4
I recently became involved with EAE Project, a project that for many started in September 2013 resulting in an extremely steep learning curve for me. I am now in my second shift on the Project and still have a great deal to become familiar with given all the different works areas. Since 1987, I have witnessed many positive changes in how we incorporate Safety into our daily work. Safety used to consist of a simple “Don’t get hurt” philosophy. These days it is difficult to imagine Safety not being such an integral part of how we approach every day at work - Things are so much better for everyone since Safety’s profile has increased. I am a strong believer in the philosophy that when people understand exactly WHY they want to work safe, they will carry those ideals at work and into their personal lives as well. We should remind ourselves daily that we have people who care for us and expect to see us come home safely. The commitment toward safety on this project by all involved has been impressive. Enbridge has done an excellent job of bringing Contractors together and promoting dialogue not only on Safety but all aspects of the job. PROJECT MILESTONES & ACCOMPLISHMENTS - Doug Frunchak, Assistant Construction Manager, Enbridge Volume 1, Issue 6 Message From: Darcy Pearson - Construction Manager, Worley Parsons DATE: November 2014 EAE EAE EAE Newsletter Newsletter Newsletter As of today, the EAE project has worked over 766,763 hours this year, and over 920,612 hours to date. So here are some of the things you, the EAE Team, have accomplished this past month; North pig traps Phase 1 complete, ready to turnover for Ledcor scope. Area 4, 1st Street & 4th Ave. bridges installed. M203 Phase 5 complete, Phase 6 in progress Area 7(slip bore) mid pit backfill in progress, piping installation started in North and South pit M217 Piles complete, excavation in progress M224 Suction discharge piping complete, hydrotest complete on suction piping, structural steel/wall panel installation and cable pull in progress, prepping for firewater installation. M225 A/G suction and discharge header installation ongoing, underground discharge piping installation complete, backfill in progress M226 underground suction piping backfill complete (TP-10/11/12/13), TP-8 installation started, A/G suction/discharge header installation ongoing. Line 4 surge, excavation Phase 1 complete, Phase 2 and 3 ongoing Prepping for cable pull (480 Sub to ESB 224) Received and set ESB 226 Volume 1, Issue 6 M203 LOOKING NORTH
Transcript
Page 1: EAE Newsletter - Nov - Issue #6

I recently became involved with EAE Project, a project that for many started in September

2013 resulting in an extremely steep learning curve for me.

I am now in my second shift on the Project and still have a great deal to become familiar

with given all the different works areas.

Since 1987, I have witnessed many positive changes in how we incorporate Safety into our

daily work. Safety used to consist of a simple “Don’t get hurt” philosophy. These days it is

difficult to imagine Safety not being such an integral part of how we approach every day at

work - Things are so much better for everyone since Safety’s profile has increased.

I am a strong believer in the philosophy that when people understand exactly WHY they

want to work safe, they will carry those ideals at work and into their personal lives as well.

We should remind ourselves daily that we have people who care for us and expect to see us come home safely.

The commitment toward safety on this project by all involved has been impressive. Enbridge has done an excellent job of

bringing Contractors together and promoting dialogue not only on Safety but all aspects of the job.

PROJECT MILESTONES & ACCOMPLISHMENTS - Doug Frunchak, Assistant Construction Manager, Enbridge

Volume 1, Issue 6

Message From: Darcy Pearson - Construction Manager, Worley Parsons DATE: November 2014

EAEEAEEAE NewsletterNewsletterNewsletter

As of today, the EAE project has worked over 766,763 hours this year, and over 920,612 hours to date. So here are some

of the things you, the EAE Team, have accomplished this past month;

North pig traps Phase 1 complete, ready to turnover for Ledcor scope.

Area 4, 1st Street & 4th Ave. bridges installed.

M203 Phase 5 complete, Phase 6 in progress

Area 7(slip bore) mid pit backfill in progress, piping

installation started in North and South pit

M217 Piles complete, excavation in progress

M224 Suction discharge piping complete, hydrotest

complete on suction piping, structural steel/wall

panel installation and cable pull in progress,

prepping for firewater installation.

M225 A/G suction and discharge header installation

ongoing, underground discharge piping installation

complete, backfill in progress

M226 underground suction piping backfill complete

(TP-10/11/12/13), TP-8 installation started, A/G

suction/discharge header installation ongoing.

Line 4 surge, excavation Phase 1 complete, Phase 2

and 3 ongoing

Prepping for cable pull (480 Sub to ESB 224)

Received and set ESB 226

Volume 1, Issue 6

M203 LOOKING NORTH

Page 2: EAE Newsletter - Nov - Issue #6

EAE PROJECT NEWSLETTER Page 2

O n October 15th, 2014, Surepoint Group began the EAE project commissioning process at the 203 manifold. Techniques and procedures will be applied to check, inspect, pro-gram/calibrate when required and test every operational component of the project starting from the individual functions of each component of the system up to the subsystem and the system.

In November and December some of the new headers in the 203 Manifold will be going live and the timing of construction and commissioning is critical to meeting the target.

The activities are applied to all phases of the project until the final turnover of the unit to operations by the Senior Turnover Coordinator - Bob Matiushyk.

Our main objective as the commissioning team is to affect the safe and orderly turnover of each unit from con-struction to operation, confirming it’s operability in terms of performance and reliability. Safety and information documentation traceability are essential factors of the successful commissioning.

The commissioning of the EAE project is a challenging and complex task because many of the activities interact with the existing systems. A great attention to detail, planning and real time communication with Enbridge oper-ation personnel - local and CCO, SCADA, PLC Automation and other related trades must be implemented to en-sure safety, efficiency and on a timely manner completion.

Although the commissioning completion target date is a must, personnel safety and protection of the environ-ment will precede each activity and thinking safety and working safely will be the norm.

CONSTRUCTION LOOKAHEAD - Karolyn Russ, Enbridge Field Planner/Scheduler

EAE COMMISIONING UPDATES -

CIVIL

WBP 224-Complete Backfill U/G Discharge Lines Outside of Mani-fold & Firewater Line

WBP 224-Continue Liner Install

SBP 225-Install Synthetic Liner & Backfill remaining for TP#’s 5,6,9.

Area 5-Remove Timber Shoring & Backfill.

MF 210 - Backfill south Side.

MF217-Excavate Bathtub & Agra install new BP Outer Can.

Line 4 Surge Relief - Continue Phase 3 Excavation.

Bob Matiushyk, Sr. Turnover Coordinator, Enbridge Jay Elhalabi, Commissioning Lead, Surepoint Group

MECHANICAL / STRUCTUAL WBP 224 - Install Booster Pump Plat-

forms & Pre-Cast Walls. WBP 224 - Install U/G Suction & Dis-

charge Pipe Up to TP’s # 1/2/4. ESB 224-Complete HVAC Platforms &

Stairs. SBP 225 - Install Suction & Discharge

Piping. SBP 225-Complete Installation of Pre-

Cast Concrete Containment Walls. SBP 226 - Install Suction & Discharge

Piping. SBP 226 -Install Pre-Cast Walls MF 203 - Install U/G Headers, Risers &

Hydrotest. Complete Outage work for TP#’s 14,18 &21 Phase 6.

Area 04 Install Piping On Rack. Area 05 Install Ph #3&4 Piping. TC2 MF204—Install U/G NPS 12 Pip-

ing. TC2 MF206-Start A/G Piping Install..

ELECTRICAL 480 Sub-Install Outdoor Switch-

gear. 480 Sub - Pull Control Cables

from 480 Sub to ESB 224. 480 Sub-Pull 5kV Cable from 480

Sub to ESB 224. WBP 224 –Install Cable Trays

Inside Manifold. ESB 224 - Install building HVAC

MF224 - Install Motors Install Cable Tray from 480 Sub

to ESB 225 & ESB 226. ESB 226—Install Transformer MF 203-Install/Terminate Tempo-

rary Power to New Valves.

Page 3: EAE Newsletter - Nov - Issue #6

EAE PROJECT NEWSLETTER Page 3

LESSONS LEARNED - Lee Picco, Sr. Site Safety Coordinator

Some recent ideas and initiatives the WSC has worked to advance:

Supporting the process of installing tall delineators in strategic

locations across site to mark ditches and road edges and to be

tall enough to be seen from the cab of all vehicles and equipment.

Making posters from Dr. Lou’s presentation available to all

contractors. Requested posters were “12 Commitments,” “Healthy Eating” and others.

Helping workers to understand what is expected of them on FLHA

evaluations. A copy of the evaluation went out to Contractor safety coordinators.

The need to remind all drivers to watch for LP pedestrian traffic

on Perimeter Road between 4th and 6th Avenue, especially during darkness.

Housekeeping: The need to clean up as we go along and to

transport tools and materials back to the laydowns once they are no longer needed.

A big thank to all of our WSC volunteers for their valuable input!

WORKER SAFETY COMMITTEE (WSC) - Jim Feaver, EAE Site Safety Coordinator

Environmental Recognition Congratulations to Paragon’s Larry Bascon for practicing excellent spill containment when mixing paints and coatings on site.

Thanks from Enbridge for leading by example! ~Allison Ussyk - Environmental Inspector~

RECOGNITIONS & AWARDS

“Better to Miss A Minute In Life Than A Life In A Minute“

The following is a summary of key learnings (not corrective actions) that need to be applied

immediately to ensure we are all doing our part in creating a safe work environment.

Our loads need to be properly secured against movement. To do this effectively, we need to plan the work &

work the plan. This has to start at scheduled planning meetings already in place (3 shift look ahead; Daily

planning meetings, etc.), and is to flow throughout the execution of the work as well (Permit Issuing, FLHA,

Stop & Think). If the plan changes, STOP the work and notify supervision.

Confirm loads weights by referencing drawings and/or weight tables.

Identify dimensions and changing weights of our loads, and secure them appropriately taking into

consideration changing conditions, ability for lean for the load to shift/lean/creep, and changes in our center of

gravity.

Use the right tool for the job, not the best tool that’s available. Not all methods of supporting/securing loads

are created equal (i.e. pipe stand designed for the proper size of pipe being supported), so STOP the work until

the right tool is available.

Verbalize the plan by having a group discussion, documenting key steps when completing the Field Level

Hazard Assessment as a crew, and asking questions.

1st Place Congratulations to Manuel Goncalves of Bird Construction for winning this month’s Safety Slo-gan contest

“Choose Safety Over Convenience”

2nd Place Congratulations to Orville Kasaa of Bird Construction for a second place win in this month’s Safe-ty Slogan contest

B EST OBSERVATION CONTEST - You can win a $250.00 pre paid credit card for submitting your quality

observation card to your safety department. Each contractor will submit their top 5 observations for the Enbridge Best Observation monthly draw.

NOVEMBER SAFETY SLOGAN WINNERS

Page 4: EAE Newsletter - Nov - Issue #6

EAE PROJECT NEWSLETTER Page 4

Spot The H

azard

- P

hoto

s C

our

tesy

of

Jam

es F

eave

r, E

nbridg

e Safe

ty C

oord

inato

r

Can

yo

u f

ind

all

the

haz

ard

s th

at h

ave

bee

n c

orr

ecte

d i

n t

he

pho

tos

bel

ow

?

Sub

mit

an F

LH

A c

ard

id

enti

fyin

g a

ll o

f th

e

haz

ard

s an

d c

ontr

ols

that

wer

e p

ut

into

pla

ce t

o m

ake

the

wo

rksi

te i

n t

his

pic

ture

saf

e.

Wri

te S

po

t T

he

Ha

zard

in t

he

task

sect

ion a

nd

han

d i

t in

to

yo

ur

Sup

ervis

or/

Saf

ety

Dep

artm

ent.

The

bes

t F

LH

A w

ill

win

a $

50

Gas

Car

d.

La

st M

on

th’s

SP

OT

TH

E H

AZ

AR

D W

inn

er O

f a

$5

0 G

as

Ca

rd w

as

Patr

ick

Ev

oy

, C

on

gra

tula

tio

ns

Pa

tric

k!


Recommended