7/31/2019 East Africa Power Pool Presentation
1/32
EASTERN AFRICA POWEREASTERN AFRICA POWERPOOLPOOL
EAPPEAPPPresentation toPresentation to
COMESACOMESA--EACEAC--SADCSADC
Lusaka,ZambiaLusaka,Zambia
April 6April 6--7,20097,2009
7/31/2019 East Africa Power Pool Presentation
2/32
ContentsContents
11-- IntroductionIntroduction22-- Major activitiesMajor activities
33-- onon--going projectgoing project44-- Challenges.Challenges.
55--
ConclusionConclusion
7/31/2019 East Africa Power Pool Presentation
3/32
1.1. Introduct ionIntroduct ion
7/31/2019 East Africa Power Pool Presentation
4/32
Introduct ionIntroduct ion
EAPP established in Feb 24 ,2005 inEAPP established in Feb 24 ,2005 inAddis Ababa,Ethiopia by the countriesAddis Ababa,Ethiopia by the countries
of the Eastern Africa Region under theof the Eastern Africa Region under the
intergovernmental and interutilitiesintergovernmental and interutilitiesMoUMoUs.s.
It is also a specialised institution ofIt is also a specialised institution ofCOMESA for power.COMESA for power.
7/31/2019 East Africa Power Pool Presentation
5/32
Introduct ionIntroduct ion
EAPP Member Count r iesEAPP Member Count r ies
Burundi,
DRC,Egypt,
Ethiopia,
Kenya,Rwanda,Sudan
7/31/2019 East Africa Power Pool Presentation
6/32
Introduct ionIntroduct ion
EAPP Member Ut il i t iesEAPP Member Ut il it ies
REGIDESO of Burundi,
SNEL of DR Congo,EEHC of Egypt,EEPCO of Ethiopia,
KenGen and KPLC of Kenya,ELECTROGAZ of Rwanda,
NEC of Sudan and SINELAC of DR Congo-Rwanda-
Burundi.
7/31/2019 East Africa Power Pool Presentation
7/32
Introduct ionIntroduct ion
EAPP Objectives:EAPP Objectives:
Secure power supply for the RegionSecure power supply for the Regionss
countriescountries
Facilitate in the long term development ofFacilitate in the long term development of
electricity market in the regionelectricity market in the region
7/31/2019 East Africa Power Pool Presentation
8/32
Introduct ionIntroduct ion
Optimize the usage of energyOptimize the usage of energyresources available in the Region byresources available in the Region by
working out regional investmentworking out regional investment
schemes in Power generation,schemes in Power generation,transmission and distribution takingtransmission and distribution taking
into account the sociointo account the socio--economic andeconomic andenvironmental aspectsenvironmental aspects
7/31/2019 East Africa Power Pool Presentation
9/32
Introduct ionIntroduct ion
Increase power supply in the region inIncrease power supply in the region inorder to increase the access rate oforder to increase the access rate of
the population to electricitythe population to electricity
Reduce electricity cost in the RegionReduce electricity cost in the Region
by using power system interconnectionby using power system interconnection
and increasing power exchangesand increasing power exchangesamong countriesamong countries
7/31/2019 East Africa Power Pool Presentation
10/32
Introduct ionIntroduct ion
Provide efficient coProvide efficient co--ordinationordinationbetween various initiatives taken inbetween various initiatives taken in
the fields of power production,the fields of power production,
transmission as well as exchanges intransmission as well as exchanges inthe Regionthe Region
7/31/2019 East Africa Power Pool Presentation
11/32
Introduct ionIntroduct ion
Create, in the framework of NEPAD, aCreate, in the framework of NEPAD, aconducive environment forconducive environment for
investments, in order to facilitateinvestments, in order to facilitate
financing of integration projects in thefinancing of integration projects in thefields of power generation andfields of power generation and
transmission in the Regiontransmission in the Region
7/31/2019 East Africa Power Pool Presentation
12/32
2.2. MAJOR ACTI VI TI ESMAJOR ACTI VI TI ES
7/31/2019 East Africa Power Pool Presentation
13/32
Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect
European Commission FinancingEuropean Commission Financing(2.7 Mil Eur )(2.7 Mil Eur )
Overall objective
To strengthen the capability of the EAPPPermanent Secretariat to contribute in theimprovement of the integration of theelectricity markets of the region with a view
to creating a regional electricity market.
7/31/2019 East Africa Power Pool Presentation
14/32
Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect
Project componentsProject components
a.Preparation of the Eastern Africa Power
Market Developmentb. Preparation of a strategic plan and
business plan
c. Power market rules and agreements forcross-border trade
7/31/2019 East Africa Power Pool Presentation
15/32
Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect
Project components:d) Horizontal activities
A regional database on power systems Twinning (coaching) arrangement with
advanced power pools
Training Study tourStakeholders meetings
7/31/2019 East Africa Power Pool Presentation
16/32
Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect
Regional Power Market DevelopmentRegional Power Market Development
Analysis of the current power sector
situation and Implementing database
Review of the existing studies aboutEastern Africa Power Development.
Assessment of power market futuredevelopment, based on available studies
7/31/2019 East Africa Power Pool Presentation
17/32
Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect
Preparation of a strategic plan and abusiness plan
Analysis of the current context of activities in
Eastern African Power Sector, including legal,regulatory and institutional aspects, the tariffpolicies and EAPP organization;
setting up strategic objectives of the EAPPorganization and a roadmap towards achievingthe set objectives;
7/31/2019 East Africa Power Pool Presentation
18/32
Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect
Preparing the action plan, and means tomonitor the performance of systemoperations and the orientations for the
establishment of a Coordination Centre Preparing a 3-year business plan whereactions are described in detail and financial
needs and resources are identified andquantified.
7/31/2019 East Africa Power Pool Presentation
19/32
Maj or act ivit iesMaj or act ivit ies
EC Proj ectEC Proj ect
Power market rules and agreementsfor cross-border trade: Preparation
- market rules (licensing, guidelines for tariff
setting- Standard power purchasing agreement- Standard agreement on power balancing
- proposal for cost-based tariff-setting- proposal related the legal/regulatory
framework -Treaty related to regional electricity trade
7/31/2019 East Africa Power Pool Presentation
20/32
Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect
The Consultant has prepared draftThe Consultant has prepared draftInception Report which has beenInception Report which has been
discussed by the Steering Committeediscussed by the Steering Committee
in March 2009in March 2009
The project is scheduled to beThe project is scheduled to be
completed by 2012completed by 2012
7/31/2019 East Africa Power Pool Presentation
21/32
Maj or act ivit iesMaj or act ivit iesAfDB Proj ectAfDB Proj ect
AfDB Financing ( 1 Mil US$)AfDB Financing ( 1 Mil US$)- Drafting EAPP regional power systemmaster plan
- Drafting of electricity grid code for EAPP- Training on (project management , public-Private Partnership, power sectorregulation)- Implementation of Information system
7/31/2019 East Africa Power Pool Presentation
22/32
Maj or act ivit iesMaj or act ivit iesAfDB Proj ectAfDB Proj ect
We are in the process of evaluatingWe are in the process of evaluatingproposals .proposals .
The project is planned to beThe project is planned to be
completed by July 2010completed by July 2010
7/31/2019 East Africa Power Pool Presentation
23/32
Maj or act ivit iesMaj or act ivit ies
other activitiesother activities
Other activities necessary for powerOther activities necessary for powertrade are being identified andtrade are being identified and
compiled and the necessarycompiled and the necessary
funding are being soughtfunding are being sought-
-
7/31/2019 East Africa Power Pool Presentation
24/32
OnOngoing project sgoing project s
EthiopiaEthiopia--Kenya 400 KVKenya 400 KVfinal feasibility study outfinal feasibility study out
commissioning 2012commissioning 2012EthiopiaEthiopia--Sudan 220 KVSudan 220 KV
commissioning end of 2009commissioning end of 2009EthiopiaEthiopia--Djibouti 283KM of 220 KVDjibouti 283KM of 220 KV
commissioning by 2011commissioning by 2011
7/31/2019 East Africa Power Pool Presentation
25/32
OnOngoing project sgoing project s
EthiopiaEthiopia--SudanSudan--Egypt 500 HVDCEgypt 500 HVDCfeasibility study report has beenfeasibility study report has been
prepared. Financings are being soughtprepared. Financings are being sought
KenyaKenya Tanzania 400 KVTanzania 400 KV
Discussions are onDiscussions are on--goinggoing
KenyaKenya--Uganda 400 KV / NELSAPUganda 400 KV / NELSAP
commissioning 2013commissioning 2013
7/31/2019 East Africa Power Pool Presentation
26/32
OnOngoing project sgoing project s
UgandaUgandaRwanda 220 KV /NELSAPRwanda 220 KV /NELSAPcommissioning 2013commissioning 2013
RwandaRwanda--Burundi 220 KV / NELSAPBurundi 220 KV / NELSAPcommissioning 2013commissioning 2013
BurundiBurundi
--DRC 220 KV / NELSAPDRC 220 KV / NELSAP
commissioning 2013commissioning 2013
7/31/2019 East Africa Power Pool Presentation
27/32
OnOn-- going project sgoing project s
RUSOMO Falls Project 80 MWRUSOMO Falls Project 80 MWcommissioning 2014commissioning 2014
7/31/2019 East Africa Power Pool Presentation
28/32
44-- ChallengesChallenges
Financing of the Secretariat to attractFinancing of the Secretariat to attractand retain the necessary staffand retain the necessary staff
Getting all the necessary equipmentGetting all the necessary equipment
eg. Hardware and software for powereg. Hardware and software for power
planning and databaseplanning and database
7/31/2019 East Africa Power Pool Presentation
29/32
5.5. CONCLUSI ONCONCLUSI ON
7/31/2019 East Africa Power Pool Presentation
30/32
Conclusion
The number of bilateral interconnectionprojects under implementation and soon tobe implemented is a testimony that a
regional power market will be a reality in theforeseeable future;
Coordination between different initiatives inthe power sector is in good track but shouldbe further strengthened
7/31/2019 East Africa Power Pool Presentation
31/32
ConclusionConsidering that many projects are goingto be commissioned between 2011 and2013 EAPP must be ready on time to
coordinate the regional trade as 8countries would have been alreadyconnected
EAPP is ready to play its role asmandated by the Governments andUtilities of the Region through the signed
MOUs and by the COMESA Heads ofState and Government through their 11th
-
7/31/2019 East Africa Power Pool Presentation
32/32
Thank You !