East Rockingham Waste to Energy PROOF OF CONCEPT LIFE CYCLE ASSESSMENT FOR ARENA GRANT Summary Report April 2021 Planned ERWTE site susmet.com | info @ susmet.com
Transcript
Page 1: East Rockingham Waste to Energy

East Rockingham Waste to Energy PROOF OF CONCEPT LIFE CYCLE ASSESSMENT FOR ARENA GRANTSummary ReportApril 2021

Planned ERWTE site

susmet.com | info @ susmet . com

Page 2: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 2 of 35

TABLE OF CONTENTS

Executive Summary 4Context 4Results 4

1 Introduction 51.1 Life Cycle Assessment 61.2 Report structure 6

2 PoC LCA Requirements 72.1 Goal of Study 72.2 Functionalunit,referenceflowsandreferencesystem 82.3 System boundary and cut-off criteria applied 82.4 Environmental impact categories 102.5 Temporal aspects 102.6 Multi-functionality and allocation 10

3 Method 113.1 Approach 113.2 Inventory of inputs and outputs 113.3 Emission factors and conversion factors 113.4 Data sources and quality assessment 113.5 Documentation of assumptions and calculations 12 Land use change (LUC) 12 Treatment of fossil, biogenic and atmospheric carbon 12

4 Results 134.1 Overview 134.2 Contribution Analysis 144.3 AvoidedLandfill 15

5 Discussion and Interpretation 165.1 Benefittoprojectgoingforward 16

6 Critical Review 17

7 References 18

Appendix 1 19

Appendix 2 26Input and Outputs 27MajorEmissionfactorsandconversionfactors 30Modelled Waste Composition 32

Appendix 3 33

Page 3: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 3 of 35

DOCUMENT CONTROL

VERSION DATE ISSUED PREPARED BY QUALITY CONTROL REVIEW1 08/04/2021 Dinesh Jayasuriya

Principal EngineerSusmet

Michael TerrySenior Energy Strategist & Solar EngineerSusmet

Disclaimer:ThisprojectreceivedfundingfromARENAaspartofitsAdvancingRenewablesProgram.TheviewsexpressedhereinarenotnecessarilytheviewsoftheAustralianGovernment,andtheAustralianGovernmentdoesnotacceptresponsibility for any information or advice contained herein.

The report has been prepared by Sustainometrics Pty Ltd (Susmet) for East Rockingham Waste to Energy for use solely bytheclientandARENA.Itshouldnotberelieduponbyanyoneelse.Nootherwarranty,expressedorimplied,ismade in this report.

Dataprovidedbytheclientandotherexternalsourceswereassumedtobecorrectandtheconclusionsorrecommendations in this report are based on this assumption. Susmet does not accept responsibility for inaccuracies in the data supplied by any other party.

Page 4: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 4 of 35

EXECUTIVE SUMMARY

CONTEXTEast Rockingham Waste to Energy plant is a Waste to Energy facility currently under construction south of Perth. On completion, the facility is expected to annually recover energy from 300,000 tonnesofwaste,andsupply231,680megawatthoursofelectricitytotheWesternAustralianelectricity grid. It is also expected to annually recover 7,253 tonnes of metals and 65,596 tonnes of recycledaggregatefromthewastestreamthatwouldotherwisebelandfilled.

AProofofConceptLifeCycleAssessmentincompliancewiththeAustralianRenewableEnergyAgencyrequirementswascarriedoutfortheEastRockinghamWastetoEnergyplantandthisisasummary report for the study. The study compares the greenhouse gas emissions and fossil fuel resource depletion resulting from the East Rockingham Waste to Energy facility to the reference systemofblackcoalpowergeneration.Theimpactofco-productssuchasavoidedlandfillandrecoveryofmetalsandaggregateswasincludedintheassessmentofthefacility.

TheaudienceforthisreportisARENAandERWTE.Giventhespecificcontextandnatureofthisstudy, this report should not be used by anyone other than the intended audience.

RESULTSThestudyresultsaresummarisedbelow.AsrequiredbytheARENALCAguidelines,thereferencesystem for this LCA is electricity generation from black coal and supplied to the Western Australian grid. The reference system is intended as the common point of comparison or the business-as-usualscenarioinaccordancewithARENA’sgoals.

IMPACT CATEGORY ERWTEREFERENCE

SYSTEMIMPROVEMENT OVER REF SYS

Electricity supplied to the Western Australian grid (MWh)

1.0 1.0 -

Greenhouse gas emissions (kg CO2-e per MWh)

-773.9 896.9 186%

Fossil fuel energy use (MJ per MWh)

81.7 11,448.0 99%

Fossil Fuel Resource Depletion (kg oil-eq per MWh)

2.0 272.5 99%

The greenhouse gas emissions for ERWTE are -773.9 kg CO2-e per MWh. The ERWTE performance representsa186percentimprovementoverthereferencesystem,whichisagreenhousegasemission reduction of 387,104 tonnes of CO2-e per annum.

The fossil fuel energy use for ERWTE is 81.7 MJ per MWh and fossil fuel resource depletion is 2 kg oil-eqperMWh,whichisa99percentimprovementoverthereferencesystem.Thisisareductionof 62,686 tonnes of oil-eq per annum.

Page 5: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 5 of 35

1 INTRODUCTION

East Rockingham Waste to Energy (ERWTE) facility is under construction in the Rockingham Industry Zone 42kmsouthofPerth.WastetoEnergy(WtE)plantsarealsoknownasEnergyfromWaste(EfW)plants.On completion, the facility is expected to annually recover energy from 300,000 tonnes of Municipal Solid Waste(MSW)andCommercialandIndustrial(C&I)waste,andsupply231,680megawatthours(MWh)of electricity to the Western Australian (WA) South West Interconnected System (SWIS) electricity grid. It is also expected to annually recover more than 7,253 tonnes of metals and 65,596 tonnes of recycled aggregatefromthewastestreamthatwouldotherwisebelandfilled.

Theprojectwillincorporatea31MWelectricitygeneratorandanincineratorbottomash(IBA)treatmentplant to manufacture recycled aggregates. Inert materials are recovered after the thermal process, including sand, bricks, metals, glass, and other inert materials. After metals are removed, the material is crushed and screened to produce a recycled aggregate product called incinerator bottom ash aggregates (IBAA).Overall,thefacilityisexpectedtoachievea96%diversionofresidualwastefromlandfill.

Site under construction

Page 6: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 6 of 35

1.1 LIFE CYCLE ASSESSMENTThe$511millionERWTEprojectreceivedan$18millionrecoupablegrantfromtheAustralianRenewableEnergyAgency(ARENA).Aspartofthefundingagreement,ERWTEisrequiredtocarryoutaLifeCycleAssessment(LCA).TheARENALCAguidelinesaredetailedinLife Cycle Assessment (LCA) of Bioenergy Products and Projects (October 2016).1 These guidelines specify thataProofofConcept(PoC)LCAmustbeundertakenintheearlystageofprojectdevelopment.

The LCA guidelines are built on these international standards:

• ISO 14040 – Environmental management — Life cycle assessment — Principles and frame-workdescribestheprinciplesandframeworkforlifecycleassessment.

• ISO 14044 – Environmental management standard — Life cycle assessment, Requirements and guidelines is an important standard, and the underpinning original standard on require-ments for LCA.

• ISO/TS 14067 – Greenhouse gases – Carbon footprint of products – Requirements and guidelines for quantification and communicationisatechnicalspecificationforcalculationofcarbonfootprintsofproducts,whicharethecumulativeGHGemissionsacrossaproductlifecycle.ItisrelevanttoquantifyingthetotalGHGemissionsofabioenergyproduct.

• ISO 13065 – Sustainability criteria for bioenergy provides valuable guidance for Bioenergy projects,inparticularthesectiononGHGmethodologies,assessmentandcomparisons.

ThisPoCLCAstudywasproducedandreviewedbyateamofexperiencedengineers(seeAppendix3)basedontheLCAguidelines,andwithdirectrelianceontheabovestandardswhenneeded.ThemodellingwasbasedondatacollectedbetweenDecember2020andMarch2021.

1.2 REPORT STRUCTUREThe structure of this report is based on the requirements in the LCA guidelines. The next section, PoC LCA Requirements, addresses overreaching requirements in the LCA guidelines, such as the goal of the study, the system boundary, and the environmental impact categories. The Method section outlines the overall research process including inventory inputs and outputs, conversation factorsanddataquality.TheResultssectionsummarisestheresultsalongwithcontributingfactorstotheresult.Finally,theDiscussionandInterpretationsectionanalysestheresultandthebenefitsoftheproject.

1ARENA;LifeCycleAssessment(LCA)ofBioenergyProductsandProjects.October2016. Obtainedfromhttps://arena.gov.au/assets/2017/02/AU21285-ARENA-LCA-Guidelines-AW2.pdf

Page 7: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 7 of 35

2 PoC LCA REQUIREMENTS

This section addresses the overarching requirements in the LCA guidelines, including the study goal, the system boundary and the environmental impact categories.

2.1 GOAL OF STUDYThegoaloftheLCAistomeettheARENArequirementsandprovideinsightsintotheenvironmentalimpactsofdifferentfeedstockoptionsavailabletotheproject.

ThestatedaimsoftheARENALCAguidelinesareto:

• Providebioenergyproponentswithinsightsintotheenvironmentalbenefitsandrisksacrossthefulllifecycleofbioenergyproducts/projects.

• Guidemoreeffectivedecision-makingbyprovidinga‘levelplayingfield’benchmarkthatenablesARENAtocompareprojectsagainstconventionalgenerationorfueloptions.

• Support‘duediligence’byensuringtheprojectssupportedbyARENAareabletodeliveranetbenefitinenvironmentalterms,e.g.greenhousegas(GHG)footprintorenergybalance.

• Understandwheretheinnovationgaps/opportunities/‘hotspots’lieintermsofthetechnicalmaturationofnovelpathwaysandapproaches.

• Enableknowledgesharing,including:

- Provideasolidbasisforcommunicationofprojectimpactsandbenefitstothecommunity.

- Provideanalyseswithrobustcomparabilitytonon-biofuelalternativesthatarefunctionally similar.

- Provide high quality LCA outputs for independent scrutiny by other LCA experts, academics,non-governmentorganisations(NGOs)etc.

In addition, the purpose of the PoC LCA is:

• ForARENAto:

- Haveconfidencethattechnologiesproducerenewableenergywithafavourableoverallenvironmentalimpactprofile,primarilyinrelationtoembodiedfossilenergyandGHGbalance.

- Acquireinsightintoenvironmentaladvantagesandrisksassociatedwithtechnologies.

• ForARENAprogramparticipantsto:

- Provide insights into environmental challenges of different feedstocks and technologies.

- Createalevelplayingfieldcomparisonagainstcurrentfossilfuelenergysources.

- Provide‘hotspot’analysisofenvironmentalimpactsandbenefitstoguidedevelopments.

- SupportknowledgesharingobligationsassociatedwithanARENAfundingagreement.

TheaudienceforthestudywillbeARENAandERWTE.Giventhespecificcontextandnatureofthis study, this report should not be relied upon by anyone other than the intended audience.

Page 8: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 8 of 35

2.2 FUNCTIONAL UNIT, REFERENCE FLOWS AND REFERENCE SYSTEMThefunctionalunitandthereferencesystemasrequiredbytheLCAGuidelinesareshowninTable1.

ThefunctionalunitoftheWtEplantgeneratingelectricityfromwasteisthesupplyof1 MWh of electricitytotheWesternAustraliangrid.Notethatthefunctionalunitwaschangedfrom1kWhinthe LCA guidelines to 1 MWh to provide more meaningful impact numbers.

TheLCAguidelinesrequirethatthisLCAbecomparedtoareferencesystemwheretheERWTEfacility does not exist. The mandated reference system for this LCA is electricity generation from blackcoal.AusLCIdatawasusedas-isforthereferencesystemwithnocut-offconsideration.

Table 1: Reference fuel and functional unit

BIOENERGYFUEL SOURCE

OUTPUT (ELECTRICITY, HEAT, TRANSPORT FUEL, OTHER)

REGION / APPLICATION

REFERENCE FUEL

FUNCTIONAL UNIT

Biomass Combustion for electricity, baseload

WA Electricity (black coal) WA

Production of 1 MWh of electricity supplied to WA grid

2.3 SYSTEM BOUNDARY AND CUT-OFF CRITERIA APPLIED ThesystemboundaryfortheLCAandtheERWTEsiteboundaryareshowninFigure1.

AspertheLCAguidelines,thedefaultboundaryforthefunctionalunitiscradle(i.e.wastecollection)togate(i.e.electricitysuppliedtothegrid).Forothermassandenergyflows,cradletogateimpactswereconsideredforproducts(e.g.recoveredmetals)andcradletograveforwaste(e.g.fluegasresiduedisposaltolandfill).

Thecollectionofwastefromvarioussitesandtransporttothewastetransferstationoccursinthereferencesystem,sothesewereexcludedfromtheLCAboundary.Thewasteistheneithersent to the landfill in the reference system or diverted to ERWTE site. The ERWTE site is very close (around one km) to the main Perth Metropolitan landfill.

Thesystemboundaryincludesallmaterialandenergyflowsfromthesite,includingbothco-products(e.g.recycledmetals)andwaste.

Acut-offcriterionwasusedtoexcludeminorflowsfromthesystemboundary.Thecut-offforindividualflowsisonepercent,withacumulativecontributionoffivepercentorless.

TheembodiedimpactofcapitalequipmentandinfrastructurewasexcludedfromtheLCAgiven that the production system is estimated to have a 30-year life and does not require the establishment of significant supporting physical infrastructure, such as dedicated roads, rail, pipelines or inter-modal change facilities.

Page 9: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 9 of 35

Figure 1: LCA System Boundary

Municipal Waste

Collection & Transport

Transfer Station

Commercial and

Industrial Waste

WeighbridgeElectricity from grid

Diesel fuel

Water

Quicklime

Activated carbon

Urea

Avoided landfill

Air emissions

Disposal to landfill

Bunker

Grapple & feed hopper

Combustion chamber

Water treatment Steam

turbine generator

Flue gas treatment

Bottom ash extractor

Water bath

Bottom ash treatment plant

Recovered metals

Recycled aggregate

Electricity to grid

External user

ERW

TE S

ite

LCA

Sys

tem

Bou

ndar

y

Page 10: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 10 of 35

2.4 ENVIRONMENTAL IMPACT CATEGORIESThe impact assessment categories and models for this PoC LCA required by the LCA guidelines are showninTable2.

Table 2: Impact assessment categories

INDICATOR DESCRIPTION CHARACTERISATION MODEL

Climate change, GWP100 Measured in kg CO2 equivalents (kg CO2-e).

IPCC 5th Assessment Report model based on 100-year timeframe (Myhre, et al., 2013)

Fossil fuels resource depletion (abiotic depletion, fossil fuels)

Measured in kg oil equivalent (kg oil-eq).

All fossil energy carriers based on relative scarcity (Goedkoop, et al., 2009).

Fossil fuel energy use (net calorificvalue)

Measured in MJ.

2.5 TEMPORAL ASPECTS The WtE production plant is expected to commence operation in late 2022 and have an economic life of 30 years.

ThisPoCLCAmodelsthematerialsandenergyflowsduringoneyearofnormaloperation,including scheduled maintenance and upgrades.

2.6 MULTI-FUNCTIONALITY AND ALLOCATION Electricity supplied to the WA grid is considered the main product for this LCA and functional unit. The WtE process also produces multiple economically valuable co-products:

• Recoveredmetals:metalsintheincomingwastethatarerecoveredfromthebottomash.

• Recycled aggregate: remaining (i.e. non-metal) aggregate recovered from the bottom ash withmultipleapplicationssuchasuseasaconstructionaggregate.

• Avoidedlandfill:diversionofwastefromlandfill.

These co-products displace products in the market, so an environmental credit equal to these displacedproductswasprovidedtothemainproduct.Forexample,recoveringaluminiumthrough the WtE process means that aluminium need not be created from virgin materials. The greenhousegasemissionsthatwouldhaveresultedfromcreatingtheequivalentquantityofaluminium become a credit to the greenhouse gas emissions from the WtE electricity generation.

Page 11: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 11 of 35

3 METHOD

This section outlines the overall research process including inventory inputs and outputs, conversation factors and data quality.

3.1 APPROACHThisstudybeganwithanalysingthemainprocessstagesoftheERWTEfacilityandthenidentifyingmaterialandenergyinputandoutputflowsateachstage(seesection3.2).AsurveyofothercomparableLCAswasalsoundertakentoensureallthekeyflowswereconsidered.Theidentifiedflowsweregivenasignificanceratingbasedontheirexpectedcontributiontotheendresults,andthisratingwasusedtoprioritisethedatacollectionandaccuracyofthemoresignificantflows.

Giventhesiteisstillunderconstruction,thedataavailabilitywasunknownatthecommencementoftheproject,somultipletypesofdatawerecollected,andmultiplecalculationmodelswerecreated.Themodelswerecreatedusingaspreadsheetandutilisedfreelyaccessibledata(egAusLCI).Thentheoptimalcalculationmodelsalongwiththeirdatasourcesweredetermined(seeAppendix2),usuallybasedondataqualityconsiderations(seesection3.4),consistencyofcalculationsbetweenthevariousimpactcategoriesinthisstudy,andconsistencywithcomparableLCAstudies.

TheresultsofthisstudywerecomparedagainstothercomparableLCAstudiesandanysignificantdifferenceswereanalysed.Finally,boththespreadsheetmodelandthisreportwereinternallyreviewedforqualitycontrolandanexternalcriticalreviewwasconducted(seesection6).

3.2 INVENTORY OF INPUTS AND OUTPUTSTheinventoryofinputsandoutputswithinthesystemboundaryisdiagrammaticallyshowninFigure1.ThesearequantifiedinAppendix2.

3.3 EMISSION FACTORS AND CONVERSION FACTORSThese are listed in Appendix 2.

3.4 DATA SOURCES AND QUALITY ASSESSMENTThedatasourcesaredocumentedalongwiththeinventoryandfactorsinAppendix2.

Site-specificdatawasusedwhereavailableorwhentheycanbederivedfrommodelling,takingaccountofsite-specificfactors.Giventhatthesiteisnotyetoperational,actualoperationaldatawasnotavailablesoafulldataqualityassessmentwillneedtobeundertakenintheCommercialisationLCA.ThesimplifiedandpreliminarydataqualityassessmentisshowninTable3.

Table 3: Data Quality Assessment

DATASOURCE OF DATA RELIABILITY COMPLETENESS

CORRELATION (TIME, GEOGRAPHY, TECHNOLOGY)

ERWTE Input and Output Sources

ERWTE reports and estimates

Qualifiedestimates by industrial experts

Representative databut from a smallernumber of sites andshorter periods

Models and estimates of future data for current site and technology

Reference System

AusLCI Verifieddatabased onmeasurement

Representativedata from asufficientsampleof sites over anadequate period

Time and technology: Recent data based on technology under study. Geography: Average data from largerareainwhichtheareaunderstudy is included

Waste feedstock composition

NationalWaste Database 2020

Verifieddatabased onmeasurement

Representativedata from asufficientsampleof sites over anadequate period

Time and technology: Recent data based on technology under study. Geography: Average data from largerareainwhichtheareaunderstudy is included

Page 12: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 12 of 35

3.5 DOCUMENTATION OF ASSUMPTIONS AND CALCULATIONSThedatasourcesaredocumentedalongwiththeinventoryandfactorsinsectionsinAppendix2.

LAND USE CHANGE (LUC)

Due to the size, zoning and location of the ERWTE site, direct emissions from the change in the useormanagementoflandwithinsiteboundaryisexpectedtobebelowcut-off.Inaddition,LUCemissionsfromrawmaterialsotherthanwastefromoutsideofthesiteboundaryaredifficulttoanalyseatthisstageandwasassumedtobebelowcut-off.

TREATMENT OF FOSSIL, BIOGENIC AND ATMOSPHERIC CARBON

Thebiogenicandfossilcarbonflowswithinthesystemboundaryhavebeencalculatedanddocumentedseparatelyunlessstatedotherwise.

The main ERWTE production process involves combusting feedstock from the MSW and C&I wastestreamstoproduceelectricity.Giventhatthesiteisnotyetoperational,theWesternAustralianwastebreakdownfromtheNationalWasteDatabase2020wasusedtoestimatethewastefeedstockcompositionandthenthebiogeniccarboncomponentoftheincomingfuelandthemodelledairemissions(seeAppendix2).Forthesamereason,itwasassumedthatthecarbondioxide uptake by the organic materials in the feedstock is equal to the biogenic emissions during combustion. Further, given the inherent multiplicity and variability of the feedstock, it may not be possibletoreliablycalculatecarbondioxideuptakeevenifactualoperationaldatawasavailable,and this issue may need to be addressed in the Commercialisation LCA.

Thefeedstockcontainsvariouswastematerialsproducedfromfossilfuelssuchasplastics.Themanufactureofthosematerialswerenotincludedinthefossilfuelsresourcedepletionandfossilfuels energy use calculation, as the use of fossil fuels occurred outside the system boundary. They wereincludedinthegreenhousegasemissioncalculationsasthoseemissionsoccurredwithinthesystem boundary.

Page 13: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 13 of 35

4 RESULTS

4.1 OVERVIEW TheresultperfunctionalunitisshowninTable4.ThefunctionalunitisElectricitysuppliedtotheWestern Australian grid, and the results are expressed both relative to this functional unit (e.g. -773.9 kg CO2-e per MWh) and as an annual total (e.g. 231,680 MWh per annum). The ERWTE resultandtheReferenceSystemresultwerealignedatthefunctionalunittoenablecomparisonofthethreeimpactcategories.Theimprovementoverthereferencesystemwascalculatedbysubtracting the ERWTE result from the reference system result and then dividing by the reference system result.

Table 4: Functional Unit Results

IMPACT CATEGORY ERWTEREFERENCE

SYSTEMIMPROVEMENT OVER REF SYS

Electricity supplied to the Western Australian grid (MWh)

1.0(231,680 pa)

1.0(231,680 pa)

Greenhouse gas emissions (kg CO2-e per MWh)

-773.9(-179,302,933 pa)

896.9(207,802,937 pa)

186%

Fossil fuel energy use (MJ per MWh)

81.7(18,920,150 pa)

11,448.0(231,680 MWh pa)

99%

Fossil Fuel Resource Depletion (kg oil-eq per MWh)

2.0(437,799 pa)

272.5(63,124,089 pa)

99%

The greenhouse gas emissions for ERWTE are -773.9 kg CO2-e per MWh. The negative ERWTE value represents a saving of greenhouse gas emissions for the facility, mostly due to avoided landfill(seesection4.2).TheERWTEperformancerepresentsa186percentimprovementoverthereferencesystem,whichisagreenhousegasemissionreductionof387,104tonnesofCO2-e per annum.

The fossil fuel energy use for ERWTE is 81.7 MJ per MWh and fossil fuel resource depletion is 2 kg oil-eqperMWh,whichisa99percentimprovementoverthereferencesystem.Thisisareductionof 62,686 tonnes of oil-eq per annum.

Page 14: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 14 of 35

4.2 CONTRIBUTION ANALYSISThevariousinputandoutputgroupsthatcontributedtheERWTEresultsaboveareshowninFigure 2.

Thecontributionanalysisshowsthatavoidedlandfillisthemaincontributorforgreenhousegasemission savings from the facility, accounting for -964.50 kg CO2-e/MWh.Thiscontrastswiththe second main contributor, the direct emissions from the WtE combustion process (WtE Air Emissions) of 268.90 kg CO2-e/MWh.Avoidedlandfillisfurtherdiscussedinsection4.3.

Quicklime is the main contributor for fossil fuel energy use and resource depletion and accounts for1.30kg-oileqv/MWh.ThesecondmaincontributorisUrea,whichaccountsforjust0.30kg-oileqv / MWh.

-100% -80% -60% -40% -20% 0% 20% 40% 60% 80% 100%

FOSSIL FUEL ENERGY

FOSSIL FUELRESOURCE DEPLETION

GHG EMISSIONS

Waste as fuel WtE Air Emissions Support fuel Transport Ash Disposal to Landfill

Avoided Landfill Ash Recycled Urea Quicklime

Figure 2: Contribution Analysis for ERWTE results

Page 15: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 15 of 35

4.3 AVOIDED LANDFILLAsshownincontributionanalysis(section4.2),avoidedlandfillisthemaincontributorforgreenhouse gas emission savings from the facility, accounting for -964.50 kg CO2-e / MWh. Avoidedlandfillfigureisverysensitivetothewastecompositionandtheaveragelandfillmethanecapture.Whilereliablebackgrounddatawasusedforwastecomposition(seesection3.5),theaveragelandfillmethanecapturefigurewasfoundtobeverydependentonthelandfill.Basedondiscussionswithlocallandfills,amaximummethanecaptureof60%seemspossibleso50%assumedasthelikelyaveragemethanecapturefortheavoidedlandfillcalculations.However,thisfiguremaybemuchlessforlandfillsinotherareas,especiallyolderlandfills.

Toaddressthisvariability,impactofdifferentlandfillmethanecaptureratesontheERWTEgreenhousegasemissionsweremodelledandtheresultisshowninFigure3.

-2,100 -1,600 -1,100 -600 -100 400

0%

40%

50%

60%

ERWTE GHG Emissions (kg CO2-e / MWh)

AVE

RAG

E LA

ND

FILL

MET

HA

NE

CAPT

URE

D

Waste as fuel WtE Air Emissions Support fuel Transport Ash Disposal to Landfill

Avoided Landfill Ash Recycled Urea Quicklime

Figure 3: Sensitivity Analysis for Average Landfill Methane Captured

Itshouldbenotedthattheavoidedlandfillcalculationsonlyincludemethaneemissions.Therearelikelytobeotherinputandoutputflowsatalandfillsuchasdieseluse,electricityconsumptionandelectricitygeneration,butthesesourceswerenotmodelledastheywerehighlyvariablebetweenlandfills,includinglocallandfills,andwerelikelytobeminorincomparisontothemethaneemissions.

Page 16: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 16 of 35

5 DISCUSSION AND INTERPRETATION

ThisisaPoCLCAfortheprojectedERWTEelectricitygeneration.ThefinalresultnumberswerebasedonmodelleddataandwillneedtobevalidatedwithproductiondataintheCommercialisationLCA.However,itisclearthatWtEelectricityispreferabletothereferencesystemofblackcoalelectricitygeneration for the impact categories of GWP, fossil fuel energy use and fossil fuel resource depletion.

5.1 BENEFIT TO PROJECT GOING FORWARDThisstudyoutlinesthestrengthsofthisWtEplantcomparedtotheReferenceSystemaswellaswherethedataneedstobeimproved.Theseresultsmaybeusedtoassessthegreenhouseemissionswhenfinalisingthewastefeedstockcommercialagreements.Specifically,duetotheimpactofavoidedlandfillemissions,increasingtheproportionoforganicfeedstockislikelyto haveahigherbenefitthanincreasingtheproportionoffossilfuelfeedstock.

Page 17: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 17 of 35

6 CRITICAL REVIEW

ThiscriticalreviewiscompliantwiththeARENALCAGuidelinessection2.11.WhiletheLCAGuidelinesdonotrequireacriticalreviewforaPoCLCA,thisPoCLCAvoluntarilyunderwentthecriticalreviewbyanALCASCertifiedPractitionerinordertoimplementahigherstandardofpractice.

ThecriticalreviewerforthisprojectwasDrOlubukolaTokedefromDeakinUniversitywhoisalsoaLife Cycle Assessment Certified Professional(LCACP).ThereportfromthecriticalreviewerisshowninAppendix 1.

Page 18: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 18 of 35

7 REFERENCES

• ARENA.(2016,October)Life Cycle Assessment (LCA) of Bioenergy Products and Projects.

• Ramboll. (2018, December). Kwinana Waste To Energy Project Arena Life Cycle Assessment.

• RSK. (2019, July). Synthetic fuel manufacture Proof of Concept LCA (public version).

• Nyunt.(2020).National Waste Database 2020. FinalNWR2020version2(downloaded07/01/2020).

• AusLCI.(2021).Datasets.Downloaded01/03/2021fromTheAustralianLifeCycleInventoryDatabase Initiative: http://alcas.asn.au/AusLCI/index.php/Datasets.

• Dastjerdi.(2019).Renewable and Sustainable Energy Reviews, An evaluation of the potential of waste to energy technologies for residual solid waste in New South Wales, Australia.

• Randell. (2014). Waste generation and resource recovery in Australia - Reporting period 2010/11, wgrra-workbook.xlsx,WAworksheet(downloaded07/01/2020).

• Goedkoop, et al. (2009). A life cycle impact assessment method which comprises harmonised category indicators at the midpoint and the endpoint level.

• German Federal Ministry of the Interior, Building and Community (BMI). ÖKOBAUDAT. Accessed on01/03/2021athttps://www.oekobaudat.de/en/database/database-search.html.

• Australian Government. (2020). National Greenhouse Accounts Factors 2020.

Page 19: East Rockingham Waste to Energy

SUSMET - ERWTE POC LCA PAGE 19 of 35

APPENDIX 1

Critical Review Report (attached)

Page 20: East Rockingham Waste to Energy

Deakin University CRICOS Provider Code: 00113B

Jason Pugh, General Manger - Commercial East Rockingham Waste-to-Energy Plant 26 Office Rd, East Rockingham, WA, 6168 PO Box 85, Como, WA, 6952

Dr. Olubukola (Bukky). O. Tokede, PhD, IEAust, LCACP, Lecturer in Construction Management (Construction Economics and Management) Research Theme Leader: Cradle to Cradle Construction, of the Live+Smart Research Lab School of Architecture & Built Environment, Faculty of Science, Engineering & Built Environment

Faculty of Science, Engineering and Built Environment, School of Architecture and Built Environment

Geelong Waterfront Campus, Deakin University 1 – 11 Gheringhap Street, VIC 3220 deakin.edu.au

Page 21: East Rockingham Waste to Energy

Deakin University CRICOS Provider Code: 00113B

Page 2 Faculty of Science, Engineering and Built Environment, School of Architecture and Built Environment

Geelong Waterfront Campus, Deakin University 1 – 11 Gheringhap Street, VIC 3220 deakin.edu.au

Overall review of East Rockingham Waste-to-Energy Plant Life Cycle Assessment

General Aspects Overall Comments

1 The methods have been used in accordance with the ISO14040/14044 international standard and ARENA Guidelines

Yes, to a high degree, and with careful attention to details

2 The methods are scientifically and technically varied

Yes, the standard has been followed, and also in line with the ARENA Guidelines

3 Applied data is appropriate and reasonable and has been verified by participating LCACP professional

The data applied is appropriate and reasonable and has been obtained from most updated public databases. In situations, where data has been challenging, discussion with the client and the team, have led to deference to the best available science.

4 The modelling follows the best guidance for Life Cycle Impact Assessment in Australia

Overall, the modelling has been done in accordance with the appropriate impact assessment guidance from Australian Life Cycle Assessment Society

5 The assessment report is transparent and consistent

The assessment is transparent and consistent. There have been data issues in relation to the avoided landfills and recovered materials, but a sensitivity analysis has been suggested to accommodate the inexactness in this metrics.

6 The results are well supported The results are well supported by the analysis conducted

Page 22: East Rockingham Waste to Energy

Deakin University CRICOS Provider Code: 00113B

Page 3 Faculty of Science, Engineering and Built Environment, School of Architecture and Built Environment

Geelong Waterfront Campus, Deakin University 1 – 11 Gheringhap Street, VIC 3220 deakin.edu.au

Checklist

The following should be covered by the report

Aspects from ISO14044 (2006) Comments

1. General aspects

1.1 The Life Cycle Assessment Certified Professional of the Life Cycle Assessment

Although, not a requirement of the ARENA proof-of-concept LCA, the process has been conducted with the assistance and input of a certified LCACP.

1.2 report date is recorded The report date is reported

1.3 Statement that the assessment has been carried out in accordance with the requirements of ISO14044

The assessment has been conducted in accordance with IS014044

2. Goal of the Assessment 2.1 Reason for carrying out the study

2.2 its intended application

2.3 the target audience

2.4 Statement as to whether the study is intended to support comparative assertions intended to be disclosed to the public

3. Scope of the Study

3.1 Function, including

a) Statement of performance characteristics, and

b) Any omission of additional functions in comparison

3.2 Functional unit, including

a) Consistency with goal and scope

Page 23: East Rockingham Waste to Energy

Deakin University CRICOS Provider Code: 00113B

Page 4 Faculty of Science, Engineering and Built Environment, School of Architecture and Built Environment

Geelong Waterfront Campus, Deakin University 1 – 11 Gheringhap Street, VIC 3220 deakin.edu.au

b) Definition

c) Results of performance measurement

3.3 System boundary, including Cradle-to-gate

a) Omission of life cycle stages processes or data needs

, as consistent with system boundary

b) Quantification of energy and material inputs and outputs, and

c) Assumptions about electricity production

3.4 cut-off criteria for initial inclusions of inputs and outputs, including

a) Description of cut-off criteria and assumptions

Not clearly stated

b) Effect of selection on results

c) Inclusion of mass, energy and environmental criteria

4 Life cycle inventory analysis

4.1 data collection procedure

4.2 qualitative and quantitative description of unit processes

4.3 sources of published literature

4.4 calculation procedures

4.5 validation of data, including

a) Data quality assessment

b) Treatment of missing data

4.6 sensitivity analysis for refining the system boundary

Advised, to be conducted, and certified by LCACP professional, although not an immediate requirement for the LCA

Page 24: East Rockingham Waste to Energy

Deakin University CRICOS Provider Code: 00113B

Page 5 Faculty of Science, Engineering and Built Environment, School of Architecture and Built Environment

Geelong Waterfront Campus, Deakin University 1 – 11 Gheringhap Street, VIC 3220 deakin.edu.au

4.7 allocation principles and procedures including:

a) Documentation and justification of allocation procedures

b) Uniform application of allocation procedures

5 Life Cycle Impact Assessment, where applicable

5.1 the LCIA procedures, calculations, and results of the study

5.2 limitation of the LCIA relative to the defined goal and scope of the LCA

5.3 the relationship of the LCIA results to the defined goal and scope, see 4.2

5.4 the relationship of the LCIA results to the LCI results, see 4.4

5.5 impact categories and category indicators considered, including a rationale for their selection, including assumptions and a reference to their source

5.6 description of or reference to all characterization models, characterization factors and methods used, including all assumptions and limitations

5.7 description of or reference to all value-choices used in relation to impact categories, characterization models, characterization factors, normalisation, grouping, weighting, and elsewhere in the LCIA, a justification for their use and their influence on the results, conclusions and recommendations

Not relevant

5.8 a statement that the LCIA results are relative expressions and do not predict impacts on category endopoints, the exceeding of thresholds, safety margins or risks, and when included as part of the LCA, also

Page 25: East Rockingham Waste to Energy

Deakin University CRICOS Provider Code: 00113B

Page 6 Faculty of Science, Engineering and Built Environment, School of Architecture and Built Environment

Geelong Waterfront Campus, Deakin University 1 – 11 Gheringhap Street, VIC 3220 deakin.edu.au

a) A description and justification of the definition and description of any new impact categories, category indicators or characterization models used for the LCIA

Not applicable

b) A statement and justification of any grouping of the impact categories

Based on ARENA Guideline

c) Any further procedures that transform the indicator results, and a justification of the selected, references, weighting factors etc

Not applicable

d) Any analysis of the indicator results for example, sensitivity and uncertainty analysis or use of environmental data including any implications for the results

e) Data and indicator results reached prior to any normalization, grouping, or weighting shall be made available together with the normalised, grouped or weighted results

Not applicable

6. Life cycle interpretation

6.1 the results

6.2 assumptions and limitations associated with the interpretation of results, both methodology and data related

6.3 data quality assessment

6.4 full transparency in terms of value-choices, rationales and expert judgments

7. Critical review, where applicable

7.1 name and affiliation of reviewers Dr Olubukola Tokede, Deakin University

7.2 critical review reports

7.3 responses to recommendations To be provided.

Page 26: East Rockingham Waste to Energy

SUSMET - ERWTE POC LCA PAGE 26 of 35

APPENDIX 2

Input and Outputs

Major Emission factors and conversion factors

Modelled Waste Composition

Page 27: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 27 of 35

INPUT AND OUTPUTS

REFSOURCE DESCRIPTION

I/O GROUP

QTY PER MWH UNIT INFO SOURCE COMMENTS

- ERWTE Input Sources

Si-001 Municipalsolidwaste Waste as fuel 1,014.330 kg/MWh client 11/12/2020 8000 hours of operation

Si-002 Commercial and Industrial waste

Waste as fuel 280.559 kg/MWh client 11/12/2020 8000 hours of operation

Si-003 Construction and Demolition Waste

Waste as fuel 0.000 kg/MWh client 11/12/2020

Si-032 Transport - Diesel Transport 0.111 L/MWh client 03/03/2021 Transporting Ash Recycled to the marketandwastetolandfill.

Si-040 Support fuel - Electricity from grid

Support fuel 0.001 MWh/MWh client 11/12/2020 Assume 1 cold start per annum and5MWdrawover48hrspercold start

Si-041 Support fuel - Diesel Support fuel 0.124 L/MWh client 11/12/2020 Assuming 1 cold start per annum

Si-042 Mobile plant and equipment - Diesel

Support fuel 0.173 L/MWh client 11/12/2020 Front end loads in bottom ash treatment plant. Assume ~1% of site diesel.

Si-060 Ammonia/urea 40% solution Urea 0.432 kg/MWh client 11/12/2020

Si-061 Quick lime (86% pure) Quicklime 14.848 kg/MWh client 11/12/2020

Si-062 Activated carbon Activated Carbon

0.414 kg/MWh client 11/12/2020

- - -

Page 28: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 28 of 35

REFSOURCE DESCRIPTION

I/O GROUP

QTY PER MWH UNIT INFO SOURCE COMMENTS

- ERWTE Output Sources

So-001 Electricity to grid Product 1.000 MWh/MWh client 11/12/2020

So-010 Recovered Ferrous metal Ash Recycled 18.357 kg/MWh client 11/12/2020

So-011 Recovered nonferrous metal - Aluminium

Ash Recycled 2.590 kg/MWh client 11/12/2020 Total recovered nonferrous metal 3,000,000kg. Assume 20% Aluminium and 80% other.

So-012 Recovered nonferrous metal - Other

Ash Recycled 10.359 kg/MWh client 11/12/2020 Total recovered nonferrous metal 3,000,000kg. Assume 20% Aluminium and 80% other.

So-013 Recycled aggregate Ash Recycled 283.132 kg/MWh client 11/12/2020

So-020 Emissions to Air - CO2 (fossil) WtE Air Emissions

268.871 kg/MWh ERWTEERD,NationalWaste Database 2020

So-021 Emissions to Air - CO2 (biogenic)

WtE Air Emissions

555.887 kg/MWh ERWTEERD,NationalWaste Database 2020

So-024 Emissions to Air - CO WtE Air Emissions

824.758 kg/MWh ENVALL(2017),ERWTEFacility Environmental ReviewDocument,

Appendix 7, Table 1

Kwinana0.019g/kWh:Expectedair emissions from typical modern WTE plants versus EU limits.

So-025 EmissionstoAir-NOx WtE Air Emissions

1.740 kg/MWh ENVALL(2017),ERWTEFacility Environmental ReviewDocument,

Appendix 7, Table 1

Kwinana0.320g/kWh:Expectedair emissions from typical modern WTE plants versus EU limits.

So-027 Emissions to Air - SO2 WtE Air Emissions

0.360 kg/MWh ENVALL(2017),ERWTEFacility Environmental ReviewDocument,

Appendix 7, Table 1

Page 29: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 29 of 35

REFSOURCE DESCRIPTION

I/O GROUP

QTY PER MWH UNIT INFO SOURCE COMMENTS

So-040 Fluegasashtolandfill(APCR) Ash Disposal toLandfill

51.796 kg/MWh client 11/12/2020

- - -

- Reference System Input Sources

Si-104 Black coal RefSys - Input 424 kg/MWh AusLCI

- Reference System Output Sources

So-101 Electricity RefSys - Output

1 MWh/MWh AusLCI

So-105 Emissions to Air - CO2 RefSys - Output

893 kg/MWh AusLCI

So-106 EmissionstoAir-CH4 RefSys - Output

65 g/MWh AusLCI

So-107 EmissionstoAir-N2O RefSys - Output

8 g/MWh AusLCI

Page 30: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 30 of 35

MAJOR EMISSION FACTORS AND CONVERSION FACTORS

FACTOR NAME VALUE UNITS FACTOR SOURCE / COMMENTS

Biogeniccarboninwaste 67.4% Nyunt(2020),NationalWasteDatabase2020

Energy conversion from MJ to kWh

3.6 MJ/kWh

Landfillmethanecapturerate 50% Basedondiscussionswithalocallandfill.

Electricity EF 0.70 kgCO2-e/kWh AustralianGovernment,NGAFactors2020,WASWISScope2+3

Stationary Diesel EF 2,848.68 kgCO2-e/kL AustralianGovernment,NGAFactors2020,StationaryDieselScope2+3

TransportDieselEF,Heavyvehicles

2,855.24 kgCO2-e/kL AustralianGovernment,NGAFactors2020,HeavyvehiclesDieselScope2+3

Waste mix methane emissions AustralianGovernment,NGAFactors2020,Table45ANDTable46

GWP100 EFs CO2: 1CH4: 28N2O: 265SF6: 22800

GWP100 IPCC (2013), Working Group I Contribution to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change. Chapter 8: AnthropogenicandNaturalRadiativeForcing

Fossil Fuel Depletion Factors Goedkoop(2009),Alifecycleimpactassessmentmethodwhichcomprises harmonised category indicators at the midpoint and the endpoint level

Lime ADPF German Federal Ministry of the Interior, ÖKOBAUDAT, Accessed on 01/03/2021athttps://www.oekobaudat.de/en/database/database-search.html

Urea ADPF German Federal Ministry of the Interior, ÖKOBAUDAT, Accessed on 01/03/2021athttps://www.oekobaudat.de/en/database/database-search.html

Page 31: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 31 of 35

FACTOR NAME VALUE UNITS FACTOR SOURCE / COMMENTS

Oil-eq Conversation Factor 41.868 GJ/t oil-eq International Energy Agency, Unit converter and glossary, Accessed on01/03/2021athttps://www.iea.org/reports/unit-converter-and-glossary#energy-units

Construction aggregate EF Transport Authorities Greenhouse Group, Feb 2013, Greenhouse Gas AssessmentWorkbookforRoadProjects.

Metal recycling EF AusLCI, “recycling steel AU S.xlsx” and “recycling aluminium AU S.xlsx”, Downloadedon01/03/2021fromhttp://alcas.asn.au/AusLCI/index.php/Datasets

Page 32: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 32 of 35

MODELLED WASTE COMPOSITION

MATERIAL TYPE WEIGHT (T)

WEIGHT (% OF TOTAL)Masonry materials 15,835 5.3%

Metals 11,560 3.9%

Glass 13,090 4.4%

Asbestos 1,235 0.4%

Paints, resins, inks, organic sludges 11,505 3.8%

Mining 65 0.0%

Food organics 93,170 31.1%

Food-derivedhazardouswastes 130 0.0%

Garden organics 40,790 13.6%

Timber 8,720 2.9%

Other Organics 10,180 3.4%

Paper and cardboard 38,415 12.8%

Plastics 44,425 14.8%

Textiles, leather & rubber (excl. tyres) 9,710 3.2%

Tyres 1,040 0.3%

Total 299,870 100%

Page 33: East Rockingham Waste to Energy

SUSMET - ERWTE POC LCA PAGE 33 of 35

APPENDIX 3

Page 34: East Rockingham Waste to Energy

Susmet - ERWTE PoC LCA PAGE 34 of 35

TheteamforthisprojectwascomposedofDinesh Jayasuriya and Michael Terry from Susmet, and Dr Olubukola TokedefromDeakinUniversity.Dineshboretheresponsibilityforprojectdelivery,includingthedevelopingtheimpactmodelsandthisreport,withMichaelprovidingqualitycontrol reviewandOlubukolaconductingtheLCACriticalReview.

DINESH JAYASURIYADineshisthePrincipalEngineeratSusmetandhasnearlytwodecadesofprofessionalengineeringexperience.HespecialisesinSustainableEngineeringwithafocusoncorporate-levelreporting,monitoring and management of sustainability indicators and related reporting systems. Dinesh has a Bachelor of Electrical and Computer Systems Engineering and a Master of Public and International LawspecialisinginEnvironmentalLaw.HeisaccreditedbytheCleanEnergyRegulatorasanNGERAuditorandbytheDepartmentofIndustry,Science,EnergyandResourcesasaClimateActiveconsultant.Hehasalsoachievedmultiplecertificationsandaccreditationinsustainability and IT.

MICHAEL TERRYMichael is the Senior Energy Strategist & Solar Engineer at Susmet and has more than three decadesofprofessionalengineeringexperience.Hespecialisesinsustainabilitywithafocusondemand side management, energy procurement, corporate-level reporting and energy advisory. More recently he has added energy strategy and solar grid and hybrid alternatives to his skillset. Michael has a Master of Technology in Engineering & Management and an MBA specialising in Technology Management.

DR OLUBUKOLA (BUKKY) TOKEDEBukky is a Life Cycle Assessment Certified Professional (LCACP), a researcher in life cycle evaluation, and lectures in Construction Management at the School of Architecture & Built EnvironmentatDeakinUniversity.HisuniversityqualificationsincludeaPhDinEngineering and the Built Environment, a Master of Science in Construction Project Management, and Bachelor of Science in Civil Engineering. Bukky is the research lead for the cradle-to-cradle design and constructionfortheLIVE+SMARTlaboratoryatDeakinUniversityandhaspublishedscientificarticlesonlifecycleassessmentinhigh-impactinternationaljournals.