calgary.ca/16avenuenw | contact 311
Location mapWEST SEGMENT
MAIN STREET SEGMENT
EAST SEGMENT
Proposed road
Proposed bridge 3
Road closures
Lane count / direction
Legend
Existing bridge
Existing pathway / sidewalk
Existing bike route
Transit stop
Community places of interest
Proposed pathway / sidewalk
Proposed pedestrian bridge
Proposed bike route
Traffic signal
Pedestrian beacon
Roadway under construction (2021)
Pathway / sidewalk under construction (2021)
Bike lane under construction (2021)
16 AVE NW
16 AVE NW
CR
OW
CH
ILD
TR
29 S
T N
W
BOWNESS RD
WEST CAMPUS BLVD
UNIVERSITY DR
MAC
KAY
RD
BOW
RIVER
PARKDALE
ST. ANDREWSHEIGHTS
UNIVERSITYHEIGHTS
37 S
T N
W
42 ST NW
SHAG
ANAP
PI T
R
BOWNESS RD
MONTGOMERY
13 AVE NWSt. Andrews Heights
Community Centre
Foothills Hospital
MariaMontessori
University School
FoothillsAcademy
FFCA HighSchool Campus
Tom Baker Cancer Centre
St. Andrews Park
McMahon Stadium
EdworthyPark
Calgary Cancer Centre
3
3
1
2
2
2
3
3
3
33
1
1
2
2
1
1
1
3
1
1
1
3
2
2
1
13
31
1
1
21
1
3
3
33
1
2 3
1
3
1
3
1
1
3
3
3
3
2 2
1
200 40 60 80 m
Montgomery (Bowness Road)
Main Streets ProjectUnder Construction
South Shaganappi Study (2018) Ultimate Plan
Crowchild Trail Study (2017)Medium-term Plan
What we heard in Phase 2: ExploreMobility and functionality• Enhance crosswalks and shorten crossings• Improve comfort for people who walk and wheel• Improve transit stops, encourage more transit use• More travel lanes, smooth traffic flow, reduce congestion• Add bus-only lanes or queue jumps to improve transit and traffic flow
Social and healthy lifestyle• Add trees and greenery
How the concept was refined Mobility and functionality
Continuous multi-use pathway provided on north side of 16 Avenue N.W.
Multi-use pathway extended north of 16 Avenue N.W. on east side of 29 Street N.W.
New MAX Orange stations added near University Drive when new development starts on McMahon Stadium lands
Separated cycle tracks added along Bowness Road
Total of six lanes (three per direction) provided on 16 Avenue N.W. when interchange improvements are complete at Shaganappi Trail and Crowchild Trail
When six lanes are provided on 16 Avenue N.W., there will be an opportunity to designate lanes for high occupancy vehicle (HOV) use, including transit
Character and identityEnhanced gateway features provided at east entrance to Montgomery including a grand boulevard of large trees and Montgomery-specific wayfinding and banners
Social and healthy lifestyleRoadside areas enhanced with naturalized, low-maintenance plantings
1
2
3
4
5
6
7
8
East Segment - Long-term Recommended Plan
1
1
1
2
3
3
5
6
78
4
calgary.ca/16avenuenw | contact 311
Location mapWEST SEGMENT
MAIN STREET SEGMENT
EAST SEGMENT
Proposed road
Proposed bridge 3
Road closures
Lane count / direction
Legend
Existing bridge
Existing pathway / sidewalk
Existing bike route
Transit stop
Community places of interest
Proposed pathway / sidewalk
Proposed pedestrian bridge
Proposed bike route
Traffic signal
Pedestrian beacon
Roadway under construction (2021)
Pathway / sidewalk under construction (2021)
Bike lane under construction (2021)
16 AVE NW
16 AVE NW
29 S
T N
W
BOWNESS RD
WEST CAMPUS BLVD
UNIVERSITY DR
MAC
KAY
RD
BOW
RIVER
PARKDALE
ST. ANDREWSHEIGHTS
UNIVERSITYHEIGHTS
37 S
T N
W
42 ST NW
SHAG
ANAP
PI T
R
BOWNESS RD
CR
OW
CH
ILD
TR
MONTGOMERY
13 AVE NW
2
2
1
2
1
2
1
1
3
2
1
33
1
2
1
2
1
St. Andrews HeightsCommunity Centre
Foothills Hospital
MariaMontessori
University School
FoothillsAcademy
FFCA HighSchool Campus
Tom Baker Cancer Centre
St. Andrews Park
McMahon Stadium
EdworthyPark
Calgary Cancer Centre
200 40 60 80 m
Montgomery (Bowness Road)
Main Streets ProjectUnder Construction
South Shaganappi Study (2018) Short-term Plan
Banff Trail Area Improvements
Under Construction
East Segment - Medium-term Recommended Plan
How the Concept Was Refined Mobility and functionality
Continuous multi-use pathway provided on north side of 16 Avenue N.W.
Multi-use pathway extended south of 16 Avenue N.W. on east side of 29 Street N.W.
New pedestrian overpass added across 16 Avenue N.W. west of 29 Street N.W.
Improvments to Bowness Road include extended multi-use pathway to the Bow River
Multi-use pathway extended on east side of University Drive between McMahon Stadium and 13 Avenue N.W.
Character and identityEnhanced gateway features provided at east entrance to Montgomery including a grand boulevard of large trees and Montgomery-specific wayfinding and banners
Social and healthy lifestyleRoadside areas enhanced with naturalized, low-maintenance plantings
1
2
3
4
7
5
What we heard in Phase 2: ExploreMobility and functionality• Enhance crosswalks and shorten crossings• Improve comfort for people who walk and wheel• Improve transit stops, encourage more transit use
Social and healthy lifestyle• Add trees and greenery
6
67
4
1
1
1
3
2
5
calgary.ca/16avenuenw | contact 311
Location mapWEST SEGMENT
MAIN STREET SEGMENT
EAST SEGMENT
Proposed road
Proposed bridge 3
Road closures
Lane count / direction
Legend
Existing bridge
Existing pathway / sidewalk
Existing bike route
Transit stop
Community places of interest
Proposed pathway / sidewalk
Proposed pedestrian bridge
Proposed bike route
Traffic signal
Pedestrian beacon
Roadway under construction (2021)
Pathway / sidewalk under construction (2021)
Bike lane under construction (2021)
16 AVE NW
16 AVE NW
29 S
T N
W
BOWNESS RD
WEST CAMPUS BLVD
UNIVERSITY DR
MAC
KAY
RD
BOW
RIVER
PARKDALE
ST. ANDREWSHEIGHTS
UNIVERSITYHEIGHTS
37 S
T N
W
42 ST NW
SHAG
ANAP
PI T
R
BOWNESS RD
CR
OW
CH
ILD
TR
MONTGOMERY
13 AVE NW
2
1
33
1
211
2
1
St. Andrews HeightsCommunity Centre
Foothills Hospital
MariaMontessori
University School
FoothillsAcademy
FFCA HighSchool Campus
Tom Baker Cancer Centre
St. Andrews Park
McMahon Stadium
EdworthyPark
Calgary Cancer Centre
200 40 60 80 m
Montgomery (Bowness Road)
Main Streets ProjectUnder Construction
Banff Trail Area Improvements
Under Construction
East Segment - Short-term Recommended PlanImprovements moving forward in the short-term:
Multi-use crosswalks added at 16 Avenue N.W. and 29 Street N.W. so that people who wheel do not need to dismount
New MAX Orange station added in front of the Calgary Cancer Centre
Pathway connection on west side of 29 Street N.W. restored with completion of the Calgary Cancer Centre
Dual right turn signalized to manage merge from Bowness Road to westbound 16 Avenue N.W.
New ramp from southbound Shaganappi Trail to eastbound 16 Avenue N.W. to improve merge and minimize impacts to existing trees
50 km/h speed limit shifted further east past Bowness Road to provide lower speed approaches to new traffic signals and Montgomery
1
2
3
4
5
64 6
5
12
3