23
ecologic.de 16-Jun-03 Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO- Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry of Development / Ecologic (Institute for Inter- national and European Environmental Policy) Authors: N. Chagiou, E. Chiotis, M. Ghini, G. Gioni, E. Interwies, A. Morfis, M. Stefouli Presenter: E. Interwies, Ecologic Session 4.1: WFD Economic elements
Transcript
Page 1: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

ecologic.de

16-Jun-03 Testing the WATECO-Guidance: Corfu Pilot Project

Testing the WATECO-Guidance:the Corfu Pilot Project

Prepared by: I.G.M.E. / Ministry of Development / Ecologic (Institute for Inter-national and European Environmental Policy)

Authors: N. Chagiou, E. Chiotis, M. Ghini, G. Gioni, E. Interwies, A. Morfis, M. Stefouli

Presenter:E. Interwies, Ecologic

Session 4.1: WFD Economic elements

Page 2: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

2

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Structure of the presentation:

• Aims of the project

• Short overall description of the situation

on Corfu

• Selection of main findings of the project

• The way forward for the Economic

Analysis in Greece

Page 3: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

3

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Aims of the project I:

•Check selected elements of the WATECO-guidance draft, mainly:

• linking hydogeological to economic

information• description of main water uses• assessment of water demand• pricing of water (public supply)

Page 4: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

4

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Aims of the project II:

• Provide input for finalizing the WATECO-guidance (done)

• Provide input for implementing the Economic Analysis in Greece by identifying main gaps (based on initial scoping)

Page 5: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

5

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

The location of the pilot project area

Page 6: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

6

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Description of situation in Corfu

• Corfu Island dealt with as a river basin, but without a river!

• Water for all uses: groundwater origin• High seasonality of water demand (tourism),

water supply constant in time• Groundwater deterioration due to:

- natural reasons (presence of gypsum and natural sea water intrusion)

- human activity (groundwater overexploitation)

Page 7: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

7

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Distribution of public water supply consumption(cubic meters) in the period of year 1998

Month Consumption Month ConsumptionJanuary 704,226 July 1,771,444February 709,105 August 1,842,789March 715,457 September 1,559,529April 783,671 October 952,044May 1,231,161 November 711,315June 1,520,312 December 712,972Annual total: 13,214,025 cubic meters

Page 8: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

8

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Main Land Uses

Satellite image:August 2000

Page 9: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

9

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Description of the pilot area Corfu• Area: Corfu island, 587 km2

(including surrounding small islands: 632.5 km2) • Administrative division: 12 municipalities (including surrounding islands: 16) • Municipal Water Suppliers: 9 for Corfu island• Permanent population: 112.848 (year 2000),

all connected to public water supply system• Most of the population is living in the city and

the coastal areas

Page 10: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

10

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Description of the pilot areaGround water resources availability:• Estimation of deposits: 114*106 m3 (44% in karst units,

21% in Triassic conglomerates, 35% in intergranular series)

• Due to sea water intrusion and gypsum presence, only a small percentage is of adequate quality for water uses

• Indication of quality factors (mg/l) (water supply in Corfu city):

13.3109941.123501.339.89325.548

NO3-SO4

--Cl-HCO3-K+Na+Mg++Ca++

Page 11: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

11

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

MAIN HYDROLOGICAL UNITS

• Karstic units - Blue green • Conglomerates - Brown• Porous intergranular

series - The rest

Page 12: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

12

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Results: Importance of water uses

• Main use: household and tourism • Significant additional use: agriculture• Not significant: “industry” (rather:

manufacturing)

Overall: water related activities are strongly affected by geomorphological characteristics of Corfu

Page 13: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

13

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Results: spatial economics• Detailed view of Ropa

valley• Primary use of water

for tourism: Only the golf terrain is irrigated

Page 14: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

14

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Results: Projecting trends for 2015Crucial element of the 3-step-approach:• Large gap between the requirements of the

guidance document and reality• only estimates available for future water

demand on 2038, based solely on demographic changes/estimates of per head consumption

• large amounts of new data needed• out of existing information, no estimation on

the baseline scenario can be given

Page 15: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

15

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Results: Assessing cost recovery

A number of sub-steps (information) is needed for this estimate, focus here on:

• water pricing of municipal water supply, pricing in

agriculture

• costs of water supply

--> issues of charges, fees, taxes, relevant public

subsidies/grants, cross-subsidisation, environmental

costs: not considered

Page 16: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

16

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Results: Water pricing issuesNo aggregated information available, primary data:• Public water supply of the 12 municipalities: different

tariff systems• In some cases: special tariffs for entrepreneurial uses• In 2 cases: special tariffs for agricultural use; 2 local

irrigation organisations have tariffs covering operation costs

• In order to compare prices, different consumption values were assumed: wide variation of prices for public supply, most with a gradual price increase for higher consumption, some cases show a decrease

Page 17: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

17

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Results: cost of water supply

• very limited information on agriculture

• public water supply: centralised data does not

exist, local water suppliers asked for information

• no estimation on cost recovery can be given:

- no estimates on environmental/resource costs

- information on financial costs of water supply

was fragmentary

Page 18: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

18

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Evaluation• A non-virtual exercise to be used as a

framework for the economic analysis in Greece, but: time and financing constraints, therefore not complete “testing”

• Linking economic to hydrogeological information (Annex II WFD) is important

• WATECO-guidance useful, but requires a lot of economic understanding

• A good starting point for understanding the need of improvement of the water management structures in Greece

Page 19: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

19

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Evaluation

Large efforts needed in Greece for delivering the

Economic Analysis in time, due to limited:

• data availability and quality;

• centralised availability of data;

• awareness of the WFD and water-economic

capacities in water administration

• methodological knowledge

Page 20: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

20

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Support by:

Recently commissioned program for the development of water resources management systems (divided regionally according to the water districts), aimed at the development of Water Resources Management Plans (duration: 36 months)

--> some support for the economic analysis can be expected from these studies

Page 21: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

21

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

The axes for improvement

• Accelerate the establishment and staffing of the regional “competent authorities” as well as the central water institution (reduce overlaps between ministries)--> will happen soon• Provide adequate resources and capacities for conducting the economic analysis (2004: at the central level)• Establish a clear “plan of action” including strict deadlines (“critical path”)

Page 22: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

22

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

The axes for improvement

• Improve data availability and quality (primary data)• Urgent need for raising awareness and inform local water administrations about the WFD requirements

--> strong political support will be needed!

Page 23: Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.

23

ecologic.de

19.6.2003, Hellenic Water Week: Testing the WATECO-Guidance: Corfu Pilot Project

Thank you for your attention!


Recommended