EC TITLE: Surge Tank Clarifications PROJECT: 3 Kings Water Treatment Plant EC NO.: 38 DATE: 7/17/2020 STATUS: Acknowledged SECTION 1: BY CONTRACTOR QUESTION: The selected surge tank vendor (PULSCO) provided an email on Jun 12, 2020, regarding the height of the surge tanks. After discussions with the vendor related to tank size and I&C components the changes provided in this clarification will provide consistency with the surge tanks that were provided at Quinns Junction and clarify the physical size of the tanks. DRAWING NO.: 060-N-50003 INSTRUMENTATION AND CONTROL - BACKWASH WASTE POLYMER FEED SYSTEM POTENTIAL COST IMPACT: SPECIFICATION SECTION: 33 12 17.01Surge Control System POTENTIAL SCHEDULE IMPACT: PROPOSED SOLUTION: See attached markups to specification and tank datasheets. COMMENTS: INITIATOR: Menk, Sean/SLC PRIORITY: Normal REQUESTED RESPONSE DATE: 7/31/2020 SECTION 2: BY REVIEWER RESPONSE: COMMENTS: REVIEWED BY: Sam Conant REVIEWED DATE: 7/29/2020 ENGINEERING CLARIFICATION VPO® by Simplex Group Printed Date: 8/11/2020
Transcript
  • EC TITLE: Surge Tank ClarificationsPROJECT: 3 Kings Water Treatment Plant

    EC NO.: 38DATE: 7/17/2020STATUS: Acknowledged

    SECTION 1: BY CONTRACTOR

    QUESTION:

    The selected surge tank vendor (PULSCO) provided an email on Jun 12, 2020, regarding the height of the surge tanks. Afterdiscussions with the vendor related to tank size and I&C components the changes provided in this clarification will provideconsistency with the surge tanks that were provided at Quinns Junction and clarify the physical size of the tanks.

    DRAWING NO.: 060-N-50003 INSTRUMENTATION ANDCONTROL - BACKWASH WASTE POLYMER FEED SYSTEM

    POTENTIAL COST IMPACT:

    SPECIFICATION SECTION: 33 12 17.01Surge Control System POTENTIAL SCHEDULE IMPACT:

    PROPOSED SOLUTION:

    See attached markups to specification and tank datasheets.

    COMMENTS:

    INITIATOR: Menk, Sean/SLC

    PRIORITY: NormalREQUESTED RESPONSE DATE: 7/31/2020

    SECTION 2: BY REVIEWER

    RESPONSE:

    COMMENTS:

    REVIEWED BY: Sam Conant REVIEWED DATE: 7/29/2020

    ENGINEERING CLARIFICATION

    VPO® by Simplex Group Printed Date: 8/11/2020

  • DIGITALLY SIGNED:

    02/10/2020

    dthoma10Snapshot

    RASMUSM1Cloud

    RASMUSM1Text Box1

    jzallaText Box 1 04/27/2020 ENGINEERING CLARIFICATION #16 DT JZ

    smenkSnapshot

    smenkPolygon

    smenkPolygon

    smenkText Box400-138-04

    smenkSnapshot

    smenkPolygon

    smenkText Box400-140-04

    smenkText Box 2 07/17/2020 ENGINEERING CLARIFICATION #38 DT JZ

    smenkCloud

    smenkCloud

    smenkText Box2

    smenkText Box2

  • 3KINGS WTF PHASE III DESIGN

    PW/DEN003/694342 SURGE CONTROL SYSTEM FEBRUARY 10, 2020 33 12 17.01 - 1 ©COPYRIGHT 2020 JACOBS

    SECTION 33 12 17.01 SURGE CONTROL SYSTEM

    PART 1 GENERAL

    1.01 REFERENCES

    A. The following is a list of standards which may be referenced in this section:

    1. American Society of Mechanical Engineers (ASME): a. B16.5, Pipe Flanges and Flanged Fittings. b. B16.11, Forged Steel Fittings, Socket-Welding and Threaded.

    2. National Electrical Manufacturers Association (NEMA): ICS 1, General Standards for Industrial Control and Systems.

    3. Steel Structures Painting Council (SSPC): a. SP 6, Commercial Blast Cleaning. b. SP 10, Near-White Blast Cleaning.

    1.02 SUBMITTALS

    A. Action Submittals: Shop Drawings:

    1. Complete dimensional fabrication drawings of surge tank, surge tank control panel, equipment, accessories, supports, connections, outlets, and all related piping.

    2. Complete electrical elementary diagrams and electrical interconnection diagrams for bladder integrity monitoring system. Diagrams in accordance with NEMA ICS 1.

    B. Informational Submittals:

    1. Manufacturer’s Certificate of Compliance, in accordance with Section 01 61 00, Common Product Requirements, that tank is certified and stamped in accordance with ASME Section VIII, Division 1.

    2. Seismic anchorage and bracing calculations as required by Section 01 88 15, Anchorage and Bracing.

    3. Manufacturer’s Certificate of Proper Installation, in accordance with Section 01 43 33, Manufacturers’ Field Services.

    4. Tank manufacturer’s written instructions.

  • 3KINGS WTF PHASE III DESIGN

    SURGE CONTROL SYSTEM PW/DEN003/694342 33 12 17.01 - 2 FEBRUARY 10, 2020 ©COPYRIGHT 2020 JACOBS

    5. Test Reports: a. Date and time of testing. b. Description of method of testing, including pumping

    combinations and pressure records. c. Description of observed leaks and method and date of repair. d. Description of catastrophic failures.

    6. Operation and Maintenance Manual and Maintenance Summary: Provide an Operation and Maintenance Manual and Maintenance Summary in conformance with the requirements of Bid Package 1 - Section 01 78 23, Operation and Maintenance Data.

    1.03 QUALIFICATIONS

    A. Statement of Qualification: Tank welders must be ASME certified.

    PART 2 PRODUCTS

    2.01 SURGE TANK

    A. Materials for tank, design, shop fabrication and inspection shall comply with ASME Boiler and Pressure Vessel Code, Section VIII, Division 1, with only the plate steels in Table UCS-23 of said code being used. Provide ASME code stamp, National Board Registration number and pressure rating on tank.

    B. Physical Data:

    1. Vertical, inverted bladder-type vessel suitable for use with raw water, for Surge Tank TNK-400-138-01.

    2. Vertical, inverted bladder-type vessel suitable for use with potable water, for Surge Tank TNK-400-023-02.

    3. Vertical, bladder-type vessel suitable for use with potable water. Surge tank bladder and manufacturing facility shall be NFS-61 approved for potable water and listed with NFS.

    4. Size of the surge bladder tank shall be based on the hydraulic analysis performed by the tank manufacturer. Minimum volume, diameter and height required as specified in the Tank Data sheets at the end of this section.

    5. Minimum design pressure as specified in the Tank Data sheets at the end of this section.

    C. Structural Design and Supports shall include the tank, supports, and anchor bolts shall be designed based upon local building codes in addition to the following criteria:

  • 3KINGS WTF PHASE III DESIGN

    PW/DEN003/694342 SURGE CONTROL SYSTEM FEBRUARY 10, 2020 33 12 17.01 - 3 ©COPYRIGHT 2020 JACOBS

    1. Design for hydrostatic operating pressure and test pressure with no reactive load permitted through the inlet/outlet piping as specified in the Tank Data Sheets at the end of this section.

    2. Seismic Design Parameters to conform to the current IBC (if necessary and required by design engineer).

    D. Attachments:

    1. Manways: a. One minimum, design and fabricate in accordance with ASME

    Boiler and Pressure Vessel Code, Section VIII, Article D10. b. Minimum Diameter: 16 inches. c. Removable top or end to allow for inspection and maintenance of

    the bladder. d. Include davit arm to support manway lid when unbolted from

    surge tank. 2. Nozzles:

    a. As shown and in accordance with ASME Code, Section VIII, Article D6.

    b. As specified in the Tank Data Sheets at the end of this section.

    E. Instrumentation:

    1. Surge tank vendor shall provide all instruments described within this specification and shall be compatible with surge tanks provided.

    2. Instrumentation shall conform to additional requirements specified in 40 90 00 Instrumentation and Control.

    F. Lifting Lugs: Provide suitably attached for equipment assemblies and components weighing over 100 pounds.

    G. Equipment Identification Plates: An engraved Gravoply laminated identification plate shall be securely mounted on the equipment in a readily visible location. The plate shall bear the 1/4-inch minimum identification number indicated on Drawings..

    H. Anchor Bolts: Type 316 stainless steel, sized by equipment manufacturer, 1/2-inch minimum diameter, and as specified in Section 05 50 00, Metal Fabrications. Coat in accordance with Section 09 90 00, Painting and Coating.

    2.02 FABRICATION

    A. Fabricate tank in accordance with ASME Boiler and Pressure Vessel Code, Section VIII. Stamp and certify tank in accordance with ASME Code Section VIII, Division 1.

  • 3KINGS WTF PHASE III DESIGN

    SURGE CONTROL SYSTEM PW/DEN003/694342 33 12 17.01 - 4 FEBRUARY 10, 2020 ©COPYRIGHT 2020 JACOBS

    B. Construct tank shell of deep drawn carbon steel sub-arc welded domes and side shells with double welded seams. Tank/Vessels shall be fabricated by listed manufacturer, not contracted out.

    C. Weld the support legs to the tank. Secure tank by attaching support legs (four minimum) to a concrete floor or slab. Material of construction shall comply with ASTM A 36 or ASTM A 285, Grade C.

    D. Bladder tank shall be National Board approved with Liquid Relief Valve set at tank design pressure. Bladders and replacement bladders shall be manufactured in the tank manufacturers’ plant. Bladder shall be sized to conform to the inner shape of the vessel. Bladder tank, fabricated with a food grade, heavy duty butyl rubber bladder, shall be of vertical configuration.

    E. Precharge pressure will be located between the shell and the bladder. Provide a 1/2-inch threaded connection at the top of the tank to contain a gas charging valve and pressure gauge.

    F. Valves: Tank shall be designed to function properly with the specific valves, including but not limited to plug valves and check valves, submitted by the Contractor. Acceptance of these valves shall be clearly stated in the surge tank submittal.

    G. Plate Thicknesses: Determine in accordance with allowable stresses listed in the Code for material, pressure, and temperature specified.

    H. Heads: As specified in ASME Code, Section VIII, Division 1.

    I. Shell and Head Thicknesses: Include minimum corrosion allowance of 0.125 inch.

    J. Painting and Coating: All painting and coating shall be completed at the factory. Field painting and coating will not be accepted.

    1. Interior (submerged) Surface Treatment: Tank interior shall be painted with an NSF 61 epoxy paint with a uniform layer thickness of no less than 6 mils. Clean and paint in accordance with Section 09 90 00, Painting and Coating.

    2. Exterior Surface Treatment: Tank exterior shall be painted with an anti-corrosion polyurethane and shall have a uniform layer with a minimum thickness of 10 mils. Clean and paint in accordance with Section 09 90 00, Painting and Coating.

  • 3KINGS WTF PHASE III DESIGN

    PW/DEN003/694342 SURGE CONTROL SYSTEM FEBRUARY 10, 2020 33 12 17.01 - 5 ©COPYRIGHT 2020 JACOBS

    2.03 SOURCE QUALITY CONTROL

    A. Perform hydrostatic testing in shop. Test pressure shall be 150 percent of the design pressure of the tank for at least 24 hours.

    B. Repair leaks found during testing prior to painting.

    PART 3 EXECUTION

    3.01 INSTALLATION

    A. Install tank in accordance with manufacturer’s written instructions.

    B. The surge tank manufacturer shall verify the performance of the surge protection equipment provided, by recording surge pressures following a pump trip, furnish an updated and calibrated surge model of the installed conditions and summarize the results in a written document.

    C. The surge tank vendor shall provide all equipment needed to record the field data during field testing. The surge tank vendor shall provide all equipment needed to record the field data during a pump trip. The pressure shall be recorded with a pressure transducer capable of recording the surge pressures at a sample rate of 1,000 recordings per second. Transducers and measurement software are not permanently installed and are to be provided by the manufacturer for testing only.

    D. Level tank and grout support legs as specified in Section 03 62 00, Grouting, before anchoring.

    E. Assemble Accessories: Make process, control, and electrical connections.

    F. Make piping connections such that misalignment stresses are not induced in tank nozzles.

    3.02 FIELD QUALITY CONTROL

    A. Field Hydrostatic Test:

    1. Hydrostatically test installed surge control tank for 4 hours minimum at 1.3 times design pressure, before dynamic testing.

    2. Repair leaks detected during testing. Retest until no leakage is detected.

  • 3KINGS WTF PHASE III DESIGN

    SURGE CONTROL SYSTEM PW/DEN003/694342 33 12 17.01 - 6 FEBRUARY 10, 2020 ©COPYRIGHT 2020 JACOBS

    B. Test Preparation:

    1. Perform test preparation and inspections prior to functional and performance testing.

    2. Inspect existing and new piping, branches, connections, nipples, valves, tapping bosses, associated instruments, and all other components for deficiency, damage and inadequate rated pressure.

    3. If any component is damaged, rated less than tank design pressure, or not restrained, notify Engineer and do not perform functional test.

    C. Functional and Performance Test:

    1. Contractor shall submit test schedule a minimum of 4 weeks prior to commencement. Tests shall not commence on weekends or holidays.

    2. Inspect and test all components for alignment, connection, operation, and performance.

    3. System Supplier shall test level control system for all functions. 4. At least 30 minutes shall be allowed between each pump start to prevent

    overheating of the pump motor. 5. Dynamic Test: Perform in response to flow startup and stoppage. 6. Testing with Multiple Pumps: Increase number of pumps, one at a time. 7. Record steady state flow prior to flow stoppage. 8. Record dynamic pressures and surge tank level for each test. 9. System Supplier shall provide suitable test equipment to electronically

    log surge tank pressure in 0.5-second increments (maximum) for the duration of each dynamic test. Pressure transducers shall have calibration certificates dated no earlier than 30 days prior to test date, and be accurate to within 0.5 percent.

    10. Functional Test Report: a. Contractor shall submit complete written report and electronic

    data file of all tests performed within 10 days after test completion. Reports shall include: 1) Date and time of all testing. 2) Description of method of testing including pumping

    combinations, pressure records, etc. 3) Description of any failures or repairs. 4) Signature of System Supplier, Contractor, and test

    equipment operator. 5) Electronic file on compact disc (CD) media containing

    pressure versus time data of all tests. Data file shall be in Microsoft Excel format, or approved equivalent.

  • 3KINGS WTF PHASE III DESIGN

    PW/DEN003/694342 SURGE CONTROL SYSTEM FEBRUARY 10, 2020 33 12 17.01 - 7 ©COPYRIGHT 2020 JACOBS

    3.03 SUPPLEMENTS

    A. The supplements listed below, following “End of Section” are a part of this specification.

    1. Tank Data Sheets: a. TNK-400-138-01, Thaynes Surge Tank. b. TNK-400-023-02, Boothill Surge Tank. c. TNK 400-023-02 Tank Data Sheet. d. TNK 400-138-01 Tank Data Sheet.

    END OF SECTION

  • 3KINGS WTF PHASE III DESIGN

    PW/DEN003/694342 SURGE CONTROL SYSTEM FEBRUARY 10, 2020 33 12 17.01 SUPPLEMENT 1 - 1 ©COPYRIGHT 2020 JACOBS

    HYDROPNEUMATIC TANK DATA SHEET, 01

    Tag Number: TNK-400-138-01

    Tank Name: Thaynes Surge Tank

    Manufacturers and Product: (1) Charlatte America

    (2) Pulsco

    (3) Wessels Co.

    Physical Data:

    Type: Pre-charged Bladder

    Net Volume: 198 gallons (Minimum)

    Configuration: Vertical cylindrical shape with elliptical heads

    Diameter: 2.5 feet

    Sidewall Length: 4 feet

    Design Pressure: Rated for 175 psig (minimum)

    Design Temperature: 100 degrees F

    Nozzles:

    Sizes 2-1/2 Inches and Larger: 150 psi flanged, ASME B16.5

    Sizes 2 Inches and Smaller: 150 psi screwed, ASME B16.11

    Number and Type:

    One 8-inch inlet/outlet nozzle

    One 0.5-inch pressure relief nozzle

    Two level gauge nozzles

    One differential pressure instrument per manufacturer recommended size

    One level element per manufacturer recommended size

    One pressure sustaining valve per manufacturer recommended size

    Pressure Relief (Safety) Valve:

    In accordance with Boiler and Pressure Vessel Code, Section VIII, General Requirements, UG-125 and 126.

    smenkText BoxInstrumentation:

    smenkLine

    smenkText BoxOne pressure gauge for visual indication

    smenkText BoxOne pressure transmitter

    smenkArrow

    smenkText Boxfor level indication,

    smenkArrow

    smenkText Boxwith local digital display

    smenkArrow

    smenkCloud

    smenkText BoxEC#38

  • 3KINGS WTF PHASE III DESIGN

    SURGE CONTROL SYSTEM PW/DEN003/694342 33 12 17.01 SUPPLEMENT 1 - 2 FEBRUARY 10, 2020 ©COPYRIGHT 2020 JACOBS

    Set as recommended by Surge Tank Supplier

    Tank Support Legs: Four minimum sized to set inlet/outlet flange approximately 2 feet above base plates

    Level Gauges: One

  • 3KINGS WTF PHASE III DESIGN

    PW/DEN003/694342 SURGE CONTROL SYSTEM FEBRUARY 10, 2020 33 12 17.01 SUPPLEMENT 2 - 1 ©COPYRIGHT 2020 JACOBS

    HYDROPNEUMATIC TANK DATA SHEET, 02

    Tag Number: TNK-400-023-02

    Tank Name: Boothill Surge Tank

    Manufacturers and Product: (1) Charlatte America

    (2) Pulsco

    (3) Wessels Co.

    Physical Data:

    Type: Pre-charged Bladder

    Net Volume: 1,981 gallons (Minimum)

    Configuration: Vertical cylindrical shape with elliptical heads

    Diameter: 6 feet

    Sidewall Length: 7 feet

    Design Pressure: Rated for 75 psig (Minimum)

    Design Temperature: 100 degrees F

    Nozzles:

    Sizes 2-1/2 Inches and Larger: 150 psi flanged, ASME B16.5

    Sizes 2 Inches and Smaller: 150 psi screwed, ASME B16.11

    Number and Type:

    One 14-inch inlet/outlet nozzle

    One 0.5-inch pressure relief nozzle

    Two level gauge nozzles

    Two level gauge nozzles

    One differential pressure instrument per manufacturer recommended size

    One level element per manufacturer recommended size

    One pressure sustaining valve per manufacturer recommended size

    smenkLine

    smenkText Boxfor level indication,

    smenkArrow

    smenkLine

    smenkText BoxOne pressure gauge for visual indication

    smenkText BoxOne pressure transmitter

    smenkText Boxwith local digital display

    smenkArrow

    smenkText BoxInstrumentation:

    smenkCloud

    smenkText BoxEC#38

  • 3KINGS WTF PHASE III DESIGN

    SURGE CONTROL SYSTEM PW/DEN003/694342 33 12 17.01 SUPPLEMENT 2 - 2 FEBRUARY 10, 2020 ©COPYRIGHT 2020 JACOBS

    Pressure Relief (Safety) Valve:

    In accordance with Boiler and Pressure Vessel Code, Section VIII, General Requirements, UG-125 and 126

    Set as recommended by Surge Tank Supplier

    Tank Support Legs: Four minimum sized to set inlet/outlet flange approximately 3 feet above base plates

    Level Gauges: One

  • I

    TANK DATA SHEET

    APPLICABLE TO: □ PROPOSAL □ PURCHASE □ RECORD

    Information not specified to be supplied by vender as applicable

    315: "

    oo

    I I

    .i

    ' J_ '>-/ ' '✓ I•'--,!,/'

    /45°

    / N6

    N2

    NS 210° ---P _\¥ - --0 � ------ goo

    � \ / i''-/ I 10'-6"

    / 225°/

    , -r-' '

    ;' �� "'-./.._ I ' T

    N3 180°

    PLAN

    I>

    n != nn T

    I I

    2'-6" DIA

    - -

    - >-� t7

    � ......0 I

    � /

    Le 0 c=:::J _:.... c==>

    ELEVATION

    " ' 135°

    N2

    --

    0 ex:> I I

    � f...

    -�

    NOTE: NOZZLE LOCATIONS IN THE ELEVATION VIEW MAY

    BE ROTATED FOR DIMENSIONING.

    Item No. · TNK-400-138-01

    · 3KINGS WTP

    THAYNES SURGE TANK

    GENERAL INFORMATION

    Service · SURGE TANK Workina Caoacitv · 198 GAL/MIN Thickness Design Code · ASTM/ASME Roof · ELLIPTICAL Material · CARBON STEEL Shell · VERTICAL CYLINDER

    Bottom · ELLIPTICALCOATING EXTERNAL INTERNAL

    Surface Prep · SEE SPEC 09 90 00 · SEE SPEC 09 90 00 Primer · SEE SPEC 09 90 00 · SEE SPEC 09 90 00 Finish Coat · SEE SPEC 09 90 00 · SEE SPEC 09 90 00 Insulation Thk Material Claddina

    NOZZLE SCHEDULE

    MK Size/Tvoe Service Proiection Radial CL N1 . 8" · INLET/OUTLET · CENTERN2 · 16" · MANWAY · CENTERN3 · 0.5" NTP · GAS CHARGE VALVE WITH GAUGE · CENTERN4 · 2" FLG · DRAIN WITH BALL VAVLE . 270° NS · NOTE 5 · DIFF, PRESSURE INSTRUMENT . goo N6 · NOTE 5 · LEVEL ELEMENT . 45° N7 · NOTE 4 · LEVEL GAUGE NOZZLE · 90°(SIDE)NS N9 N10

    ACCESSORIES Level Indicator X Handrails On Lid Ladder □ Int □ Ext Ory Scrubber Unit Stairs Walkway Platform Clips □Anchor Lugs X Syphon Drain Sump Vortex Breaker Inlet Baffle Lifting Lugs X Thief Hatch Access Manway NOTE 2 X Down Comer □ Int □ ExtHeat Trace Insulate

    NOTES ---

    1. PROVIDE TANK LEGS PER DIMENSION SHOWN.

    2. ACCESS MANWAY SHALL HAVE A DAVIT ARM TO SUPPORT MANWAYAFTER REMOVAL.

    3. VALVE PROJECTION AS RECOMMENDED BY SURGE TANK SUPPLIER.

    4. LEVEL GAUGE NOZZLE SIZE PER MANUFACTURER RECOMMENDATION.

    5. PRESSURE AND LEVEL INSTRUMENT SIZING PER MANUFACTURER RECOMMENDATION.

    33 12 17.01 SUPPLEMENT 3 - 1

    smenkLine

    smenkText BoxN6

    smenkText BoxN6

    smenkLine

    smenkLine

    smenkText BoxN6

    smenkArrow

    smenkText Box9'-3"

    smenkText Box4'-8"

    smenkText BoxN6

    smenkLine

    smenkLine

    smenkLine

    smenkLine

    smenkCloud

    smenkText BoxEC#38

    smenkSnapshot

    smenkText Box5. PRESSURE AND LEVEL INSTRUMENT LOCATION AND SIZING PER MANUFACTURER.

  • I

    TANK DATA SHEET

    APPLICABLE TO: □ PROPOSAL □ PURCHASE □ RECORD

    315: "

    ' "

    27@f--

    N3 / 225°/

    N2

    ®\

    ®\ -

    -

    \ I---.

    Information not specified to be supplied by vender as applicable

    oo

    I

    -!� , N6

    - ' " /I "I I 1-0 ( '--,', \ \-- -- --+�---- goo

    , ''"' J � �/ N5

    "

    I , i

    "

    !' 135°

    Ii

    180°

    PLAN --

    N3

    - - ,r@I I

    --

    6'-0" DIAb

    I

    f...

    C") -I

    C") .....

    f-- -�

    l/ ---

    I 0�

    le' ""--�b C")

    -�

    ELEVATION

    NOTE: NOZZLE LOCATIONS IN THE ELEVATION VIEW MAY

    BE ROTATED FOR DIMENSIONING.

    Item No. · TNK-400-023-02

    · 3KINGS WTP

    BOOTHILL SURGE TANK

    GENERAL INFORMATION

    Service · SURGE TANK Workina Caoacitv · 1,981 GAL (MIN) Thickness Design Code · ASTM / ASME Roof · ELLIPTICAL Material · CARBON STEEL Shell · VERTICAL CYLINDER

    Bottom · ELLIPTICAL

    COATING EXTERNAL INTERNAL

    Surface Prep · SEE SPEC 09 90 00 · SEE SPEC 09 90 00 Primer · SEE SPEC 09 90 00 · SEE SPEC 09 90 00 Finish Coat · SEE SPEC 09 90 00 · SEE SPEC 09 90 00 Insulation Thk Material Claddina

    NOZZLE SCHEDULE

    MK Size/Tvoe Service Proiection Radial CL N1 · 14" FLG · INLET/OUTLET ·CENTER N2 · 16" FLG · MANWAY & DAVIT, NOTE 2 ·CENTERN3 · 0.5" NPT · GAS CHARGE VALVE WITH GAUGE ·CENTERN4 · 2" FLG · DRAIN WITH BALL VALVE · CENTER N5 NOTE 5 DIFF, PRESSURE INSTRUMENT goo N6 · NOTE 5 · LEVEL ELEMENT . 45°

    N7 · NOTE 4 · LEVEL GAUGE NOZZLE · SIDENB N9

    ACCESSORIES

    Level Indicator Handrails On Lid Ladder □ Int □ Ext Ory Scrubber Unit Stairs Walkway Platform Clips □Anchor Lugs X Syphon Drain Sump Vortex Breaker Inlet Baffle Lifting Lugs X Thief Hatch Access Manway NOTE2 X Down Comer □ Int □ ExtHeat Trace Insulate

    NOTES ---1. PROVIDE TANK LEGS PER DIMENSION SHOWN.

    2. ACCESS MANWAY SHALL HAVE A DAVIT ARM TO SUPPORT MANWAYAFTER REMOVAL.

    3. VALVE PROJECTION AS RECOMMENDED BY SURGE TANK SUPPLIER.

    4. LEVEL GAUGE NOZZLE SIZE PER MANUFACTURER RECOMMENDATION.

    X

    33 12 17.01 SUPPLEMENT 4 - 1

    smenkText Box7'-0

    smenkLine

    smenkText Box4'-6"

    smenkLine

    smenkText Box13'-10"

    smenkLine

    smenkLine

    smenkArrow

    smenkText BoxN6

    smenkText BoxN6

    smenkLine

    smenkText BoxN6

    smenkLine

    smenkLine

    smenkLine

    smenkHighlight

    smenkText BoxN6

    smenkLine

    smenkText BoxN4

    smenkCloud

    smenkText BoxEC#38

    smenkSnapshot

    smenkText Box5. PRESSURE AND LEVEL INSTRUMENT LOCATION AND SIZING PER MANUFACTURER.