Date post: | 16-Apr-2017 |
Category: |
Engineering |
Upload: | israfil-jabrayilov |
View: | 28 times |
Download: | 0 times |
Prepared by: I. Jabrayilov 1
Drilling
1/9/2016
Prepared by: I. Jabrayilov 21/9/2016
Prepared by: I. Jabrayilov 3
Drilling Methods
TurbineRotary
Top Drive
Speed+x Directional
Drilling +x
1/9/2016
Prepared by: I. Jabrayilov 41/9/2016
Prepared by: I. Jabrayilov 51/9/2016
Prepared by: I. Jabrayilov 61/9/2016
Prepared by: I. Jabrayilov 7
StatisticsNeft Dashlari Palchiq Pilpilesi
Overall Drilled Wells 1851 347
Exploration 138 56
Production 1580 272
Water Injection Wells 133 19
Abandoned Wells 1400 193
Source: Neft Dashlari, Oil and Gas Extraction Management, Geology department
1/9/2016
Prepared by: I. Jabrayilov 81/9/2016
• Statistics of Geology department in Neft Dashlari, Oil and Gas Extraction Management.• “Drilling Engineering” – “Heriot Watt” University• “Drilling Engineering” – J.J.Azar, Robello Samuel
Sources