Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional Power Generation and Transmission Infrastructure 2019 - 2033
Transcript
Page 1: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Presentation by West African Power PoolAbidjan, February 28, 2019

ECOWAS Master Plan for the Development of Regional Power Generation and

Transmission Infrastructure 2019 - 2033

Page 2: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Presentation Outline

A.Background

C.Conclusion

B.

ECOWAS Master Plan for the Development of Regional Power Generation and Transmission Infrastructure

2019 - 2033

Page 3: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

BACKGROUND

Page 4: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Establishment, Vision and Mission of WAPP

Establishment:WAPP was created in 1999 by Decision A/DEC. 5/12/99 and establishedin 2006 through Decisions A/DEC. 18/01/06 and Decision A/DEC.20/01/06 by the Authority of ECOWAS Heads of State and Government.

Vision:To integrate the national power systems into an unified regionalelectricity market

Mission:To promote and develop infrastructure for power generation andtransmission, as well as, to assure the coordination of electric powerexchanges between ECOWAS Member States

Page 5: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Members of WAPP in February 2019 (35#)

Page 6: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

ORGANISATIONAL COMMITTEES

GENERAL ASSEMBLY

EXECUTIVE BOARD

GENERAL SECRETARIAT

Administration & Finance Department

Information & Coordination Centre

Planning, Investment Programming & Environmental

Safeguards Department

Organisational Structure

MDs of WAPP Member Utilities

Responsible for execution of WAPP policies and decisions

WAPP Donors’ Coordination Committee

•EOC•SPEC

•FC•HRGC•DCC

Page 7: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

ONGOING STRATEGY BY WAPP TO ACHIEVE VISION

DEVELOPMENT OF WAPP INFORMATION AND

COORDINATION CENTERIMPLEMENTATION OF

MASTER PLAN

REGIONAL ELECTRICITY

MARKET

Page 8: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

8

NIGERIA

NIGER

LIBERIA

TOGO

BENIN

CÔTED’IVOIRE GHANA

BURKINA FASO

SENEGAL

MALI

GAMBIAGUINEABISSAU

SIERRALEONE

GUINEA

WAPP In 2006 WAPP Today

WAPP In 2020

Page 9: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Model of ICC Building under Construction at Abomey Calavi (BENIN)

Page 10: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

ECOWAS Master Plan for the Development of Regional Power Generation and Transmission

Infrastructure, 2019 - 2033

Page 11: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Recollection

In 2012, the Authority of the ECOWAS Heads of State andGovernment approved, through Supplementary ActA/SA.12/02/12, a list of 59 Priority Projects for the subregion.

0123456789

101112131415161718

Phase 1 (2012 -2019)

Phase 2 (2019 -2021)

Phase 3 (>2021)

Num

ber

of p

roje

cts

Generation Projects Transmission Projects

Page 12: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

High Growth of electricity demand (about 8% inaverage per annum)

Insufficient generation fleet compared to demand,despite a significant potential

Young interconnected power system with operationalissues

Very gradual integration of renewable energyresources

Current Context of ECOWAS Regional ElectricitySub-sector

Page 13: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

• Ongoing investments within ECOWAS Member States,including the updates of national power generation andtransmission Master Plans;

• Renewed drive of the sub-region to better integraterenewable energy resources into the energy mix especiallyin light of economics with Solar;

• Completion of integration of all of the national powersystems of the ECOWAS mainland countries in 2020;

• Near-term commissioning of the WAPP Information andCoordination Center and operationalization of the regionalelectricity market within the ECOWAS region;

Why develop this new Master Plan?

Page 14: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Consultant commenced work in January 2018 and:

Visited all mainland ECOWAS Member States to collectdata and hold discussions with key stakeholders ofnational energy sectors;

Performed an economic study to identify the necessaryleast cost investments in generation and transmission;

Verified through technical studies that the proposedgeneration and transmission investments will lead tostable and reliable operation conditions for the WAPPinterconnected system;

Conduct of Study

Page 15: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

75 (#) regional projects deemed priority for the period 2019-2033,with an estimated total investment requirement of US$36.39 billion

28 (#) transmission line projects of approximately 22,932 km of high-voltage transmission lines at an estimated cost of US$10.48 billion• Including transmission line projects that shall enable WAPP interconnect

beyond its current area of coverage – Northern Africa through Morocco, Central African Power Pool to Inga Dam

47 (#) generation projects with a total capacity of approximately15.49 GW at an estimated cost of US$25.91 billion• The generation projects comprise:

• 31.1% thermal projects operating mainly with natural gas and

• 68.9% renewable energy projects (10.67 GW) of which 29.5% involveVariable Renewable Energy (VRE) projects (3.15 GW solar, wind);

• VRE projects constitute 20.33 % of the total generation in the priority list.

Main Results of new Master Plan : 2019-2033

Page 16: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Interconnection Rollout in the Short Term : 2019 to 2022

NIGERIA

NIGER

LIBERIA

TOGO

BENIN

CÔTED’IVOIRE

GHANA

BURKINA FASO

SENEGAL

MALI

GAMBIA

GUINEABISSAU

SIERRA LEONE

GUINEA

+4,940 MW

Interconnection of all mainland ECOWAS Countries by 2019/2020

+8,419 km

Page 17: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Project Capacity (MW)

Approximate Cost

(US$ m) 1 Early POWER Combined Cycle in Ghana 300 390 2 GPGC Combined Cycle in Ghana 170 221 3 Kaduna Thermal in Nigeria 215 280 4 Wind Farm in Senegal 150 230 5 Gouina Hydropower (OMVS) 140 462 6 Sambangalou Hydropower (OMVG) 128 454 7 Azito IV Combined Cycle in Côte d’Ivoire 253 302 8 Amandi Combined Cycle in Ghana 240 312 9 OKPAI Combined Cycle in Nigeria 450 585

10 Souapiti Hydropower in Guinea 450 1,350 11 Gribo-Popoli Hydropower in Côte d’Ivoire 112 345 12 Ciprel V Combined Cycle in Côte d’Ivoire 412 505 13 Salkadamna Coal Thermal in Niger 200 573 14 Zungeru Hydropower in Nigeria 700 1,200 15 Fomi Hydropower in Guinea 90 620 16 Rotan Combined Cycle in Ghana 330 429 17 Boutoubre Hydropower in Côte d’Ivoire 150 343 18 WAPP Maria Gleta Combined Cycle in Benin 450 585

SUB-TOTAL SHORT TERM 4940 9,185

Generation Projects in the Short Term : 2019 to 2022

Page 18: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Interconnection Rollout in the Medium Term : 2023 to 2029

NIGERIA

NIGER

LIBERIA

TOGO

BENIN

CÔTED’IVOIRE

GHANA

BURKINA FASO

SENEGAL

MALI

THE GAMBIA

GUINEABISSAU

SIERRA LEONE

GUINEA

+8,669 MW +4,234 km

Page 19: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Generation Projects in the Medium Term : 2023 to 2029

Project Capacity (MW)

Approximate Cost (US$ m)

1 WAPP PV Solar Park in Burkina Faso 150 139 2 WAPP PV Solar Park in Mali 150 139 3 WAPP PV Solar Park in Cote d'Ivoire 150 143 4 WAPP PV Solar Park in The Gambia 150 130 5 Amaria Hydropower in Guinea 300 600 6 Bumbuna II Hydropower in Sierra Leone 143 358 7 Louga Hydropower in Côte d’Ivoire 246 647 8 Grand Kinkon Hydropower in Guinea 291 350 9 Koukoutamba Hydropower (OMVS) 294 689

10 Mambilla Hydropower in Nigeria 3,050 5,800 11 WAPP PV Solar Power Park in Benin 150 120 12 Alaoji II Thermal in Nigeria 285 371 13 Morisananko in Guinea (Hybrid PV – Hydro) 200 353 14 Bonkon Diara Hydropower in Guinea 174 211 15 Regional PV Solar Park in Nigeria (Gwiwa, Jigawa State) 1000 695 16 Adjaralla Hydropower (Togo-Benin) 147 333 17 WAPP PV Solar Power Park in Ghana 150 108 18 San Pedro Coal Thermal in Côte d’Ivoire 700 1,900 19 Tiboto Hydropower (Côte d’Ivoire-Liberia) 225 599 20 WAPP PV Solar Power Park in Togo 150 90 21 Boureya Hydropower (OMVS) 114 448 22 WAPP Aboadze Combined Cycle in Ghana 450 585

SUB-TOTAL MEDIUM TERM 8669 14808

Page 20: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Interconnection Rollout in the Long Term : 2030 to 2033

NIGERIA

NIGER

LIBERIA

TOGO

BENIN

CÔTED’IVOIRE

GHANA

BURKINA FASO

SENEGAL

MALI

THE GAMBIA

GUINEABISSAU

SIERRA LEONE

GUINEA

+1,883 MW +10,279 km

Page 21: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Generation Projects in the Long Term : 2030 to 2033

Project Capacity (MW)

Approximate Cost

(US$ m)

1 Saint Paul Hydropower Reservoir In Liberia 584 511 2 WAPP PV Solar Park in Niger 150 90 3 Wind Farm in Nigeria 300 190 4 Mano Hydropower (MRU) 180 487 5 Songon Thermal in Côte d’Ivoire 369 480 6 WAPP PV Solar Power Park in Burkina Phase II 150 84 7 WAPP PV Solar Power Park in Mali Phase II 150 77

SUB-TOTAL LONG TERM 1883 1919

Page 22: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

31.1%

20.3%

48.6%

Generation Projects

Thermal VRE Hydro

Page 23: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Monitor the development of projects carried out by other sub-regional entities (OMVG, OMVS, NBA, CEB, and MRU)

Pursue the opportunities offered by new technologies linked to the increase of renewable energies (Battery storage,

hybridization of hydro and thermal units,…)

Diversification of financing resources for the realization of the priority projects and enhance private sector participation

Support WAPP member utilities, in particular Distribution utilities, to improve their performances and efficiency – loss reduction,

revenue collection

Continue the reinforcement of WAPP member utilities’ capacities and accelerate the development of WAPP Centers of

Excellence

Accompanying measures include…..

23

Page 24: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

ECOWAS Master Plan for the Development of Regional PowerGeneration and Transmission Infrastructure 2019 – 2033: September 19-22, 2018 - Experts from WAPP Member Utilities as well as

Ministries in charge of energy of ECOWAS Member States, ECOWASCommission, UEMOA Commission, sub-regional organizations and WAPPTechnical and Financial Partners;

October 13, 2018 : 39th Meeting of Executive Board of WAPP; November 9, 2018 : 13th General Assembly of WAPP; December 4, 2018 : 13th Meeting of ECOWAS Ministers in charge of Energy; December 11, 2018 : ECOWAS Parliament; December 13-15, 2018 : 81st Ordinary Session of ECOWAS Council of

Ministers;

December 22, 2018 : 54th Ordinary Session of ECOWAS Heads of State andGovernment – Adoption through Supplementary ActA/SA.4/12/18

Consideration by Governance Structures….

Page 25: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

2nd WAPP Transmission Line between Nigeria and Benin: Pre-investment studies in progress

Development of St. Paul River Hydropower potential in Liberia: Pre-investment studies in progress

330 kV WAPP Nigeria-Benin-Togo-Ghana-Cote d’Ivoire MedianBackbone Project:

Procurement for Pre-investment studies about to be launched

330 kV WAPP Ghana-Burkina-Mali Interconnection Project: Procurement for Update of pre-investment studies about to be

launched

150 MW WAPP Regional Solar Park in Burkina and 150 MWWAPP Regional Solar Park in Mali:

Feasibility Study to commence in March 2019

Master Plan Implementation Already In Progress….

Page 26: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Pre-Investment StudiesProject Estimated

Cost (US$m)

2019

1 225 kV Cote d’Ivoire – Liberia Interconnection Reinforcement 3.1

2 225 kV Cote d’Ivoire – Guinea Interconnection 2.8

T O T A L 5.9

2020

1 1,000 MW WAPP Solar Power Park in Nigeria (Gwiwa, Jigawa State) 3.6

2 330 kV WAPP Eastern Backbone in Nigeria 6.1

3 150 MW WAPP Solar Power Park in Benin 2.3

4 150 MW WAPP Solar Power Park in Togo 2.3

T O T A L 14.3

Page 27: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

ImplementationProject Ready

For Financing

In

Estimated Cost

(US$m)

1 330 kV Nigeria – Benin Interco Reinforcement Project 2019 134

2 225 kV Kayes – Kiffa Transmission Line under OMVS 2019 184

T O T A L 2 0 1 9 318

1 150 MW WAPP Solar Power Park in Burkina 2019 149

2 150 MW WAPP Solar Power Park in Mali 2019 126

3 330 kV Ghana - Burkina – Mali Interconnection 2020 341

4 330 kV WAPP Nigeria-Benin-Togo-Ghana-Cote d’Ivoire Interconnection (WAPP Median Backbone)

2020 813

5 Via Reservoir and 1st Phase of Cascade Hydropower in Liberia

2020 511

6 225 kV Cote d’Ivoire – Liberia InterconnectionReinforcement

2020 129

7 225 kV Cote d’Ivoire – Guinea Interconnection 2020 96

T O T A L 2 0 2 0 1,824

Page 28: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

ImplementationProject Ready For

Financing In

Estimated Cost

(US$m)

1 1,000 MW WAPP Solar Power Park in Nigeria (Gwiwa, Jigawa State)

2021 695

2 330 kV WAPP Eastern Backbone in Nigeria 2021 966

3 150 MW WAPP Solar Power Park in Cote d’Ivoire 2021 143

4 150 MW WAPP Solar Power Park in The Gambia 2021 130

5 150 MW WAPP Solar Power Park in Benin 2021 120

6 150 MW WAPP Solar Power Park in Togo 2021 120

T O T A L 2 0 2 1 2,174

Page 29: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

CONCLUSION

Page 30: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

Construction of 22,932 km of high voltage transmission linesenvisaged at an estimated cost of US$10.48 billion;

Development of a total capacity of about 15.49 GW (10.67 GWof Renewable Energy) at an estimated cost of US$25.91 billion;

All mainland ECOWAS Member States shall be interconnectedin the short term;

330 kV Transmission Backbone from Senegal to Nigeria;

Master Plan envisions interconnection of WAPP to NorthernAfrica through Morocco and interconnection of WAPP withCentral African Power Pool to Inga;

Master Plan is completely aligned with the High-5s and theNew Deal on Energy for Africa !!!

Page 31: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

WAPP THANKS THE AFRICAN

DEVELOPMENT BANK FOR THE CONTINUOUS SUPPORT AND LOOKS

FORWARD TO NEW ENGAGEMENTS

Page 32: ECOWAS Master Plan for the Development of Regional Power ... · Presentation by West African Power Pool Abidjan, February 28, 2019 ECOWAS Master Plan for the Development of Regional

32

WAPP: “Lighting Up West Africa”

THANK YOU FOR YOUR ATTENTION

WAPP Secretariat06 BP 2907 Cotonou – République du Bénin

Tel : + (229) 21 37 41 95 / 21 37 71 44Fax : + (229) 21 37 41 96 / 21 37 71 43