+ All Categories
Home > Documents > DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

Date post: 11-Apr-2022
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
42
JAPAN INTERNATIONAL COOPERATION AGENCY REMARKS: DRAWING TITLE SCALE PREPARED BY NAME S IG NA TURE DATE CHECKED BY APPROVED BY DRAWING NO. REV. NO. SHEET NO. - Oriental Consultants Co., Ltd. Eight-Japan Engineering Consultants Inc. Plan and Profile (34/45) 1:5000 ETHIOPIAN ROADS AUTHORITY The Preparatory Survey on the Project for Rehabilitation of Trunk Road, Phase IV in the Federal Democratic Republic of Ethiopia A-5-35
Transcript
Page 1: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(34/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-35

Page 2: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(35/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-36

Page 3: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

FLKL

K (N

FASA

M)

S C H O O L

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(36/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-37

Page 4: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(37/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-38

Page 5: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(38/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-39

Page 6: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(39/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-40

Page 7: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

CH

EMO

GA

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(40/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-41

Page 8: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(41/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-42

Page 9: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

AW

ERA

GO

DA

NA

(ER

A)

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(42/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-43

Page 10: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(43/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-44

Page 11: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(44/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-45

Page 12: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

DEBRE - MARKOS

TO B

AH

RD

AR

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RKS

:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NATU

RE

DA

TE

CH

ECK

ED B

YA

PP

ROV

ED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.

Eig

ht-J

apan

Eng

inee

ring

Con

sulta

nts

Inc.

Pla

n an

d Pr

ofile

(45/

45)

1:50

00

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-46

Page 13: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

C L C L

Popu

late

d Ar

ea in

D/M

arko

s (T

ype-

2)

D/M

arko

s To

wn

Cen

ter (

Type

-1)

D/M

arko

s To

wn

Cen

ter

64+1

51.4

- En

dD

/M T

own

Cent

er

Popu

late

d A

rea

in D

/Mar

kos

61+6

91.4

- 64

+151

.4D

/Mar

kos T

own

Phas

e II

L=34

.938

Phas

e II

L=34

.938

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

RE

MAR

KS:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPAR

ED B

Y

NAM

E

SIG

NA

TUR

E

DAT

E

CH

ECKE

D B

YAP

PRO

VED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

ETH

IOP

IAN

RO

AD

S A

UTH

OR

ITY

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r Reh

abili

tatio

n of

Tru

nk R

oad,

Pha

se IV

in th

e Fe

dera

l Dem

ocra

tic R

epub

lic o

f Eth

iopi

a

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.E

ight

-Jap

an E

ngin

eerin

g C

onsu

ltant

s In

c.Ty

pica

l Cro

ss S

ectio

ns (1

)

1:10

0

A-5-47

Page 14: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

C L

Wer

eda

Tow

n Ar

ea (T

ype-

3)

Sect

ions

Whe

re W

ered

a To

wns

Loc

ated

Phas

e I

18+6

80.0

- 20

+160

.0W

ejel

Tow

n28

+700

.0 -

30+4

00.0

Lum

ame

Tow

n

45+5

31.4

- 36

+531

.4A

mbe

r Tow

nPh

ase

II

L=30

.531

km

L=34

.938

Entra

nce

of D

/Mar

ikos

(Typ

e-4)

C L

Entr

ance

of D

/Mar

kos

Phas

e II

L=34

.938

Entra

nce

of D

/M60

+931

.4 -

61+6

91.4

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

RE

MAR

KS:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPAR

ED B

Y

NAM

E

SIG

NA

TUR

E

DAT

E

CH

ECKE

D B

YAP

PRO

VED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.E

ight

-Jap

an E

ngin

eerin

g C

onsu

ltant

s In

c.Ty

pica

l Cro

ss S

ectio

ns (2

)

1:10

0

ETH

IOP

IAN

RO

AD

S A

UTH

OR

ITY

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r Reh

abili

tatio

n of

Tru

nk R

oad,

Pha

se IV

in th

e Fe

dera

l Dem

ocra

tic R

epub

lic o

f Eth

iopi

a

A-5-48

Page 15: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

C L

Kebe

le &

End

of D

ejen

(Typ

e-5)

Sect

ions

Whe

re K

ebel

e To

wns

Loc

ated

6+80

0.0

- 9+2

20.0

Yitn

ora

Keb

ele

24+5

00.0

- 24

+800

.0Y

egod

ena

Keb

ele

126

+700

.0 -

27+2

00.0

Yeg

oden

a K

ebel

e 2

39+4

31.4

- 40

+ 31

.4

0+00

0.0

- 0+5

00.0

End

of D

ejen

Tow

n

C L

58+

31.4

- 59

+ 31

.4

Phas

e I

L=30

.531

km

God

elm

a K

ebel

e51

+991

.4 -

52+6

31.4

Filik

lik K

ebel

eC

hem

oga

Keb

ele

Phas

e II

L=34

.938

Rur

al S

ectio

n (E

xist

ing

Roa

d Se

ctio

n) (T

ype-

6-1)

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

RE

MAR

KS:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPAR

ED B

Y

NAM

E

SIG

NA

TUR

E

DAT

E

CH

ECKE

D B

YAP

PRO

VED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.E

ight

-Jap

an E

ngin

eerin

g C

onsu

ltant

s In

c.Ty

pica

l Cro

ss S

ectio

ns (3

)

1:10

0

ETH

IOP

IAN

RO

AD

S A

UTH

OR

ITY

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r Reh

abili

tatio

n of

Tru

nk R

oad,

Pha

se IV

in th

e Fe

dera

l Dem

ocra

tic R

epub

lic o

f Eth

iopi

a

A-5-49

Page 16: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

Rur

al S

ectio

n (N

ew R

oad

Sec

tion)

(Typ

e-6-

2)

C L

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RK

S:

DRA

WIN

G T

ITLE

SC

ALE

PRE

PAR

ED B

Y

NA

ME

SIG

NA

TUR

E

DA

TE

CHE

CK

ED B

YA

PPR

OV

ED B

Y

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.E

ight

-Jap

an E

ngin

eerin

g C

onsu

ltant

s In

c.Ty

pica

l Cro

ss S

ectio

ns (4

)

1:10

0

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-50

Page 17: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

C L

*As

requ

ired:

depe

ndin

g on

con

ditio

nof

wat

er ta

ble.

C LC L

C L

Ups

tream

Sid

e

Ear

th D

rain

age

Exis

ting

Roa

d Se

ctio

n in

Tow

n Ar

ea

Exi

stin

g R

oad

Sec

tion

in R

ural

Are

a

JAPA

N IN

TER

NA

TIO

NA

L C

OO

PER

ATIO

N A

GEN

CY

REM

AR

KS:

DR

AW

ING

TIT

LE

SC

ALE

PR

EPA

RED

BY

NA

ME

SIG

NA

TUR

E

DA

TE

CH

EC

KED

BY

APP

RO

VED

BY

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.E

ight

-Jap

an E

ngin

eerin

g C

onsu

ltant

s In

c.C

ount

erm

easu

re fo

r BC

Soi

l (1)

1:10

0

ETH

IOPI

AN R

OAD

S A

UTH

OR

ITY

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r Reh

abili

tatio

n of

Tru

nk R

oad,

Pha

se IV

in th

e Fe

dera

l Dem

ocra

tic R

epub

lic o

f Eth

iopi

a

A-5-51

Page 18: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

Ups

tream

Sid

e

Ear

th D

rain

age

C L

New

Roa

d (B

ypas

s) S

ectio

n

JAP

AN IN

TER

NA

TIO

NAL

CO

OPE

RA

TIO

N A

GEN

CY

RE

MA

RK

S:

DRA

WIN

G T

ITLE

SC

ALE

PRE

PAR

ED B

Y

NA

ME

SIG

NA

TUR

E

DA

TE

CHE

CK

ED B

YA

PPR

OV

ED B

Y

DR

AW

ING

NO

.R

EV

. NO

.S

HE

ET

NO

.-

Orie

ntal

Con

sulta

nts

Co.

, Ltd

.E

ight

-Jap

an E

ngin

eerin

g C

onsu

ltant

s In

c.C

ount

erm

easu

re fo

r BC

Soi

l (2)

1:10

0

ETH

IOPI

AN R

OA

DS

AU

THO

RIT

Y

The

Pre

para

tory

Sur

vey

on th

e P

roje

ct fo

r R

ehab

ilita

tion

of T

runk

Roa

d, P

hase

IV in

the

Fede

ral D

emoc

ratic

Rep

ublic

of E

thio

pia

A-5-52

Page 19: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-53

Page 20: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-54

Page 21: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-55

Page 22: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-56

Page 23: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-57

Page 24: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-58

Page 25: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-59

Page 26: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-60

Page 27: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-61

Page 28: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-62

Page 29: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-63

Page 30: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-64

Page 31: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-5-65

Page 32: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-6-1

6 参考資料

6.1 ERA との協議 Technical Notes

Page 33: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

Preparation Survey on the Project for Rehabilitation of Trunk Road, Phase IV in the Federal Democratic Republic of Ethiopia September 28, 2010

1

Study for Route Selection in Debre Markos under the Project for Rehabilitat ion of Trunk Road, Phase IV

1. Background Detailed design for the study section (L=65km) between Dejen and Debre Markos had already been finished by HEC under ERA. According to the final detailed design report, the number of affected houses along the study section goes up to 159. This number is categorized in category A of the Environment Guideline of World Bank and JICA. In case of category A, it is necessary to consult and get approval of the JICA Advisory Committee on the Social and Environmental Issues. Consequently, this procedure may affect the implementation schedule for the Project causing delay and it is convenient to minimize the number of affected houses by selecting the best suitable route in Debre Markos to realize the planned implementation.

2. Comparison of two Routes Alt.1: DD Route by HEC (Blue) At entrance of Debre Markos, it diverts from existing A3 to unpaved town road and rejoins A3 in the city center via two new roundabouts. Length: 4,100m No. of Bridges: 2 Land Use: Residential and Commercial Road Width planned by DD = 21.5m

Outline of Alternative Routes in Debre Markos

Rbt .2

Useta RiverU seta River

Rbt. 1

River

Alt.2: Existing A3 (Red) Existing A3 in Debre Markos is paved. Length: 4,100m No. of Bridges: 1 Land Use: Residential and Commercial Road Width: See “4. Impact to Social Environment”.

Fig.-1 Outline of Each Alternative

A-6-2

Page 34: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

Preparation Survey on the Project for Rehabilitation of Trunk Road, Phase IV in the Federal Democratic Republic of Ethiopia September 28, 2010

2

3. Evaluation from engineering point of view (1) Vertical and Horizontal Alignment

2340.00

2360.00

2380.00

2400.00

2420.00

2440.00

2460.00

2480.00

Useta River

Rbt.2

Average i =1.52%

Rise + Fall = 22.1m/ km

Average I = 1.52%, Max. I = 4.52%, Rise and Fall = 22.1m/km

Reduction of risk of traffic accident will be expected by installation of road safety facilities.

2340

2360

2380

2400

2420

2440

2460

2480

Useta River

Rbt.2

Average i = 2.99%

Rbt.1

Rise + Fall = 29.9m/ km

River

Average I = 2.99%, Max. I = 6.93%, Rise and Fall = 29.9m/km

Increse of risk of traffic accident will be a matter of concern at two right-angled turns in densely

populated area of Debre Markos Town. Fig.-2 Comparison of Characteristics of Each Alternative

A-6-3

Page 35: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

Preparation Survey on the Project for Rehabilitation of Trunk Road, Phase IV in the Federal Democratic Republic of Ethiopia September 28, 2010

3

(2) Disadvantages of Horizontal and Vertical Alignment. As mentioned earlier, the DD route by HEC passes two new roundabouts located within a congested town area before connecting to the existing A3. However, the elevation difference of A3 and DD route at connecting point at Rbt.2 is approximately 3m. This will result in a steep grade of more than 10% at Rbt.2 and more than 7% at Rbt.1. Consequently, these poor geometric features will constrain heavy trucks that commonly use this route. In addition, unexpected affected houses will likely be increased with the construction of roundabouts.

GH=2459m

Affected House by Rbt

Affected House by RbtAffected House by Rbt

Rbt.2

Rbt.1

Fig.-3 Issues of Connecting Point to existing A3

A-6-4

Page 36: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

Preparation Survey on the Project for Rehabilitation of Trunk Road, Phase IV in the Federal Democratic Republic of Ethiopia September 28, 2010

4

(3) Summary of Comparison of the existing A3 (Alt.2) and DD Route by HEC (Alt.1) in Technical Aspect

Table-1 shows that rehabilitation of existing A3 (Alt.2) is more superior than HEC (Alt.1) in all items of technical aspect. Table-1 Comparison of two alternatives in technical aspect Alt.2 Existing A3 Alt.1 DD Route by HEC Alignment (1)Length of route 4.1km 4.1km (2)Gradient (average) 1.52% 2.99% (3)Gradient (max.) Inclination

4.52% 6.93% Over 7% at Rbt.1

Over 10% at Rbt.2 (4)Flatness (Rise and Fall) 22.1m/km 29.9m/km (5)Number roundabout 0 2 (6)Turning 0 2 intersections

at a right angle (7)Radius of curve (min) 200m 30m

Traffic condition & traffic safety (8)Disturbance by transit traffic & local traffic

Less Heavy

(9)Traffic jam Less Heavy and frequent due to (3), (5), (6), (7)& (8)

(10)Vehicle Speed Good Slow due to (9) (11)Traffic safety Good Poor due to (8) (12)Comfort Good Poor due to (4) & (9) (13) Transportation cost Low High

A-6-5

Page 37: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

Preparation Survey on the Project for Rehabilitation of Trunk Road, Phase IV in the Federal Democratic Republic of Ethiopia September 28, 2010

5

4. Impact to Social Environment 1. On-site Investigation of the alignment of ERA/DD (1) Date

• 20th September 2010 (2) Members

• ERA; Mr.Gashaw and one highway engineer • HEC; Survey engineer • Debre Markos Municipal; One engineer • JICA Study Team; Dr.Tatsumi, Mr.Takagi, Mr.Mizuno, Mr.Nemoto

2. Number of Affected Houses In case the existing route A3 alignment is used in Debre Markos, the number of affected houses shall be greatly reduced as shown in Table-2 below:

Table-2 Comparison of the Number of Affected Houses Number of Affected Houses

DD Route Section Road Width

(m) Rehabilitation of

Existing A3(*1) The Study Team (*1) ERA RAP

Dejen to

entrance of

D/Markos

(*2)

Sta.00+185-60+857 10.0 19.0 26 26 75

Section-1

Sta.60+857-61+900 15.0

Section-2

Sta.61+900-64+300 19.0 1

Section-3

Sta.64+300-65+000 21.5

10

Section-1 15.0

Section-2 17.0

D/Markos

Town

2

Section-3 19.0

6

86 84

Total Dejen D/Markos 32 36 (*3) 112 159

Note) *1: The number of affected houses is based on site survey by the Study Team and/or google map Rental housings should be included in affected houses because of involuntary relocation.

*2: Section between Dejen to entrance of Debre Markos *3: The number of affected houses will vary (from 32 to 36) depending on the road section plan.

A-6-6

Page 38: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

Preparation Survey on the Project for Rehabilitation of Trunk Road, Phase IV in the Federal Democratic Republic of Ethiopia September 28, 2010

6

5. Recommendation

The JICA Study Team recommends that the existing A3 route in Debre Markos should be rehabilitated under the Project for Rehabilitation of Trunk Road, Phase IV taking into account the following;

(1) Environmental aspect The number of affected houses of DD Route by HEC (Alt.1) is obviously classified in Category A of the JICA Environmental Guideline. The number of affected houses of rehabilitation of existing A3 is less than that of Category A. Effect of heavy vehicles noise and exhaust emissions to residents is reduced in case of rehabilitation of existing A3.

(2) Technical aspect

The rehabilitation plan of existing A3 (Alt.2) is superior to DD Route by HEC (Alt.1) in all items of technical aspect. Transit traffic and local traffic should be separated as much as possible, so it is common practice that the international trunk road should be planned to avoid to passing through the center of populous city.

(3) Recommendation

In the context of above two aspects, the rehabilitation of existing A3 in Debre Markos should be recommended.

A-6-7

Page 39: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

Preparation Survey on the Project for Rehabilitation of Trunk Road, Phase IV in the Federal Democratic Republic of Ethiopia September 28, 2010

7

(3) Number of Affected Houses in case of Rehabilitation of existing route A3

Fig.-4 S ection and Cross Section Plan

A-6-8

Page 40: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

Preparation Survey on the Project for Rehabilitation of Trunk Road, Phase IV in the Federal Democratic Republic of Ethiopia September 28, 2010

8

Annex-1: Detailed Number of Affected Houses (Whole Section)

A-6-9

Page 41: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-6-10

Page 42: DRAWING TITLE CHECKED BY APPROVED BY PREPARED BY …

A-6-11


Recommended