Draughton 16 th April 2014. John Moore Chief Executive NYnet. Areas we will cover. BT rollout – Phase 1 Lessons learnt to date How to address final 10%? Phase 2 Phase 3 Demand stimulation. Reminder of our Vision. Access to high-quality broadband for 100% of North Yorkshire premises - PowerPoint PPT Presentation
Popular Tags:
9
Draughton Draughton 16 16 th th April 2014 April 2014 John Moore John Moore Chief Chief Executive Executive NYnet
Transcript
Page 1: Draughton 16 th  April 2014

DraughtonDraughton1616thth April 2014 April 2014

John MooreJohn MooreChief Chief ExecutiveExecutiveNYnet

Page 2: Draughton 16 th  April 2014

Areas we will cover• BT rollout – Phase 1• Lessons learnt to date• How to address final 10%? • Phase 2• Phase 3• Demand stimulation

Page 3: Draughton 16 th  April 2014

Reminder of our Vision

Access to high-quality broadbandfor

100% of North Yorkshire premisesby

2017

Page 4: Draughton 16 th  April 2014

To secure >> than average levels of broadband take-up, both residentially and by SMEs

Page 5: Draughton 16 th  April 2014

BT Rollout – Phase 1• Key contract terms (Intervention Area)• 77% access to min 25Mbps • 100% access to min 2Mbps• Completion by October 2014

• Mostly FTTC• Some FTTP (3%)

cont …

Page 6: Draughton 16 th  April 2014

BT Rollout – Phase 1• Headlines• 462+ of 670 cabinets completed

• 110,000+ of 150,000 total premises now able to access superfast speeds (25+Mbps)

Page 7: Draughton 16 th  April 2014
Page 8: Draughton 16 th  April 2014
Page 9: Draughton 16 th  April 2014