1 TSX: EDR | NYSE: EXK September 9, 2020 Driving Organic Growth
Transcript
Page 1: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

1

TSX: EDR | NYSE: EXK September 9, 2020

DrivingOrganicGrowth

Page 2: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

2

Cautionary Note

This presentation contains “forward-looking statements” within the meaning of the United States private securities litigation reform act of 1995 and “forward-looking

information” within the meaning of applicable Canadian securities legislation. Such forward-looking statements and information herein include, but are not limited to,

statements regarding Endeavour’s anticipated performance in 2020 and future years, including revenue, cash flow, operating and capital cost forecasts, silver and gold

production, timing and expenditures to explore and develop new silver mines and mineralized zones, silver and gold grades and recoveries, cash and all-in sustaining

costs per ounce, initial and sustaining capital expenditures, and the use of the Company’s working capital. The Company does not intend to, and does not assume any

obligation to update such forward-looking statements or information, other than as required by applicable law.

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity,

performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include,

among others: fluctuations in the prices of silver and gold, fluctuations in the currency markets (particularly the Mexican peso, Canadian dollar and U.S. dollar);

fluctuations in the price of consumed commodities, changes in national and local governments, legislation, taxation, controls, regulations and political or economic

developments in Canada and Mexico; operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral

exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected geological conditions, pressures, cave-ins and

flooding); inadequate insurance, or inability to obtain insurance; availability of and costs associated with mining inputs and labour; the speculative nature of mineral

exploration and development, reliability of calculation of mineral reserves and resources and precious metal recoveries, diminishing quantities or grades of mineral

reserves as properties are mined; risks in obtaining necessary licenses and permits, global market events and conditions and challenges to the Company’s title to

properties; as well as those factors described in the section “risk factors” contained in the Company’s most recent form 40F/Annual Information Form filed with the S.E.C.

and Canadian securities regulatory authorities

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company’s

mining operations, no material adverse change in the market price of commodities, mining operations will operate and the mining products will be completed in

accordance with management’s expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements

or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be

no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those

anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Page 3: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

3

Investor Highlights

Pure precious metals producer with sector leading leverage

to silver in an emerging silver bull market

Opportunistic mergers and acquisitions; Acquire core assets at low prices to expand project pipeline

Mid-Tier Producer

Organic Growth

Discovering Orebodies

Acquiring Key Assets

Best Silver Leverage

Three underground silver-gold mines located in Mexico; restarted operations following COVID-19 suspension

Best organic growth profile in silver mining sector;

Two potential new mines to drive growth

Optimizing Operations Reducing operating costs, focus on free cash flow; raising productivity, improving safety

Track record of virgin discoveries, our competitive advantage; Brownfields exploration to extend mine lives

Page 4: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

4

Core Assets

OPERATIONS

DEVELOPMENT

EXPLORATION

MEXICO CHILE

M exi co C i t y

Lo u r d es

Gu a d a lup e y C a l v o

L EO NO F F I C E

S A N T I A G OO F F I C E

M E X I C O

G U A N A C EV I M I N E

E L C O M P A S M I N E

EL C U B O ( 1)

B O L A N I T O S M I N ET ER R O N ER A

P A R RA L

B O L I V I A

C H I L EA I D A

P A L O M A

C E R R O M A R Q U EZ

2,000 employees and contractors

▸ 3 operations▸ 1 development projects ▸ 6 exploration projects

1. See EDR news release dated November 21, 2019 regarding placing the El Cubo mine to care and maintenance effective November 30, 2019, while Management conducts evaluation of alternatives including final closure

Page 5: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

5

Recent Highlights

5

H1 Abbreviated Production due to COVID-19 was 1.5 million oz

Ag and 14,293 oz Au for 2.6 million oz AgEq(1)

Improving Financial Performance through reduced operating

costs, each mine generated positive FCF due to improvements

and higher metal prices, notwithstanding suspension of

operations

Q2 Operating Improvements Gained Traction, Guanacevi

outperformed plan, Bolanitos still below plan and El Compas

close to plan

Robust 2020 PFS (2) for Terronera

$137 million NPV (5% after tax)

30% IRR

2.7 years payback period

Initial mine life: 10 years

LOM AISC of $2.10/Ag oz, net of by product

Discovered New High Grade Mineralization at Bolanitos,

in Melladito vein, incl. 24.3 gpt Au & 787 gpt Ag over 1.5m

Discovered New High Grade Mineralization at Guanacevi,

on El Curso property, incl. 1,085 gpt Ag & 3.25 gpt Au over 10m

50% Au12,672

oz Au sold

50% Ag1.3 millionoz Ag sold

H1, 2020 Revenue $42.1 million

H1 2020 AgEq (1) Production 2.6 million oz

1. Silver equivalent at an 80:1 gold: silver ratio 2. Economics presented use the base case price scenario at $15.97/oz silver and $1,419/ oz gold, with an implied gold: silver ratio of 88:1

Guanacevi

62%Bolanitos

25%

El Compas

13%

Page 6: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

6

Guanacevi MineDurango

Page 7: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

7

Guanacevi – Turnaround Complete

831 tpd 853 tpd

1,004 tpd1,024 tpd

1,051 tpd292 g/t Ag Eq 286 g/t Ag Eq

312 g/t Ag Eq 350 g/t Ag Eq412 g/t Ag Eq

200

250

300

350

400

450

Q2, 2019 Q3, 2019 Q4, 2019 Q1, 2020 June , 2020

REDUCTION IN DIRECT PRODUCTION

INCREASE IN PRODUCTIVITYtonnes / employee / day in 2019

IMPROVED WORK CULTURENew supervisors and

management

Grades in June increased 56% and milled tonnesincreased 26% since Q2, 2019

Processed tonnes, silver and gold grades and recoveries all well above plan

Operational turn-around now complete as new high grade mines scaled up to fill the plant

Targeting 1,150 tpd in H2, 2020

1. Silver equivalents have been calculated using an 80:1 gold: silver ratio

Page 8: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

8

1. Represents a partial period, as operations were suspended for more than half the quarter, as mandated by Mexican government to prevent spread of COVID-19

2. Silver equivalents are converted using a 80:1 silver: gold ratio 3. Cash costs per ounce and AISC per ounce are examples of Non-IFRS measures. See disclosure in quarterly MD&A for information on “Non-GAAP”

measures found on the company website. Costs are presented in US $, net of by-product credits. 4. All-in sustaining costs (AISC) include mining, processing, direct overhead, corporate G&A, on-site exploration, share-based compensation,

reclamation, and sustaining capital net of gold credits.

Guanacevi - Continue to Outperform

$17.37 $12.83 $13.54

$9.01 $8.48

$24.94

$20.99 $19.48

$14.61 $15.00

$0.00

$5.00

$10.00

$15.00

$20.00

$25.00

$30.00

Q2, 2019 Q3, 2019 Q4, 2019 Q1, 2020 Q2, 2020

AISC/ oz Cash Cost/ oz

Improving Operating Costs(3,4)

H1, 2020 Production of 1.6 million AgEq (2) oz

21% Au 4,274 oz

79% Ag1,272,461 oz

► Installed two refurbished core crushers in April

► Ramping up throughput to 1,200 tpd plant capacity in H2

► Expanding production from SCS orebody to 2-300 tpd

► Replacing mining contractors with employees to reduce costs

► Delivered free cash flow - $2.7 million in Q2

Q2, 2020 (1) Q2, 2019 Change (%)

Tonnes Produced (tpd) 684 831 18%

Ag Grade (gpt) 304 242 26%

Au Grade (gpt) 1.05 0.62 69%

AgEq (2) Production (oz) 675,107 646,326 4%

Q2, 2020 Cash Costs (3) $8.48 $17.37 51%

Q2, 2020 All-in Sustaining Costs (3,4) $15.00 $24.94 40%

Page 9: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

9

Bolanitos MineGuanajuato

Page 10: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

10

Bolanitos – Turnaround Underway

Production below plan due to lower grades, throughput,

and slow mine development. Grades now improving due

to less dilution and higher ore grade

Development of new higher grade, San Miguel and

Melladito orebodies will be completed in H2

Improvements made in 2019

✓ Revised Mine Plan: Re-sequenced the mine

plan to reduce arsenic levels

✓ Acquired New Equipment: Acquired

new equipment to reduce operating costs

✓ Accelerated Mine Development: Fast

tracked mine development in Q3 and Q4 to

improve ore access in 2020

✓ Discovered New Orebody: New high grade discovery in 2019 incorporated into 2020 mine plan

✓ Improved Plant & Equipment Availability: Adjusted reagents in flotation circuit and improved truck availability by acquiring new 30 tonne low profile trucks

Monthly Grade Profile (gpt)

59

47 46

41

36

43

59

44

1.7

1.831.94

1.45

1.68

2.01

2.25

2.05

1

1.2

1.4

1.6

1.8

2

2.2

2.4

30

35

40

45

50

55

60

65

Oct Nov Dec Jan Feb Mar May June

Page 11: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

11

Bolanitos – Continue to Improve

78% Au 6,430 oz Au22% Ag

141,807 oz Ag

H1, 2020 Production of 660,000 AgEq (2) oz

Rising Quarterly Throughput (tpd)

839

tpd778

tpd

893

tpd

905

tpd

1,070

tpd

500

600

700

800

900

1000

1100

1200

Q2, 2019 Q3, 2019 Q4, 2019 Q1, 2020 Jun-20

Q2, 2020 (1) Q2, 2019 Change (%)

Tonnes Produced (tpd) 458 839 45%

Ag Grade (gpt) 47 78 40%

Au Grade (gpt) 2.10 1.49 41%

AgEq (2) Production (oz) 256,322 414,691 38%

Q2, 2020 Cash Costs (3) ($30.20) $11.56 360%

Q2, 2020 All-in Sustaining Costs (3,4) $29.79 $22.64 32%

Ramping up throughput to 1,200 tpd plant capacity in H2

Expanding production from San Miguel to 300 tpd

Developing new Melladito orebody

Investing sustaining capital to develop new high-grade areas

Acquire extensions of known orebodies to increase mine life

Delivered free cash flow - $0.1 million in Q2

1. Represents a partial period, as operations were suspended for more than half the quarter, as mandated by Mexican government to prevent spread of COVID-19

2. Silver equivalents are converted using a 80:1 silver: gold ratio 3. Cash costs per ounce and AISC per ounce are examples of Non-IFRS measures. See disclosure in quarterly MD&A for information on “Non-GAAP”

measures found on the company website. Costs are presented in US $, net of by-product credits. 4. All-in sustaining costs (AISC) include mining, processing, direct overhead, corporate G&A, on-site exploration, share-based compensation,

reclamation, and sustaining capital net of gold credits.

Page 12: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

12

El Compas MineZacatecas

Page 13: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

13

El Compas – Q1 Close to Plan

La PlomosaPanuco

Vetagrande

San JuanMala Noche

Calicanto

La Cantera

La Parroquia

Compas Orito

Plant

Processed tonnes higher but silver and gold grades and

recoveries lower than plan

Operating improvements continuing

Delayed development of higher grade Upper El Compas vein

Throughput, grades and recoveries improved during Q1

Page 14: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

14

El Compas – Achieve Mine Plan

Quarterly Throughput (tpd)

87% Au 3,589 oz Au13% Ag

39,936 oz Ag

H1, 2020 Production of 327,056 AgEq (2) oz

233

tpd

238

tpd

248

tpd

238

tpd

240

tpd

0

50

100

150

200

250

300

Q2, 2019 Q3, 2019 Q4, 2019 Q1, 2020 June, 2020

Q2, 2020 (1) Q1, 2020 Change (%)

Tonnes Produced (tpd) 112 238 53%

Ag Grade (gpt) 60 58 4%

Au Grade (gpt) 5.55 4.02 38%

AgEq (2) Production (oz) 130,476 196,580 34%

Cash Costs (3) ($96.83) $22.10 538%

All-in Sustaining Costs (3,4) ($48.25) $45.98 205%

Developing upper El Compas vein to access higher grades

Transitioning from cut + fill to long hole mining to reduce costs

Exploring Calicanto property to find new orebodies

New Capstone discovery in MNFW vein at Calicanto

Transition from mining contractor to employees to reduce costs

Delivered free cash flow - $1.1 million in Q2

1. Represents a partial period, as operations were suspended for more than half the quarter, as mandated by Mexican government to prevent spread of COVID-19

2. Silver equivalents are converted using a 80:1 silver: gold ratio 3. Cash costs per ounce and AISC per ounce are examples of Non-IFRS measures. See disclosure in quarterly MD&A for information on “Non-GAAP”

measures found on the company website. Costs are presented in US $, net of by-product credits. 4. All-in sustaining costs (AISC) include mining, processing, direct overhead, corporate G&A, on-site exploration, share-based compensation,

reclamation, and sustaining capital net of gold credits.

Page 15: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

15

Terronera Project Jalisco

Page 16: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

16

Terronera – Large, Low Cost Mine Potential

TerroneraDiscovery

La LuzDiscovery

1. silver equivalents are converted using a 88:1 gold: silver ratio , using the base case pricing assumption in the 2020 PFS

2. As at December 31, 2019. For full details refer to table in the appendix

Quick Facts

Annual Silver/Gold Production (oz) 3 million Ag / 33,000 Au

Annual AgEq (1) Production (oz) 5.9 million

2 Defined Ore Bodies Terronera and La Luz, 66m oz Ag Eq in Reserves (2)

and 14m oz AgEq in Resources, 12 year mine life

AgEq (1) Grade (gpt) & Vein Widths Approx. 400 – 1,000 gpt AgEq; 1-30 m thick

Next Core Asset

Almost doubles consolidated production

Significantly decreases consolidated costs

District Scale Opportunity

Endeavour controls 24 concessions, totalling 17,369 hectares

Covers the entire district of San Sebastian, +50 old mines on

+50 known veins, 50 km NE of Puerto Vallarta

Final PFS Delivered Robust Economics

Feasibility study underway to further de-risk project

Page 17: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

17

Mining Costs ,

$44.64

Processing

Costs , $19.27

G&A, $6.16

Royalty ,

$3.99

Positive Project Economics Based on Updated 2020 PFS (AFTER-TAX)

NPV

@5% (US$)

$137 M

IRR

30%

PAYBACK

(years)

2.7

Terronera - Robust Project Economics

Operating & Financial Metrics 2020 PFS (1)

LOM tonnes processed (thousands) 5,563

Life of Mine (Years) 10

Average silver grade (g/t) 201

Average gold grade (g/t) 2.29

Silver equivalent grade (g/t) Base Prices 405

Avg annual Ag ounces produced (millions) 3.0

Avg annual Au ounces produced (thousands) 33

Avg annual Ag Eq ounces produced (millions) 5.9

LOM Revenue ($, millions) 942.7

LOM EBITDA ($, millions) 476.4

LOM Free cash flow, after tax ($, millions) 217.4

Total Cost $83.82

Direct Costs per Tonne

Cash Costs(2) AISC (2)

$0 / Ag oz$2.10/ Ag oz

Projected Low Total Cash Costs & AISC (3)

1. See Appendix for full base case assumptions in the updated 2020 PFS. Silver and gold price assumptions were $15.97/ oz Ag and $1,419 / oz Au. Average Recoveries for silver and gold are 84.9% and 82.3% respectively. The implied silver equivalent ratio is 89:1

2. Cash costs per ounce and AISC per ounce are examples of Non-IFRS measures. See disclosure in quarterly MD&A for information on “Non-GAAP” measures found on the company website. Costs are presented in US $, net of by-product credits

3. Projected cash costs & AISC are based on Updated PFS filed in 2018.

Page 18: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

18

2020 PFS Base & Spot Case Highlights

PFS BASE CASE

PFS SPOT CASE

CURRENT

Silver price $15.97/oz $18.49 $26.00/ oz

Gold price $1,419/oz $1,812 $1,950/ oz

Gold: silver ratio 89:1 98:1 75:1

NPV (5% after-tax) $137 million $229 million $350 million

IRR (after-tax) 30% 45.7% 64.50%

Payback Period 2.7 1.7 1.1

LOM cash cost, net of gold by-product credit

$0.00/ oz ($4.15)/oz ($5.44)/oz

LOM AISC, net of gold by-product credit

$2.10/ oz ($2.06)/oz ($3.35)/oz

Average annual after tax free cash flow once in production

$31 million $43 million $57 million

After tax cumulative undiscounted free cash flow

$217 million $342 million $506 million

• Base case prices for the PFS are calculated on a 2 year trailing average• Spot case scenario for the PFS is closing metal prices as of July 8, 2020 • Current price scenario for the PFS using a 75:1 gold: silver ratio and implied prices of $26/ oz silver and $1950/ oz gold as of August 10

3 million oz silver and 33,000 oz goldLOM Annual Production

10 year mine life with 5.9 million oz of Ag Eq at 405 gpt(89:1 ratio)

$100 million initial capital expenditure And $62.4 million LOM sustaining capital

$83.82 totalDirect production cost per tonne

Page 19: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

19

Production and Grade Profile

480492

381401

390 385 384378

362

345

250

300

350

400

450

500

550

--

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10

Silver Production (oz)

Gold Production (oz)

Ag Eq Grade

K o

z A

g E

q

• Silver equivalents are calculated at a 89:1 ratio, using base case prices of $15.97/oz Ag, $1409/ oz Au

Terronera Vein

La Luz Vein

Years 1-4: Average Ag Eq annual production of 6.5 million oz ; elevated grade profile (average Ag Eq grade of 440 gpt)

La Luz is almost entirely very high grade and will be mined early

Page 20: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

20

Expand Property Size - acquire new concessions covering

mineralized areas in proximity

Expand Resources & Reserves – plan additional drilling to convert

inferred to probable, test other veins

Expand Mine & Plant – evaluate potential to expand to 2,000 tpd

subject to expanding reserves

Optimize Mining Methods – with more geotechnical drilling,

additional longhole mining may be possible

Optimize Ore Transport – evaluate automated underground rail

haulage system to benefit haulage costs and ventilation

Optimize Mining Equipment – evaluate electric equipment instead

of diesel

Optimize Recoveries – evaluate grind size vs. floatation stages

Tailings Transport – evaluate conveyor or pipeline vs. trucks

Power Capacity – re-evaluate power needs and rates once

alternatives are optimized

Upside Opportunities

Page 21: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

21

Complete feasibility study –approximately 9-12 months

Evaluate upside opportunities –recommence exploration drilling

Build project team

Complete EPC process –contractor bidding and selection

Extend Government permits – amend mine access ramp, construction camp

Secure project financing

Obtain board approval for development

Order long lead items – mine and plant procurement

Next Steps

Page 22: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

22

Parral ProjectChihuahua

Page 23: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

23

Parral – Potential Sixth Mine

Historic Silver District

Palmilla was highest grade silver mine in Mexico in 1800s,

provided silver to the Mexican mint

Veta Colorada mine produced 4 million oz Ag per year prior to

closing in 1990 due to low silver price

Historic IMMSA resource at Veta Colorada; small toll mill in the

district could facilitate early production in 2020

IMMSA’s Santa Barbara and Frisco’s San Francisco mines to SW,

Discovery’s Cordero project to NE, Kootenay’s Cigarra project to W

Potential Core Asset

Was 4 million Ag oz per year mine until 1990

Indicated Resource(1) 3.7 million oz Ag; Inferred Resource(1)

36.8 million oz Ag, 21,800 oz Au

District Scale Opportunity

Endeavour concessions total 3,450 hectares

Controls the Parral district, 4 old mines and multiple veins

Potential Resource Expansion

Largest exploration project in 2019 ($2 million budget)

Updated resource estimate, mined bulk sample, now ready

for processing at local toll mill

1. As at December 31, 2019. For full details refer to table in the appendix.

Page 24: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

24

Chile Projects

Page 25: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

25

Chile – World Class Exploration Targets

Cerro Marquez – Bulk Tonnage Porphyry Copper (Au-Mo)

Geologically similar to other large porphyry copper mines in Chile

Massive porphyry alteration zone in Miocene Volcanic Caldera

Drilled in Q4, 2019 – results geologically encouraging

Paloma – High Sulfidation Epithermal Gold (Ag)

Geologically similar to 4 million oz Solares Norte discovery

Massive acid-sulfate alteration zone in Miocene Volcanic Caldera

Drilling commenced November 2019, will resume in Q3, 2019

Aida – Low Sulfidation Epithermal Silver (Pb-Zn)

Geologically similar to 2 billion oz Cerro Potosi mine

Massive epithermal alteration zone Miocene Volcanic rocks

Drilling planned 2021

Cerro Marquez

Paloma

Aida

Page 26: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

26

Exploring to extend

mine lives

Developing to

expand production

Advancing to development

High impact discovery potential

OPERATING MINES

Guanacevi – Transitioned to new higher grade orebodies

Bolanitos – Developing new higher grade orebodies

El Compas – Recently commissioned new mine

DEVELOPMENT PROJECTS

CHILE ASSETS

Aida – Bulk tonnage low sulfidation epithermal silver

Cerro Marquez – Bulk tonnage porphyry copper

Paloma – Bulk tonnage high sulfidation epithermal gold

Terronera Jalisco

Consider feasibility study

Consider upside opportunities and development decision

Parral, Chihuahua

Complete initial PEA

Evaluate near term small scale production

Evaluate longer term large scale production

Sector Leading Organic Growth Strategy

Page 27: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

27

Shareholder Information

Capital Structure

Issued/ Outstanding 154.9 million

Fully Diluted 165.1 million

Recent Price (Sept 9, 2020) US$4.17

Market cap (Sept 9, 2020) US$650 million

52-Week High/Low US$4.79/$1.00

60-Day Avg Daily Volume (shares) ~7.0 million

Key Data

Exchange Listings NYSE:EXK, TSX:EDR, FSE:EJD

Working Capital US$44.6 million

Cash Position US$30.5 million

Major Shareholder Van Eck (GDXJ) 6.0%

Strategic Shareholder Fresnillo 2%

Mining Analysts 10

~ presented as at June 30, 2020 unless noted otherwise

Sector Leading Beta to Silver(1)

Analysts Coverage

B Riley FBR Lucas Pipes

BMO Capital Markets Ryan Thompson

CIBC World Markets Cosmos Chiu

Global Alliance Bhakti Pavani

GMP Securities Ian Parkinson

Noble Capital Markets Mark Reichman

PI Financial Chris Thompson

Roth Capital Partners Joseph Reagor

H.C. Wainwright Heiko Ihle

TD Securities Craig Hutchison

1.301.40

1.50 1.50 1.50 1.501.60

Hecla Mining Fortuna Silver Pan American Coeur Mining Great Panther First Majestic Endeavour Silver

Expressed as a weekly frequency as compared to the GSCI Silver index

1. Source: 5 year beta as provided by Capital IQ software – as of June 25, 2020.

Page 28: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

28

2020 Catalysts

Extend Mine Lives

Reduce Operating Costs

OptimizeTerronera

Make New Discoveries

28

Grow Through M&A

Improve productivity at each mine, focus on free cash flow

Continue exploration drilling, replace reserves and grow resources

Published final PFS with robust economics, initiated feasibility study

Drill world class Paloma high sulfidation gold –silver prospect in Chile

Acquire new mines that are accretive to NAV and cash flow with organic growth potential

Page 29: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

29

Why Invest?

Mid-Tier Silver Producer

Three high-grade silver-gold mines in Mexico

Compelling Organic Growth

Building new mines to increase production and reduce costs

Experienced Management Team

Proven track record with exploration, development and

operational expertise

Strong Balance Sheet

$44.6 million working capital, no debt

(as at 6/30/2020)

Pure Silver/ Gold Leverage

No base metals, no hedging & strong beta to silver price (60/40 silver gold producer)

Our mission is to create value for our shareholders

and become a premier silver producer in the silver

mining industry.

Page 30: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

30

Appendix

Compelling Value Proposition

An attractive investment opportunity with an industry leading growth profile & silver leverage

Page 31: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

31

ELECTRONICS

SILVERWARE

BATTERIES

SOLAR PANELS

BARS & COINS

WATER TREATMENT

MEDICAL

JEWELRY

Why Silver?

SILVER is playing an increasingly important role in industrial applications that contribute to a sustainable future:

100%

50%

0%

DENARIUS % SILVER

64-68 161-168 DidiusJulianus

193

Elagabalus219-222

Puplenus & Balbinus

238

Philip 244 Valerian255-60

Best natural conductor of electricity and heat: used in electronics, batteries, solar panels, alloys & coatings, LED & RFID chips, semi-conductors, photography, anti-bacterials, preservatives, medicines

Silver is a precious metal: like gold, silver is money and its role as a store of value and a hedge against monetary inflation is growing

Currency debasement is not new: governments throughout history have “printed” money; eg. falling silver % in the Roman Denarius coin

POPULAR APPLICATIONS: NON-COMMERCIAL USES:

SILVER SEMI-CONDUCTOR FILM

SILVER NANO PARTICLES

HIGH VALUE CHEMICALS

HYDROGREN FOR FUEL CELLS, ELECTRICITY

Page 32: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

32

Ore Grades (g/t) Recovered Ounces Recoveries (%) Cost Analysis

Period

Plant throughput

(tonnes)Silver Gold Silver Gold Silver Gold

Cash costs ($/oz Ag)

AISC ($/oz Ag)

Direct costs($/tonne)

Q1 - 16 408,553 137 1.50 1,510,065 15,960 83.7 81.0 7.63 11.12 74.26

Q2 - 16 377,198 148 1.58 1,551,851 15,649 86.2 81.9 5.37 10.53 73.01

Q3 - 16 355,611 133 1.55 1,284,646 14,364 84.3 80.8 5.27 11.47 71.18

Q4 - 16 317,555 123 1.35 1,088.845 11,402 87.0 83.0 9.39 20.11 70.72

Total 2016 1,458,917 136 1.50 5,435,407 57,375 85.3 81.7 6.78 12.43 72.42

Q1 - 17 303,222 126 1.41 1,076,974 11,724 87.4 85.2 7.81 18.24 75.77

Q2 - 17 303,943 135 1.58 1,143,788 13,058 86.6 84.6 8.36 20.46 84.01

Q3 - 17 319,038 144 1.53 1,262,064 13,648 84.5 87 8.10 18.71 81.60

Q4 - 17 349,924 152 1.56 1,436,962 14,577 84.1 83.3 7.97 12.70 84.38

Total 2017 1,279,873 140 1.54 4,919,788 53,007 85.4 83.9 8.06 16.96 82.36

Q1 - 18 325,669 148 1.47 1,314,648 12,832 84.6 83.6 6.50 14.18 79.38

Q2 - 18 314,305 156 1.60 1,355,895 13,674 86.2 84.5 7.05 15.73 83.75

Q3 - 18 317,821 160 1.50 1,428,828 12,968 87.5 84.8 8.86 16.14 86.33

Q4 - 18 309,036 157 1.55 1,386,505 13,117 88.8 85.4 9.22 14.20 93.52

Total 2018 1,266,831 156 1.53 5,522,068 52,967 86.9 84.9 8.06 15.45 86.32

Q1 - 19 246,519 154 1.45 1,071,355 10,055 87.7 87.4 12.55 19.37 105.84

Q2 - 19 237,640 157 1.51 1,059,322 9,558 88.5 83.0 13.67 20.90 114.40

Q3 - 19 234,196 144 1.49 948,547 9,716 87.6 86.7 11.51 21.53 106.76

Q4 - 19 236,531 140 1.53 939,511 9,578 88.3 82.2 13.63 23.20 113.47

Total 2019 954,886 149 1.50 4,018,735 38,907 88.0 84.7 12.85 21.19 110.09

Q1 - 20 199,327 155 1.57 857,659 8,476 86.1 84.4 7.85 18.38 101.63

Q2 - 20 114,120 188 1.84 596,545 5,817 86.3 86.3 2.78 14.91 109.74

Q3 - 20

Q4 - 20

Total 2020 313,447 167 1.66 1,454,204 14,293 86.2 85.3 5.77 16.96 104.59

Consolidated Mine Operations Table

Page 33: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

33

Guanaceví Mine Operations Table

Ore Grades (g/t) Recovered Ounces Recoveries (%) Cost Analysis

Period

Plant throughput

(tonnes)Silver Gold Silver Gold Silver Gold

Cash costs ($/oz Ag)

AISC ($/oz Ag)

Direct costs($/tonne)

Q1 - 16 98,776 249 0.56 651,731 1,568 82.4 88.5 8.09 12.95 71.92

Q2 - 16 98,756 232 0.49 629,221 1,365 85.4 87.7 10.82 20.11 83.38

Q3 - 16 82,059 235 0.51 542,385 1,163 87.5 86.4 11.12 21.53 93.24

Q4 - 16 87,850 211 0.49 540,708 1,232 90.7 89.0 12.66 26.74 93.60

Total 2016 367,441 232 0.51 2,364,045 5,328 86.3 88.4 10.56 19.07 84.94

Q1 - 17 87,599 213 0.49 530,683 1,192 88.5 86.4 12.85 23.78 94.99

Q2 - 17 74,894 219 0.50 468,741 1,079 88.8 89.5 14.94 27.40 111.42

Q3 - 17 74,649 249 0.57 522,907 1,224 87.5 89.5 13.68 23.47 117.15

Q4 - 17 83,881 241 0.54 544,117 1,245 83.7 85.5 12.39 17.57 99.39

Total 2017 321,113 230 0.53 2,066,448 4,740 87.0 86.6 13.41 22.87 105.13

Q1 - 18 78,971 224 0.63 489,163 1,443 86.0 90.2 15.31 22.62 120.63

Q2 - 18 71,275 225 0.67 464,929 1,423 90.2 92.7 17.46 29.24 139.24

Q3 - 18 81,268 218 0.48 518,318 1,114 91.0 88.8 18.14 28.75 131.75

Q4 - 18 75,528 222 0.58 484,197 1,240 89.8 88.0 19.38 27.49 144.57

Total 2018 307,042 222 0.59 1,963,773 5,224 89.6 89.7 17.57 27.01 133.78

Q1 – 19 76,557 206 0.52 458,144 1,138 90.4 88.9 21.06 27.56 145.37

Q2 – 19 75,591 242 0.62 536,966 1,367 91.3 90.7 17.37 24.94 148.84

Q3 – 19 78,517 232 0.67 533,923 1,557 91.2 92.1 12.83 20.99 116.20

Q4 – 19 92,323 252 0.75 673,559 2,025 90.0 91.0 13.54 19.48 131.56

Total 2019 322,988 234 0.65 2,202,592 6,087 90.6 90.2 15.87 22.86 135.14

Q1 – 20 94,207 280 0.87 745,114 2,427 87.9 92.1 9.01 14.61 111.89

Q2 – 20 62,231 304 1.05 527,347 1,847 86.7 87.9 8.48 15.00 126.13

Q3 – 20

Q4 – 20

Total 2020 156,438 289 0.94 1,272,461 4,274 87.5 90.4 8.79 14.77 117.55

Page 34: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

34

Ore Grades (g/t) Recovered Ounces Recoveries (%) Cost Analysis

Period

Plant throughput

(tonnes)Silver Gold Silver Gold Silver Gold

Cash costs ($/oz Ag)

AISC ($/oz Ag)

Direct costs($/tonne)

Q1 - 16 137,128 94 2.33 334,569 8,449 80.7 82.2 (6.20) (3.55) 60.03

Q2 - 16 136,322 80 2.38 276,885 8,470 79.0 81.2 (7.08) (4.25) 63.94

Q3 - 16 132,686 76 2.30 255,350 7,875 78.7 80.3 (15.17) (11.16) 49.03

Q4 - 16 101,568 71 2.22 185,813 5,926 80.1 81.7 (4.87) 1.02 54.35

Total 2016 507,704 81 2.31 1,052,617 30,720 79.6 81.5 (8.37) (4.77) 57.07

Q1 - 17 94,351 66 2.40 168,723 6,218 84.3 85.4 (10.28) (3.82) 65.18

Q2 - 17 113,875 78 2.27 231,106 6,965 80.9 83.8 (4.78) 3.61 66.60

Q3 - 17 114,526 83 2.09 257,972 6,663 84.4 86.6 (0.52) 3.96 71.52

Q4 - 17 124,172 86 2.18 280,712 7,204 81.8 82.8 (2.73) 1.01 67.04

Total 2017 446,924 80 2.24 934,238 26,910 81.3 83.6 (4.00) 1.62 67.68

Q1 - 18 115,014 82 1.83 238,012 5,578 78.5 82.4 (2.77) 4.20 60.87

Q2 - 18 108,495 91 1.82 248,591 5,222 78.3 82.3 2.87 12.84 65.74

Q3 - 18 109,728 84 1.67 236,197 4,832 79.7 82.0 6.22 14.00 64.00

Q4 - 18 105,768 82 1.77 235,326 5,166 84.4 85.8 2.59 5.12 66.43

Total 2018 439,005 86 1.79 975,555 21,127 80.4 83.6 2.14 9.00 64.20

Q1 – 19 86,634 86 1.82 196,010 4,430 81.8 87.4 2.43 16.36 70.87

Q2 – 19 76,386 78 1.49 171,891 3,035 89.7 82.9 11.56 22.64 79.90

Q3 – 19 71,541 77 1.62 147,078 3,226 86.6 83.0 8.13 29.90 81.03

Q4 – 19 82,147 51 1.81 109,963 4,088 81.6 85.5 4.82 38.83 80.66

Total 2019 316,708 73 1.69 624,942 14,779 84.1 85.9 6.72 25.11 77.88

Q1 – 20 83,217 40 1.71 86,125 3,922 80.5 85.7 (7.32) 44.17 68.85

Q2 – 20 41,680 47 2.10 55,682 2,508 88.4 89.1 (30.20) 29.79 77.02

Q3 – 20

Q4 – 20

Total 2020 124,897 43 1.84 141,807 6,430 82.1 87.0 (16.26) 38.55 71.44

Bolañitos Mine Operations Table

Page 35: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

35

Ore Grades (g/t) Recovered Ounces Recoveries (%) Cost Analysis

Period

Plant throughput

(tonnes)Silver Gold Silver Gold Silver Gold

Cash costs ($/oz Ag)

AISC ($/oz Ag)

Direct costs($/tonne)

Q1 – 19 3,790 61 3.66 3,218 342 43.3 76.8 (5.59) 18.55 110.03

Q2 – 19 21,242 72 4.35 24,007 2,238 48.8 75.3 (1.52) 43.62 138.03

Q3 – 19 21,885 90 4.56 43,634 2,669 68.9 84.1 (25.37) 3.46 137.99

Q4 - 19 22,855 65 4.33 33,5181 2,298 70.2 72.2 10.90 47.68 160.01

Total 2019 69,772 75 4.37 104,377 7,577 62.0 77.3 (7.74) 27.49 143.70

Q1 – 20 21,903 58 4.02 26,420 2,127 64.7 75.1 22.10 45.98 182.81

Q2 – 20 10,209 60 5.55 13,516 1,462 68.6 80.3 (96.83) (48.25) 143.50

Q3 – 20

Q4 - 20

Total 2020 32,112 59 4.50 39,936 3,589 65.6 77.3 (17.64) 14.50 170.31

El Compas Mine Operations Table

Page 36: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

36

Silver-Gold Reserves and Resources

Tonnes Ag g/t Au g/t Ag oz Au oz Ag Eq OzCompared

to 2018

Proven

Guanaceví 155,000 276 0.70 1,374,000 3,500 1,654,000 143%

Bolañitos 39,000 68 2.56 86,000 3,300 350,000 (78%)

El Compas 42,000 64 3.65 87,000 5,000 487,000 (2%)

Total Proven 236,000 203 1.54 1,547,000 11,800 2,491,000 (35%)

Probable

Guanaceví 560,000 240 0.66 4,326,000 11,800 5,270,000 (30%)

Bolañitos 327,000 43 2.44 455,000 25,700 2,511,000 111%

El Compas 53,000 82 4.96 141,000 8,500 821,000 100%

Terronera 5,587,000 208 2.33 37,440,000 419,000 70,960,000 -

Total Probable 6,527,000 202 2.22 42,362,000 465,000 79,562,000 (2%)

Total P+P 6,763,000 202 2.19 43,909,000 476,800 82,053,000 (4%)

Measured

Guanaceví 78,000 377 0.64 947,000 1,600 1,075,000 168%

Bolañitos 33,000 124 1.89 131,000 2,000 291,000 (77%)

El Cubo 19,000 224 1.89 140,000 1,200 236,000 (70%)

El Compas 2,000 123 6.27 9,000 500 49,000 43%

Total Measured 132,000 287 1.23 1,227,000 5,300 1,651,000 (33%)

Indicated

Guanaceví 1,062,000 331 0.85 11,305,000 29,100 13,633,000 22%

Bolañitos 502,000 160 1.95 2,588,000 31,400 5,100,000 (10%)

El Cubo 32,000 209 2.03 214,000 2,100 382,000 (83%)

El Compas 32,000 69 4.79 64,000 6,400 576,000 (49%)

Guadalupe y Calvo 1,861,000 119 2.38 7,120,000 142,400 18,512,000 -

Parral (new) 433,000 271 - 3,771,000 - 3,771,000 1,461%

Total Indicated 3,922,000 199 1.68 25,062,000 211,400 41,974,000 7%

Total M&I 4,054,000 202 1.68 26,289,000 216,700 43,625,000 5%

Inferred

Guanaceví 778,000 406 0.99 10,155,000 24,900 12,147,000 26%

Bolanitos 832,000 113 2.31 3,031,000 61,700 7,967,000 5%

El Cubo 463,000 163 1.89 2,419,000 28,200 4,675,000 (47%)

El Compas 81,000 90 6.77 232,000 17,500 1,632,000 (52%)

Terronera 1,080,000 208 2.26 7,239,000 79,000 13,559,000 -

Guadalupe y Calvo 154,000 94 2.14 465,000 10,600 1,313,000 -

Parral (new) 3,160,000 324 0.21 32,930,000 21,800 34,674,000 9%

Total Inferred 6,548,000 269 1.16 56,471,000 243,700 75,967,000 0%

Silver-Gold-Lead-Zinc Resources

Tonnes Ag g/t Au g/t Ag oz Au oz Pb% Zn% Ag Eq OzCompared to

2018

IndicatedGuanaceví 363,000 208 0.26 2,420,500 3,100 0.78 1.32 2,668,500 -

Parral (Cometa) 180,000 55 1.17 300,000 6,800 3.20 3.30 844,000 (87%)

Total Indicated 543,000 156 0.57 2,720,500 9,900 1.58 1.98 3,512,500 (61%)

InferredGuanaceví 488,000 132 0.16 2,076,000 2,500 1.36 2.54 2,276,000 -

Parral (Cometa) 880,000 74 1.45 2,100,000 41,000 3.27 3.24 5,380,000 (4%)

Total Inferred 1,368,000 95 0.99 4,176,000 43,500 2,59 2.99 7,656,000 (3%)

Reserves and Resources (Dec 31, 2019)

Page 37: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

37

Reserves & Resources (Dec 31, 2019)Notes1. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that any or all part of the Mineral Resources will be converted into

Mineral Reserves.2. The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is

reasonably expected that the majority of the Inferred Mineral Resource could be upgraded to an Indicated Mineral Resource with continued exploration.3. The Mineral Resources in this estimate were calculated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves,

Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council.4. Mineral Resources are exclusive of and in addition to Mineral Reserves.5. Guanacevi Mineral Resource and Mineral Reserve cut-off grades are based on a 182 g/t silver equivalent for Santa Cruz Sur of Guanacevi, 340 g/t silver equivalent for the El Curso

concession of Guanacevi and 218 g/t silver equivalent for Santa Cruz, North Porvenir and Milache of Guanaceví; Metallurgical recoveries were 83.3% silver and 84.5% gold for Guanaceví6. Bolañitos, Mineral Resource and Mineral Reserve cut-off grades are based on a 166 g/t silver equivalent for the Lucero ramp, 206 g/t for the La Luz ramp and 168 g/t for San Miguel of

Bolanitos. Metallurgical recoveries were 71.9% silver and 89.0% gold for Bolañitos7. El Cubo Mineral Resource cut-off grades are based on a 196 g/t silver equivalent for Area II (that comprises Dolores Mine) of El Cubo and 238 g/t silver equivalent for Areas I&IV (that

comprise Santa Cecilia and San Nicolas Mines) of El Cubo.8. El Compas Mineral Resource and Mineral Reserve cut-off grades are based on a 3.46 g/t gold equivalent. Metallurgical recoveries were 70.0% silver and 82.5% gold for El Compas9. Mineral Resource cut-off grades for Terronera was 150 g/t silver equivalent and the Mineral Reserve cut-off grades for Terronera and La Luz Deposits were 165 g/t and 222 g/t silver

equivalent respectively. Metallurgical recoveries were 84.6% silver and 80.4% gold for Terronera10. Mineral Resource cut-off grades are based on a 150 g/t silver equivalent for Guadalupe y Calvo11. Mineral Resource cut-off grades at Parral vary: 130 g/t silver equivalent for most veins, 200 g/t silver for Sierra Plata, and US$55/t NSR for Cometa.12. Mining recoveries of 93% were applied for Guanaceví, Bolañitos and El Compas and 95% for Terronera for Mineral Reserve Estimate calculations. Minimum mining widths were 0.8 metres

for Mineral Reserve Estimate calculations.13. Dilution factors for Mineral Reserve Estimate calculations averaged 35% for Guanaceví, 33.66% for Bolañitos and 36.2% for El Compas and 11% for Terronera. Dilution factors are calculated

based on internal stope dilution calculations and external dilution factors of 24% for cut and fill mining and 40% for long hole mining at Guanaceví and Bolañitos14. Silver equivalent grades and ounces are based on a 80:1 silver:gold ratio and calculated including only silver and gold.15. Probable Mineral Reserves for Terronera includes the Terronera and La Luz Deposits.16. Inferred Mineral Resources for Terronera includes the Terronera, La Luz and Real Alto Area.17. Indicated and Inferred Mineral Resources for "Parral (new)" includes the Colorada, Palmilla, San Patricio, and Sierra Plata areas.18. The La Colorada structure (Parral) does not contain gold on an economic scale.19. Price assumptions for Guanaceví, Bolañitos, El Compas and El Cubo are US$16.34/oz for silver, US$1,279/oz for gold, US$0.82/lb for lead and US$0.90/lb for zinc.20. Price assumptions for Terronera are US$17.50/oz for silver, US$1,275/oz for gold.21. Price assumptions for Parral are US$15/oz for silver, US$1,275/oz for gold.22. Figures in tables are rounded to reflect estimate precision; small differences generated by rounding are not material to the estimates.23. Effective November 31, 2019, Endeavour Silver announced suspension of operations at the El Cubo Mine, while Management evaluates other alternatives including final closure. 2018

Reserve subtotals and totals include El Cubo for comparative purposes.24. See AIF for potential risks that can materially affect the development of the mineral resources or exploitation of reserves.

Godfrey Walton, M.Sc., P.Geo., President and COO of Endeavour, is the Qualified Person who reviewed and approved this technical information contained in these Mineral Reserve and Resource Estimates. A Quality Control sampling program of reference standards, blanks and duplicates has been instituted to monitor th e integrity of all assay results. All samples are split at the local field office and shipped to ALS-Chemex Labs, where they are dried, crushed, split and 50 gram pulp samples are prepared for analysis. Gold and silver are determined by fire assay with an atomic absorption (AA) finish.

The Mineral Reserve Estimate for Terronera in the technical report titled “Updated Technical Report for the Terronera Project, Jalisco State, Mexico” effective February 12, 2019 and signed April 30, 2019 were undertaken by Independent Qualified Persons Eugene Puritch, P.Eng., FEC, CET, Yungang Wu, P.Geo., David Burga, P.Geo., D. Gregory Robinson, P.Eng., Peter J Smith P. Eng, Eugenio Iasillo P.E., Humberto Preciado P.E., and Benjamin Peacock, P. Eng.

The Parral Mineral Resources disclosed have been estimated by Mr. Jose Texidor Carlsson, P.Geo., an employee of Roscoe Postle Associates (RPA) and independent of Endeavour. By virtue of his education and relevant experience, Mr. Texidor Carlsson is a “Qualified Person” for the purpose of National Instrument 43 -101. The Mineral Resources have been classified in accordance with CIM Definition Standards for Mineral Resources and Mineral Reserves (May, 2014). Mr. Texidor Carlsson, P.Geo. has read and approved the contents as it pertains to the disclosed Parral Mineral Resource estimates.

Page 38: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

Terronera Assumptions for 2020 PFS

2020

Silver Price 15.97

Gold Price 1,419

Silver:Gold Ratio 89

Operating Statistics

LOM Tonnes Processed LOM (thousands) 5,563

Life of Mine (Years) 10.0

Average silver grade (g/t) 201

Average gold grade (g/t) 2.29

Silver equivalent grade (g/t) 405

Average silver recovery 84.9%

Average gold recovery 82.3%

LOM payable Ag ounces produced (millions) 29.8

LOM payable Au ounces produced (thousands) 328

LOM payable Ag Eq ounces produced (millions) 59.0

Avg annual payable Ag ounces produced (millions) 3.0

Avg annual payable Au ounces produced (thousands) 33

Avg annual payable Ag Eq ounces produced (millions) 5.9

Capital Expenditure Statistics

Initial Capital Expenditure (millions) 99.1

Process Capacity (tonnes per day) 1,600

LOM Sustaining Capital 62.4

Total LOM Project Capital 161.5

Financial Cost Metrics

LOM Revenue (millions) 942.7

LOM EBITDA (millions) 476.4

After Tax LOM Free Cash Flow (millions) 217.4

After Tax Project Net Present Value (millions)

137.1

After Tax Internal Rate of Return 30.0%

Pay Back Period (years) 2.7

Cash costs by Product (per silver ounce) 0.00

All in sustaining (per silver ounce) 2.10

Cash costs by Silver Equivalent (per silver ounce)

7.90

All in sustaining Silver equivalents (per silver ounce)

8.96

LOM COS (millions) 466.3

Total Direct Production Costs (per Tonne) 83.82

Page 39: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

39

Management Team

Dan Dickson, CA, CFO

Luis Castro, Ing., Geo.

VP Exploration

Miguel Ordaz,Ing., Geo.

Mexico Projects Director, Legal Representative

Bradford Cooke, M.Sc., P.Geo.

CEO

Godfrey Walton, M.Sc., P.Geo.

President and COO

Dale Mah,

B.Sc., P.Geo.VP Corporate Development

Galina Meleger,Director

Investor Relations

Christine West,

CPA, CGAVP Controller

Lorena Aguilar, BS,

DirectorHuman Resources

Ernesto Lima,

Ing., MBADirector, Project

Development

Nicholas Shakesby, BBA

VP Operations

Page 40: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

40

Board of Directors

Bradford Cooke, M.Sc., P.Geo.

Margaret Beck, B.Sc.

Mario Szotlender, B.IR

Ricardo Campoy, B.Sc.

Comp. Committee Chair

Geoff Handley, B.Sc.Chair; Corp. Gov. &

Nom. Committee Chair

Rex McLennan, B.Sc., MBA, ICD.D

Audit Committee Chair

Ken Pickering, P. Eng.

HSES Committee Chair

Page 41: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

41

Van Eck Associates

Renaissance Technologies

Fresnillo

Merian Global Investors

Mirae Asset Global Investments

Credit Suisse Securities

Black Rock

Konwave AG

Stabilitas

Dimensional Fund Advisors

RBC Global Asset Management

Millennium Management

Sprott Asset Management

Sprott Inc

Global X Management

Connor Clark & Lunn

NinePoint Partners

Morgan Stanley

AMG Fondsverwaltung

UBS Financial Services

ETF Managers

Institutional Investors, Analyst Coverage

Ryan Thompson, BMO

Cosmos Chiu, CIBC

Bhakti Pavani, Alliance Global Partners

Ian Parkinson, GMP Securities

Mark Reichman, Noble Capital Markets

Heiko Ihle, H.C. Wainwright

Craig Hutchison, TD

Chris Thompson, PI Financial

Joseph Reagor, Roth Capital Partners

Adam Graf, B. Riley FBR

Page 42: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

42

Page 43: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

43

▸ 2012 – Endeavour started GRI 4.0 reporting of its sustainability activities.

▸ Every year, we go to our stakeholders for feedback on a full range of interests, and every two years, we conduct a materiality review to rank what is most important both internally and externally to adjust our goals and programs.

▸ Our reporting is based on the five pillars listed below, with Governance as the foundation.

2018 Annual Review & Sustainability Report

2019 marks the 8th consecutive year that we’ve reported on our sustainability initiatives

We receive annual awards for the way we do business

Page 44: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

44

▸ Because mining is a high risk industry, employee health and safety is our #1 priority, governed by extensive safety policies and practices.

▸ Every employee goes through rigorous safety induction, daily safety procedures, regular refresher courses, job site audits and each mine has award-winning first aid and mine rescue teams.

▸ We provide regular health programs for employees including annual medical checkups, disease and occupational health tests, drug and alcohol tests, lifestyle and fitness counselling.

▸ In the communities, we work with state governments to provide medical, dental, and optical services, and lifestyle and addiction counselling.

Health & Safety

2019 Highlights

70% of all training activities involved safety education, highlighting its importance Guanacevi received the “Casco de Plata” safety award last year, the highest safety recognition provided by the Mining Chamber in Mexico, for their performance in 2018

Page 45: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

45

▸ Education and training are important to improving the quality of life in the local communities.

▸ Endeavour sponsors university scholarships in Mexico and Canada, high school scholarships in Mexico, and online courses to complete high school diplomas, technical and self-employment courses.

▸ We run mining skills training programs to teach young people, women and the unemployed career skills like operating dump trucks, scoop trams, jumbo drills followed by job offers.

Our People

2019 Highlights

Provided an average of 47 hours of training for each employeeCompleted the suspension of operations at El Cubo smoothly, and transferred 40% of the professional employees to other job opportunities within the Company

Page 46: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

46

▸ We support our local communities in many ways to improve the quality of life, resolve issues and build sustainable capacity.

▸ Endeavour donates our time, funds, food and gifts for cultural and religious celebrations; we sponsor sports teams, kids camps and field trips, and an annual 10 km race to promote fitness; we help upgrade local buildings, schools, churches and roads.

▸ We also train locals and provide equipment for cottage businesses such as pastry making, confections, jewelry, tourist gifts, clothing and mops.

▸ Our goal is to complete at least one legacy project at each community, from fresh water supply, to proper sewage disposal, to new community buildings, to tourist mine.

Community

2019 Highlights

Supported 118 Mexican students with scholarships to further their education Sponsored several events to engage with over 1,000 locals in the communities near TerroneraFully funded a multi-use recreational facility for the El Cubocommunity

Page 47: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

47

▸ Protection of our natural environment is paramount for Endeavour.

▸ We monitor dumps, tailings, water and energy consumption and emissions, waste recycling and disposal & biodiversity.

▸ In particular, tailings management has been a hot topic recently but from day one we have made major investments to upgrade our tailings facilities to North American standards – dry stack at Guanaceví, a unique drainage system at Bolañitos, and new facilities at El Cubo.

▸ We typically plant tens of thousands of trees and cacti each year, reclaiming areas disturbed by Endeavour but also historic areas.

Environment

2019 Highlights

Planted 51,000 trees in reforestation projects to reclaim disturbed groundRecycled over 93% of water used

Page 48: Driving Organic Growth...Sep 09, 2020  · 7 Guanacevi –Turnaround Complete 831 tpd 853 tpd 1,004 tpd 1,024 tpd 1,051 tpd 292 g/t Ag Eq 286 g/t Ag Eq 312 g/t Ag Eq 350 g/t Ag Eq

48

▸ Investments are essential to generate economic impact and profits are essential to fulfil community and sustainability objectives.

▸ Our most obvious positive economic impacts have been from investing in:

▸ acquisition of properties, mines and plants ▸ exploration to discover new orebodies in historic mining districts▸ development to open new mines and refurbish and expand old

mines, plants and facilities▸ operations to create over 2,000 employee and contractor jobs▸ direct economic impact on 8,100 people (3:1 ratio)▸ indirect economic impact on another 8,100 people such as

suppliers and services; 99% in Mexico

Economic Value

2019 Highlights

99% of our workforce is Mexican, spent $42 million in employee wages and benefits. Spent $164 million on goods and services, 97% of total procurement is from within Mexico. Paid $5 million in various taxes