DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND BEST PRACTICE 16-17 October 2012 PIOMBINO SEDIMENT IN THE PORT OF PIOMBINO: FIRST HAND EXPERIENCE AND POSSIBLE NEW APPLICATIONS Dott. Ing. Sandra Muccetti Dott.ssa Roberta Macii
Transcript
Page 1: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

DREDGING IN THE EUROPEAN UNION:

REGULATIONS, PROBLEMS AND BESTPRACTICE

16-17 October 2012

PIOMBINO

SEDIMENT IN THE PORT OF PIOMBINO:FIRST HAND EXPERIENCE AND POSSIBLE

NEW APPLICATIONS

Dott. Ing. Sandra Muccetti

Dott.ssa Roberta Macii

Page 2: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

TerritorialTerritorialpositionposition

Page 3: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

Piombino has been included in the sites of national interest (SIPiombino has been included in the sites of national interest (SIN) underN) underarticle 1, clause 4 of the law 426/98, and the boundaries of thearticle 1, clause 4 of the law 426/98, and the boundaries of the area werearea weredefined in the Ministerial Decree of 10 January 2000, with laterdefined in the Ministerial Decree of 10 January 2000, with latermodifications to enlarge these in the Ministerial Decree of 07 Amodifications to enlarge these in the Ministerial Decree of 07 April 2006,pril 2006,as published in theas published in the GazzettaGazzetta UfficialeUfficiale nn°°147 of the 26 June 2006147 of the 26 June 2006

Boundaries of the Piombino SIN

The SIN of Piombinois made up of:

A land area of 930ha

A sea area of2,015 ha

Page 4: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

INDUSTRIAL ACTIVITIES WITHININDUSTRIAL ACTIVITIES WITHINTHE PIOMBINO SINTHE PIOMBINO SIN

Page 5: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

CHARACTERISATION OF THE MARINE AREASCHARACTERISATION OF THE MARINE AREAS

The Chiusa area

The large basin

The small basin

The port area andthe dock evolution

The area next tothe Marinai

d’Italia wharf

Page 6: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

Chemical values forChemical values forintervention, it should beintervention, it should beremembered, means theremembered, means theconcentration in the sedimentsconcentration in the sedimentsof the chemical substancesof the chemical substanceslisted in the following Tablelisted in the following Tablewhich, if exceeded, may set inwhich, if exceeded, may set inmotion an interventionmotion an interventionprocedure. This is evaluated onprocedure. This is evaluated ona casea case--toto--case basis,case basis,considering the quality andconsidering the quality andquantity of the sediments thatquantity of the sediments thatare not in conformity and theare not in conformity and thelegitimate use of the area inlegitimate use of the area inquestion (such interventionquestion (such interventionvalues are proposed by ICRAMvalues are proposed by ICRAMto the Ministry for theto the Ministry for theEnvironment and the Care ofEnvironment and the Care ofWater and the Seas under theWater and the Seas under theprotocol nprotocol n°° 2604/06 of 212604/06 of 21March 2006).March 2006).

MARINE INTERVENTION LEVELS FOR THE PIOMBINO SIN

NUMBER

SAMPLE

STATION

PARAMETER INTERVENTION

VALUES

Metals mg/kg s.s.

7440-38-2 Arsenic 42

7440-43-9 PP Cadmium 1

7440-47-3 Chrome 1.75

7439-97-6 PP Mercury 1.7

7440-02-0 P Nickel 90

7439-92-1 P Lead 95

Copper 95

Zinc 200

Organo-metals pg/kg s.s.

Organo-stannic compounds 70 (Sn)

Aromatic polycyclicals pg/kg s.s.

PP Total IPA 4,000

50-32-8 PP Benzo(a)pyrene 760

120-12-7 P Anthracene 245

206-44-0 P Fluoranthene 1,500

91-20-3 P Naphthalene 390

Pesticides pg/kg s.s.

309-00-2 Aldrin 5

319-84-6 PP Alpha hexachlorocycloesane 1

319-85-7 PP Beta hexachlorocycloesane 1

58-89-9 PP Gamma lindan hexachlorocycloesane 1

DDT 5

DDD 5

DDE 5

60-57-1 Dieldrin 5

Dioxins pg/kg

Sommat. PCDD, PCDF and PCB dioxins and similar 30 x 10­³

133-63-63 PCB pg/kg

total PCB 190

Page 7: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

PRELIMINARY RECLAMATION PROJECT FORTHE SEABED OF THE PORT AREA INCLUDED

IN THE PIOMBINO SIN (ISPRA 2008)

Page 8: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

GIVEN THE RESULTS OF THE RECLAMATIONGIVEN THE RESULTS OF THE RECLAMATIONPROJECT, IT WILL BE NECESSARY TOPROJECT, IT WILL BE NECESSARY TO

REMOVE/DREDGE THE FOLLOWING QUANTITIESREMOVE/DREDGE THE FOLLOWING QUANTITIESOF MATERIALOF MATERIAL

LAYERIntervention values

ICRAM <Conc< Col. BTable 1 attachment 5

title V part IVlegislative decree

152/06[m³]

Table 1 attachment 5title V part IV

legislative decree152/06

< Conc < attachment Dpart IV legislative

decree 152/06[m³]

< Conc < attachment Dpart IV legislative

decree 152/06[m³]

0-50 cm 18,284 205,668 5,834

50-100 cm 78,295 146,811 1,655

100-150cm 86,865 130,016 1,655

150-200 cm 104,849 84,105 -

200-250 cm 55,415 18,014 -

250-300 cm 48,866 16,905 -

TOTAL down to 3 metres392,574 601,519 9,144

1,003,237

Page 9: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

TheThe ““definitive reclamation projectdefinitive reclamation project”” for the seabed in front of thefor the seabed in front of the MarinaiMarinai dd’’ItaliaItaliawharf, approved by the Ministry of the Environment and Territoriwharf, approved by the Ministry of the Environment and Territorial Protection onal Protection on28 September 2004.28 September 2004.The reclamation intervention has been carried out by way of theThe reclamation intervention has been carried out by way of the mechanical removalmechanical removalof the contaminated sediments and their succeeding removal to anof the contaminated sediments and their succeeding removal to an infill basin. Ininfill basin. Indetail, the reclamation operations involved the removal of a totdetail, the reclamation operations involved the removal of a total quantity of 93,000al quantity of 93,000mm³³ of marine sediments.of marine sediments.

Page 10: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

Photograph of the small basinPhotograph of the small basin

Page 11: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

The priority objective of the monitoring plan to evaluate the effects ofactivities connected with dredging in the water space in front of theMarinai d’Italia wharf in the port of Piombino was

to environmentally safeguard the areas involved in activities of dredging,transport and storage in infill basins of the sediments arising from thereclamation. This was to be brought about through checking certainenvironmental parameters which could have been influenced by reclamationactivities (re-suspension of sediments, turbidity, mobilisation ofcontaminants) and their interaction with the biota.

Monitoring was carried out not only during the activities outlined above, butalso during the periods before and after, in order to verify any possiblevariation in the conditions of the environmental parameters involved, and toverify that the conditions existent prior to beginning dredging wererestored at the close of such operations.

ENVIRONMENTAL MONITORING DURINGRECLAMATION/DREDGING ACTIVITIES

Page 12: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

The chosen monitoring system to evaluate the effects that activities ofexcavation, transport and backfilling into the basins might have had on thesurrounding marine environment was articulated as:

- monitoring the changes in the physical and chemical characteristics ofthe water column;

- determining the bio-accumulation and analysing bio-markers in bivalvemolluscs transplanted to the areas under investigation (Mussel Watch);

- analysis of outflow waters from the basin;

- analysis of waters collected in pietzometers installed around the edge ofthe basin;

- analysis of surface sediments close to the backfill basins.

The monitoring plan: investigative fields

Page 13: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

The monitoring programmeThe monitoring programme -- sampling sites.sampling sites.

In order to carry out the monitoring as mentioned above, on theIn order to carry out the monitoring as mentioned above, on the basisbasis

of existing knowledge of the marine area under investigation, aof existing knowledge of the marine area under investigation, a systemsystemof fixedof fixed sampling sitessampling sites was set up within the area involved in such awas set up within the area involved in such away as to permit the following typologically different areas:way as to permit the following typologically different areas:

-- area to be dredged (port),area to be dredged (port),

-- area of stocking and the stretch of sea in front of the basinarea of stocking and the stretch of sea in front of the basin(basin),(basin),

-- control area on the external side of thecontrol area on the external side of the MoloMolo BatteriaBatteria breakwaterbreakwater(white).(white).

Page 14: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

The monitoring plan:The monitoring plan:placement of the sampling sitesplacement of the sampling sites

control areacontrol areaon the outer sideon the outer side

of the Molo Batteriaof the Molo Batteriabreakwaterbreakwater ““WhiteWhite

area da dragarearea da dragare““PortoPorto””

Infill areaInfill area““BasinBasin””

Page 15: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

DEFINITIVE RECLAMATION PROJECT OF THE AREA KNOWNDEFINITIVE RECLAMATION PROJECT OF THE AREA KNOWNASAS ““CHIUSACHIUSA”” WITHIN THE PIOMBINOWITHIN THE PIOMBINO SINSIN AND THE FIRSTAND THE FIRST

PHASE OF INTERVENTIONPHASE OF INTERVENTION

Page 16: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

THETHE ‘‘PHASE I OF THE RECLAMATION OF THE CHIUSAPHASE I OF THE RECLAMATION OF THE CHIUSA’’INVOLVED 95,000 mINVOLVED 95,000 m³³ OF MARINE SEDIMENTSOF MARINE SEDIMENTS

Page 17: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

CONSTRUCTION OF THE FIRST WHARFAGE ANDCONSTRUCTION OF THE FIRST WHARFAGE ANDTHE DREDGING IN FRONT OF ITTHE DREDGING IN FRONT OF IT

(Phase I of the activation of the Port Regulatory Plan(Phase I of the activation of the Port Regulatory Planfor Piombino)for Piombino)

Page 18: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

TABLES SHOWING THE DREDGING PLANTABLES SHOWING THE DREDGING PLANFOR WHARFAGE PHASE IFOR WHARFAGE PHASE I

Page 19: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

QUANTITIES OF MARINE SEDIMENTS TO BE DREDGEDQUANTITIES OF MARINE SEDIMENTS TO BE DREDGEDDURING WORKS RELATED TO WHARFAGE PHASE IDURING WORKS RELATED TO WHARFAGE PHASE I

Total volumes to be dredged (including tolerances andconnections

Contamination level Volume (m³)

Green (not dangerous) 2.272,20

Yellow (not dangerous) 7.202,71

Red (not dangerous) 46.455,83

Violet (dangerous) 14.593,80

TOTAL 70.524,54

Page 20: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

SEDIMENT VOLUMES INVOLVED IN DREDGING ACTIVITIES INSEDIMENT VOLUMES INVOLVED IN DREDGING ACTIVITIES INTHE PORT AREATHE PORT AREA IN FRONT OFIN FRONT OF THE WORKS FROM THE SECONDTHE WORKS FROM THE SECOND

VARIANT OF THE PORT REGULATORY PLAN FOR PIOMBINOVARIANT OF THE PORT REGULATORY PLAN FOR PIOMBINO

Page 21: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

A CALCULATION OF THE VOLUME OF SEDIMENT TO BE DREDGEDA CALCULATION OF THE VOLUME OF SEDIMENT TO BE DREDGEDINFILL BASINS OF THE PORT OF PIOMBINOINFILL BASINS OF THE PORT OF PIOMBINO

3D visualisation of the depth trends in excavation

Visualisation of the depth of excavation

Volumes of sediment to be removed by type and qualityVolumes of sediment to be removed by type and quality

Level(cm)

Conc. elaboratedIntervention

values

Interventionvalues

conc. elaboratedCol. B

Table 1 attachment5 title V part IV

legislative decree152/06

[m³]

Col. B table 1attachment 5 title

V part IVlegislative decree

152/06< Conc. elab. <attachment D

legislative decree152/06, part IV

titles I & II[m³]

Conc. elab.attachment D

legislative decree152/06, part IV

titles I & II[m³]

0-50 0 828 46,164 0

50-100 0 1,654 44,931 0

100-150 0 1,612 44,611 58

150-200 53 3,413 42,400 0

200-250 53 33,719 11,069 0

250-300 53 30,391 11,448 0

300-350 53 33,272 7,140 0

350-400 53 30,008 4,698 0

400-450 10,742 19,171 0 0

450-500 3,928 19,249 2,633 0

500-550 4,158 15,226 0 0

550-600 11,347 5,486 0 0

600-650 8,869 4,871 2,006 0

650-700 4,356 6,995 3,283 0

700-750 2,839 8,836 1,851 0

750-800 3,887 8,009 540 0

800-850 2,187 8,444 0 0

850-900 336 8,174 0 0

900-950 1,016 3,645 1,289 0

950-1,000 2,113 3,068 0 0

Total volume ofsediment involved

in dredgingactivities

56,045 244,071 226,264 58

526,438

Page 22: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

INFILL BASINS IN THEINFILL BASINS IN THEPORT OF PIOMBINOPORT OF PIOMBINO

Page 23: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

Photograph of thePhotograph of thelarge basinlarge basin

Page 24: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

THE PORT OF PIOMBINOTHE PORT OF PIOMBINO

OBJECTIVESOBJECTIVES

CURRENTCURRENTSITUATIONSITUATION

FUTURE LAYOUTFUTURE LAYOUT

• Development of wharfage, depth, area

• Railway and SS398 highway arriving into the port

• Completion of the Tyrrhenian motorway and the Grosseto Fano highway

AERIAL VIEW OF THE PORTAERIAL VIEW OF THE PORT

Page 25: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

CHARACTERISATIONS UNDERWAY OR TOCHARACTERISATIONS UNDERWAY OR TOBE CARRIED OUTBE CARRIED OUT

Page 26: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

•• New Port Regulatory Plan (PRP) for the port of Piombino, 2008:New Port Regulatory Plan (PRP) for the port of Piombino, 2008:

•• All the solutions to critical points have come together in the nAll the solutions to critical points have come together in the new PRP alongew PRP alongwith proposals for port developments followingwith proposals for port developments following

•• AN INTEGRATED AND SYNERGISTIC VISIONAN INTEGRATED AND SYNERGISTIC VISION OF PORT INFRASTRUCTUREOF PORT INFRASTRUCTUREAND ENVIRONMENTAL RECLAMATION INTERVENTIONS GIVING RISE TOAND ENVIRONMENTAL RECLAMATION INTERVENTIONS GIVING RISE TOSTRONGSTRONG PROJECT COORDINATIONPROJECT COORDINATION

LENGTH OFLENGTH OFWHARFAGEWHARFAGE

PORT AREAPORT AREA(INCLUDING ROAD(INCLUDING ROAD

NETWORKNETWORK

CURRENT SITUATIONCURRENT SITUATION 2.300 mtl2.300 mtl 125.000 m125.000 m²²

VARIANT II TO THEVARIANT II TO THEPRPPRP

3400 mtl3400 mtl 325.000 m325.000 m²²

NEW PRP 2008NEW PRP 2008 5750 mtl5750 mtl 1.090.000 m1.090.000 m²²

Page 27: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

NEW LAYOUTNEW LAYOUT –– PORT REGULATORY PLAN FORPORT REGULATORY PLAN FORTHE PORT OF PIOMBINOTHE PORT OF PIOMBINO

New volume: 7.000.000 m³

Dredging: 3.900.000 m³

Page 28: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

MARINE SEDIMENTS

DREDGINGDREDGING →→ discretional activitydiscretional activity RECLAMATION→ an activity that isbinding both on an and on quomodo

can/must Legitimateright/interest ofthe collective group

An activity of guarantee forpublic interest in thefunctionality of the portstructure

A necessary activity qualified interms of obligation laid down by

law and covered by a form ofcompensatory protection

Page 29: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment
Page 30: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

WHERE THEY ARE

•• -- in the Environmental Codein the Environmental Code

article 185article 185 ““Exclusion from the field of applicationExclusion from the field of application””

clause 4:clause 4: Saving those obligations deriving from specific CommunitySaving those obligations deriving from specific Communitystandards, the following are excluded from the field of applicatstandards, the following are excluded from the field of application ofion ofthis Fourth Part of the present decree: those sediments moved withis Fourth Part of the present decree: those sediments moved withinthinsurface waters for the management of such waters and watercoursesurface waters for the management of such waters and watercourses,s,or for the prevention of flooding, or for a reduction in the effor for the prevention of flooding, or for a reduction in the effects ofects offlooding or of drought or of soil reinstatement, if it is provenflooding or of drought or of soil reinstatement, if it is proven that thethat thesediments are not dangerous as under the decision 2000/532/CE ofsediments are not dangerous as under the decision 2000/532/CE of thetheCommission of the 3 May 2000, together with subsequentCommission of the 3 May 2000, together with subsequentmodifications.modifications.

•• -- Law nLaw n°°. 84/94 article 5. 84/94 article 5 bisbis

as modifiedas modified MOBILITY

-- --National Reclamation ProgrammeNational Reclamation Programme-

Page 31: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

WHAT THEY AREWHAT THEY ARE

From a subjective point of viewFrom a subjective point of view

Law n. 84/94, article 5Law n. 84/94, article 5 bisbis

Materials coming from dredging activities within port andMaterials coming from dredging activities within port andmarinemarine--coastal areas situated within sites of national interestcoastal areas situated within sites of national interestor for greater precisionor for greater precision each singleeach single granulometricgranulometric partpartobtained by physical meansobtained by physical means……..

-

Page 32: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

•• Law nLaw n°° 84/94, article 584/94, article 5

•• clause 11clause 11 terter: m: materials comingaterials comingfrom dredging activities, whichfrom dredging activities, whichpresent physical, chemical andpresent physical, chemical andmicrobiological characteristicsmicrobiological characteristicsanalogous to the natural seabedanalogous to the natural seabedwith regard to the site of origin,with regard to the site of origin,and suitable with regard to theand suitable with regard to thesite of destination, as long assite of destination, as long asthey show no positive results inthey show no positive results inecoeco--toxicology testing.toxicology testing.

•• Law nLaw n°° 84/94, article 584/94, article 5 bisbis

•• clause 2, letter a)clause 2, letter a):: wheneverwheneverthey present, either at origin orthey present, either at origin orfollowing treatment with thefollowing treatment with thesole scope of removal pollutants,sole scope of removal pollutants,excluding processes aimed atexcluding processes aimed atthe immobilisation of the samethe immobilisation of the samepollutants, physical, chemical andpollutants, physical, chemical andmicrobiological characteristicsmicrobiological characteristicsto the natural seabed withto the natural seabed withregard to the site of origin, andregard to the site of origin, andsuitable with regard to the sitesuitable with regard to the siteof destination, and show noof destination, and show nopositive results in ecopositive results in eco--toxicologytoxicologytesting.testing.

sea coastalland

beachnourishment

sea coastalland

beachnourishment

capping

Page 33: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

•• Law nLaw n°° 84/94 article 584/94 article 5

•• clause 11clause 11 quaterquater:: materialsmaterialscoming from dredging andcoming from dredging andreclamation activities, if they arereclamation activities, if they arenot dangerous either at origin ornot dangerous either at origin orfollowing treatment aimedfollowing treatment aimedexclusively at the removal ofexclusively at the removal ofpollutants, excluding thereforepollutants, excluding thereforethose processes aimed at thethose processes aimed at theimmobilisation of the sameimmobilisation of the samepollutants, such as those ofpollutants, such as those ofsolidification/stabilisationsolidification/stabilisation

•• Law nLaw n°° 84/94 article 584/94 article 5 bisbis

•• clause 2, letter c):clause 2, letter c): wheneverwheneverthey result not dangerous atthey result not dangerous atorigin or following treatmentorigin or following treatmentaimed solely at the removal ofaimed solely at the removal ofpollutants, excluding thereforepollutants, excluding thereforethose processes aimed at thethose processes aimed at theimmobilisation of the sameimmobilisation of the samepollutants, such aspollutants, such assolidification/stabilisationsolidification/stabilisation

=

BASINS

Ministerial decree 7/11/2008, article 2 clause 3

Dredged materials that show, also following treatment aimed exclusivelyat the removal of pollutants, contamination levels above those laid downin table 1, attachment 5, part IV, title V of the legislative decree152/06, but below those foreseen in attachment D part IV of thelegislative decree 152/06, may be backfilled in containing structures

Page 34: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

MANAGEMENT HYPOTHESESMANAGEMENT HYPOTHESESREMOVALREMOVAL

From the water circuitFrom the water circuit

toto ““authorisation for useauthorisation for use””

Page 35: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

THE BASINSTHE BASINSFrom containers as a complement of the reclamation interventionFrom containers as a complement of the reclamation intervention

to port worksto port works

NATURENATURE

•• A list of the projects attached to the Presidential Decree of 12A list of the projects attached to the Presidential Decree of 12/4/96 entitled/4/96 entitled ““Act ofAct ofreference and coordination for the activation of article 40, clareference and coordination for the activation of article 40, clause 1 of the law nuse 1 of the law n°° 146 of146 of22/02/94 concerning dispositions regarding evaluations of enviro22/02/94 concerning dispositions regarding evaluations of environmental impactnmental impact”” RecoveryRecoveryof soil from the seaof soil from the sea

•• Definition article 5, Environmental CodeDefinition article 5, Environmental Code -- environmental impactenvironmental impact: the qualitative and/or: the qualitative and/orquantitative alteration of the environment, direct or indirect,quantitative alteration of the environment, direct or indirect, short or long term, permanentshort or long term, permanentor temporary, single or cumulative, positive or negative, enviroor temporary, single or cumulative, positive or negative, environment being understood as anment being understood as asystem of relations betweensystem of relations between anthropicanthropic, naturalist,, naturalist, chemicochemico--physical, climatic, landscape,physical, climatic, landscape,architectonic, cultural, agricultural and economic factors, comiarchitectonic, cultural, agricultural and economic factors, coming about as a consequenceng about as a consequence ofofthe activation on the territory of plans or programmes or projecthe activation on the territory of plans or programmes or projects in the various phases ofts in the various phases oftheir realisation, management and divestment, as well as possibltheir realisation, management and divestment, as well as possible malfunctions;e malfunctions;

•• Definition article 2, Ministerial Decree 471/99Definition article 2, Ministerial Decree 471/99 -- Environmental clean up:Environmental clean up: interventions forinterventions forenvironmental and landscape requalification, making up a componeenvironmental and landscape requalification, making up a component of the reclamationnt of the reclamationinterventions in the cases where such are requested, that allowinterventions in the cases where such are requested, that allow the recovery on the site ofthe recovery on the site ofan effective and definitive usability for its proposed usage, inan effective and definitive usability for its proposed usage, in conformity with theconformity with the VALIDVALIDplanning instruments, ensuring preservation of the quality of thplanning instruments, ensuring preservation of the quality of the environmental matrices.e environmental matrices.

•• Definition article 240, Environmental CodeDefinition article 240, Environmental Code -- Clean up and environmental clean up:Clean up and environmental clean up:interventions for environmental and landscape requalification, ainterventions for environmental and landscape requalification, also making up a complementlso making up a complementto reclamation interventions and those made to ensure permanentto reclamation interventions and those made to ensure permanent safety, that allow thesafety, that allow therecovery on the site of an effective and definitive usability forecovery on the site of an effective and definitive usability for its proposed usage inr its proposed usage inconformity with planning instrumentsconformity with planning instruments

Page 36: DREDGING IN THE EUROPEAN UNION: REGULATIONS, PROBLEMS AND ... workshop... · dredging in the european union: regulations, problems and best practice 16-17 october 2012 piombino sediment

FUNCTIONS

PROGRAMMING

Environmentalrequalification

Port infrastructureworks

Effectiveness,efficiency and

economicmanagement for the

P.A.


Recommended