+ All Categories
Home > Documents > Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams...

Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams...

Date post: 17-Jan-2016
Category:
Upload: gervase-gibbs
View: 229 times
Download: 0 times
Share this document with a friend
Popular Tags:
18
Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates
Transcript
Page 1: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Page 2: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

Earthwork Specs Payment based on excavation (Cut)

Specs define methods for cut and fill Typically not paid for fill

Based on “Excavation measured in place as computed from survey notes” Not weighing, counting truck rounds Look for spec allowing contractor to

dispute volumes in a certain area

Page 3: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

Excavation Specs Common excavation

Determined from survey notes Describes most of work

Rock/Muck Rock requires blasting Muck requires deep dig, granular fill Before/after volume survey

Page 4: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

Haul Payments Volume payments - $/cy Excavation

Separate lines for common, rock , muck Free Haul - Stations Overhaul - $/cy-stations Borrow - $/cy

Covers cost of lease, haul, reclamation Waste - $/cy

Page 5: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

End Areas Based on

Cross-sections

CL

Typical section Area – ft2

Cut Fill

Page 6: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

Construction Grade Staking Based on “typical section” Stake centerline, slope “breakouts”

Page 7: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

Slope Stakes

12’ + 4’(4) + 8’ + 6.3’(4) = 61.2’

Page 8: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

Slope Staking

12’ + 3.7’(4) = 26.8’

Page 9: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

End Area Calculations

Page 10: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

End Area Calculations Level Sections

3-level Sections

5-level Sections

Other Sections

Triangular Sections

Page 11: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

Level Sections

)()2

( cswcw

dcA

6.390)2

404.31(6.7)

2(

wdcA

6.390)5.16.740(6.7)( cswcA

Page 12: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

3-Level Sections

)(2

)(4 rLrL dd

chh

wA

34.338)6.295.30(2

8.6)4.60.7(

4

40A

Page 13: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

5-Level Sections

)(2

1rrLL dhdhcwA

2.258)3.277.61.239.6308.5(2

1A

Page 14: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

Transition Sections

)(4

1)

2(2

1whh

wA

6.15)6.240(4

1cA 0.15)0.230(

4

1fA

Page 15: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

End Area Calculations Planimeter Coordinate Calculations

Similar to coordinate area Start/end at same point

)()( 1121

iiii dfdfA

Page 16: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

Coordinate Areas

Assign (0, 0)30 ‘ top, left shoulder (-15, 0)

15

0

0

0

8.25

2.7

20

8.8

7.14

0.7

0.0

0.8

0.18

1.8

0.24

3.9

1.29

4.9

15

0

0

0

Page 17: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

Coordinate Calc Example

0

0

15

0

1.29

4.9

24

3.9

18

1.8

0

0.8

7.14

0.7

20

8.8

8.25

2.7

15

0

0

0

2.338

)15(0)1.29(0)24(4.9)18(3.9)0(1.8

)7.14(0.8)20(0.7)8.25(8.8)15(2.7

)15(4.9)1.29(3.9)24(1.8)18(0.8)0(0.7

)7.14(8.8)20(2.7)8.25(0)15(0

2

1

A

Page 18: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates.

End-Area Volumes

AI = 390.6 ft2

AH = 338.3 ft2

AG = 144.8 ft2

AE = 15.6 ft2

AE = 15.0 ft2

AD = 113.2 ft2

AB = 258.2 ft2

AA = 338.2 ft2


Recommended