
services and negatively affect the achievement of MDGs’ goals 4, 5 and 6 on especially child
and maternal health care.
WATER AND SANITATION
1.7.1 Water
The availability of and accessibility to improved drinking water is an important aspect of the
health of household members. The UN Millennium Development Goal (MDG) Seven aimed to
reduce by half the proportion of people without sustainable access to safe drinking water by 2015
based on 1990 levels. The source of water supply particularly for drinking has a tremendous
effect on burden of diseases. For instance, one of the main health benefits of clean drinking water
supply is a reduction in diarrhoea.
Water sources are often classified as ‘improved’ or ‘unimproved’: Sources considered as
improved are piped public water into homes, public standpipe, borehole, protected (lined) dug
well, protected spring, and rainwater collection; unimproved are unprotected wells and springs,
vendors, and tanker-trucks (WHO and UNICEF, 2000).
51 | P a g e
Source of drinking water is one of the indicators used to assess the standard of living of people.
sources of drinking water for households in the district can be categorised broadly into pipe-
borne water, boreholes/wells, rain water and river/stream.
Of these sources of drinking water, the use of borehole/pump/tube well was the most common,
accounting for more than three-quarters (79.3%) households in the district. A small percentage
(8.8%) of households also reported river/streams as source of drinking water. Pipe-borne inside
dwelling and rain water accounting for (0.2%) each being the least source of drinking water in
the district.
Table 8.10: Main source of water of dwelling unit for drinking and other domestic purposes
Sources of water
Total
country Region
District
Total Urban Rural
N % % %
Main source of drinking water for household
Total 5,467,054 110,174 11,486 100.0 - 100.0
Pipe-borne inside dwelling 790,493 5,933 19 0.2 - 0.2
Pipe-borne outside dwelling 1,039,667 12,542 396 3.4 - 3.4
Public tap/Standpipe 712,375 4,807 106 0.9 - 0.9
Bore-hole/Pump/Tube well 1,267,688 70,759 9,113 79.3 - 79.3
Protected well 321,091 4,011 190 1.7 - 1.7
Rain water 39,438 172 26 0.2 - 0.2
Protected spring 19,345 368 30 0.3 - 0.3
Bottled water 20,261 50 2 0.0 - 0.0
Sachet water 490,283 823 53 0.5 - 0.5
Tanker supply/Vendor provided 58,400 302 2 0.0 - 0.0
Unprotected well 112,567 1,719 124 1.1 - 1.1
Unprotected spring 12,222 287 36 0.3 - 0.3
River/Stream 502,804 7,037 1,010 8.8 - 8.8
Dugout/Pond/Lake/Dam/Canal 76,448 1,344 374 3.3 - 3.3
Other 3,972 20 5 0.0 - 0.0
Currently, the Wa West District Assembly can boasts of 234 functioning Boreholes fitted with
hand pumps. There are no existing small town water systems in the District. There also 9
institutional boreholes in the district.
52 | P a g e
The Wa West District Assembly has also stepped up the drilling of boreholes in communities.
Currently 55 are under construction from the implementation of the SRWSP . Maintenance of
boreholes is also carried out on large scale and the drilling of boreholes for communities without
water has been scaled up. The intension of the District is to construct Small Town Water
Systems for five( 5) major communities but this did not materialize only the construction of the
Wechiau Small Town Water System at elementary stage
It is the intension of the Wa West District Assembly that, Wechiau, the District capital, Dorimon,
Vieri, Ga and Gurungu could benefit from the small towns water systems by the end of 2013.
The water coverage is currently at 73.0 % from the 65 % level recorded in 2009.
53 | P a g e
54 | P a g e
1.7.2 Sanitation
Potable water goes with good sanitation facilities and practices. This will help reduce the water
and sanitation related diseases in the area. However, in the district, good sanitation practices
have been relegated to the background and efforts are being put in to scaling it up tremendously.
Only 32.05% of the population in the district has access to sanitation facilities. Currently, the
district has 6 KVIPs, 3 Septic Tanks and 1,606 household latrines. There are 34 institutional
latrines also in the district. As there is low coverage of sanitation facilities, especially toilets,
defecating in the bushes and behind houses is a common practice in the towns and villages.
There are few public toilets within the district, however, their conditions add up deterring some
people who would prefer using the public toilets to the “free-range” (Defecating in the bush)
habit. This has adverse health implications.
The table below indicates Sanitation Facilities by type and coverage in the District.
Table 1.12 Sanitation Facilities in the District
AREA COUNCIL POPULATION SANITATION FACILITIES
Sceptic Tank KVIP VIP COVERAGE (%)
GA 18,001 1 1 233 16.77
GURUNGU 8,508 0 0 432 53.24
DORIMON 22,672 1 2 461 20.50
VIERI 17,220 0 1 186 11
WECHIAU 14,377 1 2 292 13.03
TOTAL 81,349 3 6 1606 16.05
Source: DWST-WA WEST, 2014
Sanitary facilities in the district are woefully inadequate. The Assembly also received and
distributed a number of rubber dustbins, which were placed at vantage points to improve the
sanitary situation if well used.The introduction of School Hygiene and Education System under
the SRWSP has helped in educating school children to be champions of change with regards to
55 | P a g e
sanitation practices in the district. Open Defecation Free(ODF) has also been introduced to
educate people on the importance of constructing household latrines instead of defecating openly
in the bush.
Toilet Facilities
Many district authorities have been grappling with the problem of sanitation, especially the
disposal of solid waste. Figure 8.4 presents the distribution of households by type of toilet
facility. The data show the various types of toilet facilities available to households in the
districts.
Most households use bush or open field for toilet (85.9%). Use of pit latrine constitutes about
(9%). About 3.1 percent of households use public toilet. KVIP is the fourth highest means of
defecation with 1.2 percent followed by W.C. with 0.9 percent. Bucket/Pan is not in existence in
the district.
The use of bush, or open field as toilet facility is more pronounced in rural areas than in urban
areas as indicated by figure 8.4.
Figure 8.4 Toilet Facility
Source: Ghana Statistical Service, 2010 Population and Housing Census
85.9
0.9
8.8
1.2 0.03.1
0.10.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
Per
cen
tag
e
Toilet Facility
Rural
56 | P a g e
57 | P a g e
1.7 Vulnerability Analysis
1.7.1 Introduction
Vulnerability may be defined as the probability that livelihood stress will occur. It has been
defined as the lack of capacity (of a household) to cope with an adverse shock or a households
resilience against a shock. That is the likelihood that a shock will result in a decline in well-being
of the household. Exclusion and lack of voice can also determine the extent of a person’s access
to resources. Lack of voice and the inability to make recourse to justice can increase a person’s
vulnerability to injustice and corruption and thus exclusion.
1.7.2 Vulnerable and Excluded Groups
In the Wa West District, the following groups have been identified as vulnerable and excluded:
children in difficult circumstances (those from low income and broken homes and orphans).
These children are likely to suffer from malnutrition or be involved in economic activity at an
early age (child labour/street children), adolescent girls (those from low income and broken
homes and single mothers as well as commercial sex workers), Persons living with HIV/AIDS,
the aged, persons with disability, women and unemployed youth and subsistence food/vegetable
farmers were also identified as vulnerable and excluded.
1.7.3 Types of shock facing households in the District
The Wa West District as a major agricultural area is also dependent on rainfall for production.
As a result the major shocks affecting food availability, incomes and wealth accumulation are
those that relate mainly to crop production. The economic activities that individuals and
household are involved in also determine to a large extent vulnerability to income and asset loss
in the Municipality.
Three main types of shocks affecting most families in the District relate to the areas of food
insecurity, human insecurity and job insecurity. Household also face a wide variety of shocks
ranging from natural events to man-made (that is conflicts, policy induced, terms of trade shocks,
illness and deaths). The most cited shocks are production related. This may occur as a result of
58 | P a g e
crop failure due to poor rains affecting harvests or pest invasion affecting storage.
Price- related shocks rank second. Due to the fluctuating prices of agricultural produce and
inadequate storage and processing facilities, increased harvest usually end up in glut of produce
and low prices. Farmers then tend to sell off their produce immediately after harvest when prices
are low. Farmers, especially subsistence ones, are forced to buy back the produce during the lean
season, when prices are at their highest levels.
At the community level most communities reported of events relating to rainstorms that affect
houses including schools and other individual and community’s building as well as flooding
during the peak rainfall periods.
1.7.4 Coping Strategies/impacts of shocks
In Wa West District most poor households respond to shocks by recourse to self help coping
strategies like selling of assets or livestock and informal insurance mechanisms. The non-poor
also use both self-help mechanisms, as well as market-based strategies such as falling on savings
and banks loans. Majority of household do not use formal insurance mechanisms.
The extent to which the affected household or individual can gain access to credit, private
transfer or public safety nets to help maintain consumption, may determine the type of response.
When it is not possible to access any public safety nets or sufficient credit to maintain current
consumption, recourse may be made to other strategies that either directly or indirectly reduces
assets or further consumption. This situation tends to further worsen the individual or households
Current disaster management programmes which need to be strengthened and the role of social
assistance expanded. Greater collaboration between agencies/organizations for the sector needs
to be promoted to enhance effectiveness of assistance. Reliable data on the vulnerable, excluded
and disadvantaged persons need to be addressed.
1.7.6 Gender Issues
Current statistics indicates that women in Wa West District form more than 50% of the total
59 | P a g e
population in the district and their roles have mainly been defined and shaped along biological
and cultural lines. Women as homemakers and caregivers are challenged to provide food
security and material needs and are therefore actively engaged in economic activities. Strides
have been made in all sectors of the economy especially in agro processing and services.
However, women continue to face considerable constraints that prevent them from taking full
advantage of opportunities that are available to them. Women experience the worst form of
poverty, generally they continue to have limited access to and control over land, inadequate
access to credit for production and expansion of businesses, inadequate skills and training, less
formal education and fewer numbers in decision making process at both community and national
levels.
The programmes identified in the plan are in line with the National Gender and children policy,
Early Childhood Care and Development policy and the Ghana Shared Growth and Development
Agenda (GSGDAII). Under the plan, activities that will improve the social, economic and
political status of women and enhance the development and potential of children have been
identified and will be implemented and monitored accordingly.
1.8 GOVERNANCE
1.8.1 Local Governance
The Wa West District Assembly constitutes the highest political authority in the district. it
guides, directs and supervises all other administrative authority in the district. It has five (5) Area
Councils and a number of unit committees. The Assembly itself is made up 28 members all of
them elected with two of them being women. Among the government appointees, four(4 ) are
women.
This underscores the need to encourage more women to offer themselves for district level
election and to appoint more government appointees as women to bridge the gender imbalance in
the Assembly. There are also 5 sub-committees with deliberative functions. In line with Act 462,
Wa West District discharges its functions through sub-committees. Apart from the mandatory
sub-committees (Finance and Administration, Development Planning, Social Services, Works,
and Justice and Security) Wa West District has two other sub-committees; namely: Women and
60 | P a g e
Children and Public Relations and Complaints. The creation of these additional sub-committees
has great relevance especially if they focus strongly on the development issues of those areas.
Local governance in Wa West District reflects the provisions in the Local Government Act of
1993 (Act 462). The District Assembly (established by Legislative Instrument LI 1751 is the
highest political, administrative and planning authority in the district and has deliberative,
legislative and executive functions. The main features of the decentralized system are reflected in
a number of legislations including the following: -
1. The 1992 Constitution of the Republic of Ghana
2. Local Government Act, 1993 (Act 462)
3. The National Development Planning [System] Act 1994 (Act 480)
4. The District Assembly Common Fund Act 1994 (Act 455)
61 | P a g e
1.8.1.1 Decentralized Departments
Out of the eleven decentralized departments of the assembly, only a few are operational in the
district as shown below:
Table 1.13 Decentralized Departments in the District
No Department Constituent Available/Not available
1 Central Administration
General Administration Available
District Planning Co-ordinating Unit Available
Births and Deaths Registry Available
Information Service Dept. Available
Statistical Service Not available
2 Education, Science and
Sports
Education, Science and Sports Available
Ghana Library Board. Not available
3 Social Welfare and
Community
Development
Social Welfare Available
Community Development Available
4 Finance Controller and Accountant General Available
5 Physical Planning Department of Town and Country
Planning
Available
Department of Parks and Gardens Not available
6 Works Public Works Department Available
Department of Feeder Roads Not available
Rural Housing Not available
7 Trade and industry Trade Not available
Cottage Industry Not available
62 | P a g e
Co-operatives Not available
8 Natural resource
conservation
Forestry Not available
Games and Wildlife Not available
9 Health District Health Administration
Team
Available
Environmental Division of MLG Available
10
MOFA
Department of Animal Health &
Production
Available
Department of Fisheries Available
Department of Agricultural
Extension Services
Available
Department of Crop services Available
Department of Agricultural
Engineering
Not Available
11 Disaster Prevention Fire Service Department Not available
NADMO Available
Source: Wa West District Assembly, 2013
1.8.2 Traditional Authority
Alongside the decentralized governance system is a parallel traditional governance system which
appears not to be in harmony with the district assembly system thereby stifling development in
the local area. Even though the two governance systems both seek the development of their area,
they are not able to complement each other as a team towards achieving the common goal of
development. This may be traced to the subtle power dynamics and competition for control of
resources between the two systems. The district has two paramountcies: Wechiau and
63 | P a g e
Dorimonheaded by Wechiau Naa and DorimonNaa respectively. There are also divisional and
sub-divisional chiefs under the authority of the two paramountcies.
Interactions between District assembly and traditional authorities in the district is often limited to
ceremonial role of chiefs during major functions as well as seeking land from chiefs for
development.
A remarkable feature of the traditional governance system in Wa West District is that there are
no chieftaincy conflicts in other parts of the country.
1.8.3 Judiciary and Security
The principles of good governance are achieved on the back of increased staff strength and
logistical support given to judicial and security forces of any geographical setting. Paradoxically,
the Wa West District has no court to maintain law and order and to adjudicate both civil and
criminal cases. There is therefore the need for a law court, especially at Wechiau to maintain and
sustain the peace.onomic Governance
1.8.4.1 Sources of Revenue
The major sources of revenue available to the District Assembly can be grouped into three:
Internally Generated Fund/Traditional (IGF), Locally Central Government Transfers (CGT) and
Donor Transfers
Internally Generated Funds comprises Rates, Lands, Fees, Licenses, Trading Services and
Miscellaneous Sources. Central Government Transfers are derived from; Grants, which
comprises: District Assembly Common Fund (DACF) and HIPC Funds, MP common Fund and
District Development Facility (DDF). Donor transfers comprise of funds extended to the district
from development partners.
64 | P a g e
Table 1.14 Internal Generated Fund
Type
2010 2011
2012
2013
Amount Percentage Amount Percent
age
Amount Percen
tage
Amount Percentage
Rates
5,502.10 7.47
3,392.76 4.45
3,853.00
11.92
15,371.30 14.80
Lands
23,190.90 31.49
28,300.0
0 37.09
800.00
2.48 - 0.00
Fees
and
Fines
15,917.90 21.61
13,083.5
0 17.15
10,554.2
5
32.66
34,331.60 33.06
Licen
ses
7,076.16 9.61
19,445.0
0 25.49
7,126.00
22.05
8,819.50 8.49
Rent
401.00 0.54
107.00 0.14
20.00
0.06 - 0.00
Invest
ment
8,066.27 10.95
10,340.5
0 13.55
5,325.00
16.48
7,794.00 7.51
Misce
llaneo
us
13,500.00 18.33
1,626.00 2.13
4,640.00
14.36
37,533.85 36.14
TOT
AL
73,654.33 100.00
76,294.7
6
100.00
32,318.2
5
100.00
103,850.25 100.00
SOURCE: Wa West District, 2013
From the above table, it is clear that the Assembly has a low IGF. This is as a result of the low
revenue base, unwillingness on the part of the community members to pay their tax obligations.
65 | P a g e
Another major reason for the low IGF is poor reporting and accounting system. The Assembly
lacks the machinery to ensure proper accounting from revenue collectors.
Finally, it was identified that the relatively low level of economic activities in the District serves
as a barrier to any effort aimed at increasing revenue mobilization in the District. The low IGF
implies that the District is over dependent on external sources for the financing of its
development projects. This high degree of dependence could affect the autonomy of the
Assembly and undermine its decision-making system.
Table 1.15 External Source of Revenue
Type
2010 2011
2012
2013
Amount Percentage Amount Percentag
e
Amount Percentage Amount Percen
tage
DACF&
MPCF
213,635.0
2 15.02
1,669,774.
04 71.41
676,226.6
2 20.80
559,380.83 13.91
DDF
765,900.8
5 53.84
168,147.23 7.19
2,084,653.
57 64.14
1,586,839.
44 39.46
GSFP
13,000.00 0.91
11,930.00 0.51
206,134.0
0 6.34
785,877.30 19.54
CBRDP/
GSOP
92,283.10 6.49
106,316.64 4.55
124,358.9
8 3.83
628,855.14 15.64
DWAP
258,549.3
0 18.18
282,507.53 12.08
- 0.00
- 0.00
SRWSP - 0.00 - 0.00 - 0.00 397,072.66 9.87
66 | P a g e
HIPC
62,000.00 4.36
5,060.00 0.22
110,000.0
0 3.38
- 0.00
PWD
- 0.00
-
91,679.87 3.92
48,936.30 1.51
60,578.45 1.51
MSHAP
17,169.00 1.21
3,000.00 0.13
- 0.00
2,400.00 0.06
TOTAL
1,422,537.
27 100.00
2,338,415.
31 100.00
3,250,309.
47 100.00
4,021,003.
82 100.00
1.9 DEVELOPMENT PARTNERS OPERATING IN THE DISTRICT
Development Partners in the District contribute in diverse ways in the development of the
district. These organizations contribute immensely in the pr
67 | P a g e
vision economic and social services to better the lot of the people in the district. The table below
shows the Development Partners operating in the District as well as their areas of operations.
Table 1.16 Development Partners and their Area of Operation
NO. DEVELOPMENT PARTNER AREA OF OPERATION
1 Plan Ghana Education, Health/HIV/AIDS, Livelihood/Food
security and, Water and Sanitation
68 | P a g e
2 CRS School Supplementary Feeding Programme
3 SNV Capacity Building
4 CAMfed Education
5 CHALICE Education and Health
6. UNICEF Education, Health, Tourism, Water and
Sanitation
7 UNFPA Health
8 CARD Microfinance, food security, water and
sanitation
9 EDUCATION FOR LIFE Education
Source: Wa West District Assembly, 2013
An unfortunate happening is that some of these development partners do not inform the District
Assembly about their plans and implementation strategies in the communities they operate,
neither do they submit their annual reports for review. This has made it difficult to track their
performance and impacts in the communities in which they operate.
This weak collaboration between the District Assembly and these organizations need to be
addressed to enhance effective coordination of activities and the realization of desired results.
1.9 Summary of Key Development Problems
The under mentioned development problems have been identified in consultation communities
and identified groups as well as analysis of current development status of the district.
1. Lack of adequate tourism infrastructure
2. Ineffective cultural practices amongst small holder farmers leading to comparatively
lower yields
3. Inadequate and poor quality data and lack of proper monitoring system
4. poor surveillance of livestock diseases
69 | P a g e
5. Increasing trends in deforestation, degradation and biodiversity loss with adverse
consequences for agriculture
6. Increasing frequency and impacts of droughts, floods, forest fires and other natural
hazards
7. Inadequate power supply infrastructure and access to electricity
8. Low accessibility to telephone facilities
9. Poor and inadequate internet infrastructure
10. Limited deployment of ICT infrastructure in educational institutions
11. Lack of spatial land use plans
12. Weak enforcement of planning and building regulations
13. Inadequate human and institutional capacities for land use planning
14. Inadequate access to quality and affordable water
15. Inadequate access to sanitation facilities and poor sanitation service delivery
16. Inadequate access to basic education
17. Infrequent and ineffective supervision of teaching and learning in educational institutions
18. Inadequate teacher housing facilities in deprived communities
19. High infant and maternal mortality
20. High morbidity and mortality from communicable diseases such as malaria, HIV/AIDS
and TB
21. High stigmatization of PLWHIV
22. Limited coverage of social protection interventions
23. Lack of reliable and adequate data on disable people
24. Low awareness of and violation of child rights
25. Poor performance of the local governance system due to inadequate participation
26. Inadequate women representation and participation in public life and governance
27. Inaccessibility of justice
70 | P a g e
28. Limited public awareness and advocacy on rights and responsibilities
29. Weak internal revenue mobilization
30. Weak capacities of personnel and logistics shortfall
31. Weak employment generation capacities at the district level
61 | P a g e
CHAPTER TWO
2.0 DISTRICT DEVELOPMENT PRIORITIES
2.1 Introduction
This sub-section presents the prioritized development issues/problems identified and listed in the
previous section. These prioritized issues have been grouped under the pillars of the Medium
Term Development Policy Framework (MTDPF) document.
The focus of the MTDPF is to address the economic imbalances, re-stabilizing the economy,
placing it on a path of sustained accelerated growth and poverty reduction towards the
millennium development goals and middle income status within a measurable planning period.
2.2 List of development priorities in the district
In line with the priority areas of the MTDPF, the main development issues of the Wa West
District have been prioritized and presented under the seven thematic areas. These are shown in
the ensuing sub-sections.
Thematic Area1: Enhancing Competitiveness in Ghana’s Private Sector
1. Lack of adequate tourism infrastructure
Thematic Area 2: Accelerated Agricultural Modernization and Sustainable Natural
Resource Management
1. Ineffective cultural practices amongst small holder farmers leading to comparatively
lower yields
2. Increasing frequency and impacts of droughts, floods, forest fires and other natural
hazards
3. Increasing trends in deforestation, degradation and biodiversity loss with adverse
consequences for agriculture
4. Poor surveillance of livestock diseases
5. Inadequate and poor quality data and lack of proper monitoring system
62 | P a g e
Thematic Area 3: Infrastructure, and Human Settlement Development
1. Inadequate access to sanitation facilities and poor sanitation service delivery
2. Inadequate access to quality water
3. Lack of spatial land use plans
4. Inadequate power supply infrastructure and access to electricity
5. Low accessibility to telephone facilities
6. Poor and inadequate internet infrastructure
7. Inadequate human and institutional capacities for land use planning
8. Weak enforcement of planning and building regulations
9. limited deployment of ICT infrastructure in educational institutions
Thematic Area 4: Human Development, Productivity and employment
1. Inadequate access to basic education
2. High morbidity and mortality from communicable diseases such as malaria,
HIV/AIDS and TB
3. High infant and maternal mortality
4. Limited coverage of social protection interventions
5. Inadequate teacher housing facilities in deprived communities
6. Loss of quality human and material resources due to the HIV/AIDS pandemic
7. High stigmatization of PLWHIV
8. Lack of reliable and adequate data on disable people
9. Low awareness of and violation of child rights
10. Infrequent and ineffective supervision of teaching and learning in educational
institutions
11. Lack of office accommodation for District Directorate of Education
Thematic Area 5: Transparent and Accountable Governance
1. Weak internal revenue mobilization
2. Weak capacities of personnel and logistics shortfall
3. Inadequate women representation and participation in public life and governance
4. Poor performance of the local governance system due to inadequate participation
5. Limited public awareness and advocacy on rights and responsibilities
6. Weak employment generation capacities at the district level
7. Inaccessibility of justice
Thematic Area 6: Ensuring and Sustaining Micro-Economic Stability
63 | P a g e
thematic area 7: oil and gas development
2.2 Application of Potential, Opportunities, Constraints and Challenges (POCC) to
Development Problems
From the examination of the current situation of the district, key issues identified were subjected
to the analysis of the Potentials, Opportunities, Constraints and Challenges of the district in
respect of MTDPF (2014-2017). The tables below present the Potentials, Opportunities,
Constraints and Challenges of the District in line with the thematic areas of the MTDPF (2014-
2017).
64 | P a g e
TABLE 2.1 APPLICATION OF POCC TO KEY DEVELOPMENT PROBLEMS – WA WEST DISTRICT
PROBLEM POTENTIAL OPPORTUNITIES CONSTRAINTS CHALLENGES
THEMATIC AREA : ENHANCING COMPETITIVENESS OF GHANA’S PRIVATE SECTOR
TOURISM
Lack of adequate
tourism infrastructure
- Existence of Hippo
sanctuary
- DA support
- Sanctuary
Management Board
- Visitors centre
- accessible road
- Presence of GTB
- Ghana as a tourist
destination
- Development
partners ( e.g.
Calgary zoo)
- Existence of the
media
- Existence of
ministry of tourism
- Lack of modern
accommodation at
the tourist site
- Unattractive nature
of the tourist site
- Low marketing of
tourist attraction
- Low IGF
- Activities of hunters
- Activities of chain
saw operators
- Farming along the
Black Volta
- Inadequate donor
funding
- Poor access roads
- Bush fires
- limited involvement
of the DA
Conclusion: Lack of adequate tourism infrastructure can be addressed since enough potential and opportunities exist. The constraints
can be managed by collaborating effectively with the DA. Challenges can also be addressed through dialogue with development
partners, Ministry of Roads and by enacting and enforcing bye-laws on bush fires.
PROBLEM POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES
THEMATIC AREA : ACCELERATED AGRICULTURE MODERNISATION AND SUSTAINABLE NATURAL RESOURCE
MANAGEMENT
Low crop yields
- Availability of
extension officers
- Vast land for crop
production
- Availability of
- Good government
policies on agric
- Presence of
development
partners
- Inadequate
extension
officers
- Use of low
quality seeds
- Ineffective cultural
practices amongst
small holder farmers
- Soil infertility
- High cost of inputs
65 | P a g e
labour force
- Presence of
information
department and van
to disseminate
information
- Presence of dams
and river bodies to
support irrigation
-
- Availability of
improved seeds
- Presence of
MOFA
- Availability of
input credit
schemes (Block
Farm, SADA)
- Collaboration
with research
institutions
(SARI)
- High extension/
farmer ratio
- Bush fires
- Lack of
favourable credit
facilities
- Activities of foreign
cattle herds men
- Over reliance on
rainfall
- Reducing extension
staff numbers
- Low/slow adoption
of technologies by
farmers
- Low recovery of
credit schemes by
farmers
Conclusion: The district abounds with enough potentials and opportunities to increase the production levels of crops. The constraints can
be managed through the development of appropriate programmes for the use of dams for irrigation. The challenges can also be managed
through collaboration with partners and appropriate Ministries for infrastructural development and the provision of inputs.
Reducing
productivity of land
Availability of vast land to
support shifting cultivation - Increasing
availability of
organic fertilizers
- Availability of
high yielding and
short duration
crop varieties
- Continuous
cropping
- Tedious use of
organic manure
compared to
inorganic fertilizer
- Continuous use
of chemical
fertilizers
- Low cost of
inorganic
fertilizer
comparative to
organic fertilizer
High post-harvest
losses
Available knowledge on
processing and storage
techniques
- Availability of
warehouses
- Poor maintenance
of available
warehouses
- Bush fires
- Inadequate
storage
facilities
- Poor road
network
- High investment
cost of communal
storage houses
- Inadequate
66 | P a g e
market for
produce
- Competition with
cheaply imported
foreign products
-
Climate change
effects
Availability of water
bodies (Black volta, dams)
to support irrigation
- Introduction of
new crop
varieties suitable
to climatic
conditions
- Availability of
resource person
(s) on climate
change
- Collaborative
efforts between
various
stakeholders
(EPA, Hippo
sanctuary board
etc)
- Reducing
productivity of
staples
- Limited technical
know-how on
climate change
issues
-
- Changing rainfall
distribution
patterns
- Conservative
farmer attitudes
- Low/slow
adoption of
technologies by
farmers
Inadequate and poor
quality data and lack
of proper monitoring
systems
- Existence of farmer
groups
-
- Presence of
telecommunicatio
n facilities
- Presence of
MOFA
- Good road
network
- Presence of
NGOs
-
- Inadequate
capacities to collect
and analyze data
- Low IGF
-
- Dwindling donor
support
- Inadequate funds
67 | P a g e
Prevalence of
livestock diseases
Availability of veterinary
staff - Presence of
veterinary unit
- Poor housing of
livestock/poultry
- Use of low quality
breeds
- Rising cost of
vaccines and hence
vaccinations
- High veterinary
/farmer ratio
- Inadequate
veterinary
officers and
vaccines
- Inadequate funds
- Absence of
regular livestock
censuses
- Absence of a
veterinary doctor
- Poor surveillance
due to inadequate
funds
Low production of
livestock
Availability of veterinary
staff.
Availability of crop
residue as supplementary
feed
Large numbers of livestock
farmers
- Presence of
veterinary unit
- Availability of
improved
livestock varieties
- Seasonal
availability of feed
and water
- Improper housing
of livestock
- End of livestock
Development
Project
- Farmers over-
reliance on
communal
grazing lands
- Low patronage of
vaccinations
Comments: The district abounds with enough potentials and opportunities to increase the production levels of livestock. The constraints
can be managed through the development of appropriate programmes such as provision of housing, use of high quality breeds, routine
vaccination, etc. The challenges can also be managed through collaboration with partners and MOFA.
Low fish production. - Availability of
fisheries officer
- Availability of
water bodies
- Ongoing
community
rehabilitation of
dams/dugouts
- Availability of
IDA in the
- Lack of fishing
inputs
- Lack of storage
facilities
- Lack of credit
facilities
- Poor road
network
- Inadequate field
staff
68 | P a g e
region.
Comments: the constraints and challenges of fish production can be overcome by improving infrastructural development and building on
the opportunities and potentials in the District.
Inadequate and poor
quality data and lack of
proper monitoring
system
poor surveillance of
livestock diseases
- Availability of
vertinary officers
- Existence of
farmer groups
- DA data base on
cattle
- Presence of
telecommunicatio
n facilities
- Presence of
MOFA
- Good road
network
- Presence of
NGOs
- Availability of
credit in kind
scheme
- Inadequate
capacities to collect
and analyze data
- Low IGF
- Poor housing of
livestock/poultry
- Use of low quality
breeds
-
- Dwindling
donor support
- High vertinary
/farmer ratio
- Inadequate
vertinary
officers
and services
Comments: The district abounds with enough potentials and opportunities to increase the production levels of livestock. The
constraints can be managed through the development of appropriate programmes such as provision of housing, use of high quality
breeds, etc. The challenges can also be managed through collaboration with partners and MOFA.
Increasing frequency
and impacts of
droughts, floods, forest
fires and other natural
hazards
- Presence of
Traditional
authorities
- Presence of
NADMO in the
district
Existence of
- Development
partners
- EPA
- Forestry
commission
- Presence of FM
- establishment of
tree nursery in
talawona
- Absence of fire
service
department in
the district
- High prevalence
of charcoal
production
- Hunting
- High rate of
illiteracy
- Lack of bye
- Prolonged dry
season
- Weak
enforcement of
by-laws
- Erratic rainfall
pattern
69 | P a g e
- provision of soka
pumps for
farmers along the
black volta
laws
Conclusion: the impact of droughts, floods, forest fires and other natural hazards can be effectively minimized through government
policies with the support of traditional authorities. The Constraint can be addressed through the introduction of alternative livelihood
programmes, public education and the enactment and enforcement of bye-laws. Challenges can be managed through collaboration
with NADMO.
Increasing trends in
deforestation,
degradation and
biodiversity loss with
adverse consequences
for agriculture
- Availability of
security personnel
- Presence of
traditional
authorities
- Presence of
Assembly/Unit
Committee
members
- Wechiau Hippo
sanctuary
- Existence of
forestry
commission
- Existence of EPA
- Presence of FM
stations
- Availability of
plantation
programmes
- Availability of
donor funding
- Illegal chainsaw
operation
- Poor farming
practices
- Rampant
Bushfires
- Charcoal burning
- Sand wining
- Erratic rainfall
pattern
Conclusion: There are enough potentials and opportunities for the district to harness in order to combat this menace. Strategies such as
bye-laws and alternative livelihood programmes can be designed to effectively handle the constraints. District will partner with the
partners/agencies to manage the challenge through dam/dug-out construction for irrigation.
70 | P a g e
PROBLEM POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES
THEMATIC AREA : INFRASTRUCTURE, ENERGY AND HUMAN SETTLEMENT
Inadequate power supply
infrastructure and access
to electricity
- High demand
for electricity
- DA support
- Cheap labour
force
- Presence of
high tension
lines along
many
communities
- GOG funds
- Presence of
NED/VRA
- SHEP
- Donor support
- Disperse nature of
settlement
- Absence of teak
plantation in the
region
- Rampant bush
fires
- High cost of
electricity tariffs
- High cost of electric
poles
- Low incomes
- Poor road network
Conclusion:On-going electrification projects coupled with DA support can mitigate the problem of electricity supply in the district. The
constraints can be mitigated through dialogue/sensitization with communities and enactment of bye-laws. The challenges can be
managed through advocacy, employment creation and improvement of the road network
Low accessibility to
telephone facilities
Poor and inadequate
internet infrastructure
limited deployment of
ICT infrastructure in
educational institutions
- high demand
- Peaceful
environment
- Investment
friendly
environment
- Presence of
educational
institutions
- Presence of
CICs
- Favourable
government
policy on ICT
- Presence of
network
providers in the
region
- Dispersed
settlement
- Poor road
network
- High rate of
illiteracy
- Inadequate supply
of electricity
- Limited ICT
facilities and ICT
technocrats
71 | P a g e
Conclusion: The identified potentials and opportunities are enough to mitigate the problem. The constraints can also be managed
through sensitization/dialogue with communities and investment on the road and educational sectors. The challenges can also be
mitigated through dialogue with service providers to cover more communities and institutions.
PROBLEM POTENTIAL OPPORTUNITIES CONSTRAINTS CHALLENGES
THEMATIC AREA : INFRASTRUCTURE, ENERGY AND HUMAN SETTLEMENT
WATER AND
SANITATION
Inadequate access to
quality water
- Existence of
WATSAN
committees and
DWST
- Existence of
boreholes
- Vibrant communal
spirit
- Presence of
development
partners
- Government
interventions
- Presence of the
Black Volta
river
- Dispersed settlement
pattern of communities
- Poor maintenance
culture
- Inadequate capacity of
DWST
- Inadequate logistics
- inadequate personnel at
the district works
department
- Irregular release of
DACF
- High cost of drilling
- Dwindling Donor
support
Conclusion: Effective collaboration with donors coupled with increasing government intervention can address the issue of inadequate
access to quality water. The district will develop programmes to handle the challenges identified and also manage the constraints as
these two are significant and can negatively affect the provision of potable water
Inadequate access to
sanitation facilities
and poor sanitation
service delivery
- existence of house hold
latrines, public and
institutional toilets
-local materials for
building
- implementation of the
sustainable rural water
programme
- Labour
- Zoomlion
- NGO’s
- development
partners(IDA/PRO
NNET/MAFORD,
SNV/)
- negative attitude of
community members
- Absence of bye laws
- Poor management of
existing facilities.
-
- Dwindling donor
support
- Inadequate staff of
the environmental
health unit
- Delay payments to
sanitation guards
-
72 | P a g e
- Sanitation guards
CONCLUSION: Poor sanitation can be positively tackled with adequate collaboration with development partners, vigorous
behavioral change communication campaign.
PROBLEM POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES
THEMATIC AREA : HUMAN DEVELOPMENT, PRODUCTIVITY AND EMPLOYMENT
EDUCATION
Inadequate access to
basic education
-Presence of PTA and
SMC
-Availability of school
infrastructure
-Availability of
traditional authority
- DA support
-Availability of land
-Communal labour
- Availability of
community teaching
assistants.
availability of national
service personnel
- On-going donor
support for school
infrastructure
development
- Capitation grant
- School feeding
programme
- GETFund, DWAP,
CBRDP, Plan Ghana
- Free school uniform
and exercise books
- MP Common Fund
- Poor school infrastructure
- Low income levels of
parents to support children
- Negative cultural
practices
- Ineffective PTAs and
SMCs
- Poor community
involvement in enrolment
drive
- Low IGF
- Negative attitude of
parents towards the
education of their children
- Donor fatigue
- Erratic release of
DACF
- Poor road network
- Inadequate trained
teachers
73 | P a g e
Conclusion: Government interventions with the support of donors can increase access to basic education. The constraints can be
overcome through sensitization of communities and expanding the coverage of school feeding programme. The challenges can also
be mitigated through dialogue with development partners and sponsorship of teacher trainees.
Inadequate teacher
housing facilities in
deprived communities
- High communal
spirit
- Presence of
DACF/DDF
- Availability of
land and labour
- Support from
PTAs/SMCs
- Donor support
- Unwillingness of
teachers to stay in
deprived
communities
- Inadequate
community
motivation for
teachers
- Absence of
electricity in
most
communities
- Inadequate basic
social amenities
- inadequate
teacher
accommodation
and water for
schools
Conclusion: The district can effectively utilize the potentials and opportunities available to improve upon teacher housing. Provision
of basic social amenities such as electricity and the timely release of funds can also address the challenges and constraints.
Infrequent and
ineffective
supervision of
teaching and learning
- Availability of circuit
supervisors
- Availability of motor
- National Best
Teacher awards
scheme
- Poor road networks
- Inadequate logistics
- Poor motivation for
- Inadequate resources
from the National
level for monitoring
74 | P a g e
in educational
institutions
bikes for monitoring
- Availability of
PTAs/SMCs
- Presence of
development
partners in
education sector.
- Commitment of
District Directorate
of Education
towards
monitoring and
supervision.
supervisors
- Poor implementation
of sanctions on poorly
performed teachers
- Negative attitude
towards funding of
monitoring activities
and supervision
- Refusal of teachers
to stay in
communities.
- absenteeism of
teachers
CONCLUSION: Monitoring can be improved since significant potentials and opportunities exist. The Constraint can be addressed
through dialogue with development partners/DA regarding funding.
75 | P a g e
PROBLEM POTENTIAL OPPORTUNITIES CONSTRAINTS CHALLENGES
THEMATIC AREA : HUMAN DEVELOPMENT, PRODUCTIVITY AND EMPLOYMENT
High infant and
maternal mortality
High morbidity and
mortality from
communicable
diseases such as
malaria, HIV/AIDS
and TB
- NHIS
- Presence of health
facilities
- Availability of IE &
C materials
- Practice of
community based
surveillance by
volunteers (CBSV)
- Availability of
midwives and TBAs
- Sponsorship of health
trainees
- Availability of
community health
extension workers
- Free maternal and
infant health policy
- Funding from
Global Fund for
malaria
- High donor interest
in health
- Availability of
vaccines for vaccine
preventable diseases
- Presence of health
training institutions
- DACF/DWAP/UN
ICEF/JICA /MP and
other partners
- Inadequate CBSV
- Non commitment of
some CBSV
- Inadequate staff
- Low community
participation
- Inadequate transport and
equipment
- Few and aging
midwives
- Dispersed settlement
patterns of
communities
- Inadequate staff
accommodation
- Dwindling donor
funding
- Delay in the release
of funds
-
Conclusion: There exist significant potentials and opportunities to mitigate the situation. The Constraints and challenges are
significant and serious attention need to be paid in tackling them.
Loss of quality
human and material
resources due to the
HIV/AIDS pandemic
- Presence of health
facilities
- DACF
- Availability of VCT
centres
- Presence
NGOs/CBOs
- Donor support
- Availability of
anti-retroviral drugs
- Inadequate VCT
centres
- Non – existence of
association of PLWHIV
- Inadequate knowledge
on the mode of HIV
- Absence of offices of
implementing
agencies in the
district
- Weak collaboration
between GAC and the
76 | P a g e
High stigmatization
of PLWHIV
/AIDS transmission DA
- Centralized
distribution of anti-
retroviral drugs
Conclusion: Effective collaboration between AIDS commission, DA, Ghana Health service and implementing NGOs to reduce stigma
and decentralised the distribution of anti-retroviral drugs.
Limited coverage of
social protection
interventions
Lack of reliable and
adequate data on
disable people
Low awareness of
and violation of child
rights
- Department of social
welfare & community
development
- DACF
- Police
- Disability Fund
- Presence of LEAP
- Presence of
UNICEF in the
district
- Presence of Plan
Ghana and other
partners
- Disability Act, Act
715
- Act 560/98
- NHIS
- Education
institution for the
disable
- Limited data on the abuse
- Under resourced and
under staffed Dept. of
Social Welfare and
Community
Development
- Absence of child panels
- Low advocacy on child
rights
- Weakly organized
disability groups
- Limited donor
support
- Inadequate security
apparatus
Conclusion: The district can effectively utilize the potentials and opportunities available such as DACF, LEAP, donors’ etc. to
mitigate the identified development problems. The challenges and constrains can also be effectively addressed by resourcing the
department of social welfare and community development, forming well-organized disability groups and intensifying advocacy on
child rights.
77 | P a g e
PROBLEM POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES
THEMATIC AREA: TRANSPARENT AND ACCOUNTABLE GOVERNANCE
Weak employment
generation
capacities at the
district level
- Availability of raw
materials (sheanuts)
- Availability of labour
force - Mango plantations
- Afforestation
programme
- Vast land for
agriculture and
industrial
development
- Availability of
international
market - Availability of
support from
development
partners - GYEEDA
- SADA
- Block farming
- Micro credit
schemes
- Inadequate micro-
finance - Inadequate technical/
vocational skills
- Inadequate
entrepreneurial/mana
gerial skills - High illiteracy rat
- Inadequate irrigation facilities
- Poor attitude
towards agricultural
activities
- Inadequate
investment
opportunities
- Low diversification
- Seasonality of raw
materials - Bushfires - Lack of technology in
production process
- Inadequate market for
finished products - Untimely release of
funding
Conclusion: significant potentials and opportunities exist for local economic development. The Constraint and challenges can be managed
through the provision of technical/vocational/entrepreneurial know how, creation of conducive business environment for the thriving of
the private sector.
PROBLEM POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES
THEMATIC AREA: TRANSPARENT AND ACCOUNTABLE GOVERNANCE
Weak internal
revenue
- Availability of markets
- Authority to levy rates
and charge fees
- Media
- Telecommunic
ation providers
- Unreliable database
- Revenue leakages
- Low economic activities
-Harsh National
economic conditions
- No National budget
78 | P a g e
mobilization
Weak
capacities of
personnel and
logistics
shortfall
- Availability of
livestock
- Presence of Wechiau
Hippo Sanctuary
- New properties
springing up
- Tipper truck and tractor
- CICs
- Unit Committees
-
- NGOs
- Service
providers
in the district
- Citizens unwillingness
to pay tax
- Lack of logistics for
monitoring revenue
collection
- Low revenue base
- Non-operational CICs
- Inexperience revenue
staff
- Poor remuneration
allocation to support
functioning of sub-
district structures
Conclusion: Low Internal Revenue Generation can be positively addressed since significant potentials and opportunities exist. The
Constraint can be addressed through sensitization, increasing and building the capacity of revenue staff. and devising strategies to block
revenue leakages
79 | P a g e
PROBLEM POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES
THEMATIC AREA: TRANSPARENT AND ACCOUNTABLE GOVERNANCE
Inadequate women
representation and
participation in public
life and governance
Poor performance of
the local governance
system due to
inadequate
participation
- Available local
governance
structures
- Presence of Gender
desk office
- Availability of
community based
structures e.g. chiefs, ,
religious organizations
etc
- Existence of women
groups
- Participatory planning
process
- African women
Dev’t fund
- MOWAC
- Presence of
UNICEF
- International
conventions and
protocols
- Training and
capacity building
support from
NGOs and NCCE
- Presence of
UNFPA
-
- Illiteracy
- Unfavorable cultural
practices
- Lack of interest in
participation
- Poor social
mobilization
- Apathy by community
members
- Inadequate role
modules
- Unavailable
motivation for
women in local
governance
- Unfavorable
Political
environment
-
Conclusion: the problems can be positively addressed since significant potentials and opportunities such as donor support,
community based structures, etc exists. The Constraint and challenges can be addressed through sensitization and creating the
platform for women to participate in local governance.
80 | P a g e
PROBLEM POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES
THEMATIC AREA: TRANSPARENT AND ACCOUNTABLE GOVERNANCE
Inaccessibility of
justice
- Availability of Police
Post
- DACF/DDF
- Community police
- Traditional authority
- Department of social
welfare and
community
development
- Availability of
donors
- Commitment of
government to
fight crime
- Availability of
polce
commanders
bungalow and
junior staff
bungalow
- Inadequate
infrastructural facilities
- Inadequate logistics
- Low awareness of civic
rights
- Negative perception
about the justice
delivery system
- No judicial court
- No residence for
magistrate
-
- Inadequate
government funding
- Inadequate police
personnel
-
Conclusion: The situation can be positively tackled by providing infrastructural facilities, sensitization and resourcing the relevant
departments.
Limited public
awareness and
advocacy on rights
and responsibilities
- Existence of
institutions – CHRAJ,
NCCE, Information
Service, CSOs
- Traditional authorities
- Presence of
Development partners
- High illiteracy rate
- inadequate logistics
- Inadequate funding
- belief system
- Inadequate funding
for decentralized
institutions
- Non- enforcement of
laws
- Lack of political will
CONCLUSION: The situation can be positively tackled through public education and enforcement of applicable laws.
81 | P a g e
CHAPTER THREE
3.0 DISTRICT GOAL, OBJECTIVES AND STRATEGIES
3.1 National Development Focus
The basic Goal of the Medium-Term Development Policy Framework (2014-2017) is to address
the economic imbalances, re-stabilizing the economy and placing it on a path of sustained
accelerated growth and poverty reduction towards achieving the Millennium Development Goals
and middle income status.
The broad strategic direction for the Medium-Term Development Policy Framework: Ghana
Shared Growth and Development Agenda (GSGDA), 2014-2017 focuses on the following:
i. Ensuring and Sustaining Macroeconomic Stability
ii. Enhancing Competitiveness of Ghana’s Private Sector
iii. Accelerated Agricultural Modernization and Sustainable Natural Resource
Management
iv. Oil and Gas Development
v. Infrastructure and Human Settlements
vi. Human Development, Productivity and Employment
vii. Transparent and Accountable Governance
3.2 District Development Focus
The District Development Plan has been formulated in line with the Medium Term Development
Policy Framework (2014-2017). This is to ensure that efforts are harmonized at all levels:
District, Regional and National levels. The peculiarities of the District were however taken into
consideration.
3.3 District Development Goal
Following the review of the 2010-2013 DMTDP under the GSGDA II, the goal of the district
under the Medium Term Development Policy Framework is “To improve the socio-economic
well-being of the Disrict through efficient and reliable provision of needed services).In order
to realize this goal, the district would intensively focus its efforts and resources on the broad
strategies of the Medium Term Development Policy Framework.
82 | P a g e
3.4 District Development Prospects
The development prospects entails the projection of the district finances, population, services and
facilities requirements and environmental factors over the plan period of four years (2014-2017)
and related policy implications.
The output of this section forms the basis for the planning and programming phase of the plan.
They deal essentially with future trends in various variables and guide the achievement of the
district goal.
3.4.1 Population Projections
Population projections were undertaken so as to estimate future demand for both social and
technical infrastructure and establish indicators for the objectives over the plan period.
The mathematical method (arithmetic, geometric and exponential growth laws) of population
projection was used to project the population of the district for the next four years (2014-2017).
The population projections were based on the following assumptions:
Current growth rate will remain constant throughout the period
Migration will remain constant throughout the planned period
Table 3.1 Population Projection
Year Male Female Total
2014 38,397 40,688 79,086
2015 39,079 41,424 80,503
2016 39,714 42,084 81,797
2017 40,389 42,799 83,188
83 | P a g e
Table 3.3.1 Population Projection by Area Council
Area
Council
2014 2015 2016 2017
Dorimon 21,623 21,990 22,364 22,744
Ga 17,617 17,990 18,221 18,531
Gurungu 9,613 9,777 9,943 10,112
Vieri 15,471 15,734 16,001 16,273
THEMATIC AREA:PRIVATE SECTOR COMPETITIVENESS CROP PRODUCTION
OBJECTIVE: To facilitate farmers' adoption of improved technologies for increased production
Crop Production Projections
CROP(Mt/Annum) 2013 2014 2015 2016 2017
Achie Target Target Achie Target Achie Target Achievement
Maize 6,960 7100 7,160
7,300 7,400
Rice 2,560 3,000 3,500 3,900 4,200
Sorghum 4,176 4,200 4,300 4,420 4,550
Groundnut 25,674 30,000 32,000 33,000 34,500
Millet 2,243 2,500 2,576 2,584 2,650
ANIMAL PRODUCTION PROJECTIONS
LIVESTOCK
2013 2014 2015 2016 2017
Achie Target Target Achie Target Achie Target Achie
Cattle 15,750 21000 21,890 22,050 23,100
Sheep 15,200 16,000 16,780 17,100 17,600
Goats 19,200 28,800 34,560 41,760 50,112
Pigs 12,500 16,250 21,125 25,350 27,885
Poultry 35,000 38,500 46,200 55,440 60,984
84 | P a g e
3.5 Education Projection
Assumptions
Acceptable pupil-classroom ratio and pupil-teacher ratio at the K.G level is 35:1
Acceptable pupil-classroom ratio and pupil-teacher ratio at the primary and J.H.S level is
45:1
All classrooms needing major repairs should be replaced
Table 3.5.1 Pre-School Projections-Infrastructure
Year Projected
Enrolment
Existing no. of
class rooms
blocks
No. of classrooms
blocks required
Backlog
2013 5,246 60 90 30
2014 4,954 66 76 10
2015 5,455 72 84 12
2016 6,071 78 95 17
2017 8,414 84 156 72
Table 3.5.2 Pre-Projection-Quality of education
Year Projected
Enrolment
No of
Trained
Teacher
Pupil- Teachers
ratio
Required Backlog
2013 5,246 9 583:1 583 574
2014 4,954 12 412:1 413 401
2015 5,455 1,310 5:1 5 1,305
2016 6,071 1,578 4:1 4 1,574
85 | P a g e
Table 3.5.1 Pre-School Projections-Infrastructure
Year Projected
Enrolment
Existing no. of class
rooms blocks
No. of classrooms
blocks required
Backlog
2013 5,246 60 90 30
2014 4,954 66 76 10
2015 5,455 72 84 12
2016 6,071 78 95 17
2017 8,414 84 156 72
Table 3.5.2 Pre-Projection-Quality of education
Year Projected
Enrolment
No of
Trained
Teacher
Pupil-
Teachers
ratio
Required Backlog
2013 5,246 9 583:1 583 574
2014 4,954 12 412:1 413 401
2015 5,455 1,310 5:1 5 1,305
2016 6,071 1,578 4:1 4 1,574
2017 8,414 2,945 3:1 3 2942
86 | P a g e
Table 3.5.6 JHS Projection-Infrastructure
Table 3.5.7 JHS projections-Teachers
Year Projected
Enrolment
No. of trained
teacher
No. Teacher
pupil ratio
No. required Excess
2013 5,064 1,721 3:1 3 -
2014 5,502 1,926 3:1 3 -
2015 5,915 2,189 3:1 3 -
2016 6,146 2,397 3:1 3 -
2017 16,153 7,269 2:1 3 -
Table 3.6 Water Projection
Year Population Population
served
Population
served
Boreholes
Required
Backlog
2014 81,349 62,792 17,711 59 59
2015 81,797 67,073 14,724 10 69
Year Projected
Enrolment
Existing no.
of class
rooms blocks
No. of
classrooms
blocks required
Backlog
2013 5,064 160 15 145
2014 5,502 166 14 152
2015 5,915 172 14 158
2016 6,146 178 11 167
2017 16,153 184 7 177
87 | P a g e
2016 83.188 71,541 11,647 29 98
2017 84,602 76,141 8,461 1 99
Table 3.7 Tourism Projection
VISITORS 2014 2015 2016 2017
Foreign 1,031 1,131 1,231 1,331
Domestic 1,539 1,739 1,939 2,139
Table 3.8 Health Sector Projection
2014 2015 2016 2017
Under 5
mortality rate
176/100,000 176/100,000 176/100,000 176/100,000
Maternal
mortality rate
0 0 0 0
Skilled delivery 50% 55% 60% 65%
Family planning
acceptance rate
45% 50% 55% 60%
HIV/AIDS
prevalence rate
1% 1% 1% 1%
Incidence of
malaria
50% 45% 40% 35%
NHIS coverage 85% 88% 90% 95%
88 | P a g e
Table 3.9 Feeder Roads Projections
Table 3.10 Job Creation
Source of employment/Year 2010 2011 2012 2013
GYEEDA 600 725 840 945
Block farming 1,500 1,500 1,500 1,500
EDIF sponsored mango project 200 100 100 100
New National Forest Plantation
Development Programme
300 100 100 100
Credit in kind 80 80 80 80
Table 3.11 Revenue Projection
SOURCE 2013 ACTUAL 2014 2015 2016 2017
IGF 103,850.25
150,850.00
158,392.50 166,312.13 174,627.73
DACF/MPCF 559,380.83
1,850,685.00
1,943,219.25 2,040,380.21 2,142,399.22
DDF 1,586,839.44
1,307,562.00
1,372,940.10 1,441,587.11 1,513,666.46
DONOR 1,025,927.80
3,216,200.00
3,377,010.00 3,545,860.50 3,723,153.53
OTHER
GOG 848,855.75
1,385,594.00
1,454,873.70 1,527,617.39 1,603,998.25
Type/Year 2014 2015 2016 2017
Spot
improvement/re
habilitation/surf
acing
14KM
10KM 25KM 5KM
89 | P a g e
DISTRICT OBJECTIVES AND STRATEGIES
From the projections made, the following objectives and strategies were developed. These are
put into the various thematic areas as indicated below.
Focus Area District Development
Issue
District Objectives
linked to National Policy
Objectives
District Strategies linked
to National Strategies
Thematic Area: Enhancing Competitiveness of Ghana’s Private Sector
Developing the
Tourism Industry
for Jobs and
Revenue
Generation
1. Lack of adequate
tourism infrastructure
2. Inadequate promotion
of domestic tourism
Promote domestic tourism
to foster national cohesion
as well as redistribution of
income
Promote sustainable and
responsible tourism in
such a way to preserve
historical, cultural and
national heritage
Vigorously promote
domestic tourism to
encourage
Ghanaians to
appreciate and
preserve their
national heritage
and create wealth in
the communities.
Develop sustainable
ecotourism, culture
and historical sites
Thematic Area: Accelerated Agricultural Modernization and Sustainable Natural Resource
Management
Accelerated
Modernization of
Agriculture
1.Ineffective cultural
practices amongst small
holder farmers leading to
comparatively lower yields
Promote selected crop
development for food
security, export and
industry
Support production
of certified seeds
and improved
planting materials
for both staple and
industrial crops.
Promote the
adoption of good
agricultural
practices by
farmers
90 | P a g e
Build capacities of
FBOs and CBOs to
facilitate delivery
of extension
services to their
members
Promote the
development of
selected staple
crops
Extend the concept
of nucleus- out
grower and block
farming schemes
and contract
farming to bridge
the gap between
large and small
scale producers
Improvement of
feeder roads linking
production areas to
market centers
Accelerated
Modernization of
Agriculture
2. Inadequate and poor
quality data and lack of
proper monitoring system
3. poor surveillance of
livestock diseases
Promote livestockand
poultry development for
food security and income
Intensify disease
control and
surveillance
especially for
zoonotic and
scheduled diseases
Strengthen the
institutional
collaboration for
livestock/poultry
statistics and
monitoring
Accelerated
Modernization of
Agriculture
4. Inadequate data for
fisheries management
(inland and marine)
5. Weak collaboration with
communities towards the
management of fisheries
resources
6. The application of
Promote fisheries
development for food
security and income
Promote the
gathering of data
for fisheries
management
Establish and
strengthen co-
management
mechanisms with local communities
91 | P a g e
inappropriate and
unorthodox fishing
methods and techniques
for fisheries
resource
management
Revamp the current
fleet of fishing
crafts with modern
ones equipped with
appropriate storage
and processing
facilities Restoration of
degraded Forest
and Land
Management
7. Increasing trends in
deforestation, degradation
and biodiversity loss with
adverse consequences for
agriculture
Reverse forest and land
degradation
Encourage
reforestation of
degraded forest and
off-reserve areas
through the
Plantations
Development and
afforestation
programmes.
Enforce ban on
illegal chainsaw
operation and
constitute a
monitoring team to
ensure that
appropriate timber
species are
replanted on
degraded lands.
Promote
plantation/woodlot
development
among
communities to
meet the needs of
society
Natural Disasters,
Risks and
Vulnerability
8. Increasing frequency
and impacts of droughts,
floods, forest fires and
other natural hazards
Mitigate and reduce
natural disasters and
reduce risks and
vulnerability
Invest in early
warning and
response systems
Introduce education
programmes to
create public
awareness
92 | P a g e
Increase capacity of
NADMO to deal
with the impacts of
natural disasters
Enact and enforce
bye-laws restricting
structures in flood
plains, water ways,
wetlands
Thematic Area 3. Infrastructure, Energy and Human Settlement Development
Energy Supply to
Support Industries
and Households
1. Inadequate power
supply infrastructure and
access to electricity
Provide adequate and
reliable power to meet the
needs of Ghanaians and
for export
Increase access to
modern forms of
energy to the poor
and vulnerable
especially in the
rural areas through
the extension of
national electricity
grid.
Information
Communication
Technology
Development for
growth
2. Low accessibility to
telephone facilities
3. Poor and inadequate
internet infrastructure
4. Limited deployment of
ICT infrastructure in
educational institutions
Promote rapid
development and
deployment of the
national ICT infrastructure
Increase coverage
of ICT
infrastructure.
Improve the quality
of telephone
services
Facilitate the
development of
community
information centers
Transport
Infrastructure:
Road, Rail, Water
and Air Transport
1. Uneven access to
transportation leading to
post-harvest losses
2. Insufficient facilities for
inland, air and water
transport development
Create and sustain an
efficient transport system
that meets user needs
Prioritise the
maintenance of
existing road
infrastructure to
reduce vehicle
operating costs
(VOC) and future
rehabilitation costs
Reinstate labour-
based methods of
93 | P a g e
road construction
and maintenance to
improve rural roads
and maximize
employment
opportunities
Human
Settlements
Development
5. Lack of spatial land use
plans
6.weak enforcement of
planning and building
regulations
7. inadequate human and
institutional capacities for
land use planning
Promote a sustainable,
spatially integrated and
orderly development of
human settlements for
socio-economic
development
Develop
appropriate
planning models,
simplified
operational
procedures and
planning standards
for land use
planning
Adopt new and
innovative means
of promoting
development
control and
enforcement of
planning and
building regulations
Undertake capacity
building to up-
grade human
settlements and
land use planning
competencies
Water,
Environmental
Sanitation and
Hygiene
Water and Sanitation
8. Inadequate access to
quality water
9. inadequate access to
sanitation facilities and
poor sanitation service
delivery
Accelerate the provision
of affordable and safe
water
Accelerate the provision
and improve
environmental sanitation
Implement district
water and sanitation
plan (DWSP)
Strengthen Public-
Private and NGO
Partnerships in
water provision
Strengthen human
resource capacities
in water
management
Promote the
construction and
use of appropriate
and low cost
domestic latrines
94 | P a g e
Adopt CLTS for the
promotion of
household
sanitation
Improve household
and institutional
sanitation
Integrate hygiene
education into
water and sanitation
delivery
Thematic Area 4. Human Development, Productivity and employment
Education Education
1. inadequate access to
basic education
Increase equitable access
to and participation in
education at all levels
Provide
infrastructure
facilities for
schools at all levels
across the district
particularly in
deprived areas
Provide uniforms
and exercise books
in public schools in
deprived
communities
Accelerate
integration of pre-
school education
into the FCUBE
programme
Accelerate the
rehabilitation /
development of
basic school
infrastructure
especially schools
under trees
Expand school
feeding
progressively to
cover all deprived
communities and
link it to the local
economies
95 | P a g e
Education 2. Infrequent and
ineffective supervision of
teaching and learning in
educational institutions
3. Lack of office
accommodation for District
Directorate of Education
Improve management of
education delivery
Strengthen
monitoring and
evaluation and
reporting channels
undertake more
efficient teacher
development,
deployment and
supervision
train educational
managers/leaders in
management and
leadership skills
Provide office
accommodation for
district directorate
Education 4. Inadequate teacher
housing facilities in
deprived communities
Improve quality of
teaching and learning
Provide teacher
accommodation
Increase the
number of trained
teachers, trainers,
instructors and
attendants at all
levels
Provide distance
learning
opportunities for
serving teachers
Health 5. High infant and
maternal mortality
2. Improve access to
quality maternal, neonatal,
child and adolescent
health services
Increase access to
maternal, newborn,
child health
(MNCH) and
adolescent health
services
Strengthen the
Health Service to
deliver quality
MNCH services
HIV, AIDS, STIs,
and TB
6. High morbidity and
mortality from
communicable diseases
such as malaria, HIV/AIDS
Prevent and control the
spread of communicable
and non-communicable
diseases and promote
healthy lifestyles
Strengthen health
promotion,
prevention and
rehabilitation
Improve case
detection and
96 | P a g e
and TB
management at
health facility level
Scale up
community and
home base
management of
selected diseases
Strengthen
surveillance,
reporting and
emergency
response
HIV, AIDS, STIs,
and TB
7. Loss of quality human
and material resources due
to the HIV/AIDS pandemic
8. High stigmatization of
PLWHIV
Ensure the reduction of
new HIV and AIDS, STIs,
TB transmission
Intensify
behavioural change
strategies especially
for high risk groups
Intensify advocacy
to reduce infection
and impact of HIV,
AIDS and TB
Prevent mother-to-
child transmission
Ensure safe blood
and blood products
transfusion
Improve access to
counseling and
testing, male and
female condoms
and integrated
youth friendly
services
Promote safe sex
practices
Social Protection 9. Limited coverage of
social protection
interventions
Progressively expand
social protection
interventions to cover the
poor
Improve targeting
of existing social
protection
programmes
Strengthen
monitoring of
social protection
programmes
Disability 10. Lack of reliable and Ensure a more effective
appreciation of and
Promote continuous
collection of data
97 | P a g e
adequate data on disabled
people
inclusion of disability
issues both within the
formal decision making
process and in the society
at large
on PWDs
Promote the
implementation of
the provisions of
the disability ACT
Thematic Area 5: Transparent and Accountable Governance
Women
Empowerment
1. Inadequate women
representation and
participation in public life
and governance
Empower women and
mainstream gender into
socio-economic
development
Institute measures
to ensure increasing
proportion of
women government
appointees in DA
Sustain public
education,
advocacy and
sensitization on the
need to reform
outmoded socio-
cultural practices,
beliefs, perceptions
that promote gender
discrimination
Strengthen
institutions dealing
with women and
children issues
Public Safety and
Security
2. Inaccessibility of justice
Improve the capacity of
security agencies to
provide internal security
for human safety and
protection
Improve
institutional
capacity of the
security agencies
including the Police
Engage in intensive
legal literacy and
rights awareness
and education for
all sectors of the
populace
Deepening the
Practice of
Democracy and
Institutional
Reform
3. Limited public
awareness and advocacy on
rights and responsibilities
Foster civic advocacy to
nurture the culture of
rights and responsibilities
Strengthen
interaction between
assembly members
and citizens
98 | P a g e
Deepening the
Practice of
Democracy and
Institutional
Reform
6. Poor performance of the
local governance system
due to inadequate
participation
Enhance community
participation in
governance and decision
making
Develop plans that
are based on
engagement with
communities and
involve the full key
range of key
stakeholders
Strengthen existing
governance
structures such as
unit committees by
increasing their
awareness of
environmental
issues
Facilitate the
broadcasting of DA
proceedings and
activities on local
FM stations
Local Governance
and
Decentralization
Local economy
7. Weak employment
generation capacities at the
district level
Mainstream the concept of
local economic
development into planning
at the district level
Facilitate, develop
and implement
employment
programmes based
on natural resource
endowments and
competitive
advantage
Local Governance
and
Decentralization
4. Weak internal revenue
mobilization
5. Weak capacities of
personnel and logistics
shortfall
Ensure efficient internal
revenue generation and
transparency in local
resource management
Revisit IGF sources
Strengthen the
revenue bases of
the district
assembly
Develop the
capacity of the
district assembly
towards effective
revenue
mobilization
Local Governance
and
Decentralization
8. Weak capacity of
MMDAs
to ensure improved
performance and service
delivery
Ensure effective
implementation of the
Local Government
Service Act
Strengthen existing
sub-district
structures to ensure
effective operation
Strengthen the
capacity of
99 | P a g e
9. Dysfunctional sub-
district structures
MMDAs for
accountable,
effective
performance and
service delivery
Access to Rights
and Entitlement
11. Low awareness of and
violation of child rights
Protect children from
direct and indirect
physical and emotional
harm
Create public
awareness on
children’s rights
Conduct research to
track cases of child
abuse for proper
resolution
100 | P a g e
CHAPTER FOUR
4.0 DISTRICT PROGRAMME OF ACTION
4.1Introduction
This Chapter focuses on the various projects that will be implemented within the plan period
2014-2017 the responsibilities of the institutions/ units involved and the time frame for
implementation. The section also highlights the roles of stakeholders since the successful
implementation of programmes/ projects depends on the coordinated efforts of all stakeholders.
The role of all stakeholders is paramount to the successful implementation of programmes/
projects in this District Medium Term Plan 2014-2017. In the process of implementation
however, the anticipated role each stakeholder will play is highlighted.
The Local Government Act 462 designates District Assemblies not only as planning authorities
but also their implementation, monitoring and evaluation. To implement these projects/
programmes, it is therefore necessary that the District Assembly mobilizes funds both from
within and outside the district. The local revenue base needs to be fully assessed and restructured
to give the assembly a sound financial footing for projects implementation.
The departments/ agencies will provide technical guidance and facilitate the implementation of
desirable projects/ programmes.
The Chiefs, Opinion Leaders and Traditional Authorities and land owners need to be informed of
their responsibilities in implementing the programmes/ projects designed in the plan.
The District is mindful of the crucial roles played by Non-Governmental Organizations and the
Private Sector in support of various Projects/ Programmes in the District. The role of NGOs and
other Development Partners has been very crucial for the successful implementation of planned
programmes/ projects. It is hoped that the development partners will buy into the plan to enhance
the overall development of the district.
101 | P a g e
Communities offer a lot of support starting from project identification, design and
implementation, monitoring and evaluation. They also play important roles by providing land
and other natural resources such as sand and stone towards project implementation. This is to
enhance the principle of community ownership and management for sustainability. In this
direction, communities provide labour, land, local expertise, counterpart funds, etc for project
implementation. It is hoped that communities would continue to offer their best through project
identification, implementation, monitoring and evaluation for sustainability
102 | P a g e
Table 4.1 DISTRICT PROGRAMME OF ACTION
Thematic Area: Enhancing Competitiveness of Ghana’s Private Sector
Objective 1: Promote domestic tourism to foster national cohesion as well as redistribution of income
Objective 2: Promote sustainable and responsible tourism in such a way to preserve historical, cultural and national heritage
Activities Indicators TIMEFRAME Indicative Budget
(GH¢)
Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Organize radio talk shows to publicize the
tourist potentials of the district.
No. of radio talk
shows
10,000 WCHS DA
Design brochures and flyers on the tourism
potentials of the district
No. of brochures and
flyers procured
20,000 WCHS DA
Train tourist guards in tourist management Management trained 15,000 WCHS DA
Construct a canteen Canteen constructed 120,000 WCHS DA
Construct a guest house Guest house
constructed
100,000 WCHS DA
Institute tourism festival Annual festival
organized
20,000 WCHS DA
Sub total 190,000 45,000
103 | P a g e
Thematic Area: Accelerated Agriculture Modernization and Sustainable Natural Resources Management
District Objective 1: Promote selected crop development for food security, export and industry
Activity
Indicators
Time frame Indicative Budget
GH¢
Implementing Agencies
2014 2015 2016 2017 GOG DONOR Lead Collaborators
Train 960 farmers on
management practices of
dry season seed production
along the Black Volta
River
Increased
availability of
maize seed during
major season
10,062 MOFA
NRGP
Carry out 10,000 acres
maize grain block farm
project
Increased acreage
of maize grain
farm
431,079 MOFA
RSSP
RSSP
Engage 60 farmers for an
improved technology in
rice production
Increased yield
and no. of rice
farmers
9,483 MOFA
CRS, SARI
Train 3000 vegetable
(Tomato,okro and Chilli
pepper) farmers at Dam
sites on appropriate
agronomic practices
Increased acreage
of veg. farms,
Increased income
of farmers
7750
MOFA
NRGP
Conduct 3 demonstrations
for 240 farmers on new
uses of Root &Tubers
Utilization of root
and tubers
increased
4000 MOFA RTIMP
Introduce improved crop Farmers adopt
5860 MOFA
104 | P a g e
varieties new improved
varieties.
Monitoring of pest and
diseases on crops
Pest and diseases
of crops
controlled
720 MOFA
Identify markets and link
to producers
Farmers have easy
access to markets
550 MOFA
Facilitate the development
of FBOs to the level of
input and service providers
Active FBOs
operating in the
District
747 MOFA
Build the capacity of field
officers and farmers in the
use of appropriate
technologies
Farmers adopt
appropriate
technologies
4646 MOFA
Conduct census on crop
production
10,000 MOFA DA
Organize annual farmers
day celebration
Farmers day
celebrated
40,000 MOFA DA
Spot improvement of
22No. roads
No. of roads
rehabilitated
14,454,002 FR DONORS
Construct a bridge over the
black Volta to link Burkina
Face
Bridge
constructed
1,000,000 FR DONORS
Rehabilitation of 2No.
roads
No. of non-
engineered roads
opened
1,200,000 FR DONORS
105 | P a g e
Construction of steel bridge 2 steel bridges
constructed
1,300,00 FR DONORS
Surfacing of roads length of roads
surfaced
5,322,755 FR DONORS
Objective 2: Promote livestockand poultry development for food security and income
Activity Indicators
Time frame Indicative Budget
GH¢
Implementing Agencies
2014 2015 2016 2017 GOG DONOR Lead Collaborators
Identify, update and
disseminate existing
livestock technologies
Improved
technologies
identified and
updated
12,000
MOFA
Monitoring of pest and
diseases on livestock
Pest and diseases
of livestock
controlled
720
MOFA
Provide adequate and
effective extension
knowledge in livestock
management for farmers
Framers
management
practices improved
1927
MOFA
Immunization of dogs, cattle,
poultry against rabies, CBPP,
PPR Anthrax and NCD
Livestock health
ensured
3725
MOFA
Train 140 livestock farmers
on livestock farming as a
Maximum profit
derived from
1531 MOFA
106 | P a g e
business venture livestock rearing
Carry out livestock census
using the developed format
Population of
animal species
ascertained
1232
MOFA
Field and home visits by
AEAs on technologies
dissemination
Technologies
dissemination
ensured
1000
MOFA
Acquire and distribute
improved 400 sheep and 400
goats to credit in kind
beneficiaries
Local breeds of
sheep and goats
improved
30,000 MOFA LDP/DA
Sub-total 7500 59,635
Objective: Reverse forest and land degradation
Activities Indicator TIMEFRAME Indicative Budget
(GH¢)
Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Sensitize communities on the
dangers of deforestation/ bush
fires
No. of Communities
sensitized on the dangers of
deforestation/bush fires
8,000 EPA GFS
NADMO
107 | P a g e
District Objective:Mitigate and reduce natural disasters and reduce risks and vulnerability
Activities Indicators Timeframe Indicative Budget
Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATORS
Organize 3 for a, 3 durbars and
workshops on disaster prevention and
response mechanisms
No. of for a, durbars and 10,000 NADMO DA
Form and train district volunteer
guards (DVGs) and District volunteer
committees on disaster prevention
and response mechanism.
No. of District Volunteer
Guard & District
Volunteer Committees
trained
10,000 NADMO DA
Map out disaster prone areas Disaster prone area
mapped out
500 NADMO DA
Assist communities to establish
tree nurseries and plantations
No. of Communities assisted
to establish tree nurseries and
plantations.
10,000 Parks and
Garden
DA, EPA
Form and train guards and fire
volunteer squads
No. of Guards and fire
volunteer squads formed and
trained
10,000 DA GFS
Provide fire volunteer squads
with protection
clothing/equipment
No. of Fire volunteer squads
provided with protective
clothing/equipment.
8,000 DA GFS
Sub total 00 36,000
108 | P a g e
Develop a disaster preparedness plan
for the district
Availability of a Disaster
preparedness plan
500 NADMO DA
Train NADMO staff in disaster
management
No. of NADMO staff
trained in disaster
management
8,000 NADMO DA
Sub total 29,000
Thematic Area: Infrastructure, Energy and Human Settlement Development
District Objective: Provide adequate and reliable power to meet the needs of Ghanaians and for export
Activities
Indicator TIMEFRAME Indicative Budget
(GH¢)
Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Procure 200 low tension poles
annually
No. of low tension poles
procured
400,000 DA NGOs
Extend the national grid to 15
communities annually
No. of communities connected
to the National electricity grid
500,000 VRA DA
Sub total 900,000
109 | P a g e
District Objective: Promote rapid development and deployment of the national ICT infrastructure
District Objective:Promote a sustainable, spatially integrated and orderly development of human settlements for socio-economic development
Activities Indicator TIMEFRAME Indicative Budget
(GH¢)
Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Construct 2No. ICT
centers
ICT centers
constructed
200,000 DA NGOs
Procure 60No computers Computers procured 120,000 DA
Connect 2 centers to the
internet
ICT centers connected
to the internet
50,000 DA
Liaise with telephone
service providers to
increase their coverage
Telephone services
increased
2,000 DA MTN, Airtel, Vodafone,
Gloand Tigo
Sub total 370,000 00
110 | P a g e
WATER AND SANITATION
Objective 1: Accelerate the provision ofaffordable and safe water
Objective 2: Accelerate the provision and improve environmental sanitation
Activities Indicators Timeframe Indicative Budget Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATORS
Construction of 1No. small town
system
Small town system in place
and functioning
567,840 DA CWSA
Activities Indicator TIMEFRAME Indicative Budget
(GH¢)
Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Develop lay-out for communities layouts
developed
20,000 DA Survey department,
Department Town and
Country Planning
Facilitate the development of
community resource maps
Communit
y resource
maps
developed
20,000 DA NGOs
Facilitate the engagement of building
inspectors
Building
inspectors
engaged
10,000 DA
111 | P a g e
50,000
Construction of 61No. boreholes 61No. boreholes
constructed
580,000 DA CWSA, CBRDP
Construction of 20No. sanitation
facilities for schools
20No. sanitation facilities
constructed
140,000 DA CWSA
Construction of 10No. sanitation
facilities for health institutions
10No. sanitation facilities
constructed
100,000 DA Ghana Health Service
Construction of 2,500 Household
latrines
2,500 house hold latrine
constructed
1,000,000
Mechanise 4No. boreholes 4No. boreholes
mechanised
60,000 DA
Develop district specific Hygiene
Behaviour Change
Communication Plan
Hygiene Behaviour
Change Communication
Plan developed
5,000 DA Environmental Health
Unit
Conduct Hygiene Behaviour
Change Communication
campaign in 50 communities
Behaviour Change
Communication campaign
conducted
40,000 DA Environmental Health
Unit
Facilitate the achievement status
ODF in 20 communities based on
the CLTS approach
20 ODF communities
achieved
20,000 DA Environmental Health
Unit
Develop 5No. community
cemeteries
5No. community
cemeteries developed
100,000 DA Environmental Health
Unit
Conduct 3No. Clean community
campaign/contest
3No. Clean community
campaign/contest
conducted
30,000 DA Environmental Health
Unit
112 | P a g e
Identify and train school health
teachers in 20 selected schools
school health teachers in
20 selected schools
identified and trained
12,000 DA Environmental Health
Unit
Form and train school health
clubs in 20No. selected schools
School health clubs in
20No. selected schools
formed and trained
20,000 DA Environmental Health
Unit
Train CBHV in 20 communities CBHV in 20 communities
trained
10,000 DA Environmental Health
Unit
Form and train 58No. community
based WATSAN committees for
point sources
58No. community based
WATSAN committees
formed and trained
51,000 DA CWSA, CBRDP
Form and train 1No. Water Board
for small town water system
1No. Water Board for
small town water system
formed and trained
3,000 DA CWSA, CBRDP
Identify and train 5 Area
Mechanics and 58 Hand pump
care takers
5 Area Mechanics and 58
Hand pump care takers
identified and trained
20,000 DA CWSA, CBRDP
Establish hand pump spare store hand pump spare store
established
20,000 DA CWSA, CBRDP
Monitoring and Evaluation of
water and sanitation activities
30,000 DA CWSA, CBRDP
Sub total 00 2,748,840
113 | P a g e
Thematic Area:Human Development, Productivity and Employment
Objective 1: Increase equitable access to and participation in education at all levels
Activities Indicators Time frame Indicative budget Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Support 40 needy pupils Needy students
supported
8,000 DA Development Partners
Sensitization of communities to
enroll their children and retain
them in school
Enrollment drive
carried out
1,000 1,000 DA Development Partners
Construct 20No. 6-Unit classroom
blocks with ancillary facilities
20 No. 6-unit classroom
blocks constructed
3,000,000 2000,000 DA Development Partners
Construct 14No. 3-Unit classroom
blocks with ancillary facilities
14No. 3-unit classroom
blocks constructed
500,000 60,000 DA Development Partners
Construct 8No. 2-Unit classroom
blocks with ancillary facilities
8 No. 2-unit classroom
blocks constructed
200,000 80,000. DA Development Partners
Provide 4000 school uniforms to
pupils
No. of school uniforms
provided
80,000 DA Development Partners
Provide 20,000 exercise books to
pupils
no. of exercise books
provided
20,000 DA Development Partners
Enroll 30No. schools into the
school feeding program
No. of schools enrolled 600,000 DA Development Partners
Construct 8No. Kitchens for the
school feeding program
No. of kitchens
constructed
240,000 DA Development Partners
114 | P a g e
Organize sporting and cultural
activities
sporting and cultural
activities organized
40,000 DA Centre for National
Culture
conduct periodic school
mapping to determine extent
and locate the type senior
highypeoduction
objective 3- bridge gender
gap in access to education
(sh)
activities:
development of girls week
activities and using local
radio 1 media programmes
and civil society group to
educate on behaviour of ges
objective 6: promote science
and technical education at all
levels
activities:
provide suitable ICT and sd
facilities for SHS students
and their teachers
115 | P a g e
activities:
provide equipped
laboratories
4,660,000 369,500
Objective 2objectives: to improve planning and management in the delivery of education by developing resource management,
decision-making and monitoring to district and institutions while retaining central responsibility for establishing norms, guides, and
system accountability.
Activities Indicators Time frame Indicative budget Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Revive SMCs through training to
improve upon their supervision of
schools
SMCs revived and
trained
3,000 2,000 DA Development Partners
Support with funds/fuel for
monitoring and supervision
Monitoring activities
supported
4,000 1,000 DA Development Partners
Organize training workshops for
circuit supervisors and head
teachers to upgrade their skills
(monitoring tools/methods)
Capacities of circuit
supervisors built
2,000 1,000 DA Development Partners
review and make DEOC
functional at the district
level
provision of office furniture
116 | P a g e
Conductannual head counts
on the district payroll.
provision of ICT equipment
train EMIS officials at the
district level on how to
analyze, interpret and use
EMIS data
conduct management
training for head teachers on
effective use of capitation
grant
publish resources,
distribution, allocation,
posting outcome in public
schools
train office personnel’s to
upgrade their financial
management system to
support GIFMIS
Objective 3:Improve quality of teaching and learning
117 | P a g e
Activities Indicators Time frame Indicative budget Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Sponsor 120 teacher trainees
and effectively bond them
No. teacher trainees
sponsored
24,000 DA Plan Ghana
Organize induction courses for
the new recruited trainees’
pupils’ teachers.
Induction courses
organized
2,000 500 DA Development Partners
Construct 20No. 3-Unit
teachers quarters
No. of teachers quarters
constructed
1,000,000 600,000 DA Communities
Institution of best teacher
award
Best teacher award
instituted
80,000 DA Development partners
Organize STME camps and
INSET
STME and INSET
organized
2,000 1,000 DA CHALICE, Plan
Ghana
Organize 2 inter-schools quiz
competition among schools
No. of Interschool quiz
competition for schools
organized.
24,000.00
DA
Development partners
Institute awards for Best
Performing Pupils
Existence of Awards for
Best Performing Pupils
40,000.00 DA Development partners
support schools to
organize school base inset
undertake because, SEA/
NEA
118 | P a g e
organize spam using NEA
and sea results
Provide training for all
teachers in the use of
revise syllabus
Provide all schools with
an up-to-date curriculum
relevant to personal
Implement Best Teacher
Award
Sub total 1,104,000 600,000
OBJECTIVE 6: Promote science and technical education at all levels.
Activities Indicators Time frame Indicative budget Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Liaise with development
partners to train ICT
teachers at the basic
levels
24,000 DA
Liaise with development
partners to construct ICT
center at circuit centers
2,000 500 DA
119 | P a g e
Liaise with development
partners to build ICT
center at D.E.O
1,000,000 600,000 DA
objective 5improve management of education service delivery
Determine the realistic
vacancies in schools or
over staffing
80,000 DA
Conduct payroll audit 2,000 1,000 DA
Liaise with DA to support
teachers to embark on
distance education
24,000.00
DA
Organise INSET for
teachers in basic schools
40,000.00 DA
Draw up and circulate
guidelines to all schools
and through SMCS
communities on time
table that ensure
maximum teachers, pupils
contact time with the
SMC oversight of time
and task
120 | P a g e
Construct store for district
directorate of education
Support teachers
undergoing the distance
learning programme
Continue to train
SMC/PTA to function
well
Conduct regular school
inspection and
disseminate reports in
timely manner
Provide training for circuit
supervisor’s and
inspection system
Provide materials and
logistics support to
supervisor and inspectors
Support with funds/fuel
for monitoring and
supervision
121 | P a g e
Objective 1Improve access to quality maternal, neonatal, child and adolescent health services
Activities Indicators Timeframe Indicative Budget Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATORS
De-worm all children 2-5yrs
every six months
Deworming done and
reports written
15000 GHS MoH/NGOs
Establish 3 baby friendly
centers
Five baby friendly
centres established
120000 GHS Project Five Alive/MoH
Form 20 mother to mother
support groups to promote
breastfeeding.
Mother-to mother
support groups formed
20000 GHS NGOs
Sponsor 20 students in
Community Health Nursing &
General nursing and 12
midwives
32 students sponsored 224,000 GHS DA
Build capacity of health staff
and community agents to
implement C-IMCI
Health staff &
community agents
capacity built
15000 GHS NGOs
Hold monthly immunization
outreach
Children vaccinated
75000 GHS NGOs
Organize Health Education on
Exclusive Breast Feeding
Exclusive
breastfeeding,
Intensified
15000 GHS NGOs
122 | P a g e
Construct 10No. CHPS
compound
700,000 700,000
Community fora on family
planning
Fora held and reports
written
15000 GHS PPAG /PLAN
Provide focused antenatal care Antenatal care
provided
8000 GHS Project Five Alive/MoH
Facilitate the establishment of
12 emergency transport
systems.
12 ETS established 12000 GHS MoH/PLAN
Organize education on skilled
delivery in 12 communities.
Education carried out
and reports written
12000 GHS NGOs
Organize Health Education for
TBAs on referral
TBAs educated 12000 GHS NGOs
Refresher training on
emergency delivery to CHOs.
CHOs trained 6000 GHS NGOs
Build 6 community Hostel in
sub-districts
Hostels build 900,000 DA NGOs
Refresher training on life
saving skills for midwives
Training done 6000 GHS NGOs
Complete theatre Wechiau 30,000
Construction of a polyclinic Wechiau 3,000,00
0
GHS DA
Sub total
3,970,00
30,000
123 | P a g e
0
Objective 2: Prevent and control the spread of communicable and non-communicable diseases and promote healthy lifestyles
Activities Indicators Timeframe Indicative Budget Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATORS
Organize community durbars
to sensitize people on malaria
Community durbars
on malaria organised
45000 GHS NGOs
Procure and distribute bed nets
to children under five and
pregnant women
Bed nets distributed 60000 GHS NGOs
Sub total 00 80,000
Objective 3:Ensure the reduction of new HIV and AIDS, STIs, TB transmission
Activities Indicators Timeframe Indicative Budget Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATORS
Health education on safe sex and
condom use.
Education carried out 12000 GHS NGOs
Counseling and testing all
pregnant women
Number of pregnant
women tested
6000 GHS NGOs
Conducting counseling and
testing and “know your status”
campaign
Know your status carried
out
45000 GHS NGOs
Facilitate the formation of
PLWHA Association in the
Association formed 3000 GHS
124 | P a g e
district.
Establish CT/PMCT center Centre constructed 30000 GHS
Monitor and evaluate the
implementation of HIV/AIDS
programmes
Report on the
implementation of
HIV/AIDS activities
60,000
DA
Sub total 00 96,000
Objective 1:Progressively expand social protection interventions to cover the poor
Activities Indicators Timeframe Indicative Budget Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATORS
Equip community Health
Insurance committees with
community mobilization
skills.
Community Health
Insurance committees
equipped with community
mobilization skills.
8,000 DA NHIS
Conduct a client’s
satisfaction survey at the end
of the year and the results
incorporated into the schemes
plans.
Clients satisfaction
survey conducted
30,000 DA NHIS
Organize capacity building
programs and refresher
training for NHIS staff
Capacity building
programs and refresher
training for staff
organized
40,000 DA NHIS
Organize quarterly Quarterly monitoring and 8,000 DA NHIS
125 | P a g e
monitoring and evaluation evaluation organized
Recruit and train data
collectors in all LEAP
beneficiary communities
Data collectors recruited
and trained
DSW & CD Dev’t Partners
Conduct LEAP beneficiary
for a in all beneficiary
communities
for a conducted DSW & CD Dev’t Partners
Identify and register NGOs,
CBOs and other
governmental agencies that
provides complementary
services and link them to
LEAP beneficiaries for
support
NGOs, CBOs etc
registered and linked to
LEAP beneficiaries
DSW & CD Dev’t Partners
Organise 5 information
sharing sessions for
traditional rulers, assembly
members and departments on
cultural/traditional practices.
No. of information
sharing session for
traditional rulers,
assembly members and
departments on
cultural/traditional
practices organized
10,000
Social
welfare
Community
development
DA
Traditional Authorities
CHRAJ, NCCE
Ghana Police
Organize 5 training sessions
for stakeholders on the
domestic violence Law,
Children’s Act etc.
No. of training sessions
organized for
Stakeholders on the
domestic violence bill.
10,000 DA
CHRAJ
NCCE
Ghana Police
Strengthen institutions such
as DSW&CD, NCCE, Police
and allied institutions to deal
4000 DA
126 | P a g e
with cultural / traditional
issues
Objective 2:A more effective appreciation of and inclusion of disability issues both within the formal decision making process and in the society at large
Conduct educational fora on
issues of disabilities through
durbars and radio talk shows
Durbars and radio
talk shows on
disabilities issues
conducted
3,000 DSW & CD Dev’t Partners
Intensify education on Act 715 Education conducted 1,000 DSW & CD Dev’t Partners
Organize PWDs into groups and
improve upon their capacities
PWDs groups formed
and capacities
improved
1,000 DSW & CD Dev’t Partners
Register and properly dispose off
120 family welfare cases
No of welfare cases
handled and disposed
off
10,000 DSW & CD Dev’t Partners
Activities Indicator TIMEFRAME Indicative Budget (GH¢) Implementing Agencies
2014 2015 2016 2017 GOG DONOR Lead Collaborating
Registration of PWDs in the
district
PWDs registered 1000 DSW & CD Dev’t Partners
Link PWDs with NGOs and other
service providers for support
services
PWDs linked to
NGOs and service
providers
1000 DSW & CD Dev’t Partners
127 | P a g e
Objective: Protect children from direct and indirect physical and emotional harm.
Thematic Area:Transparent and Accountable Governance
Activities Indicator TIMEFRAME Indicative Budget (GH¢) Implementing Agencies
2014 2015 2016 2017 GOG DONOR Lead Collaborating
Sensitize 50 communities on child
rights
No. of Communities
sensitized on the
rights of the child
5,000 5,000 Dept. of
Social
Welfare
NCCE ,DA
CHRAJ, NGOs
Organize durbars and radio talk
shows on harmful cultural
practices against children
Durbars and radio
talk shows organized
2,000
Form and inaugurate district child
panel
District child panel
formed and
inaugurated
4,000.00 4,000 Dept. of
Social
Welfare
NCCE ,DA
CHRAJ, NGOs
Organize review meetings on
child rights
No. of Review
meetings organized
1,000.00 2,000 Dept. of
Social
Welfare
NCCE ,DA
CHRAJ, NGOs
Support 16 Plan Ghana
communities child initiated
projects
16 Plan Ghana
communities
supported
24,000 DA Development
Partners
Sub total 10,000 11,000
128 | P a g e
Objective 1: Enhance community participation in governance and decision making
Activities Indicator TIMEFRAME Indicative Budget
(GH¢)
Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Build capacities of Assembly
Members and Unit Committees
Capacity of Assembly
members and Unit
Committees built
10,000 DA NGOs
Organise reviews and Public
hearings on Assembly activities
No. of Reviews and
public hearings
organised
20,000
Organise community durbars with
traditional authorities
No. of Community
durbars organised
10,000
Prepare Community Action Plans
and integrate them into district
plans
Community Action
Plans prepared and
integrated
10,000
Construct 2No. bungalows 2No. bungalows
constructed
320,000 DA NGOs
Complete DADU office DADU office
completed
70,000 DA NGOs
Build capacity of DA and Area
Council staff
Capacity of DA and
Area Council staff built
80,000 DA NGOs
Furnish District Assembly offices District assembly
offices furnished
10,000 DA NGOs
129 | P a g e
Organise participatory monitoring
on development projects and
programmes
Participatory
monitoring organised
60,000 DA
Construct additional office
accommodation for DA
Additional office
accommodation for DA
constructed
60,000 DA Development Partners
Organise talk shows on DA
activities
No. of talk shows
organised
20,000 DA
Support community self help
projects
Community self help
projects supported
80,000 DA Development Partners
Procure vehicle for monitoring of
projects
vehicle for monitoring
of projects procured
80,000
Sub total 580,000 70,000
130 | P a g e
Objective 2: Empower women and mainstream gender into socio-economic development
Activities Indicator TIMEFRAME Indicative Budget
(GH¢)
Implementing
Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLOBRATORS
Organise 6 workshops for selected
women on decision-making processes
at the District level
No. of Workshops for
selected women on decision
making processes at the
district level organised
14,000 DA NGOs
Lobby assembly leadership to appoint
40% of 30% appointees as women
% of Assembly appointees
who are women
2,000 NGOs DA
Organise an education forum for 300
women and girls to create awareness
on breast cancer and reproductive
health
300 women and girls
sensitized on breast cancer
and reproductive health
3,600 DA NGOs
Sensitize 300 traditional leaders and
the general public on the need to
reduce out-migration of women and
girls
300 traditional leaders and
the general public sensitized
on the need to reduce out
migration of women and
girls
3756 DA NGOs
Organise a workshop to sensitize 300
traditional leaders and parents on the
dangers of girl elopement
300 traditional leaders and
parents sensitized on the
dangers of girl elopement
4149 DA NGOs
131 | P a g e
Objective 3: Improve the capacity of security agencies to provide internal security for human safety and protection.
Objective 5: Ensure efficient internal revenue generation and transparency in local resource management
Sensitize 300 chiefs, wine sellers and
the general public on the effect of
alcoholism and drug addiction
300 Chiefs, wine sellers and
the general public sensitized
on the effect of alcoholism
and drug addiction
4450 DA NGOs
Sub total 31,955 00
Activities Indicator TIMEFRAME Indicative Budget (GH¢) Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Construct 1 no. Police
accommodation
Availability of police
accommodation in the
district
60,000 DA NGOs
Construct a District Court
Building
Availability of District
court in the district
70,000 DA NGOs
Construct 1 no. bungalow for
District magistrate
Availability of bungalow
for district magistrate
60,000 DA NGOs
Liaise and lobby police
administration for additional
personnel
No. of police personnel
posted to the district
3,000 DA NGOs
Sub total 193,000 00
132 | P a g e
Activities Indicator TIMEFRAME Indicative Budget Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Employ more
revenue/commission collectors
No. Of revenue/ commission
collectors engaged
1,000
DA
AREA COUNCIL
Organize refresher training for
revenue collectors
No. Of refresher training organised
for revenue collectors
10,000 DA AREA COUNCIL
Intensify monitoring and
supervision of revenue
collection in the district
No. Of Monitoring and supervision
of revenue collection conducted in
the district
20,000
DA
AREA COUNCIL
Organize bi-annual public fora
on revenue mobilization and
expenditure at the district level.
No. Of bi-annual public fora on
revenue mobilisation and
expenditures organised at the
district level
12,000
DA
AREA COUNCIL
Engage private firms in revenue
collection (out sourcing)
No. Of private firms engaged 500 DA AREA COUNCIL
Procure motorbikes for revenue
collectors
No. Of motorbikes procured
8,000
DA
AREA COUNCIL
Organize annual awards
ceremony for the best revenue
collectors.
No. Of annual awards organised
10,000
DA
AREA COUNCIL
Review fee fixing to include
newly identified revenue items
Fee fixing reviewed 1,000 DA AREA COUNCIL
133 | P a g e
Objective 6:Mainstream the concept of local economic development into planning at the district level
Sub total 61,500 00
Activities Indicator TIMEFRAME Indicative Budget
(GH¢)
Implementing Agencies
2014 2015 2016 2017 GOG DONOR LEAD COLLABORATING
Conduct sensitization seminar
on sheabutter extraction within
production communities
No. of sensitization
seminars on sheabutter
extraction conducted
4,000
BAC DA, NGOs, Dept. of
Community Dev’t
Formation of sheabutter
production groups in selected
communities
No. of Sheabutter
production groups
formed
2,000 BAC DA, NGOs, Dept. of
Community Dev’t
Conduct market research for
sheabutter
Availability of Market
research data for
sheabutter
5,000 BAC DA, NGOs
Purchase sheabutter equipment
for 10 producer groups
No. of sheabutter
producer groups
provided with equipment
200,000 BAC Donor Agencies, SADA
Build market linkages between
producers and buyers
Availability of Market
linkages between
producers and buyers
7,000 BAC DA, NGOs
Conduct management training
on quality control, records
No. of groups trained 10,000 BAC DA, NGOs, SADA
134 | P a g e
keeping, marketing, costing
and pricing and credit
management for sheabutter
production groups in the
district.
Monitoring of performance of
producer groups
Production communities 10,000
Asses the employment needs
of the youths
Availability of list of
Employment needs of
the youths
3,000
NYEP,S
OCIAL
WELFA
RE
DA, MOE &S
Engage 945 youth under the
NYEP
No. of Youth employed
200 NYEP
DA
MOE &S
Engage 500 youth in the EDIF
sponsored mango plantation
project
No. of Youthengaged. 5,000 DA MOFA
Engage 600 youth in the New
National Forest Plantation
Development Programme
No. of Youth engaged. 5,000 DA MOFA
Sub - Total
135 | P a g e
Table 4.2: summary of indicative budget by thematic areas
THEMATIC AREA
INDICATIVE BUDGET
TOTAL
% OF BUDGET FOR
THEMATIC AREA GOG DONOR
1. Enhancing competitiveness of Ghana's private
sector 190,000 45,000 235,000 0.51
2. Infrastructure and Human settlement 6,262,755 16,654,002 22,916,757 50.45
3. Accelerated Agricultural modernisation and
sustainable natural resource management 7,500 609,532 617,032 1.36
4. Human Development, Productivity and
Employment 15,470,279 5,207,340 20,677,619 45.53
5. Transparent and Accountable Governance 880,000 97,000 977,000 2.15
Total Budget 22,810,534 22,612,874 45,423,408 100.00
136 | P a g e
4.2 INDICATIVE FINANCIAL PLAN FOR WA WEST DISTRICT ASSEMBLY 2010 –
2013
FINANCING THE GAP
From the analysis above, the total cost of financing the Medium Term Development Plan (2010 –
2013) stands at Forty FiveMillion, Four hundred and Twenty Three thousand, Four Hundred and
Eight Ghana Cedis (GH¢45,423,408) against an Indicative Financial Budget of Nineteen
Million, One Hundred and Sixty Three Thousand, Five Hundred and Thirty Four Ghana Cedis
(GH¢19,163,534). This reveals a financial gap of Twenty two million, three hundred and
thirteen thousand, eight hundred and seventy four Ghana Cedis (GH¢26,259,874).
In financing the gap, it is expected that more revenue and assistance would be mobilized from
the following sources;
The Assembly will make conscious efforts to scale up the volume of IGF through market
tolls and cattle rate collection.
There would also be frantic efforts at blocking all revenue leakages by providing accurate
data on properties, efficient and reliable revenue collection method and well trained and
motivated staff.
It is also expected that our Development Partners would support the district assembly.
Communities would be required to pay counterpart funds as their contribution to cost of
projects in some instances.
137 | P a g e
CHAPTER FIVE
5.0 ANNUAL ACTION PLAN
5.1 Introduction
The attainment of the desired benefits from the District Medium Term Plan will depend on how
successfully it is coordinated and implemented to achieve the set objectives.
This section of the District Development Plan identifies projects whose implementation will
assist in the realization of the goal of the Medium Term Plan. Development programmes and
projects will be carefully phased out year by year within the Four-Year period and these will
reflect in the Annual plans indicating what action is to be taken, by whom and at what time.
5.2 Justification for Choice of Annual Action Plan and Location of projects
The specific location of projects is based on the following factors:
1. Needy or deprived areas in terms of socio-economic infrastructure and services,
accessibility, and spatial/ economic interaction.
2. Access to deprived areas where the production of agro-based raw material, food
crops and export crops can be improved.
3. Areas with the necessary threshold population. Notwithstanding this, some deprived
areas are supported.
4. Areas with the capacity to ensure high returns to investment due to availability of
needed facilities and markets.
5. Areas that have the potential to enhance community participation in the decision
making process and other issues related to good governance.
6. Areas which are centrally located to make information flow and sharing of cost
benefit effective. This includes areas that can generate local revenue for the district.
7. Communities with a proven capacity for self-help and local initiative.
138 | P a g e
5.3 Implementation Factors
The implementation of planned programmes/ projects within the four-year period will take into
consideration certain administrative, social, climatic, and geological factors.
Some of these include:
Timely availability of funds and other inputs
Availability of personnel with the necessary technical skills and expertise
The seasonal calendar of the activities of rural population, especially farmers
Availability of surface/ underground water
The seasons and their effects on the roads
Sensitivity to cultural norms and practices of the people
5.4 Selection of Implementing Agency
The various implementing departments/ agencies, NGOs and donors were chosen for the
following reasons:
1. Existing and expected functions
2. On-going and planned projects by the agency in question
3. Technical resource availability
4. Expertise in the relevant field of project
The 2014 Annual Action Plan, based on the Programme of Action is as shown in table 5.1.
139 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: ENHANCING COMPETITIVENESS OF GHANA'S PRIVATE
SECTOR
DISTRICT OBJECTIVES: 1. Promote domestic tourism to foster national cohesion as well as redistribution of income
2. Promote sustainable and responsible tourism in such a way to preserve historical, cultural and national
heritage
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
IMP
LE
ME
NTA
TIO
N
AGE
NCI
ES
INDICATOR 1 2 3 4 LOCAL
EXTERN
AL
LEA
D
COLL
ABOR
ATIN
G
Organize radio talk shows to
publicize the tourist potentials
of the district
Wa
No. of radio talk
shows 4,000
WC
HS DA
Train tourist guards in tourist
management
Wechiau
Tourist guides
trained 5,000.00
WC
HS DA
Construct a quest house
Wechiau
Quest house
constructed
100,000.0
0 DA WCHS
Organize tourism festival
Wechiau
Tourist festival
organized 10,000.00
WC
HS DA
Develop a car park at the
Hippo sanctuary
Talawona
20,000.00 DA WCHS
Sub Total 139,000
140 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: ACCELERATED AGRICULTURAL MODERNIZATION AND SUSTAINABLE NATURAL RESOURCE MANAGEMENT
DISTRICT OBJECTIVES: Promote selected crop development for food security, export and industry
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEM
ENTATI
ON
AGENCI
ES
INDICATOR 1 2 3 4 LOCAL
EXTER
NAL LEAD
COLLABOR
ATING
Train 240 farmers on management practices
of dry season seed production along the
Black Volta River
Jumboso, Mwabase,
Konjogli, Buka,
Increased availability of
maize seed during major
season
2,515.50 MOFA NRGP
Carry out 2,500 acres maize grain block
farm project
District wide Increased acreage of
maize grain farm
107,769.75 MOFA LAP/RSSP
Engage 15 farmers for an improved
technology in rice production
Nahaa, Tindoma,
Wechiau
Increased yield and no.
of rice farmers
2,370.75 MOFA CRS/SAARI
Engage 17 communities in cowpea
production
District wide Increased cowpea
producers
4,312.50 MOFA WVI
141 | P a g e
Train 75 vegetable (Tomato,okro and Chilli
pepper) farmers at Dam sites on appropriate
agronomic practices
Yeliyiri, Baleofilli,
Siiru, Balawa,
Dobaziiri,
Pigbengben,
Increased acreage of veg.
farms, Increased income
of farmers
1,937.50 MOFA NRGP
Cary out 150 acres rice block farm District wide no. of farmers and
acreage of rice farms
Train 1000 farmers on safe use of agro-
chemical
District wide Correct use of agro-
chemical ensured
700 MOFA NRGP
Train 125 farmer on compost preparation District wide Increased knowledge on
compost preparation
350 MOFA NRGP
Carry out media campaign to sensitized and
disseminate information on cassava
production, processing issues and marketing
District wide Interaction of
stakeholder promoted
125 MOFA RTIMP
Distribute 2000 improved cassava Cuttings
to 400 farmers
District wide Cassava production
increased
250 MOFA RTIMP
Conduct 3 demonstrations for 60 farmers on
new uses of Root &Tubers
District wide Utilization of root and
tubers increased
1,000 MOFA RTIMP
Educate and train consumers on appropriate
food combination of local available food
materials
District wide Consumers combine
appropriate local
available food materials.
1,128 MOFA NRGP
142 | P a g e
Introduce improved crop varieties District wide Farmers adopt new
improved varieties.
1,465 MOFA NRGP
Build the capacity of cash crop farmers to
improve productivity and produce quality
District wide Cash crop farmers
produce good quality of
produce
361.25 MOFA NRGP
Monitoring of pest and diseases on crops District wide Pest and diseases of
crops controlled
180 MOFA NRGP
Identify markets and link to producers District wide Farmers have easy
access to markets
137.5 MOFA NRGP
Improve storage facilities along the value
chain
District wide Post harvest losses
reduced.
294.25 MOFA NRGP
Facilitate the development of FBOs to the
level of input and service providers
District wide Active FBOs operating
in the District
186.75 MOFA NRGP
Mainstream sustainable land management
(SLM) into the design of sector policies
programmes and
District wide Land use plan developed
by all communities
481.75 MOFA NRGP
Build the capacity of field officers and
farmers in the use of appropriate
technologies
District wide Farmers adopt
appropriate technologies
1,161.50 MOFA NRGP
Train 37 farmers in each zone on khebab
soya utilization and groundnut extraction
Wechiau, Dorimon
and Ponyentanga
Soya utilization and
groundnut extraction
improved.
225 MOFA NRGP
143 | P a g e
develop stands and promote good
agricultural practices along the value
chain(including hygiene, proper use of
packge, grading standardidation
distrcit wide Good agricultural
practices along the value
chain improved
2500 MOFA RTIMP
Create awareness on gari processing to
women groups
District wide Increased knowledge on
gari processing
1500 MOFA RTIMP
Training of staff in ICT (microsoft office
suit, data entry and analysis)
District wide staff acquird knowledge
in ICT
3000 MOFA RTIMP
Educate and senstized farmers the
importance of soil improvement and the use
of farm yard manure.
District wide Soil fertility enhanced
800 MOFA
Train 100 farmers on simple farm record
keeping.
District wide Farmers acquired
knowledge in record
keeping 1600 MOFA
Apply approraite agricultural research and
technology to introduce economics of scale
in agriculral production
District wide Research and technology
enhanced
4500 MOFA
144 | P a g e
Inprove the effectiveness of Research -
Extension-Farmer linkage and integrate the
concept into the agricultural research
system to increase participation of users in
technology development.
District wide Research- extension -
farmer linkage improved
3500 MOFA
Train FBO's and CBO's for Extension
delivery services in improved technologies.
District wide Extension delivery
services improved
2800 MOFA
Intensify dissemanation of updated crop
production technological packages
District wide Crop production package
upgraded
1500 MOFA
Organise three farmer field days on cassava
copping for planting
distrcit wide farmers skills improved
3000 MOFA RTIMP
Conduction of demonstrations on
cajanuscajan in four communities.
Four zones Cajaanuscajan
demonstration conducted
1500 MOFA PATECH
conduction of three WAAPP sweet potato
demoonstration in all the three zones of the
district.
three zones 3 WAAP demonstrations
organised
1800 MOFA WAAPP
145 | P a g e
Conduction of nine baby rice
demonstrations and seven mother
demonstrations in each of the RSSP
lowlands.
Gurungu,
Tanina,Pole and
Chogsia
9 rice demonstrations
organised
1200 MOFA RSSP, SARI
Conduction of six AGRA maize
demonstrations
zones A,Band C Maize demonstration
conducted
1800 MOFA SARI
Training 150 women in each of the 3 zones
on income generating activities in areas of
ground nut oil extaction, shea butter
extraction, rice par boiling, weanimix
preparation
zones A,Band C Women income
improved
2400 MOFA
Conduct food demonstration for 50 women
in each zone using soya and cowpea for diet
improvement among farm families
zones A,Band C women knowledge on
soya and cowpea diet
improved
1200 MOFA
Conduct nutrition education for 70 women
in each zone using the three food groups
chart.
zones A,Band C 210 women acquired
knowledge in food group
chart
1120 MOFA
Conduct training on processing , prevention
and storage of vegetables for the off-season
for 70 women in each zone.
zones A,Band C 210 women trained on
processing, prevention
and storage of vegetables
1370 MOFA
146 | P a g e
Train farm wives on home managemnet
practices such as construction of soakaway
pits, dry lines, raised platforms etc. for 70
women in each zone.
zones A,Band C Farmwives trained on
home sanitation
3360 MOFA
Educate 50 farm families on the importance
of family planning in agriculture.
District wide families educated on
family planning
1400 MOFA
Educate farm families on the hazards of
HIV/AIDS, prevention of the disease and
care of the affected people especially their
nutritional issues.
District wide farmers knowledge on
HIV/AIDS enhanced
1800 MOFA
Organise 25 women in each of the zones to
go into dry season farming especially along
the Black Volta
3 zones 75 women engaged in
dry season farming
1200
Organise gender mainstream training for 70
farm families in each zone.
zones A,Band C Gender mainstream
training organised for
210 farmers
1120 MOFA
Train 180 farm wifes on the importance of
iodized salt in the meals and linking them to
sources.
District wide Farm wives trained and
linked
2980 MOFA
147 | P a g e
Training of 25 AEA's on the various actor
of value chain on cassava production.
District wide AEAs trained on cassava
value chain production
13400 MOFA
Oranise exposure visits for 90 women to
cassava processing centers.
90 women exposed to
processing centers
11500 MOFA
Training of 25AEA's on data collection on
RTIMP activities.
District wide Data collection on
RTIMP enhanced
880 MOFA
Link cassava farmers to financial institution
to access credit.
District wide Cassava farmers linked
to financial institutions
175 MOFA
Conduction of field demonstration on
bambaragroundnut in all zones
zones A,Band C Demonstration on
bambara nuts conducted
1600 MOFA
Conduct census on crop production District wide production levels of
major crops determined
10,000 MOFA NRGP
Sub Total 194,958 18,499
2014 ANNUAL ACTION PLAN
THEMATIC AREA: ACCELERATED AGRICULTURAL MODERNIZATION AND SUSTAINABLE NATURAL RESOURCE MANAGEMENT
DISTRICT OBJECTIVES: Promote livestock and poultry development for food security and income
ACTIVITIES LOCATION OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
148 | P a g e
INDICATOR 1 2 3
4 LOCAL EXTERNAL LEAD
COLLABORATI
NG
Identify, update and
disseminate existing livestock
technologies
District wide
Improved
technologies
identified and
updated 3,000 MOFA LDP/DA
Monitoring of pest and
diseases on livestock
District wide
Pest and diseases
of livestock
controlled 300 MOFA LDP/DA
Provide adequate and effective
extension knowledge in
livestock management for
farmers District wide
Framers
management
practices
improved 481.75 MOFA LDP/DA
Early detection, reporting and
controlling of livestock
disease District wide
Livestock health
ensured
400 MOFA LDP/DA
Immunization of dogs, cattle,
poultry against rabies, CBPP,
PPR Anthrax and NCD
District wide Livestock health
ensured
931.25 MOFA LDP/DA
Clinical field treatment, ecto
and endo parasite control
livestock movement and meat
inspection carried out annually
District wide
Livestock health
ensured
937.5 MOFA LDP/DA
Train 30 livestock farmers on
preservation and utilization of
crop residue for dry season
feeding of livestock
District wide Availability of
animal feed
ensured
337.5 MOFA LDP/DA
149 | P a g e
Train 35 livestock farmers on
livestock farming as a
business venture
District wide Maximum profit
derived from
livestock rearing
382.75 MOFA LDP/DA
Carry out livestock census
using the developed format
District wide Population of
animal species
ascertained 5,000 MOFA LDP/DA
Sensitize livestock farmers on
importance of vaccination
against endemic diseases
District wide Livestock health
ensured
500 MOFA LDP/DA
Field and home visits by
AEAs on technologies
dissemination
District wide Technologies
dissemination
ensured
1,000 MOFA LDP/DA
Acquire and distribute
improved 00 sheep and 100
goats to credit in kind
beneficiaries
District wide Local breeds of
sheep and goats
improved
10,000 MOFA LDP/DA
Celebration of National
Farmers’ Day
District wide Competition of
crops and
livestock
encouraged 10,000 MOFA LDP/DA
Train CAHW to support
existing ones
District wide CAHW trianed
800
Sub Total 34,071
150 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: ACCELERATED AGRICULTURAL MODERNIZATION AND SUSTAINABLE NATURAL RESOURCE MANAGEMENT
DISTRICT OBJECTIVES: Promote fisheries development for food security and
income
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR 1 2 3 4 LOCAL EXTERNAL LEAD
COLLABORATI
NG
To train 120 youth in simple
net construction and
application in six fishing
communities.
Siiru,
Yeleyiri,Pongy
entanga,
120 youth trained
in net construction
and application 9610 MOFA
Siiru,
Yeleyiri,Pongy
entanga,
60 fish farmers
trained in fisheries
catch data
collection 3,400.00 MOFA
Facilitate the training of 120
fishmongers in HACCP
processing of fish in 4 dam
communities. Siiru,
Yeleyiri,Pongy
entanga,
120 fishmongers
equiped with
morden
technology of fish
processing 5750 MOFA
To facilitate the formation of
FFA's and CBFMC's for
resource protection in six dam
comminities.
Siiru,
Yeleyiri,Pongy
entanga,
10 FFA's and
CBFMC's formed
in 10 communities
4910 MOFA
To promote fish farming in 6
fishing communities.
District wide Increased
awareness of fish
farming in 6
communities 6710 MOFA
151 | P a g e
Train 60 fish farmers in 6
communities to detect and
manage fish disease problems
and facilitate the establishment
of a fish health center Siiru,
Yeleyiri,Pongy
entanga,
60 fish farmers
equiped with
knowledge in fish
health
5,210.00 MOFA
Train 6 fishpond construction
gangs in 6 communities.
District wide 6 Youth trained in
fishpond
construction 5355 MOFA
Train 60 youth in pond
stocking and fish feeding in 6
communities.
Siiru,
Yeleyiri,Pongy
entanga,
60 youth trained
in fish pond
stocking and
feeding 3400 MOFA
Introduction of control gear,
quotas and licensing in 10
fishing communities
District wide Fisheries
resources properly
monitored and
protected
1760 MOFA
To conduct stock assessment
and restocking of major dams.
District wide Aqurate fisheries
statistics
documented and
sufficient fish
provided in dams 4000 MOFA
To sensitize 10 fishing
communities on the fisheries
laws and regulations.
District wide 10 communities
sensitized on
fisheries
regulations and
Laws 6200 MOFA
Construct 4 cages in 2
communities
Siiru, Yeleyiri Four cages
constructed in 2
communities
along the Black
Volta 13660 MOFA
152 | P a g e
Facilitate the construction of 1
hatchery on 1 dam
Siiru 10,000 quality
fingerlings
produced to stock
dams and ponds
19,740 MOFA
Sub Total 87,705
2014 ANNUAL ACTION PLAN
THEMATIC AREA: ACCELERATED AGRICULTURAL MODERNIZATION AND SUSTAINABLE NATURAL RESOURCE MANAGEMENT
DISTRICT OBJECTIVES: Mitigate and reduce natural disasters and reduce risks and vulnerability
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR 1 2 3 4 LOCAL EXTERNAL LEAD
COLLABORATI
NG
Organise public education on
the effect of flood in 50
communities District wide No. of Public
education
organised
2,000 NADMO DA, Devt Partners
Form 1,000 district volunteer
guards (DVGs) in 50
communities within the
district District wide
training
undertaken
9,000 NADMO DA, Devt Partners
Train 760 DVGs within the
district District wide DVGs Trained
19,000 NADMO DA, Devt Partners
Provide relief items to disaster
victims Wechiau Relief items
provided 18,000 NADMO DA, Devt Partners
Sub Total 48,000
153 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: ACCELERATED AGRICULTURAL MODERNIZATION AND SUSTAINABLE NATURAL RESOURCE MANAGEMENT
DISTRICT OBJECTIVES: Reverse forest and land degradation
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR 1 2 3 4 LOCAL EXTERNAL LEAD
COLLABORATI
NG
Sensitize communities on the
dangers of deforestation/ bush
fires
District wide Communities
sensitised on the
dangers of
deforestation/bush
fires 4,000 DA
GFS, NADMO,
EPA
Sensitize 50 communities on
climate change and adaptation
strategies
District wide 50 communities
sensitized on
climate change
and adaptation
strategies 10,000 DA
GSOP, FSC, EPA,
Traditional
Authorities
Assist 3 communities to
establish tree nurseries
Ga, Gbache,
Yeliyiri
3 Communities
assisted to
establish tree
nurseries 42,831 DA
GSOP, FSC, EPA,
Traditional
Authorities
Assist 3 communities to
establish woolots and
plantations
Boro, Naha,
Poyentanga
3 Communities
assisted to
establish tree
woodlots and
plantations. 45,480 DA
GSOP, FSC, EPA,
Traditional
Authorities
Create 10km fire belt at the
Wechiau Hippo Sanctuary
Wechiau
Hippo
Sanctuary
10km fire belt
created
42,830 DA
GSOP, FSC, EPA,
Traditional
Authorities
154 | P a g e
Form and train fire volunteer
squads
District wide Fire volunteer
squads formed
and trained 10,000 DA GFS
Provide fire volunteer squads
with protection
clothing/equipment
District wide Fire volunteer
squads provided
with protective
clothing/equipme
nt. 8,000 DA
Sub Total 163,141
155 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: INFRASTRUCTURE, ENERGY AND HUMAN SETTLEMENT
DEVELOPMENT
DISTRICT OBJECTIVES: Provide adequate and reliable power to meet the needs of Ghanaians and for export
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDU
LE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR 1 2 3 4 LOCAL EXTERNAL LEAD
COLLABORATIN
G
Procure 200No. low tension
poles
200No. low
tension poles
procured 100,000 DA NED/VRA
Provide solar energy to 25No
institutions
Selected
Communities
25No. Institutions
provided with
solar energy 62,500 DA
Total 162,500
156 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: INFRASTRUCTURE, ENERGY AND HUMAN SETTLEMENT
DEVELOPMENT
DISTRICT OBJECTIVES: Promote rapid development and deployment of the national ICT
infrastructure
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR 1 2 3 4 LOCAL EXTERNAL LEAD
COLLABORATIN
G
Connect 2 centers to the
internet
Wechiau,
Dorimon
ICT centers
connected to the
internet
10,000
40,000
DA
Ministry Of
Environment,
Science &
Technology
Liaise with telephone service
providers to increase their
coverage Wechiau
Telephone
services increased
2,000
DA
MTN, Airtel,
Vodafone, Glo and
Tigo
Sub Total
12,000 40,000
2014 ANNUAL ACTION PLAN
THEMATIC AREA: INFRASTRUCTURE, ENERGY AND HUMAN SETTLEMENT
DEVELOPMENT
DISTRICT OBJECTIVES: Create and sustain an efficient transport system that meets user needs
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR 1 2 3 4 LOCAL EXTERNAL LEAD
COLLABORATI
NG
157 | P a g e
Undertake labour intensive
spot improvement of Nyoli -
Dolinguo feeder road
Wechiau -
Tuolu
13 km labour
intensive road
rehabilitated 200,000.00 DA
GSOP, Feeder
Roads
2014 ANNUAL ACTION PLAN
THEMATIC AREA: INFRASTRUCTURE, ENERGY AND HUMAN SETTLEMENT
DEVELOPMENT
DISTRICT OBJECTIVES: Promote a sustainable, spatially integrated and orderly development of human settlements for socio-economic development
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR 1 2 3 4 LOCAL EXTERNAL LEAD
COLLABORATIN
G
Develop lay-out for 3
communities
Selected
communities
layouts developed
42,000 DA Survey department,
Department Town
and Country
Planning
Facilitate the development of
community resource maps
Selected
communities
Community
resource maps
developed
20,000 DA NGOs
Sub Total 62,000
2014 ANNUAL ACTION PLAN
THEMATIC AREA: INFRASTRUCTURE, ENERGY AND HUMAN SETTLEMENT
DEVELOPMENT
DISTRICT OBJECTIVES: 1.Accelerate the provision of affordable and safe water
ACTIVITIES LOCATION OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
158 | P a g e
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
Construction of 15No.
boreholes
District wide 15No. boreholes
constructed 150,000
EHSU DA, CWSA
DWST/DPCU training on
water and sanitation activities
Selected
communities
DWST/DPCU
trained on water
and sanitation
activities 10,000
EHSU DA, CWSA
Advocacy campaign on water
and sanitation activities
District wide Advocacy
campaign
conducted 10,000
EHSU DA, CWSA,
UNICEF
DWST Operational cost Wechiau DWST
Operational cost
met 3,000
EHSU DA, World Bank
Monitoring and Evaluation of
water and sanitation activities
District wide M&E undertaken
10,000
EHSU DA, CWSA,
UNICEF
Sub Total 183,000
2014 ANNUAL ACTION PLAN
THEMATIC AREA: INFRASTRUCTURE, ENERGY AND HUMAN SETTLEMENT
DEVELOPMENT
DISTRICT OBJECTIVES: 2. Accelerate the provision and improve environmental
sanitation
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
159 | P a g e
Construction of 10No.
sanitation facilities for schools
District wide 10No. sanitation
facilities
constructed 140,000
EHSU DA, CWSA
Construction of 1,000
Household latrines
District wide 1000 house hold
latrine constructed
40,000
EHSU Environmental
Health Unit
Conduct Hygiene Behaviour
Change Communication
campaign in 10 communities
District wide Behaviour
Change
Communication
campaign
conducted 10,000
EHSU Environmental
Health Unit
Facilitate the achievement
status ODF in 5 communities
based on the CLTS approach
Selected
communities
5 ODF
communities
achieved
25,000
EHSU DA, DSW & CD
Conduct Clean community
campaign/contest
Selected
communities
Clean community
campaign/contest
conducted 10,000
EHSU Environmental
Health Unit
Identify and train school
health teachers in 5 selected
schools
Selected
communities
school health
teachers in 5
selected schools
identified and
trained 5,000
EHSU Environmental
Health Unit
Form and train school health
clubs in 5No. selected schools
Selected
communities
School health
clubs in 5No.
selected schools
formed and
trained 5,000
EHSU Environmental
Health Unit
Train CBHV in 5 communities Selected
communities
CBHV in 5
communities
trained 5,000
EHSU DA, DSW & CD
Identify and train 10 latrine
artisan as TOT
Selected
communities
10 latrine artisan
identified and
trained as TOT 5,00
EHSU CWSA
160 | P a g e
Sub Total 240,000
2014 ANNUAL ACTION PLAN
THEMATIC AREA: HUMAN DEVELOPMENT, PRODUCTIVITY
AND EMPLOYMENT
DISTRICT OBJECTIVES: Increase equitable access to and participation in education at all levels
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
Sensitization of communities
to provide at least 6 teachers
with accommodation.
District wide communities
sensitized
2,000
DA Plan Ghana,
Chalice
Construct 10No. 3-Unit
teachers quarters
District wide Teachers quarters
constructed
700,000
DA GES
Support 10 needy pupils District wide 10 needy pupils
supported 10,000
DA Plan GH, GES,
Chalice
Sensitization of communities
to enroll their children and
retain them in school
District Wide communities
sensitized
5,000
DA GETFUND/HIPC/
PLAN GH.
Construct 11No. 6-Unit
classroom blocks with
ancillary facilities
11No. 6-Unit
classroom blocks
with ancillary
facilities
constructed 1,671,322
DA GETFUND/GSOP/
HIPC/PLAN GH.
161 | P a g e
Construct 4No. 3-Unit
classroom blocks with
ancillary facilities
District Wide Classrooms
constructed
280,000
DA GETFUND/HIPC/
PLAN GH.
Construct 5No. 2-Unit
classroom blocks with
ancillary facilities
Classrooms
constructed
400,000
DA GES, MP
Provide 1000 school uniforms
to pupils
District Wide 1000 school
uniforms provided
10,000
DA GOG
Provide 5,000 exercise books
to pupils
District wide 5,000 exercise
books provided 3,000
DA GOG
Enroll 2No. schools into the
school feeding program
Selected
school
2No. schools
enrolled into the
GSFP 1,000
DA GOG
Construct 2No. Kitchens for
the school feeding program
Selected
schools
2No. Kitchens
constructed
80,000
DA Plan Ghana
Support 4 child initiated
projects
4 Plan Ghana
communities
4 child initiated
projects supported
20,000 DA
Plan Ghana
Organize sporting and cultural
activities
District Wide sporting and
cultural activities
organized 10,000
DA Plan GH, SNV,
Chalice
Sub Total 3,192,322
162 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: HUMAN DEVELOPMENT, PRODUCTIVITY AND
EMPLOYMENT
DISTRICT OBJECTIVES: 1. Improve management of education delivery
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
Organize training workshops
for circuit supervisors and
head teachers to upgrade their
skills (monitoring
tools/methods)
District wide workshops
organised
5,000
DA GES
Support GES with funds/fuel
for monitoring and supervision
Funds provided
5,000
DA SNV,RAAP
Build capacities of
PTAs/SMCs
Selected
school capacities of
PTAs/SMCs built 20,000
DA Plan GH, SNV,
Chalice
Construct Office
accomodation for district
directorate of education Wechiau
Office
accommodation
built 100,000 DA GES, NGOs
Sub Total 130,000
163 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: HUMAN DEVELOPMENT, PRODUCTIVITY AND
EMPLOYMENT
DISTRICT OBJECTIVES: 1. Improve quality of teaching and
learning
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
Organize STME camps and
INSET
District
wide Camps and Insets
organised 10,000
DA Plan GH, GES,
Chalice
Organize pre-service training
for newly posted teachers
pre-service
training for newly
posted teachers
organized 10,000
DA Plan GH, SNV,
Chalice
Organize in-service training
for pupil teachers
District Wide in-service training
for pupil teachers
organized
10,000
DA Plan GH, SNV,
Chalice
Organize best teacher award District Wide best teacher
award organised 20,000
DA Plan GH, SNV,
Chalice
164 | P a g e
Organize induction course for
the new recruited trainees’
pupils’ teachers.
induction course
for the new
recruited trainees’
pupils’ teachers
organized
10,000
DA Plan GH, SNV,
Chalice
Organized awards for best
circuit supervisor
awards for best
circuit supervisor
instituted 20,000
DA Plan GH, SNV,
Chalice
Organise inter-schools quiz
competition among schools
District wide inter-schools quiz
competition
among schools
organized 20,000
DA Plan GH, SNV,
Chalice
Organized awards for Best
Performing Pupils
District wide awards for Best
Performing Pupils
organized 5,000
DA Plan GH, SNV,
Chalice
Sponsor 30 teacher trainees
and effectively bond them
District wide Teachers
sponsored and
bonded 150,000
DA MP, chalice
Institution of speech and prize
giving day by the end of
September each year.
District Wide speech and prize
giving day
instituted
10,000
DA CHALICE
Sub Total 265,000
165 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: HUMAN DEVELOPMENT, PRODUCTIVITY AND
EMPLOYMENT
DISTRICT OBJECTIVES: 1. Improve access to quality maternal, neonatal, child and adolescent health services
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
De-worm all children 2-5yrs
every six months
District wide Deworming done
and reports
written 3,750 GHS MOH/NGOs
Conduct EPI coverage survey
within the period
District wide EPI coverage
conducted
2,500 GHS NGOs
Establish 1 baby friendly
centers
District wide 1 baby friendly
centre established
30,000 GHS
Project Five
Alive/MoH
Carry out food demonstration
on right combination of food
during complimentary feeding.
District wide Food
demonstration
carried out
42,00 GHS NGOs
Form 5 mother to mother
support groups to promote
breastfeeding.
District wide Mother-to mother
support groups
formed
937.5 GHS NGOs
Sponsor 5 students in
Community Health Nursing &
General nursing
District wide 5 students
sponsored
2,500 GHS DA
166 | P a g e
Build capacity of health staff
and community agents to
implement C-IMCI
Wechiau Health staff &
community agents
capacity built
382.75 GHS NGOs
Organize educational
campaign on malaria
prevention
District wide People educated
on malaria
prevention 5,000 GHS NGOs
Hold monthly immunization
outreach
District wide Children
vaccinationated 200 GHS NGOs
Conduct community growth
promotion
District Wide Children weighed
1,000 GHS NGOs
Organize Health Education on
Exclusive Breast Feeding
District wide Exclusive
breastfeeding,
Intensified 10,000 GHS NGOs
Construct 4No. CHPS
compound
Selected
CHPS zones
CHPS zones
operational 200,000 GHS DA
Organize education on skilled
delivery in 3 communities.
District wide Education carried
out and reports
written 3,000 GHS
GOG, DA,
UNFPA, JICA,
UNICEF F
Sponsor 3 additional midwifes District wide 12 additional
midwifes
appointed 6,000 GHS
GOG, DA,
UNFPA, JICA,
UNICEF
Organize Health Education for
TBAs on referral
District wide TBAs educated
3,000 GHS
GOG, DA,
UNFPA, JICA,
UNICEF
Refresher training on
emergency delivery to CHOs.
District wide CHOs trained
1,500 GHS
GOG, DA,
UNFPA, JICA,
UNICEF
Build 2 community Hostel in
sub-districts
District wide Hostels build
2,250 GHS
GOG, DA,
UNFPA, JICA,
UNICEF
Refresher training on life
saving skills for midwives
District wide Training done
1,500 GHS
GOG, DA,
UNFPA, JICA,
UNICEF
167 | P a g e
Sensitive communities on the
need to arrange for alternative
transport in times of
emergencies
District Wide Communities
sensitized on
alternative
transport in times
of emergencies 2,000 GHS
GOG, DA,
UNFPA, JICA,
UNICEF
Support communities to
arrange with GPRTU to
intervene in times of
emergencies
District Wide communities
supported to
arrange with
GPRTU 2,500 GHS
DA, UNFPA,
JICA, UNICEF
Establish a polyclinic Wechiau Polyclinic
established 3,000,000
GOG
Construct 2No. Staff quarters
for GHS
Wechiau 2No. Staff
quarters
constructed 160,000 GHS
DA, GSOP
Community fora on family
planning
District wide Fora held and
reports written 3,750 GHS PPAG, Plan Ghana
Provide focused antenatal care District wide Antenatal care
provided 2,000 GHS
Project Five Alive,
MoH
Organize Health Education
TBAs on referral
District wide Education carried
out and reports
written 2,250 GHS NGOs
Facilitate the establishment 12
emergency transport systems.
District wide 12 ETS
established
3,000 GHS MoH, Plan Ghana
Educate communities on post
abortion care.
District wide Evidence of
yearly reports 3,000 GHS NGOs
Refresher training for maternal
audit committees in the
district.
District wide Training held
3,000 GHS NGOs
Provide Antenatal Care District wide Number of
antenatal
attendance 2,250 GHS NGOs
168 | P a g e
Organize Health Education on
Exclusive Breast Feeding
District wide Exclusive
breastfeeding,
Intensified 3,000 GHS NGOs
Organise C4D dialogue on
prevention of maternal
mortality in 24 communities
District wide Meetings
organised and
minutes written
7,500 GHS NGOs
Sub Total 3,431,520
2014ANNUAL ACTION PLAN
THEMATIC AREA: HUMAN DEVELOPMENT, PRODUCTIVITY AND
EMPLOYMENT
DISTRICT OBJECTIVES: 1. Prevent and control the spread of communicable and non-communicable diseases and promote healthy lifestyles
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
Organize community durbars
to sensitize people on malaria
District wide Community
durbars on
malaria organised 5,000 GHS
GOG, DA,
UNFPA, JICA,
UNICEF
Organise community clean up
campaigns and award best
communities.
District wide Clean up
campaigns carried
out
3,750 GHS
GOG, DA,
UNFPA, JICA,
UNICEF
Procure and distribute bed nets
to children under five and
pregnant women
District wide Bed nets
distributed
15,000 GHS
GOG, DA,
UNFPA, JICA,
UNICEF
169 | P a g e
Community sensitization on
early reporting for health care
District wide Community
sensitized and
reports written 5,000 GHS
GOG, DA,
UNFPA, JICA,
UNICEF
Sub Total 28,750
2014 ANNUAL ACTION PLAN
THEMATIC AREA: HUMAN DEVELOPMENT, PRODUCTIVITY AND
EMPLOYMENT
DISTRICT OBJECTIVES: 1. Ensure the reduction of new HIV and AIDS, STIs, TB transmission
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
Health education on safe sex District wide Education carried
out 3,000 GHS
DA, UNFPA,
JICA, UNICEF
Distribution of condoms District wide Condoms
provided 25,000 GHS
DA, UNFPA,
JICA, UNICEF
Counseling and testing all
pregnant women
District wide Number of
pregnant women
tested 1,500 GHS
DA, UNFPA,
JICA, UNICEF
Register all HIV clients and
transport them to ART centre
every month for their drugs
District wide PLWHA’s
transported to Wa
for their ART
3,000 GHS
DA, UNFPA,
JICA, UNICEF
Conducting counseling and
testing and “know your status”
campaign
District wide Know your status
carried out
11,250 GHS
DA, UNFPA,
JICA, UNICEF
170 | P a g e
Facilitate the formation of
PLWHA associations
District Wide Association
formed
750 GHS
DA, UNFPA,
JICA, UNICEF
Establish CT/PMCT center District Wide Center
constructed 7,500 GHS
DA, UNFPA,
JICA, UNICEF
Monitor and evaluate HIV/
Aids activities in the district District wide
HIV/AIDS
activities
monitored 15,280 DA GHS, NGOs
Sub Total 67,280
2014 ANNUAL ACTION PLAN
THEMATIC AREA: HUMAN DEVELOPMENT, PRODUCTIVITY AND
EMPLOYMENT
DISTRICT OBJECTIVES: 1. Progressively expand social protection interventions to cover the poor
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
Organize programs in the local
languages that will appeal and
be better understood by
residents.
District Wide Programs in the
local languages
that will appeal to
residents
organized 12,000 NHIS
DA, NGOs
Equip community Health
Insurance committees with
community mobilization
skills.
Wechiau Community
Health Insurance
committees
equiped with
community
mobilization
skills. 2,000 NHIS
DA, NGOs
171 | P a g e
Engage casuals to cope with
the work load
Wechiau Casuals engaged
to cope with the
work load 5,000 NHIS
DA, NGOs
Institute an award system for
agents, staff and providers as a
motivation
Wechiau Award system for
agents, staff and
providers
instituted as a
motivation 5,000 NHIS
DA, NGOs
Organize capacity building
programs and refresher
training for staff
Wechiau Capacity building
programs and
refresher training
for staff organized
10,000 NHIS
DA, NGOs
Organize community
education and participation
through stakeholder meetings.
District wide Community
education and
participation
through
stakeholder
meetings
organized 3,000 NHIS
DA, NGOs
Organize quarterly monitoring
and evaluation
District Wide Quarterly
monitoring and
evaluation
meetings
organized 2,000 NHIS
DA, NGOs
Sub Total 39,000
172 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: HUMAN DEVELOPMENT, PRODUCTIVITY AND
EMPLOYMENT
DISTRICT OBJECTIVES: 1. Progressively expand social protection interventions to cover the poor
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
Recruit and train data
collectors in all LEAP
beneficiary communities 9
Communities
Data collectors
recruited and
trained
2,000 DSW & CD
Dev’t Partners
Conduct LEAP beneficiary
fora in all beneficiary
communities 9
Communities
Fora conducted
1,500 DSW & CD
Dev’t Partners
Identify and register NGOs,
CBOs and other governmental
agencies that provides
complementary services and
link them to LEAP
beneficiaries for support
District wide
NGOs, CBOs etc
registered and
linked to LEAP
beneficiaries
1,000 DSW & CD
Dev’t Partners
173 | P a g e
Organise 5 information
sharing sessions for traditional
rulers, assembly members and
departments on
cultural/traditional practices.
5
Communities
No. of
information
sharing session
for traditional
rulers, assembly
members and
departments on
cultural/traditional
practices
organized
2,000 DSW & CD
DA Traditional
Authorities
Organize 5 training sessions
for stakeholders on the
domestic violence Law,
Children’s Act etc.
5
Communities
No. of training
sessions
organized for
Stakeholders on
the domestic
violence bill.
1,000 DSW & CD
CHRAJ, NCCE
Strengthen institutions such as
DSW&CD, NCCE, Police and
allied institutions to deal with
cultural / traditional issues
Wechiau
1,500
Ghana Police,
CHRAJ, NCCE,
Ghana Police
Sub Total
9,000
174 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: HUMAN DEVELOPMENT, PRODUCTIVITY AND EMPLOYMENT
DISTRICT OBJECTIVES: 1. Enhance community participation in governance and decision making
Organise mass education
programmes on government
policies in 30 communities Selected
communities
No. of mass
education
programmes
organised
3,000 DSW & CD
NCCE, ISD
Sensitize 30 communities on
backward cultural practices
that fuel HIV infection
Selected
communities
No. of
sensitization
programmes
organised
1,500 DSW & CD
NCCE, GHS
Organise training for 50
women leaders (Maakaajie) on
group dynamics
District wide
No. of training
organised
1,500 DSW & CD
Dev’t Partners
Organise training for 20
women's groups on income
generating activities and
financial management
District wide
No. of training
organised
1,000 DSW & CD
Dev’t Partners
Sub Total
7,000
175 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: HUMAN DEVELOPMENT, PRODUCTIVITY AND
EMPLOYMENT
DISTRICT OBJECTIVES: 1. Ensure a more effective appreciation of and inclusion of disability issues both within the formal decision making process
and in the society at large
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
Registration of PWDs in the
district District wide
PWDs registered
1000
DSW & CD Dev’t Partners
Link PWDs with NGOs and
other service providers for
support services
District wide
PWDs linked to
NGOs and service
providers
1000
DSW & CD Dev’t Partners
Conduct educational fora on
issues of disabilities through
durbars and radio talk shows
District wide
Durbars and radio
talk shows on
disabilities issues
conducted
3,000
DSW & CD Dev’t Partners
Intensify education on Act 715
District wide
Education
conducted
1,000
DSW & CD Dev’t Partners
Organize PWDs into groups
and improve upon their
capacities
District wide
PWDs groups
formed and
capacities
improved
1,000
DSW & CD Dev’t Partners
Sub Total
7,000.00
176 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: TRANSPARENT AND ACCOUNTABLE
GOVERNANCE
DISTRICT OBJECTIVES: Ensure effective implementation of the Local Government Service Act
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR 1 2 3 4
LOCAL(
GH¢) EXTERNAL LEAD
COLLABORATI
NG
Organise quarterly reviews
and Public hearings on
Assembly activities District wide
No. of Reviews
and public
hearings
organised 10,000 DA
Review Fee Fixing Resolution Wechiau
2013 fees
prepared and
approved 10,000
Prepare and submit 2013
Composite Budget and Annual
Action plan Wechiau
2013 Composite
budget and
Annual Action
plan prepared and
submitted 12,000 DA
Organise public hearings on
District Assembly activities District wide
No. of public
hearings
organised 10,000 DA
Organise community
engagement sessions with DA
No. of community
engagement
sessions organised 10,000 DA
Organise participatory
monitoring on all development
projects and programmes:
District wide
No. of
participatory
monitoring
organised 135,000 DA
177 | P a g e
Construct 1No. office
accommodation for DA Wechiau
1 No. office
accommodation
for DA
constructed
100,000 DA
Construct 2No. bungalows District wide 3No. bungallows
built
160,000
DA NGOs
Construct 3No. Semi-detached
quarters
Wechiau No. of Semi-
detached quarters
built
240,000
Procure office equipment and
furniture for HR Unit
Wechiau
15,000
DA MLGRD
Train DA Staff in ICT, record
keeping, financial
management, procurement
Wechiau DA staff trained
in various skills
25,000
DA
Train Assembly Members in
leadership skills, report
writing, group dynamics,
networking, etc
Wechiau Assembly
Members trained
in various skills
15,000
DA
Support DA staff to undergo
furhter studies within Ghana
Ghana Hihger
institutions
DA staff
supported for
further studies
20,000
DA NGOs
Support community self help
projects
Wechiau Availability of
logistics &
equipment for
Fire Service
20,000
DA Development
Partners
Sub Total 782,000
178 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: TRANSPARENT AND ACCOUNTABLE
GOVERNANCE
DISTRICT OBJECTIVES: 1. Empower women and mainstream gender into socio-economic
development
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
Organise an education forum
for 300 women and girls to
create awareness on breast
cancer and reproductive health
District wide 300 women and
girls sensitized on
breast cancer and
reproductive
health
3,600 DA NGOs
Organise a workshop to
sensitize 300 traditional
leaders and parents on the
dangers of girl elopement
District wide 300 traditional
leaders and
parents sensitized
on the dangers of
girl elopement
4,149 DA NGOs
Sensitize 300 traditional
leaders and the general public
on the need to reduce out-
migration of women and girls
District wide 300 traditional
leaders and the
general public
sensitized on the
need to reduce out
migration of
women and girls
3,756 DA NGOs, CBOs
179 | P a g e
Sensitize 300 chiefs, wine
sellers and the general public
on the effect of alcoholism and
drug addiction
District wide 300 Chiefs, wine
sellers and the
general public
sensitized on the
effect of
alcoholism and
drug addiction
4,450
Sub Total 15,955
2014 ANNUAL ACTION PLAN
THEMATIC AREA: HUMAN DEVELOPMENT, PRODUCTIVITY AND
EMPLOYMENT
DISTRICT OBJECTIVES: Protect children from direct and indirect physical and emotional harm
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR 1 2 3 4 LOCAL EXTERNAL LEAD
COLLABORATI
NG
Sensitize 50 communities on
child rights
District wide No. of
Communities
sensitized on the
rights of the child 2,500
DSW & CD NCCE, DA,
CHRAJ, NGOs
Form Community Child
Protection Teams
Wechiau Availability of
District Child
Protection Teams
750.00
DSW & CD NCCE, DA,
CHRAJ, NGOs
180 | P a g e
Train Community Child
Protection Teams
Wechiau No. of trainings
organized for
District Child
Protection Teams
1,250.00
DSW & CD NCCE, DA,
CHRAJ, NGOs
Organise training for 30 club
formed on child rights and
advocacy
District wide 30 club formed on
child rights and
advocacy
2000 DSW & CD NCCE, DA,
CHRAJ, NGOs
Organize review meetings on
child rights and
responsibilities
Wechiau Review meeting
organized
750 DSW & CD NCCE, DA,
CHRAJ, NGOs
Register and properly handle
30 family welfare cases
District wide No. of families
registered
200
DSW & CD NCCE, DA,
CHRAJ, NGOs
Sub Total 7,450
2014 ANNUAL ACTION PLAN
THEMATIC AREA: TRANSPARENT AND ACCOUNTABLE
GOVERNANCE
DISTRICT OBJECTIVES: Improve the capacity of security agencies to provide internal security for human safety and protection
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR 1 2 3 4
LOCAL(
GH¢) EXTERNAL LEAD
COLLABORATI
NG
Acquire and demarcate land
for Police buildings
District wide No. of plots of
Land acquired and
demarcated for
police buildings
30,000.00
DA NGOs
181 | P a g e
Construct 1 no. bungalow for
District Police Commander
Wechiau Availability of
bungalow for
district magistrate
80,000.00
DA NGOs
Construct district court
building
Wechiau Court building
constructed
200,000.0
0
DA Donors
Construct office accomodation
for Fire Service
Wechiau Availability of
office
accommodation
for fire service
30,000.00
DA GNFS,
Development
Partners
Provide logistics & equipment
to the Fire Service
Wechiau Availability of
logistics &
equipment for
Fire Service
5,000.00
DA GNFS,
Development
Partners
Construct Junior Police
Quarters
Wechiau Police barracks
constructed
200,000.0
0
DA Ghana Police
Service
Sub Total
545,000.0
0
2014 ANNUAL ACTION PLAN
THEMATIC AREA: TRANSPARENT AND ACCOUNTABLE
GOVERNANCE
DISTRICT OBJECTIVES: 1. Ensure efficient internal revenue generation and transparency in local resource
management
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR LOCAL EXTERNAL LEAD
COLLABORATI
NG
182 | P a g e
Employ more
revenue/commission collectors
District Wide No. Of revenue/
commission
collectors engaged
2,000
DA AREA COUNCIL
Organize refresher training for
revenue collectors
Wechiau No. Of refresher
training organised
for revenue
collectors
2,000
DA AREA COUNCIL
Organize quarterly monitoring
and supervision of revenue
collection in the district
District Wide No. Of
Monitoring and
supervision of
revenue collection
conducted in the
district
4,000
DA AREA COUNCIL
Organize annual awards
ceremony for the best revenue
collectors.
Wechiau No. Of annual
awards organised
3,000
DA AREA COUNCIL
Collect districtwide data on
rateable properties
Selected
communities
Data collected
10,000
DA AREA COUNCIL
Sub Total 21,000
183 | P a g e
2014 ANNUAL ACTION PLAN
THEMATIC AREA: TRANSPARENT AND ACCOUNTABLE
GOVERNANCE
DISTRICT OBJECTIVES: Mainstream the concept of local economic development into planning at the district level
ACTIVITIES LOCATION
OUTPUT
TIME
SCHEDULE
ANNUAL
BUDGET
IMPLEMENTA
TION
AGENCIES
INDICATOR 1 2 3 4 LOCAL EXTERNAL LEAD
COLLABORATI
NG
Conduct technical training on
quality control for sheabutter
producers
Production
communities
Technical training
conducted on
quality control for
sheabutter
producers
10,000
BAC DA, NGOs, Dept.
of Community
Dev’t
Conduct market research for
sheabutter
National &
internationally
Availability of
Market research
data for sheabutter
10,000
BAC DA, NGOs, Dept.
of Community
Dev’t
Purchase 3 sheabutter
equipment for 3 producer
groups
Locally &
internationally
3 No. sheabutter
producer groups
provided with
equipment
60,000
BAC Donor Agencies,
SADA
Develop primary groups for
networking and market
linkage
District wide Primary
sheabutter groups
developed
12,000
BAC Donor Agencies,
SADA
184 | P a g e
Sub Total 92,000
185 | P a g e
CHAPTER SIX
6.0 MONITORING AND EVELUATION
6.1 Introduction
Monitoring and Evaluation are key to the successful implementation of any development plan,
programme or project.
The Monitoring and Evaluation of the DMTDP from2014-2017 cannot therefore be over
emphasized. This is expected to be done in a participatory manner and consistent with the NDPC
guidelines on Monitoring and Evaluation.
6.2 Objectives for Monitoring & Evaluation
To track the progress of indicators set
To track the implementation process set in the DMTDP
To ensure that the DMTDP achieves its set objectives and goals
6.3 Activities to Monitor
Input Delivery i.e., Resources to achieve the objectives and strategies
Output – provision of goods and services produced by inputs
Quality – both inputs and output
Programme/project coverage
Target groups – who are the beneficiaries and are they benefiting from the
projects/programmes
Effectiveness – to what extent is the project/programme achieving results.
Thus, this compares inputs and output or objectives and results. This is expressed in the form of
percentages, i.e., expected results and actual results
6.3 Stakeholder Analysis
Table 6.1 Identification and Analysis of Stakeholders
NO. STAKEHOLDERS RESPONSIBILITIES
1. National Development Planning Commission (NDPC) Provide M&E formulation
guidelines
2. Regional Co-ordinating Council/Regional Panning Co-
ordinating Unit
Policy formulation
Co-ordination of M&E
activities
3. District Assembly/Assembly Members Planning M&E activities
Co-ordinating M&E activities
Provides resources for M&E
186 | P a g e
activities
4. Decentralized Departments & Agencies Collection of data
Preparation of M&E reports
5. Local community Support data collection
Demand accountability
6. Donor Agencies To monitor utilization of fund
inflows
Provides resources for M&E
Table 6.2 Assessing Needs, Conditions and Capacities for M&E
No. Capacity Indicators Score=1 Score=5 Score=10
1. Qualification of
personnel
Some staff have the
required education, but not
all
2. Staff compliment Most staff have the
requisite skills &
knowledge in some areas
but not all
3. Skills & knowledge Some staff have requisite
skills & knowledge in
some areas not all
4. Availability of funds Funds available to meet
basic costs but will not
allow DPCU to carry out
all activities in the M&E
Plan
5. Utilization of funds Funds are
spent as
budgeted in
accordance
with
DMTDP
6. Timely access to funds Funds released up to 6
months behind schedules
7. Leadership Funds released up to six
months behind schedules
8. Management Management is
187 | P a g e
technically skilled
in all components
9. Workload Workload forces staff to
work overtime to complete
administrative
programming functions
10. Motivation/Incentives Some central government
motivation/incentives are
accessible (e.g. training)
11. Equipment/facilities Office space & furniture is
adequate but technology is
lacking for some staff
6.4 Data Collection and Collation
Data for Monitory and Evaluation of the DMTDP shall be both quantitative and qualitative. The
primary data shall be collected directly from the field by all sector departments, the DPCU,
community members, Assembly Members and Area Councilors. Secondary data shall also be
collected through review of research documents and others relevant documents in order to
support the primary data. This data would be source from sector departments, NGOs etc.
6.5 Data Analysis and Use of the Results
Data analysis shall be done through software such as the SPSS as well as other available data
softwares. The DPCU shall use regression analysis and frequencies to analyze the data. The
results of the data analysis would be discussed at a stakeholder forum and the outcome used for
future planning in the Short-term and Medium-Term.
6.6 Reporting
The DPCU shall prepare a report after, each monitoring for discussion by the District Chief
Executive, the Presiding Members and Chairmen of the Sub-Committees of the Assembly.
However, there would be mid-year and annual progress reports which shall be discussed at a
forum of stakeholder and presented to the General Assembly.
6.7 Dissemination of the Reports
It is not often possible to get all stakeholders to a forum to discuss reports. Therefore, to reach
out to a greater percentage of the stakeholders, there would be a Public Hearing on the reports
and this could be carried by the media. These Public Hearing would be held at the following
levels:
Unit Committee level
188 | P a g e
Area Council level
District Assembly level
Table 6.4 M&E CALENDAR
ACTIVITIES TIMEFRAME ACTORS BUDGET
Year 1 Year 2 Year 3 Year 4
2014 2015 2016 2017
Annual review of
DMTDP
DPCU GH¢10,000
Mid-Year review
of DMTDP
June June June June DPCU GH¢10,000
Annual progress
reviewed
workshop
Jan Jan Jan DPCU GH¢6,000
Preparation of
Annual Progress
Report
Feb Feb Feb Feb DPCU GH¢4,000
Dissemination May May May May DPCU GH¢6,000
Quarterly Review March June September Jan DPCU GH¢4,000
Quarterly Field
Visits
Jan - March April - June July - September October -
December DPCU GH¢6,000
6.9 EVALUATION
The participation M&E approach would be adopted in the evaluation of the DMTDP. This would
enable both right bearers and duty bearer to access the impact of interventions and challenges
affecting the effective implementation of the interventions.
In view of the above, the District Assembly would engage Civil Society Organizations (CSOs) to
assist in using participatory methods to collect data for the evaluation of the DMTDP.
Some of the M&E techniques to be adopted are indicated below:
i. Citizen Report Cards
ii. Community Score Cards
iii. Focus Group discussing etc
189 | P a g e
CHAPTER SEVEN
7.0. DISTRICT COMMUNICATION STRATEGY/PLAN
7.1. INTRODUCTION
Communication is key to the promotion of transparency and accountability. It also promotes
team spirit and team work since every actor in the particular activity is aware of what is going
on.
In view of the above, the Wa West District Assembly as part of the DMTDP 2014-2017 has
developed a communication strategy in order to enable all responsible agencies and persons are
abreast with the contents of the DMTDP and the role they are expected to play. This would be
done by disseminating the DMTDP throughout the district.
7.2. DISSEMINATION OF DMTDP
The DMTDP would be disseminated through Public Hearing and Fora where a presentation
would be done on the DMTDP for all stakeholders to know their roles and responsibilities in the
implementation of the Plan. Hence the programmes, projects and activities captured in the Plan
would be presented.
Moreover, there would be preparation of Annual Progress Report during Performance Review
Meetings which would be discussed at Public Hearings and Stakeholders Meetings to identify
the challenges for redress whiles enhancing the achievements made over the period.
In addition, there would be engagement meetings between right bearers and duty bearers where
there would be an interaction and feedback between right holders and duty bearers.
The feedback from such engagements would be discussed at the Sub-Committee level and the
General Assembly for possible redress of the issues raised by right bearers and duty bearers.
There would also be Town Hall Meetings at the Sub-district level to create a platform for the
people to also ask questions about government policies especially relating to the MTDP and the
MTPF for 2014-2017.
190 | P a g e
Table 7.1: Budget for Communication Strategy
ACTIVITIES LOCATION OUTPUT
TIMEFRAME BUDGET
IMPLEMENTING
AGENCIES
2014 2015 2016 2017 GH¢ Lead Collaborating
Organize 4 Public
hearing on the MTDP
District wide 4 Public hearing
organized on MTDP
15,000 DPCU All Dec. Depts.
Traditional Authorities
Media
Organize 4 Mid-Year
Performance reviews
on MTDP
Wechiau 4 Mid–Year reviews
on MTDP organized
15,000 DPCU All Depts.
Media
Organize 4 annual
reviews on the MTDP
Wechiau 4 annual reviews on
MTDP organized
15,000 DPCU All Depts.
Media
Organize 5 Town Hall
meetings annually on
the MTDP
All Sub-
district
5 Town Hall
meetings organized
on the MTDP
30,000 DA All Depts.
Media
Organized
Engagement Meetings
between right bearers
and duty bearer
District wide Engagement
Meetings organized
between right
bearers and duty
bearer
30,000 DA All Service Providers
All Depts.
191 | P a g e
Radio talk shows on
the implementation of
the MTDP
Wechiau Radio Talk Shows
on the
implementation of
the MTDP organized
10,000 DA Radio
Stations
1 | P a g e