DURO FELGUERABFS TO CONSTRUCTION THROUGH EPC
“YOU´LL NEVER WALK ALONE”
20TH APRIL 2017 JAKARTAJose Valdes Suarez ([email protected])Iñigo Garcia Pardo ([email protected])
MINING IN A DAY SEMINAR
“Our goal of sending all our employees, including our sub-contractors home safely
at the end of every shift, is integrated into every decision and activity”.
Safety at the core of our Success
Our culture is based on positive reinforcement, interdependence among workers and good practices.
Strengthening preventive culture on all business lines and throughout the whole hierarchy, with people as the main value to protect.
Commitment to professional development and acquiring good preventive habits for the organization's professionals.
Promotion of safety in contractors in the international field.
Development of training, information and awareness programs among employees and our contractors.
The company Duro y Cia. is set up tomanufacture iron products at the factory in La Felguera (Asturias-Northern Spain)
The company changes to becomeSociedad Metalúrgica Duro Felguera
(SMDF) and leads the domestic steeland coal markets for seyeral years.
SMDF shares starttrading on the Madrid stock exchange.
Sale of mining and steel assets and the company focuses its business on
the manufacture of industrial equipment.
International actitiviescommence and the companyevolves towards industrial construction and assembly.
Specialisation in turnkey powergeneration and industrial
projects.
New headquarters in Gijón whereengineering and projects are concentrated.
1858
1900
1905
1966-1967
1970
1994
2009
155 years of industrial history
159 years of industrial history
Company Overview
4
Engineering, Procurement & Construction (EPC)
Erection, (ETC)Operation & Maintenance (O&M)
Other Activities
Energy Mining & Handling Oil & Gas
Coal Power Plants
FGD& DeNox
Biomass Plants
Cogeneration Plants
Simple & Combined Gas Cycles P.P
Thermosolar Plants
Mineral Processing Plants
Material Handling
Process Units
Storage Tanks & Terminals
LNG Terminals
Pressure Vessels
Railway Systems
Tunnel formworks
Communication
Manufacturing Intelligent Systems
Geothermal Power Plants
Fertilizer Plants
Mechanical, E&I Installation, Heat Insulation
Operation & Maintenance
Services
Chemical Plants
Warehouse Management Systems
Infrastructures &Energy
Erection, Overhauling ofsteam & gas turbines
E-Services
Security and Defense
Operating in sectors of the futurePresence in all fieldsOrganization Structure
5
Mining and Handling
• Engineering, Procurement and Construction projects in the mining and mineral handling field.
• Leading company in the construction of mineral processing and bulk material handling facilities, and bulk loading and unloading port terminals.
• Strategic Alliance between DF and for the development and execution of EPC projects.
BULK HANLING: COAL PORT TERMINAL, INDIA MINING:IRON ORE PROCESSING PLANT WITH CAPACITY OF 4 MTPY, MAURITANIA
• Vertical shafts and all related equipment
• Underground and surface loading stations
• Crushing and Screening Plants
• Conveyor systems
• Truck loading and unloading stations
• Ore storage and homogenisation yards
• Comminution Circuits
• Gravity circuits
• Flotation Concentrators
• Leaching ( Heap/Tank)
• Hydrometallurgy (SX+EW)
• Gold CIL Circuits
• Uranium IX Resins
• Roasting/Smelting
• Stackers and reclaimers
• Grab shipunloaders
• Ship loaders
• Train loading and unloading systems
• Conveyor systems
• Coal
• Iron ore
• Aggregates,
• Cement and Clinker
• Petroleum coke
• Sulphur
• Phosphates
• Fertilizers
Open cast or underground mines Treatment Plants
Mining and Mineral Processing Handling
Equipment Materials
6
DF- Specialist in EPC Projects Execution
Scope of Supply of a typical DF Mining and Handling Project consists of :
Conceptual DesignBasic and Detailed engineeringSupply, Transport,Fabrication, Erection, Commissioning, Testing and Warranty related Services
Including the entire Material Handling System and Auxiliary Equipment, Power Distribution, Communication and Lighting.
Civil Works design and supervision are also included, partnering with first class specialists worldwide.
Photograph: Erection Works Gangavaram Port Project7
Key Aspects for Success on a EPC Project
Working as one team with the owner to define Project’s goals and
scope.
Good execution strategy/ Project organization
Local Knowledge
Reliability and capacity to perform the work
Own know-how and specialist technological partners
Financial capabilities
Global presence
8
DURO FELGUERA IN INDONESIA
The history of DF in Indonesia dates back to 1982, when we supplied from our workshop in Spain specialized on manufacturing of pressure vessels (FCP) the several equipment for the Hydrocracking Complex for Pertamina in Dumai.
During the 90´s our Material Handling Division have been appointed as EPC supplier of 16 Overhead Cranes for Krakatau Steel Facilities in Cilegon.
PT. Duro Felguera Indonesia is established since 2012 as a mining services company, with the license of the Ministry of Energy and Mineral Resources. We have delivered two projects and several studies.
Duro Felguera is proud member of the following professional associations:
Association MEMBER
ASPINDO B-081/KTA-A.a/112/IX/2014
GAPENRI 33.101
10
DURO FELGUERA INDONESIA REFERENCESMATERIAL HANDLING
Description
Turn Key supply of Coal Mine Storage Yard ConveyorSystem including:
Two (2) Conveyors 2,500 tph. Two (2) Transfer Towers One (1) Travelling Tripper two- way chute 2,500 tph
Customer
P.T. LAMINDO INTER MULTIKON
Location
North Kalimantan – INDONESIA
Status
Completed
COAL STACKING CONVEYOR SYSTEM
12
DURO FELGUERA INDONESIA REFERENCESMATERIAL HANDLING
Description
Turnkey supply of river barge loading terminal consisting of:
Barge loading conveyors:• BC01 and BC02: 800 tph.
Loading hoppers with variable speed belt feeders:• 4 on BC01• 3 on BC02
Complete Civil works:• Land filling and conveyor foundations.• River barge mooring jetty,
Client
PT BARA RIA SUKSES
Location
Jambi . Sumatra Selatan. INDONESIA
Status
Completed
JAMBI COAL TERMINAL
13
Description
Iron Ore Wagon Tripper: 24 tips/hour. Iron Ore Stacker 1,500 tph. Iron Ore Bucket Wheel
Reclaimer 5,400 tph Iron Ore Shiploader 5,400 tph; 200,000 DWT vessels Belt conveyor system 1,500 / 5,400 tph. Two Coal Grab Shipunloaders 62 t. Vessel up to
120,000 DWT. Coal Stacker 4,800 tph. Coal Bucket Wheel Stacker
Reclaimer 4,800 / 1,500 tph. Coal Bucket WheelReclaimer 1,500 tph.
Coal Train Loading System 1,500 tph. Belt Conveyor System. Total length approx. 9 km.
Customer
GANGAVARAM PORT LIMITED
Location
Visakhapatnam. Andhra Pradesh - INDIA
Status
Completed
IRON ORE AND COAL SEA PORT TERMINAL
DURO FELGUERA MAJOR REFERENCESMATERIAL HANDLING
15
DURO FELGUERA MAJOR REFERENCESMATERIAL HANDLING
Description
Belt Conveyor System 4.800 tph Two (2) Shipunloaders FDR 2.400 tph / CDR 2.800 tph Two (2) Stackers 4.800 tph Two (2) Reclaimers 3.840 tph In motion Wagon Loading Station. Electrical and I&C
System Dust Suppression System. Civil Works Integration with existing Port Terminal minimizing
downtime interface
Customer
GANGAVARAM PORT LIMITED
Location
Vishakhapatnam. Andra Pradesh. INDIA
Status
Execution
PORT TERMINAL FOR GANGAVARAM PORT EXPANSION
16
Description
Two (2) Stacker-Reclaimer 3,250/1,750 tph. One (1) Stacker 3,250 tph. Six (6) Belt Conveyors 2,250 tph & Eight (8) Belt
Conveyors 3,250 tph Two (2) Oversea conveyors 3 km length 3,250 tph Eight (8) Transfer Tower Four (4) Trucks loading station, including hoppers and
weighing. Dust suppression system, Fire Fighting Systems Electric and Control System, Sub-Station 110 kV
Customer
TUTICORIN COAL TERMINAL PVT.LTD. (ABG-LDA Group)
Location
Tuticorin - INDIA
Status
Execution
COAL TERMINAL AND TRUCK LOADING SYSTEM OF TUTICORIN, NCB II
DURO FELGUERA MAJOR REFERENCESMATERIAL HANDLING
17
Description
2 Grab Shipunloaders - 54 t. 1 Stacker for Coal Stacking. Capacity: 5,400 tph. 1 Water Processing Plant. Re-running Water System. Belt Conveyor System 5,4000 tph coal. B = 1,800 mm. Trucks Weighing. Fire-fighting system. Dust Collection
System. Pile Spraying System. Trucks washing system. Offices buildings. Workshop – storehouse. Electric Sub-
station.
Customer
ENDESA GENERACIÓN
Location
Cabo Prioriño Port. El Ferrol - SPAIN
Status
Completed
TERMINAL FOR COAL UNLOADING AND STORAGE
DURO FELGUERA MAJOR REFERENCESMATERIAL HANDLING
18
Description
The plant consist of: Crushing: Primary Crusher and Pebbles Crusher Grinding: SAG Mill and Ball Mill Gravimetric Circuit:: Spirals, Shaking Tables and
Knelson Concentrators Flotation: Rougher, Cleaner and recleaner CIL plant Activated Carbon Desorption Electrolysis. Crude Bullion Production Cyanide destruct Thickening and filtering
Customer
RIO NARCEA GOLD MINES S.A.
Location
Belmonte. Asturias – ESPAÑA
Status
Completed
EL VALLE GOLD CONCENTRATION PLANT 0.9 Mtpy
DURO FELGUERA MAJOR REFERENCESMINERAL PROCESSING
20
Description
Turn Key execution of following scope: One Concentrate Stacker 3,000 tph. One Double Bucket Wheel Bridge Reclaimer 3,000 tph. One Bucket Wheel Reclaimer 3,000 tph. Belt Conveyor System 3,000 tph. Total length approx.
3 km. Auxiliary systems: infrastructures and civilbuildings, power distribution for all facilities.
Customer
C.V.G. FERROMINERA ORINOCO, C.A.
Location
Ciudad Piar - VENEZUELA
Status
Completed
PHASE II OF AN IRON ORE 12 Mty CONCENTRATION PLANT (1/2)
DURO FELGUERA MAJOR REFERENCESMINERAL PROCESSING
21
PHASE II OF AN IRON ORE 12 Mty CONCENTRATION PLANT (2/2)
Process plant
The Process Plant consist of two separate “mirror image”processing lines with parallel main equipment and a number ofservices in common for both plants.
Main equipment is described as follow:
Two (2) Ball Mill Fourteen (14) Cyclones Modules Twelve (12) Hydrosizers Twenty (20) Banks of Rougher Spirals Six (6) Banks of Scavenger Spirals
Sixteen (16) Medium Intensity Magnetic Separators Four (4) Primary Wet High Intensity Magnetic Separators Four(4)Secondary Wet High Intensity Magnetic Separators Six (6) Rougher Column Flotation Cells Six (6) Cleaner Column Flotation Cells Two (2) Belt Filters Two (2) Concentrate Thickeners Two (2) Tailing Thickeners Tailing Dam designed for 20 years. Water Storage
Facilities.
DURO FELGUERA MAJOR REFERENCESMINERAL PROCESSING
22
Description
Roy Hill Project has been designed to export 55 Mta of Iron Oreand includes Mine, Process Plant, Storage Yard, Heavy RailroadSystem from Mine to Port and New Port Facilities at southwestof Port Hedland, Western Australia.
Within this megaproject, DF has been awarded the supply of allprocess equipment / electrical system and the EP package ofthe ore handling system both at the Process Plant Storage Yardand at the large Port facility.
The handling equipment for Process Plant and Port has acapacity around 14,000 tons per hour, which ranks any of themwithin the range of the largest in the world. …/…
Client
SAMSUNG C&T Corporation
Location
Pílbara. AUSTRALIA
Status
Completed
ROY HILL IRON ORE PROJECT (1/2)
DURO FELGUERA MAJOR REFERENCESMINERAL PROCESSING
23
DURO FELGUERA MAJOR REFERENCESMINERAL PROCESSING
ROY HILL IRON ORE PROJECT (2/2)
Equipment
Within the Process Plant, which includes five main parallel processlines, main equipment is described as follows:
• Three (3) units of Primary and Secondary CrushingModular Facilities
• Five (5) Scrubbers• Five (5) Modules of Wet Coarse and Fines Screens• Three (3) Modules of Tertiary Crushers and Dry / Wet Screens• Five (5) Modules of Deslime Cyclones• Five (5) Up Curret-Classifier• Five (5) Modules of First and Second Stage of Spirals• Five (5) Belt Filters• Three (3) Tailings Thickeners• Process Water Dam and Residue Storage Facility• One (1) Laboratory
In addition to all belt conveying system, in excess of 12 Km length,following equipment are going to be designed, manufactured andsupplied (Process Plant equipment also to be erected):
• Process Plant site:o One (1) Iron Ore Fixed Slewing Stacker 13,700 tpho One (1) Fines Ore Traveling / Slewing Stacker 5,600 tpho One (1) Lump Ore Traveling / Slewing Stacker 5,600 tpho One (1) Traveling / Slewing Bucket Wheel Reclaimer 16,700 tpho One (1) Train Loading Station• Port site:o Two (2) Ore Traveling / Slewing Stacker 14,500 tpho One (1) Car Dumper 12,900 tpho One (1) Traveling / Slewing Bucket Wheel Reclaimer 16,700 tpho One (1) Traveling / Slewing Shiploader 12,700 tph
24
• Typically, a bankable feasibility study is a comprehensiveforward analysis of a project’s economics (±15% precision) to beused by financial institutions to assess the credit-worthiness forproject financing.
• The feasibility part is guided by a set of assumptions, a strategy,development conditions and a planned outcome. The outcome isuncertain and targets and objectives may not be achievable.
• The bankable part relates to the basis and conditions for a futurefinancial agreement to collateralize mining assets for a projectloan, to set a premium and a repayment schedule, withappropriate risk/reward factors.
BFS DEFINITIONS
29
BFS CONTENTS
1. Executive Summary Report
2. Geology and Ore Resources/Reserves
3. Mine Planning
4. Mineral Processing and Testwork
5. Processing Plant
6. Ancillary Services and Requirement
7. Capital Cost Estimation
8. Operating Cost Estimation
9. Baseline Studies
10. Marketing
11. Rights, Ownership and Legal Matters
12. Financial Model and Tax
13. Socio-Environmental Effects
30
• Normally, a feasibility study is prepared by a qualified engineeror estimator. It is a forward-looking document that captures aprecision level but not necessarily an acceptable* level ofaccuracy.
• So, what does “bankable feasibility” really mean in terms ofaccuracy for owner and investor confidence in the developmentand construction of a mining project?
• And how does risk analysis capture precision and accuracyfor better decision-making and executing a transparent,accountable and defensible execution plan?
* As known or required by the project owner
PRECISION / ACCURACY
31
CONCLUSIONS BFS
Some of the NI 43-101, JORC… studies have low engineering rigor due to lack of proper data and information.
A Qualified Person’s signature is not always a guarantee of reliable results.
Investors should engage independent third party engineering evaluation of reports before putting money on projects.
If investors demand more rigor of these reports, owner and engineers will be forced to keep up, improve their studiesand everyone will benefit.
34
DEFINITIONS
EPCM which is an abbreviation for Engineering (E), Procurement and Construction Management (CM)
EPCM contract has an open form and structure
EPC which is an abbreviation for Engineering (E), Procurement (P), and Construction (C)
EPC contract ruled by FIDIC Silver Book, Orgalime, ICC, ENAA, ICE, ECC, MDB Harmonised
EPC is “A contract option in which the EPC contractor is responsible for all activities from design to procurement and construction to deliver the asset to the end user or owner”
36
TYPICAL EPC ARRANGEMENT
OWNER
EPC CONTRACTOR
PROCESSENGINEERING
VENDORSTRADE
CONTRACTORS
SITE SERVICES
37
TYPICAL EPCM ARRANGEMENT
TRADECONTRACTORS
PROCESSENGINEERING
SUB-CONTRACTORS
SUB-VENDORS
SITE SERVICES
EPCM CONTRACTOR
OWNER
38
RISK SUMMARY
EPCRisk for CONTRACTOR and more effective for OWNER.Budget, schedule and performance risks are transferred to EPC contractor.
EPCMRisk for OWNER. EPCM is a professional service as opposed to a partyto the contract.
EPC/EPCM mix
Taylor made form of CONTRACT, complicated and difficult to make workable.
SELF PERFORM100% Risk for OWNER with no contractor.
39
BASIC ENGINEERING (FEED)
Basic engineering is a term commonly used to define concept design and is commonly known in EPC and EPCM projects as front-end engineering & design (FEED)
The FEED is normally a separate contract to the EPC and executed on agreed rates and prices.
The end of FEED is the start point of the EPC which is executed on the basis of lump sum or reimbursable cost
41
FS to EPC Proposal ConversionTransparency during Open Book Process
IND
IRE
CT
C
OS
TS
CO
NT
RA
CT
OR
RIS
K
AC
UR
AC
Y /
ES
CA
LA
TIO
N
Value Improvement /
Basic Enginering /
FEED
Enginering /
Initial Procurement
Lump Sum EPC
Execution
IND
IRE
CT
C
OS
TS
CO
NT
RA
CT
OR
RIS
KA
CU
RA
CY
/
ES
CA
LA
TIO
N
OPEN BOOK OPEN BOOK CLOSED BOOK
MILESTONE 1 MILESTONE 2
2 - 3 months 3 months
DIR
EC
T C
OS
TS
DIR
EC
T C
OS
TS
Fixed Price Lump Sum
(EPC)
Guaranteed
Maximun Price
(GMP)
COST OPTIMIZATION
TIME
Memorandum Of
Understanding
(MOU)
EPC PATH
43
FS to EPC Proposal ConversionTransparency during Open Book Process
SCOPE
• Review engineering Performed during FS
• Assume process will not change
• Review quality of Budget Price received (equipment, contractor, etc.)
and performed comparison with in-house data
• Finalise procurement and contracting packaging plan
• Update quotations
HIGH LEVEL DELIVERABLES
• Revised CAPEX estimate (AACE Class 3) 10-40% including final EPCM
• Project Master Schedule
• Guaranteed Maximun Price (GMP)
• EPC Term Sheet
FS GMP
44
SCOPE
• Finalise Basic Engineering, Commence Detailed Enginering
• Major equipment package tender and evaluation
• Pre-qualification of contractors, issue RFP/RFQ, undertake initial
evaluations
• Produce final CAPEX estimate
• Finalise EPC contract
OUTCOME
• Detailed design progressed to 10% complete
• Major purchase orders awarded / ready for award
• Earthworks and civils contracts awarded / ready for award
• Final CAPEX estimate (AACE Class 2 30-75%)
• Final Project Schedule
• LSTK EPC Price & contract
GMP EPC
45
INCORPORATE ADDED VALUE AT EARLY STAGES
TEAM BUILDING WITH CLIENT
TRANSPARENCY DURING PROPOSAL PREPARATION AND EXECUTION
TRACEABILITY FROM FS TO PROJECT EXECUTION
SECURE COMMITMENT WITH PROJECT BUSINESS PLAN
TARGET CAPEX FOR EPC CONTRACT
PROVEN KNOW-HOW TROUGH TECHNOLOGY PARTNERTS
TRACK RECORD DELIVERING IN TIME, COST AND QUALITY
WIN-WIN SOLUTION
SUMMARY OF ADVANTAGES
47