THE MONSTER LOBE! Duhn, Duhn, Duuhn!
Transcript
Page 1: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

THE MONSTER LOBE!Duhn, Duhn, Duuhn!

Page 2: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 3: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 4: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 5: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 6: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

This is a STEM Problem!

• How do we stop the Monster Lobe?• Build a wall?• Build a tunnel?• Refreeze it?• Deflect it?• Bury it in concrete?• Move the Road?• Raise the pipeline?• Minimize Climate Change?

Page 7: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

Your Resources

• Your teacher colleagues and their students• AK Problem-Solving Bibliography • UAS faculty• Maps of Alaska• Scientific papers and the scientists who

authored them• DOT scientists and regional managers• The Monster Lobe Wiki• The rest of this PPT

Page 8: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 9: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 10: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

Location, Dimensions, Rate

• Frozen debri lobe less than 70 meters from Dalton Highway and 300 m from Pipeline (buried in this section)

• 67◦48.669′N/149◦49.185′W• Chandalar D-6, AK (1975) 1 888 627 3325

USGS • 65 km north of Coldfoot, 170 km south of

Deadhorse• 100 m wide, 20 m tall, 1000 m long

moving 1 cm per day

Page 11: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 12: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 13: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 14: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 15: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 16: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 17: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 18: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 19: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 20: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 21: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 22: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 23: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

Solifluction

• Definition: Mass movement of soil and regolith affected by alternate freezing and thawing. Characteristic of saturated soils in high latitudes, both within and beyond the permafrost zone.

• A solifluction lobe in Alaska. Solifluction is the slow downslope movement of waterlogged soil. A solifluction lobe is an isolated, tongue-shaped feature, formed by more rapid solifluction on certain sections of a slope showing variations in gradient. It commonly has a steep front and a relatively smooth upper surface.

Page 24: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

A variety of earthflow called solifluction is the flow of watersaturated earth material over an impermeable surface such as permafrost. It occurs frequently in bitterly cold regions such as in Alaska or Canada. Springtime temperatures thaw only the first few feet of the frozen ground (the active layer), which becomes saturated quickly and slowly flows over the ever-frozen permafrost below. Solifluction can occur on even the gentlest of slopes. Not forceful enough to break apart the surface vegetation, the migrating material drags it along like a wrinkled green rug. The soil finally settles on level ground at the base.

Page 25: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

Key Terms

• Climate change, Alaska, mystery lobe, solifluction, haul road, Alaska pipeline:

• Sliding friction, permafrost, permeable and impermeable, porosity, viscosity, density, buoyancy, saturated and unsaturated, moisture, mixture

• Freeze thaw cycle, soil profile, cross section, core sample, slope gradient, topography

• Distance, rate, time, temperature• Two and three-D modeling, Glog poster

Page 26: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 27: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 28: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.
Page 29: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

Simulations• Distance Time Graphs

http://www.explorelearning.com/index.cfm?method=cResource.dspDetail&ResourceID=260&ClassID=2136130

• Distance Time Velocity Time graphs http://www.explorelearning.com/index.cfm?method=cResource.dspDetail&ResourceID=626&ClassID=2136130

• Porosity Simulator http://www.planetseed.com/node/93972• Viscosity Simulator http://www.planetseed.com/node/19125• Phet simulation of permeable, impermeable and semi-

permeable membranes: http://phet.colorado.edu/en/simulation/membrane-channels

• Bridge design website: http://bridgecontest.usma.edu/index.htm

Page 30: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

Vocabulary

• Friction, permafrost, permeable and impermeable, porosity, viscosity, density, buoyancy, saturated and unsaturated, moisture,

• Freeze thaw cycle, soil profile, cross section, core sample, slope gradient

• Distance, rate, time, temperature

Page 31: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

Middle Schoolers Solving Monster Lobe Using Minecraft

• http://youtu.be/XcYBOy40l08

Page 32: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

You Want to Join Us?

[email protected]

Page 33: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

Constraints

Page 34: Duhn, Duhn, Duuhn!. This is a STEM Problem! How do we stop the Monster Lobe? Build a wall? Build a tunnel? Refreeze it? Deflect it? Bury it in.

Constraints

• Time• Money• Materials• Environmental Concerns