calgary.ca/16avenuenw | contact 311 Location map WEST SEGMENT M A I N S T R E E T S E G M E N T E A S T SE G M E N T Proposed road Proposed bridge 3 Road closures Lane count / direction Legend Existing bridge Existing pathway / sidewalk Existing bike route Transit stop Community places of interest Proposed pathway / sidewalk Proposed pedestrian bridge Proposed bike route Traffic signal Pedestrian beacon Roadway under construction (2021) Pathway / sidewalk under construction (2021) Bike lane under construction (2021) 16 AVE NW 16 AVE NW CROWCHILD TR 29 ST NW BOWNESS RD WEST CAMPUS BLVD UNIVERSITY DR MACKAY RD BOW RIVER PARKDALE ST. ANDREWS HEIGHTS UNIVERSITY HEIGHTS 37 ST NW 42 ST NW SHAGANAPPI TR BOWNESS RD MONTGOMERY 13 AVE NW St. Andrews Heights Community Centre Foothills Hospital Maria Montessori University School Foothills Academy FFCA High School Campus Tom Baker Cancer Centre St. Andrews Park McMahon Stadium Edworthy Park Calgary Cancer Centre 3 3 1 2 2 2 3 3 3 3 3 1 1 2 2 1 1 1 3 1 1 1 3 2 2 1 1 3 3 1 1 1 2 1 1 3 3 3 3 1 2 3 1 3 1 3 1 1 3 3 3 3 2 2 1 20 0 40 60 80 m Montgomery (Bowness Road) Main Streets Project Under Construction South Shaganappi Study (2018) Ultimate Plan Crowchild Trail Study (2017) Medium-term Plan What we heard in Phase 2: Explore Mobility and functionality • Enhance crosswalks and shorten crossings • Improve comfort for people who walk and wheel • Improve transit stops, encourage more transit use • More travel lanes, smooth traffic flow, reduce congestion • Add bus-only lanes or queue jumps to improve transit and traffic flow Social and healthy lifestyle • Add trees and greenery How the concept was refined Mobility and functionality Continuous multi-use pathway provided on north side of 16 Avenue N.W. Multi-use pathway extended north of 16 Avenue N.W. on east side of 29 Street N.W. New MAX Orange stations added near University Drive when new development starts on McMahon Stadium lands Separated cycle tracks added along Bowness Road Total of six lanes (three per direction) provided on 16 Avenue N.W. when interchange improvements are complete at Shaganappi Trail and Crowchild Trail When six lanes are provided on 16 Avenue N.W., there will be an opportunity to designate lanes for high occupancy vehicle (HOV) use, including transit Character and identity Enhanced gateway features provided at east entrance to Montgomery including a grand boulevard of large trees and Montgomery-specific wayfinding and banners Social and healthy lifestyle Roadside areas enhanced with naturalized, low-maintenance plantings 1 2 3 4 5 6 7 8 East Segment - Long-term Recommended Plan 1 1 1 2 3 3 5 6 7 8 4
Transcript

calgary.ca/16avenuenw | contact 311

Location mapWEST SEGMENT

MAIN STREET SEGMENT

EAST SEGMENT

Proposed road

Proposed bridge 3

Road closures

Lane count / direction

Legend

Existing bridge

Existing pathway / sidewalk

Existing bike route

Transit stop

Community places of interest

Proposed pathway / sidewalk

Proposed pedestrian bridge

Proposed bike route

Traffic signal

Pedestrian beacon

Roadway under construction (2021)

Pathway / sidewalk under construction (2021)

Bike lane under construction (2021)

16 AVE NW

16 AVE NW

CR

OW

CH

ILD

TR

29 S

T N

W

BOWNESS RD

WEST CAMPUS BLVD

UNIVERSITY DR

MAC

KAY

RD

BOW

RIVER

PARKDALE

ST. ANDREWSHEIGHTS

UNIVERSITYHEIGHTS

37 S

T N

W

42 ST NW

SHAG

ANAP

PI T

R

BOWNESS RD

MONTGOMERY

13 AVE NWSt. Andrews Heights

Community Centre

Foothills Hospital

MariaMontessori

University School

FoothillsAcademy

FFCA HighSchool Campus

Tom Baker Cancer Centre

St. Andrews Park

McMahon Stadium

EdworthyPark

Calgary Cancer Centre

3

3

1

2

2

2

3

3

3

33

1

1

2

2

1

1

1

3

1

1

1

3

2

2

1

13

31

1

1

21

1

3

3

33

1

2 3

1

3

1

3

1

1

3

3

3

3

2 2

1

200 40 60 80 m

Montgomery (Bowness Road)

Main Streets ProjectUnder Construction

South Shaganappi Study (2018) Ultimate Plan

Crowchild Trail Study (2017)Medium-term Plan

What we heard in Phase 2: ExploreMobility and functionality• Enhance crosswalks and shorten crossings• Improve comfort for people who walk and wheel• Improve transit stops, encourage more transit use• More travel lanes, smooth traffic flow, reduce congestion• Add bus-only lanes or queue jumps to improve transit and traffic flow

Social and healthy lifestyle• Add trees and greenery

How the concept was refined Mobility and functionality

Continuous multi-use pathway provided on north side of 16 Avenue N.W.

Multi-use pathway extended north of 16 Avenue N.W. on east side of 29 Street N.W.

New MAX Orange stations added near University Drive when new development starts on McMahon Stadium lands

Separated cycle tracks added along Bowness Road

Total of six lanes (three per direction) provided on 16 Avenue N.W. when interchange improvements are complete at Shaganappi Trail and Crowchild Trail

When six lanes are provided on 16 Avenue N.W., there will be an opportunity to designate lanes for high occupancy vehicle (HOV) use, including transit

Character and identityEnhanced gateway features provided at east entrance to Montgomery including a grand boulevard of large trees and Montgomery-specific wayfinding and banners

Social and healthy lifestyleRoadside areas enhanced with naturalized, low-maintenance plantings

1

2

3

4

5

6

7

8

East Segment - Long-term Recommended Plan

1

1

1

2

3

3

5

6

78

4

calgary.ca/16avenuenw | contact 311

Location mapWEST SEGMENT

MAIN STREET SEGMENT

EAST SEGMENT

Proposed road

Proposed bridge 3

Road closures

Lane count / direction

Legend

Existing bridge

Existing pathway / sidewalk

Existing bike route

Transit stop

Community places of interest

Proposed pathway / sidewalk

Proposed pedestrian bridge

Proposed bike route

Traffic signal

Pedestrian beacon

Roadway under construction (2021)

Pathway / sidewalk under construction (2021)

Bike lane under construction (2021)

16 AVE NW

16 AVE NW

29 S

T N

W

BOWNESS RD

WEST CAMPUS BLVD

UNIVERSITY DR

MAC

KAY

RD

BOW

RIVER

PARKDALE

ST. ANDREWSHEIGHTS

UNIVERSITYHEIGHTS

37 S

T N

W

42 ST NW

SHAG

ANAP

PI T

R

BOWNESS RD

CR

OW

CH

ILD

TR

MONTGOMERY

13 AVE NW

2

2

1

2

1

2

1

1

3

2

1

33

1

2

1

2

1

St. Andrews HeightsCommunity Centre

Foothills Hospital

MariaMontessori

University School

FoothillsAcademy

FFCA HighSchool Campus

Tom Baker Cancer Centre

St. Andrews Park

McMahon Stadium

EdworthyPark

Calgary Cancer Centre

200 40 60 80 m

Montgomery (Bowness Road)

Main Streets ProjectUnder Construction

South Shaganappi Study (2018) Short-term Plan

Banff Trail Area Improvements

Under Construction

East Segment - Medium-term Recommended Plan

How the Concept Was Refined Mobility and functionality

Continuous multi-use pathway provided on north side of 16 Avenue N.W.

Multi-use pathway extended south of 16 Avenue N.W. on east side of 29 Street N.W.

New pedestrian overpass added across 16 Avenue N.W. west of 29 Street N.W.

Improvments to Bowness Road include extended multi-use pathway to the Bow River

Multi-use pathway extended on east side of University Drive between McMahon Stadium and 13 Avenue N.W.

Character and identityEnhanced gateway features provided at east entrance to Montgomery including a grand boulevard of large trees and Montgomery-specific wayfinding and banners

Social and healthy lifestyleRoadside areas enhanced with naturalized, low-maintenance plantings

1

2

3

4

7

5

What we heard in Phase 2: ExploreMobility and functionality• Enhance crosswalks and shorten crossings• Improve comfort for people who walk and wheel• Improve transit stops, encourage more transit use

Social and healthy lifestyle• Add trees and greenery

6

67

4

1

1

1

3

2

5

calgary.ca/16avenuenw | contact 311

Location mapWEST SEGMENT

MAIN STREET SEGMENT

EAST SEGMENT

Proposed road

Proposed bridge 3

Road closures

Lane count / direction

Legend

Existing bridge

Existing pathway / sidewalk

Existing bike route

Transit stop

Community places of interest

Proposed pathway / sidewalk

Proposed pedestrian bridge

Proposed bike route

Traffic signal

Pedestrian beacon

Roadway under construction (2021)

Pathway / sidewalk under construction (2021)

Bike lane under construction (2021)

16 AVE NW

16 AVE NW

29 S

T N

W

BOWNESS RD

WEST CAMPUS BLVD

UNIVERSITY DR

MAC

KAY

RD

BOW

RIVER

PARKDALE

ST. ANDREWSHEIGHTS

UNIVERSITYHEIGHTS

37 S

T N

W

42 ST NW

SHAG

ANAP

PI T

R

BOWNESS RD

CR

OW

CH

ILD

TR

MONTGOMERY

13 AVE NW

2

1

33

1

211

2

1

St. Andrews HeightsCommunity Centre

Foothills Hospital

MariaMontessori

University School

FoothillsAcademy

FFCA HighSchool Campus

Tom Baker Cancer Centre

St. Andrews Park

McMahon Stadium

EdworthyPark

Calgary Cancer Centre

200 40 60 80 m

Montgomery (Bowness Road)

Main Streets ProjectUnder Construction

Banff Trail Area Improvements

Under Construction

East Segment - Short-term Recommended PlanImprovements moving forward in the short-term:

Multi-use crosswalks added at 16 Avenue N.W. and 29 Street N.W. so that people who wheel do not need to dismount

New MAX Orange station added in front of the Calgary Cancer Centre

Pathway connection on west side of 29 Street N.W. restored with completion of the Calgary Cancer Centre

Dual right turn signalized to manage merge from Bowness Road to westbound 16 Avenue N.W.

New ramp from southbound Shaganappi Trail to eastbound 16 Avenue N.W. to improve merge and minimize impacts to existing trees

50 km/h speed limit shifted further east past Bowness Road to provide lower speed approaches to new traffic signals and Montgomery

1

2

3

4

5

64 6

5

12

3


Recommended