PROJECT NAME Sainsbury’s Brentwood INDUSTRY SECTOR Retail PROJECT TYPE Car park extension CLIENT J Sainsbury Plc ARCHITECT CHQ Partnership Ltd MAIN CONTRACTOR AD Bly PROGRAMME January to October 2017 PRODUCT SUPPLIED Pumps, pipework and valves to existing pump station, plus new pre-packaged dedicated surface water pump station PROJECT SUMMARY: Sainsbury’s supermarket, in the busy town centre of Brentwood, Essex, recently underwent a massive redevelopment plan to provide additional car parking with direct access to the store. This project required the ground level car park to be reconfigured, demolition of the existing multi-storey car park and then the construction of a new larger multi-story car- park. Dutypoint were called to site by the main contractor, AD Bly, to investigate the current storm water pump station and provide a solution to meet the surface water drainage demands of the new car park area and multi-story car park building. Dutypoint case study: Sainsbury’s Brentwood Location: Brentwood, Essex Dutypoint Ltd, Shepherd Road, Gloucester GL2 5EL T: 01452 300592 | [email protected] www.dutypoint.com PROJECT CHALLENGE: The existing surface water pump station for the ground level car park had fallen out of operation due to lack of regular maintenance and required a complete overhaul to meet the drainage demands of the new car park. The construction of the new multi-story car park also required a new dedicated surface water pump system.
Transcript

PROJECT NAMESainsbury’s Brentwood

INDUSTRY SECTORRetail

PROJECT TYPECar park extension

CLIENTJ Sainsbury Plc

ARCHITECTCHQ Partnership Ltd

MAIN CONTRACTORAD Bly

PROGRAMMEJanuary to October 2017

PRODUCT SUPPLIEDPumps, pipework and valves to existing pump station, plus new pre-packaged dedicated surface water pump station

PROJECT SUMMARY: Sainsbury’s supermarket, in the busy town centre of Brentwood, Essex, recently underwent a massive redevelopment plan to provide additional car parking with direct access to the store. This project required the ground level car park to be reconfigured, demolition of the existing multi-storey car park and then the construction of a new larger multi-story car-park. Dutypoint were called to site by the main contractor, AD Bly, to investigate the current storm water pump station and provide a solution to meet the surface water drainage demands of the new car park area and multi-story car park building.

Dutypoint case study: Sainsbury’s Brentwood Location:

Brentwood, Essex

Dutypoint Ltd, Shepherd Road, Gloucester GL2 5EL T: 01452 300592 | [email protected] www.dutypoint.com

PROJECT CHALLENGE: The existing surface water pump station for the ground level car park had fallen out of operation due to lack of regular maintenance and required a complete overhaul to meet the drainage demands of the new car park. The construction of the new multi-story car park also required a new dedicated surface water pump system.

Dutypoint Ltd, Shepherd Road, Gloucester GL2 5EL T: 01452 300592 | [email protected] www.dutypoint.com

PRODUCT SOLUTION: Following a site survey, Dutypoint specified new pumps, pipework and valves to refurbish the existing pump station to deal with surface water from the new ground level car park. In addition, Dutypoint supplied a complete packaged pump station for the new multi-storey car park. The team worked closely with the contracts manager and also the building, surface and civil contractors to minimise any disruption to the build schedule or Sainbury’s customers. This cross-functional involvement ensured that project was executed in a manner which allowed the store to continue trading. The delivery and installation was managed within specific time-lines co-ordinated with other on-site contractors, and the additional pre-built packaged pump station was installed quickly in the new car park area - saving considerable time on site.

Valve chamber before refurbishment

Wet wall before refurbishment

Valve chamber after refurbishment

Wet wall after refurbishment

Dutypoint's experience in specifying the best surface water drainage solutions for the project was invaluable. They managed the project very well, worked

closely with other contractors and showed a real willingness to go the extra mile to make the job run smoothly.