E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga...

Date post: 29-Jan-2016
Category:
Upload: philomena-wright
View: 217 times
Download: 0 times
Share this document with a friend
Popular Tags:
8
E-Cal Readout Boards - 8 Boards total - Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18- 19 2011 - Jlab
Transcript
Page 1: E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab.

E-Cal Readout Boards

- 8 Boards total-Design & Fabrication at Jlab- Assembly at Orsay

Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

Page 2: E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab.

Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

MotherBoard

• Each Signal trace has Ground guard traces • Signal trace 8mil space 8 mil• Stackup verified in BoardSim• Crosstalk simulated for longest traces• **Board layers for Full Experiment.

• 4 Boards (2-Identical)•16- layers • 6 signal layers• 2 High Voltage• 2 Low Voltage• 6 Ground

Page 3: E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab.

Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

Amplifier Connections1. GND (2 pins)2. High Voltage (1 Pin)

APD Connections (2 pins)1. Anode2. Cathode

Connection Boards • 4 Boards (2 similar) 2 Layers 2 Connectors (No traces)

Page 4: E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab.

Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

Ecal Grouping

Each grouping requires its own High Voltage Connection

Page 5: E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab.

Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

SI - SimulationCharacteristic Amplifier Output (DVCS 2005)

Tested on Longest Trace ~ 22inchesEquivalent to 4ns prop. delay.

Longest Trace Highlighted for Signal Integrity Analysis

Page 6: E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab.

Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

Simulation

Setup:CMOS Driver with 0.8V/ns slew rate.Termination: 50-ohm.

Result:Less than 2% reflection (40mV on 2V scale)

Page 7: E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab.

Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

Crosstalk Threshold set to 15mV (only one trace affected)

Crosstalk Threshold set to 20mV (Two traces affected)

CROSSTALK SIMULATION

Page 8: E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab.

Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

Board Status (design)• Connection Boards ~1.5 Days– Bottom Right ~0.5 days– Top Right ~ 0.5 days– Bottom Left, Top Left ~ 0.5-day

• MotherBoards ~2.5 Days– Bottom Right ~1 day– Top Right ~ 1 days– Bottom Left, Top Left ~ 0.5-days