+ All Categories
Home > Documents > Dyad Construction - BUILDINGBLOCKS Media...

Dyad Construction - BUILDINGBLOCKS Media...

Date post: 13-Apr-2018
Category:
Upload: vuongnhan
View: 215 times
Download: 0 times
Share this document with a friend
18
Transcript

Dyad Construction Project Listing 1978 through January, 2013

1978

Keystone Mini Warehouse

Hinomoto Tractor for Vantage Toyota

Hillcroft Store Rooms for Vantage Toyota

Pearsall Chemical Ceilings

Gulf States Toyota – Port of Houston

Gulf States Toyota – Hull Field Hangar

1979

L. Braverman & Co. Facility

Hinomoto Offices

A-AAA Key Mini Storage

Keystone Flood Repair

G. H. Bettis Co.

Silber #3 for Trammell Crow

Gulf States Toyota - Port of Houston

City Wide Plumbing Facility

Gulf States Toyota Body Shop - Port of Houston

Hollywood Warehouse

1980

Grant Supply Facility

Southport Business Park Buildings 1-4 for Trammell Crow

Talley Glass Facility

Cameron Iron

Toyota Body Shop Paving

Bell Oaks Center

Southport Business Park Buildings 5-7 for Trammell Crow

Gulf States Toyota Office Expansion

South Main Mini Warehouse II

Westchase Park Office / Service Buildings 5, 6 & 7 for Trammell Crow

1981

National Supply Facility

Cameron Iron Electrical

Union Iron and Metal Railroad Spur

Westchase Park Office / Service Buildings 4 & 5 for Trammell Crow

Ira Slover

Clay Campbell Business Center

BECO

North by Northwest Building

Andrau Hanger

Hull Field Hanger Repair

Cameron Iron II

Dyad Projects Page 2 of 9

Japanese Victor Corporation Facility

Tesco Cable

Gulf Interstate

Advent management Facility

Monitoring Systems

Bingle Road Phase II

Gulf Interstate II

A Jiffy Facility

Wood and Associates Facility

Port of Houston

Aritech

Travel Unlimited

Geo Seismic

1982

Park 10 Service Center

Century Papers Facility

Japanese Victor Corporation Water Damage Repair

Summitville Tile

TRW Mission

Greenbriar South West V

1771 Upland

West by Northwest Buildings 1 and 2 for Trammell Crow

Gulf States Toyota Loading

Heyltex

West by Northwest A-4 Building 1 for Trammell Crow

Atlantic Cable Facility

Chickering Oil

Anaconda Ericsson Facility

Rig Air Inc.

Gulf State Toyota Phase 4

Hydril-Advanced Ocean Systems

Greenbriar South West V – Building C

Greenbriar South West V – Building A

All Safe

United D.C.

West by Northwest Industrial Esplanade for Trammell Crow

West by Northwest Business Esplanades for Trammell Crow

West Port sign Pylon

Trammell Crow 6th Floor

Westchase Park Office / Service Building for Trammell Crow

1983

Pella Window & Door Facility

Greenbriar South West V #300 Remodel

North Post Oak Business Center

Gulf States Toyota Remodel

Anacondia Ericsson Remodel

Eastman Kodak Facility

Redfish II

Steeplechase

South Post Oak

Dyad Projects Page 3 of 9

West by Northwest A5 Building 8 for Trammell Crow

Intercontinental Business Center

Gulf States Toyota Repair

South Post Oak 7, 8, 102 and 104

Prairie View A&M Physical Plant and Transportation Center

Prairie View A&M Roof Extensions

Compaq Parking

Foxx Moving & Storage Facility

Westport Buildings 12, 13 and 14 for Trammell Crow

Scharck Mini Warehouse

1984

Wilshire North Garage

Steeplechaes Repair

6111 Griggs Road

R & R Warehouse

Century Papers Garage

Two Parc Plaza Office Building for The Parc Crest Company

West by Northwest A5 Building 9

Gulf States Toyota Paving

Gulf States Toyota Acc. Shop

South Post Oak III

Westport Screen Wall

Donovan Street Mini Warehouse

Ladco / ComputerCraft

South Post Oak III Leases

The Falls Maintenance Shop

The Falls Clubhouse

South Park Baptist Church Family Life Center

1985

Gulf States Toyota Tire Shop

Century Papers Bathroom Remodel

Kirby Business Center #6

Acme Brick

League City Loan Out

Raleigh Hills

MLK Post Office

Herndon’s Place

El Campo Elementary and Middle Schools for El Campo ISD

West Oaks Village Shopping Center

Times Square Building Remodel

Crosswinds Shopping Center

Teuscher Chocolates

1986

El Campo Paving for El Campo ISD

Times Tenant Finish #1, Suite 320

Interurban Pharmacy

Warehouse for Fort Bend ISD

Highlands lease

Brittmoore Business Center

Dyad Projects Page 4 of 9

Times Tenant Finish #2, Suite 250

South Post Oak Tenant Finish

Falls Clubhouse Extras

Paxton Beautiful Woods

Lantern Lane Repair Work

El Campo Wall Enclosures for El Campo ISD

Connally Elementary School Classroom Additions for Waco ISD

Walnut Hill Business Park

El Campo Bus Loading Shelter for El Campo ISD

Dripping Springs Elementary School for Dripping Springs ISD

Helen Hall Library for the City of League City

Steeplechase Driveways

Dripping Springs High School Paving

Westwood Country Club

1987

Anson Elementary School for Anson ISD

Opera House Restoration

Silsbee Elementary School for Silsbee ISD

Cannon Oaks

Elementary School for Livingston ISD

Paxton Operations

Lamar High School for Lamar Consolidated ISD OR HISD?

Livingston High School Remodel for Livingston ISD

Horizon Hospital

Holbrook Elementary School for Cypress-Fairbanks ISD

1988

Patterson Laboratory Reroof & Remodel for University of Texas, Austin

Austin Northwest Service Center

South Houston Intermediate School for Pasadena ISD

Murphy Southwest, Phase 3 for Murphy Southwest Business Center

Anson Middle School Remodel for Anson ISD

Braeburn House

Strawberry Administration Building for Phase V for Pasadena ISD

Kuehnle Elementary for Klein ISD

Elementary School #21 for Cypress Fairbanks ISD

Glolite

Texas Commerce Bank Lease Remodel

Paxton Beautiful Woods Renovations

Teuscher Chocolates

State Farm for Insurance Service Center Building for State Farm Mutual Automobile Insurance Co.

Texas Commerce Bank Drive Thru

Commons @ Presidio/TJ Maxx for Crow-Barnett Houston Venture #2

1989

Murphy Addition for Murphy Southwest Business Center

S.E.A.R.C.H.

Texas Commerce Bank Clearance Bar

Teare's Redfish Farm

San Jacinto Truck Driving Range for San Jacinto College District

Dyad Projects Page 5 of 9

Kroger Warehouse Addition for The Kroger Company

Brazosport Elementary for Brazosport ISD

Silk Greenhouse

Sanchez Relief Elementary for Houston ISD

Fairmont Elementary for Deer Park ISD

C. E. King Reroof for Sheldon ISD

Jungle Gym

Temple Emanu El

1990

2307 Naomi for P & R Interests

2020 Naomi for P & R Interests

San Jacinto McCollum for San Jacinto College District

San Jacinto Phase II for Slocum Auditorium for San Jacinto College District

Bud Walter's House

Murphy Road Building H for Murphy Southwest Business Center

Recreational Resilient Flooring for Pasadena ISD

Cypress Fairbanks Elementary No. 24 for Cypress Fairbanks ISD

Cypress Fairbanks Elementary No. 25 for Cypress Fairbanks ISD

1991

Martin Sprocket Gear Facility for Martin Sprocket & Gear, Inc.

Addition to Richey Elementary for Pasadena ISD

STOR/IKEA Building for GVD Commercial Properties

STOR/IKEA Site for GVD Commercial Properties

GVD Facility for GVD Commercial Properties

Vista Health Care Facility for Vista Health Care Inc.

Stafford Elementary School for Stafford Municipal School District

Cypress-Fairbanks Elementary No. 27 for Cypress Fairbanks ISD

Cypress-Fairbanks Elementary No. 28 for Cypress Fairbanks ISD

Cypress-Fairbanks Elementary No. 29 for Cypress Fairbanks ISD

1992

Beverly Hills Intermediate for Pasadena ISD

Parkview Intermediate for Pasadena ISD

Queens Intermediate for Pasadena ISD

San Jacinto Intermediate for Pasadena ISD

Southmore Intermediate for Pasadena ISD

San Jacinto Intermediate Gym for Pasadena ISD

Southmore Intermediate Gym for Pasadena ISD

Wedgewood Elementary for Clear Creek ISD

Outley Elementary School (ES No. 19) for Alief ISD

1993

Hitchcock High School for Hitchcock ISD

Stewart Elementary for Hitchcock ISD

Northside Elementary for Hitchcock ISD

Norma Sanders Ault Elementary School (ES No. 30) for CFISD

Parker Williams South Campus Library for San Jacinto College District

Dyad Projects Page 6 of 9

1994

New 5th & 6th Grade School for Brazosport ISD

Bess Brannen/O.M. Roberts Elementary Schools for Brazosport ISD

Brookside Intermediate School (Westside Intermediate) for Clear Creek ISD

Northpoint Elementary School (Northfork ES) for Clear Creek ISD

Assigned to School of the Woods 11/94 - 2/95 project not awarded

West by Northwest Industrial Park Building No. 11 for Security Capital Industrial Trust

1995

The Woodlands Intermediate School for Conroe ISD

West by Northwest Industrial Park Building #15 for Security Capital Industrial Trust

Treasure Forest Elementary School for Spring Branch ISD

Caney Creek High School for Conroe ISD

I-610 & Richmond Retail Shell/Cost Plus for Weingarten Realty

1996

U.S. Xpress for Security Capital Industrial Trust

West by Northwest, Buildings 12, 16 & 17 for Security Capital Industrial Trust

Alvin Justice Center for City of Alvin

Security Capital Industrial Trust - Miscellaneous Projects

Early Childhood Development for Jewish Community Center

Weingarten Realty Investors - Miscellaneous Extras

1997

Pearland 9/10 High School for Pearland ISD

Buildings 18 and 19 for Security Capital Industrial Trust

Ladco Showroom Addition for Ladin Furniture Warehouse Partnership/L & L Warehouse Co.

Naomi Street, Phase II for P & R Investments

Barkley Tract, Austin for Transwestern Property Company

Greensheet North Loop Press Facility for Helen Gordon Interests dba Greensheet

CTI – Jersey Village Corporate Center for Security Capital Industrial Trust

Office/Warehouse Project for P & R Investments

1998

Houston Mini Storage Facilities

West by Northwest Industrial Park Buildings 20 & 21 for ProLogis Trust

World Houston Distribution Center for ProLogis Trust

CTI Phase I for ProLogis Trust

Walnut Creek Buildings #12, 16, 17 and 19 – ProLogis Trust

Monterey Oaks Corporate Park – E & S Controls for Transwestern Property Co.

1999

AmberOaks, Phase I, Buildings A, B & C for Transwestern Property Company

Monterey Oaks Corporate Park (main contract) for Transwestern Property Co.

ANREM Warehouse for American National Insurance Company

Cameron Road Corporate Park – E & S Controls for Transwestern Property Company

Furniture Marketing Group of Austin (Walnut Creek Building 16) for ProLogis Trust

Dyad Projects Page 7 of 9

Cameron Road Corporate Park for Transwestern Property Company

West by Northwest Industrial Park Bldg. #23 (#22 & #23 Clearing) for ProLogis Trust

Galena Park 6th Grade School for Galena Park ISD

Forest Cove Baptist Church for Forest Cove Baptist Church

Murphy Southwest Business Center for Murphy Southwest Business Center, Ltd.

Jersey Village Pylon Sign and Entry for ProLogis Trust

2000

West by Northwest Industrial Park Buildings. #24 & #25 Clearing for ProLogis Trust

Seven Acres Jewish Senior Care Services for Seven Acres Jewish Senior Care Services

Murphy Southwest Business Center Phase 2, Bldg. N for Murphy Southwest Business Center, Ltd.

Pearland Stadium for Pearland Independent School District

Dickinson HS Cafeteria and Foodservice Renovations for Dickinson ISD

Corridor Park Corporate Center, Round Rock for ProLogis Trust

1920 Interpark Rankin Associates for General Development Corporation

Silvercrest Elementary School (Pearland ES No. 8) for Pearland ISD

Town & Country Building 7 Expansion for Town & Country Partnership (Moody Rambin Interests)

2001

Murphy SW Business Ctr. Phase 2, Bldg. N, Interior Buildout for Murphy SW Business Center, Ltd.

Town & Country Commerce Park Building “F” and “F” Addition for I-10 Westview Partnership

Northbelt II – Houston for Northbelt Office Center II, L.P. (Pritchard & Associates CM)

Wal-Mart Neighborhood Market #3506-00 for Wal-Mart Stores, Inc.

Bank of Memorial – Sitework Package for Bank of Tanglewood (W B Holding Corp. CM)

Westfield High School Auditorium and Fine Arts Expansion for Spring ISD

Bank of Memorial – Building Package for Bank of Tanglewood

Seitel Technical Center, Town & Country Commerce Park Building F for Seitel, Inc.

West by Northwest Industrial Center #24 and #25 grading and erosion control for ProLogis Trust

Steel Supply, Inc.

JVCC Pylon Sign for ProLogis Trust

2002

Wal-Mart Neighborhood Market #3578-00 (Long Point) for Wal-Mart Stores, Inc.

PACE Institute for Pearland I.S.D.

Rogers Middle School (New MS No. 3) for Pearland ISD

Wal-Mart Supercenter #1103-02 (TC Jester) for Wal-Mart Stores, Inc.

Wal-Mart Neighborhood Market #5094 for Wal-Mart Stores, Inc.

Timmers Chevrolet Showroom and Facilities for Timmers

Eagle Logistics Facility, Miami, Florida for Eagle Global Logistics, LP

Wal-Mart Supercenter #5116 for Wal-Mart Stores, Inc.

Moody Rambin Miscellaneous 2002 for Moody Rambin Interests

2003

Caney Creek High School Additions & Renovations for Conroe ISD

Seitel Fire Marshall Revisions for Seitel Inc.

New 5th and 6th Grade Facility for Dayton ISD

Westbrook Intermediate School l(Clear Creek IS No. 9) for Clear Creek ISD

Miscellaneous Projects for Pearland ISD

Paving Demo @ Timmers Chevrolet

Wal-Mart Supercenter #5091for Wal-Mart Stores, Inc.

Dyad Projects Page 8 of 9

2005

Spring ISD Academy at Wunsche for Spring ISD

Massey Ranch Elementary for Pearland ISD

ProLogis Jersey Village Temporary Storage Lot for ProLogis

Expeditor’s Sitework for Cargo Ventures LLC

ProLogis Jersey Village Goodman Building Expansion for ProLogis

Town & Country Re-Branding for Moody Rambin Interests

Humble Parkway (Parkway for Expeditors Houston) for Cargo Ventures LLC

Expeditor’s Houston Facility (Shell) for Cargo Ventures, LLC

Roy’s Body Shop – Beach City (Baytown), Texas for Roy Pigford

2006

Sugar Land Corporate Center Monument Signs for ProLogis

Town & Country Building #12 for Moody Rambin Interests

Jersey Village Corporate Center Repainting for ProLogis

Berry Miller Junior High School for Pearland ISD

Sam Houston Elementary School (Galena Park ISD ES No. 116) for Galena Park ISD

Expeditor’s Miscellaneous for Cargo Ventures, LLC

Excel – Re-Roofing (Holmes Road) for ProLogis

Don McGill Toyota Showroom, Collision Center, Make-Ready Facility for Don McGill Toyota

Cedar Crossing for Cedar Crossing Distribution Center No. 1, Ltd. (American Realty)

Jersey Village Corporate Center Building 3 for ProLogis

Moody Rambin Office Renovation for Moody Rambin Interests

Southland Distribution - Holmes Road structural damage repair for Southland Distribution

Town & Country Building 20 for Moody Rambin Interests

2007

Town & Country Track 2 for Moody Rambin Interests

Shops at Bella Terra Phases 1 and 2 for Moody Rambin Interests

Town & Country Rebranding for Moody Rambin Interests

Brookhill Structural Repair for ProLogis

JVCC Building 3 – Goodman for ProLogis

ProLogis Northpark Buildings 6, 7 & 8 for ProLogis

Michael R. Null Middle School (Sheldon MS No. 2) for Sheldon ISD

2008

Ralph Eichenroth Elementary School (Grand Point ES) for Spring ISD

ProLogis 2008 Miscellaneous Jobs Design Tech for ProLogis

Ron Carter Autoland for Ron Carter Auto

Don McGill Toyota, Katy for Don McGill Toyota

Northbelt Office Center VI for Beltway Tech. Assoc. L.P.(c/o Sarofim Realty Advisors) Meyers Crow

Cedar Crossing Building A Hurricane Ike Repairs for Cedar Crossing Distribution Center No. 1, Ltd.

2009

Shops at Bella Terra, Phase 3 B2-B5 & Best Buy for MRPL Retail Partners Ltd. (Moody Rambin Int.)

Cedar Crossing TI for Cedar Crossing Distribution Center No. 1, Ltd. (American Realty)

Bammel Replacement Elementary School for Spring ISD

Marq E Center Shell Bldg 3 & So. Parking Lot Renovation for CJUF II MarqE Co. LP (Fidelis Realty)

Column Replacement – Northpark Building 8 for ProLogis

Memorial Middle School Renovations for Spring Branch ISD

Pine Timbers Distribution Center #2 – Structural Repair for ProLogis

LSC-Cy Fair Paving for Lone Star College System

Dyad Projects Page 9 of 9

2010

Sheldon Maintenance Complex for Sheldon ISD

Drink Houston Interior for CJUF II MarqE Company LP (Fidelis Realty)

ProLogis Wingfoot DC#1 Polytex Fibers for ProLogis

Sheldon ISD Network Operations for Sheldon ISD

2011

Tomball Elementary K-6 for Tomball ISD

SBEC-Exterior Repairs for Spring Branch ISD

Shops at Bella Terra Phase 4, Buildings T,U,V for MRPL Retail Partners Ltd. (Moody Rambin)

GIS Facility, LaPorte for IMC Gulf Intermodal Services

Todai Entrance for Fidelis

Express Energy Services – InSite Realty, El Campo, TX

2012

Grand Lakes Marketplace for Fidelis Realty

Shops at Bella Terra Phase 5 – Buildings W1, W2, P, X and Pier 1 TI for MRPL (Moody Rambin)

Athena Gun Club Range and Facility for Athena Gun Club

Best Buy Store No. 214 – Willowbrook for Best Buy Stores, LP

Career and Technology High School Site Package (CTE) for Pasadena ISD

Northpark Buildings 10 & 12 for Prologis

2013

New Career and Technology High School (CTE) for Pasadena ISD

Plaza Verde Buildings 1 and 2 for Hines Development

Buc-ee’s Travel Center #33 for Buc-ee’s Ltd.

Greens Crossing Tract A / HD Supply for Hines Development

Intrepid Business Park for Triten Real Estate Partners, LLC

8505 Cambridge Street, Houston, Texas 77054 | 713-799-9380

Testimonials Retail, Industrial and Office Projects

Shops at Bella Terra Phase 4, Buildings T, U & V: Great Job! Everyone

really shined on the delivery of both Sports Authority and Party City. I thought

everyone would be interested in the feedback we received from Sports

Authority and Party City.

Sports Authority (shell) was delivered in 105 days (including Thanksgiving and

Christmas)

Party City (shell and interior) was delivered in 131 days (including

Thanksgiving and Christmas)

According to the Party City's construction manager, and their area manager,

this store deliver was the cleanest delivery with the fewest punch list items

they can ever remember being associated with. Sports Authority gave the

exact same glowing report two weeks ago. It has been a pleasure to work with the overall team on this project. Record completion for the Shops at Bella Terra Sports Authority. You

guys have done a GREAT JOB!

Dan Moody III, Principal Moody Rambin Interests Property Company | Development

Shops at Bella Terra Phase 4: Sports Authority #239: All's looking well.

In fact, I suspect I'll experience the best delivery of my career. Nice work all.

Michael McGee

The Sports Authority

Shops at Bella Terra Phases 2 & 3: Moody Rambin has the highest degree

of confidence in Dyad and has used Dyad in projects for the last 10-years

totaling over 100 million dollars. We consider them to be extremely capable,

reliable, honest and responsive. We have never had a project delayed due to

Dyad’s performance and they have always exceeded expectations. Dan Moody III, Principal

Moody Rambin Interests Property Company | Development

Shops at Bella Terra Phases 1-5 and Grand Lakes Marketplace: Thanks

for making us look so good on these last projects. I appreciate the association

with you and your firm and look forward to many more successful

collaborations this next year.

Lawrence S. Levinson, AIA Levinson Alcoser Associates, L.P.

8505 Cambridge Street, Houston, Texas 77054 | 713-799-9380

Marq*E Center Phases 1 & 2: Thanks for catching that sidewalk grade issue

and for asking the question before it became a problem. We really appreciate

the diligence and attention to detail that Dyad brings every day. You always

want to do the right thing and we really appreciate that.

Its refreshing working with a conscientious pro-active contractor that has a

team attitude and that can bring value to a project by identifying potential

issues and resolving them before installation. We hope to do a lot more work

with Dyad in the future.

Todd Arenz, A.I.A., CSI, LEED®A.P. Formerly with Hermes Architects

Don McGill Toyota: I have built and rebuilt several stores over the last 3 or 4

decades and therefore have had the pleasure and pain of dealing with everything

that comes along with the responsibility. Unquestionably the best experience has

been a $20m rebuild of the Don McGill Houston store. Believe me I was not

looking forward to constructing all new buildings while we remained open, a real

challenge. Bruce Casares and the DYAD crew fulfilled their sales pitch and then

some. Very trustworthy and capable people. I am starting Image II at the Katy

location and did not even bother with putting it out for bid. I have never once

recommended a construction company in the past but after this last experience I

would not hesitate in recommending that you at least have a meeting with Bruce

and Rick and get some advice. In my opinion their product is as reliable as ours.

This has been a difficult contract in that we have remained open for business

during the construction process. Demolition of all buildings and reconstruction

required considerable cooperation of the contractor for parking and traffic flow.

This contractor's diligence and conscience were recognized throughout the

process which certainly required a team effort. Without question, this has been a

pleasant and professional relationship.

Bruce TeSelle, Vice President Don McGill Toyota

ProLogis Sugar Land Corporate Center: Dyad constructed all three of the

buildings in Sugar Land Corporate Center and I am very pleased with their work.

Rick Trask's whole team has been excellent to work with and I will continue to use

them on other projects. Ross P. Matthews, CCIM

VP-Houston Market Officer, ProLogis

ProLogis Sugar Land Corporate Center: Dyad completed Sugar Land

Corporate Center on a fast track schedule and with impressive attention to quality.

Dyad has been ProLogis' alliance contractor in Houston and Austin since 1992

completing over 5,000,000 square feet of warehouse facilities. They have never

failed to complete a project within the committed time frame and often complete

early. Their expertise with due diligence and value engineering makes them a true

asset to the team. Again, congratulations and thank you for providing excellent

service to ProLogis!

Former Vice President ProLogis

8505 Cambridge Street, Houston, Texas 77054 | 713-799-9380

ProLogis Sugar Land Corporate Center – Tramontina Building: Antonio

Galafassi and I drove around the newly-built warehouse leased to Tramontina.

Both of us were absolutely blown away by the building’s construction quality as

well as the striking aesthetics. Knowing your inventory as well as I do, ProLogis

has never built a finer facility in this market.

Bob Berry, Executive Vice President/Principal The Staubach Company

Monument Chevrolet: It was a pleasure to work on the Monument Chevrolet

project with Dyad Construction. Their entire team, including Joe Pigford, Rick

Trask, Neil Copelin and David Berthold, went out of their way to please the client

and make this difficult project a success. Kenneth L. Turnell, AIA

Castles Design Group

IMC Gulf Intermodal Services: One of the highlights of my year was getting to

know your team as Dyad this year, especially Bill and Ben. We are very proud of

our new office and we know that while it’s small by comparison to what you guys

normally tackle, it’s a big step for us. Your guidance, wisdom, PATIENCE, and

persistence was evident throughout the year. I am very pleased we selected Dyad

as our GC and hopefully we can build a warehouse one day together as well!

Will Connell, President Gulf Intermodal Services

Seitel Solutions Technical Center: Your 24/7 commitment and attention to

quality and the dedication of your management team to getting the job done was

unsurpassed.

Ben Lauderdale, Director Global Operations Seitel Solutions

Amber Oaks Office Complex, Austin: In the sometimes adversarial world of

design team versus contractors, I have known your company to be a team

player, focused on working with the team to achieve the best end for the project,

rather than concentrating on just the contractor's interests. Joe Pigford and the

entire Dyad team are, and I believe you will continue to be, an asset to the

construction industry. Working with Dyad Construction is always a pleasure. Robert E. Haynes, President

Haynes Whaley Associates, Inc.

8505 Cambridge Street, Houston, Texas 77054 | 713-799-9380

Educational Facilities

Timber Creek Elementary School (New K-6): Bruce, I want to express my

thanks to you and Dyad Construction for the wonderful work at Timber Creek

Elementary School. Dyad was a new contractor to Tomball ISD, but the team of

Steve Casares and yourself has made a great impression on Tomball ISD. We

look forward to a long relationship with Dyad. November, 2012 Gary Hutton, Director of Construction Tomball Independent School District

Bammel Replacement Elementary School: Hey everyone, I wish I had a

hundred Mil right now, I'd keep you all busy for quite a while. There were some

considerable challenges on this project and you all took them in stride and

completed the project on time and it is one of my favorites.

Again Thanks for a job well done!! GREAT JOB!!!!!!!!!!!!!!!!!!!!!! Jeff Windsor, Director Planning & Construction

Spring Independent School District

Career and Technology Academy @ Wunsche: Words cannot express how

proud we are of the fact that Dyad constructed our facility. Your craftsmanship

will forever be part of CWHS & SISD. As the building is complete and construction

is drawing to a close we will miss seeing our Dyad friends. Debi Koch, Principal

Carl Wunsche Sr. High School

Westfield High School Performing Arts Center / Milton Cooper

Elementary School / Career and Technology Academy @ Wunsche: Dyad

Constructors has built three projects for me over the last six years. I would use

them whenever possible. Every project team I have worked with has been very

professional, effective and accommodating.

The first project was a ten million dollar Performing Arts Center for our Westfield

High School. This project was completed on time, within budget and was

constructed to exacting standards of quality.

The second was a ten million dollar elementary school. This project was

completed on time and within budget overcoming many obstacles due to the

delay of utilities by the developer.

The third is probably our most ambitious project to date. It is a thirty-three

million dollar Career and Technology Academy. The completion date for this

project is December of 2006. Dyad is completing enough of this facility this

summer that we will be able to open for the fall 2006 semester! Some of our

students will be in portables but should be in their permanent classrooms by

September. By their hard work and commitment to help us we will open this

facility one full year ahead of what was anticipated. June, 2006

Jeff Windsor, Director Planning & Construction Spring Independent School District

8505 Cambridge Street, Houston, Texas 77054 | 713-799-9380

Massey Ranch Elementary, Berry Miller Junior High, Rogers Middle

School, PACE Institute, Silvercrest Elementary, Pearland 9/10 High

School, and Pearland Oiler Stadium: A common objective is to work towards

closing out a project as soon as possible. Dyad has met or surpassed this

objective on every project they have built for our District. David M. Holland, Project Manager

Pearland Independent School District

Caney Creek High School Additions and Renovations: It was a remarkably

smooth process considering we were remodeling our school during the school

year. Dyad's foremen were always courteous and sensitive to our needs. The

quality of Dyad's work is excellent and when there was a need to alter or change

something we found them to be very responsive.

I would recommend Dyad without any reservations.

Greg Poole, Principal Caney Creek High School

Westbrook Intermediate School (No. 9): I highly recommend Dyad

Construction. This firm brings a true commitment to their projects for excellence.

They constantly monitor their own process from start to finish.

Sherrie L. Matula, Former Member Clear Creek ISD Board of Trustees

Recommendations/Endorsements written to

Rick Trask as Owner of Dyad by LinkedIn Users

Jack Rizzo, Global Director of Construction, Prologis, has endorsed your work. 11/19/12

Details of the Recommendation: "Rick and Dyad Construction have been a good partner for Prologis and has historically provided great results for cost, schedule and quality."

Service Category: General Contractor Year first hired: 1999 (hired more than once) Top Qualities: Personable, Good Value, High Integrity

Tom Mercer, ProLogis then JTM Development, has endorsed your work. 11/20/12

Details of the Recommendation: "Rick Trask constructed more than 1,000,000 square feet of projects for me. He was always on time, on budget, and perfect. I have constructed buildings in three countries and 14 states and have found Rick Trask to be among the very

best contractors in North America. Feel free to contact me should you need more examples of his outstanding results. - Tom Mercer" Service Category: General Contractor

Year first hired: 1999 (hired more than once) Top Qualities: Great Results, Expert, High Integrity

Steven Barthel, Owner, Cargo Ventures/Expeditor’s, has recommended Dyad. 02/04/13

"Rick is a true professional with a great work ethic. He has a genuine focus on customer

satisfaction and worked diligently to deliver my project on time and within budget. I give Rick and his team a well deserved strong recommendation for general contracting services."

Service Category: General Contractor Year first hired: 2006 Top Qualities: Great Results, On Time, High Integrity

Terry Bell, Director of Planning & Construction Department, Spring Branch ISD, has recommended your work. 12/16/12

Details of the Recommendation: "Rick and Dyad were great to work with and diligent in every aspect of our projects together." Service Category: General Contractor

Year first hired: 1994 (hired more than once) Top Qualities: Great Results, Expert, High Integrity

Roy Montalbano, Principal, PBK Architects, Inc., has recommended your work. 12/14/12

Details of the Recommendation: "Rick is an outstanding guy who ensures you receive the services that are expected and more. Through his leadership in planning and past

performance of bringing projects in on time and budget, Rick is certainly someone you can count on."

Joe Moody, Moody-Rambin Interests, has endorsed your work. 11/19/12

Details of the Recommendation: "Rick has a great group of people working for him. Our project was a $200,000 remodel. It involved very high end finishes including stone, doors

and electrical. Rick's performance on the project was perfect. He balanced our schedule with quality and did an excellent job." Service Category: General Contractor

Year first hired: 2007 Top Qualities: Great Results, Personable, Expert

Robert Mitchamore, AIA, LEED AP, Owner, RFM Architects – Plus, has endorsed your work.

11/19/12

Details of the Recommendation: "Rick is a very professional, conscientious person whose firm I would hire or recommend any time." Service Category: General Contractor

Year first hired: 2011 Top Qualities: Great Results, Good Value, High Integrity

Jesse Garcia, AIA, PBK Architects, Inc., has endorsed your work. 11/27/12

Details of the Recommendation: "Rick was very easy to work with, and extremely helpful throughout the entire construction process. Rick made himself available to answer any and

all questions I had, and took the time to explain his answers in detail. I would definitely work with him and his company again, and would recommend them for your next project as well."

Top Qualities: Great Results, Good Value, On Time

Ed Wong, Owner, Wong & Associates, Inc., has endorsed your work. 11/17/12

Details of the Recommendation: "I just wanted to take a moment to share with you my impression of Rick and his company DYAD Construction. I have worked on many, many projects in the past 28 years where DYAD Construction was the general contractor for the

project. In all cases; I witness that the projects were done in a most professional and timely manner.

I testify that all parties concerned on a project were completely satisfied with how the project was put together and completed. I would highly, highly recommend that you give Rick and his company serious, serious consideration.

Jackie Spurling, Principal, Stanley Spurling & Hamilton, Inc., has endorsed your work. 11/18/12

Details of the Recommendation: "Rick's company is one of the "Good Guys" in the industry and very Engineer friendly. They go the extra mile to ask questions before, so potential

problems in the field do not materialize. They also help protect the Engineer by reviewing the drawings for errors or conflicts."


Recommended