Date post: | 15-Jan-2016 |
Category: |
Documents |
Upload: | himdad-tahir |
View: | 12 times |
Download: | 0 times |
CONFIGURATION REL 670 (A31)
VERSION 1.2.3
Work Sheet
OVERVIEW
I_AI
U_AI
IMP_PROT
IMP_COM
U_PROT
CB_TR
CB_AR
CB_BF
MEASURE
DREP_AI
DREP_BI
COMMON
LED
BIM
BOM
Description
List of contents
Analog inputs for current circuits
Analog inputs for voltage circuits
Distance Protection functions
Distance Protection Communication logic
Voltage protection functions
Tripping logic
Autorecloser and synchrocheck circuits
Breaker failure protection
Measurement of power, current and voltage
Disturbance report Analog inputs
Disturbance report Binary inputs
General IED functions
Indication diodes
Binary inputs
Binary outputs
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: OVERVIEW, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 1 / 38
SMAI7
LINE CT A
BLOCKIL1GRP7L1IL2GRP7L2IL3GRP7L3IN optionalGRP7N
AI3PAI1AI2AI3AI4AIN
SMAI7
LineCTMeasure
BLOCKIL1GRP7L1IL2GRP7L2IL3GRP7L3IN optionalGRP7N
AI3PAI1AI2AI3AI4AIN
LINE_CT_A_I3PLINE_CT_A_IL1LINE_CT_A_IL2LINE_CT_A_IL3
LINE_CT_A_IN
LINE_CT_MEASUREMENT_I3P
LINE_CT_IL1
TRM_6I_6U_31.CH1
LINE_CT_IL2
TRM_6I_6U_31.CH2
LINE_CT_IL3
TRM_6I_6U_31.CH3
LINE_CT_IL1
TRM_6I_6U_31.CH1
LINE_CT_IL2
TRM_6I_6U_31.CH2
LINE_CT_IL3
TRM_6I_6U_31.CH3
CURRENT CIRCUIT A FOR ZM AND BFP
Note! If IN is not connected with SMT the residual current is calculated and used.
CURRENT CIRCUIT FOR MEASUREMENT
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: I_AI, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 2 / 38
SMAI1
LINE VT A
BLOCKDFTSPFCUL1GRP1L1UL2GRP1L2UL3GRP1L3UN optionalGRP1N
SPFCOUTAI3P
AI1AI2AI3AI4AIN
SMAI1
LINE VT B
BLOCKDFTSPFCUL1GRP1L1UL2GRP1L2UL3GRP1L3Not usedGRP1N
SPFCOUTAI3P
AI1AI2AI3AI4AIN
SMAI9
MeasurementVT
BLOCKUL1GRP9L1UL2GRP9L2UL3GRP9L3Not usedGRP9N
AI3PAI1AI2AI3AI4AIN
REALZERO LINE_VT_A_U3PLINE_VT_A_UL1LINE_VT_A_UL2LINE_VT_A_UL3
LINE_VT_A_UN
REALZERO LINE_VT_B_U3P
LINE_VT_MEASUREMENT_U3P
LINE_VT_UL1
TRM_6I_6U_31.CH7
LINE_VT_UL2
TRM_6I_6U_31.CH8
LINE_VT_UL3
TRM_6I_6U_31.CH9
LINE_VT_UL1
TRM_6I_6U_31.CH7
LINE_VT_UL2
TRM_6I_6U_31.CH8
LINE_VT_UL3
TRM_6I_6U_31.CH9
LINE_VT_UL1
TRM_6I_6U_31.CH7
LINE_VT_UL2
TRM_6I_6U_31.CH8
LINE_VT_UL3
TRM_6I_6U_31.CH9
VOLTAGE CIRCUITS LINE VT CIRCUIT A FOR DISTANCE PROTECTION AND FUSE FAIL
VOLTAGE CIRCUITS LINE VT CIRCUIT B FOR U<, U> AND SYNCROCHECK
VOLTAGE CIRCUITS LINE VT FOR MEASUREMENT
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: U_AI, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 3 / 38
SMAI2
Bus 1 1PhVT
BLOCKUL1GRP2L1UL2GRP2L2UL3GRP2L3Not usedGRP2N
AI3PAI1AI2AI3AI4AIN
SMAI4
Bus 2 1PhVT
BLOCKUL1GRP4L1UL2GRP4L2UL3GRP4L3Not usedGRP4N
AI3PAI1AI2AI3AI4AIN
BUS_1_1PH_VT_U3P
BUS_2_1PH_VT_U3P
BUS_1_VT_UL2
TRM_6I_6U_31.CH10
BUS_2_VT_UL2
TRM_6I_6U_31.CH11
VOLTAGE CIRCUITS BUS 1 VT CIRCUIT FOR SYNCROCHECK
Note! Connect the phase used for SC and set this phase in PST.
VOLTAGE CIRCUITS BUS 1 VT CIRCUIT FOR SYNCROCHECK
Note! Connect the phase used for SC and set this phase in PST.
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: U_AI, Page: 2
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 4 / 38
ZDRDIRU3PI3P
STDIRCND
FDPSPDISI3PU3PBLOCKDIRCND
TRIPSTART
STFWL1STFWL2STFWL3STFWPESTRVL1STRVL2STRVL3STRVPESTNDL1STNDL2STNDL3STNDPE
STFW1PHSTFW2PHSTFW3PH
STPESTPP
STCNDZSTCNDLE
ZMRPSBI3PU3PBLOCKBLKI01BLKI02BLK1PHREL1PHBLK2PHREL2PHI0CHECKTRSPEXTERNAL
STARTZOUT
ZIN
LINE_CT_A_I3PLINE_VT_A_U3P ZD-STDIR
LINE_CT_A_I3PLINE_VT_A_U3P
LINE_FUSE_FAILURE_FSD1-BLKZZD-STDIR
PHS-STFWL1PHS-STFWL2PHS-STFWL3PHS-STFWPE
PHS-STPE
PHS-STCNDZPHS-STCNDI
LINE_CT_A_I3PLINE_VT_A_U3P
PHS-STPE
TRUE
PSD1-START
DIRECTIONAL MEASUREMENT FOR DISTANCE PROTECTION
PHASE SELECTOR, DISTANCE PROTECTION
POWER SWING DETECTION
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: IMP_PROT, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 5 / 38
ZMQPDISI3PU3PBLOCKVTSZBLKTRSTCNDDIRCND
TRIPTRL1TRL2TRL3
STARTSTL1STL2STL3
STND
ZMQAPDISI3PU3PBLOCKVTSZBLKTRSTCNDDIRCND
TRIPTRL1TRL2TRL3
STARTSTL1STL2STL3
STND
ZMQAPDISI3PU3PBLOCKVTSZBLKTRSTCNDDIRCND
TRIPTRL1TRL2TRL3
STARTSTL1STL2STL3
STND
ZMQAPDISI3PU3PBLOCKVTSZBLKTRSTCNDDIRCND
TRIPTRL1TRL2TRL3
STARTSTL1STL2STL3
STND
ZMQAPDISI3PU3PBLOCKVTSZBLKTRSTCNDDIRCND
TRIPTRL1TRL2TRL3
STARTSTL1STL2STL3
STND
LINE_CT_A_I3PLINE_VT_A_U3P
PSD1-STARTLINE_FUSE_FAILURE_FSD1-BLKZ
PHS-STCNDZZD-STDIR
ZM01-TRIP
ZM01-START
LINE_CT_A_I3PLINE_VT_A_U3P
PSD1-STARTLINE_FUSE_FAILURE_FSD1-BLKZ
PHS-STCNDZZD-STDIR
ZM02-TRIP
ZM02-STARTZM02-STL1ZM02-STL2ZM02-STL3ZM02-STND
LINE_CT_A_I3PLINE_VT_A_U3P
PSD1-STARTLINE_FUSE_FAILURE_FSD1-BLKZ
PHS-STCNDIZD-STDIR
ZM03-TRIP
ZM03-START
LINE_CT_A_I3PLINE_VT_A_U3P
PSD1-STARTLINE_FUSE_FAILURE_FSD1-BLKZ
PHS-STCNDIZD-STDIR
ZM04-TRIP
ZM04-START
LINE_CT_A_I3PLINE_VT_A_U3P
PSD1-STARTLINE_FUSE_FAILURE_FSD1-BLKZ
PHS-STCNDZZD-STDIR
ZM05-TRIP
ZM05-START
ZM05-STND
LINE DISTANCE PROTECTION, 5 ZONES
ZM05 SET IN REVERSE DIRECTION, USED IN BLOCKING SCHEME AND CURRENT REVERSAL LOGIC.
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: IMP_PROT, Page: 2
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 6 / 38
ZCVPSOFI3PU3PBLOCKBCZACC
TRIP
LMBRFLOPHSELL1PHSELL2PHSELL3CALCDIST
FLTDISTXCALCMADE
BCD_80BCD_40BCD_20BCD_10BCD_8BCD_4BCD_2BCD_1
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
LINE_CT_A_I3PLINE_VT_A_U3P
ZM02-STND
SOTF-TRIP
ZM02-STL1ZM02-STL2ZM02-STL3
AR01-STARTSOTF-TRIP
SWITCH ON TO FAULT LOGIC
FAULT LOCATOR
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: IMP_PROT, Page: 3
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 7 / 38
ZCPSCHBLOCKBLKTRBLKCSCSBLKCACCCSORCSURCRCRG
TRIPCS
CRLLCG
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
ZCRWPSCHU3PBLOCKIRVBLKIRVWEIBLK1WEIBLK2VTSZCBOPENCRL
IRVLTRWEI
TRWEIL1TRWEIL2TRWEIL3
ECHO
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
ZM02-START
BI_ZCOM-CR
ZCOM-TRIPZCOM-CS
ZM01-START
BI_CS_TEST
LINE_FUSE_FAILURE_FSD1-BLKZ
LINE_VT_A_U3P
ZM05-STARTZM02-START
ZM02-STARTZM05-STND
BI_CB_CLOSED
ZCAL-IRVLZCAL-TRWEI
ZM02-START
ZM05-START
COMMUNICATION LOGIC, DISTANCE PROTECTION
CURRENT REVERSAL AND WEAK END INFEED LOGIC, DISTANCE PROTECTION
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: IMP_COM, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 8 / 38
PHPIOCI3PBLOCKENMULT
TRIPTRL1TRL2TRL3
EFPIOCI3PBLOCKBLKARMULTEN
TRIP
LINE_FUSE_FAILURE_FSD1-BLKZ
LINE_FUSE_FAILURE_FSD1-BLKZ
LINE_CT_A_I3P
LINE_CT_A_I3P
PHPIOC-TRIP
EFPIOC-TRIP
STAND BY NON DIRECTIONAL OVER CURRENT PROTECTION
STAND BY NON DIRECTIONAL EARTH FAULT PROTECTION
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: I_PROT, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 9 / 38
SDDRFUFI3PU3PBLOCKCBCLOSEDMCBOPDISCPOSBLKTRIP
BLKZBLKU
3PHDLD1PHDLD3PH
OV2PTOVU3PBLOCKBLKTR1BLKST1BLKTR2BLKST2
TRIPTR1
TR1L1TR1L2TR1L3
TR2TR2L1TR2L2TR2L3START
ST1ST1L1ST1L2ST1L3
ST2ST2L1ST2L2ST2L3
UV2PTUVU3PBLOCKBLKTR1BLKST1BLKTR2BLKST2
TRIPTR1
TR1L1TR1L2TR1L3
TR2TR2L1TR2L2TR2L3START
ST1ST1L1ST1L2ST1L3
ST2ST2L1ST2L2ST2L3
LOVPTUVU3PBLOCKCBOPENVTSU
TRIPSTART
LINE_CT_A_I3PLINE_VT_A_U3P
BI_CB_CLOSEDBI_LINE_MCB_OK
BI_LINE_DISC_OPENTRP1-TRIP
LINE_FUSE_FAILURE_FSD1-BLKZLINE_FUSE_FAILURE_FSD1-BLKU
LINE_VT_B_U3P TOV1-TRIP
TOV1-START
TOV1-ST1L1TOV1-ST1L2TOV1-ST1L3
LINE_VT_B_U3PLINE_FUSE_FAILURE_FSD1-BLKU
BI_CB_CLOSED
BI_CB_CLOSED
TUV1-TRIP
TUV1-START
TUV1-ST1L1TUV1-ST1L2TUV1-ST1L3
LINE_VT_B_U3P
LINE_FUSE_FAILURE_FSD1-BLKU
LOV1-START
FUSE FAILURE SUPERVISION
DELAYED OVERVOLTAGE PROTECTION
DELAYED UNDERVOLTAGE PROTECTION
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: U_PROT, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 10 / 38
TMAGGIOINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6INPUT7INPUT8INPUT9INPUT10INPUT11INPUT12INPUT13INPUT14INPUT15INPUT16INPUT17INPUT18INPUT19INPUT20INPUT21INPUT22INPUT23INPUT24INPUT25INPUT26INPUT27INPUT28INPUT29INPUT30INPUT31INPUT32
OUTPUT1OUTPUT2OUTPUT3
SMPPTRCBLOCKBLKLKOUTTRINTRINL1TRINL2TRINL3PSL1PSL2PSL31PTRZ1PTREFP3PTRSETLKOUTRSTLKOUT
TRIPTRL1TRL2TRL3TR1PTR2PTR3P
CLLKOUTOR
INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
SOTF-TRIP
TOV1-TRIPTUV1-TRIP
TRUE
TRP1-TRIP
TRP1-TR3P
ZM02-TRIPZM03-TRIPZM04-TRIPZM05-TRIP
ZM_DELAYED_TRIP
ZM01-TRIPZCOM-TRIP
ZCAL-TRWEI
EFPIOC-TRIPPHPIOC-TRIP
FRONT LOGIC CB TRIPPING
TR01-INPUT 1-21 = CB TRIP
TRIP CIRCUITS CB
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: CB_TR, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 11 / 38
TMAGGIOINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6INPUT7INPUT8INPUT9INPUT10INPUT11INPUT12INPUT13INPUT14INPUT15INPUT16INPUT17INPUT18INPUT19INPUT20INPUT21INPUT22INPUT23INPUT24INPUT25INPUT26INPUT27INPUT28INPUT29INPUT30INPUT31INPUT32
OUTPUT1OUTPUT2OUTPUT3
ZM01-TRIPZCOM-TRIP
TOV1-TRIPTUV1-TRIPBFP1-TRBU
BI_LINE_DIT_REC
ZM_DELAYED_TRIP
AR01-STARTAR01-INHBIT
ZCAL-TRWEI
PHPIOC-TRIPEFPIOC-TRIP
FRONT LOGIC CB AUTORECLOSE
TR03-INPUT 1-16 =START AR
TR03-INPUT 17-32 =INHIBIT AR
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: CB_AR, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 12 / 38
SMBRRECONOFFBLKONBLKOFFRESETINHIBITSTARTSTARTHSTRSOTFSKIPHSZONESTEPTR2PTR3PTHOLHOLDCBREADYCBPOSPLCLOSTSYNCWAITRSTCOUNTMODEINT
BLOCKEDSETONREADYACTIVESUCCL
UNSUCCLINPROGR
1PT12PT13PT13PT23PT33PT43PT5
PERMIT1PPREP3P
CLOSECBWFMASTER
COUNT1PCOUNT2P
COUNT3P1COUNT3P2COUNT3P3COUNT3P4COUNT3P5COUNTAR
MODE
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
INVINPUT OUT
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
GATEINPUT OUT
BI_AR01-ONBI_AR01-OFF
AR01-INHBIT
SOTF-TRIP
TRP1-TR3P
BI_CB_CLOSED
AUTO_SC_OK
INTZERO
AR01-SETONAR01-READYAR01-ACTIVEAR01-SUCCLAR01-UNSUCCLAR01-INPROGR
AR01-CLOSECB
AR01-START
AR01_3 PHASE_START
AR01_SETOFF
BI_CB_NOT_READY
TRUE
CB AUTORECLOSE
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: CB_AR, Page: 2
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 13 / 38
SESRSYNU3PBB1U3PBB2U3PLN1U3PLN2BLOCKBLKSYNCHBLKSCBLKENERGB1QOPENB1QCLDB2QOPENB2QCLDLN1QOPENLN1QCLDLN2QOPENLN2QCLDUB1OKUB1FFUB2OKUB2FFULN1OKULN1FFULN2OKULN2FFSTARTSYNTSTSYNCHTSTSCTSTENERGAENMODEMENMODE
SYNOKAUTOSYOKAUTOENOK
MANSYOKMANENOK
TSTSYNOKTSTAUTSYTSTMANSY
TSTENOKUSELFAIL
B1SELB2SEL
LN1SELLN2SEL
SYNPROGRSYNFAILUOKSYN
UDIFFSYNFRDIFSYNFRDIFFOKFRDERIVA
UOKSCUDIFFSCFRDIFFAPHDIFFAFRDIFFMPHDIFFM
INADVCLSUDIFFME
FRDIFFMEPHDIFFME
UBUSULINE
MODEAENMODEMEN
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
BUS_1_1PH_VT_U3PBUS_2_1PH_VT_U3P
LINE_VT_B_U3PGRP_OFF
BI_BUS_1_DISC_CLOSED
BI_BUS_2_DISC_CLOSEDTRUE
TRUE
BI_BUS_MCB_OK
BI_BUS_MCB_OK
BI_LINE_MCB_OK
TRUE
INTZEROINTZERO
AUTO_SC_OK
MAN_SC_OK
AR01_3 PHASE_START
SYNCHRO CHECK AND ENERGIZING CHECK CB
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: CB_AR, Page: 3
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 14 / 38
CCRBRFI3PBLOCKSTARTSTL1STL2STL3CBCLDL1CBCLDL2CBCLDL3CBFLT
TRBUTRBU2TRRET
TRRETL1TRRETL2TRRETL3
CBALARM
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
LINE_CT_A_I3P
TRP1-TRIP
BFP1-TRBU
BI_START_BF
BREAKER FAILURE PROTECTION CB
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: CB_BF, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 15 / 38
CVMMXNI3PU3P
SS_RANGE
P_INSTP
P_RANGEQ_INST
QQ_RANGE
PFPF_RANGE
ILAGILEAD
UU_RANGE
II_RANGE
FF_RANGE
VNMMXUU3P UL1
UL1RANGUL1ANGL
UL2UL2RANGUL2ANGL
UL3UL3RANGUL3ANGL
VMMXUU3P UL12
UL12RANGUL12ANGL
UL23UL23RANGUL23ANGL
UL31UL31RANGUL31ANGL
VMSQIU3P 3U0
3U0RANG3U0ANGL
U1U1RANGU1ANGL
U2U2RANGU2ANGL
CMSQII3P 3I0
3I0RANG3I0ANGL
I1I1RANGI1ANGL
I2I2RANGI2ANGL
CMMXUI3P IL1
IL1RANGIL1ANGL
IL2IL2RANGIL2ANGL
IL3IL3RANGIL3ANGL
LINE_CT_MEASUREMENT_I3PLINE_VT_MEASUREMENT_U3P
LINE_VT_MEASUREMENT_U3P
LINE_VT_MEASUREMENT_U3P
LINE_VT_MEASUREMENT_U3P
LINE_CT_MEASUREMENT_I3P
LINE_CT_MEASUREMENT_I3P
MEASUREMENTS
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: MEASURE, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 16 / 38
A1RADRLINE_A_IL1INPUT1LINE_A_IL2INPUT2LINE_A_IL3INPUT3LINE_A_ININPUT4LINE_UL1INPUT5LINE_UL2INPUT6LINE_UL3INPUT7LINE_UNINPUT8Not usedINPUT9Not usedINPUT10
LINE_CT_A_IL1
LINE_CT_A_IL2
LINE_CT_A_IL3
LINE_CT_A_IN
LINE_VT_A_UL1
LINE_VT_A_UL2
LINE_VT_A_UL3
LINE_VT_A_UN
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: DREP_AI, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 17 / 38
B1RBDRTRIPINPUT1Not usedINPUT2Not usedINPUT3Not usedINPUT4Not usedINPUT5Not usedINPUT6ZM01 TRIPINPUT7ZM01 STARTINPUT8ZM02 TRIPINPUT9ZM02 STARTINPUT10ZM03 TRIPINPUT11ZM03 STARTINPUT12ZM04 TRIPINPUT13ZM04 STARTINPUT14ZM05 TRIPINPUT15ZM05 STARTINPUT16
B2RBDRSOTF TRIPINPUT17ZCOM TRIPINPUT18CRINPUT19CSINPUT20Not usedINPUT21PHS STFWL1INPUT22PHS STFWL2INPUT23PHS STFWL3INPUT24PHS STFWPEINPUT25PSD1 STARTINPUT26Not usedINPUT27Not usedINPUT28DIT RECEIVEINPUT29Not usedINPUT30Not usedINPUT31FUSE FAILINPUT32
B3RBDRCURR REV ZINPUT33TRVEI ZINPUT34Not usedINPUT35BI START BFPINPUT36BFP TRBUINPUT37CS TESTINPUT38DIT SEND TESTINPUT39Not usedINPUT40Not usedINPUT41Not usedINPUT42Not usedINPUT43Not usedINPUT44Not usedINPUT45CB CLOSEDINPUT46LINE DS OPENINPUT47TEST MODE ONINPUT48
B4RBDRCB CLOSEINPUT49CB READYINPUT50AR UNSUCCLINPUT51AR INPROGRINPUT52AR READYINPUT53AR ACTIVEINPUT54AR SUCCLINPUT55Not usedINPUT56Not usedINPUT57Not usedINPUT58Not usedINPUT59Not usedINPUT60Not usedINPUT61Not usedINPUT62Not usedINPUT63PD TRIPINPUT64
B5RBDRUV2 TRIPINPUT65UV2 STARTINPUT66OV2 TRIPINPUT67OV2 STARTINPUT68UV2 STL1INPUT69UV2 STL2INPUT70UV2 STL3INPUT71OV2 STL1INPUT72OV2 STL2INPUT73OV2 STL3INPUT74PHPIOC TRIPINPUT75EFPIOC TRIPINPUT76Not usedINPUT77Not usedINPUT78Not usedINPUT79Not usedINPUT80
TRP1-TRIP
ZM01-TRIP
ZM01-START
ZM02-TRIP
ZM02-START
ZM03-TRIP
ZM03-START
ZM04-TRIP
ZM04-START
ZM05-TRIP
ZM05-START
SOTF-TRIP
ZCOM-TRIP
BI_ZCOM-CR
PHS-STFWL1
PHS-STFWL2
PHS-STFWL3
PHS-STFWPE
PSD1-START
BI_LINE_DIT_REC
LINE_FUSE_FAILURE_FSD1-BLKU
BFP1-TRBU
BI_CB_CLOSED
TEST-ACTIVE
BI_START_BF
BI_CS_TEST
BI_DIT_SEND_TEST
AR01-CLOSECB
AR01-UNSUCCL
AR01-INPROGR
BI_LINE_DISC_OPEN
ZCOM-CS
AR01-READY
AR01-ACTIVE
AR01-SUCCL
BI_CB_NOT_READY
ZCAL-IRVL
ZCAL-TRWEI
TUV1-TRIP
TUV1-START
TOV1-TRIP
TOV1-START
TUV1-ST1L1
TUV1-ST1L2
TUV1-ST1L3
TOV1-ST1L1
TOV1-ST1L2
TOV1-ST1L3
PHPIOC-TRIP
EFPIOC-TRIP
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: DREP_BI, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 18 / 38
LEDGENBLOCKRESETLEDTEST
NEWINDACK
LocalHMICLRLEDS HMI-ON
RED-SYELLOW-SYELLOW-FCLRPULSELEDSCLRD
TIMERINPUT ON
OFF
TESTMODEINPUT ACTIVE
OUTPUTSETTING
NOEVENT
FXDSIGNOFFON
INTZEROINTONE
INTALONEREALZERO
STRNULLZEROSMPL
GRP_OFF
BI_ACTIVATE_TESTMODETEST-ACTIVE
FALSETRUEINTZERO
REALZERO
GRP_OFF
LED MONITOR
TEST MODE ON/OFF
FIXED SIGNALS
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: COMMON, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 19 / 38
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
ZM01-TRIP
ZM_DELAYED_TRIP
ZCOM-CS
DIT_SEND
TOV1-TRIPTUV1-TRIP
BFP1-TRBU
ZCOM-TRIPZCAL-TRWEIPHPIOC-TRIPEFPIOC-TRIP
SOTF-TRIP
LED.RED1
LED.RED2
LED.RED3
LED.RED4
LED.RED5
LED.RED6
RED LEDsA A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: LED, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 20 / 38
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
BI_CB_LOCKED_OUT
AR01-CLOSECB
BI_LINE_DIT_REC
BI_ZCOM-CR
AR01-SETON
AR01_SETOFF
PSD1-START
ZM01-STARTZM02-STARTZM03-STARTZM04-STARTZM05-START
AR01-UNSUCCL
LED.YELLOW7
LED.YELLOW8
LED.YELLOW9
LED.YELLOW10
LED.YELLOW11
LED.YELLOW12
LED.YELLOW13
LED.YELLOW14
LED.YELLOW15
YELLOW LEDsA A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: LED, Page: 2
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 21 / 38
BI_CB_CLOSED
BI_AR01-ON
BI_AR01-OFF
BI_LINE_DISC_OPEN
BI_LINE_MCB_OK
BI_BUS_1_DISC_CLOSED
BI_BUS_MCB_OK
BI_BUS_2_DISC_CLOSED
BI_ACTIVATE_TESTMODE
BI_CB_LOCKED_OUT
BI_CB_NOT_READY
QB1 CLOSED
BIM_3.BI1
QB2 CLOSED
BIM_3.BI2
QB9 OPEN
BIM_3.BI3
QA1 ON
BIM_3.BI5
CB NOT READY
BIM_3.BI6
LINE MCB OK
BIM_3.BI7
CB L-O
BIM_3.BI8
AR ON
BIM_3.BI9
AR OFF
BIM_3.BI10
RTXP INSERTED
BIM_3.BI11
WA MCB OK
BIM_3.BI12
BIM 3A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: BIM, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 22 / 38
BI_ZCOM-CR
BI_LINE_DIT_REC
BI_START_BF
BI_CS_TEST
BI_DIT_SEND_TEST
CS TEST
BIM_5.BI2
DIT SEND TEST
BIM_5.BI3
CR
BIM_5.BI9
DIT RECEIVE
BIM_5.BI10
START BFP
BIM_5.BI6
BIM 5A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: BIM, Page: 2
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 23 / 38
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
ORINPUT1INPUT2INPUT3INPUT4INPUT5INPUT6
OUTNOUT
FALSE
FALSE
MAN_SC_OK
BFP1-TRBU
BFP1-TRBU
AR01-CLOSECB
LOV1-START
AR01-CLOSECB
ZM01-TRIPZM_DELAYED_TRIP
SOTF-TRIPFALSEFALSEFALSE
TRP1-TRIP
TRP1-TRIP
ZCOM-CSBFP1-TRBU
BI_DIT_SEND_TEST
ZM_TRIP ZM_TRIP
FALSE
AR01-UNSUCCL
DIT_SEND
TEST-ACTIVE
AR01_SETOFF
AR01-SETON
AR01-CLOSECB
ZM_TRIP
BFP1-TRBU
FALSE
AR01-UNSUCCL
BFP1-TRBU
MAN SC OK
BOM_4.BO1
BOM_4.BO2
BFP TRIP BU
BOM_4.BO3
BFP TRIP BU
BOM_4.BO4
AR CLOSE CB
BOM_4.BO5
BOM_4.BO6
LINE ZERO U
BOM_4.BO7
BOM_4.BO8
AR CLOSE CB
BOM_4.BO9
AR UNSUCCL
BOM_4.BO10
ZM TRIP
BOM_4.BO11
BOM_4.BO12
TRIP
BOM_4.BO13
TRIP
BOM_4.BO14
CS
BOM_4.BO15
DIT
BOM_4.BO16
TEST ACTIVE
BOM_4.BO17
CBF TRIP
BOM_4.BO18
AR SET OFF
BOM_4.BO19
AR SET ON
BOM_4.BO20
AR CLOSE CB
BOM_4.BO21
AR UNSUCCL
BOM_4.BO22
ZM TRIP
BOM_4.BO23
CBF TRIP
BOM_4.BO24
BOM 4A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: BOM, Page: 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 24 / 38
ZM01-TRIP
ZM02-TRIP
ZM03-TRIP
ZM01-TRIP
ZM02-TRIP
ZM03-TRIP
LINE_FUSE_FAILURE_FSD1-BLKU
ZM01 TRIP
BOM_6.BO1
ZM02 TRIP
BOM_6.BO2
ZM03 TRIP
BOM_6.BO3
FUSE FAILURE
BOM_6.BO4
BOM_6.BO5
BOM_6.BO6
BOM_6.BO7
BOM_6.BO8
BOM_6.BO9
BOM_6.BO10
BOM_6.BO11
BOM_6.BO12
ZM01 TRIP
BOM_6.BO13
ZM02 TRIP
BOM_6.BO14
ZM03 TRIP
BOM_6.BO15
BOM_6.BO16
BOM_6.BO17
BOM_6.BO18
BOM_6.BO19
BOM_6.BO20
BOM_6.BO21
BOM_6.BO22
BOM_6.BO23
BOM_6.BO24
BOM 6A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: BOM, Page: 2
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 25 / 38
Output Variable Information Present in I_AI Page 1Name Page Partner Location Partner PageLINE_CT_A_I3P 1 IMP_PROT 1
IMP_PROT 1IMP_PROT 1IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 3I_PROT 1I_PROT 1U_PROT 1CB_BF 1
LINE_CT_A_IL1 1 DREP_AI 1LINE_CT_A_IL2 1 DREP_AI 1LINE_CT_A_IL3 1 DREP_AI 1LINE_CT_A_IN 1 DREP_AI 1LINE_CT_MEASUREMENT_I3P 1 MEASURE 1
MEASURE 1MEASURE 1
Input Variable Information Present in U_AI Page 1Name Page Partner Location Partner PageREALZERO 1 COMMON 1REALZERO 1 COMMON 1Output Variable Information Present in U_AI Page 1Name Page Partner Location Partner PageLINE_VT_A_U3P 1 IMP_PROT 1
IMP_PROT 1IMP_PROT 1IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 3IMP_COM 1U_PROT 1
LINE_VT_A_UL1 1 DREP_AI 1LINE_VT_A_UL2 1 DREP_AI 1LINE_VT_A_UL3 1 DREP_AI 1LINE_VT_A_UN 1 DREP_AI 1LINE_VT_B_U3P 1 U_PROT 1
U_PROT 1U_PROT 1CB_AR 3
LINE_VT_MEASUREMENT_U3P 1 MEASURE 1MEASURE 1MEASURE 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 26 / 38
Name Page Partner Location Partner PageMEASURE 1
Output Variable Information Present in U_AI Page 2Name Page Partner Location Partner PageBUS_1_1PH_VT_U3P 2 CB_AR 3BUS_2_1PH_VT_U3P 2 CB_AR 3Input Variable Information Present in IMP_PROT Page 1Name Page Partner Location Partner PageLINE_CT_A_I3P 1 I_AI 1LINE_VT_A_U3P 1 U_AI 1LINE_CT_A_I3P 1 I_AI 1LINE_VT_A_U3P 1 U_AI 1LINE_FUSE_FAILURE_FSD1-BLKZ 1 U_PROT 1ZD-STDIR 1 IMP_PROT 1LINE_CT_A_I3P 1 I_AI 1LINE_VT_A_U3P 1 U_AI 1PHS-STPE 1 IMP_PROT 1TRUE 1 COMMON 1Output Variable Information Present in IMP_PROT Page 1Name Page Partner Location Partner PageZD-STDIR 1 IMP_PROT 1
IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 2
PHS-STFWL1 1 DREP_BI 1PHS-STFWL2 1 DREP_BI 1PHS-STFWL3 1 DREP_BI 1PHS-STFWPE 1 DREP_BI 1PHS-STPE 1 IMP_PROT 1PHS-STCNDZ 1 IMP_PROT 2
IMP_PROT 2IMP_PROT 2
PHS-STCNDI 1 IMP_PROT 2IMP_PROT 2
PSD1-START 1 IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 2DREP_BI 1LED 2
Input Variable Information Present in IMP_PROT Page 2Name Page Partner Location Partner PageLINE_CT_A_I3P 2 I_AI 1LINE_VT_A_U3P 2 U_AI 1PSD1-START 2 IMP_PROT 1LINE_FUSE_FAILURE_FSD1-BLKZ 2 U_PROT 1PHS-STCNDZ 2 IMP_PROT 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 27 / 38
Name Page Partner Location Partner PageZD-STDIR 2 IMP_PROT 1LINE_CT_A_I3P 2 I_AI 1LINE_VT_A_U3P 2 U_AI 1PSD1-START 2 IMP_PROT 1LINE_FUSE_FAILURE_FSD1-BLKZ 2 U_PROT 1PHS-STCNDZ 2 IMP_PROT 1ZD-STDIR 2 IMP_PROT 1LINE_CT_A_I3P 2 I_AI 1LINE_VT_A_U3P 2 U_AI 1PSD1-START 2 IMP_PROT 1LINE_FUSE_FAILURE_FSD1-BLKZ 2 U_PROT 1PHS-STCNDI 2 IMP_PROT 1ZD-STDIR 2 IMP_PROT 1LINE_CT_A_I3P 2 I_AI 1LINE_VT_A_U3P 2 U_AI 1PSD1-START 2 IMP_PROT 1LINE_FUSE_FAILURE_FSD1-BLKZ 2 U_PROT 1PHS-STCNDI 2 IMP_PROT 1ZD-STDIR 2 IMP_PROT 1LINE_CT_A_I3P 2 I_AI 1LINE_VT_A_U3P 2 U_AI 1PSD1-START 2 IMP_PROT 1LINE_FUSE_FAILURE_FSD1-BLKZ 2 U_PROT 1PHS-STCNDZ 2 IMP_PROT 1ZD-STDIR 2 IMP_PROT 1Output Variable Information Present in IMP_PROT Page 2Name Page Partner Location Partner PageZM01-TRIP 2 CB_TR 1
CB_AR 1DREP_BI 1LED 1BOM 1BOM 2BOM 2
ZM01-START 2 IMP_COM 1DREP_BI 1LED 2
ZM02-TRIP 2 CB_TR 1DREP_BI 1BOM 2BOM 2
ZM02-START 2 IMP_COM 1IMP_COM 1IMP_COM 1IMP_COM 1DREP_BI 1LED 2
ZM02-STL1 2 IMP_PROT 3ZM02-STL2 2 IMP_PROT 3
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 28 / 38
Name Page Partner Location Partner PageZM02-STL3 2 IMP_PROT 3ZM02-STND 2 IMP_PROT 3ZM03-TRIP 2 CB_TR 1
DREP_BI 1BOM 2BOM 2
ZM03-START 2 DREP_BI 1LED 2
ZM04-TRIP 2 CB_TR 1DREP_BI 1
ZM04-START 2 DREP_BI 1LED 2
ZM05-TRIP 2 CB_TR 1DREP_BI 1
ZM05-START 2 IMP_COM 1IMP_COM 1DREP_BI 1LED 2
ZM05-STND 2 IMP_COM 1Input Variable Information Present in IMP_PROT Page 3Name Page Partner Location Partner PageLINE_CT_A_I3P 3 I_AI 1LINE_VT_A_U3P 3 U_AI 1ZM02-STND 3 IMP_PROT 2ZM02-STL1 3 IMP_PROT 2ZM02-STL2 3 IMP_PROT 2ZM02-STL3 3 IMP_PROT 2AR01-START 3 CB_AR 1SOTF-TRIP 3 IMP_PROT 3Output Variable Information Present in IMP_PROT Page 3Name Page Partner Location Partner PageSOTF-TRIP 3 IMP_PROT 3
CB_TR 1CB_AR 2DREP_BI 1LED 1BOM 1
Input Variable Information Present in IMP_COM Page 1Name Page Partner Location Partner PageZM02-START 1 IMP_PROT 2BI_ZCOM-CR 1 BIM 2ZM01-START 1 IMP_PROT 2BI_CS_TEST 1 BIM 2LINE_FUSE_FAILURE_FSD1-BLKZ 1 U_PROT 1LINE_VT_A_U3P 1 U_AI 1ZM05-START 1 IMP_PROT 2ZM02-START 1 IMP_PROT 2ZM02-START 1 IMP_PROT 2ZM05-STND 1 IMP_PROT 2
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 29 / 38
Name Page Partner Location Partner PageBI_CB_CLOSED 1 BIM 1ZM02-START 1 IMP_PROT 2ZM05-START 1 IMP_PROT 2Output Variable Information Present in IMP_COM Page 1Name Page Partner Location Partner PageZCOM-TRIP 1 CB_TR 1
CB_AR 1DREP_BI 1LED 1
ZCOM-CS 1 DREP_BI 1LED 1BOM 1
ZCAL-IRVL 1 DREP_BI 1ZCAL-TRWEI 1 CB_TR 1
CB_AR 1DREP_BI 1LED 1
Input Variable Information Present in I_PROT Page 1Name Page Partner Location Partner PageLINE_FUSE_FAILURE_FSD1-BLKZ 1 U_PROT 1LINE_FUSE_FAILURE_FSD1-BLKZ 1 U_PROT 1LINE_CT_A_I3P 1 I_AI 1LINE_CT_A_I3P 1 I_AI 1Output Variable Information Present in I_PROT Page 1Name Page Partner Location Partner PagePHPIOC-TRIP 1 CB_TR 1
CB_AR 1DREP_BI 1LED 1
EFPIOC-TRIP 1 CB_TR 1CB_AR 1DREP_BI 1LED 1
Input Variable Information Present in U_PROT Page 1Name Page Partner Location Partner PageLINE_CT_A_I3P 1 I_AI 1LINE_VT_A_U3P 1 U_AI 1BI_CB_CLOSED 1 BIM 1BI_LINE_MCB_OK 1 BIM 1BI_LINE_DISC_OPEN 1 BIM 1TRP1-TRIP 1 CB_TR 1LINE_VT_B_U3P 1 U_AI 1LINE_VT_B_U3P 1 U_AI 1LINE_FUSE_FAILURE_FSD1-BLKU 1 U_PROT 1BI_CB_CLOSED 1 BIM 1BI_CB_CLOSED 1 BIM 1LINE_VT_B_U3P 1 U_AI 1LINE_FUSE_FAILURE_FSD1-BLKU 1 U_PROT 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 30 / 38
Output Variable Information Present in U_PROT Page 1Name Page Partner Location Partner PageLINE_FUSE_FAILURE_FSD1-BLKZ 1 IMP_PROT 1
IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_PROT 2IMP_COM 1I_PROT 1I_PROT 1
LINE_FUSE_FAILURE_FSD1-BLKU 1 U_PROT 1U_PROT 1DREP_BI 1BOM 2
TOV1-TRIP 1 CB_TR 1CB_AR 1DREP_BI 1LED 1
TOV1-START 1 DREP_BI 1TOV1-ST1L1 1 DREP_BI 1TOV1-ST1L2 1 DREP_BI 1TOV1-ST1L3 1 DREP_BI 1TUV1-TRIP 1 CB_TR 1
CB_AR 1DREP_BI 1LED 1
TUV1-START 1 DREP_BI 1TUV1-ST1L1 1 DREP_BI 1TUV1-ST1L2 1 DREP_BI 1TUV1-ST1L3 1 DREP_BI 1LOV1-START 1 BOM 1Input Variable Information Present in CB_TR Page 1Name Page Partner Location Partner PageSOTF-TRIP 1 IMP_PROT 3TOV1-TRIP 1 U_PROT 1TUV1-TRIP 1 U_PROT 1TRUE 1 COMMON 1ZM02-TRIP 1 IMP_PROT 2ZM03-TRIP 1 IMP_PROT 2ZM04-TRIP 1 IMP_PROT 2ZM05-TRIP 1 IMP_PROT 2ZM01-TRIP 1 IMP_PROT 2ZCOM-TRIP 1 IMP_COM 1ZCAL-TRWEI 1 IMP_COM 1EFPIOC-TRIP 1 I_PROT 1PHPIOC-TRIP 1 I_PROT 1Output Variable Information Present in CB_TR Page 1Name Page Partner Location Partner PageTRP1-TRIP 1 U_PROT 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 31 / 38
Name Page Partner Location Partner PageCB_BF 1DREP_BI 1BOM 1BOM 1
TRP1-TR3P 1 CB_AR 2ZM_DELAYED_TRIP 1 CB_AR 1
LED 1BOM 1
Input Variable Information Present in CB_AR Page 1Name Page Partner Location Partner PageZM01-TRIP 1 IMP_PROT 2ZCOM-TRIP 1 IMP_COM 1TOV1-TRIP 1 U_PROT 1TUV1-TRIP 1 U_PROT 1BFP1-TRBU 1 CB_BF 1BI_LINE_DIT_REC 1 BIM 2ZM_DELAYED_TRIP 1 CB_TR 1ZCAL-TRWEI 1 IMP_COM 1PHPIOC-TRIP 1 I_PROT 1EFPIOC-TRIP 1 I_PROT 1Output Variable Information Present in CB_AR Page 1Name Page Partner Location Partner PageAR01-START 1 IMP_PROT 3
CB_AR 2AR01-INHBIT 1 CB_AR 2Input Variable Information Present in CB_AR Page 2Name Page Partner Location Partner PageBI_AR01-ON 2 BIM 1BI_AR01-OFF 2 BIM 1AR01-INHBIT 2 CB_AR 1SOTF-TRIP 2 IMP_PROT 3TRP1-TR3P 2 CB_TR 1BI_CB_CLOSED 2 BIM 1AUTO_SC_OK 2 CB_AR 3INTZERO 2 COMMON 1AR01-START 2 CB_AR 1BI_CB_NOT_READY 2 BIM 1TRUE 2 COMMON 1Output Variable Information Present in CB_AR Page 2Name Page Partner Location Partner PageAR01-SETON 2 LED 2
BOM 1AR01-READY 2 DREP_BI 1AR01-ACTIVE 2 DREP_BI 1AR01-SUCCL 2 DREP_BI 1AR01-UNSUCCL 2 DREP_BI 1
LED 2BOM 1BOM 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 32 / 38
Name Page Partner Location Partner PageAR01-INPROGR 2 DREP_BI 1AR01-CLOSECB 2 DREP_BI 1
LED 2BOM 1BOM 1BOM 1
AR01_3 PHASE_START 2 CB_AR 3AR01_SETOFF 2 LED 2
BOM 1Input Variable Information Present in CB_AR Page 3Name Page Partner Location Partner PageBUS_1_1PH_VT_U3P 3 U_AI 2BUS_2_1PH_VT_U3P 3 U_AI 2LINE_VT_B_U3P 3 U_AI 1GRP_OFF 3 COMMON 1BI_BUS_1_DISC_CLOSED 3 BIM 1BI_BUS_2_DISC_CLOSED 3 BIM 1TRUE 3 COMMON 1TRUE 3 COMMON 1BI_BUS_MCB_OK 3 BIM 1BI_BUS_MCB_OK 3 BIM 1BI_LINE_MCB_OK 3 BIM 1TRUE 3 COMMON 1INTZERO 3 COMMON 1INTZERO 3 COMMON 1AR01_3 PHASE_START 3 CB_AR 2Output Variable Information Present in CB_AR Page 3Name Page Partner Location Partner PageAUTO_SC_OK 3 CB_AR 2MAN_SC_OK 3 BOM 1Input Variable Information Present in CB_BF Page 1Name Page Partner Location Partner PageLINE_CT_A_I3P 1 I_AI 1TRP1-TRIP 1 CB_TR 1BI_START_BF 1 BIM 2Output Variable Information Present in CB_BF Page 1Name Page Partner Location Partner PageBFP1-TRBU 1 CB_AR 1
DREP_BI 1LED 1BOM 1BOM 1BOM 1BOM 1BOM 1
Input Variable Information Present in MEASURE Page 1Name Page Partner Location Partner PageLINE_CT_MEASUREMENT_I3P 1 I_AI 1LINE_VT_MEASUREMENT_U3P 1 U_AI 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 33 / 38
Name Page Partner Location Partner PageLINE_VT_MEASUREMENT_U3P 1 U_AI 1LINE_VT_MEASUREMENT_U3P 1 U_AI 1LINE_VT_MEASUREMENT_U3P 1 U_AI 1LINE_CT_MEASUREMENT_I3P 1 I_AI 1LINE_CT_MEASUREMENT_I3P 1 I_AI 1Input Variable Information Present in DREP_AI Page 1Name Page Partner Location Partner PageLINE_CT_A_IL1 1 I_AI 1LINE_CT_A_IL2 1 I_AI 1LINE_CT_A_IL3 1 I_AI 1LINE_CT_A_IN 1 I_AI 1LINE_VT_A_UL1 1 U_AI 1LINE_VT_A_UL2 1 U_AI 1LINE_VT_A_UL3 1 U_AI 1LINE_VT_A_UN 1 U_AI 1Input Variable Information Present in DREP_BI Page 1Name Page Partner Location Partner PageTRP1-TRIP 1 CB_TR 1ZM01-TRIP 1 IMP_PROT 2ZM01-START 1 IMP_PROT 2ZM02-TRIP 1 IMP_PROT 2ZM02-START 1 IMP_PROT 2ZM03-TRIP 1 IMP_PROT 2ZM03-START 1 IMP_PROT 2ZM04-TRIP 1 IMP_PROT 2ZM04-START 1 IMP_PROT 2ZM05-TRIP 1 IMP_PROT 2ZM05-START 1 IMP_PROT 2SOTF-TRIP 1 IMP_PROT 3ZCOM-TRIP 1 IMP_COM 1BI_ZCOM-CR 1 BIM 2PHS-STFWL1 1 IMP_PROT 1PHS-STFWL2 1 IMP_PROT 1PHS-STFWL3 1 IMP_PROT 1PHS-STFWPE 1 IMP_PROT 1PSD1-START 1 IMP_PROT 1BI_LINE_DIT_REC 1 BIM 2LINE_FUSE_FAILURE_FSD1-BLKU 1 U_PROT 1BFP1-TRBU 1 CB_BF 1BI_CB_CLOSED 1 BIM 1TEST-ACTIVE 1 COMMON 1BI_START_BF 1 BIM 2BI_CS_TEST 1 BIM 2BI_DIT_SEND_TEST 1 BIM 2AR01-CLOSECB 1 CB_AR 2AR01-UNSUCCL 1 CB_AR 2AR01-INPROGR 1 CB_AR 2BI_LINE_DISC_OPEN 1 BIM 1ZCOM-CS 1 IMP_COM 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 34 / 38
Name Page Partner Location Partner PageAR01-READY 1 CB_AR 2AR01-ACTIVE 1 CB_AR 2AR01-SUCCL 1 CB_AR 2BI_CB_NOT_READY 1 BIM 1ZCAL-IRVL 1 IMP_COM 1ZCAL-TRWEI 1 IMP_COM 1TUV1-TRIP 1 U_PROT 1TUV1-START 1 U_PROT 1TOV1-TRIP 1 U_PROT 1TOV1-START 1 U_PROT 1TUV1-ST1L1 1 U_PROT 1TUV1-ST1L2 1 U_PROT 1TUV1-ST1L3 1 U_PROT 1TOV1-ST1L1 1 U_PROT 1TOV1-ST1L2 1 U_PROT 1TOV1-ST1L3 1 U_PROT 1PHPIOC-TRIP 1 I_PROT 1EFPIOC-TRIP 1 I_PROT 1Input Variable Information Present in COMMON Page 1Name Page Partner Location Partner PageBI_ACTIVATE_TESTMODE 1 BIM 1Output Variable Information Present in COMMON Page 1Name Page Partner Location Partner PageTEST-ACTIVE 1 DREP_BI 1
BOM 1FALSE 1 BOM 1
BOM 1BOM 1BOM 1BOM 1BOM 1BOM 1
TRUE 1 IMP_PROT 1CB_TR 1CB_AR 2CB_AR 3CB_AR 3CB_AR 3
INTZERO 1 CB_AR 2CB_AR 3CB_AR 3
REALZERO 1 U_AI 1U_AI 1
GRP_OFF 1 CB_AR 3Input Variable Information Present in LED Page 1Name Page Partner Location Partner PageZM01-TRIP 1 IMP_PROT 2ZM_DELAYED_TRIP 1 CB_TR 1ZCOM-CS 1 IMP_COM 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 35 / 38
Name Page Partner Location Partner PageDIT_SEND 1 BOM 1TOV1-TRIP 1 U_PROT 1TUV1-TRIP 1 U_PROT 1BFP1-TRBU 1 CB_BF 1ZCOM-TRIP 1 IMP_COM 1ZCAL-TRWEI 1 IMP_COM 1PHPIOC-TRIP 1 I_PROT 1EFPIOC-TRIP 1 I_PROT 1SOTF-TRIP 1 IMP_PROT 3Input Variable Information Present in LED Page 2Name Page Partner Location Partner PageBI_CB_LOCKED_OUT 2 BIM 1AR01-CLOSECB 2 CB_AR 2BI_LINE_DIT_REC 2 BIM 2BI_ZCOM-CR 2 BIM 2AR01-SETON 2 CB_AR 2AR01_SETOFF 2 CB_AR 2PSD1-START 2 IMP_PROT 1ZM01-START 2 IMP_PROT 2ZM02-START 2 IMP_PROT 2ZM03-START 2 IMP_PROT 2ZM04-START 2 IMP_PROT 2ZM05-START 2 IMP_PROT 2AR01-UNSUCCL 2 CB_AR 2Output Variable Information Present in BIM Page 1Name Page Partner Location Partner PageBI_CB_CLOSED 1 IMP_COM 1
U_PROT 1U_PROT 1U_PROT 1CB_AR 2DREP_BI 1
BI_AR01-ON 1 CB_AR 2BI_AR01-OFF 1 CB_AR 2BI_LINE_DISC_OPEN 1 U_PROT 1
DREP_BI 1BI_LINE_MCB_OK 1 U_PROT 1
CB_AR 3BI_BUS_1_DISC_CLOSED 1 CB_AR 3BI_BUS_MCB_OK 1 CB_AR 3
CB_AR 3BI_BUS_2_DISC_CLOSED 1 CB_AR 3BI_ACTIVATE_TESTMODE 1 COMMON 1BI_CB_LOCKED_OUT 1 LED 2BI_CB_NOT_READY 1 CB_AR 2
DREP_BI 1Output Variable Information Present in BIM Page 2Name Page Partner Location Partner PageBI_ZCOM-CR 2 IMP_COM 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 36 / 38
Name Page Partner Location Partner PageDREP_BI 1LED 2
BI_LINE_DIT_REC 2 CB_AR 1DREP_BI 1LED 2
BI_START_BF 2 CB_BF 1DREP_BI 1
BI_CS_TEST 2 IMP_COM 1DREP_BI 1
BI_DIT_SEND_TEST 2 DREP_BI 1BOM 1
Input Variable Information Present in BOM Page 1Name Page Partner Location Partner PageFALSE 1 COMMON 1FALSE 1 COMMON 1MAN_SC_OK 1 CB_AR 3BFP1-TRBU 1 CB_BF 1BFP1-TRBU 1 CB_BF 1AR01-CLOSECB 1 CB_AR 2LOV1-START 1 U_PROT 1AR01-CLOSECB 1 CB_AR 2ZM01-TRIP 1 IMP_PROT 2ZM_DELAYED_TRIP 1 CB_TR 1SOTF-TRIP 1 IMP_PROT 3FALSE 1 COMMON 1FALSE 1 COMMON 1FALSE 1 COMMON 1TRP1-TRIP 1 CB_TR 1TRP1-TRIP 1 CB_TR 1ZCOM-CS 1 IMP_COM 1BFP1-TRBU 1 CB_BF 1BI_DIT_SEND_TEST 1 BIM 2ZM_TRIP 1 BOM 1FALSE 1 COMMON 1AR01-UNSUCCL 1 CB_AR 2TEST-ACTIVE 1 COMMON 1AR01_SETOFF 1 CB_AR 2AR01-SETON 1 CB_AR 2AR01-CLOSECB 1 CB_AR 2ZM_TRIP 1 BOM 1BFP1-TRBU 1 CB_BF 1FALSE 1 COMMON 1AR01-UNSUCCL 1 CB_AR 2BFP1-TRBU 1 CB_BF 1Output Variable Information Present in BOM Page 1Name Page Partner Location Partner PageZM_TRIP 1 BOM 1
BOM 1DIT_SEND 1 LED 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 37 / 38
Input Variable Information Present in BOM Page 2Name Page Partner Location Partner PageZM01-TRIP 2 IMP_PROT 2ZM02-TRIP 2 IMP_PROT 2ZM03-TRIP 2 IMP_PROT 2ZM01-TRIP 2 IMP_PROT 2ZM02-TRIP 2 IMP_PROT 2ZM03-TRIP 2 IMP_PROT 2LINE_FUSE_FAILURE_FSD1-BLKU 2 U_PROT 1
Rev. Modification Rel. date Created by
Replacing
Based on
ProjectStage 5 New Rizgary
Responsible departmentABB ABB
Stage 5 New Rizgary.New Rizgary 132/33kV S/S.132kV.=E1.Q5
Technical reference Document kindGraphical Application Configuration
Doc. designationE1Q5_REL670
Created byApplication Development
Title
=E1.Q5_REL670Document id.1MRK007500_5
Approved byProduct Management
Rev.0
Rel. date2010-05-31
Lang.en 38 / 38