Roland Cross Technology Project Consultant, Leeds Metropolitan University
Data Centre Efficiency
• 9 month project• Funded by Joint Information Systems Committee
(JISC)• Sponsored and led by IT Director• Mixed project team – Professor of Mobile & Converging Technologies– Senior Infrastructure Consultant– Engineering Systems Engineer– Technology Project Consultant
What is Data centre Efficiency?
Survey
Data Centre Power Metering
Before
After
Power Metering Employed
EGX300 – acts as web server for metering information Power Meter Series 700
What are we going to measure?
Changes to Power Usage Effectiveness caused by:
• Data centre temperature rises
• Virtualisation
• Installation of ‘hot aisle – cold aisle’ regime