1
Department of
Design and Construction
Dr. Feniosky Peña-Mora
Commissioner
DSNY: THE NEW STATEN ISLAND 1 & 3 GARAGE AND REHABILITATION OF THE BOROUGH REPAIR SHOP FACILITYPRE-PROPOSAL CONFERENCE
1
Project Personnel
Location
Scope
Floor Plans
Questions
SANITATION UNITAssistant Commissioner: Bogdan Pestka
Program Director: Glenn Brue
Deputy Program Director: John Ziedonis
Senior Project Manager: Nicole
Hoppenworth
Project Personnel
Location
Scope
Floor Plans
Questions
SITE:1000 WEST SERVICE
ROAD
STATEN ISLAND, 10314
Project Personnel
Location
Scope
Floor Plans
Questions
SITE:1000 WEST SERVICE
ROAD
STATEN ISLAND, 10314
EXISTING SI 3
GARAGE
EXISTING BOROUGH
REPAIR SHOP
Project Personnel
Location
Scope
Floor Plans
Questions
Project Personnel
Location
Scope
Floor Plans
Questions
EXISTING CONDITIONS SITE DIAGRAM
Project Personnel
Location
Scope
Floor Plans
Questions
SCOPE OF WORK:
• CONSTRUCT NEW GARAGE FOR STATEN ISLAND DISTRICTS 1 & 3
• DISTRICT 1 WILL BE RELOCATED TO THE SITE
• RENOVATION OF EXISTING BOROUGH REPAIR SHOP
• EXPAND INTO THE FORMER SI 3 GARAGE
• REPLACE SYSTEMS AND EQUIPMENT THROUGHOUT
• LIMITED ROOF REPLACEMENT & HVAC EQUIPMENT REPLACEMENT TO
TAKE PLACE UNDER A SEPARATE PROJECT
• SITE
• ADDITIONAL 6 ACRES RECLAIMED FROM THE LANDFILL
• NEW GRADING AND DRAINAGE
• NEW SURFACE PARKING for DSNY VEHICLES AND EMPLOYEE VEHICLES
• NEW OUTDOOR FUELING
• NEW HOUSEHOLD WASTE DROP-OFF
• NEW SALT STORAGE
• NEW SANITARY LINE TO CONNECT TO DEP SEWER SYSTEM
• PHASING
• PERSONNEL AND EQUIPMENT WILL CONTINUE TO OPERATE FROM THE
EXISTING STATEN ISLAND DISTRICT 3 GARAGE AND BOROUGH REPAIR
SHOP UNTIL COMPLETION OF THE NEW GARAGE.
• VEHICLE MAINTENANCE AND REPAIR WILL CONTINUE TO FUNCTION FROM
THE BOROUGH REPAIR SHOP THROUGHOUT CONSTRUCTION.
EXISTING CONDITIONS
Project Personnel
Location
Scope
Floor Plans
Questions
DDC PROJECTED MILESTONE SCHEDULE:
DESIGN PROCURMENT
• 290 CCD
DESIGN PHASE*
• 730 CCD
CONSTRUCTION PROCUREMENT*
• 365 CCD
CONSTRUCTION PHASE*
• 1075 CCD
* Timeline to be confirmed at the end of Design Development
Project Personnel
Location
Scope
Floor Plans
Questions
BOROUGH REPAIR SHOP: EXISTING PLAN – FIRST FLOOR
Project Personnel
Location
Scope
Floor Plans
Questions
BOROUGH REPAIR SHOP: EXISTING PLAN – SECOND FLOOR
Equity East Flatbush Library
Sustainability Rescue Company 2
Design - Lenses
12
Jerome Avenue, Bronx
ResiliencyEastside Coastal
Resiliency Initiative
Healthy LivingMontefiore Square Park
12
GrowthTimes Square
Project Personnel
Location
Scope
Floor Plans
Questions
PRE-PROPOSAL
SITE WALK THROUGH:
THURSDAY JANUARY, 5, 2017 at
1:00 PM
QUESTIONS?