+ All Categories
Home > Documents > Drawing reference Footing details Project Name: Street ...

Drawing reference Footing details Project Name: Street ...

Date post: 09-Jan-2022
Category:
Upload: others
View: 4 times
Download: 2 times
Share this document with a friend
19
Drawing reference Footing details Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill Drawing Number: ST-01
Transcript
Page 1: Drawing reference Footing details Project Name: Street ...

Drawing reference

Footing details

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Drawing Number: ST-01

Page 2: Drawing reference Footing details Project Name: Street ...

Drawing reference

Pole details

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Drawing Number: ST-02

Page 3: Drawing reference Footing details Project Name: Street ...

Drawing reference

Pole details 6m high

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Drawing Number: ST-03

Page 4: Drawing reference Footing details Project Name: Street ...

Drawing reference

Mounting system- Minimum requirements of design and installation data sheet

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Drawing Number: ST-04

Page 5: Drawing reference Footing details Project Name: Street ...

Drawing reference

Mounting system- Minimum requirements of design and installation data sheet

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Drawing Number: ST-05

Page 6: Drawing reference Footing details Project Name: Street ...

Drawing reference

Mounting system- Minimum requirements of design and installation data sheet

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Drawing Number: ST-06

Page 7: Drawing reference Footing details Project Name: Street ...

Car Parking by the Old Admin Building

Top View

Car Parking by the New Admin Building

Top View

Car Parking by the Pray Building

Top View

North

Drawing

Strings Layout

Client:

UNDP- Jordan Country Office

Solar Power Services

Zobelweg 10

53842 Troisdorf,Germany

rev

01

Area

Old Building

New Building

Pray Building

No. of Modules

70

64

70

All dimensions in meter

1.9560

0.9920

Re01 MA First Issue 17.Aug.2017

14.8800

9.9200

4.9600

13.6920

13.6920

13.6920

9.9200

Drawing Number:ST-07

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Page 8: Drawing reference Footing details Project Name: Street ...

Car Parking by the Old Admin Building

Top ViewSide View

Car Parking by the New Admin Building

Top View

Side View

Car Parking by the Pray Building

Top ViewSide View

North

Drawing

PV System layout

Client:

UNDP- Jordan Country Office

Solar Power Services

Zobelweg 10

53842 Troisdorf,Germany

rev

02

Area

Old Building

New Building

Pray Building

No. of Modules

70

64

70

All dimensions in meter

1.9560

0.9920

Re01 MA First Issue 8.Aug.2017

2.5000

3.2500

9.9200

2.5000

14.8800

3.2500

14.8800

13.6920

9.9200

2.5000

3.2500

9.9200

13.6920

9.9200

13.6920

4.9600

Re02 MA Increase Capacity 16.Aug.2017

Drawing number:ST-08

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Page 9: Drawing reference Footing details Project Name: Street ...

Drawing

Cable installation

method

Client:

UNDP- Jordan Country Office

Solar Power Services

Zobelweg 10

53842 Troisdorf,Germany

rev

01

Re01 MA First Issue 17.Aug.2017

Warning Tape

300 mm

300 mm

Ground Level

Existing soil

Native Soil Backfil

100 mm

Armoured AC Cables

100 mm

Clean Filtered Sand

Native Soil

Grounding Conductor

400 mm

800 mm

AC Cable Trench Section

Road

Cable Route

300 mm

200 mm

800 mm

Asphalt

AC Cable

Crossing Details

Drawing number:ST-09

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Page 10: Drawing reference Footing details Project Name: Street ...

Drawing

Inverter installation

method

Client:

UNDP- Jordan Country Office

Solar Power Services

Zobelweg 10

53842 Troisdorf,Germany

rev

01

Re01 MA First Issue 17.Aug.2017

Installation Location

80 cm

50 cm50 cm

50 cm

Wall/ Suitable Structure for bearing the weight

Vertical

maximum inclination is +/-5 degrees

NOT exposed to direct sunlight

Inverter

Key

Drawing number:ST-10

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Page 11: Drawing reference Footing details Project Name: Street ...
Page 12: Drawing reference Footing details Project Name: Street ...

Drawing number:

ST-12

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Page 13: Drawing reference Footing details Project Name: Street ...

Drawing

Street lighting system sld

rev

01

Re01 MA First Issue 18.Aug.2017

Drawing NumberST-13

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

AutoCAD SHX Text
Client: UNDP- Jordan Country Office
AutoCAD SHX Text
Solar Power Services Zobelweg 10 53842 Troisdorf,Germany
AutoCAD SHX Text
DB
AutoCAD SHX Text
FP1
AutoCAD SHX Text
FP2
AutoCAD SHX Text
FP3
AutoCAD SHX Text
From Main MDB
AutoCAD SHX Text
CU/3cX25mm2 Aerial 100 m
AutoCAD SHX Text
MCB 32 A
AutoCAD SHX Text
MCB 32 A
AutoCAD SHX Text
Isolator 32 A
AutoCAD SHX Text
Road 2 100 w X 33 lighting pole
AutoCAD SHX Text
Road 1 100 w X 68 lighting pole
AutoCAD SHX Text
Road 1 100 w X 68 lighting pole
AutoCAD SHX Text
CU/3cX35mm2 Aerial 1400 m each
AutoCAD SHX Text
CU/3cX6mm2 Aerial 900 m
AutoCAD SHX Text
MCB 10 A
AutoCAD SHX Text
MCB 16 A
AutoCAD SHX Text
MCB 16 A
AutoCAD SHX Text
CU/3cX6mm2 Aerial 250 m
AutoCAD SHX Text
MCB 10 A
AutoCAD SHX Text
MCB 10 A
AutoCAD SHX Text
Isolator 10 A
AutoCAD SHX Text
Road 3 and 5 100 w X 40 lighting pole
AutoCAD SHX Text
CU/3cX10mm2 Aerial 1000 m each
AutoCAD SHX Text
MCB 10 A
AutoCAD SHX Text
CU/3cX6mm2 Aerial 500 m
AutoCAD SHX Text
Road 4 100 w X 6 lighting pole
AutoCAD SHX Text
MCB 6 A
AutoCAD SHX Text
MCB 6 A
AutoCAD SHX Text
Isolator 6 A
AutoCAD SHX Text
MCB 40 A
AutoCAD SHX Text
Isolator 40 A
AutoCAD SHX Text
CU/3cX10mm2 in Duct 20 m
Page 14: Drawing reference Footing details Project Name: Street ...

Drawing

PV System SLD

Client:

UNDP- Jordan Country Office

Solar Power Services

Zobelweg 10

53842 Troisdorf,Germany

rev

02

Re01 MA First Issue 8.Aug.2017

Inverter Model

TRIO-20.0-TL-OUTD

-S2X

to Meter

MDB

MCCB

35A

RCCB

35A

AC Cable

Cu/XLPE up to1.1kV

4cX 10 mm2

Up to 100m

DC Cable

4 mm2

18 module per string

2 strings

JKM320P-72

320 Watt

Below SLD is applicable for the two

locations; Old admin building and Pray

building

17 module per string

2 strings

JKM320P-72

320 Watt

Re02 MA Increase Capacity 16.Aug.2017

Page 15: Drawing reference Footing details Project Name: Street ...

Drawing

PV System SLD

Client:

UNDP- Jordan Country Office

Solar Power Services

Zobelweg 10

53842 Troisdorf,Germany

rev

02

Re01 MA First Issue 8.Aug.2017

Inverter Model

TRIO-20.0-TL-OUTD

-S2X

to Meter

MDB

MCCB

35A

RCCB

35A

AC Cable

Cu/XLPE up to1.1kV

4cX 10 mm2

Up to 100m

DC Cable

4 mm2

16 module per string

4 strings

JKM320P-72

320 Watt

Below SLD is applicable for the New

Admin Building

Re02 MA Increase Capacity 16.Aug.2017

Drawing number:ST-14

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Page 16: Drawing reference Footing details Project Name: Street ...

Drawing reference Fence details

Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Drawing Number: ST-15

Page 17: Drawing reference Footing details Project Name: Street ...

 

 

 

 

 

  Drawing reference   PV String Sizing Reports (minimum standard) 

   Project Name: Street Lighting Through on‐grid hybrid Solar power system – Al Ekaider Landfill      Drawing Number: ST‐16 

Page 18: Drawing reference Footing details Project Name: Street ...

 

 

 

 

  Drawing reference   PV String Sizing Reports (minimum standard) 

   Project Name: Street Lighting Through on‐grid hybrid Solar power system – Al Ekaider Landfill      Drawing Number: ST‐17 

Page 19: Drawing reference Footing details Project Name: Street ...

Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill

Item

NumberItem Name Item Code

1 Footing detail ST-01

2 Pole detail 10m ST-02

3 Pole detail 6m ST-03

4 Mounting system detail 1 ST-04

5 Mounting system detail 2 ST-05

6 Mounting system detail 3 ST-06

7 String layout ST-07

8 PV system layout ST-08

9 Cable installtion method ST-09

10 Inverter installtion method ST-10

11Master Plan PV & Meter & Inverters

locationST-11

12 Poles Location ST-12

13 Street lighting SLD ST-13

14 PV system SLD ST-14

15 Fence Details ST-15

16 PV string sizing reports ST-16

17 PV string sizing reports ST-17

18 Drawings schedule ST-18

Drawing Schedule

Project Name: Street Lighting Through on-grid hybrid Solar power

system – Al Ekaider Landfill

Ref. ST-18


Recommended