    Presentation to

    UW-La CrosseSustainability Council

    4/23/10

    by David HelbachSecretary, State Building CommissionAdministrator, Division of State Facilities

  • 8/7/2019 DSF-UW-LAX Final

    2/28

    2

    Division of State Facilities

    Administrator

    Portfolio Management Architecture and Engineering Facilities Management

    - Develop and oversee $1.4Billion Capital Budget

    - Staff State BuildingCommission

    - 500+ Leases 3.6 MillionSq. Ft.

    - Parking- 3,000 Construction and

    A&E Contracts

    - Architects and Engineers- All Projects over $40,000 State

    and UW- 77.25 Million Sq. Ft.- 33 State Heating Plants- Conserve Wisconsin- 80 miles of Roadways- 100 miles of Sidewalks

    - 1800 new projects each year

    - 4.5 Million Sq. Ft., 31DOA Buildings

    - La Crosse Ofc Bldg Yes

    - UW-La Crosse No- Operate 2 State

    Heating Plants

  • 8/7/2019 DSF-UW-LAX Final

    3/28

    3

    Conserve Wisconsin

    I. Executive Order 145 Challenged State Agencies to reduce

    energy consumption from 2005 levels

    2008 10%2010 20%

    New Buildings 30% more energyefficient

    Demo Projects

    Sustainability Standard LEEDequivalent

  • 8/7/2019 DSF-UW-LAX Final

    4/28

    4

    Statewide Total7.9% Reduction in Rate of Energy Use

    Percent Change from Base (BTU/GSF)

    -10%

    -8%

    -6%

    -4%

    -2%

    0%

    2%

    FY05 FY06 FY07 FY08 FY09

    Statewide Total

    Statewide Total (Adjusted)

    Statewide Energy Usage (BTU/GSF)

    -

    20,000

    40,000

    60,000

    80,000

    100,000

    120,000

    140,000

    160,000

    180,000

    200,000

    220,000

    FY05 FY06 FY07 FY08 FY09

    Btu/GSF/Year Electricity Adjusted Btu/GSF

    Thermal Adjusted Btu/GSF

  • 8/7/2019 DSF-UW-LAX Final

    5/28

    5

    University of Wisconsin System9.3% Reduction in Rate of Energy Use

    Per

    ent Change fr

    Base (BTU/

    )

    -

    %

    -

    %

    -

    %

    -

    %

    -

    %

    %

    %

    UW

    ! "

    #

    $

    %

    &

    UW

    ! "

    #

    $

    %

    &

    ('

    (

    j)

    !

    (

    )

    University ofWisconsin System Energy Usage (BTU/0

    SF)

    -

    1 2

    ,2 2 2

    3 2

    ,2 2 2

    4 2

    ,2 2 2

    5 2

    ,2 2 2

    6

    2 2

    ,2 2 2

    6

    1 2

    ,2 2 2

    6

    3 2

    ,2 2 2

    6

    4 2

    ,2 2 2

    6

    5 2

    ,2 2 2

    1 2 2

    ,2 2 2

    1 1 2

    ,2 2 2

    7 8 2 9 7 8 2 4 7 8 2 @ 7 8 2 5 7 8 2 A

    B

    C

    D

    E

    G

    F

    G

    E

    H

    I

    P

    rQ

    &

    ! R

    rS

    R

    S

    '(

    j)

    !

    (T

    )

    UG

    #V

    !

    r" %

    &'

    (

    j)

    !

    (T

    )

    UG

  • 8/7/2019 DSF-UW-LAX Final

    6/28

    6

    UW La Crosse6.0% Reduction in Rate of Energy Use

    Percent ChW

    nge from Base (BTUX Y

    SF)

    -20%

    -15%

    -10%

    -5%

    0%

    5%

    10%

    FY05 FY06 FY07 FY08 FY09

    U

    - La Crosse

    U

    - La Crosse (Adjusted)

    UW - La Crosse EnergyUsage (BTUa

    b

    SF)

    -

    20,000

    40,000

    60,000

    80,000

    100,000

    120,000

    140,000

    160,000

    FY05 FY06 FY07 FY08 FY09

    Btu

    /GSF/Year Electricity Adjusted Btu/GSF

    Thermal Adjusted Btu/GSF

  • 8/7/2019 DSF-UW-LAX Final

    7/28

    7

    Conserve Wisconsin

    II. Wisconsin Act 141

    Purchase Renewable Electricity

    Goals:

    December 31, 2007 10%

    December 31, 2011 20%

  • 8/7/2019 DSF-UW-LAX Final

    8/28

    8

    Conserve Wisconsin

    III. Energy ConservationConstruction Fund

    2007-09 $30 Million2009-11 $50 Million

  • 8/7/2019 DSF-UW-LAX Final

    9/28

    9

    Conserve Wisconsin

    IV. 4 Campuses Off the GridBy 2012, each campus will reduceits carbon dioxide emissions equal

    to the emissions produced by its2005 electric consumption.

    UW-River Falls

    At 52% Goal Energy Reduction of 26.7%

    Renewables 36.7% 46.7% by 2011

  • 8/7/2019 DSF-UW-LAX Final

    10/28

    10

    UW-Oshkosh At 30% Goal

    Energy Reduction of 5% Renewables 21.4%

    UW-Stevens Point At 40% of Goal Energy Reduction of 11.1%

    Renewables 28.9%

    UW-Green Bay At 37% of Goal

    Energy Reduction of 26.7%

    Renewables 10%

  • 8/7/2019 DSF-UW-LAX Final

    11/28

    11

    Conserve Wisconsin

    V. Executive Order 192

    Office of Energy Independence

    Goals- Develop Biomass Market

    - 25 x 25

    - Become a National Leader inResearch

  • 8/7/2019 DSF-UW-LAX Final

    12/28

    12

    Heating Plants

    33 Heating Plants Statewide

    16 Coal/Gas Plants Total of 199,000 Tons of Coal

    (Compare Columbia PowerPlant at 610Tons per Hour)

    In less than 12 hours, Columbia burnsmore coal than UW-La Crosse does in ayear

  • 8/7/2019 DSF-UW-LAX Final

    13/28

    COAL USAGE BY RANK BY FACILITY

    Note: State facilities coal consumption is based on the average of years 2007 and 2008

    Agency Facility Data Total Ranking % of Use

    UWS Madison-Charter Sum of coal tons 121,261 1 61

    DHS Mendota Complex Sum of coal tons 12,654 2 6

    UWS Eau Claire Sum of coal tons 9,875 3 5

    DOC Waupun Complex Sum of coal tons 9,403 4 5

    UWS Stevens Point Sum of coal tons 7,842 5 4

    UWS La Crosse Sum of coal tons 7,035 6 4

    UWS Oshkosh Sum of coal tons 5,695 7 3

    DOA Capitol H & PP Sum of coal tons 5,408 8 3

    UWS Stout Sum of coal tons 4,040 9 2

    DHS Winnebago Complex Sum of coal tons 3,584 10 2

    UWS River Falls Sum of coal tons 3,337 11 2

    UWS Platteville Sum of coal tons 2,691 12 1

    UWS Superior Sum of coal tons 2,585 13 1

    DOA Hill Farms Sum of coal tons 2,214 14 1

    DHS Northern Sum of coal tons 2,156 15 1

    Total Sum of coal tons 199,780 100

  • 8/7/2019 DSF-UW-LAX Final

    14/28

    14

    State Action to Date

    2009/11 Budget Total Tons 199,000

    Charter Street UW Madison $250 Million 121,261 Tons

    (No Coal 10/11)

    Capitol Heat and Power

    $25 Million 5,408 Tons

    (No Coal 3/10)

  • 8/7/2019 DSF-UW-LAX Final

    15/28

    15

    2011/13 Budget

    Waupun Correctional $20 Million 9,403 Tons

    (No Coal 6/13)

    Reduction of 136, 072 Tons or

    -69%

  • 8/7/2019 DSF-UW-LAX Final

    16/28

    2007 COAL CONSUMPTION IN WISCONSIN

    Facility Type Data Total State Plants%

    All Entities within State Burning Coal Coal tons 26,583,000 100

    All 16 State Heating Plants Coal tons 199,780 0.75

    15 State Heating Plants( w/o Charter) Coal tons 78,519 0.30

    13 State Heating Plants (w/o Charter, CHPP & Waupun) Coal tons 63,708 0.24

  • 8/7/2019 DSF-UW-LAX Final

    17/28

    COAL USAGE BY RANK BY FACILITY

    Note: State facilities coal consumption is based on the average of years 2007 and 2008

    Agency Facility Data Total Ranking % of Use

    UWS Madison-Charter Sum of coal tons 121,261 1 61

    DHS Mendota Complex Sum of coal tons 12,654 2 6

    UWS Eau Claire Sum of coal tons 9,875 3 5

    DOC Waupun Complex Sum of coal tons 9,403 4 5

    UWS Stevens Point Sum of coal tons 7,842 5 4

    UWS La Crosse Sum of coal tons 7,035 6 4

    UWS Oshkosh Sum of coal tons 5,695 7 3

    DOA Capitol H & PP Sum of coal tons 5,408 8 3

    UWS Stout Sum of coal tons 4,040 9 2

    DHS Winnebago Complex Sum of coal tons 3,584 10 2

    UWS River Falls Sum of coal tons 3,337 11 2

    UWS Platteville Sum of coal tons 2,691 12 1

    UWS Superior Sum of coal tons 2,585 13 1

    DOA Hill Farms Sum of coal tons 2,214 14 1

    DHS Northern Sum of coal tons 2,156 15 1

    Total Sum of coal tons 199,780 100

  • 8/7/2019 DSF-UW-LAX Final

    18/28

    18

    La Crosse Heating Plant

    3 Boilers 2 - Coal/Gas, 1-Gas

    Operates 24/7

    7 UW Employees

    No electricity produced creates steam

  • 8/7/2019 DSF-UW-LAX Final

    19/28

    19

    Without the plan, the Campus

    would not function:Heat

    Hot Shower

    Humidification AC

    Swimming Pool

    Produces steam only to fulfillCampus need

    Plant does nothing to dictate how

    much steam is generated

  • 8/7/2019 DSF-UW-LAX Final

    20/28

    20

    CurrentStatus

    Consent Decree

    Look Back Discussion with EPA, DNR, USJ,

    Sierra Club, UW, DOA

  • 8/7/2019 DSF-UW-LAX Final

    21/28

    Ce ra ea a s as Coa Ca ac es

    Curre a Configura ions

    -

    50 00

    100 00

    150 00

    200 00

    250 00

    illFa

    aupun

    endo

    a

    o

    he

    n

    en

    e

    innebago

    -Eau

    laie

    -LaCrosse

    -Osh

    osh

    -latteville

    -RiverFalls

    UW-Stevens

    oint

    UW-Stout

    UW-Superior

    Centra ant

    Tota

    Ca

    acity(M

    MBtu/Hr)

    Gas Boiler Capacity MMBtu c d r Coal Boiler Capacity MMBtu c d r

    Max Steam MMBtu c d re

    verage HeatingLoad MMBtu c Hr

  • 8/7/2019 DSF-UW-LAX Final

    22/28

    T t l C n umpti n b Aenc in Y2009 ner Rep rt

    Oth f gh

    .i p

    DPI

    q.3

    p

    DOA

    4.3p

    DVA

    1.1%

    DH r

    s.4%

    DOC

    10. t %

    Uu

    r

    v

    h

    . v %

    DMA

    1.w%

    DPI

    Uu

    r

    DOC

    DHr

    DVA

    DOA

    DMA

    Othf g

    Nx

    te: The suy

    of these expend

    tuesw

    not

    equ

    the totals on the follow

    ng page since

    not all agencies are includedin this figure.

  • 8/7/2019 DSF-UW-LAX Final

    23/28

    23

    Total Cost by gency in 2009 nergy eport

    Ot er, $4,871,224,

    2.7%

    DMA, $5,709,829,

    3.2%

    UWS, $125,799,406,

    70.3%

    DOC, $20,479,364,

    11.5%DHS, $9,067,052,

    5.1%

    DVA, $2,076,261,1.2%

    DOA, $10,245,455,

    5.7%

    DPI, $584,818,0.3%

    DPI

    UWSDOC

    DHS

    DVA

    DOA

    DMA

    Ot er

    N

    te: Thes m

    theseexpen

    itreswill n

    t

    eq al thet

    tals

    nthe

    ll

    wingpagesince

    n

    tall agenciesareincluded inthis

    igure.

  • 8/7/2019 DSF-UW-LAX Final

    24/28

    24

    Who Pays and When

  • 8/7/2019 DSF-UW-LAX Final

    25/28

    25

    Cost Allocation Operating Costs Capital Costs

    State Funding (GPR) 38% 59%

    Student Tuition 21%

    Student Dorm and other Fees (PR) 41% 41%

    100% 100%

    UWLa CrosseCapital

    ConversionCosts

    CurrentAnnual Fuel

    Costs

    100% GasFuel Costs

    Co-operatingCost

    Increment

    $7,200,000 $1,521,490 $1,967,826 $446,336

    Annual Costs (debt service / operating costs) $590,056 $446,336

    Total Annual Cost Impact

    State Supported UW Funding (GPR) $519,303

    Student Tuition $92,168

    Student Dorm and other Student Fees (PR) $424,921

    $1,036,392

  • 8/7/2019 DSF-UW-LAX Final

    26/28

    26

    F 2009 Fue y os s by TypeOthe

    F

    els

    ,

    78,

    72 ,

    .

    %

    FelOil,

    278,2

    ,

    .2% Alte ative &

    Pellets,

    7

    ,8

    ,

    .%

    C al,

    22,27,

    82 ,

    2.7%

    as

    Utility

    F nished,

    58,

    ,582 ,

    2.%

    Electricity,7,

    7,7

    5 ,

    5

    .%

    Electricity

    GasUtility

    Frnished

    C j al

    FelOil

    Alternative &PelletsOtherF

    els

  • 8/7/2019 DSF-UW-LAX Final

    27/28

    27

    UW La Crosse Heating Plant Conversion Operating and Capital Cost

    Allocation

    Student Tuition

    9%

    State Supported UW

    Funding (GPR)

    50%

    Student Dorm and other

    Student Fees (PR)

    41%

  • 8/7/2019 DSF-UW-LAX Final

    28/28

    28

    Questions