8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 1/125
A single copy of this
publication is licensed to
on
This is an uncontrolled copy
- not for contract use
Concrete Society
This is an uncontrolled copy. Ensure use of the most current version of this document
by searching the Construction Information Service at http://uk.ihs.com
L
i c e n s ed
c o p y :
G L A M O R G
A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
GLAMORGAN
University of South Wales
19/11/2015
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 2/125
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 3/125
Acknowledgements
The Concrete Society is grate ful to the fo llow ing for the provision of photographs:
Strongforce/Laing O'Rourke: Figures 18, 20 and 21
Sir Robert M cAlpine: Figures 19 and 22.
Published by The Con crete S ociety
CCIP-047
Published September 2010
ISBN 978-1-904482-62-8
© The Concrete Society
The Concrete Society
Riverside House, 4 Meadows Business Park, Station Approach, Blackwater, Camberley, Surrey GU17 9AB
Tel: +4 4 (0)1276 60714 0 Fax: +4 4 (0)1276 607141 ww w.concre te.org.uk
CCIP publications are produced by The Concrete Society (www.concrete.org.uk) on behalf of
the Cement and Concrete Industry Publications Forum - an industry initiative to publish technical
guidance in support of concrete design and cons truction.
CCIP publications are available from the Concrete Bookshop at www.concretebookshop.com
Tel: +44 (0)700 4 607777
All advice or information from The Concrete Society is intended for those who will evaluate the significance and limitations of
its contents and take responsibility for its use and application. No liability (including that for negligence) for any loss resulting
from such advice or information is accepted byThe Concrete Society or its subcontractors, suppliers or advisors. Readers shoul
note that publications are subject to revision from time to time and should therefore ensure that they are in possession of the
latest version.
Printed by Ruscombe Printing Ltd, Reading, UK.
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/
11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 4/125
Durable post-tensioned concrete
structures
Contents
Preface
List of figures
List of tables
1 .
Introduction
1.1
General backgrou nd
1.2
Technical backgrou nd
1.2.1 Pos t-tens ione d bridges
1.2.2 Po st-ten sion ed buildings
1.3
Summary
of
progress
1.4
Summary
of key
provisions
1.4.1 Design
and
detai l ing
1.4.2 Duct
and
grou ting systems
1.4.3 Gro ut ma terials
1.4.4 Certification
of
post-tensioning operations
and
training
1.4.5 Testing
Recommendations for durable post-tensioned
concrete bridges
2.
Factors affecting durability
2.1 Corrosion
of
prestressing steel
2.2 Materials
and
components
2.3 Con struction qua lity
2.4 Expansion joi nt s
2.5 Con struction join ts
V I
vii
vii
1
1
2
2
4
4
5
6
6
7
8
9
11
13
13
14
14
14
14
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 5/125
2.6 Cracking
2.7 Duct and anchorage layout
2.8 Precast seg me ntal con struc tion and join t typ e
2.9 Proximity to sea water
2.10 Road salts, wa terp roo fing and drainage
2.11 Access for inspection and maintenance
3. Available protec tive measures
3.1 Design strategy - multi-la ye r prote ction
3.2 The struc ture as a wh ole
3.2.1 General
3.2.2 Bridge deck wa terp roo fing systems
3.2.3 Coatings
3.2.4 Drainage
3.3 Individual structu ral elements
3.4 Prestressing com po nen ts
3.4.1 Prestressing ten do ns
3.4.2 Ducts
3.4.3 Anchorage location
3.4.4 Ancho rage details
4. Grou ted bonded post-tensioned construction fo r bridges
4.1 Grou ts and gro utin g
4.2 Vents and grout injec tion
4.3 Recomm ended protec tion systems
4.3.1 Prestressing syste m
4.3.2 The deck and its elemen ts
4.3.3 Possible ad ditio na l measures for exc ep tiona l structures
5. Externa l unbonded post-tensioned cons truction for bridges
5.1 Advantages and disadvantages
5.2 Background
5.3 Struc tural design and basic performa nce re quirem ents
5.4 Available prote ctive measures
5.5 Detailing
5.6 Tendon systems
5.7 De-tension ing and replacement of external tend ons
15
15
16
16
16
16
18
18
19
19
19
20
21
21
22
22
23
25
29
3 0
30
31
31
33
34
34
35
35
35
36
37
37
38
41
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 6/125
6. Seg me ntal construction
6.1 Multi-layer protection
6.2 Anchorage location and detailing
7. Void grouting
7.1 Overview
7.2 Aims of void grouting
7.3 Condition of bridge stock and po tentia l demand
7.4 Inspection records
7.5 Grouting materials
7.6 Grouting equipment and methods
7.7 Determ ining the void characteristics
7.8 Flushing w ith water
7.9 Effect of existing defects
7.10 Specification for grouting
7.11 Trials
7.12 Quality control
8. Test me thods for grouted post-tensioned concrete bridges
8.1 Introduction
8.2 Range of tests considered
8.3 The need for testing
8.4 Test methods appropriate in particular circumstances
8.4.1 Type approval at pre-contrac t stage (duct systems, grout materials
and procedures)
8.4.2 Trial grou ting w ithin a con tract (geometry, materials and procedures)
8.4.3 Duct assembly verifica tion before main grou ting
8.4.4 Duct integrity after concreting or assembly of precast units, but
before main grouting
8.4.5 Grout stiffness test of main grouting
8.4.6 Autom ated q uality c ontrol testing of main grouting
8.4.7 Survey of existing grout conditions before regrouting
4 4
44
45
4 7
47
48
49
49
50
50
51
52
52
53
54
54
56
56
56
56
58
58
59
59
60
60
61
61
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 7/125
Recommendations fo r durable post-tensioned
concrete buildings
63
9 . Dura ble post-tensione d concrete buildings
9.1 Factors affecting durab ility
9.2 Materials and components
9.3 Con struction qua lity
9.4 Expansion joints
9.5 Construction joints
9.6 Cracking
9.7 Ducts and anchorage layouts
9.8 Proxim ity to seawater
9.9 Road salts
9.10 Access for inspection and maintenance
10 . Available protec tive measures
10.1 The structure as a whole
10.2 Individual structural elements
10.3 Prestressing components
10.3.1 Prestressing tendons
10.3.2 Ducts
10.3.3 Anchorages
11.
Grouted bonded post-tensioned construction for buildings
11.1 Grouts and grouting
11.2 Vents and grout injection
11.3 Recommended p rotection systems for buildings
11.3.1 General
11.3.2 Prestressing system
11.3.3 The slab
11.3.4 Possible addition al measures
11.4 Void grouting
11.5 Test methods for grouted post-tensioned buildings
65
65
66
66
66
66
67
67
69
69
69
70
70
70
70
70
70
71
73
73
74
74
74
75
75
75
76
76
iv
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 8/125
12. Unbon ded post-tensioned construction for buildings
12.1 Introduction
12.2 Recommended pro tection systems for buildings
12.2.1 General
12.2.2 Prestressing system
12.2.3 The slab
12.2.4 Possible additiona l measures
Recommendations for specifications for
durable post-tensioned concrete
13. Recom menda tions for specifications for duct and grouting systems for
post-tensioned tendons
13.1 Introduction
13.2 Guidance on the project specification
13.2.1 Trials
13.2.2 Grout materials
13.2.3 Ducting for bridges and other aggressive environments
13.2.4 Ducting for interna l elements of buildings
13.2.5 Vents
13.2.6 Testing
13.2.7 Grouting
14 . Contractor's quality scheme requirements
14.1 Introduction
14.2 Basic quality system elements
14.3 Product requirements
14.4 Certification
References
Appendix A. Test m ethods
A1 Leaktightness tests for duct systems
A2 Grout stiffness tests
A3 Void sensors
A4 Duct pressure sensors
A5 Autom ated quality control systems
A6 Volume of voids before regrouting
77
77
77
77
78
79
79
81
83
83
83
84
85
85
86
86
87
88
9 0
90
90
92
94
95
99
99
100
101
102
102
104
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 9/125
Preface
This Report is a revision of the second e dition of Technical Report 47, Durable post tensioned
concrete bridges®,
which was published by The Concrete Society in 2 002. The recomm endations
in the second edition have been reviewed and extended, and where new international
and European standards no w exist, now make reference to t he m . This has enabled some
simplification in the text. The most significant extension to this Report is to include
recomm endations for post-ten sioning in buildings as we ll as in bridges, where significant
experience has been gained in recent years.
The measures described are aimed at improving design, detailing, spec ifications, materials,
construction m ethods and testing for grouted post-tensioned concrete with either internal
or external tendons.
Producing this revised and updated Technical Report has been undertaken by a sm all group of
people fully aware of the current state of the art and I am particularly gra teful to Tony Jones
of Arup and AndyTruby of G ifford for th eir assistance in expanding the scope to include
buildings and I am grateful to all who have con tribute d, entirely on a volu ntary basis.
At a time when the Eurocodes are upon us, the post-tensioning industry is preparing to follow
new procedures and Standards and the relevant docum ents for design and cons truction
of post-tensioned concrete are largely in place. However, it should be remembered that
practices con tinually develop and evolve and while these new standards will improve
performance significantly, there will always be scope for further development.
I am indebted to Mark Raiss and George Somerville who masterminded the production of
the first edition ofTR47 in 1996 which formed the original basis for this Report.
G.M.Clark
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 10/125
List of figures
Figure 1 Buried anchorage at end of deck wit h an abu tme nt gallery.
Figure 2 Exposed anchorage at end of deck wit h an abu tme nt gallery.
Figure 3 Exposed external anchorage at end of deck w ith an abutm ent gallery.
Figure 4 Restressable external anchorage at end of deck w ith an abutm en t gallery.
Figure 5 Anchorage at to p blister using exposed anchor.
Figure 6 External blister and bonded face anchorages for in-situ segmentai construction .
Figure 7 Anchorage at bott om blister using buried anchor (internal tend on).
Figure 8 Top pocket anchorage. (This is NOT recommended,unless externa l protective
layers are used.)
Figure 9 Buried anchorage for stressed or dead end.
Figure 10 Exposed anchorage fo r stressed or dead end.
Figure 11 Face anchor details in in-situ segmentai construction .
Figure 12 Grout ven t details at deck surface.
Figure 13 Exposed anchorage for restressing the end of an unbonded external tendon.
Figure 14 Exposed anchorage for the dead end of an unbonded external tend on. The
deta il is also app licable for the live end where restressing is not required.
Figure 15 Top de viat orf or externa l tend on.
Figure 16 Face anchor deta ils for precast segm entai const ruc tion . Precast segmentai
construction using internal grouted tendons is NOT recommended, unless
con tinuity of the d uct is assured.
Figure 17 Comb ined face anchor and shear key details for precast segmentai constru ction.
Precast segmentai construction using internal grouted tendons is NOT
recomm ended, unless continuity of the duct is assured.
Figure 18 Live end anchor at cons truction join t adjacent to unstressed pour strip.
Figure 19 Pour strip after tend on stressing and prior to fixing reinforceme nt and casting
the concrete.
Figure 20 Dead end anchorage at construction join t.
Figure 21 Top pocket before (top) and after (bottom ) casting the concrete.
Figure 22 Edges of post- tens ione d slabs.
Figure A1 Location of spongeo meter with in the grou ting system.
Figure A2 Instrumentation w ithin the Oxford grout quality contro l system.
List of tables
Table
Test methods applicable during construction.
Table 2 Test me thods app licable during service life.
v ii
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 11/125
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 12/125
Introduction 1
1.
Introduction
The first e dition of Concrete Society Technical Report 47, Durable
post-tensioned concrete
bridges^,
published in 1996, recomm ended new standards and practices for the design
and constru ction of durable bonded post-tens ioned concrete bridges. It covered the key
elements of design, detailing, ma terials, grout ing and c ertification for in stallation. This
resulted in the lifting of the moratorium for in-situ post-tensioned construction that had
been imposed by the Department of Transport in 1992.
1.1 Gene ral background
The Concrete Society Working Party continued working to improve and update its
recommendations, particularly on test methods, while developing solutions for grouted
precast segmental construction, which was not covered in the first edition. Account was
taken of intern ationa l developments, especially those involving specifications, and close
contact maintained with similar groups in other countries and with the International
Federation for Structural C oncrete
(fib).
The Working Party incorporated the best of these
new developments into the second edition ofTR47, published in Z002 , while ensuring that
the basic principles and performance requirements were met. Although relatively few bridges
of this typ e have been b uilt in the UK in recent years, there has been significant feedback
from the use of the recommendations in practice, both nationally and internationally.
The scope of the second edition was extended to include:
external unbonded prestressing
• reme dial (void) grou ting of existing bridges
• updated information on new test methods.
The second edition included a revised Specification for duct and grouting systems, together
w ith notes for guidance. That Specification, coupled w ith the CARES certification scheme for
the supply and installation of post-tensioning systems in concrete structures, has represented
the state of the art for about 10 years. More recently, developments of international
standards have taken place and the pub lication in 2007 of revised versions of BS EN 445
(2)
,
BS EN 44 6'
3
' and BS EN 447 '
4
', which embody many of the proposals in the second edition
of TR47, have led to the need for an u pdated Technical Report.
Experience of bo th grouted and unbonded post-te nsioning in buildings, especially flat
slabs, has grown significantly in recent years and this Report has now been extended to
include recommendations for this type of use.
In addition to its use in bridges and in buildings, post-ten sioning is also used in a variety of
other types of structures, such as storage silos, tanks and other containm ent structures.
The principles described in this Report will be equally applicable to such structures, but
detailed g uidance (e.g. on the layout of tend ons and the provision of vents) is not given
because of the variety of such structures.
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 13/125
introduction
Wh ile this Technical Report is primarily concerned wit h sound principles supported by
good practice and procedures, the importance of a ttitud e and awareness is also stressed.
Since 1996 awareness has increased significantly. Grouting is an installation-sensitive
operation, requiring skill and care on the part of all concerned.
1.2 Technical background
Surveys of bridge durability have been undertaken throughout the world but it is impossible
to estimate accurately the number of post-tensioned bridges that have suffered tendon
corrosion.
1.2.1 Post-tensioned bridges
The first serious pro blem in the UK was the collapse of B ickton Meadows footbridge in
Hampshire in 1967, since when appreciation of the problem has slowly gro wn . In 1981 the
Transport Research La boratory published the results of an investigation into th e g rou ting
of 12 post-tensioned concrete bridges constructed between 1958 and 1977'
5
'. Voids were
found in the ducts of te n o f the bridges. The results were passed to the Standing Co mm ittee
on S tructural Safety*
6
' which concluded that, in structures containing a large number of
tendons, "th e risk of sufficient tendons failing by corrosion at any time to cause sudden
collapse is considered to be sma ll".
In 1980 Angel Road Bridge, No rth London was found to have wires broken due to corrosion
behind some of the anchorages. The deck was propped and has since been replaced. An
inspection of Taf Fawr Bridge, M erthy rTyd fil, South Wales in 1982<
7
' revealed severe
corrosion o f the prestress that led to the deck being replaced in 1986. In 1985 the road
bridge at Ynys-y-Gwas, West Glamorgan, South Wales collapsed due to corrosion of th e
prestress at the segmental joints'
8
'. Prestress corrosion was discovered at Folly New Bridge,
Bladon, Oxfordshire in 1988, the M1 Blackburn Road Bridge, Sheffield in 1990 and Botley
Road Flyover, Oxfordshire in 1992, all of which have been replaced. At Folly New Bridge
more than half the tendons had corroded right through, behind the anchorages.
Interest and concern grew in other countries thro ugh out the 1990s, as more cases of
corrosion became known.
In 1992, the bridge across the River Schelde in Belgium collapsed w itho ut warning as a
result of corrosion of the post-tensioning through the hinged joint of the end tie-do wn
member. O f particular interest is the Niles Channel Bridge in Florida. Built in 1983, this
1390m viaduct is of precast segmental box construction, wi th external tendons in grouted
polyethylene tubes. Investigations in 1999 showed that one 19-strand tendon had failed
close to the anchorage, which itself was heavily corroded, with no effective protection.
Failure was attr ibut ed to corrosion caused by corrosive bleeding water, and there was
general evidence of inadequate grouting . As a result, the State of Florida proposed significant
changes to the specification and to grouting operations. New recommend ations for grout,
grou ting and installation have been introduced in the USA by the Post-tensioning Institute
19
'.
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 14/125
Introduction 1
The collapse in May 2000 of a bridge in North Carolina was attributed to use of calcium
chloride in the grout used to plug tempo rary tubes through wh ich pre-tensioning de flector
struts were positioned. In 2000/01 the Mid-Bay Bridge in Florida had a major regrouting
repair contract'
10
'.
Elsewhere, presentations of UK and French experience of corrosion at a 1999 conference'
11
'
led to a review of spec ification and operations. In Germany, the Federal Ministry of Transport,
Construction and Housing has introduced Guidelines
for concrete
bridges
w ith external
tendons^.
Wh ile this focused on avoiding the use of couplers at the same cross-section,
it also banned the use of grouted tendons within the webs of box beams, but not in the
top and bo tto m slabs. The reason for this appears to be concern over reinforcem ent
congestion, which may inhibit proper comp action of the concrete and the achievement
of adequate cover. In Japan, experience of voids and corrosion in post-tens ioned bridges
led the Japan Highways Public Corporation t o ban grouted internal tendons in post-
tensioned structures; the focus tended towards the use of unbonded external tendons,
and on the de velopmen t of preformed tendons pre-grouted w ith epoxies. The Japanese
developed and introduced transparent ducts.
The UK bridges that failed had internal prestress, but previous corrosion p roblems with
external prestress had led to this method of post-tensioning not being used for a number
of years. That situation has since been reversed, and design standards now exist; see for
example Raiss'
13
'.
The Highways Agency's series of special inspections of post-tensioned bridges, under
BD 54/93'
14
' and BA 50/93'
15
' , had the purpose of determining the cond ition of th e
prestressing and the efficacy of the g rou ting. Oth er bridge owners have been slower to
respond and it is a matter of concern that problems are often found by accident, either
during dem olition of redundant bridges or when othe r work is being carried out, as reported
by Woodward'
16
'. For example, the p roblems at Blackburn Road Bridge were only discovered
during routine deck resurfacing.
In 1992 the British Cem ent Association com missioned a desk study to collate the available
information'
17
'. The general impression was that there had been few cases of serious
corrosion and that the performance in service of post-tensioned concrete bridges was
generally good. However, it should be remembered that inspection of tendons is difficult
and in some locations a lmost impossible, so past statements such as, for exam ple, in the
United States, "there is visual evidence of corrosion in less than abou t
0.1%
of bridges",
must be treated with caution. It is especially imp ortan t to recognise that the o nly sure way
to find voids in internal tendons is to drill inspection holes into the ducts.
Summary information of special inspections of over 200 post-tensioned structures on
mo torwa ys and trunk roads was collated by the Transport Research Laboratory (TRL) and
made available to the Working Party. It appeared that:
• the incidence of severe or heavy corrosion was small (approximately 2% )
I roughly 9 2% of bridges were classed as good or as having minor problems
• 4.3% required attention and 3.5% had significant defects.
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 15/125
1 Introduction
There was evidence of voids in grouted ducts but most were fairly small and had not led to
any significant d eteriora tion in the structure s. No ne of the bridges was considered unsafe
but several had significant defects.
Statistics from inspections have to be treated with caution, because the development of
prestressing and grouting te chnolog y and the types of structure have evolved and the
likelihood of poor quality may be very different for each 'family' of structure from a
different era.
It was also apparent that detailed inspection of p ost-tensioned structures was difficult.
However, the need for improved design and constru ction practices rem ained strong.
Given this general background of uncertainty it was not surprising that the Department
of Transport issued a temp orary ban on post-ten sioning for bridges in 1992'
18
' and later
developments have vindicated this a ction. On a positive note, the lifting of the ban in 1996
for all forms of post-tensioned construction (other than precast segmental construction
with internal grouted tendons) has given mo tivation to the further research and development
reported in this Report. This was confirmed by the issuing of Inte rim Advice Note16<
19
' in
1999. This was superseded in 20 02 by Interim Advice N ote 47
(20)
which referred to the
second e dition of TR47. In 2003 the Highways Agency revised their Specification for
Highway Works to include many of the recommendations of the second edition ofTR47.
1.2.2 Post-tensioned buildings
The use of bonded prestressing in buildings has grown significantly over th e last 10 years.
The work tends to be carried out by a specialist con tractor who often also takes on design
responsibility for the slab. Recently concerns over the adequacy of grouting in buildings led
to the gro uting in a number of recently com pleted post-tensioned slabs being investigated.
Significant numbers of either com pletely or partially u ngrouted ducts were found. This
led to CARES revising its po st-tensioning certifica tion scheme for buildings'
21
'. Much of
the guidance on the grouting of post-tensioned buildings refers to the second edition of
TR47.
However, as the guidance was pred om inantly related to bridges and some clearly
not relevant to buildings, this could lead to confusion and differences in interpretation of
wh at was best practice for buildings.
1.3 Summary of progress
Since the 2 002 edition of TR47 there have been several impo rtant intern ation al
developm ents. These include:
I pub lication of BS EN 445<
2
), BS EN 446<
3
' and BS EN 447(
4
', fully revised to incorporate
current best practice for grouting
• publication of BS EN 13670'
22
', the concrete e xecution standard for Europe
• publication
of fib
recommendations for grou ting in 2002<
23
'
• publication
of fib
recommendation
Durability of
post tensioning
endons
in 2006 '
24
'
• public ation of ETAC 013<
25
> giving Technical Approval Guidelines for post-te nsionin g
systems in Europe
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 16/125
Introduction 1
• publication of CW A14 646'
26
' giving requirements for installation of post-tensioning
systems in Europe
• publication of the second edition of the CARES mo del specification for post-tension ing
of slabs in buildings'
27
'
development of several pre-bagged factory-produced grouts
' preparation of a new edition of the
Na tional structural concrete specification^.
In their different ways, these activities affected the Working Party, in terms of the input to
this Technical Report. Since co mp atib ility is impo rtant, the approach ado pted has been to
refer to new specifications and guidance whenever possible, rather than to revise the Report
in isolation. This has enabled omission of some of the text which was in the second edition
ofTR47.
The principal aim of the Wo rking Party was to generate confidence in the industry's
ability, with revised procedures, to design and build durable post-tensione d concrete
structures. In pursuit of this aim the W orking Party considered the fo llow ing areas:
• design and deta iling
• duct and grou ting systems
I grout materials
• certification of post-ten sioning operations and training
• testing
:
external and unbonded co nstruc tion
• remedial grou ting of existing bridges
• new test methods
and has now added:
1
grouting in buildings
;
unbonded tendons in buildings.
1.4 Sum mary of key
provisions
This section discusses those aspects of design and detailing that affect the durability of
post-tensioned concrete bridges and buildings. Various factors affecting dur ability are
considered and the conce pt of m ulti-laye r protection is introduced. This requires the
provision of a number of protec tive measures on the basis that any individ ual layer of
protection may become ineffective but that the multi-layer approach gives adequate
assurance of protection against corrosion.
The effectiveness o f the various possible layers of protection is discussed and recomm endations
are made for a protection system for a typical road bridge in the UK. In particular,
recommended details are given for the layout and protection of anchorages.
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 17/125
1 Introduction
1.4.1 Design and detailing
Segmental construction is a com mo n and economic m ethod for prestressed concrete
bridges. The recommendations herein are considered valid for in-situ segmental construction,
since duct continuity through the j o i n t - a key performance parameter in these recommen-
dation s - can be assured. For precast segm ental construc tion, this is more difficult. The
situation is reviewed in Chapter 6, and a number of possibilities pu t forw ard; if, in a particular
case, any one of these can be shown to be equivalent to duct con tinuity, the n it may be
used. This is an area where product developm ent is continuing.
External unbonded tendons were covered in the second e dition of TR47. This method may
be used for any form of prestressed co nstruction, including both in-situ and precast
segmental construction, provided the recommendations are followed.
The recommendations for building structures follow the same general principle of a
multi-layer protection system but acknowledge that in most enclosed structures the
building fabric provides one of these layers. Emphasis is placed on ensuring that the
grouting is carried out effectively to provide the second layer of protection. For external
structures, and in particular car parks, the approach is similar to bridges albeit recognising
differences in the number of tendons and their drape.
1.4.2 Duct and grouting
systems
An inter im specification and comm entary were published by the Wo rking Party in 1993'
29
'
and the lessons learnt from their use discussed at a Concrete Society/Concrete Bridge
Development Group seminar in 1994'
30
'. The 1996 specification was based on drafts of
European Standards and othe r intern ationa l docum ents, for example the FIP Guide to
good practice
Grouting oftendons in
prestressed
concrete^
.The specification which was
in the second edition of TR47 is now deleted as it has been superseded by the publication
of British Standards BS EN 44 5« , BS EN 446<
3
>, BS EN 447(
4
> and BS EN 13670<
22
). However,
there are recommendations in this Technical Report for design aspects and for procedures
in the installation process which go beyond the British Standards.
The main differences between the specifications in the second edition of this Report and
in the first e dition were as follows:
• requirement for full-scale groutin g trials on each project relaxed
I revised specification of the properties of the grout with a new bleeding test
I clear recommen dations for plastic ducts.
These built on the innovations introduced in the first edition:
I ducts to be of electrically non-co nductive, corrosion-resistant durable material forming
a double corrosion protection system in comb ination w ith the grout
• duc t systems pressure tested
• add itional vents
• additional testing.
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 18/125
Introduction 1
The use of plastic ducts is intended to ensure that the duc t itself provides a ddition al
protection against corrosion by preventing contact between the contaminants and the
tendon. Protection is thereby given by the concrete cover to the duct, the duct itself and
the alkaline e nvironm ent of the gro ut. Pressure-testing before conc reting will check the
integrity of the d uct and is a useful check on how carefully the duct has been assembled.
Recommendations on the use of plastic ducts, and on the required properties of the
materials and co mpo nents, are given in a
fib
Technical Report'
32
'. A further advantage of
non-m etallic ducts is tha t some test m ethods reviewed by the W orking Party can 'see'
through plastic-type ducts but not through metal ducts.
For enclosed building structures it is recognised that metal ducts can still provide an
adequate and economic solution . The nature of the typical me tal ducts used in b uilding
structures means th at pressure testing is not possible. For this reason, in enclosed buildings
the duct should not be considered to give any protection.
The Working Party has considered the use of vacuum grouting w hich, at first sight, appears
to offer a complete solution to any problems of filling ducts with grout. Simply, the
technique creates a vacuum in a duct and makes grout available with some added pressure
to ge t it into the duct. Assisted by the vacuum, the duct w ill be completely
filled.
Providing
a vacuum pump (or pumps) and the associated valves etc. and operating the system is
more expensive than straightforwa rd pressure grouting . The me thod has had very lim ited
use in the UK (see, for example, Balvac W hitley Moran'
33
') althoug h it is more widely used
elsewhere in Europe. However, it has a very relevant application fo r regrouting as wi ll be
discussed. Wh ile the W orking Party has undertaken some development work on vacuum
grouting, the emphasis in this Report is on gettin g the standards and procedures right for
pressure gro uting , which w ill be used in the ma jority of cases.
1.4.3 Grout materials
Prior to 1992 it was com mo n practice in the UK and elsewhere to use general-purpose
cement for grout in combination with admixtures and water, mixed on site, and described
as 'comm on grout'. The properties of such cement are variable, particularly fro m one plant
to a nother, resulting in variab ility in the properties of the grout. In add ition, difficulties
arose due to variations in the weight of bagged cem ent; tolerances of ±2kg in 50kg bags
were not unco mm on, and outside the desired tolerance of 2% . However, tolerance on
the w eight of new 25kg bags in the UK is now ± 1% which will improve one variable.
During site application, it became apparent that it was difficult to maintain consistency and
reliability of com mon g rout under all circumstances, such as variable temperature conditions.
Consequently a Working Party sub-group developed a prepacked 'special grout' w ith more
reliable and consistent properties, though it is still subject to q uality con trol and testing. A
research project was in itiated , supported by LINK fund ing and overseen by the sub-group, to:
• develop an improved grou t with properties that consistently meet the revised specification
• dem onstrate that the grou t has adequate performance under site conditions
• investigate methods of grouting and mon itoring , including trials of the 'grout stiffness test'
• provide data that satisfy the Highways Agency that the gro ut can be used in bridge
construction.
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 19/125
1 Introduction
The results from this project were available in a draft final rep ort in May 19 96'
34
', and were
considered when for mu lating the recommend ations in the first edition of TR47. Since then,
feedback has been obtained on the use of special grouts in practice. In ad dition , results
became available fro m a major BRITE EURAM project on grouts and gro uting, including
the development of improved test methods'
35
.
Grouts meeting the performance requirements are now commercially available, some as
a combination of packaged products.
The first ed ition of TR47 included both com mon and special grouts w ith in its scope. This
was the term inolog y used in th e previous editions of the European Standards. The revised
Standards simply use the te rm 'grou t' although ETAG 013<
25
' still includes fo r special grout.
The Working Party is of the opinion tha t special grouts (mean ing in this con text a
pre-bagged product simply requiring the addition of water) should generally receive first
consideration because of the ir better and more consistent properties. Feedback indicates
that grouts mixed on site using specially controlled materials can be used successfully,
but are applicable mainly to large projects, where more trials are feasible, and safeguards
can be built in, to ensure dedicated and consistent sources of co mp atible cement and
additives, for the entire job . Prepacked special grouts shou ld be the first choice for qua lity,
to minimise variables and attendant risks but this does not exclude combinations of
controlled m aterials on the basis that the quality of the end product is the important factor.
The CARES po st-tensioning certificatio n scheme now requires the use of a pre-bagged
grout requiring only the addition of water on site. This is the approach recommended for
all grouting both in bridges and in buildings.
1.4.4 Certification of post-
tensioning operations and
training
It has been recognised that good-quality workmanship is fundamental to the production
of durable post-tensioned concrete bridges and buildings. This requires good procedures
and appropriate trainin g. In the past, grouting of ducts has sometime s been undertaken
by inadequately trained staff and the importance of good grouting has not been properly
recognised on site. There are even instances of ducts being left t otall y ungrouted . Consequently
CARES, togethe r w ith the Post-Tensioning Association, developed a Ce rtification Scheme
in consultation wi th th e Highways Agency, which is referred to in Chapter 14. Similar
schemes are used elsewhere in Europe but this was the first time such a scheme had been
developed for use in the UK.
Since 1996, CARES has made regular reports to th e W orking Party, as more companies have
become certified, and on problems experienced in pra ctice. (One bridge in particular was
closely monitored and in general the specification worked well.) Most problems have been
of a practical nature, invo lving connections, vents, gaskets and taps, and a lack of data on th e
friction characteristics of the ducts. All of these p oints have been considered, in producing
revised specifications. The CARES scheme is now com ing of age and is a positive con tributor
to improved durab ility. A revision of the scheme was made in 200 7/8 to reflect experience
of use in the interve ning years and to align it w ith European requirem ents.
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 20/125
Introduction 1
In response to the increase in post-tensioned building con struc tion, CARES has broadened
its scheme to include specific post-tensioning requirements for buildings which in some
aspects are distinctly different to highways structures . Additiona lly CARES has introduced
certification of pre-bagged grouts as this eliminates or reduces the potential problems
relating to the variability of cement and workmanship issues during grout production.
1.4.5 Testing
The fact that interna l tendons cannot be inspected visually m eans that reliance has to be
placed on indirect methods to confirm the adequacy of the corrosion protection system
emp loyed. The Working Party considered num erous tests suggested for this purpose . These
are discussed in Appendix A, although some remain at the development stage and are
unlikely to prove appropriate for rou tine use.
This Report concen trates on tests that are unique t o th e gr outing process, are of pra ctical
application, and provide information relating to quality at a stage when remedial action
remains possible. Innovative methods th at are no t likely to be widely known are fully
described.
These include a me thod based upon the stiffness of gro ut developed by the
Wo rking Party before the first edition of TR47. Pressure is applied to the g rout before it has
hardened, and analysis of the 'spongy' response enables accurate c alculation of th e to ta l
volume of trappe d gas. The technique was first investigated with in a num ber of research
projects, inc luding site trial, and was known as the 'Belmec Spongeometer' - see Darby'
36
'.
It was further developed and incorporated in a device that provided immediate results
together with computer records of variables influencing grouting quality. Unfortunately at
the time of writing it is understood that despite considerable efforts to promote its use,
the e quipm ent has not been taken up and has now been scrapped.
For external tend ons, inspection and testing are som ewh at easier because the tendons
are norm ally accessible. This does of course require a regular programme of inspection t o
be follow ed after construction and in service, in order to reap the benefit.
BS EN 445<
2
>, BS EN 446<
3
> and BS EN 447<
4
' state a minim um mandatory level of testing.
This may be associated with the required p roperties of th e gro ut, where specific tests are
given. There may also be testing associated wit h the duct system, where stron g reliance is
now placed on the standardised approval system developed by //£>
(32)
. In this conte xt, a
site-specific d uct assembly verification tes t is also recom mend ed and possible add itional
tests are described which may be considered in certain circumstances. Both of these relate
to measurements of the degree of sealing provided by the duct system but, at this time,
pending furth er developm ent and experience of use, neither is included in the Standards.
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 21/125
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 22/125
Technical Report No. 72
Durable post-tensioned concrete structures
Recommendations for durable
post-tensioned concrete bridges
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 23/125
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 24/125
Factors affecting durab ility 2
2. Factors affecting durability
In broad terms, deterioration mechanisms that can affect structural concrete may be
classified as those that directly attack the concrete and those that directly or indirectly
attack the reinforcement or prestressing components.
Attack of the concrete is not covered in this Report. However, sulfate attack and alkali-silica
reaction are now well un derstood and guidance is available - see for examp le BRE Special
Digest
1
(37)
and Concrete Society Technical Report 30 , Alkali silica
reaction:
minimising the risk
of
damage
to concrete^.
Proven solutions are established to deal w ith different intensities
of the various m echanisms, mo stly in ma terial specification terms.
A major hazard for bridges is corrosion of the prestressing steel, and this is the prime
concern of this chapter.
2.1 Corrosion of
prestressing s teel
Corrosion may result from:
• chlorides in the ingredients in the concrete (or grout)
• carbonation of the concrete, resulting in reduced alkalinity in the concrete
• external chlorides pene trating to the steel, from sources such as de-icing salts or seawater.
Of these, strict limits have been placed on chlorides in the concrete (or grout) in codes
and standards for more than 20 years. Carbonation can be a hazard for buildings, but the
dom inant factor for bridges and car parks is undoubtedly external chlorides.
It follows tha t, in developing a design strategy, the nature and intensity of the aggressive
actions - and how they m ight penetrate to the steel - is of fundam ental im portan ce. This
applies b oth to concep tual design and to the evolution of design details. The transport
mechanisms for chlorides are much influenced by the combined effects of wind, water and
temperature, in both ambient and micro-climate terms. Resisting these influences requires
an integrated approach, involving design concept, detailing, construction quality and
ma terial selection. The impor tance of integrating these aspects canno t be overemphasised.
The purpose of this chapter is to identify the key factors tha t affect dura bility, based on
feedback from performance in service. The main focus is on the performance of bridges
and buildings as a who le. The factors considered are:
• materials and comp onents
• expansion joints
• construction quality
• construction joints
• cracking
• duct and anchorage layout
• precast segmen tal con struction and jo in t details
• proxim ity to seawater
• road salts, wa terpro ofing and drainage
• access for inspection and maintenance .
13
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 25/125
Factors affecting durability
2.2 M aterials and
components
The quality of materials and components is of great importance, and therefore the
derivation of good specifications is crucial. This should be done w ith a clear idea of
performance requirements, and of a methodology that will ensure that the chosen items
do in fact comply.
2.3 Co nstruction q ual i ty
Poor workmanship and construction defects are m ajor issues, which strongly influence the
level of du rability a ctually achieved. A good exam ple of this, in the past, was ineffective
grouting for post-tensioned work. However, the issue is wider than that, ranging from
poor com paction and failure to achieve specified covers to cases where joints are poorly
made (either in the structural elements themselves or in fitting together the various pieces
of hardware involved in prestressing operations). Substantial loads and forces are involved
in casting and stressing prestressed concrete structures - often involving large pressures and
strains. There is therefore a design element involved in ensuring that temporary conditions
during co nstruction are properly considered, and in deriving details tha t e nable m aterials
and components to be fitted toge ther on site.
2.4 Expansion join ts
A high propo rtion of expansion joints leak and their effectiveness and life span are very
dependent on the quality of installation and maintenance. The Highways Agency has
produced a Departme ntal Standard on the requirements fo r expansion join ts, BD 33/94<
39
>,
and a Departmental Standard and Advice Note on
Design for
durability,
BD 57/1 and
BA 57/01
(40
'. These docum ents encourage the use of continuou s bridge decks and integral
abu tmen ts wherever possible, to elimina te expansion joints and hence reduce the risk of
contam inants reaching sensitive parts of the structure .
Where expansion joints are used, provision should be made for inspecting the m and the
structure underneath, and the details should be based on the assumption that joints will
leak and will n ot provide prote ction against ingress of water and road salts. Appropriate
drainage paths for the leakage should be provided w hich ensure that it can not get access
to the prestress anchorages or bearings and that the w ater is not allowed to pond. This is
especially imp ortan t if intermed iate joints have to be located over piers, in ensuring that
drainage paths are kept clear of anchorages, because here it is often difficult to provide
an inspection gallery.
2.5 C onstruct ion joints
Well-made construction joints should not leak, particularly when protected by water-
proofing membranes. However, waterproofing membranes often do no t provide a complete
seal, and do no t last indefinitely, and join ts leak. It is therefore advisable to keep construction
joints in deck slabs away from anchorages and prevent, by means of drips, any access for
the leakage to reach the anchorages. If possible, joints in ducts should also be kept away
from construction joints. In sequential or segmental construction, where the prestressing
anchorages are inevitably located at constru ction joint s, care should be taken in detailing.
14
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 26/125
Factors affecting durability
Emphasis should be given to not creating planes of weakness, which permit easy access
to water (in the form of spray, runoff or ponding) that acts as a transport mechanism for
contaminants, and to detailing protection for the anchorages and preventing ingress of
water. Provision for ease of inspection is also imp orta nt.
2.6 Cracking
Cracking in concrete can occur for a number of reasons - see Concrete Society Technical
Report 22,
Non-structural
cracks
in concrete^.
Its relevance to durab ility is largely related to
corrosion,
and depends on the type and m agnitude of the cracks - see Concrete Society
Technical Report 44 ,
The relevance o f cracking in concrete to corrosion ofreinforcement^.
Care is required, when considering the layout and sequencing of concrete pours and
prestressing, to minim ise the risks of cracking, particula rly near anchorages. App lying a low
initial prestress at an early age can help counteract early-age cracking. The reinforcem ent
provided in the direction of the prestress is usually much less than that used in reinforced
concrete bridges and should be checked for adequate distribution of cracking in accordance
wit h BD 28/87<
43
) or the relevant part of BS EN 1992<
44
>.
Cracks parallel to and aligned w ith th e ducts can occur - due, for instance, to transverse
bending in reinforced sections, or to thermal effects at significant changes in cross-section
- a n d may require consideration, as potential planes of weakness similar to the joints
referred to in Sections 2.4 and 2.5. Such cracks may be limited either by design of
reinforcement or by the introd uction of an extra layer of protection into the m ulti-layer
prote ction system. Cracks at righ t angles to ducts are less likely to be critical, in terms of
affecting the integrity and durability of the ducts, provided that their widths are limited in
accordance wit h norm al design practice.
2.7 Duct and anchorage
layout
The method and form of co nstruction should be considered at the preliminary design stage.
They will often significantly affect the layout of prestressing tendons and the location of
anchorages. For examp le, the layout of tendons for span-by-span construction w ill be
different to that for structures cast in one pour. The significance for durability of tendon
profiles and anchor locations should also be considered at an early stage. The tendon
profile and duct size affect the ease of grouting. Anchorage location influences the ease of
stressing and subsequen t inspection , as we ll as suscep tibility to wa ter ingress. For example,
anchorages in top pockets in the deck have often been used in span-by-span construction.
They are easy to construct, stress and subsequently
fill,
but the re is a concern tha t, due to
their shape and location, they may provide a path for contaminants to the prestressing
tendons. Anchorage layouts are especially imp orta nt for externa l prestressing systems, as
is the d etailing of ducts w here they pass throu gh deflectors and diaphragms.
15
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 27/125
Factors affecting durability
2.8 Precast segmental
construct ion and joi nt type
Segmental constru ction is considered separately in Chapter 6, since p articular care is
needed; only genera l aspects are considered here. The only tw o bridge collapses in the UK
due to tendon corrosion have been in segmental structures. Both had precast segments w ith
thin mortar joints and incompletely grouted ducts. When considering the risks associated
with segmental construction, it is impo rtant to understand the significance of the different
types of joint. Those in previous use may be subdivided as follows:
• thin mortar joints
• wider, in-situ concrete join ts
u
match-cast join ts - epoxy or dry.
Sufficiently wide in-situ concrete joints, and match-cast joints properly sealed with epoxy
resin,
can be satisfactory in durab ility term s. The m ain durab ility problems have been with
thin mortar joints. Difficulties in forming these have led to the joint material being highly
permeable, and they should not be used. Special consideration has also to be given to the
con tinuity of the ducts across the joints. The Wo rking Party believes that duct con tinuity
across the joints is vital when grouted tendons are used unless some o ther protective
systems are proven. Research at the University of Texas at Austin on behalf of the Texas
Department of Transportation supports this in concluding that epoxy joints can still be
subject to pene tration and allow corrosion if not form ed perfectly; see Salas eta/.'
45
'.
2.9 Proximity to seawater
Structures in coastal areas and over the sea are at risk due to corrosion induced by splash
or spray of wind -borne chlorides. This is true of all forms of constru ction: in such situations
structures need greater corrosion protection.
2.10 Road sa lts,
waterproofing and drainage
Road salts are applied to most UK road bridges in the w inter; on some structures in the UK,
and many in other c ountries, road salts are not used. Chloride-induced corrosion is one of
the major concerns in concrete bridges, but where the structure is not subject to road salts
or wind-bor ne chlorides, and it is clear that road salts wil l not be applied in future, it may
be possible to reduce some of the layers of pro tection described in the fo llow ing chapters.
Attention to detail in the design and application of bridge deck waterproofing systems
and drainage systems is vital. This applies to car parks and to bridges of all types.
2.11 Access for inspec tion
and maintenance
One of the main concerns abo ut internal prestressing systems is the inab ility to inspect
the tendons visually. However, it should be remembered tha t e xternal prestress can
usually only be inspected in the stra ight sections between anchorages and deviators and
then on ly if it is not enclosed in a grouted duc t, although tap ping of externa l ducts can be
helpful in detec ting voids. Enclosure of extern al prestress within a duct w ith holes for
inspection using an endoscope is possible. The concern is tha t, if the tend ons cannot be
inspected, corrosion may proceed undetected and lead to collapse without warning.
1 6
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 28/125
Factors affecting durab ility
However, one of the advantages of internal prestress is tha t the concrete itself forms one
of the layers of p rote ction . Althoug h it is not possible to see the tendons, the use of
non-metallic ducts can facilitate inspection using radar and other non-destructive
techniques. Radiography can be used to inspect tendons with in me tal ducts bu t it is less
convenient than radar and has safety imp lications.
Access for inspection and maintenance should be regarded as an essential element in the
mu lti-layer prote ction strategy, and should always be provided. The use of and guidance
on integral bridges (BD 57/01 and BA 57/01,
Design for durability^)
has not yet really
addressed the ap plication of post-tensioning but design details should still apply in principle.
In particular, inspection galleries should be provided, so that anchorages (and their
protective systems) can be inspected; provision is also required at or near key locations
such as deviators and joints. Further research is necessary for post-tensioned integral
bridges. These key elements should feature strong ly in any inspection checklist, togeth er
with checks on changes in moisture conditions, caused, say, by failed expansion joints or
blocked drains. M aintaining the exposure con dition assumed in design is an im porta nt
element in management and maintenance.
17
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 29/125
Available protective measures
3. Available protective measures
For the purpose of d efining the standards and practices in this Report, the con cept of
mu lti-layer prote ction has been introdu ced. This has been used for ground anchorages
and requires the provision of a number of protective measures, on the basis that the to ta l
integrity of one layer will maintain the integrity of the whole even if another of the layers
of protection becomes partially ineffective.
3.1 Design strategy - m u lt i-
layer protection
The factors that mig ht require consideration (see BD 57/01 and BA 57/01,
Design for
durability
1
'
40
' ) w i l l inc lude:
: the location o f the bridge, and the associated general and local exposure cond itions
the provision of continuity, possibly in the form of integral bridges
• access for insp ection, testing, maintenance, and possible replacement of shor t-life
elements
the type of cross-section, and its shape, particularly at its boundaries
i the me thod of constru ction, wit h its associated buildability and workm anship factors.
I the deck waterp roofing system
I the p rovision of e ffective drainage and avoiding ingress of water.
Procedures for the design of individual elements are available, for example BS 5400'
46
' (which
was effectively with dra wn in April 201 0), BD 24/92<
47
>, BS EN 1992-2<
44
> (implemented by
IAN 123/10'
48
') and CIRIA C543<
49
>. These con trol o ther imp orta nt dura bility issues, such as
the quality of the concrete and the thickness of the cover to the ducts and reinforcement;
they also draw atten tion to important features such as time-dependent movem ent and
deform ation at different times, both during cons truction and in service. Associated w ith th is
are other relevant m atters, n ot norma lly covered in design codes, such as the avoidance
of poor details that are known not to work well in practice.
Finally, there is the pro tection o f the prestressing hardware itself. This involves consideration of:
• fi l ling the ducts wit h cement grout
• corrosion-resistant duct mate rial
..] ducts designed to exclude con tamina nts
• location , deta iling and protec tion of anchorages.
A full treatme nt of all the above factors is beyond the scope of this Report but those most
directly related to post-tensioned construction are reviewed prior to developing the core
quality recommendations. The Working Party believes that the concept of multi-layer
protection is the right approach, but it is important to maintain a reasonable perspective.
Experience and judg em ent are needed to suit each set of circumstances and it w ould not
be appropriate to recommend a fixed number of layers of p rotection. As an example, if any
one of the protective measures could be guaranteed to totally exclude all contaminants,
no other layers would be necessary.
18
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 30/125
Available protective measures
Conversely, if any one of the proposed layers was found to be ineffective, it should not be
considered a suitable layer of pro tectio n. The easy design option is to use every conceivable
protective measure available: the skill in dur ability design is to choose the mo st cost-
effective measures to suit the particular situation, while ensuring integrity and durability.
The designer should consider the risk of corrosion, the life span of the various layers of
protection, the opportunities for inspection and the possibility of maintenance, together
with the integrity and life span of the structure.
3.2 The struc ture as a
whole
There is much that can be done, both quantitatively and qualitatively, to tackle the major
threat of corrosion due to chlorides.
3.2.1 General
The source of chlorides can be either de-icing salts or seawater. To reach the bridge, chloride
transpo rt mechanisms are required. In general climatic terms, this involves a co mb ination
of water and wind. In local exposure terms , water in the for m of vapour, spray, driven rain,
runoff or ponding can interact w ith th e o uter surfaces. The effect of this inte ractio n can
be exacerbated by the influence of tem pera ture, causing joints t o open or cracks to for m.
Designers therefore need to carefully consider the location of the bridge, wh at local
conditions can form, and how these interact with the outer surfaces. A prime concern is
to minimise the uptake of water, and to g et rid of any water th at does reach the bridge as
quickly as possible. This involves a com bina tion of conceptual design, struc tural detailing
and atte ntio n to bridge 'finishings', such as drainage, wate rproofing and surfacing.
In extreme situations, there may be a case for controlling local conditions with external
barriers. There is certainly a case for looking carefully at b oth the profile and tex ture of the
outer surfaces. Movement, particularly longitudinal, should be considered. Continuous or
integral bridges can prevent moisture reaching sensitive areas such as anchorage zones. If
an articulation system is used, then jo ints have to be carefully designed and de tailed, with
provision made to quickly remove water which will inevitably leak through.
Wh ile estimates can be made of the likely climatic conditions, and the effects of temperatu re
assessed in terms of stress and deformation, effective design and detailing are largely
qualitative, based on experience and feedback. A further essential element, at th e conceptua l
stage, is to make positive plans for inspection , maintenance and the replacem ent o f
elements w ith a short service life.
3.2.2 Bridge deck
waterproofing systems
The waterp roofing system is the first line of defence against ingress of road salts app lied from
the bridge road surface. Un fortun ately the re are no systems available that can be guaranteed
to remain waterproof through out th e life of a bridge. It is understood that modern high-
quality liquid-applied membranes are likely to be more effective than earlier systems.
19
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 31/125
Available protective measures
These membranes can be applied in either one or tw o coats; however applied, they should
be proved using 'pin- hole' detection equipm ent, w hich w ill give reasonable assurance of
the integrity ofthe membrane. Careful preparation ofthe concrete surface and application
of the membrane are im portan t, and checks should be carried out for adhesion and thickness.
Current standards are given in BD 47/99 and BA 47/99'
50
'. The Highways Agency's
Specification
for Highway Works^
requires all proprietary materials for waterproofing
systems to have a current British Board of Agrement (BBA) Road and Bridges Certificate
and for the permitted waterproofing system (PWS) to be registered.
3.2.3 Coatings
The use of surface treatm ents on concrete can provide a protective barrier against
aggressive agents. Detailed guidance is given in Concrete Society Technical Report 50,
Guide o surface treatments for protection a nd enhancement of concrete^.
In selecting a
surface treatment, whole-life performance should be taken into account as the costs of
app lication, m aintenance, expected life and possible reapplication can be significant.
Surface coatings
There are many surface coating materials available including polymer-modified cementitious
coatings, synthetic rubbers and bituminous materials.
Pore-lining penetrants
Pore-lining penetrants are low-viscosity materials that impregnate the pore structure of
the concrete and interact, sometimes chem ically, w ith the internal concrete surfaces. They
confer water-repellency to concrete. As the pores and capillaries within the concrete remain
open they do not act as effective barriers against the diffusion of gases (e.g. oxygen and
carbon dioxide) or the transmission of water vapour.
Pore-blocking sealants
Pore-blocking systems consist of materials that either react with concrete to form pore-
blocking produ cts or physically block the pores wit ho ut reacting with concrete. These
materials do not prevent water penetration and chemical attack but the rate at which
they occur is reduced. They do no t prov ide an effec tive barrier against very aggressive salt
solutions. They may sometimes be used in combination with inorganic coatings but this
should be checked with the suppliers of both materials.
Non-reactive pore-blocking materials rely on sufficient solids being carried into the concrete
to effectively block the pores and capillaries. Depending upon the porosity of the concrete
and the n umbe r of a pplications th at are acceptable, a balance is required between the
viscosity of the treatment and its related solids content. Solvented systems usually contain
enough solids for a tw o- or three-c oat application to be used to seal average-qua lity
concrete. Some low-solids wa terbom e products may also be used as sealers. The solids
are dispersed as fine particles rather tha n in solu tion and the effectiveness of even very
low viscosity produ cts may be limited if the particles are large in relation to the pore size.
2 0
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 32/125
Available protective measures
In-surface sealing can be achieved w ith solvent-free systems. How ever, even with the
lowest viscosities available, the depth of penetration is likely to be very lim ited unless a
vacuum-assisted application tec hnique is used.
3.2.4 Drainage
It is essential tha t the drainage system sho uld work efficiently to remove water from the
road surface as we ll as the w ater th at passes through the surfacing dow n to the bridge
deck waterpro ofing system . The details of the drainage paths should be such that if items
of the equipment fail, leak or becom e blocked, then th e wa ter does no t find access to th e
prestressing system. BD 57/01 and BA 57/01'
40
' give advice on drainage systems, and on
dealing with th e passage of water at boundaries and at supports.
3.3 Individual structural
elements
Many of the com ments in Section 3.2 apply equally to individual structural elements in terms
of concrete profiling, texture , and articulation . However, additiona l features arise from the
structural design of the elements themselves, as contained in Codes and other authoritative
guidance docume nts. M ostly, these relate to stress levels, and the con trol of cracking,
both at early ages and in service due to the influence of loads, creep and tem perature . In
ma terial specification terms, there is also the basic pro tective layer of an adequate cover
to the steel in a good-qu ality concrete.
BS 540 0: Part 4<
46
' (which was effectively w ithdraw n in April 201 0), BS EN 1992-2<
44
> and
BS 8500<
53
' give recommendations for minimum concrete strength and cover for post-
tensioned concrete bridges, and the Specification
for H ighway Works^
gives a concrete
specification wh ich, together with the specified cover and good -quality construction, will
give a reasonably dense, imperm eable concrete protec tion to the ducts. This guidance is
augmented by BD 57/01 and BA 57/01'
40
', which include requirements for increasing
cover by 10mm . In norma l circumstances there is no reason to believe that concrete
designed and con structed in accordance with current standards and specifications does
not provide adequate p rotec tion to the ten don . However, feedback from service (see for
example Wallbank'
54
') has demon strated th at the specified cover is not always achieved
in practice; good q uality con trol is essential.
As w ith all concrete structures, it is possible in special circumstances to improve th e
concrete protection by increasing the cover or reducing the permeability of the concrete
(see for example Hobbs'
55
'). However, increasing cover often requires increased section
thickness and increased prestress adding ove rall weight and cost to the structure. Reducing
the permeability of the concrete is possible by reducing the wa ter/cem ent ratio or by cement
replacement w ith fly ash (pulverised fu el ash, pfa) or grou nd granulated blastfurnace slag
(ggbs). Cement replacement can also have other benefits such as reducing the heat of
hydration (and consequent cracking) and improving the workability and finish, although
some concerns have been reported in Belgium and France about the interaction of high
slag cements and high-ten sile steel. However, the W orking Party is not aware of any
specific cases of such problems.
21
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 33/125
Available protective measures
3.4 Prestressing
components
In simple terms, the essential elements of prestressing comp onents are:
: I the prestressing tendons
• the ducts, containing the tendons
• the anchorage system
I the overall protective system.
It is possible to consider the tendons and ducts in a general way. Ducts wil l differ depending
on whether bonded or unbonded construc tion is used. The primary p rotective system for
bonded constru ction is the cem ent-based grou t. For external unbonded constru ction, a
wider range of protective systems is available; the anchorage m ethods may also be different,
and there is the furthe r need to consider special features such as deviators and couplers.
3.4.1 Prestressing tendons
Prestressing tendons have developed significantly since the 1950s with ma jor improvements
in technolog y and increasing ab ility to provide larger, more con centrate d forces, while
adjusting to the variety of construction methods that have been introduced. To some
extent, the type of tendon still relates to the individual prestressing system, but the
designer can rely on the characteristics and mechanical properties specified in national
and intern ationa l Standards; this is funda me ntal to structu ral design, and not especially
the concern of this Report.
A nu mber of steel strand types are available; these norm ally consist o f seven wires. The
diameter of the strand, its compactness, strength and metallurgical properties may all vary.
Strand can be made w ith a bu ilt-in prote ction layer. This may be a physical layer such as
galvanising or epoxy coa ting or an add itional means of inspection such as 'intelligen t strand':
in this a fibre-op tic sensor is passed throu gh th e centre wire of the strand and can be
used to m on itor strains and breakages in the strand . The effectiveness of these special
inspection and mo nitor ing facilities needs to be carefully considered.
Of particular concern in the past has been the suscep tibility of some types of strand to
hydrogen embrittlement/stress corrosion cracking (HE/SCC). It is understood that strand
manu factured to BS 5896<
56
), prEN 10138<
57
> or ASTM A416/A416M<
58
) and adequately
protected with grout/grease is not likely to be subject to HE/SCC. Where there is a risk
that such protection cannot be provided orgreater confidence that HE/SCC will not occur
then the specification for strand should require that it is tested in accordance with the
procedure given in BS EN ISO 1 563 0-3'
59
'. Acceptance criteria are given in the
fib
report
Stress corrosion cracking resistance test or prestressing tendons^.
There have also been concerns abou t the effectiveness of epoxy coa ting, particularly for
reinforcement. Any small defect in the coating can increase the likelihood of local corrosion.
Pinhole detection techniques have improved with new manufacturing processes. However,
it is not clear whe ther the risk can be completely discounted as damage to coating can
also occur during insta llation.
2 2
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 34/125
Available protective measures
'Intelligent s trand ' may prove useful and has been tried on a bridge in the UK. However,
as it is still being investigated, it cannot be recommended ye t for w idespread use u ntil
satisfactory results are confirm ed.
3 . 4 . 2 D l J C t S During the development of post-tensioning systems, several me thods have been used to form
ducts. For straight tend ons, formers have sometimes been used which are subsequently
removed, leaving un lined ducts. Lined ducts have norm ally been forme d using welded or
spirally wou nd steel tube a lthoug h cardboard tube has occasionally been used - see
Woodward and Williams'
8
'. Unlined and biodegradable ducts such as cardboard tubes
should no t be used. The advantages of spirally wound tubes are tha t the y are flexible and
can be bent on site to the required pro file.
More recently, non-me tallic ducts have been used. These are made of high-density p oly-
ethylene (HDPE), now known as PE80, or po lypropylene, and have a number of advantages:
corrosion-resistance
11 better sealing against ingress of contaminants
• can be pressure-tested during construction to dem onstrate integ rity
I more po tentia l to be 'seen thro ugh ' by some non-de structive testin g techniques.
If the du ct is to be used as one of the protective layers in the system, it should not itself
be subject to corrosion, which would make the protection ineffective. The m ain advantage
of non-metallic ducts is that they can form a sealed system around the tendon and
minimise the risk of conta mina nts reaching the tendo n. The advantage of being able to
penetrate non -me tallic ducts w ith testing techniques rema ins to be proved. The methods
currently available have limitations and only provide partial information about conditions
within the duct. However, with further development, more detailed detection of voids
and corrosion m ay be possible.
The Highways Agency revised g routing specification for bridges requires the use of co rrosion-
resistant ducts which for interna l tendons are bonded to the surround ing concrete. The
ducts should be pressure-tested before concreting to verify the assembly. A suitable test
metho d is described in the
fib
Technical Report Corrugated
plastic
ducts
for internal
bonded
post-tensioningW
and in Section A1 in Appendix A. Walls thicker than a min imum are used
to allow for the effect of the stressed tendon 'biting' into the duct wall.
The use of n on-m etallic ducts requires a reassessment of som e of the properties of ducts
and their effects on the w hole protection system. The main properties of the m aterials
currently used for non-m etallic ducts may be compared with those for steel ducts. Non -
metallic ducts:
• do not corrode
• effective ly resist the passage of chloride ions
•
I do not conduct electricity
3 have a high coefficient of ther ma l expansion (typically 140 x 10~
6
/°C)
• have a low Young's mod ulus (typically 800M Pa).
23
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 35/125
Available protective measures
Although there are few examples of ducts corroding from the outside, the fact that a
non-metallic duct material cannot corrode is obviously an advantage. Ducts that corrode
do not provide a physical barrier between any contam inants and the tend on. Ingress of
chloride ions through the duct ma terial is theore tically possible, but is not likely given the
thickness of the mate rial. It is interesting to note tha t HDPE is used as the o uter skin of
marine electricity cables, wh ich have to be protected against chloride ingress.
Another issue to be considered is the risk of stray current corrosion. Overhead alternating-
current power systems can induce voltages and currents in nearby me tal objects, and, if
not co ntrolled, can generate harm ful potentials on exposed conductors. Third -rail DC power
systems can leak currents into the ground, which attempt to return to the power supply
via the lowest impedance route; if n ot co ntrolled, the resu lting stray currents can cause
accelerated corrosion of prestressing tendons at the point w here the current exits the
tendons. Adjacent to AC power lines, conductive paths should not exceed 500m - we ll
beyond the longest post-tensioning system tendon. N orma lly the principal control measure
is to ensure that the tendon s and anchorages are electrically isolated. This needs particular
care and is probably only tot ally reliable with plastic encapsulation of anchorages. The use
of plastic ducts, together with a nom inal concrete cover of 45m m round all metal parts of
the anchorages, may be sufficient to achieve this. If it is necessary to expose metal parts
at either or both ends of the tendons, then the tendon system should be earthed at one
end only.
The coefficient of ther ma l expansion o f steel and of concrete are similar and consequently
changes in temp erature do not cause significant relative strains. However, this is not true
for no n-m etallic ducts, which have a high coefficient of the rma l expansion. Concerns
have been raised that an increase in tempera ture, say during hydration of the concrete,
could cause a non-m etallic duct to expand m ore than the concrete. A situatio n may arise
where the duct expands while the concrete is plastic and contracts after the concrete has
hardened, leaving a gap arou nd the duct. This has no t been observed in g routing trials,
presumably because the early gain in strength of the concrete can p artly restrain the
expansion of the d uct; the effects have been shown to be minim al and this is thoug ht t o
be purely a theo retical prob lem. This observation has been confirme d by Kollegger'
61
'.
It is also true tha t, under gro uting pressure, the duct wo uld expand again into any gap.
Full-scale trials have shown the importance o f the surrounding concrete in providing
restraint to plastic ducts, especially in maintaining the integrity of the joints between
duct lengths. This integrity has, of course, to be maintained while concrete is being placed,
so the ducts themselves and the ir support system should be robust during casting.
One claimed advantage for non-m etallic ducts is their a bility to fo rm a sealed system to the
tendon tha t w ill exclude contaminants from the duct. While it would be possible to design
such a duct system, currently available ducts cann ot be assumed to be guaranteed sealed
and fully w ater tight. The pressure-test acceptance criteria are related to wh at is possible
using the currently available non-metallic ducts and demonstrate that the duct has been
properly assembled. Tests by the W orking Party show th at the acceptance criteria specified
will not guarantee a full barrier to the ingress of contaminants at the joints in the duct.
2 4
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 36/125
Available protective measures
Difficulties were experienced wit h joints between lengths of duct, and w ith seals between
the ducts and anchorages, and also with ven ting tubes. It is for this reason that mu lti-layer
prote ction is required. It is hoped tha t fully sealed ductin g systems wil l be developed in due
course, in which case acceptance criteria wo uld be much tighter than currently specified;
on the other hand, less dependence on multi-layer protection would then be required.
The developme nt of prestressing systems based on n on-m etallic ducts is still at a
comp aratively early stage, especially for bonded co nstruction . Much w ork has been done
on the properties of the basic m aterials, but the design and ma nufacture of plastic ducts
varies between suppliers. Based on all available inform ation ,
the fib
Technical Report
Corrugated plastic ducts
for internal
bonded
post-tensioning
{32)
distinguishes between ducts
for external unbonded construction and bonded construction, but the emphasis is on
defining performance requirements for bonded tendons and on test methods to ensure
these are met. This is the basis of this Report and for a systems approval approach, which
is becoming the norm.
The duct should be large enough both to allow threading of the prestressing tendon and
to fa cilitate gro uting. The diameter depends on the size of the tend on, and the overall
length and curvature of the duct. Norm ally a maximum tendon -to-duct area ratio of
0.40 to 0.45 should be used, increasing with te ndo n size. The ten do n-to -du ct area ratio
is defined as the area of the strand, based on its a ctual steel area, divided by the interna l
cross-sectional area of the d uct. For short tendons w ith little change in direction, the
tendon-to-duct area ratio can be increased provided that grouting trials show that the
duct can be satisfactorily grouted.
3.4.3 Anchorage location
Feedback from inspections clearly demonstrates tha t the ingress of con tamina nts is most
common at anchorages, with corrosion being initiated in the tendon immediately behind
the anchorage (often in the presence of imperfect grouting). Therefore, it is very important
tha t a tten tion is given to the location of anchorages and to detailing to prevent access of
water t o the d ucts. Anchorage systems vary with tendo n type and supplier. The guidance
in this chapter relates to anchorages for interna l grouted tendons and external unbonded
systems. In both cases, the W orking Party considered the subject to be so imp orta nt tha t
illustrations are given of preferred solutions (see below).
The layout of the prestressing tendons and the location of anchorages are dependent on the
method of construction. In the case of a simply supported beam cast in situ the anchorages
wo uld norm ally be at the ends of the beam (Figures 1-4), but there are many form s of
construction that require anchorages at different locations. These may be broadly sub-
divided as follow s:
• dead-end anchorages with in the body of the concrete
I anchorages in blisters with in the span, either inside a box girder or below the slab in a
beam-and-slab deck (see Figures 5-7)
anchorages in pockets in the top surface of the deck (see Figure 8)
• face anchorages on the join t betwe en segments in span-by-span, in-situ or precast
segmental construction.
25
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 37/125
Available protective measures
Figure 1
Buried anchorage at end of deck with an
abutment gallery.
F igure 2
Exposed anchorage at end of deck with an
abutment gallery.
The deck overhang must be free from
cons truct ion joints as they co uld leak,
al lowing water to reach the anchorage
L iqu id ap p l i ed— '
wa te rp roo f i ng
membrane
Expansion joint
•
n
Min.
8 0 0 m m
Min 1500mm
preferab ly > 1800m m
^Abutment dra inage
channel
The deck overhang must be free fr om
constru ct ion jo in ts as they co u ld leak,
a l lowing water to reach the anchorage
Liquid applied
waterproofing
membrane
Expansion join t
Min 1500mm
preferably > 1800m m
Abutment drainage
channel
Figure 3
Exposed external anchorage at end of deck
with an abutment gallery.
Figure 4
Restressable external anchorage at end of
deck with an abutm ent gallery.
The deck overhang mu st be free fro m
construction joints as they could leak,
allowing water to reach the anchorage
Expansion join t
Space for stressing
M i n 8 0 0 m m
Min 1500mm
preferably > 1800mm
v
Abutment drainage
channel
The deck overhang must be free fr om
construction joints as they could leak,
a llowing water to reach the anchorage Expansion jo in t
Min 1500mm
preferably
> 1800mm
Abutm ent drainage
channel
2 6
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 38/125
Available protective measures
Liquid applied
waterproofing
membrane
Min.500mm
-
Construction join t
Note: Anchorage end cap
fitted with grout during
tendon grouting operation
Drip
to
prevent seepage
through construction joint
from reaching anchors
Liquid applied
waterproofing
membrane
Grout injection
hole/vent
in
anchorage
Figure
5
Anchorage
at
top blister using exposed
anchor.
Figure
6
External blister an d bonded face anchorages
for in-situ segmental construction.
Liquid applied
waterproofing
membrane
Construction Joint .
Min.
500mm
Restressable
anchor
Figure 7
Anchorage
at
bo ttom blister using buried
anchor (internal tendon).
Liquid applied waterproofing membrane
(Note:
Membrane
may be omitted
if not in a vulnerable position)
Anchorage
end cap
Concrete cast
after stressing
and grouting
27
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 39/125
Available protective measures
Min 500mm
Liquid applied w aterproofing membrane
double thickness required over pocket
(Note: Second complete layer covers
patch first a yer)
Sealant at
construction
joint
Pocket filled w ith
non-shrink flow able
capping concrete
to BD 27/86 item 4
Reinforcement lapped with
starters from main member
Drain pipe or other de tail to ensure
pocket kept free from water and
contaminants during construction
Figure 8
Top pocket anchorage.
(This is NOT recomm ended, unless external
protec tive layers are used.)
Wherever anchorages are located the designer should ensure that an adequate multi-
layer pro tection system is provided.
There has been much discussion within the W orking Party and elsewhere on the merits of
anchorages in pockets in the top surface of the deck. There have been examples of severe
corrosion of tendons w ith to p pocket anchorages but none have occurred, to the knowledge
of the W orking Party, where the tendo n has been properly grou ted. It is no t clear whe ther
or no t top pockets con stitute an addition al level of risk. However, there is a strong feeling
among many engineers that the top pocket provides an unnecessarily convenient route
for conta minan ts into the anchorage and tendo n. There are few situations in which an
alternative to the use of top pockets cannot be found, and it is recommended that they
should n ot norm ally be used. If there is no alternative (for example in some bridge
refurbishment schemes) then th e design and con struction should ensure that contaminants
are excluded both during construction and in service by taking additional protective
measures (see Figure 8 ).
The location and detailing of anchorages depend on whethe r the anchor head is left
exposed.
One of the 'preliminary design recommendations' in a report by Ricketts'
62
' is
tha t "All anchorages, apart from dead end anchorages deep within a concrete mass, be
designed so tha t th ey are inspectable".
Exposed anchorages go some way to allaying fears of lack of inspectability of prestressing
systems, but they do increase the risk of corrosion by reducing the numb er of layers of
prote ction. The end cap of the anchorage has to be removable to inspect the ends of the
strand and, once rem oved, it may be difficu lt to replace and ensure an airtig ht
seal.
The
advantages of burying the anchorage in a concreted pocket are tha t the end cap can be
filled wit h g rout rather than grease and is itself surrounded in concrete. Inspectable or
buried anchorages are equally acceptable and the designer should choose the type most
appropriate to the location under consideration.
Dead end anchorages deep with in the concrete are also acceptable but have the practical
disadvantage of requiring the tendo n to be in place before concreting.
2 8
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 40/125
Available protective measures
At expansion joints, BD 57/01 and BA 57/01'
40
' recommend the use of an abu tme nt gallery
for inspections of the joint and the concrete below the joint. This gallery can also be used to
inspect exposed anchorages and the concrete and wa terproofing covering buried anchorages
(see Figures 1-4). Anchorages tha t are required to be inspectable should also be replaceable.
Wherever possible, BD 57/01 and BA 57/01 recommend the use of integral bridges, avoiding
the use of expansion joints . The Work ing Party sub-group has not been able to agree on the
most appropriate measures to prote ct anchorages at the ends of the deck. One possibility
is that an abutm ent gallery is provided, similar to th at required at expansion joints , so that
the end of the deck can be inspected. It may also be possible to have a smaller gallery for
inspection using a TV camera, although such a gallery would not fa cilitate maintenance
should this be required. Alternatively, it may be possible to dispense w ith visual inspection
by placing a corrosion probe adjacent to the anchorage and using a buried anchor detail.
It is anticipated tha t, with greater use of integ ral bridges, new details w ill be forthco ming .
3.4.4 Anchorage details Figures 9-17 give typical anchorage details for a number o f situations. In developing the
details the following points have been taken into account:
I The anchorage should have m ulti-layer protection . No individual layer can be assumed
to be effective for the life of the structure.
I The detailing of expansion joints sh ould be such that, when the jo in t leaks, the water
is directed away fro m th e anchorages and in to a properly detailed drainage system.
I The anchorage end cap should be filled with grout d uring groutin g of the ten don . The
end cap is shown bolted to the anchor p late in the figures, but in some systems the cap
is bolted to th e anchor head. Provided tha t the anchor plate and head are m achined
for a close fit, this is an acceptable deta il.
I Any concrete used to infill pockets should have flowable non-shrink cha racteristics in
accordance with BD 27/86
(63)
, and should be held in by reinforcement.
B The anchorage or capping concrete should be covered with the bridge waterp roofing
membrane.
I Exposed anchorages should be protected fro m seepage throu gh c ons tructio n joints in
thin slabs.
It should be noted that deck overhangs without construction joints necessitate special
devices to enable stressing jacks to access the anchorages. N orm ally a crane w ith a special
lifting device or a acking trolley wo uld be required. For very large tendons this can be
prohibitive and consideration could be given to use of a construc tion join t w ith a waterbar
and sealant in a surface groove .
29
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 41/125
Grouted bonded post-tensioned construction for bridges
4 . Grouted bonded post-tensioned
construction for bridges
The overall design strategy recommended in this Report is that of multi-layer protection.
Available protective measures are reviewed in Chapter 3 and in Chapter 4 the focus is on
grouted bonded construction. The chapter begins with a review of grouts and g routing and
is followed by details of a recommended protection system for this form of construction.
4.1 Grouts and g rou ting
One of the main advantages of a properly grouted duct is the alkaline environm ent created
within the du ct. A major concern w ith existing bridges has been the qu ality of th e grouting
and the protection provided to the tendo ns. The grouting operation has often been under-
taken by inadequately trained personnel who have not understood its importance. There
are even instances of ducts being left com pletely ungrou ted'
64
'. The gro uting Standards
give details of improved grouting methods, vent layout and materials. Site operations
should be carried ou t by companies and operatives satisfying the CARES certificatio n
scheme - see Chapter 15.
The use of plasticisers in grouts is common practice, and the resulting improved workability
and reduced water/ce me nt ratios can on ly be beneficial. There has been discussion of the
safety of using expanding agents in g rou t. The expansion is norm ally achieved by incorporating
alum inium particles and it has been suggested that the hydrogen given off can cause
em brittlem en t of the prestressing steel. The Working Party has not been able to find any
evidence to support this suggestion, but it has been found that aluminium particles can
generate air bubbles. To meet th e requireme nts of the revised Standards it is likely th at
plasticisers and expanding agents w ill be required.
The measures proposed, together with the certification scheme, are a substantial
improvement on previous grouting operations and give assurance that the ducts are
adequately filled with grout. They canno t guarantee complete filling of a ll ducts and some
sma ll voids may still occur. However, it m ust be remembered tha t voids themselves do
not cause corrosion of th e tendon s.
One of the main concerns with bonded tend ons and anchorages is the difficu lty o f inspection.
It may be possible to partially overcom e this difficulty by installing sensors or probes that
allow remote mon itoring of the p oten tial for corrosion at the probe location . This may be
particularly useful at anchorages for integral bridges, which may be difficult to inspect.
The Working Party has not a dequately investigated the usefulness and reliab ility of such
probes and cannot yet recommend their use. However, it is anticipated that with some
developm ent they may be used as an add itional assurance, if required, by war ning of
potential corrosion.
3 0
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 42/125
Grouted bonded post-tensioned construction for bridges
4.2 Vents and gro ut
injection
Trials undertaken on behalf of the Transport Research Laboratory
65
'
66
' showed tha t an
additional grout vent just beyond the crest in the tendon profile, in the direction of grouting,
can be beneficial as tha t area is particularly prone to trap ping air. Any air or bleed water
carried past the vent at the crest during g routing should migrate back up the duct and be
removed at this additional vent. The additional vent should be closed before the crest vent.
The trials also showed th at larger vents are desirable. The inte ntion of raising vents, where
possible, at least 500 m m above the d uct p rofile, is to provide an effective head of grout.
This Report gives guidance on spacing, location and size of du ct vents based on these trials.
If the direction of gro uting is not known a t the time o f casting, add itional vents wil l be
required on both sides of the crest vent.
All anchorages are supplied w ith a tapped hole for use either for injecting gro ut or as a
vent. The end cap to the anchorage is also supplied w ith an air vent and the cap is to be
filled with g rout d uring grouting of th e cable. For grout injection, the anchorage hole must
be positioned so that grout is injected from the bottom. At the far end of the cable the
anchorage hole should be pos itioned at the top to act as a vent du ring grou ting. The final
vent is the tubed ven t on the end cap, which must always be placed at the highest p oint.
Anchorages with tw o holes avoid the possibility of the grout hole being placed incorrectly.
In the design of the vents it mu st be remembered th at the ve nt is part of the protective
system and needs to be sealed to the same level of airtightness as the duct. This requires an
engineered connection between th e vent and the duct and a sealable stopper where the
vent exits the concrete. If this is the to p surface of the deck and the ve nt is extended above
deck level for gro uting purposes, the extension w ill have to be removed before stopp ing
up the duct. Vents should be sealed on c om pletion of grou ting and also on remo val of
any extension tubes. An example of such a deta il is given in Figure 12. Care is necessary
here to ensure tha t the form er for th e pocket is held in po sition, and to avoid the top
reinforcement in the deck.
4.3 Recommended
protection systems
In proposing the multi-layer protec tion concept, an outline has been given in general terms
of a ll the factors that could com e into th e design equ ation, in consciously designing for
durab ility. This section is focused on protection of the prestressing system for grouted
post-tensioned construction. In making the recommendations below, the Working Party
has concentrated on the minimum protective measures required for a typical road bridge in
the UK. The en vironme ntal cond itions may be less onerous for rail bridges, in the absence
of de-icing salts, and for bridges in othe r countries where the environment is less aggressive.
To set the scene, the standards and practices outlined herein are seen as a comp atible package
of design, material and c onstru ction measures for UK applications. For the prestressing
system itself, the basis of the core recom mendations is one of quality, linking the Standards
to the supporting certification scheme and underpinned by the design recommendations.
All of this is summarised in the subsections which follow, togethe r w ith the review of
available test methods in Chapter 8, and including the development work undertaken on
tests for checking the sealing of duct systems and for de tecting and measuring voids in
fluid gro ut. These have shown great pote ntial for the fu ture but at present are seen as
potential additional protective measures, in support of the core requirements.
31
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 43/125
Grouted bonded post-tensioned construction for bridges
Sealant at construction
jo i n t
Anchorage
end cap vent
Note: Anchorage end
cap filled with grout
during tendon grouting
operation. In some
systems the end cap
is bolted to the anchor
head
Anchorage end
cap minimum
cover 50mm
Grout injection,
hole/vent in
anchorage
Pocket fi l led w ith
non-shrink flowable
capping concrete, to
BD 27/86 i tem 4
Reinforcement/mesl
lapped with starters
from m ain member
Min 500mm
Liquid applied
waterproofing
membrane
Figure 9
Buried anchorage fo r stressed or dead end.
Grout injection,
hole/vent in
anchorage
Liquid applied
waterproofing
membrane
Anchorage
end cap vent
Anchorage end cap
Note: Anchorage end
cap fil led with grout
during tendon grouting
operation. In some
systems he end cap
is bolted to the anchor
head.
Reinforcement from 1st
segment projects into
2nd segment
Grout injection
hole/vent in
anchorage
1st Segment
(a) Elevation
.Liquid applied
waterproof ing
membrane
Note: Anchorage end cap
filled with grout during
tendon grouting operation
Anchorage end cap vent
Anchorage end cap
surrounded in in situ
concrete from 2nd
segment
2nd Segment
Note:Anchorage end cap
filled with grout during
tendon grouting operation
Anchorage end cap
Grout injection hole/vent and
anchorage end cap vent
(b) Plan
Figure 1 0
Exposed anchorage fo r stressed or dead end.
Figure 11
Face anchor details in in-situ segmental
construction.
3 2
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 44/125
Grouted bonded post-tensioned construction
for
bridges
Figure 12
Grout vent details
at
deck surface.
(a) Grout vent cast into concrete with
a
recess
at
deck level.
.
o
(b) Vent extension pipe and valve fitted during gro uting.
Note: Extension pipe must be rigid
f
used with grout stiffness
test.
Liquid applied waterproofing membrane,
double thickness over vent
<t • o \
• • • . . " . • . . • •
• t>
(c) Vent capped and recess filled w ith n on-shrink m ortar
4.3.1 PrestreSSing System
-
Ducts and vents should
be
corrosion-resistant and pressure-testable. The ducts
and
vents should
be
pressure-tested.
• Where there is no previous history, full-scale representative g routing trials should be
used to prove the grou ting m etho d, materials and personnel.
I Method statements should be prepared in advance for all prestressing op erations and
should
be
approved
by
an appropriately experienced C hartered Engineer.
All operations associated with the installation, stressing and gro uting of tendons
should be undertaken under the CARES cer tification scheme.
Anchorage and vent locations and detailing should fo llow the logic outlined in Figures 8 -12.
33
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 45/125
Grouted bonded post-tensioned construction for bridges
4.3.2 The deck and its
elements
Concrete strength and cover requirements should be in accordance w ith BS 5400: Part 4'
46
'
(effectively w ithdrawn in April 2010) and BD 24/921
47
' m odified as required by BD 57/01<
40
>
and BS 8500(
53)
where app ropria te. For design to the Eurocodes, BS EN 1992-2<
44
>
(implemented by IAN 123/10<
48
') should be used.
Specification should be in accordance w ith the Specification
for H ighway Works^
as
amended to adop t BS EN 445<
2
), BS EN 446<
3
>, BS EN 447<
4
> and BS EN 13670'
22
'.
A waterproofing system complying with BD 47/99'
50
', and having a current Road and
Bridges Certificate issued by the Highways Agency, should be used on the deck surface
and in the o ther locations recomm ended in BD 57/01<
40
. It should be checked for integ rity
using appropriate non-destructive test equipment, including pin-hole detection equipment
for liquid-applied w aterpr oofing systems. Where a double thickness is used, the first
layer should be proved before the second layer is applied. In ad dition , the membrane
should be used to prote ct any anchorages left exposed in abutm ent galleries, inside
box girders and on bridge deck soffits.
The expansion joints and drainage system should be detailed to ensure that, in the event
of equ ipmen t failure or leakage, water ca nnot find access to the prestressing system.
Strand should be in accordance with BS 5896<
56
> or similar.
4.3.3 Possible additional
measures for exceptional
structures
Additional protective measures from the list below could be considered for exceptional
structures in unusually aggressive environments (e.g. bridges over the open sea), with
each structure being considered on its own merits:
I increased cover
• reduced concrete perm eab ility
• perfectly sealed ducts
corrosion-m onitoring devices
I special strands.
3 4
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 46/125
External unbonded post-tensioned construction for bridges
5. External unbonded post-tensioned
construction for bridges
In external unbonded construction the prestressing tendons are unbonded and laterally
outside the co ncrete cross-section, and the forces are transferred to the concrete thro ugh
end anchorages and deviators; this includes such tendons located inside a box section. It
follows that the design and d etailing of these elements, and the development of protection
systems for the prestressing hardware as a who le, are pa rticularly impo rtant.
5.1 Advantages and
disadvantages
The advantages and disadvantages of external unbonded construction, compared with
grouted bonded construction, may be summarised as follows.
Advantages
Reduces self-weight.
• Makes placing concre te in the webs easier.
• Permits simpler tend on layouts.
• Reduces prestressing losses, especially due to fric tio n.
Facilitates inspection, restressing and replacement.
Gives early w arning of failure.
Reduces importance of cracking in the concrete in terms of corrosion p rote ction for
the tendons.
• Can perm it more rapid construction, wit h bigger spans due to reduced we ight.
Disadvantages
:
' The eccentric ity of prestress is generally less.
The tendons do not necessarily reach their ultimate strength at failure of the structure,
i.e. the structure is over-reinforced.
I The structural role of anchorages and deviators is more critical.
:
The safety and security of the prime struc tural mem bers is more at risk, for exam ple in
relation to vandalism.
• Can be more expensive.
In general, the advantages become m ore significant for bigger spans (greater than 40m )
or for long viaducts.
5.2 Background
The use of extern al unbonde d tendons is not new and their origin can be traced back to
the work of Dischinger in Germany in 1928. The Magnel prestressing system, developed in
Belgium in the 1940s, used unbonded cons truction, and Freyssinet progressed the technique
further in the 1950s. French and German engineers were responsible for developing the
technology in other countries, particularly in North America, using in-situ and precast
segmental methods, and there is now a flourishing American Segmental Bridge Institute.
35
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 47/125
External unbonded post-tensioned construction for bridges
The first example in the UK was the Braidley Road Bridge in Bournemouth designed by
Gifford in 1967. Therefore experience in the UK is relatively recent and lim ited, although in
the 2 000s some notable externally prestressed bridges have been constructed. Attitudes
to the me thod have varied. After Braidley Road, there were few examples u ntil the 1990s.
It is looked on more favourably, as the practical difficulties of inspecting grouted bonded
construction have become clear. The ability to inspect, and, if necessary, replace external
unbonded tendon s, is perceived as a major advantage, and it is the only me thod curren tly
allowed in the UK for precast segmental construction.
In terms of du rability, the track record of extern al unbonded construction is good. There
have been instances of corrosion, but no collapses; the ease of inspection and remedial
action has been a plus - indeed, external prestressing has been used in strengthening a
number of existing bridges, such as Kingston Bridge, Glasgow'
67
' and Medway Bridge in
Kent'
68
'. Reviews have been conducted on performance in service and examples of distress
have occurred, frequ ently due to lack of apprec iation of th e local forces and strains induced
by the prestressing, or to th e neglecting of tempe rature effects.
Over the years, the technology of prestressing has developed significantly in response to new
construction methods and the demand for bigger spans. Cable-stayed bridges are an example,
and the protection systems developed for them have been of benefit to external unbonded
construction generally. Many such developments relate to the evolution of particular
prestressing systems, and generalisation in this Report is rather difficult. However, some
basic principles are set down in this chapter, and references given to cover detailed aspects.
5.3 S tructura l design and
basic performance
requirements
The structural performance of external unbonded construction is well understood, and
design m ethods are given in relevant codes BS 54 00 '
46
' (effectively w ithdrawn in April 2010)
and BS EN 199 2-2'
44
'. In applying these in the UK, add itional specific requirements are
contained in Highways Agency Standards and Advice Notes: BD 57/01 and BA 57/01'
40
'
are generally relevant in durability terms, but BD 58/ 94 and BA 58/9 4'
69
' focus on externa l
unbonded prestressing.
Going beyond basic design, BA 58 /94 gives a good d eal of inform ation at the detailing
level, in terms of:
i loads to be carried by anchorages and deviators
• coefficients of frictio n
• radii of curvature of tendons
• protec tion systems.
Clearly, these are key documents. In addition, they contain two important requirements,
which can have a strong influence on the prestressing system ad opted, and on the level
of prestress needed. These requirements are as follows:
• The prestressing and prote ction system should perm it easy inspection, and tendons
should be capable of being restressed or replaced, if necessary.
I The failure of either two tendon s or 25% of the tendons at one section should no t lead
to collapse.
3 6
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 48/125
External unbonded post-tensioned construction for bridges
Some recent UK practice wit h e xternal tendons has involved locating interme diate blocks
or bonding points in the span, to ensure some increase in strain in the tendons under the
design u ltima te loads. The choice of tendons tha t can be restressed and replaced or tendons
tha t are only replaceable has a significant impact on the design, and whether provision is
made to de-tension by jacks and whether the consequent projecting lengths of strand are
provided at pe rmanent anchorages.
The decision should be taken wit h reference to the number of tendo ns, the spans and the
consequen tial costs.
5.4 Available protective
measures
Details of protective measures available internationally are given in the 1996 FIP state-
of-the-art report
M aterials and systems for external prestressing
1
-
70
1
.
Most experience in the
UK has been w ith the use of grease, wax or ceme nt g rout contained in polyethylene (PE)
tubes. It is recommended tha t o nly plastic ducts should be used, which should be of PE
material, at least of strength class PE80. Plastic ducts for external systems are relatively
thick and smooth (in comparison to those for bonded construction w hich are corrugated).
The systems now available w ill no d oub t continue to evolve and im prove. Their success
will depend not only on the system hardware and on the chosen protective material but
also on de tailing, and on ensuring that the protective barriers are properly sealed and
continuous, and tha t the pro tective materials can be placed effectively under site conditions.
This is the main focus of the general guidance tha t follows, which does not conce ntrate
on any pa rticular system.
5.5 Detail ing
In very simple terms, the objective in detailing e xternal prestressing systems is to get th e
tendons in place from one anchor to the other, to the correct design p rofile, and with the
prote ction measures intact, both before and after the stressing operations. The pro file is
adjusted by suitably placed deviators, and the tend ons are essentially straigh t between
deviators, and between anchorages and deviators. The force from the tend ons should be
transferred to the structure in a controlled manner.
Duct layout is influenced by the construction metho d and the form of the structure. Simply
supported structures (or determinate bridges made continuous for durability reasons)
require different layouts and patterns to cantilever m ethods or span-by-span c onstru ction.
Doubly inclined profiles, up to 200m or more, may be required, or short straight lengths
- horizontal or inclined - dictated by the co nstruction me thod, while still ensuring that
the final stress conditions are satisfactory at a ll sections, under service co nditions.
Ducts should be tested for wate rtightness. They should also be located we ll clear of water,
preferably in a non-aggressive env ironm ent. Particularly vulnerable areas are where ducts
are connected to the anchorages or pass over deviators; detailing in these areas is especially
important. Where it is necessary to join lengths of duct, electro-fusion or butt-fusion
join tin g can no rmally be used for PE ducts.
3 7
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 49/125
External unbonded post-tensioned construction for bridges
Again, detailing is imp ortant and such joints shou ld preferably be kept clear of construction
joints (up to 1m is suggested), to reduce the risk of pe netration . For longer tendons,
consideration needs to be given to duct move men ts durin g stressing and the provision of
a join t w ith a sleeve coupler that allows the du ct to shorten.
Temporary access holes into box sections from the deck above, which are often provided
by the contractor during construction, must be carefully positioned and detailed to ensure
they remain watertight after reinstatement and so that if any leakage occurs it cannot
drip onto the tendo ns.
Any drainage system inside box section decks should similarly be positioned and
coordinated with the tendon layout to avoid this risk as well.
Permanent access holes from the road surface should be avoided if at all possible.
W ith externa l tendon s inside a box it is not feasible to extend vents at high points to
50 0m m above the du ct, as is required for inte rnal tendo ns, as this wou ld need holes
through the slab. However, the a bility to check the duc t for voids after grouting by impact-
echo techniques gives added confidence th at heavily outweighs this disadvantage.
Use of tendo n couplers should be given careful co nsideration . Cast-in couplers have the
security of p reventing progressive collapse but unrestrained couplers in the deck void can
be vulnerable in this respect. An alternative to the use of couplers is to cast an interm ediate
diaphragm , and to anchor a tendo n on its far side, w ith a new tendon being started on
the oth er side of the same diaphragm; this also facilitates replacement.
It is important to detail for access. At its simplest, this is required for ease of inspection, but
access is also needed behind anchorages, for restressing or replacement. In these cases, a
substantial length of tendon is required behind anchorages to permit the jacks to be
reattached, wit h an allowance for extension. This length should be specified, since it w ill
depend on whe ther single-strand jacks or cable jacks are required. In service, this extra
tendo n length is usually protected by wax or grease with in a tube, irrespective of the
protective material used elsewhere in the duct. A typical arrangement is shown in Figure 13.
5.6 Tendon system s
Anchorages and deviators are considered toge ther, because detailing solutions for each are
interrelated, and are dependent on the type o f tendo n and the protective system adopted.
There are also differences between the technologies offered by the prestressing suppliers.
General guidance is available'
71
', but most detail is contained in manufacturers' literature.
There are three basic tendo n systems:
• unbonded tendons protected by a cement grout
• unbonded tendon s protected by a flexible product (e.g. wax)
• tendons made w ith sheathed and greased mono strands, within a grouted system.
3 8
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 50/125
External unbonded post-tensioned construction for bridges
Guide tube
Grout injection hole/vent
in anchorage
PE duct fil led with grout
(debonedfrom guide tube)
Length of strand sufficient to al low re-stressing
Liquid applied
waterproof ing
membrane
Min 500mm
Anchorage
end capvent""
Anchorage end cap
Note: Anchorage end cap fil led
with pertroleun wax or similar
Figure 13
Exposed anchorage for restressing the end of
an unbonded external tendon.
PE duct fil led w ith grout
Liquid applied waterproo fing
membrane
Anchorage end cap vent
Anchorage end cap
Grout injection hole/vent in
anchorage
Note: Anchorage en d cap filled
with grout during tendon grouting
operation. In some
systems
the end
cap s bolted to the anchor head
Figure 14
Exposed anchorag e for the dead end of an
unbonded external tendon .
The detail is also applicable for the live end where
restressing is not req uired.
3 9
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 51/125
External unbonded post-tensioned construction for bridges
Unbonded tendons protected by a cement grout
In this case, the duc t is a continu ous tube, for example of PE. At anchorages it passes
throu gh the concrete, usually, but not necessarily, via an outer pipe and trum pe t to the
anchorage - the so-called double envelope system. This is illustrated in Figure 14. At
deviators, it again passes throug h an outer tube, often w ith a bell mouth to prevent damage
to the plastic. For easy removal, it is imp orta nt th at the ten don can move freely in these
zones; in this regard, it is impo rtan t to have a good seal between the anchor head and the
duct. Protection of the anchorage itself is also important, and may be done using a long cap
to accept the extra tendon length required for restressing. These tendons are no t normally
suited to restressing unless they are straight and a shimm ed or screwed anchor head is used.
Unbonded tendons protected by a flexible product
The most common filler material is petroleum wax, which is heated to about 90°C and
poured wh ile still liquid. In general, only a single duct is used (no doub le envelope), and care
is necessary to prevent the wax running ou t o f the d uct. There has been lim ited feedback
on some waxes being br ittle.
There have been a number of reported instances of wax products becom ing unstable and
leaking out, especially at high tempe ratures, and care should be used when considering
these products.
Tendons made w ith sheathed and greased monostrands
Such monostrands are described
in fib
Bulletin No. 11
(72
>. Greased strands are enclosed in
a PE sheath, and pass throu gh pipe assemblies both at the anchorages and the deviators.
One advantage is tha t the strands can be stressed (and de-stressed) using a m onostrand
jack, requiring less wo rking space beh ind the anchorages. The strands can also be extracted
individually and replaced. A system is also available of sheathed and greased strands
with in a PE pipe, which is grouted prior to stressing. The grout is used to fix the strands in
position, reducing the risk of d isplacement and of tears in the sheaths. In this case the
duct must be supported to avoid displacement by the weight of grout.
Deviators are generally of steel or reinforced concrete; in the latter case, they may be lined
wit h a pipe, or cushioned in some other w ay. Usually, they are designed to accom mod ate
an un intentio nal angle change of 0.02 radians. The angle change has a major influence
on their design, in terms of the forces to be resisted, and m inimu m radii are usually given
in specifications (e.g. BD 58/94<
69
').
One p articular problem is the location of vents at high points, where deviators are
positioned. This is illustrated in Figure 15. The loca tion of such vents (for either grouts or
waxes) should be considered at the design stage, and will depend , in part, on the prestressing
and protection systems to be used. Such vents by necessity have to be of smaller diameter
than the specification m inim um of 15m m. It may also be necessary to locate drains at
low-po int deviators, to remove water that may have accumulated in the du ct.
4 0
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 52/125
External unbonded post-tensioned construction for bridges
PEduct
Vent
Vent
Direction of gro uting
Deviatortube
Figure 15
Top deviator for external tendo n.
5.7 D e-tensioning and
replacement of external
tendons
De-tensioning and replacement of external tendons requires special consideration with
particular emphasis on safety. The opera tion should be carried o ut o nly by trained and
experienced personnel directed by a com petent supervisor, from firms accredited by
CARES. Exclusion of personnel from the area imm ediately adjacent to the de-tensioning
operation as well as the en tire tendo n length is of param ount impor tance. Investigations
before de-tensioning should include:
removing anchorage caps to inspect the condition and length of strand protruding
• tapping the duct to check the adequacy of grouting .
The five most common arrangements of external tendons are as follows:
i Tendons are fully grouted w ithin a PE duct and the tendons are cropped .
Tendons are grouted w ithin a PE duct and a a cking length is left tha t w ill allow
de-tensioning.
' PE ducts are filled w ith a flexible filler (wax or grease) and the strands are free to move
individually.
• Strands are individua lly greased and sleeved in plastic inside the PE duct. The tendon is
norma lly grouted prior to stressing to prevent trapping of the strands. This tendon can
be single strand stressed.
• Strands are ind ividua lly greased and sleeved and are exposed inside the bridge deck.
The strands are deflected over specially made saddles.
Each of these will behave differe ntly during the de-tensioning process, and five possible
corresponding systems are briefly described below. In all cases, particular atte ntio n must
be paid to health and safety issues.
De-tensioning-System 1
Typically, in this system the tendons are cropped close to the bearing plate. De-tensioning
has to be done by exposing the strands and severing them , preferably at a poin t close to one
of the anchorages. The adequacy of the gr outing must be established before beginning
the op eration. This can norma lly be checked simply by tapping the d uct.
41
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 53/125
External unbonded post-tensioned construction for bridges
De-tensioning this type of tend on requires special consideration. If one of the strands is
cut, the force in this strand will be transmitted to the others via bond to the grout. For
example, in a 19-strand tendon wit h a force of 60% ultimate tensile strength (UTS), after
cu tting seven strands the force in the rema ining 12 uncut strands will be 9 5% UTS. This
situation is poten tially dangerous as the strands are approaching their yield point.
For safety reasons it is advisable to remove the grout over a substa ntial leng th of the
tendo n and clamp the bare strands togethe r. This procedure was used on 11 tendons on
the Mid-Bay Bridge in Florida in 2000<
10
>.
The following procedure should be adopted:
• Mark the position on the duct where the tendon w ill be cut.
I Carefully remove a section of duct exposing the grouted tend on.
Remove the grout by a method that will not damage the strands.
Protect the tendon either side of the cut position by a suitable prote ctive screen.
Cut the strands rem otely, if possible. Use of a flame cutter is preferred, which softens
the steel and releases strain before th e c ut is complete. If a heating m etho d is chosen
for de -tensioning, the tendo n either side of the exposed area should be screened from
the other tendons to prevent heat transmission.
If personnel cannot be excluded fr om the area, provide su bstantial screens to ensure
tha t flying debris canno t cause injury.
This system should incorpo rate a bond breaker inside the anchor guide wh ich allows the
tendon to be extracted for replacement. After de-tensioning, the tendon can be cut into
short lengths and removed from the bridge. It should be noted that the deviators should
follow a circular radius to fac ilitate remo val, and very short cropping shou ld be avoided
(enough strand should be left to accommodate strand couplers).
Detens ion ing-System 2
The adequacy of the grou ting needs to be checked as for System 1.
The ends of the tendons are no t croppe d and norm al practice is to leave enough strand
projecting to accom mod ate a ack for de-tensioning . The projecting length is protected
by a grease- or wa x-filled cap. This cap is removed and the strands and anchorages are
cleaned and inspected before de-tensioning.
As the ungrouted length of strand is very short in this system, the stroke capacity of the
jack should be sufficient to release the force at the anchorage, it may be necessary to
overstress the tend on to release the wedges. De-tensioning is therefore a hazardous
procedure and it is recommend ed t ha t th is is carried out by a specialist company. Single-
strand de-tensioning should not be used from a safety point of view as the force will
transfer through the grout into the other strands and lead to failure of the remaining
strands at the anchorage.
On de -tensioning at the anchorage the tendon force will be transferred into the grout
and will norma lly crush it. Care needs to be taken to ensure the te ndo n is free to move
along its length.
After de-tensioning the complete tendon it can be cut into short lengths and removed.
4 2
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 54/125
External unbonded post-tensioned construction for bridges
De-tensioning - Systems 3 and 4
As each strand with in the tendo n of both these systems is comp letely free, the force can
norm ally be released strand by strand . However, there is a risk of the strands be ing trapped
by others at the deviators (in System 3) so particular care is necessary to measure and
monitor the release of extension and/or
load.
Prestressing jacks no rmally have a useful
stroke of 200mm so this will be the maximum extension that can be released from the
tendon in one operation. Should greater release be anticipated , the d e-tensioning system
should have the capability of reseating the wedges as the tendo n has to be re-anchored
at an intermediate stage.
The tendon may be de-tensioned by other means. It is always advisable to seek the
assistance of a specialist company.
De-tensioning - System 5
The de-tensioning will depend on whether or not the strands have been cropped. If they
have not been cropped they can be de-tensioned one at a time w ith a single-strand jack.
If the strands have been cropped, de-tensioning can be carried o ut by cuttin g the strands
one by one after remo ving the plastic sleeve. The cut ting can be done using a disc cutter
or a cutting torch and it is recommended that this is only carried out under the control of
an experienced supervisor and preferably remotely. Before cutting, a bound timber packing
system should be put in place, to prevent the wh ipping m oveme nt of the strand when cut.
Alternatively, special devices can be em ployed to clamp the strands one at a tim e, transfer
the load through a parallel bar system prior to c utting and then gradually enable co ntrolled
release. This system was used at Braidley Road Bridge, Bournemouth when the strands
were replaced in the early 1980s.
Replacement
W ith all replaceable systems it is advisable to replace the d ucting as the te ndon w ill have
cut into the w all of the du ct at th e dev iation p oints. The anchorages should be designed
so tha t the tend on can be extracted after d e-tensioning. In the case of a grouted tend on
a liner is norma lly in place to ensure tha t gro ut does not bond to th e guide tubes.
On replacing the duct th e tendo ns can be installed, stressed and gro uted or greased as in
the original installation.
4 3
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 55/125
6 Segmental construction
6. Segmental construction
Segmental construction is a comm on form of construction, particularly fo r major spans and
viaducts, built by cantilevering or span-by-span methods. For in-situ segmental construction,
concrete sections are cast against previously constructed sections, and it is possible to
have duct co ntinu ity thr oug h the join t. This is satisfactory as far as the recomm endations
in this Report are concerned and either grouted bonded or external unbonded methods
may be used, provided tha t the guidance given in this Report is follow ed.
For precast segmental construction, modern methods generally involve match-cast
segments with t hin epoxy joints. In some countries, dry joints have been used, but these
are not recommended for conditions in the UK.
6.1 Multi-layer protection One of the principles of the multi-layer protection strategy is that a continuous sealed
duct is a key layer, in preventing contam inants reaching the prestressing steel. When the
first edition of TR47 was published in 1996, the Working Party was unaware of any detail
that could guarantee duct continuity, directly or indirectly, and the recommendation was
tha t only externa l unbonded prestressing should be used for precast segm ental construction.
Since 1996 the W orking Party has sought reliable solutions to this problem . There appear
to be three possibilities:
I The development of prop rietary splicing sleeves for the duct at the joints . At least one
such solution has been developed, and has been trialled on a bridge in the USA but f ull
details of its pe rformance have no t been revealed to the marke t. Any such solution
wou ld be proven via a Technical Approvals system, which wo uld require the development
of a suitable test and acceptance criteria. Pending further experience wit h this system
it may be prude nt to assume tha t some percentage of the internal tendons is lost (say
5-10 % ). Key to th is is the positioning of the splicing sleeve in the m atch-casting process
to ensure the correct alignment.
I Further research on the use of epoxy resins in thin ma tch-cast jo ints , both in the
laboratory and in the field. The Working Party has kept in close con tact wi th the research
at the U niversity of Texas at Austin into corrosion prote ction at segm ental joints
45
'
73
'.
Precast segmental bridges have been in service in the UK and especially in the USA for
up to 30 years.
The development of a design-based solution, based on the multi-layer protection
strategy, possibly involving a combination of external unbonded and internal bonded
tendons (enough, say, to carry all dead loads), and ad dition al protective layers, to give
an overall reliability comparable to that of continuous ducts, as part of the system.
Current practice with this approach is to have a minim um of 75 % o f the tendons as
external unbonded.
Wh at is being described here is a developing situation . However, a t present it is believed that
use of internal groute d tendon s for precast segmental cons truction wo uld be treated as a
Departure from Standard if an acceptable duct joint device or other protection strategy
was proposed.
4 4
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 56/125
Segmental construction 6
6.2 Anchorage loc ation and
detail ing
There are some special considerations for segme ntal con struction, and these m ainly
relate to face anchorages at joints, both for in-situ and match-cast precast segm ental
cons truction. Typical layouts for precast segm ental con struction are shown in Figures 16
and 17 and for in-situ segm ental construction in Figure 11. The p articular concern is to
protect the anchorage, including the cap, from any possible water leakage in the joints.
Figure 16
Face anchor details for precast segmental
construction.
Precast segmental construction using internal
grouted tendons is NOT recommended, unless
continu ity of the duct is assured.
Special care needs to be paid to th e follo wing details:
I Sealing of the anchorage recess or box-out, pa rticula rly if the distance from the edge
of the recess to the edge of the segment is small (this concrete is easily damaged).
• Location of inlet /ou tlet/v en t pipes. For precast segmen tal construction Figures 16(a)
and 16(b) require the anchorage pipes to be threaded throug h the second segment as
it is erected. Special atten tion is required to prevent these pipes becoming restricted
during the erection process. Figures 17(a) and 17(b) show a detail that does not require
pipes to pass from the first to the second segment.
Min.
500mm
Liquid appl ied waterproofing mem brane,
double thickness required over joint.
(Note:
Second
complete layer
covers
patch first ayer)
Note:
Anchorage end cap
filled with grout
during
tendon grouting operation
(a) Elevation
1st Segment
Epoxy resin sealant
Recess ven t
Anchorage end cap vent
Anchorage end cap
Grout injection ho le/vent
in anchorage
Inlet for gro uting recess
2nd Segment
Note: Anchorage end cap
filled with grout during
tendon grouting operation
(b) Plan
Epoxy resin
sealant
Anchorage end cap
Grout injection hole/vent
in anchorage
Inlet and vent for
grou ting recess
4 5
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 57/125
6 Seemental construction
Figure 17
Combined face anchor and shear key details
for precast segmental construct ion.
Precast segm ental cons truction using internal
grouted tendons is NOT recommended, unless
con tinuity of the du ct is assured.
L i q u id a p p l i e d wa t e r p r o o f i n g m e m b r a n e ,
d o u b l e t h ic k n e s s r e q u i r e d o v e r j o i n t .
(Note: Second complete layer covers
patch first layer)
Note: Anchorage end cap
filled with grout during
tendon grouting operation
Anchorage end
cap vent
_Epoxy resin sealant
-Recess vent
Anchorage end cap
Shear key
Inlet for grou ting
recess
Grout injection hole/vent
in anchorage
1st segment
2nd segmen t
(a ) E leva t i on
Note:
Anchorage end cap
filled with grout during -
tendon
grouting
operation
r-^\\\\\
-< -
Grout injection hole/vent »-\ \
and anchorage end cap vent ^
s
Epoxy resin
sealant
Anchorage
end cap
-«—
Inlet and vent for
grouting recess
(b)Plan
4 6
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 58/125
Void grouting 7
7. Void grouting
The discovery of deficiencies in the g routing of post-tensioned concrete bridges has
persuaded bridge managers of the need to consider remedial work. This chapter provides
guidance on where it is appropriate and how it m ight be done.
7.1 Overview
Void grouting is the injection of grout into voids left in tendon ducts after the original
grou t has hardened. The term 'void gr ou ting ' is used in this Report to describe this process
to distinguish it from 'regrouting' which means the reinjection of grout into ducts while
the original grou t is still fluid.
Void grou ting has much in commo n with grou ting in new construction - referred to here
as 'new g routin g'. In many respects, therefore, the recommen dations for new gro uting in
this Report may be applied to void gro uting. Atten tion is drawn to differences between
new and void grouting in this chapter and ways are suggested for accom mod ating th em .
Void grouting has two objectives: to improve the protection of the tendons in order to extend
the life of the structure and to bond them to the structure as originally intended in order
to take advantage of the structural superiority of bonded tendons over unbonded tendons.
Void gro uting presents more challenges than new grou ting. The current view is that the
quality achievable in void grouting will therefore often be lower than in new grouting.
This does not imply tha t a lower standard of workmanship should be set. On th e contrary,
greater care and ingenuity will often be required to adapt grouting methods to the conditions
as found . The possibility that a lower quality w ill be obtained in void grouting shou ld not deter
the engineer from recomm ending it. Even a partially successful void-g routin g op eration
may provide sufficient benefits to justify th e works.
To grout all the voids in a bridge is a major task not to be undertaken lightly. Partly for this
reason,
some engineers take the view that void gro uting should be done in exce ptional
cases only. The view taken in this Report is tha t voids should be grou ted as part of a
bridge management
plan.
Alternative or complementary strategies include monitoring,
strengthening and reinspection at intervals. It is acknowledged that, for reasons of access,
void grou ting is not practical in all cases and it should not be undertaken if the pote ntial
benefits are considered to be insufficient.
Although void grouting is dealt with as a separate topic in this Report, in terms of selecting
structures for void grouting it should be viewed in the wider context of m anaging the bridge
over its expected lifetim e. M anagement strategies m ay include:
• do noth ing at present
• plan for a reinspection of the prestressing system after a few years
• mon itoring only
• grout the voids
• strengthen the structure by other methods
• combinations of monitoring, void grouting and strengthening.
4 7
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 59/125
7 Void groutinj
Detailed advice on these matters is outside the scope of this Report.
The reliability of void g routing depends on the nature of the voids, the filling th at can be
achieved and the risk factors influencing ongoing corrosion. The 'do nothing' option applies
to the least vulnerable bridges where the risk of corrosion is low. Where the risk is higher
but void gro uting is difficult, 'm on itorin g on ly' m ay be the preferred opt ion . In such cases,
the rate of deterioration is likely to be important. The main uncertainties affecting the
management of these structures are the limited knowledge of the deterioration rates and
the structur al capacity in the presence of defects.
In a structure or m ember containing relatively few tendons, each one is likely to be
structura lly crucial. This may not be the case when there are a great m any tendons and a
degree of redundancy. In addition, void grouting of structures with many tendons may be
impractical because of th e scale of the work. The inspection may only have covered a small
proportion of the tendons and relatively little may be achieved by grouting just these.
As the reliability of the void g routing decreases, the justification for a dditiona l measures
such as mo nito ring or strengthen ing increases. However, even a comb ination of measures is
likely to be significantly cheaper than replacing the struc ture, especially if disruption costs
are considered.
7.2 Aims of void gro uting
Void grouting can improve the protective environment and structural behaviour of the
tendons.
Tendon pro tection is improved because the new gro ut helps provide a better barrier to
water ingress by filling the voids that w ould otherwise a llow water to migrate freely through
the structure, possibly bearing chlorides. In addition, providing the grouting material is
ceme ntitious, protection w ill be improved by an increase in the alkalinity of the environment
surrounding the te ndon and the passivity arising from th is. These are both imp orta nt
reasons for grouting in new construction.
Structurally beneficial effects arise from the improved bond between the tendons and the
structure. When there is no bond, the flexural capa city of the m ember is reduced because
the force in an unbonded tendon does not reach yield at failure. Shear may also be affected.
Providing bond over all or m ost of the te ndo n length w ill also reduce the loss of effective
tendon section if a wire fractures by allowing re-anchoring to take place.
At present, it is not possible to quantify the improvement achieved when partially
grouted tendons are grouted. H owever, it is reasonable to assume that, if successfully
accomplished, the new condition will be similar to that achieved in new construction. It
should be noted , however, tha t whe n tendon s re-anchor, transverse forces are created
locally in the structure. If several tendons attempt to re-anchor in one region badly
affected by corrosion, longitudinal cracking may occur.
4 8
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 60/125
Void groutin
7.3 Condition of bridge
stock and poten t ial
demand
A review of data from the programm e of S pecial Inspections of pos t-tensioned bridges in
England'
1115
' revealed that about 20 % of bridges inspected contained sign ificant voids in
the ducts. This means that, a t the inspection point, the duct contains no grout or a void of
significant size such that a substantial part o f the tendon is exposed. In abou t half these
bridges (10% of the tota l), voids of this size occur at 5% , at least, of the inspection points
and in some cases the proportion rises to more than 25% . In a further 10% of the tota l
bridges, the voids are large enough to leave the ten don partially exposed.
These figures can be compared with the number of recommendations relating to the
grouting of voids in the Special Inspection reports (specifically, the Phase 3 reports). Void
grouting is mentioned in about 10% of the reports, and recommended in about half of
these (5% of the total). Of the remaining 5% , most reports give a qualified recommen dation
for void grouting subject to further assessment or investigation, or the dissemination of
advice on the practice.
7.4 Inspection records
Records of inspections carried out in accordance w ith BA 50/93 '
15
' provide a go od
indication of the co ndition of a bridge as foun d at sample locations. They are the starting
point for assessing the need for void grouting, although supplementary information from
further inspections may be needed, before embarking on void grouting.
Existing inspection records may show th at v oid gro uting is not needed or they m ay
characterise the bridge sufficiently t o suggest there is a need. However, it may be necessary
to remedy deficiencies in the inspection data before making a firm proposal for void
grouting or specifying and planning a void-grouting contract. Further inspection will have
to take place duct by duct before grouting commences.
The con tinuity between voids in a particular du ct is rarely recorded in inspection reports
because the inspection strategy adopted in m ost Special Inspections is invasive inspection
at critica l points. The presence of grout cover or a grout wash over the tend on is no t
always formally recorded althoug h it can sometim es be seen in photographs of exposed
tendon s. Such factors have to be established for assessing the need for and pra cticality of
void g rou ting, and po tential deficiencies in the data have to be addressed when its merits
are being considered.
Where th e volum e of the void has been m easured, it is sometimes clear that w hole ducts
are complete ly ungrou ted. In other cases, where the void volume is only a pro portio n of
the duct volume, the situation along the duct is not clear. Void grouting is more difficult
where duct continuity is interrupted by fully grouted sections, or compromised by sections
containing small voids that inhibit grout flow. Information like this has not normally been
obtained in inspections or recorded in the reports.
4 9
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 61/125
Void groutin;
7.5 Grouting materials
It is recomm ended tha t the same m aterials are used for void grouting as are curren tly
used for new gro uting , namely cemen titious special grouts with properties as defined in
Standards. This type of m aterial has been used in recent void-gro uting contracts, but it
has been shown t ha t blockages are likely when these grouts are required to pass thoug h
narrow passages. Flow is reduced and a grout plug m ay form in the void as the pressure
rises. To avoid this, the min imum suitable void cross-section should be established.
Whe n voids with sma ll cross-sections are to be grou ted, there may be an inclination to
seek grouts wi th suitable flow characteristics, such as low viscosity, even if other properties
are comp romised slightly. The current recomm endations for viscosity using the flow cone
test are considered valid for void grouting except when narrow passages present particular
difficulties.
Particle size is not thought to be a critical influence on the flow of grout through typical
voids.
How ever, if a significant a mo unt of grout must flow through sma ll voids (say less
than 5mm ) th e use of grout designed for this purpose may be desirable'
35
', and specialist
advice may be sough t on the use of fine-grain ce ments.
One possible difficulty in using fine-grain materials is that the time frame during which
the grout remains sufficiently fluid for injection may be curtailed. However, experiments
have shown (see Mathey
etal.
(74)
) that grouts of this type can be produced that will pass
thoug h gaps as sma ll as 1mm. The property of resistance to plug forma tion has been
described as 'differentia l pressure m icrosta bility' - se e Henrichsen and Stang'
75
'.
Chemically reactive resins can flow through smaller voids and fissures than can cem entitious
grouts because they are wholly liquid and n ot suspensions of particles in a fluid, bu t
currently (2010) their bond and tendon protection characteristics are considered inferior
to cemen titious materials.
7.6 Gro ut ing equipment
and methods
The equipment for pressure grouting in new construction is normally satisfactory for
grouting voids. Where the volume of grout is small, the equipment and meth od of operation
should be selected wit h this in m ind. For example, pressure p ots can be used for injecting
grou t into a small void such as at an anchorage or a high point in a duc t. The gr outing
specification and contractor's method statement, including the equipment, must take
account of site conditions. Requirements may include the continued operation of the
structure and any routes beneath it.
In m ost instances, access to the ten don duct for g rout injection and venting will be through
holes drilled th rou gh the concrete. The equipm ent must provide an adequate seal on the
drilled h ole. This is not particularly difficu lt and can be accomplished by use of an expanding
nozzle for injection and resin adhesive for sealing vent pipes.
Void-grouting trials have shown that, provided the process is well managed, cementitious
grout can be made to pass though small voids (about 5mm measured radially) by pressure
gro uting alone. N evertheless, blockages can occur where voids of sma ll cross-section are
very long or particularly small, or restrictions such as spacers are present.
50
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 62/125
Void groutim
Observation o f void-g rou ting contracts on site suggests tha t, if a blockage occurs during
grouting, it can sometimes be cleared by the application of vacuum-see for example
Milner and Haynes'
76
'. Altho ugh this appears logical, at present the evidence fo r this is
considered inconclusive. There is little published data on the use of vacuum-assisted
grou ting (but see Lapsley'
77
'). A LINK p roject included a limited evaluation of vacuum
grouting'
3435
', but the technique cannot be recommended on the results of that trial alone.
Users of vacuum-assisted gro uting report tha t removing air from small discrete voids,
particularly those with small and tapering cross-sections, improves penetration of the grout.
Evidence is needed to con firm wh at is a reasonable view. Such voids m ay occur at the
raised ends of ducts w ith parabolic profiles, which are likely to conta in voids that are not
accessible at the top . Where these are sealed at the tim e o f gro uting , pressure g routing
wi ll compress the trapped air and leave a
void,
albeit smaller than before.
In the meantime , vacuum assistance has been specified in recent void-g rou ting contracts on
bridge sites, and specifications have been prepared on a bridge-specific basis for such work.
7.7 Determining the void
characteristics
No rm al practice for determ ining the characteristics of a void is to extend the invasive
inspection carried out under Phase 3 of th e Special Inspection'
15
' or in other inspections
that have been the source of information used to determine the need for grouting voids.
The aim should be to establish as far as possible the characteristics of each void to be
grouted,
including its len gth, cross-section at suitable intervals, volume, presence and
position of con strictions, con tinu ity and ex tent and position of leakage. The ability to do
this w ill depend on the available access and the accep tability of drilling closely spaced holes.
The extent of drilling should be decided with the agreement of the engineer in order to
avoid unacceptable damage to the fabric of the bridge. Some useful tests are described in
Appendix A.
Establishing the void characteristics is im por tant for assessing the s uitab ility o f ducts for
grouting, planning the operation in detail, including the injection and venting points, and
estimating the quantities of grout required.
Existing and recently developed method s for d eterm ining void characteristics in Special
Inspections are, in p rinciple, applicable to void -gro uting operations. Their use can be
explored in trials e ither as a separate exercise, before being specified for use th roug hou t
the works, or as part of proving suitability within a contract.
The difficulty of establishing a ccurately the size and na ture of voids should not be under-
estimated. However, provided that during grouting the grout is seen to flow adequately
out of all the vent points, the precise details need not be known . Wh en a blockage occurs
between vent p oints that have previously been shown to be continuous for th e passage of
air, it may be possible to inject in the reverse direction. This may leave a void ungrouted
somewhere between the two points, but at least the barrier to the movem ent of water
should have been improved. Use of a grout flow meter is recommended to compare the
volume of grout injected with the previously determined volume of void.
51
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 63/125
7 Void groutin
7.8 Flushing w ith wa ter
Unlike for new grouting , flushing with water is recommended where the duc t is partially
filled with hardened grout because it improves the flow of grout during void grouting.
However, if grou ting can be accomplished w itho ut introducing flushing water, this is
preferable. For example, when grou ting a wholly voided me tal duct, there is no existing
grou t surface to absorb water fro m th e fresh grout and the large cross-section to be
grouted presents no additional problems over new grouting.
Water can help to identify continuity between duct entry (injection/vent) points and may
indicate the presence of narrow passages when the flow is unexpectedly slow between two
consecutive access points. It may also remove or dilute w ater th at contains chlorides,
which had previously entered the duct during service, or flush out a proportion of any
chloride deposits left behind when w ater has dried out. After flushing, the wa ter sho uld
be removed (e.g. by draining, use of compressed air or vacuum) but pockets of water are
likely to remain in the duct. Some of this water w ill mix with or be displaced by the grout
during void gro uting and should be expelled from the d uct. Grout sho uld be passed out of
the vent points until its fluidity matches that at the injection point. Some pockets may
remain trapped (although this has not been demonstrated). Nevertheless, it is suggested
that the practice of flushing with water be left to the judgement of the engineer.
Attempts have been made to estimate the void volume by collecting flushing water as it
is drained off. From the remarks above, it is should be clear that only a rough estimate is
likely to be obtained in this way. It is better to find the void volume w ith an air pressure
method,
provided th at th e e quipm ent used can cater for the large leakage rates tha t may
be encountered.
Flushing to remove grou t during a failed g routing op eration is not reco mm ended because
cells of grout are left in the duc t: the flushing water passes over the grou t even when it
remains fluid.
7.9 Effect of existing
defects
The ducts and tendons targeted fo r void gro uting w ill sometimes co ntain defects as we ll as
voids. Even if defects have no t been found at the inspection points, they may be present
at other locations.
If the e xisting grout is of po or qua lity or in poor c ond ition, this should n ot de ter the use
of void grouting. H owever, the possibility of blockages occurring during the grou ting
operation may need to be taken into account.
If exposed tendons occur in com bination wi th conditions suitable for co rrosion, particularly
high chloride concentrations, and the presence of existing corrosion, including wire fractures,
consideration should be given to alternative managem ent strategies, as we ll as to vo id
grouting. Grouting cannot be relied on to prevent further corrosion at these locations.
Moreover, in certain situations , void grou ting could result in addition al and possibly
accelerated corrosion.
The benefits of re-establishing bond and improving the re-anchoring properties are still
relevant. If the defects as stated are present but not widespread, grouting is still recommended.
52
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 64/125
Void groutin,
7.10 Spe cification f or
grout ing
BS EN 4 45'
2
', BS EN 446<
3
> and BS EN 447<
4
> are recomm ended as the basis for the
specification of void-grouting works with appropriate modifications.
Several provisions in the Standards relate to new grouting only, and should be excluded from
the void-gro uting specification or amended accordingly. For example, the recomme ndation
in this Report for pressure testin g ducts before concreting is not appropriate although th e
benefits of measuring duct leakage before gro uting remain. In some cases, entirely new
provisions are needed, for example relating to drilling in to the ducts for investigation
purposes and subsequently for ve nting or injection. Some provisions may apply only after
mo dification , for w hich exam ples are given in the paragraphs below. A convenient way of
defining variations to the Specification is to use Appendix 17/6 to the Specification
for
Highway Works^.
There must some times be enough flexibility for the engineer to accept m ethods proposed
by the co ntractor and adapted to the conditions on site. However, significant factors m ust
not be overlooked by default, and the quality of work must be maintained.
Maximum pressures during void grouting
Where sm all passages have to be grouted, it may be desirable to increase the maxim um
pressure to ensure that grout flows through to the next larger void. Pressures higher than
8 bar (800kPa) require the approva l of the engineer. Sudden app lication of high pressure
to drive grout along small passages may cause a blockage.
Distance between vent points
The distance between ven t points may be shorter or longer than norm al. Reasons are the
need to establish void characteristics at sufficient intervals - this may require closely
spaced holes - and access difficulties th at may restrict hole drilling anywhere but at the
ends of the span.
Height of vents above the duct
Restrictions on height w ill som etimes prevent the standard he ight being achieved. The
specification should provide for this, allowing the maximum practical height to be used in
all locations.
Amount of grout removed from each vent
When vents are very closely spaced because of the spacing of holes used for invasive
drilling,
and all holes are used as vents, it is not necessary to collect a full volume of gro ut
from all vents. An exce ption mig ht be where flushing with water has been used. The
procedure should be covered in the specification and agreed with the engineer.
Holding pressure after g rou ting
It may be desirable for th e norm al requirements, e.g. for holding pressure, length of time ,
reinjection, to be reconsidered. This m ay apply where it proves impossible to fully seal the
void being grouted.
53
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 65/125
7 Void sroutirr
7.11 Trials
7.12 Qua l ity co ntrol
Rate of progression of g routing a long duct
It is accepted that this cannot be controlled for void g routing to th e same degree as for
new grouting. Because the void cross-section changes as the grout progresses along the
duct, the volume required to fill a given length m ay change rapidly. This can be anticipated
to some extent if the characteristics of the void are established before grou ting.
Trials are essential for all void-g rou ting contracts. The ducts, tendons and void characteristics
should be faithfu lly reproduced in the trials.
The trials should e mp loy the method s used to characterise the voids and establish the
extent of continuity, and the proposed grouting method. If the ducts in the structure leak
significantly, the ab ility of the proposed metho d to counteract this should be demonstrated
with match ing leakage rates. If water is to be used to flush the vo id before gro uting and
provide lubrication, this should form part of the trials.
Coloured grout can be used, either for the 'original' grout used to partially grout the duct
to prepare the specimens for the trials or for the void-grouting material.
Quality control requires the following elements:
. dem onstration in advance of equipmen t, materials and techniques in a representative
situation
• detailed me thod sta teme nts, including a planned reaction to possible scenarios
highlighted in risk assessments
a flexible approach to enable the best grou ting to be achieved according to the
circumstances foun d
I meticulous record taking that includes an agreed statem ent of the likely duct conditions
on completion of the remedial grouting operation.
The control of qua lity should begin with thorough docum entation of the void characteristics.
A schedule of du cts, voids, vent pipes and injection points, etc. should be submitted
before work starts, and records should be kept during gr outin g, as for new grouting . It wil l
be impossible to know exa ctly what each void is like but a full record of site inform ation
made during grou ting wi ll help in resolving, w itho ut delay, questions tha t arise during and
after the work.
5 4
Experienced site personnel m ust be used, to operate the pum p, at the injection points and
to manage the works. The quality of the grout is important, particularly at the vent pipes,
and this can be mon itored . The significance of the different operations and m aterial
properties m ust be recognised - for instance, acceptable limits for grou t fluidity, the
correct amount of water, preliminary testing and the need to have everything to hand so
there are no delays during the work.
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 66/125
Void groutin
Careful notes should betaken during grouting to monitor fluidity, pumping pressure, flow
time and any problems encountered, for each voided length attempted. Any locations
where it is not clear if g routin g has been successful, or where flow times are shorter or
longer than expected, can then be inspected carefully later.
After grou ting, the qu ality achieved should be established by invasive drilling at points
other tha n the injection and vent positions. Suitable places include vulnerable locations,
for example at the top of a profile, or where something unexpected happened during the
process. It is reasonable to assume that, in a well-controlled grouting operation in which the
flow of grout th roug h a ll vent pipes has been achieved in com pliance with all procedures,
the voids have been satisfactorily filled. Sample drilling may be used to confirm this. If
coloured grou t is used for vo id gro uting in the works, the success of the g routin g process
can be established more easily.
Where invasive d rilling has been carried out, the characteristics of the duct after the voids
have been grouted may be established by measurements of void volume, co ntin uity and
leakage.
If the most vulnerable positions are inspected, and are seen to be fully gro uted, this
demonstrates th at there is grout in the d uct tha t was no t present before. The tendons are
at least better protected than before the voids were grouted.
As wi th o ther g rou ting operations, the quality requirements in Chapter 14 should be
followed.
55
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 67/125
Test methods for grouted post-tensioned concrete bridges
8. Test methods for grouted post-tensioned
concrete bridges
This chapter covers tests relating to the durab ility o f prestressing tendon s, the efficiency
of the g routing process, and also outlines acceptable altern ative tests.
8.1 Introduct ion
8.2 Range of tests
considered
8.3 The need for testin g
The testing sub-group of the W orking Party considered a wide variety of testing m ethods for
durability and grou ting efficiency before publication of the first ed ition ofTR47 in 1996. The
general approach to testing taken at th at time remains unchanged in this Report. However,
the subject has continued to develop and the latest developments are reported here.
The chapter summarises the complete range of test methods considered, but then
concentrates on those that have most to offer. Further details can be found in Guide
to
testing and monitoring the du rability of
concrete
structures
1
-
7
^.
Emphasis is given to tests
specifically designed for grouted construction.
Routine testing of the qu ality of com pleted grouting was not com mo n in the past, although
such testing is com mo n for many other co nstruction activities. This may have been
because suitable test m ethods were not available, but it may have allowed defective
workmanship to go undetected on occasions.
In searching for app ropriate tests, the testing sub-group set the fo llow ing criteria against
which to judge tests to assess the quality of grouting during construction:
i The test should be taken at an early stage when rem edial action is possible.
: The test should inte rrup t the production process as little as possible.
i The test should be simple, so tha t ambiguous inter pre tation is unlikely.
Table
shows test me thod s applicable during co nstruction and Table 2 shows test
methods applicable durin g service life.
The selection of tests and the a mou nt of testing required are a ma tter of judgemen t. Ato ne
extreme, testing may be seen as a needless expense if reliability is already guaranteed in
some other way, and requirem ents tha t are too stringent cause needless expenditure and
delay. On the othe r hand, even extensive testing is likely to form a very small prop ortion
of the tot al ex pend iture, and it is essential tha t all concerned have full confidence in the
form of co nstruction and the workmanship with in each application. Only then can
long-
term durability be assured.
56
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 68/125
Test methods for grou ted post-tensioned concrete bridges 8
Table 1
Test methods applicable during construction.
Table 2
Test m ethods applicable during service Life.
Note
Some of these
methods are only
part ial ly developed,
and inclusion does not
imply that they are
appropriate for rout ine
appl icat ion.
Feature under tes t
Test method
Before grouting
Sealing of duct
Suitability of grout
Duct leakage under pressure (see Appendix A1)
As BS EN 445, BS EN 446 and BS EN 447
During grouting
Voids in grout
Grouting pressure
Overall quality control
Voids above grout
Grout stiffness test (see Appendix A2)
Void sensors (see Appendix A2)
Duct pressure sensor (see Appendix A3)
Autom ated quality co ntrol system (see Appendix A5)
Radiography
Impulse radar
Impact echo (sonic)
Ultrasonic transmission
Ultrasonic reflection
Thermography
Radiometry/tomography
Pressure/volume/leakage testing
Feature under test
Degree o f corrosion risk
Tendon integr ity
Prestress loss
Survey of existing ducts
before regrouting
Test method
Half-cell potential
Resistivity
Electrical c ontinu ity
Corrosion
Fibre-optic integrity
Acoustic monitoring
Ultrasonic electronic pulse
RIMT (Reflectometric Impulse Measurement Technique) electronic pulse
Magnetic flux exclusion
Strain by fibre-optic sensors
Strain by vibrating wire gauge or Demec gauge
Vibration monitoring
Duc t leakage under pressure (see App endix A1)
Volume of voids (see Appendix A6)
Autom ated quality control system (see Appendix A5)
A single test usually evaluates the effectiveness of only one layer of protection. Clients,
designers and contractors should therefore reflect upon the level of assurance tha t they
require, and commission a combination of tests that they judge will meet their needs.
An insight into the problem of grouting defects can be obtained from the extensive
programm e of Special Inspections of grouted bridge structures that has taken place in the
UK over recent years. This programm e showed tha t o nly sm all voids were present in 40%
of structures. On th e othe r hand, over 35% of structures co ntained, in varying degrees,
either large voids or ungrouted tendons. There is no dou bt fro m this survey tha t bridges
can be grouted extremely well, even those early bridges tha t were grouted w ith simple
equipm ent. The problem is therefore one of achieving good g routing every tim e.
57
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 69/125
Test methods for grouted post-tensioned concrete bridges
8.4 Test methods
appropriate in particular
circumstances
8.4.1 Type approvai at pre-
contract stage (duct systems,
grout materials and
procedures)
Qu ality assurance certification schemes have an impo rtant role in regulating con sistent
performance, bu t testing may be seen as the de finitive proof tha t a quality product has
been produced.
The problems discovered in post-tensioned grouted construction stimulated a number of
research activities. These have led to a greater understanding of the behaviour of materials,
but have also indicated the subject to be more complex than had been previously assumed.
Testing also has a role in recording the actual behaviour of materials under constru ction
site cond itions. Only in this way can the technology of gro uting be advanced still further.
It has been emphasised tha t the most useful tests are those undertaken at a sufficiently
early stage for defects to be corrected. The stages at which the tests mig ht be undertaken
are therefore considered below. Under each heading, the most appropriate tests are
discussed, wi th reference to A ppendix A, where further details of the tests themselves
may be found.
One of the m ost efficient means of achieving a qua lity end produ ct is to test certain
aspects that influence quality in advance of potential contractual complications. This
testing may include the following, separately or in combination:
• testing of duct systems
• testing of grout materials
• testing of com binations of duct systems, grout m aterials, and duct geom etry.
Examples of such testing procedures are given in the
fib
Technical Report
Corrugated
plastic
ducts
fo r internal,
bonded
post-tensioningW .
This describes testing requirements
for duct materials (such as flexural behaviour, load and wear resistance), leaktightness
and system approval testing (which includes grouting a 30m-long duct enclosing tendons
and encased in concre te). Most of these are also published in ETAG 013<
25
'.
ETAG 013 and C WA 1464 6'
26
' contain the European Approval requirements for post-
tensioning kits and for the installation and will apply to the UK on adoption of European
Standards throug h the forth com ing revision to BS EN 13670
(22
>. Further approvals are also
given in BS EN 447 for initial type tes ting of grout fa brication.
The tests described in Appendices A1 and A2 are also appropriate for use at the 'type -
approval' stage. These tests are designed to check the basic product, but can also provide
performance data against which workmanship on site can later be judged. The relevant
tests in Append ix A are:
I Test
A1,
leaktightness tests for duct systems. These give values of air leakage from the
duct tha t should be expected for the particular system.
•
Test A2, grout stiffness tests. These give the am oun t of gas tha t may be expected to be
trapped within a grouted duct for the tested system, given that the g rout material,
mixing plant, duct geometry and procedures remain unchanged.
58
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 70/125
"est methods for grouted post-tensioned concrete bridges
Pre-contract type-approval testing should be undertaken under the scrutiny of an
independen t qu ality assurance ce rtifica tion scheme, such as tha t p rovided by CARES. This
w ill result in confidence in the data produced, and its docu men tation, and provide a link
to the procedures adopted for use of the products on site.
It is necessary to record all details of the gro uting m aterial, mixing plant, duct geometry and
procedures in place during p re-contract testing , because significant de parture fro m them
can influence the quality of the finished product. The tests only demonstrate satisfactory
quality w ith given materials so long as all other factors influencing the gro uting remain
unchanged.
Type-approval tests could be extended to cover variations in grouting ma terial, m ixing
plant, duct geom etry and procedures. In tha t case, provided that do cum enta tion and
independent certification are also present, they may provide sufficient confidence to
remove the need for the trial grouting during individual contracts. The need to ensure that
conditions are as anticipated w ill remain on going, with a consequent need for qua lity
con trol measures.
8.4.2
Trial,
grouting within a
contract (geometry, materials
and procedures)
Trial grouting is taken here to describe the grouting of a trial duct w ithin a contract, before
approval of the contractor's proposals, the d uct being cut up after grouting to provide
definitive evidence that the ducts are adequately grouted. This is somewhat similar to type
approval at pre-contract stage, except that the proposed materials, geometry, equipment,
personnel and procedures will be identical to those proposed for the m ain works.
As with type-ap proval testing, the d uct assembly verification test A1 and grout stiffness
test A2 m ay be used to provide evidence tha t th e duct has been correctly assembled and
to measure the volum e of trapped gas in the tria l grouted duct(s). These tests wi ll provide
values of these parameters tha t are both achievable with the selected materials and
procedures, and also result in acceptable grouting quality.
If tests A1 and A2 are used during the tria l gro uting , they wou ld also provide achievable
target values for use during the m ain works.
8.4.3 Duct assembly
verification before main
grouting
Despite the fact th at duct systems themselves are satisfactory, a number of aspects may
go wro ng during assembly. These include local damage to ducts and seals, misalign men t,
and use of incompatible components. It is therefore important to check that the system
has been correctly assembled.
The tests for this are described in Appendix A1 .
59
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 71/125
Test methods for grouted post-tensioned concrete bridges
8.4.4 Duct integrity after
concreting or assembly of
precast units, but before
main grouting
Damage to d ucting sometimes occurs during concre ting. To determine th is, the system
should be tested after concreting. If this is undertaken prior to stressing, specially extended
end caps are required, but if undertaken after stressing the permanent caps should be
used.
The test wi ll also check the ir effectiveness.
The tests described in Appendix
A
can be used for this purpose.
It is illogical not t o test a fter concreting for fear of discovering damage that is difficult t o
remedy.
It is imp orta nt th at levels of leakage discovered follow ing concreting should
n ot
be regarded
as 'failure'. The concept of mu lti-layer prote ction is such that if each layer is as good as
practicable, then the construction as a whole is satisfactory. Some, but not all, of the causes
of leakage may be difficult to remedy at this stage. Easily corrected leakages are those
that are accessible, for example at vents or at end caps. In many cases, simple measures
such as an extra sealant between precast units may be considered an appropriate solution.
8.4.5 G rout stiffness test of
main grouting
The grout stiffness test was developed after reviewing the available test methods, and fills
a need fora test that met the criteria in Section
8.1.
The test is described in Appendix A2.
Unfortunately, however, the equipment which was developed to carry out the test has
since been scrapped, but the principles on w hich the te st is described are sound.
The alkalinity of the grout provides an effective protection against tendon corrosion,
particularly in the absence of chloride contamination. Measurement of the voids within
grou t thus indicates d irectly the likely effectiveness of g rout as a protective layer.
The major advantage of the grou t stiffness test is that th e existence of significant voids
within any duct is detected at a stage when the void can be removed by further grouting
and bleeding at vent pipes. If the test has not been calibrated d uring use on trial ducts,
the results may be interpreted by reference to other contracts, or more particularly by
reference to other ducts within the same structure. Variability in trapped gas due to changes
in m ixing, admixtures, temperature, incomplete fil l ing or inadequate venting will be
detectable. In addition, the equipment will indicate whether the duct is well sealed, or
leakage is occurring at any end caps or vent pipes.
If the stiffness test has been calibrated during a similar pre-contract typ e-app roval test or
against a tria l duct within the contract, it can be demo nstrated that the vo lume of trapped
gas is w ithin limits known to be acceptable. This w ill further increase confidence in the
finished product.
An alternative me thod o f detecting the presence of voids during grouting is the use of void
sensors, as described in Appendix A3. These have been shown to detect voids adjacent to
the sensors. If used to mo nitor grou ting during a contract, the sensors should be placed
at vulnerable locations and be wired to an accessible location before placing of concrete.
This would be an expensive and time-consuming operation.
6
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 72/125
Test methods for grouted post-tensioned concrete bridges
8.4.6 Automated quality
con trol testing of main
grouting
Equipment developed for the grout stiffness test was developed wit h the suppo rt of the
Highways Agency and the British Cement Association (now the Mineral Products Association).
This development was envisaged in Reference 34 . The equipment is described in Appendix A5.
Unfortu nately, however, the equipme nt was no t taken up by industry and has now been
scrapped. The description is included in this Report as the principles remain sound.
Autom ated quality control equipment is designed to monitor all aspects of gro uting that
may influence the final quality, and to record them automatically througho ut th e gro uting
operation. The equipment is placed within the grout flow line between the grout pump
and the duct. M easurements that are stored include temperature and grout flo w rate. The
equipment automatically tests the volume of gas trapped either within the ducts or within
samples of gro ut in the test chamber, with the results of the analysis displayed fo r immediate
use as we ll as for later reporting.
Qu ality assurance certification schemes will ensure that the equipm ent and training of
operatives is such that a high quality of gro uting can be achieved. Au tom ated qua lity
control testing demonstrates that the qu ality
has
been achieved on every duct.
The benefits of an automa ted q uality c on trol system are as follows:
I The presence of excessive trapped gas with in the grout, and hence prob able voids, is
detected at a time when further grou ting or venting can remove the voids.
I Leakage from the duct can be dete cted , and defects causing the p roblem such as loose
end caps can be rectified.
I If pre-contract type approval tests or trial ducts have established satisfactory gas
conten ts, it can be demo nstrated th at th e same quality has been achieved in the
works. With ou t such tests and trials, the equipm ent will still detect voids in excess of
what might normally be expected.
I The equipme nt produces a report of all events and their timin g. If any unforeseen
events occur, the full circumstances are recorded for analysis.
To force grout to move, pressure is applied at one end of the system, which decreases
along the length of gro ut w ithin the system. The grout pressure is generally indicated by a
gauge adjacent to the injection pu mp. The autom ated quality con trol system described in
Appendix A5 continuously measures the grout pressure closer to the p oint of injection
into the duct. If there is a particular need to m on itor pressure within the duct itself, duct
pressure sensors described in Appendix A4 may be used.
8.4.7 Survey of existing grout
conditions before regrouting
Surveys of existing structures have shown tha t voids are often present w ithin ducts, and
in some cases remedial groutin g is required. Remedial grou ting is a more diff icult opera tion
than g rout ing of new ducts. Knowledge of the extent and nature of the voids to be filled
can assist in the regrouting operation, and increases the probability of providing the tendon
protection and bonding required.
61
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 73/125
Test methods for grouted post-tensioned concrete bridges
The test methods for voids above grout carried out after grouting but before acceptance,
as given in Table 1, have all been used to assess voids with in existing structures, w ith varying
degrees of success. The ideal test for this purpose w ould be completely non-d estructive ,
and would not disturb the environment w ithin the duct. Non-destructive tests that meet
this ideal are not yet sufficiently precise, although this may improve with development.
Currently the most effective methods still involve intrusive examination of the duct,
generally throu gh a small drilled hole.
Tests applicable to existing ducts are described in Appendix A6 . These should be aimed at
providing answers to the following questions:
• Wh at is the corrosion risk arising from an ide ntified defect? Is there a need to regrout?
• Wh at is the most appropriate procedure for regrouting?
The answers to both questions depend p rimarily upon (a) the size and distribu tion of
voids and (b) the connection of these voids to the atmosphere.
The size of voids is certainly an indication of the likelihood of exposed tendon s, as we ll as
the presence of passages of sufficient size for successful regrouting. The location and
interconnection of these voids is also of great importance. However, the connection to the
atmosphere may be considered to be of even greater impo rtance. If a void is well sealed
and tendon s have only a wash of grout, they w ill retain their alkaline pr ote ction over a
long period. If the void is only sm all, but there is air leakage that enables ca rbona tion of
the grout, the durability will be significantly reduced. If water can gain entry, particularly
if it is contaminated with chlorides, the durability will be reduced further. Regrouting of
sealed voids is also more difficult, particularly if access to the end of the void is denied by
the geom etry of the structure.
The testing described in Appendix A6 is therefore aimed at reducing these uncertainties
to enable regrouting operations to be planned effectively.
62
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 74/125
Technical Report No. 72
Durable post-tensioned concrete structures
Recommendations for durable
post-tensioned concrete buildings
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 75/125
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 76/125
Durable post-tensioned concrete buildin;
9. Durable post-tensioned concrete buildings
The basic requirements for durable p ost-tensioned buildings are no different to those for
bridges. However, there is often a significant difference in:
• the environm ental exposure
• the number of ducts
• the drape of these ducts.
For these reasons it has been common practice to relax many of the established require-
ments fo r bridges when constru cting buildings. This may be appropriate in man y cases
but the consequences need to be considered. For example a car park has a very similar
exposure to a bridge and therefore the dur ability strategy should no t be significantly
differen t. Transfer beams in buildings w ill have large drapes and the con trol of materials,
workm anship and vent position should be the same as for a bridge beam to ensure that
the tendo n is fully grouted.
The aim of this chapter is to highlight w here procedures for bridges may need to be
mo dified for buildings. The aim is to refer to the main section of this Report as far as is
practical, and hence the subsections fo llow the same sequence as the sections dealing
with bridges.
9.1 Factors affe cting
durabil i ty
Chapter 2 discusses the main factors a ffecting th e durability of bridges. A key factor is the
penetra tion of external chlorides, which is also relevant to exposed buildings such as car parks.
However fo r most buildings the m ajority of the structure w ill be in a much less aggressive
environment and the principal requirement is to ensure that tendons are protected from
water and other harmful materials from the tim e of construction.
Compared w ith bridges, buildings, including car parks, have low cover and in many cases no
links enclosing the ducts. This means that the ducts are far less confined than in bridges.
As a result, excessive pressure in the ducts can lead to damage of the cover concrete; this
may be due to overpressure during gro uting but spa lling due to wa ter freezing in voids in
ducts has occurred on a car park structure. Care wit h expanding agents in grout must also
be taken as the expansion can cause h igh interna l pressure w ithin the ducts. Such spa lling
can lead to a safety issue due to falling concre te. Where com plete detac hm ent does not
occur, durability may still be compromised and the possibility of detachment occurring at
a later date can not be ruled out. It wou ld also appear possible that where wa ter has
entered a duct during con struction, freezing and associated spalling could occur p rior to
the enclosure of the building.
65
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 77/125
Durable post-tensioned concrete buildings
9.2 Materials and
components
As for bridges, the q uality of materials and compon ents used in post-tensioned buildings
is of great impo rtance, and therefore th e derivation of good specifications is crucia l This
should be done with a clear idea of performance requirements, and of a methodology
that will ensure that the chosen items do in fact comply.
9.3 Co nstruct ion qual i ty
The importance of construction quality in relation to the durability of the structure has
been discussed in Section 2.3.
9.4 Expansion join ts
For enclosed buildings the environm ent is relatively benign and no spe cial precautions are
required.
How ever, for car parks and other e xternal structures the guidance in Section 2.4
should be followed.
9.5 C onstruct ion joints
Figure 18
Live end anchor at c onstru ction join t adjacent
to unstressed pour strip.
Figure 19
Pour strip after tend on stressing and prior to
fixing reinforce ment and casting the concrete.
Wh ile it is possible to have con tinuity of prestress across construction join ts, it is more
typical to have an unstressed pour strip. Figure 18 shows a live end anchor prior to
concre ting the slab and Figure 19 shows the ends of the tendons after stressing and
cutting, prior to the reinforcement being fixed and the concrete cast in the pour strip.
6 6
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 78/125
Durable post-tensioned concrete buildinj
Figure 20
Dead end anchorage at construct ion joint .
In many case it w ill be beneficial to have a dead end anchor cast into the concrete and
therefore avoid the use of an anchorage at the construction join t altogether; see Figure 20.
However, this is not possible where double live ends are required and for structures
exposed to water th e guidance in Section 2.5 should be follow ed.
Where only dead end anchors are used, and so no space is required for the jacks, several
bespoke details have been developed to allow th e slabs to move apa rt during stressing with
con tinuity being provided later by locking the join t. The behaviour of such details should
be checked from first principles taking into consideration the effects of workmanship.
9.6 Cracking
Cracking lim ited t o th e values recom mende d in the various Codes of Practice is unlikely
to have any detrim enta l effect on enclosed structures. Indeed it is likely that wide r cracks
w ill have little e ffect p roviding the strand is protected inside a fully grou ted o r greased
duct. For external structures exposed to chlorides, BS EN 1992-1-1<
44
' requires the tendon
to be in a zone of compression and so cracking perpendicular to the te ndon should be
avoided. Section 2.6 gives further advice for ch loride environm ents.
9.7 Ducts and anchorage
layouts
General advice on duct and anchorage layouts is given in Section 2.7. For enclosed building
structures the use of top pockets is less problem atic due to the lack of water and they
provide a convenient solution when abutting existing construction. In addition the edge
of the slab is often the only pa rt of a structure tha t is either fully exposed or exposed
within an uncontrolled environment within the cladding make-up, and the use of a top
pocket (see Figure 21) may be beneficial.
67
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 79/125
Durable post-tensioned concrete buildin;
Figure 21
Top pocket before ( top) and after (botto m)
casting the concrete.
However, care should be taken that damage is not allowed to occur during construction
while any pockets can allow wa ter in to ducts. One way of avoiding this is to provide
tem pora ry drains similar to those in Figure 8; these would need to pass thro ugh the
formwork.
Where anchorages are exposed at the edge of a structure, either perm anently or due to
the phased nature of construction, the corrosion protection to the anchorage should be
designed to reflect this; see Section 10.3.3 and Figure 22.
6 8
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 80/125
Durable post-tensioned concrete buiidin)
9.8 Proximity to sea water
As indicated in Section 2 .9, structures in coastal areas and over the sea are at risk due to
corrosion induced by splash or spray of wind-borne chlorides and need greater corrosion
protection.
9.9 Road salts
As noted in
Design recommendations for multi-storey and underground carparks^,
published
by the Institution of Structural Engineers (IStructE), the exposure conditions for car parks
in the UK are much more severe than for con ventional buildings. During the w inter,
de-icing salts from roads are carried in by vehicles and are deposited on the concrete slabs,
particularly on access ramps and in well-used parking bays. A frequent factor is the retention
of water contam inated w ith salt, either on rough textured surfaces or in areas where
ponding occurs. The absence of go od drainage to carry these salts away can lead to very high
salt concentrations, perhaps ten times tha t of seawater. The IStructE recomm endations
concentrate on the concrete specification and general aspects for improving durability such
as wa terpro ofing and providing adequate drainage. No specific guidance for post-tensioned
concrete is given apart from noting that "Problems with corrosion of post-tensioned
tendons, particularly in bridges, have highlighted the importance of rigorous grouting
methods and checks".
9.10 Access fo r inspec tion
and m aintenance
Inspection and maintenance is required for all buildings including post-tensioned structures;
some guidance on procedures for car parks is given in the IStructE recommendations. For
buildings, access to the general structure will be relatively easy although as discussed
above inspection of anchorages may only be possible with removal of cladding panels.
For grouted tendons the use of non -destructive methods to check for voids within ducts
has me t w ith little success, principally due to the use of m etallic ducts. However, where
gross defects are expected it has been found relatively convenient to drill in to the duct to
inspect. Precautions should be taken to avoid damaging tendons. D rills are available which
cut out on contact with the metal duct; the final penetration into the duct can then be
carried out manually. Even if it is possible to gain access to anchorage positions, for
bonded structures, the anchorage w ill be hidden by a grout pack and only significant
deteriora tion w ill be obvious, and the effectiveness of grou ting m ay need to be inferred
from the condition of the adjacent duct.
The use of non -meta llic ducts to fac ilitate inspection has not been validated and the
relatively small size of ducts and any voids within may make this less reliable than bridge
ducts.
Research in this area wou ld be useful.
6 9
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 81/125
10 Available protective measures
10.
Available protective measures
The principles o f mu lti-layer prote ction, as discussed in Section 3.1, are equally applicable
to building structures. For internal buildings the envelope forms another significant barrier
wh ich helps pro tect the tendons. For external structures, such as car parks, such add itional
protection may not be available and the design strategy for multi-layer protection should
follow that of bridges in Chapter 3.
10.1 The structure as a
whole
As discussed above, for buildings, the envelope provides the first line of defence and for
most w ell-ma intaine d structures this reduces the reliance on other barriers. Wh ilst this is
generally true , care should be taken to highlight any parts of the stru cture t ha t are not
within a controlled environment and consider the need for additional measures.
For externa l structures, and in particular car parks, the discussion in Section 3.2 for bridges is
equally valid. In addition it should be noted that waterproofing systems in car parks are often
less robust than in bridges and can suffer fro m wear. Furthermore, wate rpro ofing to car parks
is often only carried ou t to the roof slab and, as discussed above, chloride-laden water
carried in on cars is potentia lly the main risk. Therefore, before relying on a car park water-
proofing system, the nature of the system and its likely maintenance should be considered.
10.2 Individual structural
elements
BS EN 1992-1-1'
44
' gives recomm endations for the design of building elem ents; these include
limitatio ns on stresses and crack widths and, via BS 850 0'
53
', guidance o n appropriate
covers and concrete quality. It should be noted that, for buildings, the geometry of the
duct often dictates its cover, with the minimum cover generally required to be at least
half the larger duct dimension for rectangular ducts. This is partly to lim it th e possibility
of spalling during the g routin g process.
10.3 Prestressing
components
10.3.1 Prestressing tend ons
Inform ation on prestressing tendons has been given in Section 3.4.1.
10.3.2 Ducts
The most comm on ducts in bonded post-tensioned building structures are oval galvanised
steel ducts with a folded seam. The galvanising is intended to avoid corros ion of the du ct
surface p rior to and during cons truction. In addition, the ga lvanising also serves as
lubrication and thus reduces the fr iction losses. However, the ducts can no t be considered
to provide a long-term protective layer. For car park construction it may be appropriate
to use non -me tallic ducts as a protective layer, the benefits of which are discussed in
Section 3.4.2.
70
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 82/125
Available protective measures 10
There are currently at least four European suppliers of oval non-metallic ducts to the UK
along with suppliers of plastic m onostrand ducts for grou ting. The systems typically include
all components required to make a sealed duct system. Thus it is possible to have a plastic
duct system that provides a com plete protective barrier for th e tendon s. Whilst several of
the systems are tested to the requirements of
fib
Bulletin No. 7,
Corrugated
plastic d ucts
for internal bonded post-tensioning^,
there is some practical concern about testing full
assemblies of oval ducts wit ho ut the concrete cast around the m . Pressure change may
occur due to the oval duct changing shape and this change in shape may cause additional
leakage at join ts. For this reason, where pressure testin g is used, it w ill probably on ly be
appropriate after casting of the concrete.
Typical oval ducts have tendon area-to-duct ratios similar to those in bridges and a
maximum of 0.5 is normally specified (see CARES Model Specification'
27
'). However, both
the size of the ducts and the strand layout with in mean that the size of void left w ithin
the d uct is significantly smaller than for typical bridge ducts. Nonetheless, numerous
grout trials have shown tha t w ith correct materials and workman ship the grou t is able to
penetrate these sm all voids.
10.3.3 Ancho rages
For typical intern al structures w here the anchorage is inside the building envelope, the
normal solution is to protect the anchorage with a mortar pad. Whilst the pad will only
provide nominal durability protection, in an internal environment this has been found to
be acceptable. For oval metallic ducts it is not normal to have vent points within the
anchorage cap and the vent comes off the duct or the back of the anchorage. It has been
argued that the mo rtar prote ction applied to the anchorages allows air to escape from
the anchorage and therefore allows complete grouting of the anchorage. This appears to
be demo nstrated by limited trials. However, the fact tha t the anchorage mo rtar pack is
not a irtight means tha t the protec tion for the anchorage is questionable. If voids exist,
the anchorage provides a path for moisture and oxygen to th e tendons. For this reason
this form of anchorage should not be used in exposed locations with ou t further protection.
Figure 22 shows the edges of post-tensioned slabs after the areas around the end
anchorages have been concreted.
Due to the visual imp lications it is not no rma l to continue anchorages to the outside face
of the building bu t where this is unavoidable the end of the anchorage should be covered
by sufficient reinforced concrete to provide the required dur ability.
As an alternative, the principles in Section 3.4.4 should be followed; in particular, systems
are available for oval ducts which incorporate plastic anchorage caps with the vent/injection
pipe coming o ut of the cap. These tend to be more comm on with the plastic duct systems.
71
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 83/125
10 Available protective measures
Figure 22
Edges of post-tensioned slabs.
72
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 84/125
Grouted bonded post-tensioned construction for buildings 11
11.
Grouted bonded post-tensioned
construction for buildings
As discussed previously, the strategy of this Report is tha t of mu lti-layer prote ction. For
an internal environme nt th e first line of defence is the building envelope; indeed for m ost
buildings, provided the tendons can be protected from corrosion during construction, the
building envelope should prevent furthe r ingress of the elements required for corrosion.
For most internal buildings the second layer of p rotection is the concrete cover to the
duct. However, for the protection to be effective, adequate grouting of the tendon ducts,
to expel any detr ime ntal ma terial, is essential. For externally exposed eleme nts, where
the envelop offers no or limited protection, further layers of protection are required and
these are discussed tow ards the end of this chapter.
11.1 Grouts and grou t ing
A properly grouted duct provides an alkaline environment which protects the strand from
corrosion. There has been concern tha t tendons are not always adequately grouted. Reasons
for this appear to be related to poor quality con trol procedures and /or inadequately trained
personnel. This has led to occurrences of co mpletely ungrouted ducts and to partially
grouted ducts. In this con text partially grouted means that part lengths of tendons were
not grou ted, presumably due to inappropriate action being taken when a blockage was
encountered. To address these shortfalls the CARES cer tification scheme has been updated
(see Chapter 14) and a ll site operations should be carried out by companies and operatives
satisfying the CARES Certification Scheme.
Wh ilst grouts for buildings were traditionally made from site-mixed cement and adm ixtures,
the CARES certification scheme now requires approved pre-bagged grouts to be used.
This change was driven by the va riability in cemen t bag we ight and properties, com bined
with the desire to minimise the influence of w orkmanship on gro ut properties. Such grouts
still need both suitability testing and inspection testing, carried out on a site-by-site basis,
to con firm that the methods and equipment used are appropriate.
W hilst the use of approved installers and pre-bagged grouts w ill maximise the chances of
complete filling of voids, one of the drawbacks of bonded post-tensioned construction is
tha t it is very difficult to inspect the adequacy of grouting achieved. Wh ilst there is the
possibility of installing sensors and probes for monitoring the potential for corrosion, the
large number of d ucts and less rigorous inspection regime, for b uildings when compared
with bridges, makes this impractical. Alternative methods, including the placement of an
easily traceable indicator in the g rout, are still under developme nt but most w ill require
non-metallic ducts to be used.
Experience shows that a significant number of defects in grouting occur due to whole ducts
being missed. Therefore, it is impo rtan t tha t the grou ting records include duc t-by-du ct
sign-off. It has also been proposed th at the volume of grou t used should also be recorded;
this is of value in co nfirm ing th at ducts have been grou ted, and possibly high lighting any
significant defect due to blockage of a large length of tendons. As the g rout used may be
73
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 85/125
11 Grouted bonded post-tensioned construction for buildin;
11.2 Vents and gro ut
injection
11.3 Recommended protec-
tion systems for buildings
11.3.1 General
less than a litre per metre and significant amou nts are drawn o ff at vent locations, it is
unlikely tha t such procedures w ill be able to accurately highlight ducts with smaller defects.
It is also recommended that checking of grout levels invents prior to cutting off vent tubes
be recorded.
For elements with shallow drapes - less than 5 00 m m - the requirements for vents can be
relaxed compared to those for bridges. However, for deeper elements the requirements
for grouting are no different and reference should be made to Section 4.2.
For shallow slabs, vents should be provided at in jection and exit points a nd, where the
length of the tendon exceeds 2 0m , at intermediate high-point vents such that the distance
between high-point vents is no more than 20m. The requirement for high points may be
relaxed if grout trials are carried ou t to a similar geom etry using the w orkforce and equipmen t
to be used on the project, to d emonstrate th at adequate gro uting is achieved.
A prestressing strand w ithin a dry duct is unlikely to corrode significantly during the life of
the structure, regardless of the presence of voids with in th e g rout. Once com pleted, the
building envelope shou ld prevent ingress of water, but w ater th at enters the duct during
construction will s till be available for corrosion. The first way in which wa ter may enter is
during the 'blowing through' of ducts with water prior to grouting. For this reason oil-free
compressed air should be used instead of water. The second way is due to water ponding
on the slab and entering the duct thro ugh vent tubes. The chances of this can be minimised
by ensuring that th e vent tub e is adequately filled before it is cut down .
Adequate grouting is required for durable post-tensioned structures. Whilst recommendations
are made for the type of grouts to be used, the principal factor in the qu ality of grou ting
achieved is the wo rkman ship. As such, the contra ctor should operate a quality system
tha t maximises the chances of a successful grou ting o pera tion. R ecommendations for
such a system are given in Chapter 14.
The two extremes of environment are fully enclosed buildings and buildings exposed to the
environment such as a car park. The rest of this section looks at the systems necessary for
these two situations. These are given by way of example and represent reasonable extremes.
However, it should be noted that some enclosed buildings may have more severe environ-
ments due to the ir use, e.g. swim ming pools, wh ilst m any exte rnal structures will not face
environm ents as aggressive as car parks. In these cases judge me nt w ill be required based
on the background above.
74
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 86/125
Grouted bonded post-tensioned construction for buildings 11
11.3.2 Prestressing system
The requirements for a ll buildings are as follow s:
• Ducts and vents should be in accordance with the specification, corrosion-resistant
and pressure-testable. The ducts and vents should be pressure-tested.
Full-scale representative grou ting trials should be used to prove the grou ting m etho d,
materials and personnel, unless there is evidence fr om a previous tria l using similar
geometry, and the same personnel, equipment and materials.
I Meth od s tatemen ts should be prepared in advance for all prestressing operations and
should be approved by an app ropriately experienced C hartered Engineer.
I All operations associated w ith the installation, stressing and grouting of tendons should
be undertaken under the certification scheme.
• Anchorage and vent locations and detailing should follow the logic outlined in
Sections 10.3.3 and 11.2 respectively.
In ad dition , for car parks:
Ducts should be corrosion-resistant and p ressure-testable. Sufficient ducts and vents
should be pressure-tested to demonstrate that the system and workmanship produce a
sufficiently airtight solution. It is proposed that initial pressure tests are carried out prior
to th e g routing tria l to dem onstrate the adequacy of the system. Such tests should be in
accordance with Appendix
A
and carried out after the casting of concrete. Thereafter it
is proposed th at con trol tests are carried ou t on 1 in 10 ducts with in the structure and
tha t in the event of a failure, in addition to proposals to improve procedures, the testing
regime is increased un til such time tha t the requirements of Appendix
A
are achieved.
11.3.3 The slab
The concrete strength and cover requirements shou ld be in accordance with BS 850 0
(53)
and crack width requirements in accordance w ith BS EN 1992-1 ~1<
44
'.
If a wa terpro ofing system is used it should be checked for integrity using appropriate
non-destructive test e quipment, including pin-hole d etection equipment for liquid-
applied w aterp roofin g systems. Where a double thickness is used, the first layer should
be proved before the second layer is applied. In add ition, the membrane should be
used to protect any anchorages left exposed.
For car parks the expansion joints and drainage system sho uld be detailed to ensure
tha t, in the event of equipm ent failure or leakage, water cannot find access to the
prestressing system.
Strand should be in accordance with BS 5896<
56
' or similar; see Section 3.4.1 for further
details.
11.3.4 Possible additional
measures
For buildings in unusually aggressive environm ents th e approaches recomm ended for car
parks above, or for bridges as discussed in Chapter 4, could be considered. However, for
most buildings the critical activity is the grouting and so where greater certainty is required
consideration should be given to increasing the level of checking during grouting . This could
be by ensuring tha t there is a third party responsible for checking grou ting activities. An
alternative would be to instruct the contractor installing the tendons to request an audit
under their certification scheme. Such audits are valuable in ensuring that the contractor is
work ing to the requirements of the scheme but is clearly less effective than physical checking.
75
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 87/125
11 Grouted bonded post-tensioned construction for building
11.4 Void g rout ing
The guidance given in Chapter 7 should generally be follow ed. It should be noted th at
vacuum gro uting has been used with apparent success on a num ber of building projects
using oval ducts.
11.5 Test m ethods for
grouted post-tensioned
buildings
The guidance given in Chapter 8 is generally appropriate. It sho uld be noted that oval
me tal ducts are no t a irtigh t so pressure-testing of these systems, in buildings, is not
applicable. In ad ditio n, even if a system th at is pressure-testable is used, as discussed in
Section 11.3.2, it may not be appropriate to test every duct. As stated in Section 8.3, an
element of judge me nt is required when considering the ap propriate tests to be carried
out. However, it is often appropriate to carry out a grouting tr ial as discussed below.
Grouting trials
The purpose of gro uting trials is to dem onstrate that the personnel, equipment, ma terials
and procedures can achieve adequate filling of the ducts. For this reason the trials should be
representative of the g eom etry of the structural e lement to be grouted, the ducts should
include the same num ber of tendons and these should be partially prestressed to take up
the correct profile. Grouting procedures are generally more critical for longer tendons with
higher profiles and more strands per duct. The trials should therefore consider a sensible
compromise between the worst case on the project and a trial tha t is representative of the
ma jority of tendo ns. On ly in special cases wou ld there be a need for tw o grouting trials
on the same project.
It will often be acceptable to use grout trials from previous p rojects. However, as noted
above,
these projects should have the same personnel, equipm ent, materials, procedures
and similar geometry to the structure under consideration. Therefore, it is important to
compare the details of the historic trials undertaken in addition to confirming that they
were successful. Given the natural changes in personnel, renewal of equipment, and the
recent change to pre-bagged grouts, it is unlikely that trials m ore than a year or so old
can be considered relevant.
76
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 88/125
Unbonded post-tensioned construction for buildings 12
12.
Unbonded post-tensioned construction
for buildings
As discussed
for
grouted tendons,
the
strategy
of
unbonded tendons
is
also th at
of
multi-
layer protection. For an internal environment the first line of defence is the building
envelope; indeed for most buildings, provided the tendons can be protected from corrosion
during construction, the building envelope should prevent further ingress of the elements
required
for
corrosion.
12.1 Introduction
Unlike grouted tendons,
the
unbonded strands generally used
in
building projects
are
coated with either high-density polyethylene or polypropylene. The interstices between
wires are also n orma lly filled w ith grease to repel m oisture. These elements to geth er
provide an essential additional layer of protection.
As unbonded tendons formed of conventional coated monostrand never achieve a bond
between the strand and the surrounding concrete, the anchorage com ponents remain
active throughout the life of the structure. Therefore the successful pr otec tion of the
anchorage components,
and in
pa rticular
the
uncoated sections
of
strand w ithin
the
anchorage, are essential.
A so-called 'after-bond' 19-wire coated strand has been developed in Japan, wh ich acts as
unbonded during stressing
but has a
ribbed sheath
and
contains
a
delayed a ction epoxy
filling, rather th an grease, effectively turn ing it into a bonded tendon after a short period.
It has yet to be used in the UK at the t ime of writ ing but it has an obvious advantage of
being much less heavily reliant on the permanent effectiveness of the anchorages.
For externally exposed structures where the envelope offers no or l imited, protection,
further layers of protection are required and these are discussed toward s the end of the
section.
12.2 Recommended
protect ion systems
for
buildings
For enclosed buildings the two recommended primary protection layers are the envelope
of
the
bu ilding, which
is
outside
the
scope
of
this R eport,
and the
high-density
polyethylene
or
polypropylene sheath.
12.2.1 General It is essential tha t the tendon and the protective sheath remain undamaged during
installation and the contractor should therefore operate a quality system th at maximises
the chances of a successful installation. Method statements should be prepared in advance
for
all
prestressing operations
and
should
be
approved
by an
appropriately experienced
Chartered Engineer.
77
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 89/125
12 Unbonded post-tensioned construction for buildinj
The buried 'dead end ' anchorages for unbonded tendons are afforded protec tion via the
passive environm ent provided by the surrounding concrete. Such anchorages should be
provided with cover equivalent to the normal reinforcement for the appropriate exposure
condition. A minimum of 25mm should be provided in all instances.
At the stressed end, i.e. the 'live end ', the anchorages shou ld generally be placed inboard from
the slab edge and a recessed pocket formed to give access for the stressing jack. At the
point w here the jack and wedges grip the strand, the outer sheath and the accompan ying
grease is removed during the installation process. It is recommend that anchorage compo-
nents are coated wi th grease of similar specification t o th at used in the tendo n and tha t a
wa tertigh t cap is applied over the coated area. The minim um concrete end cover to th e
cap and any other anchorage components should be 25mm.
The pockets should be sealed with mortar/re nder. The deta iling of this area requires some
careful atten tion , as mo rtar/render can be permeable and subject to shrinkage. It is
recommended therefore that a non-shrink additive is used for any infill mortar/render.
The use of pockets in the top surface of the slab should be given careful consideration; see
also Section 3.4.3. It is considered tha t the top pocket provides an unnecessarily conven ient
route for contaminants into the anchorage and tendon. If there is no alternative then the
design and construction should ensure that contaminants are excluded both during con-
struction and in service by taking ad ditional protective measures
The use of surfaced-fixed, exposed anchorages is not recommended in bu ilding structures
unless special attent ion is given to their de tailing and their protection from the ingress of
the elements required for corrosion. In such instance the requirements for fire protection
may provide a m ore onerous requirement for protection.
For some buildings the concrete structure can be exposed to the en vironm ent and one of
the more onerous conditions is that of a car park. The rest of this section looks at the
systems necessary for a typical enclosed building and an exposed car park. These are given
by way of exam ple and represent reasonable extremes. H owever, it should be noted th at
some enclosed bu ildings may have more severe environm ents due to their use, e.g. swim ming
pools, wh ilst many externa l structures wi ll not face environments as aggressive as car parks.
In these cases judg em ent w ill be required based on the background above.
12.2.2 Prestressing system
The requirements for a ll buildings are as follows :
I The coating to unbonded strand should be either high-density polyethylene or poly-
propylene. The coating thickness should be at least 1.0mm unless otherwise stated in
the project specification.
• All operations associated with the installation and stressing of tendons should be
undertaken under the CARES certificatio n scheme.
78
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 90/125
Unbonded post-tensioned construction for buildings 12
In addition for car parks:
The use of surfaced-fixed, exposed anchorages is not recommended.
I The use of pockets in the top surface of the slab is not recomm ended.
J Consideration should be given to using an increased coating thickness to the strand
from 1.0mm to 2.0mm depending on exposure conditions.
12.2.3 The slab
The concrete strength and cover req uirements should be in accordance with BS 8500
(53
>
and crack width requirements in accordance with BS EN 1992-1-1'
44
). In addition:
I If a wate rproo fing system is used it should be checked for integrity using approp riate
non-destructive test equipment, including pin-hole detection equipment for liquid-
applied waterp roofing systems. Where a dou ble thickness is used, the first layer should
be proved before the second layer is applied. In add ition, the membrane should be
used to protect any anchorages left exposed.
For car parks the expansion joints and drainage system should be detailed to ensure
tha t, in the event of e quipment failure or leakage, water cannot find access to th e
prestressing system.
I Strand should be in accordance wi th BS 589 6'
56 )
or similar. Where a dditional protection
from hydrogen emb rittlement/stress corrosion cracking is required, further testin g in
accordance w ith BS EN ISO 15630-3(
59
' and the FIP
Report on prestressing steel^
should be specified un til similar requirem ents are included in BS 5896<
56
>.
12.2.4 Possible additional
measures
For buildings in unusually aggressive environments the approaches recommended for car
parks above, or for bridges as discussed in Chap ter 4, could be considered.
79
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 91/125
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 92/125
Technical Report No. 72
Durable post-tensioned concrete structures
Recommendations for specifications
for durable post-tensioned concrete
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 93/125
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 94/125
Recommendations for specifications for post-tensioned tendons 13
13. Recommendations for specifications for
duct and grouting systems for post-tensioned
tendons
UK specifiers should adop t the recomm endations for design details given in this Report.
Users in other countries should consider whether environme ntal conditions and design
requirements are compatible with the UK.
13.1 Introduction
The version of The Concrete Society Specification published in the second edition of TR47
was drafted in 20 00 /20 01 and updated the version published in 1996. It took account of
further experience gained on tes ting of g rout, grou ting trials and systems developm ent in
the intervening period and in the LINK research project as we ll as wider intern ation al
experience drawn upon throu gh the Internationa l Federation for Structural Concrete
(fib).
In 200 7 new versions of BS EN 445<
2
), BS EN 446<
3
> and BS EN 447<
4
' were published and
the UK experience was input into the com mitte e d rafting of the revisions. Consequently
there is considered no need to reproduce the previous specification in this Report, although
there remain a number of important recommendations which should be included in
Project Specifications. These are outlined in this chapter to assist those writing a Project
Specification, and should be considered fo r use in standard industry specifications which w ill
form part of the overall Execution Specification as envisaged in BS EN 13670,
Execution
of concrete structures
1
-
2
^.
In 200 5
fib
published the important Bulletin 33,
Du rability of
post tensioning
tendons^
which adopts many of the recommendations of the second edition of TR47 and is
recommended to the reader.
Under the auspices of European Standards, every post-tensioned concrete s tructure w ill be
governed by BS EN 13670. This is turn requires a Project Specification and this w ill norma lly
be a suitable Na tional Specification such as the Highways Agency
Specification fo r Highway
Works^
or the
National Structural Concrete Specification^.
These Specifications should be
drafted to embody the principles in BS EN 13670 which calls up the grouting specifications
BS EN 445(
2
), BS EN 446<
3
) and BS EN 447<
4
>.
13.2 Guidance on th e
project specification
Site operations should only be pe rm itted to be carried out by organisations c ertificated
by CARES in accordance wi th the requirem ents of the CARES scheme for
The supply and
installation of post tensioning systems in concrete structures^
outlined in this Report, or
equivalent scheme.
83
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 95/125
13 Recommendations for specifications for post-tensioned tendons
EOTA 'type approval' for prestressing systems has been developed in Europe and this
includes tests for 'gro utab ility'. There is a requirement in BS EN 13670 fo r post-tensioning
systems to hold a European Technical Approval as outlined in ETAG O13
(25)
, but there is a
need for the Project Specification to state requiremen ts for insta llation and in this respect
BS EN 13670 refers to C WA 1464 6,
Requirements for the nstallation o f post tensioning kits
fo r
prestressing
o f
structures
and qualification of
the specialist company
and its personnel -
26
1 3 . 2 . 1 T r i a l s The Project Specification should call for full-scale trials if considered necessary to demonstra te
that th e gro uting will provide adequate pro tection to the tendons. This requirement should
be specified in the Project Specification and fully detailed on a contract drawing, including
tria l beam size, concrete grade, cover to reinforcem ent and tendons, reinforcem ent and
tendon details, together with requirements for testing and investigation. The purpose of
the trial is to test the contractor's proposed systems, methods, materials and personnel
tha t are to be used in the perm anent w orks. The trial should also incorporate any special
requirements of construction sequence and configurations. Requirements for disposal of
the tri al beam should be specified.
The trials should be carried ou t we ll in advance of the planned use of po st-tensioning in
the perma nent w orks (eight weeks is recommen ded). In particular, any proposals for
untried systems should be given due time for acceptance. The installation of the permanent
works may no rmally be allowed to commence imme diately after com pletion of successful
grout trials.
Where a supplier/installer has evidence of satisfactory grou ting from a significant number of
previous trials using the same procedures, equipm ent and m aterials, the specifier may
consider whether the cost of a ob-specific tr ial is justified. This would particularly apply to
use of a pre-bagged grout where repeatab ility is more assured, or to small projects. Never-
theless, full-scale trials are very e ffective in establishing suitable materials and procedures.
The trials are required to demonstrate that the g routing methods and procedures proposed
by the contractor will ensure that grout fills the ducts and surrounds the prestressing steel.
The contractor should be required to submit a detailed method statement, at least four
weeks prior to use in any trials or in the works, covering proposed m aterials, ducts,
anchorage and vent arrangements, personnel, equipment, grouting procedures and
quality control, for the approval of the engineer.
The trials should incorpo rate all relevant details of ducts, vents, duct supports, deviators,
prestressing anchorages and couplers, prestressing strands, grout inlets and outlets. The
tendons should be sufficiently tensioned tha t the strands with in the d uct take up a
representative a lignmen t. All systems, metho ds and materials should be those proposed
for the permanent works and should have been submitted as part of the detailed method
statement required. Grouting and testing should be carried out in accordance with the
Standards.
8 4
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 96/125
Recommendations for specifications for post-tensioned tendons 13
After three days the c ontractor should carefully cut or core the tria l section to expose
cross-sections and longitud inal sections of the duct, anchorages and any o ther locations
where required or as further directed to demonstrate that the duct is satisfactorily grouted.
The contractor should prepare a repo rt, giving full details of the
trial,
testing results and
photographs of the exposed sections.
Grou ting of the ducts should be shown to leave no void that either has a radial dimension
greater than 5% of the diame ter (or appropriate dimension in the case of oval ducts,
anchorages, etc.) or poses a risk to the protective system. The location of the voids with
respect to gro ut vents and their adequate gro uting and subsequent sealing, and the
disposition of the steel strands within the body of the gro ut should be reported.
Prestressing for the permanent works should not be permitted without written approval
to th e gro uting procedures and form al acceptance of the results of the gr outing
trial.
Irrespective of whether the contrac t requires full-scale groutin g trials, the contra ctor
should carry out a materials su itab ility assessment in accordance with BS EN 446<
3
>.
Grouting techniques such as vacuum g rou ting and po st-injection regrouting (as carried out
in Germany) are available from some suppliers and can be considered to be demonstrated
as suitable either for new works or for remedial works as appropriate. Such applications
should also be subject to trials.
13.2.2 Grout materials Composition of the grout is vitally important and it is recommended to specify pre-
bagged factory-form ulated products simply needing the add ition of a specified am ount
of water. The designer should specify the grout type required. Performance o f the grout
w ill in all cases be assured by suitab ility trials, irrespective o f wh ether full-scale grouting
trials have been called up.
If bagged cement is used, variations in age, chemical composition, fineness and temperature
can have significant effects on the performance of the g rout. Additionally, the w eight of
bagged cement is perm itted under current British Standards to vary by up to 6% from the
nominal weight, which could also significantly affect performance of the grout.
The water/cement ratio will normally be in the range 0.30-0.40 in order to achieve the
performance requirements of the Standards.
13.2.3 Ducting for bridges
and other aggressive
environments
Ducting for bridges and other aggressive environmen ts should generally com ply with, as
a minim um , the requirements of
fib
Bulletin 7,
Corrugated plastic ducts for internal bonded
tendons
1
-
32
).
It is generally agreed internationally tha t, for polyethylene and polypropylene d ucting , a wall
thickness of
1.0-1.5mm
is adequate to protect against ingress of chlorides. To allow for
damage during tensioning a minimum manufactured thickness of 2mm is recommended.
85
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 97/125
13 Recommendations for specifications for post-tensioned tendons
The system of ducts, duct connectors, g routing connections, vents, vent connections, drains,
transitions to anchorages and deviators and caps for anchorages shou ld for m a complete
encapsulation for the ten dons which is resistant to the passage of air and water. D ucts
should be of proven corrosion-resistant durable material such as high-density polyethylene
or polypropylene. Ducting that may degrade or corrode during the expected life of the
structure in the presence of contam inants permeating the surrounding concrete should not
be perm itted. The system should be fully co mpa tible with the prestressing anchorages,
couplers and other d etails. Where ducts are non-con ductive, m etal parts of anchorages
should be electrically bonded to th e adjacent reinforcement at each end of th e tendon and
the electrical continu ity of the structure over the length of the tendon should be tested .
The duct assembly ve rification test described in Appendix
A
should be carried out on site
for plastic du ct systems.
The duct rigidity and the type and spacing of fixings and supports shou ld be such as to
maintain line, position and cross-section shape during concreting. Local deformation of
the duct at supports should be avoided.
For external tendons the minimum wall thickness should be 4mm for durability or such
thicker wall as required to withstand the grouting pressures (normally about 6 bar (600kPa))
or the particular duct configura tion. For external tendons it can be impo rtan t to anticipate
any sagging of the duct due to the weight of grout, particularly for tendons stressed after
grouting,
and appropriate temp orary duct support should be provided during the grou ting
operation.
13.2.4 Ducting for internal
elements of buildings
For internal elements where it is considered acceptable to use non -encap sulating duct
systems the ducts should be robust enough to resist damage during co nstru ction, for
example smooth galvanised steel of minimum wall thickness 0.35mm or corrug
galvanised steel with a minim um wa ll thickness of 0.3mm .
1 3 . 2 . 5 V e n t S
Vents providing an air passage of at least 15mm internal diame ter shou ld be provided at
the anchorages and , for bridges, in the ducts at troughs and crests and beyond each
intermediate crest in the direction of g rout flow at the point where th e duct is one-half
diameter lower than the crest (but not further than 1m) and elsewhere, as required by the
system. For buildings where the drape is less than 5 00 m m , vents are gene rally placed at
duct crests as required to com ply w ith th e m aximum spacing. The m axim um spacing of
vents should be 15m for bridges and 20 m for buildings unless required otherwise by the
system or demonstrated by trials. Some configurations and some applications may
require closer or wider ve nt spacing.
8 6
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 98/125
Recommendations for specifications for post-tensioned tendons 13
The vent diameter and spacing may be varied in full-scale trials demon strating the suitability
of alternatives. The vents should be rigidly connected to the ducts and should be capable
of being closed and reopened. Holes in the ducts should be at least the internal diameter
of the vents and should be formed before any pressure testing. All ducts should be kept
free from stand ing water at all times and be thorou ghly clean before grouting .
For external tendons the arrangement and detailing of vents at positions w ithin deflectors/
diaphragms shou ld have been proven by detailed testing.
All anchorages for bridges and special applications should ge nerally be sealed by caps and
fitted with grou ting conn ections and vents. Sealing of anchorages should perm it the flow
of grout through the anchor head.
For most applications a vent height of at least 500mm above the adjacent concrete surface
is recommended t o help entrapped air and water to escape. For some con figurations of
tendons this may not be appropriate and the designer should consider an a lternative
13.2.6 Testing
The duct assembly verification test is intended to demo nstrate tha t plastic duct systems
have been correctly assembled. If the system fails to meet the test criteria, it should be
dismantled,
any damaged items replaced, and the system reassembled and retested. If it
still fails to comp ly, sealing o int s w ith a suitable sealant can improve matters . Acceptance
would then be subject to the engineer's decision on the results of retesting. Consideration
should be given to performance of the duct system under full grou ting pressure.
Appendix A describes additional tests for measuring the effectiveness of seal of the duct
system,
which the designer m ay consider adop ting in ap propriate circumstances. These
methods require furthe r experience and development before a dop tion as a specification
requirement.
The fluidity of the grou t dur ing injection should be high enough to be pumped effectively
and to f ill the duct a dequately, but low enough to expel the air and any water in the duct.
The time during which fluidity is maintained may need to be more than the minimum of
30 minutes given in the Standards and a target o f 90 minutes is a sensible upper lim it.
The grout should be sufficiently stable to bleed very litt le, so the materials segregate and
settle to a minimal extent. It is recommended that the allowable volume change limits in
BS EN 445P', BS EN 446<
3
> and BS EN 447<
4
> are amended in the Project Specification
such that -0 .5% < 8V < 2.5% , where
5 V
is the volum e change.
The requirement within BS EN 447 for density tests has been questioned in practice. There
is difference of op inion as to the value of this test over and above the fluid ity test. It is
understood that a correlation between fluidity and density is possible but that the
correlation can vary significantly at different temperatures. Further research is required
on this. In the mea ntime the density test should be carried ou t and reported as required.
87
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 99/125
13 Recommendations for specifications for post-tensioned tendons
13.2.7 Grouting
It was observed that th e type of bleed test previously specified in m ost nation al Codes,
and in the first edition of TR47, fails to identify poten tially unstable grou ts. The imp ortan t
feature missing from the tests is the destabilising effect of the 'wick ac tion ' caused by the
strands. This sh ortfall has been addressed by the developm ent of new tests which are
now covered in BS EN 445 . Further research developme nt o f new bleed tests is still being
carried out in the USA.
It is recommended tha t, where the system includes end caps at anchorages intended to
be left in place, these are left undisturbed and completeness of g rou ting is tested by
sounding and visual exam ination of ven t holes in order to avoid d isturbing the seals.
It is recommended that all bridges and structures in aggressive environments are classed
as Inspection Class 3 in BS EN 13670'
22
' and BS EN 446(
3
>. Inspection Class 2 could be
considered for less sensitive applications.
Norm ally, grout injection should not exceed the rate of about 10m of duct per minute. For
certain applications, where ducts are outside the norm al range of size (i.e. not m ulti-
strand tendons in 80-125mm ducts) this may be increased to 15m of duct per minute.
It is recommended that a record is made of the grout volume injected into each tendon,
preferably by use of a flow meter.
To minimise the risk of blockages of p um ping eq uipment or delivery hoses or of lumps
forming in the grout, it is advisable to wash out equipment with water at least every
three hours. This is especially recom mend ed before gro uting very lon g tendons and in
warm weather.
In cold weather it is necessary to measure the temperature of the co ncrete structure (for
internal tendons) or the air void around the ducts (for external tendons) to comply with
specifications t o avoid freezing the grou t. Air temperature measurement is straightforward
but measuring the temperature of the structure can be more difficult.
Recommended procedures are to seal the ducts, say 12 hours before g rou ting , and measure
the air temperature inside the ducts, or to form a small pocket in the concrete, fill it with
water, again say 12 hours before gro utin g, and measure the tem pera ture of this water.
The filled ducts should not be subjected to shock or vibration within 24 hours of grouting.
Whe n the gr out has set, the grou t vents should be tem pora rily reopened. If voids are
apparent on inspecting vents at end caps, the end caps should be removed to demonstrate
tha t they are satisfactorily filled w ith grou t. End caps, which have been rem oved, should
then be replaced by end caps perma nently sealed against ingress of con tamina nts.
8 8
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 100/125
Recommendations for specifications for post-tensioned tendons 13
If the anchorage caps are removed, a photographic record should be taken, clearly
identifying the individual anchorages, and included in a report.
If there is cause for doubt that the ducts or any part of the system are not satisfactorily
filled with g rout, investigations should be carried out.
The contractor should keep full records of grou ting for each duct in accordance with the
certification scheme requirements for installation of pos t-tensioning and in accordance
wit h Standards.
Grout vents should be positively sealed to be waterp roof on com pletion of grou ting by a
means separate from the concrete waterproofing.
8 9
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 101/125
14 Contractor's quality scheme requirements
14. Contractor's quality scheme requirements
The details in this chapter are intended to give guidance to post-tensioning contractors
to help develop their qu ality system procedures in line w ith the requirements of this
Technical Report.
14.1 Introduction
The CARES certification scheme PT1, The
supp ly and nstallation
of post tensioning systems
in concrete structures^,
is UKAS-accredited and was a key element in the lifting of the
moratorium on post-tensioned bridge construction in the UK n 1996. In response to the rapid
increase in post-tensioned concrete frame constru ction, CARES has developed a certification
scheme specifically
for
this method
of
construction, namely PT2,
The supply and installation
of
post tensioning systems in
concrete
structures
(excluding
highways
structures)
1
?
0
1
.
In order to give the customer assurance that the technical requirements and the spirit of
this Report
are
applied
in
practice
it is
essential tha t
the
post-tensioning contractor
has
an appropriate quality system and product certification to CARES schemes PT1 or PT2 as
appropriate.
The requirements of the CARES certification scheme have been developed through
agreement by relevant interested parties (clients, contra ctors, specifiers and technical
experts)
and
represent
a
consensus
of
opinion.
The
scheme
is
kept under review
to
ensure
that it meets industry requirements. The scheme covers both relevant o ffice a ctivities
and site practice.
The schemes are based on the premise tha t the post-tensioning contractor will supply all
of the post-tensioning system, materials and equipment, the components of which have
been proved
to be
suitable
and
comp atible,
and
which
are
correctly installed.
14.2 Basic qu ality system
elements
The CARES scheme relates
to the
quality system
and
product requirements
for the
supply
and installation of post-tensioning systems in concrete structures using bonded or unbonded
tendons
in
accordance wit h
the
relevant product standard and/or contract specification.
The post-tensioning contractor's quality management system shall be based on the
following essential elements covering both office and site activities.
Qua lity management system
The post-tensioning contractor shall have a quality system th at complies w ith the
requirements
of BS EN ISO
9001(
81
'
and
CARES Appendix PT1
or PT2 as
appropriate.
The post-tensioning contractor shall have a documented procedure that details the
attendances required
for the
post-tensioning operations.
The
provision
of
attendances
shall be agreed between the customer and the post-tensioning contractor.
9
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 102/125
Contractor's quality scheme requirements 14
Quali ty management system planning
The post-tensioning contractor shall ensure that the planning of the quality management
system is carried out in order to meet the qu ality objectives.
The post-tensioning contracto r shall produce a quality plan for each structure, iden tifying
structure-specific details, on which it is contracted to operate. The quality plan shall include
meth od statemen ts for the relevant key post-tension ing activities, e.g. duct insta llation,
tendon installation, tendon tensioning, tendon anchorages, tendon protection and grouting.
The quality plan shall also identify the human resources, responsibilities, hold points (and
release authorities), processes, materials, equipment, controls, measuring and test
equipment, standards and levels of acceptability required to meet the contract requirements.
Provision of resources
The post-tensioning contrac tor shall identify the resource requirements in a quality plan and
provide adequate resources, including trained personnel for the management, supervision and
performance of the work and verification activities as defined in Clause
6.1
of BS EN ISO
9001'
81
'.
Contract review
The contrac t review procedure shall ensure tha t the responsibilities of all relevant parties are
identified and all relevant design details, e.g. post-te nsion ing system, tendon configuration,
tensioning requirements, tension increments, grout, grou t mixing, grout placing, grout
testing,
resource requirements, attendances, are clearly, adequately and unambiguously
defined.
Records of contract review shall be maintained.
Quali ty records
The post-tens ioning contracto r shall keep quality records relating to the techn ical details
of post-tensioning contracts including site installation records.
Traceability
The post-ten sioning contrac tor shall ensure tha t materials and com ponents are traceable
from source to their location within the structure.
Purchasing
The post-ten sioning contrac tor shall have a system for purchasing materials and services
from subcontractors tha t includes all aspects of the ma terial or service specification th at
are important in ensuring satisfactory product quality and identification.
The post-tensioning contrac tor shall be responsible for the provision of po st-tensioning
system components, grout components and post-tensioning equipment.
Storage
The post-ten sioning contra ctor shall ensure tha t materials are stored and segregated in a
manner that prevents corrosion, damage, deterioration or contamination.
91
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 103/125
14 Contractor's quality scheme requirements
Handling
The post-tensioning co ntractor shall handle m aterials and equipment in a way tha t preserves
their quality and prevents them from becoming damaged, contaminated or corroded.
Inspection and tes ting
The post-tensioning contractor shall ensure that inspection and testing are conducted in
accordance with the quality plan, appropriate standards and contract specifications.
Control of non-conforming product
The post-tensioning contractor shall ensure that non-conforming work and materials are
not used in the works and tha t they are adequately segregated and ide ntified.
Internal quality audits
The post-tensioning contractor shall undertake internal quality audits in order to verify
the effectiveness of the qua lity system, including site ac tivities.
Training
It is essential tha t a ll post-tension ing operations are carried out by operatives with
appropriate knowledge, training and proven experience.
The post-tensioning contractor shall:
• Define the categories o f on-s ite personnel, e.g. trainee, opera tive, supervisor, engineer.
• Define the kn ow ledge , skills and experience required for each personnel category.
• Evaluate and endorse experience of personnel based on objective evidence such as
verifiable training records.
Provide relevant theoretical and practical training.
• Determine the level of knowledge and skill attained du ring training .
• Issue stateme nts of achieveme nt that identify the level of training achieved and
submit them to CARES in accordance with CARES PT9<
82
'.
CARES shall issue post-tensioning personnel with ID cards as appropriate in accordance
with PT9.
14.3 Product requirements
Ducts
The post-tensioning contractor shall ensure that:
• Ducts comply with the contract specification.
- Ducts are correc tly assembled, sealed, installed and adequately fixed to resist movem ent
and floatation during concrete placement.
• Ducts are free from standing water and con tam ination at all times, and are thoroug hly
clean before grouting.
• Duct vents are iden tified and protected from damage.
9 2
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 104/125
Contractor's qua lity scheme requirements 14
Tendon installation
The post-tensioning contractor shall ensure that tendons are installed safely and without
degradation, contam ination or damage to the tendon or the duct. Records shall be kept
of any problems encountered d uring the tendon installation process, e.g. blockages or the
use of excessive force.
Tensioning
The post-tensioning c ontractor shall ensure that tendons are tensioned to the correct
force in the correct sequence.
The tensioning procedure shall include the direct measurement o f tendon force and load
versus extension m easurements for verification purposes.
Anchoring of post-tensioning tendons
The pos t-tensioning contrac tor shall ensure that tendons are adequately anchored and
that the anchorages and tendons are protected from corrosion and mechanical damage.
Anchorages shall comply wit h the performance requirements of BS EN 13391'
83
' or equivalent,
e.g.
a European Technical Appro val t o ETAG 013<
25
>.
Protection of post-tensioning system components
The post-tensioning contractor shall provide protection for the post-tensioning system
components against corrosion, contamination and mechanical damage during and after
installation, prior to grouting. The post-tensioning contractor shall give due consideration
to the duration and type of exposure to which the post-tensioning system components
are likely to be subjected when selecting the me thod and type of p rotec tion.
Grout
The properties of the g rout s hall comply w ith th e requirements of BS EN 447
(4
>. In the
case of non-highways structures, grout shall be pre-bagged m aterial requiring only the
addition of water. Grou t shall be produced using fresh materials only.
Before use, the post-tens ioning contrac tor shall assess the grout properties in accordance
with the methods specified in this Specification, using the materials, material sources, plant
and personnel proposed for use on site. Grout preparation shall be undertaken under the
tempe rature conditions expected on site. The assessment shall be made sufficiently in
advance of the grouting operations to allow adjustments to the materials, procedures or
equipment.
Grouting trials
The post-tensioning contractor shall undertake full-scale grouting trials, where required
by the contract specification, to verify the proposed grouting methods and procedures.
Grouting
The post-tensioning c ontractor shall have a procedure to contro l the grouting process. The
procedure shall com ply w ith BS EN 446<
3
'. The properties of grou t shall be determine d in
accordance w ith BS EN 445(
2
>.
9 3
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 105/125
14 Contractor's quality scheme requirements
14.4 Certification The details in this chapter are only intended to give guidance to post-tensioning contractors
to help develop their quality system procedures in line with the requirements of this
Technical Report. In order to give assurance of full comp liance w ith the report, post-
tensioning c ontracto rs s hall have an appropriate qua lity system certified by CARES to
CARES Schemes PT1, PT2 or equivalent.
Further in formatio n is available fro m: UK CARES,
Pembroke House,
21 Pembroke Road,
Sevenoaks,
Kent
TN13 1XR,
UK.
Tel:+44(0)1732 450000,
Fax:+44(0)1732 455917,
E-mail: [email protected], www.ukcares.com
9 4
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 106/125
References
References
1. THE CONCRE TE SOCIETY.
Durable post-tensioned concrete bridges
The Concrete Society, Camberley,
First Edit ion 1996, Second Edit ion Z002.
2.
BRITISH STANDARDS INSTITUTIO N, BS EN 445 .
Grout for prestressing tendons -Test methods,
BSI,
London, 2007.
3. BRITISH STANDARDS INSTITU TION, BS EN 44 6.
G rout for prestressing tendons-Grouting procedures,
BSI,
London, 2007.
4 .
BRITISH STANDARDS INSTITU TION , BS EN 447.
Grout for prestressing tendons-Basic requirements,
BSI,
London, 2007.
5 . WO ODW ARD, RJ.
Conditions within ducts in post-tensioned prestressed concrete bridges,
Laboratory
Repor t 98 0, TRRL, Crowthorne, 1981.
6. STAND ING COMMITTEE O N STRUCTURAL SAFETY.
Third Report of the Committee for the Year
Ending 31 March
7979, SCOSS, London, pp. 15-18.
7. PORTER, MG . Repair of post-tens ioned conc rete structures ,
Proceedings of Symposium on Concrete
Bridges: investigation, maintenance and
repair,
September 1985,
The Concrete Society, Camberley,
1985,
pp. 1-27.
8. W OO DW AR D, RJ and WILLIAMS, FW. Collapse of Ynys-y-Gwas Bridge, West Glam organ,
Proceedings,
Institution of Civil
Engineers, Part 1, Vol . 84, August 1988, pp. 635 -669 .
9. POST-TENS IONING INSTITUTE.
Guide specification for grouting of post-tension ed structures,
Phoenix, Ar izona, 200 1.
10 .
FLORIDA DEPARTMENT OF TRANSPO RTATION.
Mid-Bay Bridgepost-tensioning evaluation,
10 October 20 01 . h t tp : //www11.myf lo r ida .com/s t ruc tu res /memos.
11 . HIGHW AYS AGENCY, TRL, SETRAand LCPC.
Post-tensioned concrete bridges,
Thomas Tel ford,
London, 1999.
12 .
FEDERAL MINISTRY OFTRANSPORT, CONS TRUCTION AN D HOU SING.
Guidelines for concrete
bridges with external tendons,
Verkehrsblat t-Ver lag, Dor tm und , No. 17/1999.
13 .
RAISS, ME. Durable post-tens ioned concre te br idges, CONCRETE, Vol. 27, No. 3, May/June 1993,
pp.
15-18.
14 . HIGHWAYS AGENCY, BD 54/93 and BA 54/ 93.
Design m anual for roads and bridges,
Vo lume 3 :
Highway structures: inspection and maintenance,
Section 1:
Inspection,
Part 2:
Post-tensioned
concrete bridges, prioritisation of special inspections,
H
gh
ways Agency, London, 1993 .
15.
HIGHWAY S AGENCY, BA 50/9 3.
D esign manual for roads and
bridges, Volume 3:
Highway structures:
inspection and maintenance,
Section 1:
Inspection,
Part 3:
Post-tensioned concrete bridges, planning,
organisation and methods for carrying out special inspections,
Highways Agency, London, 1993.
16 .
WO OD WA RD , RJ. Evidence of problems.
TRL Seminars on Inspection of post-tensioned concrete
bridges,
he ld on var ious dates 19 92-1994 .
17.
CLARK, LA.
Performance in service of post-tensioned bridges,
Br i tish Cement Associat ion (now
Mineral Products Association), Camberley, 1992.
18 . DEPARTMENT OF TRANSPORT.
Standards for post-tensioned prestressed bridges to be reviewed.
Press Notice No. 260, London, 25 September 1992.
19 .
HIGHWAYS AGENCY, IAN 16.
Design manual for roads and bridges,
Volume 2:
Highway structures:
design (substructures and special structures) materials,
Section 2:
Special structures, Post-tensioned
grouted duct concrete bridges,
H ighways Agency, London, 1999.
2 0 .
HIGHW AYS AGENCY, IAN 47.
Design manual for roads and bridges,
Volume 2:
Highway structures:
design (substructures and special structures) materials,
Sect ion 3:
Materials and components,
Post-tensioned grouted duct concrete bridges,
H ighways Agency, London, 2002.
95
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 107/125
References
2 1 . CARES. The supply and nstallation of post-tensioning systems n concrete structures.
http://wvjw.ukcares.co.uk/listjntro.htmlitposttensioning
22 .
BRITISH STANDARDS INSTITUTION,
BS EN
13670.
Execution
of'concretestructures, BSI, London, 2009 .
23 . FEDERATION INTERNATIONALE DU BETON. Grouting of tendons in prestressed concrete. Guideto
good practice, Bulletin No. 20, fib, Lausanne, 2002.
24.
FEDERATION INTERNATIONALE DU BETON. Durability of post-tensioning tendons, Bulletin No. 33,
fib, Lausanne, 2006.
25 .
EUROPEAN ORG ANIS ATIO N FORTECHNICAL APPROVALS, ETAG 013. Post-tensioning kits for
prestressing of structures, EOTA, Brussels, 2002.
26.
BRITISH STANDARDS INSTITUTION,
CW A
14646.
Requirements
forthe installation of post-tensioning
kits for prestressing of structures and qualification of the specialist company and ts personnel, BSI,
London, 2003.
27. UK CARES. Model specification f or bonded and unbonded post-tensioned floors (Second Edition),
UK CARES, Sevenoaks, 2008.
28.
CONSTRUCT. National structural concrete specification,
The
Concrete Centre, Camberley, Fourth
Edition 2010.
29 . THE CONCRETE SOCIETY. Gro uting specifications, CO NCRETE, Vol. 27, No. 4, July/August 1993,
pp.
23-28.
30. THE CONCRETE SOCIETY/CONCRETE BRIDGE DEVELOPMENT GROUP. Durable post-tensioned
concrete bridges, Proceedings
o f
Seminar,
The
Concrete Society, Camberley,
1994.
3 1 . FEDERATION INTERNATIONALE DE LA PRECONTRAINTE. Grouting o f tendons in prestressed
concrete,
FIP
Guide
t o
Good Practice, Thomas Telford, London, 1990,16pp.
32 . FEDERATION INTERNATIONALE DU BETON. Corrugated plastic ducts for internal bonded
post-tensioning, Bulletin No. 7, Taerwe, L (Ed.), fib, Lausanne, 200 0.
33 . BALVAC WHITLEY MO RAN . Feiton
Bypass,
Vacuum
assisted pressure
grouting of the post-tensioned
Macalloy ba r ducts on the River Coquet Bridge. 1981, 20pp
3 4. TILLY, GP and WOODWARD, RJ. Development of improved grouting fo r post-tensioned bridges,
Proceedings of FIP Symposium Post-tensioned concrete structures 7996,The Concrete Society,
Camberley, 1996, Vol. 1, pp. 55-64 .
35. GIFFORD A ND PARTNERS. QA of grouting post-tensioned concrete structures. Proceedings o f
Seminar, Cambridge, 23-24 September 1999. Gifford and Partners, Southampton. (Workshop
organised under BRITE EURAM Contract BRPR-CT 95-0099, BE95-1675, Improved quality
assurance
and methods of grouting post-tensioned tendons.)
36 . DARBY, JJ. Control o f grouting quality by the measurement of to ta l gas content with in fresh grout,
Proceedings
of FIP
Symposium Post-tensioned concrete structures
1996,
London, September
1996,
The Concrete Society, Camberley, 1996, Vol. 2, pp. 669-676.
37. BUILDING RESEARCH ESTABLISHMENT. Concrete in aggressive ground, Special Digest 1 (Four p arts),
CRC Ltd, Garston, 200 5.
38. THE CONCRETE SOCIETY. Alkali-silica reaction: minimising t he risk of damage to concrete,
Technical Report
30
(Third Edition),
The
Concrete Society, Camberley,
1999.
39. HIGHWAYS AGENCY, BD 33/94. Design manual for roads an d bridges, Volume 2: Highway structures:
design (substructures
and
special structures) materials, Section
3:
Materials
and
components, Part
6:
Expansion
oints for use n highway bridge decks, Highways Agency, London, 1994.
4 0 . HIGHWAYS AGENCY, BD 57/01 and BA 57/01. Design manual for roads an d bridges, Volume 1:
Highway structures: approval
processes
and general design, Section
3:
Generaldesign, Parts
7 and 8:
Design o r durability, Highways Agency, London, 200 1.
4 1 .
CONCRETE SOCIETY. Non-structural cracks in concrete, Technical Report 22 (Third Edition), The
Concrete Society, Camberley, 1992.
96
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 108/125
References
4 2 . CONCRETE SOCIETY.
The
relevance of cracking in concrete to corrosion of reinforcement, Technical
Report 44,The Concrete Society, Camberley, 1995.
4 3 .
HIGHWAYS AGENCY, BD 28/ 87 and BA 24/87 . Design manual for roads and bridges, Volume 1:
Highway structures: approval
processes
and general design, Section 3: General design, Part 14: Early
thermal cracking of concrete, Highways Agency, London, 1987.
4 4 . BRITISH STANDARDS INSTITUTION, BS EN 1992. Eurocode 2 Design of concrete structures. Part 1-1:
General rules and rules for buildings, Part 2: Concrete bridges, BSI, London, 2004 and 2005.
4 5 . SALAS, RM, SCHOKKER, AJ, WEST,JS, BREENJE and KREGER, ME. Conclusions, recommendations
and design guidelines for corrosion protection of post-tensioned
bridges,
Research Report 0-1405-9,
Center for Transp ortation Research, The University of Texas at Austin, 20 04.
4 6 .
BRITISH STANDARDS INSTITUTION, BS 540 0. Steel, concrete and composite bridges, Part 4: Code
of practice for design of concrete bridges, BSI, London, 1990.
47 .
HIGHWAYS AGENCY, BD 24/92. Design manual for
roads
and
bridges,
Volume 1: Highway structures:
approval processes and general design, Section 3: G eneral design, Part 1: The design of concrete
highway bridges and structures. U se of BS 5400: Part 4:1990, Highways Agency, London , 1992.
4 8 .
HIGHWAYS AGENCY, IAN 123/10. Use of Eurocodes for the design ofhighway structures, Highways
Agency, London, 2010.
4 9 . CONSTR UCTION INDUSTRY RESEARCH AN D INFORMAT ION ASSOCIATION. Bridge detailing
guide, C543, CIRIA, London, 2002.
5 0 . HIGHWAYS AGENCY, BD 47/9 9 and BA 47/ 99. Design manual for roads and bridges, Volume 2:
Highway structures: design (substructures and special structures) materials, Section 3: Materialsand
components, Parts 4 and 5: W aterproofing and surfacing of concrete bridge
decks,
Highways Agency,
London, 1999.
51 .
HIGHWAYS AGENCY. Manual of contract documents for highway
works,
Volume 1: Specification for
Highway
Works,
Highways Agency, London, 20 05 (plus amendm ents).
52. THE CONCRETE SOCIETY. Guide to surface treatments for protection and enhancement of concrete,
Technical Report 50 , The Concrete Society, Camberley, 1997.
53.
BRITISH STANDARDS INSTITUTIO N, BS 850 0. Concrete-Complementary British Standard to
BS
EN 206-1, Part 1: Method of specifying and guidance for the specifier, Part 2: Specification for
constituent materialsand concrete, BSI, London, 2002.
5 4 . WALLBANK, EJ.
The
performance of concrete in bridges. A survey of 200 highway bridges, HMSO,
London, 1989.
55 . HOBBS, DW. (Ed.) Minimum requirements for durable concrete. Carbonation and chloride-induced
corrosion, freeze-thaw attack and chemical attack, Publication 45.043, British Cement Association
(now Mineral Products Association), Camberley, 1998.
5 6 .
BRITISH STANDARDS INSTITUTIO N, BS 5896 . Specification for high tensile steel wire and strand for
the prestressing of concrete, BSI, London, 1980.
57. BRITISH STANDARDS INSTITUTION, prEN 10138.
Prestressing steels.
Part 3: Strand. (In preparation.)
58 .
AMERICAN SOCIETY FORTESTING AN D MATERIALS, ASTM A416/A 416M. Standard specification
for steel strand, uncoatedseven-wire for prestressed concrete, ASTM, West Conshohocken,
Philadelphia, 2006.
59 .
BRITISH STANDARDS INSTITU TION, BS EN ISO 1563 0-3. Steel for the reinforcement and
prestressing of concrete-Test methods, Part 3:
Prestressing
steel, BSI, London, 2002.
6 0 . FEDERATION INTERNATIONALE DE LA PRECONTRAINTE. Report on prestressing steel, 5:
Stress
corrosion cracking resistance test for prestressing tendons, FIP (now fib), Lausanne, Sw itzerland,
September 1980.
6 1 .
KOLLEGGER, J. Investigations on a plastic duct for bonded post-tensioning , Bauingenieur, Vol. 69,
1994,
pp. 1-10.
62 . RICKETTS, NJ. Post-tensioned concrete bridges: Improved
design
methods, details and monitoring,
Interim Summary Report, Project Report PR/BR/2/93,Transport Research Laboratory, Crowth orne, 1993.
97
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 109/125
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 110/125
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 111/125
Appendix A
This test has the m erit tha t an absolute measure of to ta l leakage is obta ined, and the
duct can be characterised fo r leakage over a range of pressures. The effect of mo vem ent
of the duct, or sealing of a known leak, can also be correlated w ith the imm ediate effect
on leakage rate. The me thod is suitable for the survey of existing ducts p rior to regrouting.
The air leakage at a poin t tha t st ill provides sufficient encapsulation has not been established
at the present tim e, but can be more easily investigated if the leakage flow rate and pressure
com binations are know n. The limitation of the m ethod is tha t it has not been used on a
range of duct types to establish achievable standards.
Water test for leaktightness
The
fib
proposal for te sting of plastic ducts'
311
includes a water test on a 110 0mm -long
sample of duc t including a coupler. The specimen is subjected to specified b ending before
testing with water, internally and then externally, at a pressure of 0.5 bar (50kPa). Leakage
and its location under each test are noted.
This test has the advantage that it tests directly one of the most important properties of
the duct system, nam ely its ability to withstand ingress of water t hat may contain chlorides.
The higher test pressure of 0.5 bar (50kPa) and testing of a duct that has been bent also
give greater reassurance than a lower pressure air test. U nfortun ately th e test at present
does not appear to have any criteria for acceptance. Neither is there any accompan ying
air testing th at can be used to correlate wit h site testin g, which shall of necessity be with
air. If the test were to be repeated on a variety of du ct systems, togeth er w ith air tests for
leakage flow rate, the data thus gathered w ould enable this test to become of greater value.
A2 Grou t sti ffness tests
One of the greatest risks to the durability of tendons arises from lack of protection by grout
due to the presence of voids. These voids are either trapp ed gas within the fluid grou t at
the time of grouting or formed after bleed water has been reabsorbed. A method of
measuring the to ta l volume of void has been developed wh ich e xploits its co mpressibility
within an otherwise incompressible
fluid.
The method was developed during a number of
research projects, and the background is more fully described in Reference 34.
Research using this apparatus has led to a greater understanding of the sources of voids
with in grouted ducts. The m ixing process first entrains air, and this gradually rises and
escapes from the fluid. Subsequent venting wi ll remove most of this air, but air reaching
the surface after ve ntin g w ill remain as a void. If raised pressure is maintained until grout
stiffens, bubbles wi ll be compressed with a reduced tendency to rise. Gas-entraining agents
incorporated to cou ntera ct shrinkage are a further source of trapped gas, and the rate of
production of this gas will depend upon the tem perature of the mix. Whether this remains
as a void will again depend upon the time of prod uction relative to the tim e of venting,
and the maintena nce of pressure. Use of the gro ut stiffness test has dem onstrated the
presence of a small volum e of trapped gas within appare ntly we ll-grou ted ducts. This is
believed to be due to air trapped w ithin strand crevices and/o r the ribs of ducting . Air
with in such strand crevices has been found by pressure transmission along a 5m length of
grouted duct. These mino r distributed voids are no t believed to pose a significant threa t
to durability.
1 00
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 112/125
Appendix A
Figure A1
Location of spongeometer within the grouting
system.
The technique was first developed to measure the volum e of trappe d gas using apparatus
illustrated in Figure
A1.
(This was called the 'Spongeometer' in the first edition of TR47 and
in early published papers.) Hydraulic pistons intrude into the main chamber, compressing
any trapped gas. The volume of this gas may be compute d from the change in pressure.
This void m easurement technique was incorporated w ithin the 'Oxford gro uting qua lity
con trol sy stem' as more fully described in Section A5.
The equipment was demonstrated to detect voids at a distance of 60 m , and to provide
information on the effect of gas-entraining agents and mixer types. Samples of grout
could be tested at any stage in the grou ting process to measure the gas entrained in the
material delivered by the mixer. In order to achieve sufficient accuracy allowance had to be
made for the small movements of piston seals and duct walls. When incorporated within
the equipm ent described in Section A5 there were facilities to include these corrections,
and to store the results electronically. When the corrections were made, the equipm ent
was also suitable for use on external tendons. An au tom atic was hout fac ility minimises
delay during use. Interpretation of results was enhanced if the system was calibrated du ring
type approval testing or on trial ducts.
Pressure transducers
Supply line to grouted duct
Pressure chamber
Controlled Pistons
Supply line
from grout
pump
A3 Vo id sensors
Sensors that can be installed w ithin or around ducts have been developed for measuring
the passage of grout and the height or quantity of grout within a section of duct'
34
'.
Two m ain types of sensor were tested, nam ely capacitance and resistance. The capacitance
sensors were contained wit hin a sleeve around the duct, and capacitance was calibrated
as a func tion of the height of g rout w ithin the d uct. Resistance sensors com prised a short
section of duct connected to the rest of the duct w ith heat-shrinkage sleeves. When the
duct is grouted , the resistance between tw o opposing electrodes drops significantly (by a
factor of 1000).
Void sensors may have a role in quality con trol of gro uting if inform ation is required on
the filling of a duct only at a particular location . They do however require ins tallation of
specialist equ ipme nt and wiring in advance of concreting, and are therefore more likely to
be appropriate in a research situatio n.
1 01
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 113/125
Appendix A
A4 Duct pressure sensors
A5 Autom ated qual i ty
co ntro l systems
Injection pressure has conven tionally been measured at the g rout pump , which is the
location on the grout line that experiences ma ximum variation. The auto ma ted q uality
con trol eq uipme nt described in Section A5 measures the pressure w ith tw o sensors closer
to the point of injection. It is also possible to install pressure sensors along the line of the
duct'
34
*. Electrical and pneum atic pressure sensors were used. They were separated fr om
the fluid grou t by a rubber mem brane, and fitted at the base of a PVC access tube. In this
way the sensors could be recovered, although if this procedure were to be adopted for
works ducts the access hole wou ld then need to be made good .
Duct pressure sensors can be used to provide an ad ditiona l record for the g routing and
inform ation on the pressures in the d uct du ring the first 24 hours after grou ting. They are
practical and can be withd raw n before the grou t sets so that the vents can be filled and
sealed in the norm al way.
Effective qu ality con trol processes require a ll relevant info rma tion to be recorded. This
can be used to d em onstrate t ha t a ll procedures have been followe d and also enables
problems to be diagnosed and where possible re ctified.
Grouting of post-tensioned ducts requires operatives to perform a number of different
operations, such as bleeding specified quan tities of gro ut at vents, sealing vents and
applying specified pressures. Final quality is sensitive to any departure from the specified
requirements. Good grouting is so imp ortant for long-term durability that automa tic
recording and testing of workmanship to demo nstrate compliance is ustified.
The equipment described in Section A2 was further developed, with the support of the
Highways Agency and British Cem ent Association. The device became known as the
'Oxford grout quality control system' (see Figure A2). Unfortunately the device was not
taken up by industry and has now been scrapped. However, the principles remain
valid.
The method of measuring the volume of trapped gas was the same as the equipment
described in Section A2, but other parameters were also measured, and all in form ation
was autom atically recorded. The follow ing features were included:
• selection of autom ated test sequences to ou tpu t the volume of trapped gas wi thin
either grout samples or grouted ducts
analysis of test results by statistical means with imm ediate display of results to th e
operator
automatic correction for movement of seals at joints of ducts, enabling use on
external tendons
• a facility to signal to the grout mixing operative at a remote location the requirement
for further grout to be pumped to the du ct
• dual measurem ent of grou t pressure to provide war ning of any discrepancies in
measurement of this vital parameter
I recording grout pressures, grou t tempera ture, amb ient tempe rature, and flow rate of
grout at any specified time intervals
1 02
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 114/125
Appendix A
i autom atic washout of the pressure cylinder wit ho ut opening to m inimise interru ption
to the g routing process
electronic contro l of a ll valves to speed use
I autom atic sequencing of operations by preset combinations, operated from a display
screen
i storage of all results for the pro duction of a report when grouting is finished.
Use of equipment of this type can demonstrate that the required quality has been achieved,
as well as provide an incentive to operatives who wi ll be aware that their wo rk is under
constant surveillance. The final report produced from the stored information could provide
a permanent record of the grouting op eration . If the equipm ent were used on a variety of
contracts and duct systems, technica l data on gro uting would be accu mula ted. This could
advance knowledge of the technicalities of grou ting, and enable further improv eme nts to
be made.
Figure A2
Instrumentation within the O xford grout
quality co ntrol system.
-
Grouted
duct
rt/V
1 K& -
Drain valves =Q ^
Chamber
Wash unit
A.
Pressure
chamber
•fc^— Bleed valves
i9 )
Grout mixer
and pump
Computer control unit
y
y
y
y
y
Recorded
continuous
date
• Time
• Pressures
• Flowrates
• Grout
temperature
• Ambient
temperature
; \
1 x
i \
1
\
1 s
1 \
1
N
R e c o r d e d
tes t da ta
Volume of
grout trapped
within ducts
or grout
samples
Operation
sequences
controlled at
remote panei
• Fill cham ber
• Test grou t
sample
• Fill duc t
• Test duc t
• Washout
chamber
1 03
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 115/125
Appendix A
A6 Volume of voids before
regrouting
One of the most important parameters influencing successful regrouting of ducts is the
volume and disposition of the void to be filled. There are several methods by which the
volum e can be measured, each of them involving air pressures. They all require a hole to
be drilled to intersect the duct, preferably the top of the duct. A pressure-tight connection to
the drilled hole is then required, such as by a resin seal or expansion device wi thin the hole.
The following methods have been used.
Boyle's law vacuum method
The duct is evacuated to the maxim um vacuum tha t can be achieved, and the pressure
measured. A valve is then operated to connect th e evacuated duct to the top of a Perspex
tube, wh ich in turn is connected to a water reservoir. The water is drawn in to the Perspex
tube by the vacuum , and the volume of void w ithin the duct is equal to the volume of
raised water after correction for pressure by Boyle's law
(PV=
constant).
Boyle's law pressure method
A steel container is first pressurised to a known value. (A fire extinguisher casing has been
used for this purpose.) A valve is then o perated t o connect this pressurised container to
the duct void, and the new pressure is noted. On the assumption that the duct void is
sealed,
the volum e o f void may be calculated by Boyle's law
(PV=
constant).
The 'Oxford void volume measurement equipment
1
This proprietary equipment determined the void volume by the electronic tim ing of
pressure changes resulting from a particular leakage rate. The leakage can thus include
any leakage from the duct arising from cracks or orifices.
Selection of the most appropriate method depends upon the particular circumstances of
the tes t. If the void is we ll sealed, either the Boyle's law vacuum me thod or the pressure
method can give accurate results. However, the vacuum method is more cumbersome,
and the application of vacuum has the p oten tial danger of drawing moisture into the duct.
The pressure me thod is relatively cheap, although the result w ill not be accurate for voids
tha t are very significantly larger or smaller than the pressurised co ntainer.
The Oxford void volume measurement equipmen t produced more accurate results, and the
principle remains effective for ducts wi th mod erate leakage. The benefits are greatest if
the voids are much smaller or larger than the pressurised container. Voids tha t leak throu gh
cracks, and are thus most vulnerable to tend on corrosion, could still be measured. The
method would be particularly appropriate for surveys in advance of regrouting, where
detailed knowledge of sma ll voids and leaks is essential if grouting is to be undertaken
wit h confidence tha t the voids will be filled.
1 04
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 116/125
CARES and Post Tensioning
CARES Approved Installation
• Approval of post-tensioning contractor,
method statements, post-tensioning
kit, m aterials.
• Trained installers.
• Verif ied comp liance of post-tensioning
kit and components with standards
and codes.
• Tracea bility of post-tensioning
kit components: anchorages,
strand/bar, duct and grout.
• Ma intenance of testing and
installation records.
or High Risk
Non CARES approved post-tensioning
contractor may result in incorrect
installation of post-tensioning system.
Non-CARES post-tension kits or materials
may not meet standard requirements.
Failure of post tensioned system or
compromised structural performance
and reduced durability due to
incorrect or incompatible components
or unsatisfactory grouting.
N o traceability w ith difficulties to proper
recourse on non conformity or failure.
Why take the RISK?
For further information about CARES and an up-to-date list of manufacturers and suppliers
holding CARES certification please consult the CARES website: ww w.ukcares.com
Alternatively, co ntact the office:-
UK Ce rtification A uthority for Reinforcing Steels,
Pembroke Ho use, 21 Pembroke Road,
Sevenoaks, KenHN13 1XR
Telephone-01732 450000
Fax -01732 455917
E-mail - [email protected]
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 117/125
POST-TENSIONING
EXPERTISE ACROSS
THE GLOBE
CCL has a world class reputation for providing high quality,
imaginative post-tensioning solutions. Throughout every
stage of t he process, CCL can help you realise your
project's full p otential.
CCL is a CAR6S approved com pany. It's h igh perform ance
post-tens ioning systems are designed, manufactured and
tested to exceed the requirements of European Standard
ETAG013andAASHT0.
www.cclint.com
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 118/125
CARES is a UK base d, internationally recognised certification
body fully, accredited and operating independently for the
benefit of a ll key sectors of the s upply ch ain for construction
materials and products. The key products covered by CARES are
reinforcing steels, prestressing steels and associated products, for
their manufacture, processing and stocking and distribution
including installation against defined product standards and
design codes. The CARES certification schemes ensure that
products supplied to the construction industry consistently satisfy
the customer's requirements.
Importance of using an app rove d installer.
The installation of post-tensioning systems is a highly specialised
operation requiring a CARES approved post-tensioning
contractor. CARES app roved post-tensioning contractors are
regularly audited at he ad office a nd on site to ensure installation
procedures are adeq uate, trained post-tensioning personnel are
used and that a qualified post-tensioning kit is being installed.
Failure to use a CARES approved post-tensioning contractor could
result dangers to site personnel or compromised structural
performance because of:
a) Incorrectly installed post-tensioning system; under stressed, over
stressed or inaccurate profiles or alignment.
b) Failure of post-tensioning kit components.
c) Use of an unqu alified post tensioning kit of unknown
jerformance or incompatible components.
i) Incorrectly grouted or ungrouted tendons.
Compliance with product standards and codes.
Ml products c overed by CARES schemes are tested against
eleygnt produc t standards O Lspecifications. Strand complies with-
JS5896 (or prEN 10138), high tensile bar complies with B S4486
or prEN10138), post-tensioning anchors comply with
SSEN13391 a nd post-tensioning kits com ply w ith ETAG 013.
Confidence in
Post-Tensioning
Construction
Impo rtance o f correct materials an d products.
Post-tensioning system components carry large forces (over
20tonnes per strand) and any weakness due to substandard or
incorrect components can be catastrophic.
Risks due to poor grout and incorrect grouting .
The grout or filling material protects the tendon from corrosion and
provides a bond with the surrounding concrete. Failure to fully grout
tendons with the correct materials can significantly reduce their
corrosion resistance and compromise the durability of the structure.
Traceability of people and p roducts.
The CARES scheme requires traceability of post-tensioning kit
components to a location within the structure and the use of
personnel whose training has been verified by CARES.
Monitoring of Scheme performance.
The CARES certification schemes require that records of complaints
relating to compliance of the product made against appro ved firms
are pro perly addressed and that details of these complaints are
returned to CARES at regular intervals. Further action may be taken
by CARES against the approved firm if required. CARES acts as a
point of reference when the performance of one of its approved firms
casts doubts on the effectiveness of the relevant certification scheme.
CARES list of app roved firms.
CARES regularly updates a list of approved firms which is
maintained on the CARES website (www.ukcares.com ). Each firm's
entry gives the scope of the CARES certification as well as other
key details of the firm. Oc casionally firms m ake spurious claims
regarding CARES appro val. This may relate to ap prova l of the firm
itself or of the products and services for which they might hold
appro val. If there are any doubts concerning the appro val status of
a firm, then the CARES list of ap proved Firms should be consulted or
alternatively the CARES office should be contacted for verification.
Why take the RISK?
For further information about CARES and an up-to-date list of manufacturers and suppliers
holding CARES ce rtification please consult the CARES website: www.ukcares.com
Alternatively, contact the office:-
UK Certification Authority for Reinforcing Steels,
Pembroke House, 21 Pembroke Road,
Sevenoaks, Kent T N I3 1XR
Te lephone-01732 450000
Fax-01732 455917
E-mail - [email protected]
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 119/125
THE CONCRETE
BOOKSHOP
For technical publica tio
m ultim ed ia, British standards
and more... _ ^
^ ^ M
If we don't have it,
it
f
s not about concrete
visit The Concrete Bookshop now
Phone: +44(0)700 460 7777
Email: [email protected]
www.concretebookshop.com
The Concrete Bookshop is wholly owned by T he Concrete Society
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 120/125
B a lv a c P o s t
T e n s i o n i n g
Balvac design, supply and install cost effective
post tensioning systems for:
•
BRIDGES
•
BUiLDiNGS
•
CAR PARKS
• SILOS • TANKS • NUCLEAR
•
RETROFIT STRENGTHENING
Balvac
is
CARES certified for the supply and installation
of
internal and external pos ttensioni ng systems, which have
been tested and approved
in
accordance w it h ETAG 013.
Our fully qualified and experienced supervisors and operatives
are directly employed and a ll hold relevant CSCS cards.
For preliminary budget information for your
next scheme contact us.
B a l v a c
Balvac Ltd
Sherwood House
Gadbrook Business Centre,
R u d h e a t h Northwich,
Cheshire, CW9 7TN
Tel:+44(0) 1606 333036
Fax:+ 44(0) 1606 812497
e-mail :[email protected]
www.balvac.co.uk
A BaifCll " Beatty Company
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 121/125
Jhe
•
I n f o r m a t i o n S e r v ic e s
Don't get left in
m f o s e r v i c e s @ c o n c r e t e o r g u
services, please contact Inform ation Services on
+44 (0 )1 276 607 140
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 122/125
Gifford
Challenge and innovation are constant features at Gifford. One such
example is our detailed design for a 150,000m3 LNG tank in Portugal
where, because of historic activity, the client doubled the seismic risk
threshold to 1 in 10,000; i.e. the tank had to withstand the wo rst earth-
quake likely to be experienced in 10,000 years. We used non-linear finite
element analysis to design an outer containment pre-stressed concrete
tank capable of containing a major spill and operating basis earthquake.
The tank is amon g the first in the world to be designed to the new
applicable Eurocodes.
From pre-stressed to post-tensioning; we're proud of our concrete
heritage, our long association with the Co ncrete Society and fib, and
the legacy of our w ork - reflected not just in the structures w e have
engineered worldw ide but in the improved industry standards we have
helped to create an d deliver.
Rhinefield Bridge
First post-tensioned concrete bridge
design in Britain by EWH Gifford in 1949 .
Deeside Road Link, River Crossing
The first major use of plastic ducts in
the UK.
Finback Bridge, Manchester
Post-tensioned internal and external
tendons.
Capital Gate, Abu Dhabi
Vertical post-tensioned concrete core.
Opening Autumn 2010.
gifford.uk.com
Concrete
Advisory
Service
Help and advice w hen
you need it
For details of this and other membership benefits, please contact our membership
depa rtment on +44 (0) 1276 607146 or visit www.concrete.org.uk/membership
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 1
9/11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 123/125
Li
c e n s ed
c o p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s , 19/11/2015
,
U n c o n t r ol
l ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 124/125
Li
c e n s ed
c o
p y :
G L A M O R G A N ,
U ni
v e r si
t y
of
S o u th
W al
e s ,
19/11/2015
,
U n c o n t r o
ll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y
8/18/2019 Durable Post-tensioned Concrete Structures
http://slidepdf.com/reader/full/durable-post-tensioned-concrete-structures 125/125
i a revision of the second edition of Techn ical
Report 47, Durable post-tenshned concrete bridges which
was publ ished by The Concrete Society in 20 02 . The
recomm endations in the second edit ion have been reviewed
and extended, and where new internat ional and European
standards now exist, now make reference to them. This has
enabled some simplification in the text. The most significant
extension to this Repo rt is to include recom me ndations
for pos t-tensioning in buildings as w el l as in bridges, wh ere
significant experience has been gained in recent years.
The measures described are aimed at imp roving design, detailing,
specifications, materials, construction methods and testing for grouted
ensioned concrete with either internal or external tendons.
o u th
W al
e s , 19/
11/2015
,
U n c o n t r oll
ed
C o p y ,
©
C o n c r e t e
S o ci
e t y