Drawing Design
Copyright 2018 FUJITSU GENERAL LIMITED1
Drawing Design
Drawing Design screen (Drawing base)
Select “Drawing Design”
Layout
Copyright 2018 FUJITSU GENERAL LIMITED2
Drawing Design
Layout screen (Disposition)
Select “Layout”
DisplayRefer to “Display”
Tool menu
Copyright 2018 FUJITSU GENERAL LIMITED3
Drawing DesignFile
: Go to menu screen
Help
: Display Manual
Preference
: Refer to “Preference“
Preference
Copyright 2018 FUJITSU GENERAL LIMITED4
Drawing Design
FloorSets the initial value of the floor
GridUse : Grid usage settingWidth : Set the width of the grid
New project picture settingNew project import picture setting
Picture size setting : Set capture size of picturePicture orientation : Set the orientation of picturePicture resolution setting : Set picture resolution
Fine : Capture with resolution equivalent to 300 dpiNormal : Capture with resolution equivalent to 200dpiBasic : Capture with resolution equivalent to 96dpi* Picture resolution setting is no change,
when picture resolution or less
RefrigerantDisplay list of wiring terminal
Optional partsDisplay list of Pipe and Branch and RB Unit Models
RefrigerantDisplay list of refrigerant equipment
Display
Copyright 2018 FUJITSU GENERAL LIMITED5
Drawing Design
Display category screenDisplay category screenThe selected screen is overlaid and displayed
NavigationDisplay Navigation screen
Delete unitDelete the selected unit
Layout-Disposition(1/2)
Copyright 2018 FUJITSU GENERAL LIMITED6
Drawing DesignFunction switching(refer to function)Disposition : Refrigerant arrangementPiping : Piping settingWiring(Transmission): Wiring settingWiring(Power) : Power supply setting
Model Info Displays unit information
Refrigerant listRefrigerants selected by Design simulator is displayed
Select refrigerantDetails of the refrigerant selected in the Refrigerant list are displayed
VRF network systemMulti and Sprit not connected to VRF network system is displayed in "Others"
Layout-Disposition(2/2)
Copyright 2018 FUJITSU GENERAL LIMITED7
Drawing Design
ClearRefer to “Clear”
CheckRefer to “Check”
ScaleRefer to “Scale setting”
Quit operationQuit current operation
Clear
Copyright 2018 FUJITSU GENERAL LIMITED8
Drawing Design
1)Press Clear button2)Check the All or Selected refrigerant3)Check the device or unit to be deleted4)Press Clear
Scale setting
Copyright 2018 FUJITSU GENERAL LIMITED9
Drawing Design
1)Select ScaleNot selected scale
Selected scale
2)Left-click at starting point3)Left-click at end point4)Input the scale5)Press Tab key6)Press Set
*If stop drawing ,Press the Esc button
1)
2) 3)
How to scale setting
4)
6)
Disposition
Copyright 2018 FUJITSU GENERAL LIMITED10
Drawing DesignHow to arrangement units
1)Select VRF Network System
2)Select refrigerant3)Select Unit4)Drag & Drop On Work area
Unplaced is orange, and already arranged is light blue
1)
2)
3)
4)
Disposition(Outdoor)
Copyright 2018 FUJITSU GENERAL LIMITED11
Drawing DesignHow to arrangement units(Combination)
1)2)
1)Select refrigerant
2) Drag & Drop on work areaWhen master or Slave units are Drag & Drop on work area ,master and slave unit only arrange
1)Select refrigerant
2) Drag & Drop on work areaWhen Refrigerant are Drag & Drop on work area ,master and slave units are arrange
1) 2)
How to arrangement units(Single unit)
Disposition(Indoor , RB Unit , Other)
Copyright 2018 FUJITSU GENERAL LIMITED12
Drawing DesignHow to arrangement units
1)Select refrigerant
2)Drag & Drop on work areaWhen RB unit are Drag & Drop on work area , RB unit and indoor unit arrange
1)2)
1)
1)Select refrigerant
2) Drag & Drop on work area
2)
Rotation1)Right-click at Menu and Select Rotation2)Unit to Rotate 90 degrees to the right
Right-click menu(1/5)
Copyright 2018 FUJITSU GENERAL LIMITED13
Drawing designMove(1/2)1)Right-click at Menu and Select Move2)Drag to end point3)Left-click at end point
Resize(Outdoor,Indoor)1)Right-click at Menu and Select Resize2)Mouse cursor on any of the four corners of the Unit3)Drag the mouse to the size to change4) Left-click at Work area
1) 2) 3)
Move(2/2)1)Left-click Unit2)Drag to end point3)Left-click at end point
1) 2) 3)
1) 2) 3) 4)
1) 2)
Right-click menu(1/2)
Copyright 2018 FUJITSU GENERAL LIMITED14
Drawing designDelete1)Right-click at Menu and Select Delete2)Confirmation dialog is displayed 2-1)Click OK to delete the unit2-2)Click Cancel to cancel the deletion
1) 2-1) 2-2)
Reference : Right click menu(Move)
Copyright 2018 FUJITSU GENERAL LIMITED15
Drawing DesignHow to Move
*If stop Move ,Press the Esc Key or Quit operation
1)Select Move2)Drag to end point3)Left-click at end point
1)2) 3)
Layout-Piping(1/2)
Copyright 2018 FUJITSU GENERAL LIMITED16
Drawing design
Display setting Model Info: Show unit’s information
CheckRefer to “Check”
Pipe lineDraw pipe : Refer to “Draw Pipe-Auto” , “Draw
Pipe -Manual”Delete pipe : Delete the selected pipe
ClearRefer to “Clear”
ScaleRefer to “Scale setting“
DS PipingShow DS piping screen
Quit operationQuit current operation
Function switching(refer to function)Disposition : Refrigerant arrangementPiping : Piping settingWiring(Transmission): Wiring settingWiring(Power) : Power supply setting
Layout-Piping(2/2)
Copyright 2018 FUJITSU GENERAL LIMITED17
Drawing design
Refrigerant listRefer to “Draw Pipe -Auto”,”Draw Pipe -Manual”
Tool boxBranch For 2Pipes, Branch For 3PipesHeader 2-6Pipe,2-8Pipe,3-6Pipe,3-8Pipe PS EPS, Pressure sensor kit :Refer to “Draw Pipe -Auto”,”Draw Pipe -Manual”*PS : Pipe SpaceEPS : Electric Pipe Space
Zoom to: Zoom up: Zoom down: Select zoom: Full picture display
RedrawRedraw: Draw the displayed picture again
Draw Pipe -Auto
Copyright 2018 FUJITSU GENERAL LIMITED18
Drawing designHow to draw a pipe automatically
1)Select refrigerant
2)Select a part3)Left-Click on work area for part disposition4)Press Draw Pipe Not selected Draw Pipe Selected Draw Pipe
5)Left-Click on the unit6)Double-Click on the another unitThe case of 2-6Multi split, when drawing a pipe, wiring(transmission) line is drawn automatically
1)
2)
3)
4)
5),6)
6)5)
6)
Draw Pipe -Manual
Copyright 2018 FUJITSU GENERAL LIMITED19
Drawing designHow to draw a pipe manually
1)Select refrigerant
2)Select parts3)Left-Click on work area4)Press Draw Pipe Not selected Draw Pipe Selected Draw Pipe
5)Left-Click on the unit6)Left-Click on the work area7)Double-Click on the another unitThe case of 2-6Multi split, when drawing a pipe, wiring(transimission) line is drawn automatically
1)
2)
3)
4)
5)-7)
5) 6) 7)
Change Pipe length
Copyright 2018 FUJITSU GENERAL LIMITED20
Drawing designHow to change pipe length
1)Double-Click on start point or
end point of pipe line
2)Input length, press Set
1)8.7m 8.7m 6.0m
2)
1),2)
Check(1/2)
Copyright 2018 FUJITSU GENERAL LIMITED21
Drawing design
1)Press Check
2)Press Report
Each check items and results are shown.Check items are depending on the type of refrigerant
1)
3)
2)
Check(2/2)
Copyright 2018 FUJITSU GENERAL LIMITED22
Drawing design
Show all unit’s modelsAfter showing check reports, all unit’s models and pipe sizes are shown as symbol
*"Display -Optional parts“ in tool menu shows all symbols detail
Layout-Wiring(Transmission) (1/2)
Copyright 2018 FUJITSU GENERAL LIMITED23
Drawing Design
DS WiringOpen “DS Wiring display”
CheckRefer to “Check”
ClearRefer to “ Clear“
Quit operationQuit current operation is terminated.
Wire lineDraw wire : Refer to “Draw Transmission Wire-Auto”
& “Draw Transmission Wire-Manual”Refer to “Draw Master-Slave Outdoor units Wire-Auto” & “Draw Master-Slave Outdoor units Wire-Manual”
Delete wire : Delete the selected pipe
Display setting Model Info: Show unit’s information
ScaleRefer to “Scale setting“
Layout-Wiring(Transmission) (2/2)
Copyright 2018 FUJITSU GENERAL LIMITED24
Drawing design
Refrigerant listRefer to “Transmission wire-Auto”,” Draw Transmission wire- Manual”
Tool boxPS,EPS:Refer to “PS,EPS”*PS : Pipe SpaceEPS : Electric Pipe Space
Zoom to: Zoom up: Zoom down: Select zoom: Full picture display
RedrawRedraw: Draw the displayed picture again
Controller List
Copyright 2018 FUJITSU GENERAL LIMITED25
Drawing DesignHow to Controller object – Drag and Drop
1)2)
1)Select Controller.
2)Drag and drop for part disposition.
Draw Transmission wire-Auto
Copyright 2018 FUJITSU GENERAL LIMITED26
Drawing Design
2) 3)
1) Press “Draw Transmission wire.”
Not selected Line
Selected Line
2) Left-Click on the unit Terminal
3)Left-double Click at Outdoor unit Terminal.
The case of 2-6Multi split, when drawing wirings,
Piping line is drawn automatically
1)
Show all unit Terminal
*“Display – Explanatory notes“ in tool menu shows all terminal detail
Draw Transmission wire- Manual
Copyright 2018 FUJITSU GENERAL LIMITED27
Drawing Design
1)
2) 2)
1)Press “Draw Transmission wire.”
Not selected Line
Selected Line
2)Left-Click at Outdoor unit Terminal
Left-click at second point
Repeat
3) Left-double Click at Terminal end pointThe case of 2-6Multi split, when drawing wirings,
Piping line is drawn automatically
2) 3)
Draw Master-Slave Outdoor units Wire-Auto
Copyright 2018 FUJITSU GENERAL LIMITED28
Drawing Design
1) Press “Draw Master-Slave Outdoor units Wire.”
Not selected Line
Selected Line
2)Left-Click at Master Outdoor unit Terminal.
Left-click at second point
Repeat
3) Left-double Click at Slave Outdoor unit Terminal.
1)
2) 2) 2) 3)
Master SlaveMaster Slave
Draw Master-Slave Outdoor units Wire-Manual
Copyright 2018 FUJITSU GENERAL LIMITED29
Drawing Design
1) Press “Draw Master-Slave Outdoor units Wire.”
Not selected Line
Selected Line
2)Left-Click at Master Outdoor unit Terminal.
Left-click at second point
Repeat
3) Left-double Click at Slave Outdoor unit Terminal.It is possible to connect different refrigerant systems in the same way
Master Slave
1)
2) 3)
Draw different refrigerant circuit Wire-Manual
Copyright 2018 FUJITSU GENERAL LIMITED30
Drawing Design
1) Press “Draw Master-Slave Outdoor units Wire.”
Not selected Line
Selected Line
2)Left-Click at Outdoor unit Terminal.
Left-click at second point
Repeat
3) Left-double Click at Slave Outdoor unit Terminal.
1)
2) 3)2) 2)
1)Press PS,EPS.Not selected PS,EPS
Selected Line PS,EPS
2)Left-Click on work area for part disposition.
3) Press Draw Transmission Wire
Not selected Line
Selected Line
4)Left-Click on the unit
5) Left-click at second point
Repeat
6) Left-double Click at Terminal end point.
PS:Pipe Space
EPS:Electric Pipe Space
PS,EPS
Copyright 2018 FUJITSU GENERAL LIMITED31
Drawing DesignHow to Wiring PS,EPS
1)
2)
3)
4) 5) 6)
Change wire length
Copyright 2018 FUJITSU GENERAL LIMITED32
Drawing designHow to change wire length
1)Double-Click on start point or
end point of pipe line
2)Input length, press Set
RC Group
Copyright 2018 FUJITSU GENERAL LIMITED33
Drawing design
When creating RC Group , terminals are displayed under the indoor unit.
RC Group Terminal name:Series + Outdoor Index + RC Gr. No
Series :V:VRF, F:8RoomMulti, M:2-6Multi split, S:Single split
Outdoor Index: 1-100RC Gr. No : 1-64
Single RC terminal is not displayed.