+ All Categories
Home > Documents > Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering...

Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering...

Date post: 04-Sep-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
13
Howard County Office of Transportation 2019 BikeHoward Implementation August 29, 2019 Ducketts Lane Proposed Bike Lanes www.bikehoward.com [email protected] (410) 313-0567
Transcript
Page 1: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

Howard County Office of Transportation2019 BikeHoward ImplementationAugust 29, 2019

Ducketts Lane Proposed Bike Lanes

[email protected]

(410) 313-0567

Page 2: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

The Vision of BikeHoward“Howard County, Maryland seeks to be a bicycle-friendly County where residents and visitors, schoolchildren and seniors, men and

women feel comfortable and safe bicycling on our roads and paths as a means of daily transportation and healthy recreation.”

What is BikeHoward?

Howard County Bicycle Master Plan

Page 3: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

• Portion of roadway or shoulder

designated for single directional bicycle

flow

• Define separate spaces for bicyclists and

drivers

• Bicyclists may leave the bike lane to

pass, make left turns, or avoid obstacles

• Parking is not permitted in bike lanes

• Bike lanes are indicated by signs (below)

and markings (right)

What are Bike Lanes?

Page 4: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

❖ Also known as “Shared Lane Markings”

❖ Used where:

• Lanes are too narrow for bicycles and

motor vehicles to operate side-by-side

• Speed limits not greater than 35 MPH

❖ Used for:

• Increasing awareness that bicycles

may be in the roadway

• Providing people bicycling with

lateral (i.e. left-to-right) guidance

on where to ride in the lane

• Indicating preferred bicycling routes

❖ Spaced every 250 feet

❖ When lanes are 13 to 15 feet wide,

sharrows are 4 feet from the outside edge

❖ When lanes are less than 13 feet wide,

often paired with “Bikes May Use Full Lane”

sign:

Above: Levering Ave in Elkridge

Shared Lane Marking ExamplesBelow: Old Dobbin Lane in Columbia

What are Sharrows?

Page 5: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

Ducketts Lane in Context

Page 6: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

Proposal Details: Segment 1

Bike Lane5’

Travel Lane12’

Travel Lane12’

Bike Lane5’

ABF Freight

Point at Elkridge

Page 7: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

Proposal Details: Segment 2

Bike Lane5’

Travel Lane11.5’

Travel Lane11.5’

Bike Lane5’

Turn Lane11’

School Parking

Marble Hill Condos

Page 8: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

Proposal Details: Segment 3

Travel Lane11’

Turn Lane11’

Travel Lane11’

Shoulder11’

School Building

Marble Hill Condos

Page 9: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

Proposal Details: Segment 4

Bike Lane5’

Travel Lane12’

Travel Lane12’

Bike Lane5’

Shoulder11’

School Side

Marble Hill Condos

School Building

Page 10: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

Proposal Details: Segment 5

Shared Lane15’

Shared Lane15’

Lori LnKyle Leaf CtKaras Walk

Page 11: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

Proposal Details: Segment 6

Bike Lane5’

Travel Lane12’

Travel Lane12’

Bike Lane5’

Niagara DrDuckeys Run

Page 12: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

Ducketts Lane

• Department of Public Works Traffic Engineering Division will develop detailed designs

based on community feedback.

• Expected implementation date is Fall 2019

Current comment period open through September 12Email: [email protected]

Web: bikehoward.com/feedback

Phone: (410) 313-0567

Mail: Howard County Government

Office of Transportation

3430 Court House Drive

Ellicott City, MD 21043

Next Steps

Page 13: Ducketts Lane Presentation - WordPress.com · •Department of Public Works Traffic Engineering Division will develop detailed designs based on community feedback. •Expected implementation

Questions?


Recommended