Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates June 22, 2016 Charles W. Stark Executive Project Director
Transcript
Page 1: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

June 22, 2016

Charles W. Stark

Executive Project Director

Page 2: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Quarter Expenditures (Feb, Mar, Apr)

$ 25.5 Million

Total Expenditures (Thru April 30, 2016)

$ 2.846 Billion

Forecast at Completion $ 2.982 Billion

Phase 1 Cost Summary

Page 3: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Phase 1 Update • Dulles Transit Partners (DTP) Closeout Status:

Estimated completion date for DTP performed punch list work: June 30, 2016.

Credit negotiations are underway with DTP for punch list work that will be assigned to the Task Order Closeout Contract (most notably VDOT items).

Warranty claims processing and remedial work by DTP will continue; most significant item is storm sewer and roadway underdrain repair.

• WMATA Facilities Major Activities through 2016 Art-in-Transit was completed in April. Automatic Train Control (ATC) Remote Terminal Units were completed in

March. Estimated completion date for Traction Power Remote Terminal Unit

Upgrade: June. This work is being performed by WMATA. Estimated completion date for ATC Training Equipment: August. Estimated completion date for Third Rail Heater Controllers: December.

Page 4: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Phase 1 Update • Closeout of VDOT Comprehensive Agreement

Warranty work must remain the responsibility of DTP. The remaining cost and scope of the punch list items remain to be

discussed with VDOT.

• Task Order Contract Status Task Orders with Notice To Proceed: 24 issued; 12 complete. The largest outstanding task orders will be for:

Heat Tape Upgrades (Negotiations nearing completion). Old Meadow Road Conceptual Study (Contractor Proposal Evaluation) in

progress. Concrete pavement repairs in preparation.

Page 5: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Old Meadow Road Schedule • In April 2016, Verizon provided evidence of “Prior Rights”

which meant the Project is responsible for the fiber optic communication ductbank relocation costs.

• Project is pursuing an alternate design concept to avoid the cost and time of the ductbank relocation. Evaluate Alternate Design Concept: Late August 2016. Develop Property Acquisition/Permit Drawings: October 2016. Property Acquisition Process: October 2016 – October 2017. Complete Final Design: March 2017. Award Construction Contract: September 2017. Construction: September 2017 to April 2018. If the alternate concept is not feasible, ductbank relocation may

add up to a year to the schedule.

Page 6: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Phase 1 Art-In-Transit Glass Wiehle Avenue Station

Page 7: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Phase 1 Art-In-Transit Sculptures

Greensboro Station

Spring Hill Station

Page 8: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Phase 2 Cost Summary

April Expenditures $ 17.5 Million

Total Expenditures $ 739.6 Million

Total Budget $ 2.778 Billion

Total Forecast $ 2.778 Billion

Page 9: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Phase 2 Contingency Utilization

Total Contingency $ 551.5 Million

Contingency Utilized through March 2016 $ 79.2 Million

Contingency Utilized in April 2016 $ 1.0 Million

Total Contingency Utilized through April 2016 $ 80.2 Million

Remaining Contingency

$ 471.3 Million

Page 10: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Current • Advancement of Design Packages:

Design complete 3 minor, non-schedule critical packages near 100% 7 packages to be Issued for Construction

• Issued 17 Permit Amendments due to Design Revisions

• Project Office Review/Approval Activities: 14 Design Change Packages 75 Contractor Submittals 20 Non-Conformance Reports

Page 11: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Set Girders In Yard Leads

Page 12: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Girder Placement over Horsepen Lake

Page 13: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Utility Tunnel Casing under Rudder Road

Page 14: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Stripping Column Forms East of Dulles Airport

Page 15: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Dulles Airport Station

Page 16: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Form and Pour Corbels for Straddle Bent #3

Page 17: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Three of Eight Straddle Bents Installed

Page 18: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Drill Caissons for Columns at Airport

Page 19: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Precast Panel Installation at Innovation Station

Page 20: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Install Concrete Foundations at Reston Station

Page 21: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Form Herndon Station Columns, Foundations and Walls

Page 22: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Prepare Column Forms at Dulles Station

Page 23: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Setting Station Managers Kiosk at Innovation Station

Page 24: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

53 of 173 Decks poured: 30% complete

Page 25: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Guideway & Stations Design-Build Activities

Upcoming • Reston Station – pour foundations and cast in place concrete walls and

continue installation of 34.5 KV. • Herndon Station – Form and pour station foundations and walls and

continue installation of underground systems and utilities. • Innovation Station – Continue station precast element placement and start

structural steel vault roof framing. • Dulles Station – Continue station foundation and aerial guideway

substructures, continue walkway retrofit and tie in to Station mezzanine. • Aerial Guideway – Pour drilled shafts, columns and pier caps; install decks

and girders; at the Airport, cast straddle bent #13 and girder support corbels at straddle bent #2.

Page 26: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

WMATA Rail Yard & Maintenance Facility Design-Build Activities

Current • Construction of all at grade and underground facilities has been permitted

and is proceeding. Initial efforts are concentrated in the Service and Inspection Building (SIB).

• Final grading, utilities and yard layout continues. • Final design of the Project Wide Package scheduled for completion in

August.

Page 27: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

WMATA Rail Yard & Maintenance Facility Design-Build Activities

Upcoming • Construction of all facilities. • Advance Project Wide design documents to 100% and Issue For Permit.

• Address open WMATA design refinements.

• Review shop documents and revised design documents.

• Process open commercial issues.

Page 28: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

WMATA Rail Yard & Maintenance Facility Design-Build Activities

Inspection Pit Foundations

SIB Basement Preparation

Page 29: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

WMATA Rail Yard & Maintenance Facility Design-Build Activities

Site Preparation Continues

Page 30: Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

DULLESMETRO.COM