DSWG Update to WMS 3/13/2013

Date post: 02-Jan-2016
Category:
Upload: fleur-french
View: 32 times
Download: 0 times
Share this document with a friend
Description:
DSWG Update to WMS 3/13/2013. Coming Soon:. ERS10 Deployment Limit Like ERS30 but with ERCOT Operations suggestions ERS10 Clearing Price Mechanism Currently pay-as-bid Both items part of ERS30 pilot Will likely seek WMS approval to submit NPRR at next WMS - PowerPoint PPT Presentation
Popular Tags:
6
DSWG Update to WMS 3/13/2013 1
Transcript
Page 1: DSWG Update to WMS 3/13/2013

DSWG Update to WMS3/13/2013

1

Page 2: DSWG Update to WMS 3/13/2013

2

DSWG Goals for 2013

# Goal Description Deliverable Scheduled Completion

Market Champion Contributors Status

1 Weather-Sensitive ERS Loads NPRR 505 approval End of Q1 Robert King Perrin Wall, Michael Cozzi, Jay Zarnikau, Kyle Miller Endorsed At TAC

2 ERS Clearing Price Draft NPRR End of Q1 Joel Obillo John Tipton, Michael Cozzi, Malcolm Ainspan, Perrin Wall, Robert King, Tim Carter

3 ERS-30 Complete Pilot Project and Introduce NPRR End of Q4 Robert King Malcolm Ainspan, Joel Obillo, Michael Cozzi, Tim Carter Pilot Phase

through Sept ‘13

4 ERS Deployment Time LimitDraft NPRR, including clarification of requirements when no contractual obligation

End of Q1 Robert King John Tipton, Malcolm Ainspan, Joel Obillo, Perrin Wall 5 Aggregated Load Resources

Draft NPRR to clarify ALR participation in Ancillary Services

End of Q2 David Kee Jay Zarnikau, Perrin Wall, Justin Louis, Robert King, Ed Echols, Cheryl Dobos, Russell Shaver, Eric Goff, Sherry Wiegand

6 DR Participation in the Real-Time Energy Market Draft NPRR End of Q3 Eric Goff

Joel Obillo, Suzanne Bertin, Perrin Wall, Caryn Rexrode, Cyrus Reed, Jay Zarnikau, John Tipton, Robert King, Justin Louis, David Kee, Sherry Weigand, Melissa Trevino, David Power,

Marguerite Wagner, Kyle Miller, David Power

In Progress

7 Adjust DR Capacity for T&D Losses

Draft and present NPRR to WMS End of Q1 Tim Carter Joel Obillo

8 Load Resource M&V via Baseline Methodology Draft NPRR End of Q1 David Kee Caryn Rexrode, Justin Louis, Robert King

9 ERS Training/Outreach Training workshop for ERS End of Q2 ERCOT Staff ERCOT Staff Scheduled for 4/5/2013

10 Update Load Participation in ERCOT Markets document

Finish and post consistent with outcome of PUC project End of Q2 Tim Carter Joel Obillo, Caryn Rexrode, ERCOT Staff In progress

11 Retail DR/Dynamic Pricing Project

Support ERCOT/LSEproject on data collection & analysis End of Q4 Jay Z Michael Cozzi, Kyle Miller, Marguerite Wagner Not Started

12 DR Asset MappingExplore locational mapping for ERS, LR and retail demand response

End of Q3 Perrin Wall Tim Carter, Marguerite Wagner, Ed Echols Not Started

13 Presentation of NPRR351 Price Forecasts

Review and provide recommendations for reports/display to ERCOT

End of Q4 Nelson Nease Tim Carter, David Power Not Started

Page 3: DSWG Update to WMS 3/13/2013

Coming Soon:

• ERS10 Deployment Limit– Like ERS30 but with ERCOT Operations suggestions

• ERS10 Clearing Price Mechanism– Currently pay-as-bid

• Both items part of ERS30 pilot

• Will likely seek WMS approval to submit NPRR at next WMS– Will be covered at ERS Subgroup meeting

3

Page 4: DSWG Update to WMS 3/13/2013

Future Meetings• PUCT Demand Response Workshop (Project 41061)– 3/14/13 9:00 a.m. to 5:00 p.m. (DR in morning) Travis

Building / Commissioners Hearing Room

• ERS Training– 4/5/13 9:30 a.m. to 12:00 p.m. ERCOT Met 206

• ERS Subgroup– 4/5/13 1:00 p.m. to 4:00 p.m. ERCOT Met 206

• Demand Side Working– 4/26/13 9:30 a.m. to 3:30 p.m. ERCOT Met 206

4

Page 5: DSWG Update to WMS 3/13/2013

Clean Up to NPRR522:

• Intended to treat all ERS Resources similarly for T&D Losses Adjustment– Inadvertent use of the term ‘Load’– Comments change term to ‘ERS Resource’

• Seek WMS approval to submit comments

5

Page 6: DSWG Update to WMS 3/13/2013

NPRR for LR Baseline Methodology for Non Spin:

• Seeking WMS approval for DSWG to submit NPRR

6


Recommended