+ All Categories
Home > Documents > East Africa Power Pool Presentation

East Africa Power Pool Presentation

Date post: 05-Apr-2018
Category:
Upload: lavu-anil-chowdary
View: 216 times
Download: 0 times
Share this document with a friend

of 32

Transcript
  • 7/31/2019 East Africa Power Pool Presentation

    1/32

    EASTERN AFRICA POWEREASTERN AFRICA POWERPOOLPOOL

    EAPPEAPPPresentation toPresentation to

    COMESACOMESA--EACEAC--SADCSADC

    Lusaka,ZambiaLusaka,Zambia

    April 6April 6--7,20097,2009

  • 7/31/2019 East Africa Power Pool Presentation

    2/32

    ContentsContents

    11-- IntroductionIntroduction22-- Major activitiesMajor activities

    33-- onon--going projectgoing project44-- Challenges.Challenges.

    55--

    ConclusionConclusion

  • 7/31/2019 East Africa Power Pool Presentation

    3/32

    1.1. Introduct ionIntroduct ion

  • 7/31/2019 East Africa Power Pool Presentation

    4/32

    Introduct ionIntroduct ion

    EAPP established in Feb 24 ,2005 inEAPP established in Feb 24 ,2005 inAddis Ababa,Ethiopia by the countriesAddis Ababa,Ethiopia by the countries

    of the Eastern Africa Region under theof the Eastern Africa Region under the

    intergovernmental and interutilitiesintergovernmental and interutilitiesMoUMoUs.s.

    It is also a specialised institution ofIt is also a specialised institution ofCOMESA for power.COMESA for power.

  • 7/31/2019 East Africa Power Pool Presentation

    5/32

    Introduct ionIntroduct ion

    EAPP Member Count r iesEAPP Member Count r ies

    Burundi,

    DRC,Egypt,

    Ethiopia,

    Kenya,Rwanda,Sudan

  • 7/31/2019 East Africa Power Pool Presentation

    6/32

    Introduct ionIntroduct ion

    EAPP Member Ut il i t iesEAPP Member Ut il it ies

    REGIDESO of Burundi,

    SNEL of DR Congo,EEHC of Egypt,EEPCO of Ethiopia,

    KenGen and KPLC of Kenya,ELECTROGAZ of Rwanda,

    NEC of Sudan and SINELAC of DR Congo-Rwanda-

    Burundi.

  • 7/31/2019 East Africa Power Pool Presentation

    7/32

    Introduct ionIntroduct ion

    EAPP Objectives:EAPP Objectives:

    Secure power supply for the RegionSecure power supply for the Regionss

    countriescountries

    Facilitate in the long term development ofFacilitate in the long term development of

    electricity market in the regionelectricity market in the region

  • 7/31/2019 East Africa Power Pool Presentation

    8/32

    Introduct ionIntroduct ion

    Optimize the usage of energyOptimize the usage of energyresources available in the Region byresources available in the Region by

    working out regional investmentworking out regional investment

    schemes in Power generation,schemes in Power generation,transmission and distribution takingtransmission and distribution taking

    into account the sociointo account the socio--economic andeconomic andenvironmental aspectsenvironmental aspects

  • 7/31/2019 East Africa Power Pool Presentation

    9/32

    Introduct ionIntroduct ion

    Increase power supply in the region inIncrease power supply in the region inorder to increase the access rate oforder to increase the access rate of

    the population to electricitythe population to electricity

    Reduce electricity cost in the RegionReduce electricity cost in the Region

    by using power system interconnectionby using power system interconnection

    and increasing power exchangesand increasing power exchangesamong countriesamong countries

  • 7/31/2019 East Africa Power Pool Presentation

    10/32

    Introduct ionIntroduct ion

    Provide efficient coProvide efficient co--ordinationordinationbetween various initiatives taken inbetween various initiatives taken in

    the fields of power production,the fields of power production,

    transmission as well as exchanges intransmission as well as exchanges inthe Regionthe Region

  • 7/31/2019 East Africa Power Pool Presentation

    11/32

    Introduct ionIntroduct ion

    Create, in the framework of NEPAD, aCreate, in the framework of NEPAD, aconducive environment forconducive environment for

    investments, in order to facilitateinvestments, in order to facilitate

    financing of integration projects in thefinancing of integration projects in thefields of power generation andfields of power generation and

    transmission in the Regiontransmission in the Region

  • 7/31/2019 East Africa Power Pool Presentation

    12/32

    2.2. MAJOR ACTI VI TI ESMAJOR ACTI VI TI ES

  • 7/31/2019 East Africa Power Pool Presentation

    13/32

    Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect

    European Commission FinancingEuropean Commission Financing(2.7 Mil Eur )(2.7 Mil Eur )

    Overall objective

    To strengthen the capability of the EAPPPermanent Secretariat to contribute in theimprovement of the integration of theelectricity markets of the region with a view

    to creating a regional electricity market.

  • 7/31/2019 East Africa Power Pool Presentation

    14/32

    Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect

    Project componentsProject components

    a.Preparation of the Eastern Africa Power

    Market Developmentb. Preparation of a strategic plan and

    business plan

    c. Power market rules and agreements forcross-border trade

  • 7/31/2019 East Africa Power Pool Presentation

    15/32

    Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect

    Project components:d) Horizontal activities

    A regional database on power systems Twinning (coaching) arrangement with

    advanced power pools

    Training Study tourStakeholders meetings

  • 7/31/2019 East Africa Power Pool Presentation

    16/32

    Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect

    Regional Power Market DevelopmentRegional Power Market Development

    Analysis of the current power sector

    situation and Implementing database

    Review of the existing studies aboutEastern Africa Power Development.

    Assessment of power market futuredevelopment, based on available studies

  • 7/31/2019 East Africa Power Pool Presentation

    17/32

    Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect

    Preparation of a strategic plan and abusiness plan

    Analysis of the current context of activities in

    Eastern African Power Sector, including legal,regulatory and institutional aspects, the tariffpolicies and EAPP organization;

    setting up strategic objectives of the EAPPorganization and a roadmap towards achievingthe set objectives;

  • 7/31/2019 East Africa Power Pool Presentation

    18/32

    Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect

    Preparing the action plan, and means tomonitor the performance of systemoperations and the orientations for the

    establishment of a Coordination Centre Preparing a 3-year business plan whereactions are described in detail and financial

    needs and resources are identified andquantified.

  • 7/31/2019 East Africa Power Pool Presentation

    19/32

    Maj or act ivit iesMaj or act ivit ies

    EC Proj ectEC Proj ect

    Power market rules and agreementsfor cross-border trade: Preparation

    - market rules (licensing, guidelines for tariff

    setting- Standard power purchasing agreement- Standard agreement on power balancing

    - proposal for cost-based tariff-setting- proposal related the legal/regulatory

    framework -Treaty related to regional electricity trade

  • 7/31/2019 East Africa Power Pool Presentation

    20/32

    Maj or act ivit iesMaj or act ivit iesEC Proj ectEC Proj ect

    The Consultant has prepared draftThe Consultant has prepared draftInception Report which has beenInception Report which has been

    discussed by the Steering Committeediscussed by the Steering Committee

    in March 2009in March 2009

    The project is scheduled to beThe project is scheduled to be

    completed by 2012completed by 2012

  • 7/31/2019 East Africa Power Pool Presentation

    21/32

    Maj or act ivit iesMaj or act ivit iesAfDB Proj ectAfDB Proj ect

    AfDB Financing ( 1 Mil US$)AfDB Financing ( 1 Mil US$)- Drafting EAPP regional power systemmaster plan

    - Drafting of electricity grid code for EAPP- Training on (project management , public-Private Partnership, power sectorregulation)- Implementation of Information system

  • 7/31/2019 East Africa Power Pool Presentation

    22/32

    Maj or act ivit iesMaj or act ivit iesAfDB Proj ectAfDB Proj ect

    We are in the process of evaluatingWe are in the process of evaluatingproposals .proposals .

    The project is planned to beThe project is planned to be

    completed by July 2010completed by July 2010

  • 7/31/2019 East Africa Power Pool Presentation

    23/32

    Maj or act ivit iesMaj or act ivit ies

    other activitiesother activities

    Other activities necessary for powerOther activities necessary for powertrade are being identified andtrade are being identified and

    compiled and the necessarycompiled and the necessary

    funding are being soughtfunding are being sought-

    -

  • 7/31/2019 East Africa Power Pool Presentation

    24/32

    OnOngoing project sgoing project s

    EthiopiaEthiopia--Kenya 400 KVKenya 400 KVfinal feasibility study outfinal feasibility study out

    commissioning 2012commissioning 2012EthiopiaEthiopia--Sudan 220 KVSudan 220 KV

    commissioning end of 2009commissioning end of 2009EthiopiaEthiopia--Djibouti 283KM of 220 KVDjibouti 283KM of 220 KV

    commissioning by 2011commissioning by 2011

  • 7/31/2019 East Africa Power Pool Presentation

    25/32

    OnOngoing project sgoing project s

    EthiopiaEthiopia--SudanSudan--Egypt 500 HVDCEgypt 500 HVDCfeasibility study report has beenfeasibility study report has been

    prepared. Financings are being soughtprepared. Financings are being sought

    KenyaKenya Tanzania 400 KVTanzania 400 KV

    Discussions are onDiscussions are on--goinggoing

    KenyaKenya--Uganda 400 KV / NELSAPUganda 400 KV / NELSAP

    commissioning 2013commissioning 2013

  • 7/31/2019 East Africa Power Pool Presentation

    26/32

    OnOngoing project sgoing project s

    UgandaUgandaRwanda 220 KV /NELSAPRwanda 220 KV /NELSAPcommissioning 2013commissioning 2013

    RwandaRwanda--Burundi 220 KV / NELSAPBurundi 220 KV / NELSAPcommissioning 2013commissioning 2013

    BurundiBurundi

    --DRC 220 KV / NELSAPDRC 220 KV / NELSAP

    commissioning 2013commissioning 2013

  • 7/31/2019 East Africa Power Pool Presentation

    27/32

    OnOn-- going project sgoing project s

    RUSOMO Falls Project 80 MWRUSOMO Falls Project 80 MWcommissioning 2014commissioning 2014

  • 7/31/2019 East Africa Power Pool Presentation

    28/32

    44-- ChallengesChallenges

    Financing of the Secretariat to attractFinancing of the Secretariat to attractand retain the necessary staffand retain the necessary staff

    Getting all the necessary equipmentGetting all the necessary equipment

    eg. Hardware and software for powereg. Hardware and software for power

    planning and databaseplanning and database

  • 7/31/2019 East Africa Power Pool Presentation

    29/32

    5.5. CONCLUSI ONCONCLUSI ON

  • 7/31/2019 East Africa Power Pool Presentation

    30/32

    Conclusion

    The number of bilateral interconnectionprojects under implementation and soon tobe implemented is a testimony that a

    regional power market will be a reality in theforeseeable future;

    Coordination between different initiatives inthe power sector is in good track but shouldbe further strengthened

  • 7/31/2019 East Africa Power Pool Presentation

    31/32

    ConclusionConsidering that many projects are goingto be commissioned between 2011 and2013 EAPP must be ready on time to

    coordinate the regional trade as 8countries would have been alreadyconnected

    EAPP is ready to play its role asmandated by the Governments andUtilities of the Region through the signed

    MOUs and by the COMESA Heads ofState and Government through their 11th

    -

  • 7/31/2019 East Africa Power Pool Presentation

    32/32

    Thank You !