+ All Categories
Home > Documents > EASTLINE VILLAGE - PHASE 1 - tempe.gov

EASTLINE VILLAGE - PHASE 1 - tempe.gov

Date post: 07-Jan-2022
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
14
GRADE 1188.90 TOP OF PARAPET BOTTOM OF ROOF A3 D3g D2c D2g F2a D9a D9a TOP OF ROOF D5b 3' - 2" 3' - 6 1/2" 10' - 5 1/2" 17' - 2" 54' - 6" GRADE 1188.90 TOP OF PARAPET BOTTOM OF ROOF D4c TOP OF ROOF MECH UNITS BEYOND 3' - 2" 3' - 6 1/2" 10' - 5 1/2" 17' - 2" D3g D2c F2a D2e B3b A3 B2b B2b B3b WALL SCONCE, TYP. B3b B2b REMOVEABLE PLANTERS 10'-5 1/2" 14'-0" 17'-2" 30' - 6 1/2" GRADE 1188.90 TOP OF PARAPET BOTTOM OF ROOF D2g A3 B3b TOP OF ROOF B2b F2a 10' - 5 1/2" 3' - 6 1/2" 3' - 2" 17' - 2" D3g D2c F2a D2g D2e 10'-5 1/2" 14'-0" 17'-2" 20' - 8 1/2" 9' - 11" 29' - 11" GRADE 1188.90 TOP OF PARAPET BOTTOM OF ROOF D2c D5b D2g D2g D2g D7c D2e D4c D2g B3b TOP OF ROOF D2c ADDRESS 17' - 2" 10' - 6" 3' - 6 1/2" 3' - 2" B2b D2g F2a F2a F2a D2g C1 B2b D4c 67' - 9" GRADE 1188.90 TOP OF PARAPET BOTTOM OF ROOF 137 SF MENS 815 SF GREAT ROOM 6 A 3.1C 8' - 5 1/2" TOP OF ROOF 3' - 2" 3' - 6 1/2" 10' - 5 1/2" 17' - 2" MECH UNITS 10'-5 1/2" 14'-0" 17'-2" GRADE 1188.90 TOP OF PARAPET BOTTOM OF ROOF 5 A 3.1C TOP OF ROOF 815 SF GREAT ROOM 10' - 5 1/2" 3' - 6 1/2" 3' - 2" 17' - 2" 10'-5 1/2" 14'-0" 17'-2" AM1 JL EASTLINE VILLAGE - PHASE 1 2025 E. APACHE BLVD, TEMPE, ARIZONA DPR #3 Sheet Number: Drawn By: Date: Scale: Issued For Bidding And Filing: Issued For Construction: Submittals: DPR #1 SUBMITTAL 07.29.19 DPR #2 SUBMITTAL 11.25.19 DPR #3 SUBMITTAL 01.06.20 01.21.20 --/--/-- --/--/-- 01.21.20 Sheet Title: w: opticosdesign.com Opticos Design, Inc. 2100 Milvia Street Suite 125 Berkeley, CA 94706 p: 510.558.6957 f: 510.898.0801 AM1 L|M Design Studio 0 8 16 FT As indicated A 3.1C COLOR ELEVATIONS AND SECTIONS BUILDING AM1 1/8" = 1'-0" A 3.1C 2 AM1 - SOUTH ELEVATION 1/8" = 1'-0" A 3.1C 3 AM1 - WEST ELEVATION 1/8" = 1'-0" A 3.1C 4 AM1 - EAST ELEVATION 1/8" = 1'-0" A 3.1C 1 AM1 - PASEO NORTH ELEVATION 1/8" = 1'-0" A 3.1C 5 AM1 - CROSS SECTION THROUGH GREAT ROOM 1/8" = 1'-0" A 3.1C 6 AM1 - LONGITUNDINAL SECTION MATERIAL / COLOR SCHEDULE A3 STUCCO - TBD - FINE SAND, PAINTED - BM SPANISH RED 1301 B2b ALUMINUM - ARCADIA - ANODIZED - MEDIUM BRONZE C1 WOOD SOFFIT - CLEAR CEDAR - STAINED - CEDAR FIR D5b STANDING SEAM ROOFING - ENGLERT - FACTORY FINISH - SLATE GREY D7c STEEL PLATE PANEL - MILL FINISH - CLEAR SEALED D9a HOLLOW METAL DOOR AND FRAME - PAINTED - BM SPANISH RED 1301 ID - MATERIAL – MANUFACTURER - FINISH - COLOR F2a CONCRETE BLOCK - ORCO - BURNISH - NUFAD MW D4c STEEL LOUVERED SCREEN - MILL FINISH - CLEAR SEALED XX MATERIAL D2c STEEL FLAT BAR - MILL FINISH - CLEAR SEALED D2e STEEL C-SHAPE - MILL FINISH - CLEAR SEALED D2g STEEL I-SHAPE - MILL FINISH - CLEAR SEALED D2i STEEL T-SHAPE - MILL FINISH - CLEAR SEALED D3g CORRUGATED METAL PANEL - AMERICAN BUILDING COMPONENTS - FACTORY FINISH - COAL BLACK B3b ALUMINUM ENTRANCE - ARCADIA - ANODIZED - MEDIUM BRONZE 1. BM = BENJAMIN MOORE PAINTS. 2. ALL GLAZING IS DOUBLE PANED, CLEAR GLASS UNLESS OTHERWISE NOTED. GENERAL MATERIAL NOTES ATTACHMENT 80
Transcript

GRADE1188.90

TOP OF PARAPET

BOTTOM OF ROOF

A3

D3gD2c D2g

F2aD9aD9a

TOP OF ROOF

D5b

3' -

2"3'

- 6

1/2"

10' -

5 1

/2" 17

' - 2

"

54' - 6"

GRADE1188.90

TOP OF PARAPET

BOTTOM OF ROOF

D4c

TOP OF ROOF

MECH UNITSBEYOND

3' -

2"3'

- 6

1/2"

10' -

5 1

/2" 17

' - 2

"

D3gD2c F2a D2e

B3b A3

B2bB2b

B3b

WALLSCONCE,TYP.

B3b B2b

REMOVEABLEPLANTERS

10'-5 1/2"

14'-0"

17'-2"

30' - 6 1/2"

GRADE1188.90

TOP OF PARAPET

BOTTOM OF ROOF

D2gA3

B3b

TOP OF ROOF

B2b

F2a

10' -

5 1

/2"

3' -

6 1/

2"3'

- 2"

17' -

2"

D3g D2c

F2a

D2g

D2e

10'-5 1/2"

14'-0"

17'-2"

20' - 8 1/2"9' - 11"

29' - 11"

GRADE1188.90

TOP OF PARAPET

BOTTOM OF ROOF

D2cD5bD2gD2gD2g

D7c D2e D4cD2g B3b

TOP OF ROOF

D2c

ADDRESS

17' -

2"

10' -

6"

3' -

6 1/

2" 3' -

2"

B2b D2gF2aF2a F2a

D2gC1B2b D4c

67' - 9"

GRADE1188.90

TOP OF PARAPET

BOTTOM OF ROOF

137 SFMENS815 SF

GREAT ROOM

6A 3.1C

8' -

5 1/

2"

TOP OF ROOF

3' -

2"3'

- 6

1/2"

10' -

5 1

/2" 17

' - 2

"

MECHUNITS

10'-5 1/2"

14'-0"

17'-2"

GRADE1188.90

TOP OF PARAPET

BOTTOM OF ROOF

5A 3.1C

TOP OF ROOF

815 SFGREAT ROOM

10' -

5 1

/2"

3' -

6 1/

2"3'

- 2"

17' -

2"10'-5 1/2"

14'-0"

17'-2"

AM1

JL

EAST

LINE

VILL

AGE

- PHA

SE 1

2025

E. A

PACH

E BL

VD, T

EMPE

, ARI

ZONA

DPR

#3

Sheet Number:Drawn By:

Date:

Scale:

Issued For Bidding And Filing:

Issued For Construction:

Submittals:DPR #1 SUBMITTAL 07.29.19DPR #2 SUBMITTAL 11.25.19DPR #3 SUBMITTAL 01.06.20

01.21.20

--/--/--

--/--/--

01.21.20

Sheet Title:

w: opt icosdesign.com

Opticos Design, Inc.2100 Milvia StreetSuite 125Berkeley, CA94706p: 510.558.6957

f: 510.898.0801

AM1

L | MD e s i g nS t u d i o

0 8 16 FT

As indicatedA 3.1C

COLOR ELEVATIONS ANDSECTIONS

BUILDING AM1

1/8" = 1'-0"A 3.1C2 AM1 - SOUTH ELEVATION

1/8" = 1'-0"A 3.1C3 AM1 - WEST ELEVATION

1/8" = 1'-0"A 3.1C4 AM1 - EAST ELEVATION

1/8" = 1'-0"A 3.1C1 AM1 - PASEO NORTH ELEVATION

1/8" = 1'-0"A 3.1C5 AM1 - CROSS SECTION THROUGH GREAT ROOM 1/8" = 1'-0"A 3.1C

6 AM1 - LONGITUNDINAL SECTION

MATERIAL / COLOR SCHEDULE

A3 STUCCO - TBD - FINE SAND, PAINTED - BM SPANISH RED 1301

B2b ALUMINUM - ARCADIA - ANODIZED - MEDIUM BRONZE

C1 WOOD SOFFIT - CLEAR CEDAR - STAINED - CEDAR FIR

D5b STANDING SEAM ROOFING - ENGLERT - FACTORY FINISH - SLATE GREY

D7c STEEL PLATE PANEL - MILL FINISH - CLEAR SEALED

D9a HOLLOW METAL DOOR AND FRAME - PAINTED - BM SPANISH RED 1301

ID - MATERIAL – MANUFACTURER - FINISH - COLOR

F2a CONCRETE BLOCK - ORCO - BURNISH - NUFAD MW

D4c STEEL LOUVERED SCREEN - MILL FINISH - CLEAR SEALED

XXX

XX MATERIAL

D2c STEEL FLAT BAR - MILL FINISH - CLEAR SEALED

D2e STEEL C-SHAPE - MILL FINISH - CLEAR SEALED

D2g STEEL I-SHAPE - MILL FINISH - CLEAR SEALED

D2i STEEL T-SHAPE - MILL FINISH - CLEAR SEALED

D3g CORRUGATED METAL PANEL - AMERICAN BUILDINGCOMPONENTS - FACTORY FINISH - COAL BLACK

B3b ALUMINUM ENTRANCE - ARCADIA - ANODIZED - MEDIUM BRONZE 1. BM = BENJAMIN MOORE PAINTS.

2. ALL GLAZING IS DOUBLE PANED, CLEARGLASS UNLESS OTHERWISENOTED.

GENERAL MATERIAL NOTES

ATTACHMENT 80

ATTACHMENT 81

N

A 3.14

A 3.12

A 3.13

-

1 2 3 4 5 6

A

B

C

D

6' - 0" 10' - 0" 10' - 0" 10' - 0" 6' - 0"

10' -

0"

10' -

0"

10' -

0"

815 SFGREAT ROOM

137 SFMENS

137 SFWOMENS

20' -

0"

5A 3.1

6A 3.1

FIXED SCREEN

LOW CONCRETE WALL

A 3.11

19' -

4 1

/2"

11' - 0"17' - 0"

4' -

9"4'

- 9"

10' X 4' 3" 5' 6" X 4' 3"

9' 5" X 14' 6" 9' 5" X 14' 6"STORAGE MECH

42' - 0"

20' -

0"

5' -

4"

LOW CABINETRY

REMOVEABLEPLANTERS

OUTDOORPATIO

87 SFKITCHENETTE

42 SF 24 SF

OVERHEADROLLING DOOR

19' 4-1/2" X 41' 6"

18' - 2" 9' - 3"

30' -

0"

70' - 0"

--

-

-

-

10' -

0"

OUTDOORPATIO

8' - 0"

11' - 5"4' - 3"

6' -

3"6'

- 3"

3' -

8 1/

2"3'

- 8

1/2"

A 3.14

A 3.12

A 3.13

-

1 2 3 4 5 6

A

B

C

D

6' - 0" 10' - 0" 10' - 0" 10' - 0" 6' - 0"

5A 3.1

6A 3.1

10' -

0"

10' -

0"

10' -

0"

A 3.11

-

--

-

-

--

46' - 10" 8' - 7"14' - 7"

29' -

11"

AM1

JL

EAST

LINE

VILL

AGE

- PHA

SE 1

2025

E. A

PACH

E BL

VD, T

EMPE

, ARI

ZONA

DPR

#3

Sheet Number:Drawn By:

Date:

Scale:

Issued For Bidding And Filing:

Issued For Construction:

Submittals:DPR #1 SUBMITTAL 07.29.19DPR #2 SUBMITTAL 11.25.19DPR #3 SUBMITTAL 01.06.20

01.21.20

--/--/--

--/--/--

01.21.20

Sheet Title:

w: opt icosdesign.com

Opticos Design, Inc.2100 Milvia StreetSuite 125Berkeley, CA94706p: 510.558.6957

f: 510.898.0801

AM1

L | MD e s i g nS t u d i o

0 8 16 FT

As indicatedA 2.1

FLOOR PLANSBUILDING AM1

1/8" = 1'-0"A 2.12 AM1 - FIRST FLOOR PLAN

1/8" = 1'-0"A 2.11 AM1 - ROOF PLAN

KEY PLAN

GENERAL NOTES1. SEE LANDSCAPE PLANL1.0 FOR EXTERIOR HARDSCAPE2. SEE LIGHTING PLAN

AM1 BUILDING:1426 GROSS SQUARE FOOTAGE1289 NET SQUARE FOOTAGEOUTDOOR PATIOS: 530 SQUARE FEETBUILDING COVERAGE: 2393 GROSS SQUARE FEET

ATTACHMENT 82

ATTACHMENT 83

ATTACHMENT 84

ATTACHMENT 85

ATTACHMENT 86

ATTACHMENT 87

ATTACHMENT 88

ATTACHMENT 89

ATTACHMENT 90

ATTACHMENT 91

ATTACHMENT 92

ATTACHMENT 93


Recommended