Share this document with a friend
Popular Tags:
15
Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical
Transcript
Page 1: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Earth Systematic Missions Program Office Pre-Phase A Guidelines and

Expectations

Mary DiJoseph

ESM Program

Deputy Technical

Page 2: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Outline

• Introduction• Road to Key Decision Point (KDP) A• Roles and Responsibilities• Study guidelines• Earth Systematic Missions-Program Office

(ESM-PO) support and assistance• NPR 7123 requirements for Mission Concept

Review (MCR)• NPR 7120.5 requirements for KDP-A• Mission Concept Study Report content

Page 3: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Associate Director/ Earth Systematic Missions

Program ManagerGilberto Colon

Senior ScientistVacant

SecretaryDonna Mudd

GSFC Earth Science Projects DivisionCode 420

ESM FlightDeputy Program Manager

David Mitchell

ESM Operations &Data Systems

Deputy Program Manager

Vacant

Advanced Studies & Strategic Capability

Deputy Associate Director/ TechnicalMary DiJoseph

Mission Integration ManagerPaul Brandinger

System Engineer/590 Nick SpecialeProgram Instrument Systems Mgr

Vacant

Program Business OfficeProgram Business Manager

Jonathan BrysonDeputy Program Business Manager

Kathy ShifflettProgram Support Manager

Katy Mikkelsen

–NPOESS IPO–LDCM–GPM–Glory–NPP

–ESMO–ESDIS– Ground Systems Capability

PAOLynn Chandler

ESM Performing CentersARC: TBD

GSFC: David MitchellLaRC: Leila VannJPL: Diane Evans

__________________________Signature /date

Draft- 4/4/08

Procurement ManagerSteven Kramer

NOAA ProjectsGilberto Colon

– NOAA N’– GOES N-P

– SMAP (JPL)– ICESat II (GSFC)– CLARREO (LaRC)– DesDynI (TBD)– Decadal Survey studies

Systems Safety & Mission Assurance/300

Independent Technical Authority/500

Page 4: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Role of the Earth Systematic Missions Program Office in Decadal Survey

• All Decadal Survey Missions are directed missions and will be managed by the Earth Systematic Missions (ESM) Program office, housed at NASA Goddard Space Flight Center (GSFC). – This is former EOS Program Office renamed and re-envigorated for

the Decadal Survey

• Directed missions are managed by the implementing Center (LaRC for CLARREO) with oversight and assistance as needed or requested from ESM-PO

• EMS-PO develops performance standards and provides independent assessments for all Decadal Survey missions

• While housed at GSFC the ESM incorporates expertise from across NASA– In particular including science and instrument expertise from LaRC and

JPL

Page 5: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

NASA’s Project Lifecycle

CLARREO is here

Need to be here by October 2009

Page 6: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Road to KDP A: The Mission Study Process

• Conduct studies and analyses to derive the Level 1 requirements (Science, engineering, cost and schedule)

• Complete an analysis of alternatives resulting in a conceptual design, and conduct Mission Concept Review

• Prepare for approval all documents required in NPR 7120.5D (NASA Space Flight Program and Project Management Requirements)

Top-Level Mission Requirements Definition

Iterate RequirementsConstraints and Assumptions

Identify and Prioritize Key Design Parameters

Develop Concept Evaluation Criteria

Develop Strawman End-To–End Mission Concept

Preliminary System Requirements Flow Down

Strawman System Concept( s)

24 5 6 7 8

9

No

TechnologyAvaliable/RisksAcceptable

12

SystemCost/Performance/Marginsvs. RequirementsEvaluations

Form Study Teamand Develop StudyPlan 1

3

MissionNeeds andObjectives

Yes

13

Peer Review

No

Yes

11

PerformanceMeetsRequirements

10

No

YesROM CostsWithinGuidelines

14

Finalize Concept and Develop Report

PMRD – Refined and Validated RequirementsROM CostsStrawman Mission Concept

15

MissionConceptReview

and Concepts

6

Page 7: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Study Guidelines: the study process

Top-Level Mission Requirements Definition

Iterate RequirementsConstraints and Assumptions

Identify and Prioritize Key Design Parameters

Develop Concept Evaluation Criteria

Develop Strawman End-To–End Mission Concept

Preliminary System Requirements Flow Down

Strawman System Concept( s)

24 5 6 7 8

9

No

TechnologyAvaliable/RisksAcceptable

12

SystemCost/Performance/Marginsvs. RequirementsEvaluations

Form Study Teamand Develop StudyPlan 1

3

MissionNeeds andObjectives

Yes

13

Peer Review

No

Yes

11

PerformanceMeetsRequirements

10

No

YesROM CostsWithinGuidelines

14

Finalize Concept and Develop Report

PMRD – Refined and Validated RequirementsROM CostsStrawman Mission Concept

15

MissionConceptReview

and Concepts

Pre-Phase A is an iterative process. Crucial to conducting a successful study is agreement on a set of realistic mission objectives and their flowdown to science and measurement requirements that are documented in the mission’s Level 1 Requirements.

Page 8: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Study Goals & Objectives

• Establish performance metrics, develop and document the mission science requirements (Level 1 requirements), explore the full range of implementation options, define an affordable project concept to meet requirements specified in the Level 1’s, identify needed technologies, and begin preliminary development of the Project Plan.

• Define the best mission that fits within the allocated resources and bring the mission to Phase A maturity. Mission Study Teams should explore the optimum range of cost, schedule, and capability that will maximize the science/cost ratio across the entire Decadal Survey flight program.

Page 9: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Study Guidelines: activities

• Investigate:– Potential Partnerships with non-NASA organizations– Instrument and mission design and development options,

including make/buy decisions and alternative mission operations approaches

• Conduct trades:– Science requirements, trying to identify the significant cost

vs. performance parameters– Mission risk (looking for cost vs. reliability drivers)– Technology– Acquisition Strategy– Mission operations approach– Data Processing and distribution approach– Access to space (launch vehicle selection; co manifest; etc)

Page 10: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Study Guidelines: study schedule should include these activities

• Detailed mission concept definition • Sensitivity analyses (science measurement requirements and instrument performance parameters)• Cost estimates• Risk assessments • System impacts of new technology infusion• Concept validation • Mission trade space modeling• Study reports and archived models• Level 1 requirement definition

– Temporal and spatial resolution requirements.– Measurement accuracy requirement as a function of spatial resolution.– Effect of orbit selection on mission performance.– Mission lifetime.– Other science requirements achievable by potential instrument combinations that could extend the mission applicability

to other science questions.– Measurement(s) to be made– Science rationale (How measurements contribute to science question(s))– Related measurements of complementary value– Define roles for international partners

• Define a baseline instrument concept, including the rationale and key instrument performance parameters• Identify alternative instrument concepts• Define a spacecraft concept, including key spacecraft performance parameters• Identify launch requirements• Identify Supporting R&A investments• Identify Specific cal/val requirements• Generate a detail cost estimate for instrument, Ground System, MO& DA, Science, Project Management, Systems

Engineering, and Flight Assurance. Parametric estimate for spacecraft.• Develop a detailed mission schedule (at least WBS Level 3 for instrument)

Page 11: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Roles & Responsibilities• Program Scientist (PS) – NASA HQ

– Establishes a Science Definition Team and produces relevant documentation.– Assists the Program Executive (PE) in the establishment of a Technology Definition Team, if relevant.– Solicits scientific investigations and prepares the Announcemetnt of Opportunity supported by the PE and Project

Scientist, with attention to how the mission relates to previous and subsequent planned missions.• Program Executive – NASA HQ

– Tracks studies to define mission feasibility and desirability – Represents program interests on working groups to define missions and generate science plans – Establishes working groups to determine the advanced technologies necessary to enable future missions.– Maintains working relationships with NASA Center management, programs, and projects.– Provides liaison with SOMD’s launch-vehicle provider organization.– Acts as liaison between the study team and Office of External Affairs to initiate international agreements

• Program Office – EMS-PO (GSFC)– Supports NASA HQ in conducting mission studies to develop mission concepts and determine feasibility.– Supports NASA HQ in new project start approval activities.– Develops launch vehicle requirements and launch windows identifying potential timeframes when launches can take

place.– Develops project performance metrics.– Conducts trade studies to develop a viable project architecture that will be approved by SMD. This involves conducting

technical/cost/schedule tradeoffs.– Ensures a Technology Plan is developed

• Study Manager – Implementing Center (LaRC)– Establish the study office and structure to direct and monitor study tasks/activities– Initiate, support, and conduct concept studies consistent with direction and guidance from PS/PE-led working group– Originates mission requirements– Develop mission options, conduct trades, and develop cost estimates.– Assess technical, schedule, and cost performance and identify risk mitigation activities– Communicate study performance, issues and risks and present recovery plans– Conduct readiness reviews leading to KDPs

Page 12: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Program Office Support Available to Study and Science Teams

• Mission design studies with GSFC’s Integrated Mission Design Center (IMDC) or JPL’s Team-X

• Access to specific discipline engineering as needed• Operations and Ground System conceptual design with Earth

Science Data Information System (ESDIS) and Earth Science Mission Operations (ESMO) Projects

• Launch Vehicle coordination and access to space through Launch Services

• Additional systems engineering support• Assistance with requirements analysis and derivation as needed• Independent Cost Estimate with GSFC Resources Analysis Office

for consistency with other Decadal missions

Page 13: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

NPR 7123 requirements for MCR

Mission Concept Review

Entrance Criteria Success Criteria

1. Mission goals and objectives.2. Analysis of alternative concepts to show at

least one is feasible.3. Concept of operations.4. Preliminary mission descope options.5. Preliminary risk assessment, including

technologies and associated risk management/mitigation strategies and options.

6. Conceptual test and evaluation strategy.7. Preliminary technical plans to achieve next

phase.8. Defined MOEs and MOPs.9. Conceptual life-cycle support strategies

(logistics, manufacturing, and operation).

1. Mission objectives are clearly defined and stated and are unambiguous and internally consistent.

2. The preliminary set of requirements satisfactorily provides a system that will meet the mission objectives.

3. The mission is feasible. A solution has been identified that is technically feasible. A rough cost estimate is within an acceptable cost range.

4. The concept evaluation criteria to be used in candidate systems evaluation have been identified and prioritized.

5. The need for the mission has been clearly identified.6. The cost and schedule estimates are credible.7. An updated technical search was done to identify existing assets or

products that could satisfy the mission or parts of the mission.8. Technical planning is sufficient to proceed to the next phase.9. Risk and mitigation strategies have been identified and are acceptable

based on technical risk assessments.

Page 14: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

NPR 7120.5 Requirements

• Deliver the following products– Draft Level 1 requirements document– Preliminary Formulation Authorization

Document– Mission Concept report– Preliminary Integrated Baseline

Page 15: Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.

Mission Concept Study Report content

1. Mission Architecture and System Concept

2. Technology Maturity, Risk Assessment and Risk Mitigation

3. Mission Acquisition Approach

4. Cost and Schedule


Recommended