DEMOLISH ALL PLUMBING FIXTURES AND ASSOCIATED PIPING IN THIS AREA. CAP EXISTING WATER PIPING ABOVE CEILING. EXISTING GAS PIPING TO REMAIN. EXISTING GAS PIPING SERVING SCIENCE LAB CLASSROOMS TO BE RELOCATED. GAS PIPING TO SCIENCE LAB CLASSROOMS TO BE REROUTED IN PHASE 1 TO AVOID SERVICE DISRUPTION. NEW GAS PIPING SHOULD BE ROUTED UNDERGROUND AND OUTSIDE OF THE BUILDING AS TO NOT INTERFERE WITH ANY NEW CONSTRUCTION. G G G G G G G G G G G G G G G G EXISTING WASTE TIE - IN SHOULD REMAIN AND BE EXTENDED TO STAY CONNECTED DURING PHASE 1 CONSTRUCTION. I.E.=8.00' B/F DEMOLISH EXISTING WATER COOLERS AND REPLACE WITH NEW WATER COOLERS. EXISTING PIPING TO REMAIN. 1 NORTH WARNING: Contractors, subcontractors, vendors and suppliers are advised that the contract documents consist of Architect - reproduced printed, bound and numbered specifications, Architect - reproduced printed, bound and numbered blue - or black - line prints, addenda, post - bid addenda, and change orders only. Documents reproduced by parties other than the Architect, whether in hard copy or in electronic format, shall not be considered part of the contract documents and do not supersede the provisions of the contract documents. The contractor, subcontractors, vendors and suppliers are solely responsible for verification that information utilized in bidding, development of shop drawings, and construction of the facility are identical to the contract documents. PROJECT NUMBER PROJECT DATE APPROVED BY CHECKED BY DRAWN BY Copyright (c) 2018 All Rights Reserved. ISSUED FOR: NOT VALID UNLESS SIGNED JAMES W. BUCKLEY & ASSOCIATES INC. -- ARCHITECTS SWAINSBORO, ALBANY, ROME, SAVANNAH AND BRUNSWICK GEORGIA SHEET NUMBER: KEY PLAN 10/24/2019 12:14:12 PM C:\Users\tbeal\Documents\Local Revit Files\Revit 2019\20180080-MECH-CENTRAL_thomasbeal8220.rvt PLUMBING DEMOLITION PLAN WOODVILLE TOMPKINS HIGH SCHOOL ADDITIONS 10/09/19 13418 JGB JGB CRS BID SET SAVANNAH CHATHAM COUNTY BOARD OF EDUCATION GEORGIA SCHOOL CODE: 625-1605 P0.1 SCALE: 1/8" = 1'-0" P0.1 1 DEMOLITION PLAN - PLUMBING T PROFESSIONAL N E E R I G N E S I G E R E R E D No. 25029 I G R O E G A B L A K E I I G. S E M A J I 1 ADDENDUM #1 10 - 24 - 2019
Transcript
Page 1: E G I STER ED PROFESSIONAL ENG NE R Iinternet.savannah.chatham.k12.ga.us/district... · 1 1 1 1 1 1 1 1 11 t t t tt t tt t t tt t t t t t t tt tt t tt t t tt t t tt t tt t t t tt

DEMOLISH ALL PLUMBING FIXTURES AND ASSOCIATED

PIPING IN THIS AREA.

CAP EXISTING WATER PIPING ABOVE CEILING. EXISTING GAS PIPING TO REMAIN.

EXISTING GAS PIPING SERVING SCIENCE LAB CLASSROOMS TO BE RELOCATED.

GAS PIPING TO SCIENCE LAB CLASSROOMS TO BE REROUTED IN PHASE 1 TO AVOID SERVICE DISRUPTION. NEW GAS PIPING SHOULD BE ROUTED UNDERGROUND AND OUTSIDE OF THE BUILDING AS TO NOT INTERFERE WITH ANY NEW CONSTRUCTION.

G

G

G G G G G G G G G G G G

G

G

EXISTING WASTE TIE-IN SHOULD REMAIN AND BE EXTENDED TO STAY CONNECTED DURING PHASE 1 CONSTRUCTION. I.E.=8.00' B/F

DEMOLISH EXISTING WATER COOLERS AND REPLACE WITH NEW WATER COOLERS. EXISTING PIPING TO REMAIN.

1

NORTH

WA

RN

ING

: C

ontr

acto

rs,

subc

ontr

acto

rs,

vend

ors

and

supp

liers

are

adv

ised

tha

t the

con

trac

t do

cum

ents

con

sist

of

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

num

bere

d sp

ecifi

catio

ns,

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

nu

mbe

red

blue

- or

bla

ck-li

ne p

rints

, add

enda

, pos

t-bi

d ad

dend

a, a

nd c

hang

e or

ders

onl

y. D

ocum

ents

rep

rodu

ced

by

part

ies

othe

r th

an th

e A

rchi

tect

, whe

ther

in h

ard

copy

or

in e

lect

roni

c fo

rmat

, sha

ll no

t be

cons

ider

ed p

art o

f th

e co

ntra

ct d

ocum

ents

and

do

not

supe

rsed

e th

e pr

ovis

ions

of t

he c

ontr

act d

ocum

ents

. T

he c

ontr

acto

r, s

ubco

ntra

ctor

s,

vend

ors

and

supp

liers

are

sol

ely

resp

onsi

ble

for

verif

icat

ion

that

info

rmat

ion

utili

zed

in b

iddi

ng,

deve

lopm

ent o

f sh

op

draw

ings

, an

d co

nstr

uctio

n of

the

faci

lity

are

iden

tical

to t

he c

ontr

act

docu

men

ts.

PROJECT NUMBER

PROJECT DATE

APPROVED BY

CHECKED BY

DRAWN BY

Copyright (c) 2018All Rights Reserved.

ISSUED FOR:

NOT VALID UNLESS SIGNED

JAM

ES

W.

BU

CK

LE

Y &

AS

SO

CIA

TE

S I

NC

. --

AR

CH

ITE

CT

SS

WA

INS

BO

RO

, A

LB

AN

Y, R

OM

E, S

AV

AN

NA

H A

ND

BR

UN

SW

ICK

GE

OR

GIA

SHEET

NUMBER:

KEY PLAN

10/2

4/20

19 1

2:14

:12

PM

C:\U

sers

\tbea

l\Doc

umen

ts\L

ocal

Rev

it F

iles\

Rev

it 20

19\2

0180

080-

ME

CH

-CE

NT

RA

L_th

omas

beal

8220

.rvt

PLU

MB

ING

DE

MO

LIT

ION

PL

AN

WO

OD

VIL

LE

TO

MP

KIN

S H

IGH

SC

HO

OL A

DD

ITIO

NS

10/09/19

13418

JGB

JGB

CRS

BID SET

SA

VA

NN

AH

CH

AT

HA

M C

OU

NT

Y B

OA

RD

OF

ED

UC

AT

ION

G

EO

RG

IAS

CH

OO

L C

OD

E:

62

5-1

60

5

P0.1

SCALE: 1/8" = 1'-0"P0.1

1 DEMOLITION PLAN - PLUMBING

T

PROFESSIONAL

NE ER

IGNE

SIGER

ERED

No. 25029

IGROEG

A

B L AKE

II

G.

S

EMA

J

I

1 ADDENDUM #110-24-2019

Page 2: E G I STER ED PROFESSIONAL ENG NE R Iinternet.savannah.chatham.k12.ga.us/district... · 1 1 1 1 1 1 1 1 11 t t t tt t tt t t tt t t t t t t tt tt t tt t t tt t t tt t tt t t t tt

11 1

11

11

1 11

T

T

T

TT

T

T TT T T

TT

T TT T T T

TT

TT

T TT T T

TT

TT

TT

TT TTTT TT T T

TT

DD

D D

DD

DDD

DD

DD

DD

DD

DD

DD

DD

DDD

DD

DD

DD

11

1111

11DD

DD

D

D D

DD

TT

DD

DD

DD

DD

TT

TT

TTTT

DD

DD

DD

DD

DD

D

TT

DD

D D

DD

TT

DD

DD

DDD

DD DD

DD

D

DD

DD

DD

DD

DD

TT

TT

TT

TT

TT

TT

TT

T

T TT

TT

T TT T T T

TT

TT

TTT

T

11

1111

11

TT

TT

TT

TT

TT

T

T T

T T

TT TT

T T

TT TT

T T

TT TT

T T

TT

T TT T T T

TT

DD

FCO

P-3B

P-1B

3"FD-A

3"FD-A

3"FD-A

3"FD-A

2"FD-A

3"FD-A 3"FD-A

3"FD-A3"FD-A

2"FD-A2"FD-A

3"FD-A 3"FD-A3"FD-A3"FD-A

2"FD-A 3"FD-A

3"FD-A3"FD-A

P-1BP-1B

P-1A P-1A

P-1A

P-1A

EWC-2

EWC-1

P-4A

P-2B

P-2A

P-1BP-1B

P-1AP-1A

P-1A

P-1A

P-2B

P-2A

GCO

COACH

313

COACH

306

B PE

307B PE TLT

308

G VARS TLT

312G VARS

315

STOR

314

HALL

128

GYM SEATING

OO

GYM SEATING

PP

RISER

310

G PE

316

G PE TLT

318

COACH

319

AD

323

B VARS TLT

320

B VARS

322

TRAINING

326

COACH TLT

325

WEIGHT RM

324

COMMON PHASE 1

330

JAN

329

LAUNDRY

327

MEN

304

GYM LOBBY

300

CONCESSIONS

303

WOMEN

301

P-5A

P-5B

P-2AP-2A

P-2A P-2A

P-2A

P-2B

P-1B P-1B P-1A P-1A P-1A

GCO4" BUILDING DRAINI.E.=4.25' B/FFOR CONTINUATIONSEE CIVIL DWGS.

4"W CAPPED FOR USE IN PHASE 2

4"WFCO

/SEE 1 P1.1

GCO

4"W

P-4B

WCO

P-1BP-1BP-1AP-1AP-1AP-1A

P-1A P-1A P-1A P-1A P-1A P-1A P-1A

3"FD-A

3"FD-A

EWC-2

EWC-12"W

P-3B

3"FD-B

3"FD-A

EWC-2

EWC-1

FCO

FCO

4"W

4"W

GCO

4"W

P-8

(4) P-3C(4) P-3C

3"FD-A

P-4A

6"RD-A

6"RD-B

6"RD-A 6"RD-B

3"FD-A

3"FD-A

6"DSN

GCO

OF OF OF

OF

6"O

FO

F

ST

8"S

T, U

/GS

T

8" STORM DRAIN I.E. = 3.00' B/FFOR CONTINUATIONSEE CIVIL DWGS.

6"DSN

6"O

FO

FO

F

OF OF

ST ST6"ST

ST ST

DATA

331

4"W

2"W

3"W

3"W

2"VTR2"V 2"V

2"V

2"V

2"V

2"V

2"V

2"V

2"V

2"VTR

2"VTR

3"W

3"W

3"W

2"V

2"V2"V 2"V

2"V2"V

2"V 2"V

2"V

2"V

2"V2"V

2"V

2"V2"V

2"V2"V

2"V

2"VTR

2"V

2"V

2"V

4"W

2"V2"VTR

3"W

3"W

P-8

P-62"FD-A

2"W

2"V

2"V

2"V

2"V

4"W

2"V

2"V

2"W

2"W

2"VTR

4"W

2"W

2"VTR2"V

2"V

2"V

2"V

3"W

3"W

3"W

2"V

2"V

2"V

2"V

2"V

2"VTR

(3) P-3A (3) P-3A

P-6 P-6ELECT.

332

2"W

2"V

2"V2"V 2"V2"V

4"W

2"V

2"VTR 2"V

2"V2"V

2"V

4"W

2"V

2"V

2"V

(3) P-3A (3) P-3A

2"V

2"V2"V

2"V2"V

3"FD-A3"FD-A

WCO3"W

4"W

3"W

2"FD-A

P-6P-6

3"W

4"W

4"W

2"V 2"V

3"W3"W

2"VTR

2"V2"V

2"V

2"V

2"V2"V

3"W 3"W

2"V

2"V2"V

2"V

2"V

2"V

2"V2"V

2"V

GCO4"W

6"ST

ST

3"FD-A

4"W

GCO4"W, EX.

WCO

4"W

WCO

3"W3"W

4"W4"W

4"W

4" BUILDING DRAINI.E.=5.00' B/FFOR CONTINUATIONSEE CIVIL DWGS.

4"W4"W

CONNECT EXISTING 4"W PIPING FROM THIS CLASSROOM WING DURING PHASE 1 CONSTRUCTION TO AVOID SERVICE DISRUPTION

4"W

4"W

4"W

1

1

NORTH

WA

RN

ING

: C

ontr

acto

rs,

subc

ontr

acto

rs,

vend

ors

and

supp

liers

are

adv

ised

tha

t the

con

trac

t do

cum

ents

con

sist

of

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

num

bere

d sp

ecifi

catio

ns,

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

nu

mbe

red

blue

- or

bla

ck-li

ne p

rints

, add

enda

, pos

t-bi

d ad

dend

a, a

nd c

hang

e or

ders

onl

y. D

ocum

ents

rep

rodu

ced

by

part

ies

othe

r th

an th

e A

rchi

tect

, whe

ther

in h

ard

copy

or

in e

lect

roni

c fo

rmat

, sha

ll no

t be

cons

ider

ed p

art o

f th

e co

ntra

ct d

ocum

ents

and

do

not

supe

rsed

e th

e pr

ovis

ions

of t

he c

ontr

act d

ocum

ents

. T

he c

ontr

acto

r, s

ubco

ntra

ctor

s,

vend

ors

and

supp

liers

are

sol

ely

resp

onsi

ble

for

verif

icat

ion

that

info

rmat

ion

utili

zed

in b

iddi

ng,

deve

lopm

ent o

f sh

op

draw

ings

, an

d co

nstr

uctio

n of

the

faci

lity

are

iden

tical

to t

he c

ontr

act

docu

men

ts.

PROJECT NUMBER

PROJECT DATE

APPROVED BY

CHECKED BY

DRAWN BY

Copyright (c) 2018All Rights Reserved.

ISSUED FOR:

NOT VALID UNLESS SIGNED

JAM

ES

W.

BU

CK

LE

Y &

AS

SO

CIA

TE

S I

NC

. --

AR

CH

ITE

CT

SS

WA

INS

BO

RO

, A

LB

AN

Y, R

OM

E, S

AV

AN

NA

H A

ND

BR

UN

SW

ICK

GE

OR

GIA

SHEET

NUMBER:

KEY PLAN

10/2

4/20

19 1

2:14

:24

PM

C:\U

sers

\tbea

l\Doc

umen

ts\L

ocal

Rev

it F

iles\

Rev

it 20

19\2

0180

080-

ME

CH

-CE

NT

RA

L_th

omas

beal

8220

.rvt

FLO

OR

PLA

N -

NE

W G

YM

NA

SIU

M -

DR

AIN

AG

E&

VE

NT

WO

OD

VIL

LE

TO

MP

KIN

S H

IGH

SC

HO

OL A

DD

ITIO

NS

10/09/19

13418

JGB

JGB

CRS

BID SET

SA

VA

NN

AH

CH

AT

HA

M C

OU

NT

Y B

OA

RD

OF

ED

UC

AT

ION

G

EO

RG

IAS

CH

OO

L C

OD

E:

62

5-1

60

5

P1.0SCALE: 1/8" = 1'-0"P1.0

1 FLOOR PLAN - NEW GYMNASIUM - DRAINAGE & VENT

T

PROFESSIONAL

NE ER

IGNE

SIGER

ERED

No. 25029

IGROEG

A

B L AKE

II

G.

S

EMA

J

I

1 ADDENDUM #110-24-2019

Page 3: E G I STER ED PROFESSIONAL ENG NE R Iinternet.savannah.chatham.k12.ga.us/district... · 1 1 1 1 1 1 1 1 11 t t t tt t tt t t tt t t t t t t tt tt t tt t t tt t t tt t tt t t t tt

2W

2W

4X

4X

4X

4X

4X

4X

4X

4X

4X4X

4X4X

4X

4X

4X

4X

4X

4X

4X

4X

1X1X

1X

1X

1X1X

1X

1X

1X

1X

1X 1X

1X

1X

1X

1X

1X

1X

1X

1X

1X

1X1X

4X

2W

2W

2W

2W

2W

2W

2W

2W

2W

2W

2W

2W

2W

11 1

11

11

1 11

T

T

T

T T

DD

DD

D

D D

DD

DD

DD

TT

TT

TT

TT TT

TT

TT

TT

T TT T T T

TT

T TT T T

TT

T

TT

TT

TT

TT

TT

TT TT

1 11

11

11 1

DD DD

DD

DD

TT TTTTTTTTT

TT

TT

TT

TT

TT

TT

T

T T

T T

TT

TT

TT

TT

DD

/SEE 1 P1.0

COMMON PHASE 2

335

STAGE STORAGE

346

CORRIDOR

336

OFFICE

339

AUDITORIUM

348

BAND RM

341

PRACTICE

344

PRACTICE

343

ENSEMBLE

342.1

CORRIDOR

345

TLT

337

TLT

338

EWC-2

EWC-1

P-3BP-3B

P-1B

P-1B

FCO 4"W

2"W

2"W

FCO

3"W

3"W

4"W 4"W

4"W

2"W

P-4C

2"V 2"V

2"V

2"V

2"V

2"V

2"VTR

2"V

3"W

2"VMUSIC STOR,

339.1

ENSEMBLE

342

INST. STOR.

340

EWC-1EWC-1

EWC-2

CONNECT NEW WATER COOLERS TO EXISTING DRAINAGE & VENT PIPING

1

3"FD-A

3"W 3"FD-A

3"W

1

NORTH

WA

RN

ING

: C

ontr

acto

rs,

subc

ontr

acto

rs,

vend

ors

and

supp

liers

are

adv

ised

tha

t the

con

trac

t do

cum

ents

con

sist

of

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

num

bere

d sp

ecifi

catio

ns,

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

nu

mbe

red

blue

- or

bla

ck-li

ne p

rints

, add

enda

, pos

t-bi

d ad

dend

a, a

nd c

hang

e or

ders

onl

y. D

ocum

ents

rep

rodu

ced

by

part

ies

othe

r th

an th

e A

rchi

tect

, whe

ther

in h

ard

copy

or

in e

lect

roni

c fo

rmat

, sha

ll no

t be

cons

ider

ed p

art o

f th

e co

ntra

ct d

ocum

ents

and

do

not

supe

rsed

e th

e pr

ovis

ions

of t

he c

ontr

act d

ocum

ents

. T

he c

ontr

acto

r, s

ubco

ntra

ctor

s,

vend

ors

and

supp

liers

are

sol

ely

resp

onsi

ble

for

verif

icat

ion

that

info

rmat

ion

utili

zed

in b

iddi

ng,

deve

lopm

ent o

f sh

op

draw

ings

, an

d co

nstr

uctio

n of

the

faci

lity

are

iden

tical

to t

he c

ontr

act

docu

men

ts.

PROJECT NUMBER

PROJECT DATE

APPROVED BY

CHECKED BY

DRAWN BY

Copyright (c) 2018All Rights Reserved.

ISSUED FOR:

NOT VALID UNLESS SIGNED

JAM

ES

W.

BU

CK

LE

Y &

AS

SO

CIA

TE

S I

NC

. --

AR

CH

ITE

CT

SS

WA

INS

BO

RO

, A

LB

AN

Y, R

OM

E, S

AV

AN

NA

H A

ND

BR

UN

SW

ICK

GE

OR

GIA

SHEET

NUMBER:

KEY PLAN

10/2

4/20

19 1

2:14

:27

PM

C:\U

sers

\tbea

l\Doc

umen

ts\L

ocal

Rev

it F

iles\

Rev

it 20

19\2

0180

080-

ME

CH

-CE

NT

RA

L_th

omas

beal

8220

.rvt

FLO

OR

PLA

N -

AU

DIT

OR

IUM

/BA

ND

-D

RA

INA

GE

& V

EN

T

WO

OD

VIL

LE

TO

MP

KIN

S H

IGH

SC

HO

OL A

DD

ITIO

NS

10/09/19

13418

JGB

JGB

CRS

BID SET

SA

VA

NN

AH

CH

AT

HA

M C

OU

NT

Y B

OA

RD

OF

ED

UC

AT

ION

G

EO

RG

IAS

CH

OO

L C

OD

E:

62

5-1

60

5

P1.1

SCALE: 1/8" = 1'-0"P1.1

1 FLOOR PLAN - AUDITORIUM/BAND - DRAINAGE & VENT

T

PROFESSIONAL

NE ER

IGNE

SIGER

ERED

No. 25029

IGROEG

A

B L AKE

II

G.

S

EMA

J

I

1 ADDENDUM #110-24-2019

Page 4: E G I STER ED PROFESSIONAL ENG NE R Iinternet.savannah.chatham.k12.ga.us/district... · 1 1 1 1 1 1 1 1 11 t t t tt t tt t t tt t t t t t t tt tt t tt t t tt t t tt t tt t t t tt

11 1

11

11

1 11

T

T

T

TT

T

T TT T T

TT

T TT T T T

TT

TT

T TT T T

TT

TT

TT

TT TTTT TT T T

TT

DD

D D

DD

DDD

DD

DD

DD

DD

DD

DD

DD

DDD

DD

DDDD

11

1111

11DD

DD

D

D D

DD

TT

DD

DD

DD

DD

TT

TT

TTTT

DD

DD

DD

DD

DD

DTT

DD

D D

DD

TT

DD

DD

DDD

DD DD

DD

D

DD

DD

DD

DD

DD

TT

TT

TT

TT

TT

TT

TT

T

T TT

TT

T TT T T T

TT

TT

TTT

T

11

1111

11

TT

TT

TT

TT

TT

T

T T

T T

TT TT

T T

TT TT

T T

TT TT

T T

TT

T TT T T T

TT

DD

HB/BHB/B

P-6

P-6

HB/BHB/B

HB/B

HB/B

HB/E

HB/E

P-3BP-1B

P-1B

P-1AP-1A

P-1A

P-1A

EWC-2

EWC-1

P-4A

P-2B

P-2A

P-1BP-1B

P-1AP-1A

P-1A

P-1A P-2B

P-2A

P-5A

P-5B

P-2A P-2A P-2A P-2A P-2A P-2B

P-1B P-1B P-1A P-1A P-1A

P-4B

P-1BP-1BP-1AP-1AP-1AP-1A

P-1A P-1A P-1A P-1A P-1A P-1A P-1A

EWC-2

EWC-1

P-3B

COACH

313

COACH

306

B PE

307

B PE TLT

308

G VARS TLT

312

G VARS

315

STOR

314

HALL

128

GYM SEATING

OO

GYM SEATING

PP

RISER

310

G PE

316

G PE TLT

318

COACH

319

AD

323

B VARS TLT

320

B VARS

322

TRAINING

326

COACH TLT

325

WEIGHT RM

324

COMMON PHASE 1

330

JAN

329

LAUNDRY

327

MEN

304

GYM LOBBY

300

CONCESSIONS

303

JAN

302

WOMEN

301

P-6

P-6

2-1/2" WATER SERVICE FOR CONTINUATIONSEE CIVIL DWGS.

2-1/2" WATER RISER

P-7

P-9

P-7

DATA

331

EWC-2

EWC-1

P-6

P-7

HB/E

HWC-1

FLOW CONTROL (2.0 GPM) 3/4"HWR 1"H

1/2"H&C TO WH-3/SEE 2 P4.0

2"H&C & 3/4"HWR TO WH-1

1/2"H&C TO WH-2/SEE 2 P4.0

/SEE 1 P4.0

/SEE 3 P4.0

2"C

P-4A

ELECT.

332

(4) P-3C

(4) P-3C

(3) P-3A (3) P-3A (3) P-3A (3) P-3A

1/2"C 1/2"C

1/2"C

1/2"H&C TO WH-4/SEE 2 P4.0

3/4"C

1 1/2"C

2"C

1 1/2"C 3/4"C2"C

2"C

2"C

HA-D

HA-D

1/2"C1/2"C

1/2"C1/2"C

2 1/2"C

3/4"C

HA-A

1"C

3/4

"C

HA-A

3/4"C

1 1/2"C

2"C

2"C

3/4"C 2"C1 1/2"C1 1/2"C

2"C

HA-C

HA-C

2"C

2 1/2"C

HB/R

HA-A

1/2"C

3/4"C

3/4

"C

HA-A

HB/R

HA-A

1"C

HA-A

1/2"C

3/4"H3/4"C

1"H1"C

1"C1"H

2"H

P-1B

HB/RHA-A

2"H

1"C

2 1/2"C

2"C

2"C

1"C

2"C

2"C

3/4"H3/4"C

1"C 1"H

1"H 1"C

HA-A

HA-D

HA-A

1 1/2"C1/2"CHA-A 1 1/2"C

1 1/2"C

2"H

HA-AHA-A

3/4

"C

HA-AHA-A

3/4"C

1"C

HA-AHA-A

2"H

2"H

2"H

2"H

2"C

HA-A

3/4

"C

2"C

2 1/2"C

2"H

2"H

2"H

P-8

2 1

/2"C

2"C CAPPED FOR USE IN PHASE 2

/SEE 1 P2.1

1

HB/E

3/4

"C

HA-A

1

1

NORTH

WA

RN

ING

: C

ontr

acto

rs,

subc

ontr

acto

rs,

vend

ors

and

supp

liers

are

adv

ised

tha

t the

con

trac

t do

cum

ents

con

sist

of

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

num

bere

d sp

ecifi

catio

ns,

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

nu

mbe

red

blue

- or

bla

ck-li

ne p

rints

, add

enda

, pos

t-bi

d ad

dend

a, a

nd c

hang

e or

ders

onl

y. D

ocum

ents

rep

rodu

ced

by

part

ies

othe

r th

an th

e A

rchi

tect

, whe

ther

in h

ard

copy

or

in e

lect

roni

c fo

rmat

, sha

ll no

t be

cons

ider

ed p

art o

f th

e co

ntra

ct d

ocum

ents

and

do

not

supe

rsed

e th

e pr

ovis

ions

of t

he c

ontr

act d

ocum

ents

. T

he c

ontr

acto

r, s

ubco

ntra

ctor

s,

vend

ors

and

supp

liers

are

sol

ely

resp

onsi

ble

for

verif

icat

ion

that

info

rmat

ion

utili

zed

in b

iddi

ng,

deve

lopm

ent o

f sh

op

draw

ings

, an

d co

nstr

uctio

n of

the

faci

lity

are

iden

tical

to t

he c

ontr

act

docu

men

ts.

PROJECT NUMBER

PROJECT DATE

APPROVED BY

CHECKED BY

DRAWN BY

Copyright (c) 2018All Rights Reserved.

ISSUED FOR:

NOT VALID UNLESS SIGNED

JAM

ES

W.

BU

CK

LE

Y &

AS

SO

CIA

TE

S I

NC

. --

AR

CH

ITE

CT

SS

WA

INS

BO

RO

, A

LB

AN

Y, R

OM

E, S

AV

AN

NA

H A

ND

BR

UN

SW

ICK

GE

OR

GIA

SHEET

NUMBER:

KEY PLAN

10/2

4/20

19 1

2:14

:37

PM

C:\U

sers

\tbea

l\Doc

umen

ts\L

ocal

Rev

it F

iles\

Rev

it 20

19\2

0180

080-

ME

CH

-CE

NT

RA

L_th

omas

beal

8220

.rvt FLO

OR

PLA

N -

NE

W G

YM

NA

SIU

M -

HO

T &

CO

LD

WA

TE

R P

LA

N

WO

OD

VIL

LE

TO

MP

KIN

S H

IGH

SC

HO

OL A

DD

ITIO

NS

10/09/19

13418

JGB

JGB

CRS

BID SET

SA

VA

NN

AH

CH

AT

HA

M C

OU

NT

Y B

OA

RD

OF

ED

UC

AT

ION

G

EO

RG

IAS

CH

OO

L C

OD

E:

62

5-1

60

5

P2.0SCALE: 1/8" = 1'-0"P2.0

1 FLOOR PLAN - NEW GYMNASIUM - HOT & COLD WATER PLAN

T

PROFESSIONAL

NE ER

IGNE

SIGER

ERED

No. 25029

IGROEG

A

B L AKE

II

G.

S

EMA

J

I

1 ADDENDUM #110-24-2019

Page 5: E G I STER ED PROFESSIONAL ENG NE R Iinternet.savannah.chatham.k12.ga.us/district... · 1 1 1 1 1 1 1 1 11 t t t tt t tt t t tt t t t t t t tt tt t tt t t tt t t tt t tt t t t tt

2W

2W

4X

4X

4X 4X4X 4X 4X

4X

4X

4X

4X

4X

4X

4X

4X4X

4X4X

4X

4X

4X

4X

4X

4X

4X

4X

4X

4X

1X1X

1X

1X

1X1X

1X

1X

1X

1X

1X 1X

1X

1X

1X

1X

1X

1X

1X

1X

1X

1X1X

4X

4X

4X

2W

2W

2W

2W

2W

2W

2W

2W

2W

2W

2W

2W

2W

11 1

11

11

1 11

T

T

T

T T

DD

DD

D

D D

DD

DD

DD

TT

TT

TT

TT TT

TT

TT

TT

T TT T T T

TT

T TT T T

TT

T

TT

TT

TT

TT

TT

TT TT

1 11

11

11 1

DD DD

DD

DD

TT TTTTTTTTT

TT

TT

TT

TT

TT

TT

T

T T

T T

TT

TT

TT

TT

DD

/SEE 1 P2.0

EWC-2

EWC-1

P-3B

P-3B

P-1B

P-1B

COMMON PHASE 2

335

STAGE STORAGE

346

CORRIDOR

336

OFFICE

339

AUDITORIUM

348

BAND RM

341

PRACTICE

344

PRACTICE

343

ENSEMBLE

342.1

CORRIDOR

345

TLT

337

TLT

338

INST. STOR.

340

MUSIC STOR,

339.1

1/2"H&C TO WH-5/SEE 2 P4.0

1/2"H&C TO WH-6/SEE 2 P4.0

1/2"H&C TO WH-7/SEE 2 P4.0

2"C1 1/2"C

1/2

"C

2"C

2"C

HA-AHA-A

HB/E

HA-A

3/4

"C

2"C

P-4C

ENSEMBLE

342

EWC-1EWC-1

EWC-2

CONNECT NEW WATER COOLERS TO EXISTING WATER PIPING

1

NORTH

WA

RN

ING

: C

ontr

acto

rs,

subc

ontr

acto

rs,

vend

ors

and

supp

liers

are

adv

ised

tha

t the

con

trac

t do

cum

ents

con

sist

of

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

num

bere

d sp

ecifi

catio

ns,

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

nu

mbe

red

blue

- or

bla

ck-li

ne p

rints

, add

enda

, pos

t-bi

d ad

dend

a, a

nd c

hang

e or

ders

onl

y. D

ocum

ents

rep

rodu

ced

by

part

ies

othe

r th

an th

e A

rchi

tect

, whe

ther

in h

ard

copy

or

in e

lect

roni

c fo

rmat

, sha

ll no

t be

cons

ider

ed p

art o

f th

e co

ntra

ct d

ocum

ents

and

do

not

supe

rsed

e th

e pr

ovis

ions

of t

he c

ontr

act d

ocum

ents

. T

he c

ontr

acto

r, s

ubco

ntra

ctor

s,

vend

ors

and

supp

liers

are

sol

ely

resp

onsi

ble

for

verif

icat

ion

that

info

rmat

ion

utili

zed

in b

iddi

ng,

deve

lopm

ent o

f sh

op

draw

ings

, an

d co

nstr

uctio

n of

the

faci

lity

are

iden

tical

to t

he c

ontr

act

docu

men

ts.

PROJECT NUMBER

PROJECT DATE

APPROVED BY

CHECKED BY

DRAWN BY

Copyright (c) 2018All Rights Reserved.

ISSUED FOR:

NOT VALID UNLESS SIGNED

JAM

ES

W.

BU

CK

LE

Y &

AS

SO

CIA

TE

S I

NC

. --

AR

CH

ITE

CT

SS

WA

INS

BO

RO

, A

LB

AN

Y, R

OM

E, S

AV

AN

NA

H A

ND

BR

UN

SW

ICK

GE

OR

GIA

SHEET

NUMBER:

KEY PLAN

10/2

4/20

19 1

2:14

:41

PM

C:\U

sers

\tbea

l\Doc

umen

ts\L

ocal

Rev

it F

iles\

Rev

it 20

19\2

0180

080-

ME

CH

-CE

NT

RA

L_th

omas

beal

8220

.rvt

FLO

OR

PLA

N -

AU

DIT

OR

IUM

/BA

ND

- H

OT

&C

OL

D W

AT

ER

PL

AN

WO

OD

VIL

LE

TO

MP

KIN

S H

IGH

SC

HO

OL A

DD

ITIO

NS

10/09/19

13418

JGB

JGB

CRS

BID SET

SA

VA

NN

AH

CH

AT

HA

M C

OU

NT

Y B

OA

RD

OF

ED

UC

AT

ION

G

EO

RG

IAS

CH

OO

L C

OD

E:

62

5-1

60

5

P2.1

SCALE: 1/8" = 1'-0"P2.1

1 FLOOR PLAN - AUDITORIUM/BAND - HOT & COLD WATER PLAN

T

PROFESSIONAL

NE ER

IGNE

SIGER

ERED

No. 25029

IGROEG

A

B L AKE

II

G.

S

EMA

J

I

1 ADDENDUM #110-24-2019

Page 6: E G I STER ED PROFESSIONAL ENG NE R Iinternet.savannah.chatham.k12.ga.us/district... · 1 1 1 1 1 1 1 1 11 t t t tt t tt t t tt t t t t t t tt tt t tt t t tt t t tt t tt t t t tt

6"RD-A 6"RD-B 6"RD-A 6"RD-B

HB/R

RAC-1

2"VTR

2"VTR 2"VTR

2"VTR

2"VTR EF-2EF-1

RAC-4

DHP-2

EF-4

2"VTR

2"VTR

2"VTR

RAC-5

RAC-6

RAC-2

2"VTR 2"VTR

RAC-3

RAC-7

DHP-1

EF-3

ROOF HATCH

HB/R

HB/R

AIR INTAKE HOOD

RANGE EXHAUST HOOD

1

1

NORTH

WA

RN

ING

: C

ontr

acto

rs,

subc

ontr

acto

rs,

vend

ors

and

supp

liers

are

adv

ised

tha

t the

con

trac

t do

cum

ents

con

sist

of

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

num

bere

d sp

ecifi

catio

ns,

Arc

hite

ct-r

epro

duce

d pr

inte

d, b

ound

and

nu

mbe

red

blue

- or

bla

ck-li

ne p

rints

, add

enda

, pos

t-bi

d ad

dend

a, a

nd c

hang

e or

ders

onl

y. D

ocum

ents

rep

rodu

ced

by

part

ies

othe

r th

an th

e A

rchi

tect

, whe

ther

in h

ard

copy

or

in e

lect

roni

c fo

rmat

, sha

ll no

t be

cons

ider

ed p

art o

f th

e co

ntra

ct d

ocum

ents

and

do

not

supe

rsed

e th

e pr

ovis

ions

of t

he c

ontr

act d

ocum

ents

. T

he c

ontr

acto

r, s

ubco

ntra

ctor

s,

vend

ors

and

supp

liers

are

sol

ely

resp

onsi

ble

for

verif

icat

ion

that

info

rmat

ion

utili

zed

in b

iddi

ng,

deve

lopm

ent o

f sh

op

draw

ings

, an

d co

nstr

uctio

n of

the

faci

lity

are

iden

tical

to t

he c

ontr

act

docu

men

ts.

PROJECT NUMBER

PROJECT DATE

APPROVED BY

CHECKED BY

DRAWN BY

Copyright (c) 2018All Rights Reserved.

ISSUED FOR:

NOT VALID UNLESS SIGNED

JAM

ES

W.

BU

CK

LE

Y &

AS

SO

CIA

TE

S I

NC

. --

AR

CH

ITE

CT

SS

WA

INS

BO

RO

, A

LB

AN

Y, R

OM

E, S

AV

AN

NA

H A

ND

BR

UN

SW

ICK

GE

OR

GIA

SHEET

NUMBER:

KEY PLAN

10/2

4/20

19 1

2:14

:45

PM

C:\U

sers

\tbea

l\Doc

umen

ts\L

ocal

Rev

it F

iles\

Rev

it 20

19\2

0180

080-

ME

CH

-CE

NT

RA

L_th

omas

beal

8220

.rvt

RO

OF

PL

AN

- P

LU

MB

ING

PH

AS

E 1

WO

OD

VIL

LE

TO

MP

KIN

S H

IGH

SC

HO

OL A

DD

ITIO

NS

10/09/19

13418

JGB

JGB

CRS

BID SET

SA

VA

NN

AH

CH

AT

HA

M C

OU

NT

Y B

OA

RD

OF

ED

UC

AT

ION

G

EO

RG

IAS

CH

OO

L C

OD

E:

62

5-1

60

5

P3.0

SCALE: 1/16" = 1'-0"P3.0

1 ROOF PLAN - PLUMBING PHASE 1

T

PROFESSIONAL

NE ER

IGNE

SIGER

ERED

No. 25029

IGROEG

A

B L AKE

II

G.

S

EMA

J

I

1 ADDENDUM #110-24-2019