Drawing reference
Footing details
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing Number: ST-01
Drawing reference
Pole details
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing Number: ST-02
Drawing reference
Pole details 6m high
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing Number: ST-03
Drawing reference
Mounting system- Minimum requirements of design and installation data sheet
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing Number: ST-04
Drawing reference
Mounting system- Minimum requirements of design and installation data sheet
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing Number: ST-05
Drawing reference
Mounting system- Minimum requirements of design and installation data sheet
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing Number: ST-06
Car Parking by the Old Admin Building
Top View
Car Parking by the New Admin Building
Top View
Car Parking by the Pray Building
Top View
North
Drawing
Strings Layout
Client:
UNDP- Jordan Country Office
Solar Power Services
Zobelweg 10
53842 Troisdorf,Germany
rev
01
Area
Old Building
New Building
Pray Building
No. of Modules
70
64
70
All dimensions in meter
1.9560
0.9920
Re01 MA First Issue 17.Aug.2017
14.8800
9.9200
4.9600
13.6920
13.6920
13.6920
9.9200
Drawing Number:ST-07
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Car Parking by the Old Admin Building
Top ViewSide View
Car Parking by the New Admin Building
Top View
Side View
Car Parking by the Pray Building
Top ViewSide View
North
Drawing
PV System layout
Client:
UNDP- Jordan Country Office
Solar Power Services
Zobelweg 10
53842 Troisdorf,Germany
rev
02
Area
Old Building
New Building
Pray Building
No. of Modules
70
64
70
All dimensions in meter
1.9560
0.9920
Re01 MA First Issue 8.Aug.2017
2.5000
3.2500
9.9200
4°
2.5000
14.8800
3.2500
14.8800
13.6920
9.9200
2.5000
3.2500
9.9200
4°
13.6920
9.9200
13.6920
4.9600
Re02 MA Increase Capacity 16.Aug.2017
Drawing number:ST-08
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing
Cable installation
method
Client:
UNDP- Jordan Country Office
Solar Power Services
Zobelweg 10
53842 Troisdorf,Germany
rev
01
Re01 MA First Issue 17.Aug.2017
Warning Tape
300 mm
300 mm
Ground Level
Existing soil
Native Soil Backfil
100 mm
Armoured AC Cables
100 mm
Clean Filtered Sand
Native Soil
Grounding Conductor
400 mm
800 mm
AC Cable Trench Section
Road
Cable Route
300 mm
200 mm
800 mm
Asphalt
AC Cable
Crossing Details
Drawing number:ST-09
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing
Inverter installation
method
Client:
UNDP- Jordan Country Office
Solar Power Services
Zobelweg 10
53842 Troisdorf,Germany
rev
01
Re01 MA First Issue 17.Aug.2017
Installation Location
80 cm
50 cm50 cm
50 cm
Wall/ Suitable Structure for bearing the weight
Vertical
maximum inclination is +/-5 degrees
NOT exposed to direct sunlight
Inverter
Key
Drawing number:ST-10
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing number:
ST-12
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing
Street lighting system sld
rev
01
Re01 MA First Issue 18.Aug.2017
Drawing NumberST-13
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing
PV System SLD
Client:
UNDP- Jordan Country Office
Solar Power Services
Zobelweg 10
53842 Troisdorf,Germany
rev
02
Re01 MA First Issue 8.Aug.2017
Inverter Model
TRIO-20.0-TL-OUTD
-S2X
to Meter
MDB
MCCB
35A
RCCB
35A
AC Cable
Cu/XLPE up to1.1kV
4cX 10 mm2
Up to 100m
DC Cable
4 mm2
18 module per string
2 strings
JKM320P-72
320 Watt
Below SLD is applicable for the two
locations; Old admin building and Pray
building
17 module per string
2 strings
JKM320P-72
320 Watt
Re02 MA Increase Capacity 16.Aug.2017
Drawing
PV System SLD
Client:
UNDP- Jordan Country Office
Solar Power Services
Zobelweg 10
53842 Troisdorf,Germany
rev
02
Re01 MA First Issue 8.Aug.2017
Inverter Model
TRIO-20.0-TL-OUTD
-S2X
to Meter
MDB
MCCB
35A
RCCB
35A
AC Cable
Cu/XLPE up to1.1kV
4cX 10 mm2
Up to 100m
DC Cable
4 mm2
16 module per string
4 strings
JKM320P-72
320 Watt
Below SLD is applicable for the New
Admin Building
Re02 MA Increase Capacity 16.Aug.2017
Drawing number:ST-14
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing reference Fence details
Project Name: Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Drawing Number: ST-15
Drawing reference PV String Sizing Reports (minimum standard)
Project Name: Street Lighting Through on‐grid hybrid Solar power system – Al Ekaider Landfill Drawing Number: ST‐16
Drawing reference PV String Sizing Reports (minimum standard)
Project Name: Street Lighting Through on‐grid hybrid Solar power system – Al Ekaider Landfill Drawing Number: ST‐17
Street Lighting Through on-grid hybrid Solar power system – Al Ekaider Landfill
Item
NumberItem Name Item Code
1 Footing detail ST-01
2 Pole detail 10m ST-02
3 Pole detail 6m ST-03
4 Mounting system detail 1 ST-04
5 Mounting system detail 2 ST-05
6 Mounting system detail 3 ST-06
7 String layout ST-07
8 PV system layout ST-08
9 Cable installtion method ST-09
10 Inverter installtion method ST-10
11Master Plan PV & Meter & Inverters
locationST-11
12 Poles Location ST-12
13 Street lighting SLD ST-13
14 PV system SLD ST-14
15 Fence Details ST-15
16 PV string sizing reports ST-16
17 PV string sizing reports ST-17
18 Drawings schedule ST-18
Drawing Schedule
Project Name: Street Lighting Through on-grid hybrid Solar power
system – Al Ekaider Landfill
Ref. ST-18