1
“Anjani” e-Measurement Book & e-Billing Portal: - Measurement book
(MB) is an important application in which daily measurements are recorded for
the work done by contractor in line with the SAP-Purchase Order. The recorded
MB is sent for approvals to PMC/ GAIL Site Engineer through the system where
PMC can take decision to accept/ return/ partial accept.
There are 03 following steps with workflow explained in brief :
Step-1 Creation of MB
WORK FLOW OF MB (Measurment Book)
Contractor GAIL SITE ENGINEER
Step-2 (After approval of MB) Creation of ABSTRACT
WORK FLOW OF ABSTRACT
Contractor GAIL SITE ENGINEER (100% approval)
GAIL EIC (15% approval) GAIL HOD (5% approval) GAIL
Finance
Step-3 Creation of MOP
WORK FLOW OF MOP (Memorandum of Payment)
Contractor GAIL SITE ENGINEER GAIL EIC GAIL
Finance
Contractor payments are made based on the measurements recorded in the MB.
2
LOGIN Site for “ANJANI” system through Internet
Open the website https://gailebank.gail.co.in/MBAutomation/frmlogin.aspx
Steps to login by Main Contractor
Login with credentials provided for the concerned users of Contractor.
The login screen is displayed as shown below.
Select User Type O&M Contractor Radio Button.
Enter the username and password in the fields provided for login.
User Id : SAP Vendor Code ( 10 DIGITS )
Initial password : 123
3
STEP-1 CREATION OF MB
Steps to Create / View / Edit Measurement Book (MB) Create MB: - To create a Measurement Book, authorisation for which is
available only to the Contractors. The steps for the same are as follows:
Login with User ID and password of Main User (SAP Vendor Code) /
Sub User of Contractor.
Click on Create MB menu. Contractor Create MB form will appear.
Select SAP WORK Order, Item No. & DATE for which the MB need to
be created. Thereafter click on “CREATE “ button
System will allow to create only Single MB per day, in case of MB
already created for the selected date, system will give an error
4
Click on Add Record button. The screen will change and option will
appear as drop down to enter Line Item or External Line Item of PO.
Description will appear automatic from system.
Provide relevant inputs, for e.g. QTY,
Special characters like *,^,#,! ,(,)>,<”.”{ },^, are NOT allowed in any
of the input fields.
Click on Insert button.
For more than 1 record, choose Add Record again for next line as per
requirement.
Contractor can save the MB as “Save as Draft” or “Submit” as
required.
View MB: - To view all the MBs whether it is in Drafted / Submitted /
Approved / Rejected mode. The steps for the same are as follows:
Click on View MB menu. Measurement Book Display form will
appear.
5
Select WORK Order, Item no., From and To dates with status and
click Submit button.
MBs along with corresponding status will be displayed as below.
Edit MB:- To edit MBs in Drafted mode, click on the MB no. which will lead
to the edit MB screen.
6
STEP-2 CREATION OF ABSTRACT
Steps to create Abstract by the Contractor Before raising the Invoice of work done for a certain period, Contractor has to prepare the
Abstract for that period.
Login with User ID and password of Main User (SAP Vendor Code) /
Sub User of Contractor. Following screen will appear:
Click on Abstract menu. Contractor Abstract screen as per below will
appear.
Choose the relevant PO, Line Item and period of measurement for
which Abstract has to be prepared and click Create. Following screen
will be displayed.
7
After clicking Submit Abstract, clicking Attach Documents.
Following screen will be displayed for attaching documents.
After attachment all documents and click on Submit. Abstract will be
displayed in Draft Mode
8
Select the Abstract and click Submit Abstract for final submission.
ABSTRACT WORKFLOW
Contractor GAIL SITE ENGINEER (100% approval)
GAIL EIC (15% approval) GAIL HOD (5% approval) GAIL
Finance
The abstract can be returned directly to the Contractor from any stage on the
basis of incomplete / old/ faulty documents attached with Abstract.
9
STEP-3 CREATION OF MOP
Login with User ID and password of Main User (SAP Vendor Code) / Sub
User of Contractor. Click on Create MOP
Select PO and ABSTRACT NUMBER and Press CREATE. Fill the GST ( IGST or SGST
,CGST) Deduction (if any) and submit it .
WORK FLOW OF MOP (Memorandum of Payment)
CONTRACTOR GAIL SITE ENGINEER GAIL EIC GAIL
FINANCE