Date post: | 18-Jul-2015 |
Category: |
Engineering |
Upload: | david-green |
View: | 25 times |
Download: | 4 times |
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
AIR CONDITIONING AND SEMI LEVEL DECK CONVERSION AT A HYDROTHERAPY SCHOOL
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
THE POOL HAS BEEN/HAD
Lengthened, widened, deepened, tiled, converted to semi level deck, new filter plant, new chemical dosing, and custom made air conditioning system
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
CONVERSION FROM SKIMMER TO SEMI LEVEL DECK USING OUR BESPOKE ANTI – WAVE PANELS
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS L
CONVERSION FROM SKIMMER TO SEMI LEVEL DECK USING OUR BESPOKE ANTI – WAVE PANELS
CONVERSION FROM SKIMMER TO SEMI LEVEL DECK USING OUR BESPOKE ANTI – WAVE PANELS
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
EXTERNAL DUCTING FROM HEATSTAR AIR CON UNIT (PRIOR TO LAGGING)
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS