Ecodesign in ORONA
ECODESIGN IN THE ORONA PRODUCT
To ensure compliance with ORONA's commitment to the environment, and taking the ISO 14006standard as reference, work has been performed on defining a procedure on the design and developmentof products which sets forth the system to be used to incorporate the environmental variable in each ofthe design and development phases. In 2007 the certification process for this management system wasstarted and in June 2008 ORONA became the first company in the Lift sector, throughout the world, tobe certified in Ecodesign.. .
As such, during the design phase, and by using ecoindicators, there is an exhaustive assessment of theproduct's environmental implications, correcting possible environmental gaps whilst always seeking anoverall improvement in the environmental impact, and taking into account the product's complete lifec y c l e . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . … … … … … … . .
.Through the environmental improvement of theproduct, we have also managed to optimise itsquality based on factors such as functionality,comfort, reliability, durability or the possibility ofrepair and modernisation.
… … … … … … … … … … … … … … … … … … … .
.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . … … … … … … . .Through the environmental improvement of theproduct, we have also managed to optimise itsquality based on factors such as functionality,comfort, reliability, durability or the possibility ofrepair and modernisation.
… … … … … … … … … … … … … … … … … … … . .
ECODESIGN IN THE ORONA PRODUCT
As a result of this commitment to the environment, the following ecoefficient lift models have been designed, as well as other Eco components and kits which contribute to obtaining maximum energy efficiency in Orona lifts:
•TECHNICAL SOLUTION ORONA 3G X15•TECHNICAL SOLUTION ORONA 3G X10•KIT – ORONA 3G SERIES DOMO AND PUBLIC CAR•KIT – COMPACT REGENERATIVE SYSTEM•KIT – G-02 COMPETITIVE MACHINE•KIT – ECO LIGHTING FLUORESCENTS•KIT – ECO LIGHTING LED PANELS•KIT – ECO LIGHTING MIXED•KIT – ECO LIGHTING LED SPOTLIGHTS
TECHNICAL SOLUTION ORONA 3G X15 AND TECHNICAL SOLUTION ORONA 3G X10
These are lift models without a machine room, with direct drive machine without reducer. …………………………………………………………These new models are indicative of a technological leap. Thanks to their innovative design, they achieve a reduction in energy consumption compared to a conventional 2-speed lift and also compared to a hydraulic lift of between 50% and 70% respectively. …………………………………………………………All of this has been achieved with reduced space requirements and a higher level of features and comfort.
KIT – ORONA 3G SERIES DOMO AND PUBLIC CAR
This is a new car generation which improves the conventional car model in various ways:
•New lighter car structure with a material saving of 5% compared with the conventional model
•Minimalist and modern aesthetics
•Energy saving during the use phase of 43% in start mode and 100% in standby mode, thanks to the efficient lighting system with the automatic switch off functionality.
… … … … … … … … … … … … … … … … … … … . .
KIT – ECO LIGHTING
Low consumption and long life efficient lighting solutions with the option of automatic switch off.
The innovative technology of these lighting systems allows obtaining an energy saving of between 35.5%-85% in the lift's start mode and zero energy consumption in standby mode compared to the conventional lighting system.
KIT – COMPACT REGENERATIVE SYSTEM
Compact and competitive regenerative system solution aimed at new lift facilities and existing lift facilities.
The compact regenerative system is designed to make maximum use of space and contributes to obtaining an energy saving of 24% in a conventional lift with standard resources.
KIT – G-02 COMPETITIVE MACHINE
New compact machine design with excellent features.
The innovative manufacturing process of the motor allows obtaining machine efficiency of more than 89% and a saving in the motor material of 34% for the magnet, 29% for steel and 22% for copper.
ECODESIGN IN THE ORONA PRODUCT
End-of-life handling of the ORONA ecodesigned product
Batteries
Electronic Boards
Other metalsCu, Al
Steel, ironand sheet metal
Oils
Plastics
Glass
Lighting
TECHNICAL SOLUTIONS ORONA 3G X15 AND ORONA 3G X10
LIFT END OF LIFE
When the lift's service life comes to an end ORONA will be responsible for its dismantling.
The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.
MaterialWaste/Recycled
Manager
Steel, iron and sheet metal R Authorised waste manager
Other metals: Cu, Al R Authorised waste manager
Plastics R Authorised waste manager
Wood R Authorised waste manager
Glass R Authorised waste manager
Oils (HW) D Authorised waste manager
Lighting (Fluorescents, LEDs) (HW)
D Authorised waste manager
Electronic boards (HW) D Authorised waste manager
Batteries (HW) D Authorised waste manager
KIT – ORONA 3G SERIES DOMO AND PUBLIC CAR
Wood
Steel, iron and sheet metal
Electronic boards
Other metals: Cu, Al
Plastic
Other metals: Cu, Al
Glass
Lighting
END OF LIFE OF THE KIT – ORONA 3G SERIES DOMO AND PUBLIC CAR
When the car's service life comes to an end ORONA will be responsible for its dismantling.
The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.
MaterialWaste/Recycled
Manager
Steel, iron and sheet metal R Authorised waste manager
Other metals: Cu, Al R Authorised waste manager
Plastics R Authorised waste manager
Wood R Authorised waste manager
Glass R Authorised waste manager
Lighting (Fluorescents, LEDs) (HW)
D Authorised waste manager
Electronic boards (HW) D Authorised waste manager
KIT – ECO LIGHTING FLUORESCENTS
Steel, iron and sheet metal
Other metals: Cu, Al Steel, iron and sheet
metal
Lighting
END OF LIFE OF THE KIT – ECO LIGHTING FLUORESCENTS
When the lighting system's service life comes to an end ORONA will be responsible for its dismantling.
The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.
MaterialWaste/Recycled
Manager
Steel, iron and sheet metal R Authorised waste manager
Other metals: Cu, Al R Authorised waste manager
Plastics R Authorised waste manager
Lighting (Fluorescents, LEDs) (HW)
D Authorised waste manager
KIT – ECO LIGHTING MIXED
Steel, iron and sheet metal
Plastics
Steel, iron and sheet metal
Lighting
END OF LIFE OF THE KIT – ECO LIGHTING MIXED
When the lighting system's service life comes to an end ORONA will be responsible for its dismantling.
The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.
MaterialWaste/Recycled
Manager
Steel, iron and sheet metal R Authorised waste manager
Plastics R Authorised waste manager
Lighting (Fluorescents, LEDs) (HW)
D Authorised waste manager
KIT – ECO LIGHTING LED PANELS
Steel, iron and sheet metal
Steel, iron and sheet metal
Lighting
END OF LIFE OF THE KIT – ECO LIGHTING LED PANELS
When the lighting system's service life comes to an end ORONA will be responsible for its dismantling.
The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.
MaterialWaste/Recycled
Manager
Steel, iron and sheet metal R Authorised waste manager
Plastics R Authorised waste manager
Lighting (Fluorescents, LEDs) (HW)
D Authorised waste manager
KIT – ECO LIGHTING LED SPOTLIGHTS
Steel, iron and sheet metal
Steel, iron and sheet metal
Lighting
END OF LIFE OF THE KIT – ECO LIGHTING LED SPOTLIGHTS
When the lighting system's service life comes to an end ORONA will be responsible for its dismantling.
The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.
MaterialWaste/Recycled
Manager
Steel, iron and sheet metal R Authorised waste manager
Plastics R Authorised waste manager
Lighting (Fluorescents, LEDs) (HW)
D Authorised waste manager
KIT – COMPACT REGENERATIVE SYSTEM
Electronic boards and plastics
Iron, Cu
Cu, iron and plastics
Aluminium
Cu and plastics
END OF LIFE OF THE KIT – COMPACT REGENERATIVE SYSTEM
When the regenerative system's service life comes to an end ORONA will be responsible for its dismantling.
The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.
MaterialWaste/Recycled
Manager
Iron R Authorised waste manager
Other metals: Cu, Al R Authorised waste manager
Plastics R Authorised waste manager
Electronic boards (HW) D Authorised waste manager
KIT – G-02 COMPETITIVE MACHINE
Cu, steel and magnets
END OF LIFE OF THE KIT – G-02 COMPETITIVE MACHINE
When the machine's service life comes to an end ORONA will be responsible for its dismantling.
The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.
MaterialWaste/Recycled
Manager
Steel. R Authorised waste manager
Other metals: Cu R Authorised waste manager
Magnets R Authorised waste manager
10
Alta eficiencia para edificios residenciales.Óptima ocupación del espacio y última tecnología de accionamiento directo (gearless).La solución a medida. Máxima flexibilidad con mayores prestaciones.
1015
Carga 320 a 1000 kg
Capacidad 4 a 13 personas
velocidad 1 - 1,6 m/s
Recorrido máximo 50 - 60 m
número máximo de paradas 16 - 21 paradas
Embarques Simple embarque / Doble embarque 1800
Sistema de accionamiento Eléctrico Directo
Maniobra Sistema de control ARCA ii, multiprocesador de bajo consumo
Tipos de puerta Automáticas de apertura lateral / Automáticas de apertura central
Luz de puerta Desde 600 a 1500 mm (en intervalos de 100 mm)
Altura de puerta 2000 / 2100 / 2200 / 2300
Dimensiones de cabina Dimensiones de cabina paramétricas
Altura interior de cabina 2100 / 2200 / 2300 / 2400
Estéticas disponiblesDR1 / DR2 / DR3 / DR4 / DR5 / DR6 / DR7 / DR8 DS1 / DS2 / DS3 / DS4 / DS5 / Orona 3G Domo Plus
Estándar Opcional
PaRaMéTRicO/ FlEXiBlE
El producto paramétrico permite la posibilidad de adaptar el ascensor a la mayoría de las necesidades de espacio que se puedan plantear (opcional).
TRÁnSiTO BaJO FOSOAdaptable a edificios donde se requiere el paso de personas bajo foso (opcional).
PuERTaSCon motor compacto de imanes permanentes, que permite movimientos de apertura y cierre rápidos, precisos y silenciosos, elevando el estándar actual de presentaciones, con apertura anticipada y/o cortina fotoeléctrica. Puerta Solid opcional para situaciones de tráfico intenso.
acciOnaMiEnTOMáquina eléctrica regulada, compacta, silenciosa, sin engranajes, de alta eficiencia energética con motor de imanes permanentes.
EcOEFiciEncia cOnTROl Y SEGuRiDaDDiSEÑO Y accESiBiliDaDaDaPTaBiliDaD al EDiFiciO
1 2 3 4
1 5
2
7
8
9
4
6
3
Características generales
Soluciones eléctricas gearless sin sala de máquinas (MRLG)
REnDiMiEnTO DE huEcO
Ascensores diseñados especialmente para aprovechar el máximo espacio en el hueco, obteniendo una buena relación entre el espacio disponible y la cantidad de pasajeros a transportar.
SiSTEMa DE EVacuaciÓn auTOMÁTica
Aunque incorpora de serie un sistema de rescate semiautomá-tico en planta para garantizar una evacuación rápida, segura y eficaz, opcionalmente, se ofrece un sis-tema de evacuación automático orientado principalmente al caso de corte de suministro eléctrico.
cOMunicaciÓn BiDiREcciOnal
Entre la cabina y el Centro de Servicio 24 horas, según En 81-28.
ElEMEnTOS DE TRacciÓn
que sustituyen a los tradicionales cables de acero. Su menor peso y una mayor vida y flexibilidad posibilitan la utilización de una máquina más compacta, con un motor más eficiente y ecológico.
huEcO REDuciDOSistema opcional que permite reducir el espacio necesario en la última planta del edificio. Garantizando la máxima seguridad y protección a los técnicos de mantenimiento.
5 6 7 8 9
Orona 3G
PL
11
1 Paso de personas bajo foso (Paracaídas en contrapeso) añadir 115 mm al AH
2 Fondo hueco con puertas apoyadas 60 mm en el forjado
3 Fondo hueco con puertas apoyadas 40 mm en el forjado
4 HF reducida opcional 830 mm
5 HUP mínima para altura interior de cabina (HC) de 2100 mm (HUP=HC+1300) HUP reducida opcional (HUP=HC+900). Consultar disponibilidad de dimensiones de cabina
* Hueco sin desplomes
Dimensiones estándares
AH
PL
FCFH
ACCuadro maniobra en última parada:
277 x 152 mm.
Ubicación flexible opcional.
PL
Configuración
Dimensiones de cabina personalizadas
1 EMbARqUE 2 EMbARqUES 180° DETALLE CUADRO DE MAniObRA
DETALLE PUERTA MARCO AnCHO
SECCiÓn vERTiCAL
AH
PL1
PL2
FCFH
AC
Carga / capacidad CabinaHueco *
Puertas apertura lateral
Puertas apertura central
velocidad
Personas
q Carga
AC Ancho
fC fondo
PL Luz
EmbarquesAH1
Ancho
fH2 fondo
AH Ancho
fH3 fondo
Hf foso
HUP Ult. PlantaAccesibilidad nº de embarques
1 m/s
4 320 kg 825 1100 7001
13001350
1000(830)4
3400(3050)5
2x1800 1500
6 450 kg 1000 1250 8001
14501500
17251450
2x1800 1650 1550
8 630 kg 1100 1400 9001
16001675
19251625
2x1800 1850 1750
10 800 kg 1350 1400 9001
18251675
19251625
2x1800 1850 1750
13 1000 kg1600 1400 1000
12075
16752150
16252x1800 1850 1750
1100 2100 10001
17752375
21252300
2x1800 2550 2400
1,6 m/s
4 320 kg 825 1100 7001
13251350
1120 3550
2x1800 1500
6 450 kg 1000 1250 8001
14751500
17251450
2x1800 1650 1550
8 630 kg 1100 1400 9001
16251675
19251625
2x1800 1850 1750
10 800 kg 1350 1400 9001
18501675
19251625
2x1800 1850 1750
13 1000 kg1600 1400 1000
12100
16752175
16252x1800 1850 1750
1100 2100 10001
17752375
21252300
2x1800 2550 2400
HF
HU
P
HPU
Ancho de cabina
Luz de puertaFondo de cabina
13 12 1600
13 13 11 1500
13 13 12 11 10 1400
13 12 11 10 9 8 1300
13 13 12 11 10 9 9 8 6 1200
13 13 12 11 11 10 9 8 8 7 6 5 1100
12 12 11 10 10 9 8 7 7 6 5 5 1000
11 10 10 9 8 8 7 7 6 5 5 4 900
6 6 5 5 4 4 800
2100 2000 1900 1800 1700 1600 1500 1400 1300 1200 1100 1000 600 700 800 900 1000 1100 1200 1300 1400 1500
Nota: Ancho y fondo de cabina variable, en incrementos de 5 mm.
Por simplificación, la tabla muestra incrementos de 100 mm.
DS1
DS2
DS3
DS4
DS5
DS5
©O
RON
A co
pyri
ght
De serie // En opción
Pasamanos
Material botonera y/o falso techo y/o puertas (cabina y piso)
Suelos
Techos e Iluminaciones
Pulsadores de cabina
Pulsadores de piso
Señalización de cabina
Señalización de piso
Espejos
Zócalos
Paredes de cabina
DS5Pack Selection
SC - PVC High ACABADOS DE SUELOS
OPCIONES DE SUELOS-Preparado para granito -Preparado para PVC
SC05 Grey Silver
HR02
MT (Espejo 3/4 estrecho)
-01 BlancoACABADO DE ESPEJO
-SK01 Anodized Aluminium (St St finish)
Pared fondoF
F L
Pared lateral opuesto panel de mandosL
RECUBRIMIENTOSPanel inox
ST01 St St Base
ST02 St St Plus
Modelo circular Orona
-Pulsador de cierre de puertas-Pulsador Braille-Pulsador con llave (Orona o eurocilindro)
-Anulación de llamadas exteriores
-Pulsador con llave (Orona o eurocilindro)-Botonera en pared y/o compartida
Botonera universal (1 pulsador)
Botonera selectiva (2 pulsadores)
-ST01 St St Base-ST02 St St Plus
-Flechas direccionales en embocadura-Gong en cabina
Flechas de dirección en cabina
Indicador de sobrecarga (acústico y luminoso)
Síntesis de voz
Matriz puntos
Matriz puntos
-Flechas próxima partida en piso-Gong en piso
UP37 - Focos LedApagado automático iluminación
-ST01 St St Base-ST02 St St Plus
ILUMINACIÓN MODELO
ILUMINACIÓN MATERIAL TECHO
OTRAS OPCIONES-Ventilador
©O
RON
A co
pyri
ght
SCALA ASCENSORES S.A.S.
CLIENTE:
PROYECTO:
ACTIVIDAD:
SUMINISTRO E INSTALACION DE ASCENSORES
1 FABRICACION DEL EQUIPOS
2 TRANSITO DE PUERTO DE ORIGEN A PUERTO COLOMBIANO Y NACIONALIZACION
3 NACIONALIZACION EN ZONA FRANCA DE BOGOTA
4 DESCARGUE DE MATERIALES EN OBRA E INVENTARIOS
5 INSTALACION DE ANCLAJES Y GUIAS
6 INSTALACIÓN DE BANCADA, MAQUINA Y CONTROL EN CUARTO DE MAQUINAS
7 ARMADO DE CHASIS DE CABINA Y CONTRAPESO, COLGADO DE GUAYAS
8 INSTALACIÓN DE MARCOS DE PUERTAS DE PISO
9 ARMADO DE CABINA Y ELEMENTOS DE CUARTO DE MAQUINAS
10 INSTALACION OPERADOR DE PUERTAS Y PUERTAS DE CABINA
11 ALAMBRADO GENERAL, POZO Y CABINA
12 AJUSTE FINAL (A partir de la existencia de Energia Definitiva)
NOTAS
C R O N O G R A M A D E A C T I V I D A D E S
MESES
oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19jul-18
Los tiempos del presente cronograma inician a partir de la firma del contrato, elección acabados y recibo del anticipo.
may-19ITEM A C T I V I D A D
jun-18 ago-18 sep-18
catalogue-orona-ecodesigncatalogo-orona-3g-1015-es-1412-v2Cabinas orona DSOrona-3G-Domo-Packs-DS5Cronograma INSTALACIÓN ASCENSORES