This deliverable is part of a project that has received funding from the ECSEL JU under grant agreement No 692474. This Joint Undertaking receives support from the European Union’s Horizon 2020 research and innovation programme and from Spain, Czech Republic, Germany, Sweden, Italy, United Kingdom and France ECSEL Research and Innovation actions (RIA) AMASS Architecture-driven, Multi-concern and Seamless Assurance and Certification of Cyber-Physical Systems Case studies description and business impact D1.1 Work Package: WP1 Case Studies and Benchmarking Dissemination level: PU = Public Status: Final Date: 11 May 2018 Responsible partner: Bernhard Winkler (ViF) Contact information: [email protected] Document reference: AMASS_D1.1_WP1_VIF_V1.3 PROPRIETARY RIGHTS STATEMENT This document contains information, which is proprietary to the AMASS consortium. Permission to reproduce any content for non-commercial purposes is granted, provided that this document and the AMASS project are credited as source.
Transcript
Page 1: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

This deliverable is part of a project that has received funding from the ECSEL JU under grant agreement No 692474. This Joint Undertaking receives support from the European Union’s Horizon 2020 research and innovation programme and from Spain, Czech Republic, Germany, Sweden, Italy, United Kingdom and France

ECSEL Research and Innovation actions (RIA)

AMASS Architecture-driven, Multi-concern and Seamless Assurance and

Certification of Cyber-Physical Systems

Case studies description and business impact D1.1

Work Package: WP1 Case Studies and Benchmarking

Dissemination level: PU = Public

Status: Final

Date: 11 May 2018

Responsible partner: Bernhard Winkler (ViF)

Contact information: [email protected]

Document reference: AMASS_D1.1_WP1_VIF_V1.3

PROPRIETARY RIGHTS STATEMENT

This document contains information, which is proprietary to the AMASS consortium. Permission to reproduce any content for non-commercial purposes is granted, provided that this document and the AMASS project are credited as source.

Page 2: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

Contributors

Reviewers

Document History Version Date Status Author (Partner) Remarks

V1.0 2016-11-30 First final version C. Martinez (TEC)

V1.1 2017-04-12 CS6 update B. Winkler(ViF) Alstom CS substitutes AVL CS&US.

V1.2 2018-02-09 Final version B. Winkler(ViF) First review comments addressed (IFX CS2, ALS CS6 and HON CS7).

V1.3 2018-05-11 Final version C. Martinez (TEC) First review comments addressed (IFX CS2, ALS CS6 and HON CS7).

Names Organisation

Bernhard Winkler, Helmut Martin Virtual Vehicle (VIF)

Elena Alaña Salazar, Javier Herrero Martín GMV Aerospace and Defence (GMV)

Carlo Vertua, Daniele Tornaghi Thales Italia (THI)

Miguel Gómez, Juan Castillo Thales Alenia Space España (TAS)

Anna Carlsson OHB Sweden (OHB)

Mario Petrick, Mathias Killer, Behrang Monajemi Assystem Germany (B&M)

Tomáš Kratochvíla, Vít Koksa Honeywell International (HON)

Norbert Bartsch Lange Research Aircraft (LAN)

Fredrik Warg, Martin Skoglund, Kenneth Östberg Rise Research Institutes of Sweden (SPS)

Jan Hellberg, Alexander Åström Comentor (COM)

David Deharbe Clearsy (CLS)

Benito Caracuel Scheneider Electric España (TLV)

Dian Nugraha, Farhan Bin Khalid, Frank Badstübner Infineon Technologies (IFX)

Marc Born Ansys Medini Technologies (KMT)

Garazi Juez, Huáscar Espinoza Tecnalia Research & Innovation (TEC)

Fernando Mejia, Fabien Belmonte Alstom Transport (ALS)

Names Organisation

Mohamed Bakkali (Peer-reviewer) Alliance pour les Technologies de l’Informatique (A4T)

Thomas Gruber (Peer-reviewer) AIT Austrian Institute of Technology (AIT)

Petr Böhm (Peer-reviewer) AIT Austrian Institute of Technology (AIT)

Cristina Martínez (Quality Manager) Tecnalia Research & Innovation (TEC)

Garazi Juez Tecnalia Research & Innovation (TEC)

Page 3: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 3 of 111

TABLE OF CONTENTS Executive Summary ...................................................................................................................................... 7

1. Introduction.......................................................................................................................................... 8

2. Case Study Description ....................................................................................................................... 10

2.1 CS1: Industrial and Automation Control Systems (IACS)................................................................ 10 2.1.1 Short description of the case study .................................................................................. 10 2.1.2 Technical description of the case study ............................................................................ 11 2.1.3 Case study state of the art ............................................................................................... 13 2.1.4 Case study state of the practice ....................................................................................... 14 2.1.5 Expected technical improvements ................................................................................... 17 2.1.6 Business needs ................................................................................................................ 18 2.1.7 Usage scenarios ............................................................................................................... 19

2.2 CS2: Advanced driver assistance function with electric vehicle ..................................................... 22 2.2.1 Short description of the case study .................................................................................. 22 2.2.2 Technical description of the case study ............................................................................ 22 2.2.3 Case study state of the art ............................................................................................... 23 2.2.4 Case study state of the practice ....................................................................................... 23 2.2.5 Expected technical improvements ................................................................................... 25 2.2.6 Business needs ................................................................................................................ 26 2.2.7 Usage scenarios ............................................................................................................... 27

2.3 CS3: Collaborative automated fleet of vehicles ............................................................................ 29 2.3.1 Short description of the case study .................................................................................. 29 2.3.2 Technical description of the case study ............................................................................ 29 2.3.3 Case study state of the art ............................................................................................... 32 2.3.4 Case study state of the practice ....................................................................................... 32 2.3.5 Expected technical improvements ................................................................................... 34 2.3.6 Business needs ................................................................................................................ 35 2.3.7 Usage scenarios ............................................................................................................... 36

2.4 CS4: Design and safety assessment of on-board software applications in Space Systems ............. 40 2.4.1 Short description of the case study .................................................................................. 40 2.4.2 Technical description of the case study ............................................................................ 41 2.4.3 Case study state of the art ............................................................................................... 42 2.4.4 Case study state of the practice ....................................................................................... 42 2.4.5 Expected technical improvements ................................................................................... 45 2.4.6 Business needs ................................................................................................................ 46 2.4.7 Usage scenarios ............................................................................................................... 47

2.5 CS5: Platform Screen Doors Controller ......................................................................................... 49 2.5.1 Short description of the case study .................................................................................. 49 2.5.2 Technical description of the case study ............................................................................ 49 2.5.3 Case study state of the art ............................................................................................... 52 2.5.4 Case study state of the practice ....................................................................................... 52 2.5.5 Expected technical improvements ................................................................................... 54 2.5.6 Business needs ................................................................................................................ 54 2.5.7 Usage scenarios ............................................................................................................... 55

2.6 CS6: Automatic Train Control Formal Verification......................................................................... 57 2.6.1 Short description of the case study .................................................................................. 57 2.6.2 Technical description of the case study ............................................................................ 57 2.6.3 Case study state of the art ............................................................................................... 58

Page 4: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 4 of 111

2.6.4 Case study state of the practice ....................................................................................... 59 2.6.5 Expected technical improvements ................................................................................... 62 2.6.6 Business needs ................................................................................................................ 63 2.6.7 Usage scenarios ............................................................................................................... 65

2.7 CS7: Safety Assessment of Multi-Modal Interactions in Cockpits .................................................. 66 2.7.1 Short Description of the Case Study ................................................................................. 66 2.7.2 Technical Description of the Case Study ........................................................................... 66 2.7.3 Case Study State of the Art .............................................................................................. 67 2.7.4 Case study state of the practice ....................................................................................... 68 2.7.5 Expected technical improvements ................................................................................... 70 2.7.6 Business needs ................................................................................................................ 71 2.7.7 Usage scenarios ............................................................................................................... 71

2.8 CS8: Telematics Function ............................................................................................................. 75 2.8.1 Short description of the case study .................................................................................. 75 2.8.2 Technical description of the case study ............................................................................ 75 2.8.3 Case study state of the art ............................................................................................... 77 2.8.4 Case study state of the practice ....................................................................................... 77 2.8.5 Expected technical improvements ................................................................................... 79 2.8.6 Business needs ................................................................................................................ 79 2.8.7 Usage scenarios ............................................................................................................... 80

2.9 CS9: Safety-Critical SW Lifecycle of a Monitoring System for NavAid (ATM domain) ..................... 81 2.9.1 Short description of the case study .................................................................................. 81 2.9.2 Technical description of the case study ............................................................................ 81 2.9.3 Case study state of the art ............................................................................................... 82 2.9.4 Case study state of the practice ....................................................................................... 83 2.9.5 Expected technical improvements ................................................................................... 84 2.9.6 Business needs ................................................................................................................ 85 2.9.7 Usage scenarios ............................................................................................................... 86

2.10 CS10: Certification basis to boost the usage of MPSoC architectures ............................................ 88 2.10.1 Short description of the case study .................................................................................. 88 2.10.2 Technical description of the case study ............................................................................ 88 2.10.3 Case study state of the art ............................................................................................... 88 2.10.4 Case study state of the Practice ....................................................................................... 89 2.10.5 Expected technical improvements ................................................................................... 91 2.10.6 Business needs ................................................................................................................ 91 2.10.7 Usage scenarios ............................................................................................................... 93

2.11 CS11: Design and efficiency assessment of model based Attitude and Orbit Control software development ............................................................................................................................... 95 2.11.1 Short description of the case study .................................................................................. 95 2.11.2 Technical description of the case study ............................................................................ 95 2.11.3 Case study state of the art ............................................................................................... 96 2.11.4 Case study state of the practice ....................................................................................... 97 2.11.5 Expected technical improvements ................................................................................... 98 2.11.6 Business needs ................................................................................................................ 99 2.11.7 Usage scenarios ............................................................................................................. 100

3. Questionnaire Evaluation ................................................................................................................. 103

4. Conclusions....................................................................................................................................... 106

Abbreviations and Definitions.................................................................................................................. 107

References ............................................................................................................................................... 110

Page 5: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 5 of 111

List of Figures Figure 1. Number of case studies per AMASS domain ................................................................................ 8 Figure 2. Smart Grid: Schneider Electric vision ......................................................................................... 10 Figure 3. Schneider Electric Saitel® RTU platform ..................................................................................... 11 Figure 4. Electrical substation and IACS .................................................................................................... 11 Figure 5. Control Center ........................................................................................................................... 12 Figure 6. Experimental scenario architecture ........................................................................................... 13 Figure 7. Product design scope ................................................................................................................ 16 Figure 8. Safety and Security Workflow of the SESAMO project ............................................................... 24 Figure 9. Cooperative Adaptive Cruise Control (CACC).............................................................................. 29 Figure 10. Platoon topologies .................................................................................................................... 30 Figure 11. State Machine Diagram for graduation and degradation of assistant systems ............................ 31 Figure 12. Functional architecture of CACC ................................................................................................ 32 Figure 13. Iberian Peninsula [9] .................................................................................................................. 40 Figure 14. OLCI instrument ........................................................................................................................ 41 Figure 15. Development life-cycle .............................................................................................................. 44 Figure 16. Example of combined systems to ensure safety at a metro platform ......................................... 49 Figure 17. Platform screen doors COPPILOT ............................................................................................... 50 Figure 18. COPPILOT SP architecture .......................................................................................................... 51 Figure 19. COPPILOT SP languages ............................................................................................................. 53 Figure 20. Alstom’s CBTC development life-cycle ....................................................................................... 59 Figure 21. CS6 Workflow ............................................................................................................................ 60 Figure 22. EN 50129 organization .............................................................................................................. 62 Figure 23. Multifunction controls ............................................................................................................... 66 Figure 24. Logical view of telematics functions for a connected vehicle. .................................................... 75 Figure 25. Positioning function for Core iteration. ...................................................................................... 76 Figure 26. Positioning function and ITS facility for P1/P2 iterations. ........................................................... 77 Figure 27. V-model for safety and security ................................................................................................. 78 Figure 28. CS9 workflow ............................................................................................................................ 83 Figure 29. Electra, Telecommunication satellite ......................................................................................... 95 Figure 30. AOCS SW Development Cycle .................................................................................................... 96 Figure 31. Relevant domains for the AMASS partners .............................................................................. 103 Figure 32. Professional categories of AMASS partners.............................................................................. 103 Figure 33. Overview of number employees of AMASS partners ................................................................ 103 Figure 34. Partners activities in the development process ........................................................................ 104 Figure 35. Partners activities in the assurance process ............................................................................. 104 Figure 36. Partners activities in the certification process .......................................................................... 105 Figure 37. Scientific and Technical Objectives (STOs) covered by AMASS case studies .............................. 106 Figure 38. AMASS goals covered by case studies ...................................................................................... 106

Page 6: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 6 of 111

List of Tables Table 1. AMASS Case studies .................................................................................................................... 9 Table 2. Impact of IEC 61508 Standards on Intelligent Electrical Networks and Safety Improvement

[15] ........................................................................................................................................... 14 Table 3. Tool chains used in the RTU design process ............................................................................... 17 Table 4. CS1 TLV and TEC usage scenarios ............................................................................................... 19 Table 5. CS1 TEC, KMT and AIT usage scenarios ...................................................................................... 20 Table 6. CS1 FBK and A4T usage scenarios .............................................................................................. 21 Table 7. CS2 IFX usage scenarios ............................................................................................................. 27 Table 8. CS2 TEC and KMT usage scenarios ............................................................................................. 28 Table 9. CS3 Workflow ............................................................................................................................ 33 Table 10. CS3 B&M usage scenarios .......................................................................................................... 36 Table 11. CS3 B&M and TEC usage scenarios ............................................................................................ 37 Table 12. CS3 KMT, MDH, AIT and ViF usage scenarios.............................................................................. 38 Table 13. CS3 ViF and A4T usage scenarios ............................................................................................... 39 Table 14. State of practice of Sentinel-3 OEU ICM SW ............................................................................... 43 Table 15. CS4 GMV and TEC usage scenarios ............................................................................................ 47 Table 16. CS4 TEC, FBK, INT and TAS-E usage scenarios ............................................................................. 48 Table 17. CS5 CLS and AIT usage scenarios ................................................................................................ 55 Table 18. CS5 FBK, A4T and CEA usage scenarios ...................................................................................... 56 Table 19. CS6 ALS usage scenarios ............................................................................................................ 65 Table 20. CS7 Workflow – baseline – tools used for development before AMASS ..................................... 68 Table 21. CS7 Workflow – expected tools to be used for development thanks to AMASS .......................... 68 Table 22. Tools used in Case Study 7 ......................................................................................................... 69 Table 23. Proposed tool chain to be deployed for Case Study 7 ................................................................ 70 Table 24. CS7 HON and TEC usage scenarios ............................................................................................. 72 Table 25. CS7 TEC, FBK and INT usage scenarios ....................................................................................... 73 Table 26. CS7 UOM and LAN usage scenarios............................................................................................ 74 Table 27. CS8 SPS and COM usage scenarios ............................................................................................. 80 Table 28. CS9 THI usage scenarios ............................................................................................................ 86 Table 29. CS9 THI and INT usage scenarios................................................................................................ 87 Table 30. CS10 TAS-E and TEC usage scenarios.......................................................................................... 93 Table 31. CS10 INT and RPT usage scenarios ............................................................................................. 94 Table 32. CS11 Workflow .......................................................................................................................... 97 Table 33. CS11 Tool Chain ......................................................................................................................... 98 Table 34. CS11 OHB and MDH usage scenarios ....................................................................................... 100 Table 35. CS11 MDH, FBK and INT usage scenarios ................................................................................. 101 Table 36. CS11 RPT usage scenarios ........................................................................................................ 102

Page 7: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111

Executive Summary

The deliverable D1.1 “Case studies description and business impact” is released by the AMASS work package WP1 “Case Studies and Benchmarking” and describes the 11 industrial case studies of the AMASS project.

For each case study the deliverable provides:

• Short description (overview) about the case study.

• Detailed technical description of the case study.

• Description of the state of the art regarding the case study.

• Description of the state of the practice in the partner companies regarding the case study.

• A rough description of the assurance workflow in the case study.

• Description about the assessment work by a third party or any independent company internal department.

• Which roles are involved in the case study and how many people work in it.

• Which methods and tools are used and how they interoperate.

• The expected improvement regarding the case study at the end of the AMASS project and which Scientific and Technical Objectives (STOs) are covered.

• Description of the specific business needs to improve the case study and which AMASS goals are covered.

• Definition of the case study stakeholders and the practices developed by them.

This deliverable also provides the main results of the questionnaire which was performed to get more information about the AMASS project partners and to obtain independent information. The questionnaire evaluation shows the main partners’ activities in the development process, the assurance and certification process. A further result of the questionnaire is an overview about the partners’ relevant domains, the professional categories and the number of employees.

D1.1 relates to the following AMASS deliverables:

• D1.2 “Report of case study data collection” [m12], which will present the data collected for the execution of each case study.

• D2.1 “Business cases and high-level requirements” [m11], which content will be partially derived from the description of the case studies.

Page 8: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 8 of 111

1. Introduction

AMASS will create and consolidate a de-facto European-wide assurance and certification open tool platform, ecosystem and self-sustainable community spanning the largest CPS vertical markets. The ultimate aim is to lower certification costs in face of rapidly changing product features and market needs. This will be achieved by establishing a novel holistic and reuse-oriented approach for architecture-driven assurance (fully compatible with standards such as AUTOSAR and IMA), multi-concern assurance (compliance demonstration, impact analyses, and compositional assurance of security and safety aspects), and for seamless interoperability between assurance/certification and engineering activities along with third-party activities (external assessments, supplier assurance).

This report presents the results of task 1.1 Case Study Specification and will define and elaborate the industrial case studies that correspond to the scope addressed by AMASS.

The aim is to specify the industrial case studies as required for covering the different aspects of the project that are needed to demonstrate and evaluate the AMASS platform improvements.

The case studies provide a set of AMASS user needs. Those user needs are derived from the industrial application domains, the AMASS industrial partners, and best practices applied on the assurance and certification/qualification of safety/security-critical products. The AMASS user needs are identified through questionnaires and interviews to industrial partners.

The task is based on the industrial practices employed by the different stakeholders, which are related to the “re-use” approach in the development, assurance and certification process. Furthermore, D1.1 presents the impact on the different business cases, which will result from the project: constraints on methodology, constraints on standards, and constraints on industry processes or practices are to be updated according to the results. This is needed to guarantee the coverage and completeness of industrial case studies.

In Section 2, the 11 AMASS case studies and the case study related usage scenarios are described.

The 11 AMASS case studies cover the following different domains (see Figure 1):

• 3 Automotive domain

• 3 Space domain

• 2 Railway domain

• 1 Avionics domain

• 1 Air Traffic Management (ATM) domain

• 1 Industrial Automation domain

Figure 1. Number of case studies per AMASS domain

Page 9: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 9 of 111

The 11 case studies are listed in Table 1. Table 1. AMASS Case studies

CSNr Partner Short Case Study Domain

CS1 Schneider Electric España S.A. TLV Industrial and Automation Control System

Industrial Automation domain

CS2 Infineon IFX Advanced driver assistance function with electric vehicle

Automotive domain

CS3 Berner & Mattner B&M Collaborative automated fleet of vehicles

Automotive domain

CS4 GMV Aerospace and Defence, S.A.U.

GMV Design and safety assessment of on-board software

Space domain

CS5 CLEARSY SAS CLS Platform Screen Doors Controller Railway domain

CS6 Alstom Transport SA ALS Automatic Train Control Formal Verification

Railway domain

CS7 Honeywell HON Safety assessment of multi-modal interactions in cockpits

Avionics domain

CS8 SP Sveriges Tekniska Forskningsinstitut

SPS Telematics function Automotive domain

CS9 Thales Italia SpA THI Safety-Critical SW Lifecycle of a Monitoring

Air Traffic Management domain

CS10 Thales Alenia Space TAS-E Certification basis to boost the usage of MPSoC architectures

Space domain

CS11 OHB Sweden AB OHB Design and efficiency assessment of model-based Attitude

Space domain

Section 3 provides a summary and evaluation of the questionnaire. The main goal of the questionnaire is to collect partner specific data (not case study specific data) which could be used by another AMASS WPs.

The questionnaire includes general questions about the partner and the partner activities in the development process, the assurance process, and the certification process.

Section 4 concludes the deliverable and provides a summary and an overview of the elaborated results.

Page 10: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 10 of 111

2. Case Study Description

2.1 CS1: Industrial and Automation Control Systems (IACS)

2.1.1 Short description of the case study

The European Commission defines Critical Infrastructure as “asset or system which is essential for the maintenance of vital societal functions. The damage to a critical infrastructure, its destruction or disruption by natural disasters, terrorism, criminal activity or malicious behaviour, may have a significant negative impact for the security of the EU and the well-being of its citizens”. For European Union, the protection of these infrastructures is one of the major objectives. An adequate level of protection must be ensured and the detrimental effects of disruptions on the society and citizens must be limited as far as possible.

The European Programme for Critical Infrastructure Protection (EPCIP) defines the Smart Grid as critical infrastructure. The adoption of smart grids is transforming the traditional energy grids, bringing control systems and devices with new requirements on the control, monitoring and protection of distribution substations and transformer stations/centres.

Figure 2. Smart Grid: Schneider Electric vision

One of the key elements of the Smart Grid is the Industrial and Automation Control Systems (IACS). The IACS control and monitor the electrical infrastructure. These control systems are composed by advanced embedded systems named Remote Terminal Units (RTU) that are evolving to become smart devices, and enclose serial and Ethernet communications, data logging capabilities, analog and digital inputs/outputs, etc.

Page 11: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 11 of 111

Figure 3. Schneider Electric Saitel® RTU platform

The Smart Grid implies advanced functionalities with the involvement of new actors. New safety and security requirements must be taken into account in this scenario, standing out standards, such as: IEC 61508 and IEC 62351. In this sense, the challenge now is to increase the safety and security aspects of the embedded systems that manage the electrical network.

2.1.2 Technical description of the case study

The case study CS1 focuses on the smart grid domain, in particular it is based on an Industrial and Automation Control Systems of the electrical substation. The substation is composed by several devices such as: sensors and actuators, remote terminal units, programmable logic controllers, supervisory control and data acquisition (SCADA), human interface machine (HMI), etc. The IACS is the element that monitors and controls the substation and sends/receives information to/from the control center.

Figure 4. Electrical substation and IACS

Page 12: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 12 of 111

Figure 5. Control Center

Schneider Electric, as IACS industry global leader, will provide the suitable experimental scenario that will be used in the project activities under realistic conditions. The aim will be to emulate a real IACS of the Electrical Distribution Network. Therefore, the scenario will cover from the highest entity in the control hierarchy, the SCADA system, to the field elements, the RTUs. Moreover, it will include the three main levels of typical smart grid control system architecture:

• Level 1 – Field Site: a subsystem that houses the acquisition system. This level runs acquisition and control activities to gather data and send it to the control center. Common devices present in the field site are the RTUs. These devices are critical assets equipped with input and output signals that provide control, monitoring and data gathering functions to the control substation, which is part of the Smart Grid. The scenario will include RTUs with acquisition signals, Ethernet and serial communications, and logical programming (Schneider Electric Saitel® RTUs).

• Level 2 – Front End: This level is in charge of concentrating the communications between the acquisition system (level 1) and the SCADA (level 3). Therefore, the second level will include the elements needed for the communication with the field site and the control center. The scenario will include RTUs with several communication ports (Schneider Electric Saitel® RTUs).

• Level 3 – Control Center: this is the highest level of the control system and includes the SCADA system. The SCADA sends the commands to the acquisition system and receives information from the field site (Schneider Electric OASyS® SCADA).

Page 13: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 13 of 111

Figure 6. Experimental scenario architecture

In conclusion, the case study CS1 will cover the functionality and equipment of a typical IACS. It will be based in a master-slave configuration, composed by several RTUs (control, communications, and acquisition), including the industrial protocols that are presented in the electrical networks, such as: DNP 3, Modbus and IEC 60870-5-104.

2.1.3 Case study state of the art

Over the last several years, utilities have replaced electro-mechanical technologies with new programmable electronic systems. While utilities have benefitted from the new technologies, it is difficult for operations personnel to determine every possible failure scenario and to predict issue-related network behaviours. The stakes are high as the tolerance for medium / high voltage electrical network downtime continues to erode. Costs are too high for both customers and utilities when network failures occur. In addition, the need to maintain safe network operation is a growing concern given the increase in complexity of the emerging networks.

These programmable electronic systems (also referred to as Intelligent Electronic Devices or IEDs), are characterized by failure modes that are different from the traditional electro-mechanical relays. The IEDs contain hundreds of electronic components and have software embedded into their microprocessors. This results in increased network complexity.

The risks are real. According to a study conducted by the UK Health and Safety Executive, 65% of incidents involving process control systems occur during the specification, design, installation and commissioning phases of the product implementation [20]. The rest occur during the maintenance and modification that take place after commissioning (see next table).

Page 14: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 14 of 111

Table 2. Impact of IEC 61508 Standards on Intelligent Electrical Networks and Safety Improvement [15]

For effective management of IED devices, risk reduction can be best achieved through the execution of robust design principles. Fortunately, industry standards such as IEC 61508 have been introduced that provide guidance on how to improve modern electrical network safety performance.

The IEC 61508 standard defines a methodology for engineering safety functions that allows all the relevant factors, associated with a product or application, to be fully taken into account and thereby meet the specific needs of users of the product and the application sector. This standard is widely used by electronic device manufacturers and suppliers when any part of the safety function contains an electrical, electronic, or programmable electronic component and where application sector international standards do not exist.

The IEC 61508 standard specifies the risk assessment and the measures to be taken in the design of safety functions for the avoidance and control of faults. In fact, IEC 61508 provides a complete safety life cycle that accounts for possible risk of physical injury and damage to the environment.

Cybersecurity is another concern in the industrial automation domain. In the last years, the systems of this domain are exposed to cyber-attacks. In this context, the standard IEC 62351 “Information Security for Power System Control Operations” is the main reference for cyber security in the electrical substation. This standard covers the cyber security of the electrical infrastructure in several aspects: access control, communications and protocols, even register, and others.

2.1.4 Case study state of the practice

Currently, the Saitel® RTU devices are checked against requirements and specifications with the following Test Plans:

1. Product and System Verification Plan. Provides a test plan for product & system that shows the general test methods for designing functional verification and for product & system verification. It covers two parts:

a. Design functional verification plan. These tests are performed during the product design & functional verification phase, when no industrial product yet exists. For this reason, tests are performed on “models”, theoretical or experimental, simulating the product. These tests are intended to assure that the design, as described in the product design files, meets its requirements as described in the product specification.

b. Product & system verification tests. These tests are performed on prototypes issued from manufacturing, during implementation & qualification phase. They are conducted before the validation tests, on simulated environment, in order to check performances, functional limits, and the margin of the product. For this reason, tests can be performed on prepared products, in order to provide appropriate estimation.

Page 15: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 15 of 111

The verification plan includes some safety tests (Failure Modes and Effects Analyses (FMEA) for digital outputs modules).

2. Product and System Validation Plan. This plan describes the overall product test strategy that organizes and optimizes all tests to be performed on the product. The tests to evaluate the equipment are of different nature:

• Functional Tests: to check the communications, inputs and output signals, diagnostics and signalling, firmware upgrading, etc.

• Electrical Safety Tests: Isolation Resistance Measurement and Dielectric Rigidity.

• Electrical Tests: consumption, protections, tolerances, etc.

• Ambient Tests: are focused on safety in certain environments and can also be considered as life-tests. They are based on standard IEC 60068-2.

• Electromagnetic Compatibility (EMC) Tests: Electrostatic Discharges, Electric Fast Transients (Burst), Surge. According to UNE–EN 610006-4 (Emissions) and UNE–EN 610006-2 (Immunity).

• Reliability Test: Mean Time Between Failures (MTBF) test is carried out according to the MIL-HDBK-217-F (Military Handbook: Reliability Prediction of Electronic Equipment).

• Cyber security Tests: access control, communications and event register according to IEC 62351.

• Mechanical Tests: enclosure, connectors, identification, etc.

In addition, before the production phase, the devices are tested by an external certification authority to obtain the EMC certifications required by the customers.

Finally, after the production phase, each manufactured module must be checked with the Module Inspection Test (MIT) procedure. The purpose of the MIT is verifying that the functionality of the manufactured module complies with specific requirements.

Page 16: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 16 of 111

2.1.4.1 Workflow

The following figure shows the standard process to design and test new RTU products and product evolutions:

Figure 7. Product design scope

The safety and security aspects are considered in the design, verification and validation phases.

2.1.4.2 Assessment

There are four different assessments for RTU products:

• Product & System Verification plan (internal department)

• Product & System Validation plan (internal department)

• Product Certification (external)

• Product & System Validation (external)

2.1.4.3 Involved roles

In general, there are several roles involved in the assessment processes:

• Electronic Hardware Engineers and Electronic Software Engineers in the verification processes

• Electronic Test Engineers in the validation process

Page 17: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 17 of 111

• Electronic Test Engineers (from external laboratory) in the certification process

• Electronic Test Engineers (from manufacturer) in post-production process

2.1.4.4 Tools and Tool chains

2.1.4.4.1 Used tools and methods (included guidelines)

Currently, there is not a tool to run the safety and security assessment for the RTUs. The target is to obtain a new tool that includes these two concerns and try to automate as much as possible the process. This tool shall consider the following standards as a reference:

• IEC 61508 (safety)

• IEC 62351 (security)

2.1.4.4.2 Tool chains

The following tool chains are used in the RTU design and development process: Table 3. Tool chains used in the RTU design process

Hardware Development Software Development

• HW scheme design: Orcad CIS (Cadence),

HDL (Cadence)

• PCB design: Allegro (Cadence)

• Circuits simulation: Tina (Texas Instrument)

• Functional testing: Visual Basic .Net

(Microsoft)

• Firmware development and testing: AVR

Studio (Atmel), CodeWarrior (Freescale), STM

Studio (ST), Coocox.

• Firmware CPLD: Quartus (Altera)

• BBDD of components: MySQL

• SW design: Eclipse, Visual Studio (Microsoft),

Work bench 3.1 (Wind River)

• SW testing: Scripts, Microsoft Excel

2.1.5 Expected technical improvements

In general, we expect to integrate new safety and security methodologies and tools to the RTU, based on the standards, such as: IEC 61508 and IEC 62351. The new AMASS tool would be integrated in the design and development RTU processes, including safety and security requirements in the workflow, improving the verification and validation and enabling the certification in these two aspects.

2.1.5.1 STO1. Architecture-driven Assurance (High Priority)

• SIL (Safety Integrity Level) estimation according to current practices.

• Link with safety/security analysis tools (impact on assurance & certification).

• Introducing safety and security concerns in the early phases of product development in order to reduce costs.

• Model-driven approaches facilitate component reuse.

2.1.5.2 STO2. Multi-concern Assurance (High Priority)

• Safety/security co-assessment (this includes several aspects such as safety and security co-design, co-analysis and co-V&V).

• Compliance management with IEC 61508 (Functional Safety) and IEC 62351 (Cybersecurity).

Page 18: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 18 of 111

2.1.5.3 STO3. Seamless Interoperability (Medium Priority)

• Integration with current Schneider tool chain for RTU design & development.

• Integration with new safety/security analysis tools.

2.1.5.4 STO4. Cross/Intra-Domain Reuse (Low Priority)

• Reuse for product upgrades and for product families.

2.1.6 Business needs

2.1.6.1 AMASS Goal 1

G1: to demonstrate a potential gain for design efficiency of complex CPS by reducing their assurance and certification/qualification effort by 50%.

• Effort for managing compliance with targeted standards.

• Effort to run safety/security analyses.

2.1.6.2 AMASS Goal 2

G2: to demonstrate a potential reuse of assurance results (qualified or certified before), leading to 40% of cost reductions for component/product (re)certification/qualification activities.

• Costs for assurance and re-certification of product upgrades or similar RTU developments.

2.1.6.3 AMASS Goal 3

G3: to demonstrate a potential raise of technology innovation led by 35% reduction of assurance and certification/qualification risks of new CPS products.

• Help to estimate the costs/effort of future developments so that Schneider Electric reduces the risks of new developments/certifications.

2.1.6.4 AMASS Goal 4

G4: to demonstrate a potential sustainable impact in CPS industry by increasing the harmonization and interoperability of assurance and certification/qualification tool technologies by 60%.

• Reduce efforts to exchange data between tools (any tool that must interact with assurance and certification activities).

Page 19: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 19 of 111

2.1.7 Usage scenarios

Table 4, Table 5 and Table 6 show the 10 usage scenarios related to Case Study 1. Table 4. CS1 TLV and TEC usage scenarios

ID: TLV UsageScenario 1 TLV UsageScenario 2 TLV UsageScenario 3 TEC UsageScenario 1

Related CaseStudy CS1 CS1 CS1 CS1

Addressed Domains Industrial Automation Industrial Automation Industrial Automation Industrial Automation

Scenario Name Assurance/Certification

Management Tool

Model-Based Development for

Safety and Security co-assessment

Reuse of components Assurance/Certification

Management Tool

Short Description Compliance with Standards/ Product

and process assurance/certification

management tool to support the

compliance assessment and

certification

1) Support for Model-based System,

Safety, and Security Co-Engineering

2) Support for Safety and Security Co-

Analysis

3) Support for Safety and Security

V&V

4) Architectural patterns: trade-off

based on analysis and certification

requirements

5) Fault Injection

Reuse of components from one

system to another

Compliance with Standards/ product

and process assurance/certification

management tool to support the

compliance assessment and

certification

Stakeholders Safety/Security Manager

Assurance Manager

Quality Manager

Safety Assessor

Safety Engineer

Security Engineer

System Engineer

System engineer

Safety engineer

Security engineer

Quality Assurance Manager

Safety/Security Manager

Assurance Manager

Quality Manager

Safety Assessor

Stakeholder constraints None None None None

Addressed Business Goals: G4 G4, G1, G3 G2 G4

Process Steps 1.- Establish Assurance &

Compliance Objectives

2.- Prepare Evidences

3.- Get Ready the Certification

Dossier

4.- Reuse in Future Dossiers

Product development on system

level concerning safety/security

-System requirements

-System design

-System analysis

-System modelling

-System verification

All 1.- Establish Assurance &

Compliance Objectives

2.- Prepare Evidences

3.- Get Ready the Certification

Dossier

4.- Reuse in Future Dossiers

Concerns Safety and Security

Reliability

Safety and Security

Reliability

Safety and Security

Reliability

Safety and Security

Reliability

Cross-system certification Yes Yes Yes Yes

Cross-domain certification No No No No

Engineering Environment

(Interoperability)

OpenCert/ AMASS Platform Open Source tools

AMASS tools when available for use

and evaluation

Toolinteraction MBSE Tools-

Safety/Security Analyses Tool and

V&V Tools (e.g. Fault Injection)

Open Source tools

AMASS tools when available for use

and evaluation

OpenCert/ AMASS Platform

Challenges Safety and Security co-assessment Safety and Security co-assessment Reuse of components targeting

items of different SILs (&security

levels)

Safety and Security co-assessment

Standards IEC 61508

IEC 62351

IEC 61508

IEC 62351

IEC 61508, IEC 62351 IEC 61508

IEC 62351

Any wishes for usage scenario N/A Reuse of established safety methods

for security topic

Reuse of established safety methods

for security topic

N/A

Any known constraints for

usage scenario

Not so far Not so far Not so far Not so far

Page 20: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 20 of 111

Table 5. CS1 TEC, KMT and AIT usage scenarios

ID: TEC UsageScenario 2 TEC UsageScenario 3 KMT UsageScenario 1 AIT UsageScenario 1

Related CaseStudy CS1 CS1 CS 1 CS1

Addressed Domains Industrial Automation Industrial Automation Industrial Automation Industrial automation and Control

Scenario Name Model-Based Development for

Safety and Security co-assessment

Reuse of components Security analysis & testing

Short Description 1) Support for Model-based System,

Safety, and Security Co-Engineering

2) Support for Safety and Security Co-

Analysis

3) Support for Safety and Security

V&V

4) Architectural patterns: trade-off

based on analysis and certification

requirements

5) Fault Injection

Reuse of components from one

system to another

Modeling of the system architecture

with SysML and adding of relevant

properties for safety (and security)

to SysML components. Perform the

FMEA and FTA based on these

components. Demonstrate Tool-

Flexibility by switching between IEC

61508 FMEDA and automotive HW

Metrics from the same data.

Demonstrate seamless

interoperability with system design

and requirement tools.

Efficient security and safety

analysis, including threat modeling

and security testing for security

assurance for components

Stakeholders Safety Engineer

Security Engineer

System Engineer

System engineer

Safety engineer

Security engineer

Quality Assurance Manager

Safety Manager

Requirments Engineer

System engineer

Safety engineer

Risk analyzer

Safety engineer

Security engineer

Test engineer

Stakeholder constraints None None None None

Addressed Business Goals: G4, G1, G3 G2 G1, G4 G1, G2

Process Steps Product development on system

level concerning safety/security

-System requirements

-System design

-System analysis

-System modelling

-System verification

All Product development on system/HW

level concerning safety (security)

-System/HW requirements

-System/HW design

-System/HW analysis

-System/HW modelling

Development and assurance process

Concerns Safety and Security

Reliability

Safety and Security

Reliability

Safety (Security) Security and safety

Cross-system certification Yes Yes none Produce assurance evidence

supporting generic, component level

security and safety case

Cross-domain certification No No none No

Engineering Environment

(Interoperability)

Open Source tools

AMASS tools when available for use

and evaluation

Toolinteraction MBSE Tools-

Safety/Security Analyses Tool and

V&V Tools (e.g. Fault Injection)

Open Source tools

AMASS tools when available for use

and evaluation

medini analyze, Rhapsody or EA, any

requirement management tool

Threat modeling tool, tool for

security testing in test phase

Challenges Safety and Security co-assessment Reuse of components targeting

items of different SILs (&security

levels)

tool adaptation for application in

another domain.

Development of a safety and

security element out of context

Standards IEC 61508

IEC 62351

IEC 61508, IEC 62351 IEC 61508 IEC 61508, IEC 62351, IEC 62443

Any wishes for usage scenario Reuse of established safety methods

for security topic

Reuse of established safety methods

for security topic

System design done with SysML.

Case study owner has to provide HW

information and proper design

models to support safety analysis

Availability of system specification

and prototype systems for security

analysis and testing

Any known constraints for

usage scenario

Not so far Not so far none generic system architecture makes it

difficult to identify safety and

security requirements and requires a

generic approach which is validated

as soon as the real usage scenario is

known

Page 21: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 21 of 111

Table 6. CS1 FBK and A4T usage scenarios

ID: FBK UsageScenario CS1 A4T UsageScenario 1

Related CaseStudy CS1 CS1

Addressed Domains Industrial Automation Industry

Scenario Name CS1FBK Security analysis & testing

Short Description 1) Modeling of the system

architecture including the plant and

the data acquisition devices

2) Formalization of the system

requirements including functional,

safety, security, and reliability

requirements

3) Formalization of component

requirements including requirements

of monitoring components

4) Validation of the requirements

including analysis of the

diagnosability of the plant

5) Contract-based verification of

requirements refinement

6) Modeling of the components

behavior

Model Based Safety Analysis (MBSA)

with safety demonstration

Stakeholders System engineer, Safety & Security

engineer, ModelBased Safety

researcher, Verification & validation

researcher

System engineer

Safety engineer

Security engineer

Stakeholder constraints None None

Addressed Business Goals: G3 G1 - G2 - G3

Process Steps system requirements

system design

system analysis

system modeling

system verification

evidence for system argumentation

Product development on system

level concerning safety/security

-System requirements

-System design

-System argumentation

Concerns Safety

Security

Reliability

Safety and Security

Cross-system certification Between system components

Cross-domain certification No No

Engineering Environment

(Interoperability)

CHESS interacting with analysis tools

(OCRA, nuXmv, xSAP) and with

OpenCert:

Modeling in SySML or AADL using

CHESS

Formalization using CHESS/OCRA

integration

Validation and Refinement checked

with OCRA

MBSE approach + Safety Architect

Challenges Assurance of monitoring

components

Application of formal methods

Generation of evidence

Safety and security co-engineering

Formalization and refinement of

Safety and Security co engineering -

collaborative work between system

architect and safety and security

analysts

Standards N/A CEI 61508

Any wishes for usage scenario N/A N/A

Any known constraints for

usage scenario

N/A N/A

Page 22: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 22 of 111

2.2 CS2: Advanced driver assistance function with electric vehicle

2.2.1 Short description of the case study

During the life of the AMASS project a complex automotive case study will be defined, which covers aspects down from vehicle level (where hazards and reliability requirements emerge) to the detailed technical implementation in hardware and software.

The automotive domain is known to be different from other domains due to the lack of national and international regulators or certification authorities for functional safety. As such, the standard ISO 26262 does not require a certification by a public authority unlike the aviation industry, where certification is needed. Even if certification is not formally required [18] , car manufacturers use compliance to ISO 26262 as a mean to qualify components and potential suppliers of E/E components (i.e. safety assurance). In this sense, the word certification is often used to describe how a certain system has been developed in compliance with ISO 26262 and audited by an independent assessor. These assessors ensure that the required safety integrity level is achieved by means of:

• Functional safety audits which evaluate the implementation of the processes required for the functional safety activities.

• Compliance management: reviews to check if a selected work product complies with the corresponding ISO 26262 requirements.

• Functional safety assessments that evaluate the functional safety achieved by the item in question.

• GAP analysis: based upon the safety integrity level required for an item, confirm that the needed development activities were performed.

The case study 2 will be based on an advanced driver assistance function (e.g. a traffic jam assistant function allowing highly automated driving of a car on highways up to a defined max speed), in which several electric drives (controller, power electronics and electric machine) act as actuators.

The case study will be executed using modelling, analysis and verification tools and their respective tool integrations.

2.2.2 Technical description of the case study

The components below are the focus of this use-case (this does not mean that all of these components necessarily have to be specified/implemented to the full extend in the context of the case study, as the main purpose of the case study is to demonstrate applicability and benefit of new AMASS technical results):

• ADAS subsystems: o Radar (24GHz or 77GHz) o Video camera o Sensor data fusion

• Vehicle control unit

• Electrical power steering system

• Brake system

• Electric Drive sub-systems: o Battery management o Main-switch o Inverter

As prototype, it is planned to use a demo car provided by B&M. This is currently based on ARM controllers. During AMASS, B&M plans to extend the fleet of demo cars by more models. Since B&M offers engineering services, Infineon is a chip manufacturer in the automotive domain. Thus, it is intended to build one or more B&M demo cars based on Infineon’s AURIX™ microcontroller platform. AURIX is available in different

Page 23: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 23 of 111

generations, the 1st is available, 2nd coming soon, while 3rd is in an early development phase. So, AMASS will help to collect relevant requirements that can still be considered for future AURIX development.

For the project itself, most likely the AURIX 1st generation will be used. Depending on availability, during the third year the 2nd generation might become a replacement.

KMT will support the case study mainly with tools for modelling the components mentioned above and providing safety analysis for the components and the system. The goal is to demonstrate advanced features of the AMASS project like the seamless integration of different tools that is elaborated in WP5, the architectural pattern approach of WP3 and the re-use approach of WP6. The efficiency advantages gained from such techniques will be demonstrated. The tool based approach will help to support later assessment of the safety case.

In the project, a prototype will be developed. Assessment itself will not take place. However, all necessary steps will be performed to prepare later assessment of products and systems.

2.2.3 Case study state of the art

The focus of development is on building blocks for future ADAS systems. The collaboration within AMASS will support the collection of field data and user requirements.

Currently, many ADAS systems rely on data fusion from two sources, e.g. camera and radar. To handle the amount of raw input data, a pre-processing takes place, usually supported by extra components such as ASICs or FPGAs. One of the goals is to increase integration of growing functionality into fewer components.

Relevant standards need to be considered, such as ISO 26262 for functional safety. Since ISO 26262 second edition most likely will be issued as draft international standard during this year or in 2017, it will be considered as available state of the art.

With the communication between cars and their environments (Car2X), an extra security aspect arises. Today, for security, there is no established standard that compares to ISO 26262 in the automotive domain. Standardization bodies are working on extensions of the standards, but nothing is established and accepted as worldwide de facto standard so far. The only available reference (in automotive) is the “Cybersecurity Guidebook for Cyber-Physical Vehicle Systems” of the SAE J3061. However, security standards exist in other domains (e.g. ED-202A: “Airworthiness Security Process Specification”) and will could serve as additional guideline here.

2.2.4 Case study state of the practice

In AMASS, controllers (e.g. ARM and AURIX) will be used to control the demo cars (provided by B&M). Functionality includes ACC. The traffic jam assistant, for example, will use sensor data (which undergoes data fusion) to control the car with respect to:

• engine control (keep distance to previous car)

• braking system (keep distance to previous car and emergency braking)

• steering (lane keeping support)

The high level part (vehicle level down to specification of the drive component) will be provided by B&M, a company that has experience with e-mobility and driver assistance projects with more than ten German carmakers and Tier1-suppliers, and has defined similar, predecessor case studies in running research projects [16].

The low level part (drive component down to control algorithms and control/power hardware) will be provided by Infineon, who is a leading supplier of both microcontrollers for safety critical vehicle applications (AURIX series) and of gate driver and power semiconductors for electric actuators (e.g. steering systems) and electric traction drives.

Page 24: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 24 of 111

The safety case will be provided with the help of tool support, especially for the safety analysis results required by the application of the ISO 26262 standard. Medini analyse will be used for the provision of the HARA (Hazard Analysis and Risk Assessment), the FMEDA (Failure Modes, Effects and Diagnostic Analysis) and the FTAs (Fault Tree Analysis). The system model will be the starting point for the safety analysis and also for the verification/validation.

For security, the situation is more difficult, as no standards or standard tools are available. We can base our work on results of research projects, but there is no real “state of practice”.

2.2.4.1 Workflow

For safety, the workflow follows the ISO 26262 safety lifecycle. For security, as there is no real state of the practice, we will follow the proposed workflow of research projects (e.g. SESAMO). An example of a combined safety security workflow looks like in Figure 8.

Figure 8. Safety and Security Workflow of the SESAMO project

2.2.4.2 Assessment

The case study serves as demonstrator. The system will not be assessed by a third party. An assessment drill will be organized within the CS-team.

2.2.4.3 Involved roles

The case study demonstrates a complete lifecycle, from OEM, via Tier suppliers to semi-conductors. Most roles involved in such a lifecycle will be part of the case study, although the case study will concentrate on innovative aspects rather than on completeness on each level.

Page 25: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 25 of 111

On average, five persons will be involved by IFX in this case study with the following roles:

• Project manager (monitoring the case study development)

• System-architect (engineers in the System Development sub group of the Infineon Automotive Business Group)

• System and safety engineers (Safety Manager of the Automotive Business Group, supported by Quality Management)

• Hardware/Software engineers (HW/SW-development for CS2)

2.2.4.4 Tools and Tool chains

2.2.4.4.1 Used tools and methods (included guidelines)

Tools:

• MATLAB / Simulink for system modeling • MATLAB Embedded Coder • Medini analyze (KMT) for safety analysis • TESTONA

Methods:

• Model-based safety and systems engineering for a distributed networked system • Contract-based modelling and formulation of requirements

2.2.5 Expected technical improvements

The focus of the CS2 is on the intra domain reuse of safety assurance data. This includes the reuse of safety artefacts such as safety arguments or FTA/FMEAs. The question then arises: what is the safety assurance impact due to design changes? For example, if a component such as a microcontroller is replaced with a model from new product family, re-assessment may become necessary. This additional and often extensive re-assessment effort is likely to be reduced by applying model-based approaches to facilitate reuse during safety assessments, as promoted by AMASS.

This CS will help assess the following objectives: STO1 (System Architecture-driven Assurance), STO3 (Seamless Interoperability) and STO4 (Cross/intra Domain Reuse).

The following improvements within the defined objectives are also purposed.

2.2.5.1 STO1. Architecture-driven Assurance

The use of a model-based approach based on contracts and defined patterns will allow a systematic analysis and creation of functional and technical safety for cooperative system-of-systems during runtime.

2.2.5.2 STO2. Multi-concern Assurance

Safety-Security-Co-Assurance is an important topic. However, this is not the main focus of CS2.

2.2.5.3 STO3. Seamless Interoperability

The case study will show for the involved tools advances in the interoperability. Furthermore, since the scenario covers the whole supply chain, the information exchange among the different stakeholders and inside a team is a topic. If there are tools available in AMASS (e.g. cloud solutions) productivity gains would be demonstrated.

Page 26: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 26 of 111

2.2.5.4 STO4. Cross/Intra-Domain Reuse

The case study will demonstrate how library concepts for re-useable components enriched with safety/security information lead to a significant reduction in the effort needed to provide the data for the assurance case.

2.2.6 Business needs

CS2 results will help to reduce assessment efforts in the following cases:

• Change of system components after initial assessment.

• Change of supplier of components involved in the system.

2.2.6.1 AMASS Goal 1

G1: to demonstrate a potential gain for design efficiency of complex CPS by reducing their assurance and certification/qualification effort by 50%.

N/A

2.2.6.2 AMASS Goal 2

G2: to demonstrate a potential reuse of assurance results (qualified or certified before), leading to 40% of cost reductions for component/product (re)certification/qualification activities.

Primary focus has been put on the automotive domain, however, the systematic approach enables potential users with cross domain challenges to benefit from this intra domain approach as well.

2.2.6.3 AMASS Goal 3

G3: to demonstrate a potential raise of technology innovation led by 35% reduction of assurance and certification/qualification risks of new CPS products.

This goal could be addressed by means of the proposed systematic creation of functional and technical safety concepts based on contracts for cooperative system-of-systems and during runtime.

2.2.6.4 AMASS Goal 4

G4: to demonstrate a potential sustainable impact in CPS industry by increasing the harmonization and interoperability of assurance and certification/qualification tool technologies by 60%.

This goal will be addressed by the information exchange among the different stakeholders using the different AMASS solutions.

Page 27: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 27 of 111

2.2.7 Usage scenarios

Table 7 and Table 8 show the 7 usage scenarios related to Case Study 2. Table 7. CS2 IFX usage scenarios

Remark to US3:

The shift from fail-silent to fail-operational systems poses a great challenge for future automotive systems, since fail-operational behaviour is up to now only implemented in other embedded systems domains with different constraints, such as the cost per unit in avionic systems [17]. However, avionics solutions such as 2oo3 (2 out of 3) are cost prohibitive in automotive. On the one hand, current research is heading into the direction of creating functional safety concepts that provide fail-operational behaviour at system level for

Page 28: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 28 of 111

individual functions. On the other hand, current microcontroller architectures are also dealing with the challenge of providing fail-operational operations without compromising costs by means of, for instance, intelligent distributed fault supervisors [18].

In the work performed, we had a focus on reuse of COTS components between application domains. Although there are standards addressing the same abstraction level (in this case component) and hold similarities (e.g. “ISO 26262-Part 5: Product development at the hardware level” versus “DO-254RTCA/DO-254, Design Assurance Guidance for Airborne Electronic Hardware”) , the dimensions of requirements are different and prevent an easy 1:1 comparison. Further efforts are necessary to first prioritize and then “translate” them between domains.

In case later work would be extended to system level, extra standards such as ARP4754, ARP4761 must be considered.

Table 8. CS2 TEC and KMT usage scenarios

Page 29: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 29 of 111

2.3 CS3: Collaborative automated fleet of vehicles

2.3.1 Short description of the case study

The automotive case study “Collaborative automated fleet of vehicles” describes how driving will be in the future. The focus is on the automation of cooperative vehicle functions that allow for the control of selected aspects of longitudinal and lateral motion of a car without driver intervention.

These functions are based on a fused environment model that integrates data from various sensor systems, as well as additional information based on Car2Car and Car2Infrastructure communication. An example of a highly automated networked vehicle function is the Cooperative Adaptive Cruise Control (CACC). CACC enables to connect the vehicles with each other, to negotiate and agree on synchronized value of the speed and warn each other about break interventions or other scenarios. Limits can be further identified and reacted.

In addition, spontaneous networking between vehicles (Car2Car) or between vehicles and infrastructure (Car2Infrastructure) results in modern networked cars, which are more reliable to deal with troublesome situations on the road. The results of the research will increase the safety, give a better traffic flow, and improve the energy efficiency. On the other side new challenges arise, e.g., more open and flexible functions, more difficult safety and security design and the necessity of open interfaces. Furthermore, there is no single manufacturer or system architect who would be fully responsible for the fulfillment of the requirements, in particular, safety requirements. This case study is an ideal application of the AMASS objectives. A demonstrator of the fleet of vehicles constitutes an important part of the validation of the AMASS research results.

Figure 9. Cooperative Adaptive Cruise Control (CACC)

2.3.2 Technical description of the case study

A collaborative automated fleet consists of multiple vehicles containing actuators and sensors. The actuators are controlled by embedded systems such as ECUs. The controllers are connected with each other in order to establish cooperation. Nowadays, the traffic density is so high that the need of intelligent systems is increased. Traffic flow can be improved by driving at smaller inter-vehicle time gaps using such intelligent systems. An important requirement for the implementation of CACC systems is to have string stable behaviour of a vehicle platoon. The challenge for the string stability is to avoid the amplification of the so-called spacing error (distance error). The spacing error is a result of a delay in the communication. The communication delay and the spacing error accumulate, such that the system becomes instable.

Page 30: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 30 of 111

Another important aspect of a string stable platoon is the chosen topology of the platoon. There are different string stability approaches for different platoon topologies. The most common method for vehicle platooning is shown in Figure 10.

a) Designated platoon leader b) N-Vehicles look ahead

Figure 10. Platoon topologies

Both topologies are bidirectional. This means that the information exchange flows from the preceding vehicle to the end of the platoon and in the opposite direction. Therefore, the vehicles use the inter-vehicle distance measured by the in-vehicle sensors and the acceleration, position and velocity sent by wireless LAN, in case a) from the preceding vehicle, in case b) from the leader and preceding vehicles. This information is then compared from the trajectory modeler and the controller to produce the best controlling results.

For a string stable platoon, it is necessary to have a reliable system.

The communication between the vehicles in a platoon is realized by the standard IEEE 802.11 and IEEE 1609. The wireless stack has a lower layer, a network service and upper layers to communicate with the vehicles. The standard for the communication is the IEEE 802.11 p that was especially designed for vehicular traffic. Wireless communication needs a short medium range technology to communicate with the vehicles. Therefore, the DSRC (Dedicated Short-Range Communication) system is utilized, and it operates in the 5.9 GHz band width.

Data rates of 27 Mbit/s are possible, but the real effective data rate is probably 6 Mbit/s. For the wireless antennas no specifications are given, but the standard organizations should create a common standard. It has to be realized a radius to the side of 300 meter and 1000 meter forward.

There are few important messages in the Car2Car communication field. One of this is the Cooperative Awareness Message (CAM) that allows sharing information with each other without any persistent communication link between the vehicles. The information between vehicles is shared by broadcasting or geocasting to all other surrounding vehicles. On the basis of the shared data between the vehicles, it is possible to analyse the vehicle trajectory and restore traffic patterns. CAM information includes Message ID, position, acceleration, speed, heading and timestamp.

Page 31: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 31 of 111

2.3.2.1 Car2X use case scenarios

Vehicle2Vehicle communication is the information exchange between at least 2 vehicles with the aim to determine scenarios that could potentially lead to hazards as well reacting to them earlier than the driver’s reaction. Some typical use case scenarios are:

• Cooperative Forward Collision Warning: sudden braking is mostly the reason for rear-end collision. The use case of Cooperative Forward Collision Warning is to avoid rear-end collision with other vehicles. Information is constantly being exchanged between the vehicles. This information consists of data such as the position, acceleration speed and heading. The ego vehicle predicts the driving behaviour of all other nearby vehicles based on the listed information. When the ego vehicle detects a critical action, the ego vehicle reacts and warns the driver.

• Hazardous Location V2V Notification: uses the shared information of preceding vehicles to determine hazardous locations. The hazardous road characteristics like sharp bends, ice, aquaplaning or other obstacles can be detected by the vehicle sensors (e.g. sensors used for Electronic Stability Program). This information can be shared with any number of vehicles over a wide area. Also, information can be shared from external service providers via roadside units.

• Pre-Crash Sensing/warning: uses periodically shared information from adjacent vehicles to predict a collision.

Figure 11 depicts an example of a state machine for graduation and degradation of a CACC system. In the CACC state, the vehicle performs the cooperative drive automatically. After a successful connection, the vehicles keep the CACC headway time. When the state manager does not receive a signal, it degrades the CACC to ACC such that the distance is kept constant by using the conventional distance sensor. Obviously, this leads to larger time gaps than the ones achieved by the CACC.

Manual drive

mode

Driver activates ACC

ACC mode CACC mode

Car2X link established

/graduate to CACC

Car2X link lost

/degradate to ACC

stm [CACC] Graduation and Degradation

Driver takes over Driver takes over

Figure 11. State Machine Diagram for graduation and degradation of assistant systems

Page 32: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 32 of 111

Figure 12 illustrates the functional architecture of a CACC system. The W-LAN connection is responsible for the communication data management. The CACC-controller controls vehicle motion based on the inter vehicle distance of the platoon members.

«hardware»WLAN Adapter

bdd CACC

«software»Communication

process Manager

«hardware»Ego Motion Sensor

«actor»Longitudinal

Actuator

«software»Trajectory Modeler

«software»State Manager

«software»Cooperative ACC

WlanDataIn

WlanDataOut

SensorData

OtherVehData

EgoData

LeaderData_Est

PrecVehData_Est

LeaderData

PrecVehData

StateMode

EgoData EgoData

Figure 12. Functional architecture of CACC

2.3.3 Case study state of the art

The Car2Car Communication Consortium Manifesto [1] is the detailed definition from the Consortium. It defines all coming standards for vehicles to communicate with each other.

A reference for the string stability is the research "Design and Experimental Evaluation of Cooperative Adaptive Cruise Control" [2]. It shows the control design and error dynamics by Cooperative systems. They tested a real fleet for the stability and the wireless communication.

Other relevant contributions are, e.g.:

• Analysis and design of controllers for cooperate and automated driving (Jeroen Ploeg) [3].

• Vehicular-2-X Communication (Radu Popescu-Zeletin, Ilja Radusch, Mihai Adrian Regani) [4].

2.3.4 Case study state of the practice

Vehicles today turn around with standards like antilock braking system, electronic stability program, attention assist and many more. The book “Handbuch Fahrerassistenzsysteme” [5] describes many ADAS systems that are actually included in vehicles today.

Another innovation in the Car2X field is presented by the new Mercedes Benz E-Class. The new E-Class is able to communicate with building sites on the road and to share information with other new E-Classes. The exchanged information includes the position of the building sites [6].

Leading projects are conducted by the pioneers of the platooning field, Mercedes Benz. In one project, three trucks were tested successfully by Mercedes Benz on a German highway A61 with a – by Daimler developed – connected Highway Pilot [7]. The video in [8] shows the implemented track platooning and the related use cases in practice. The company Continental belongs also to the leading companies for truck platooning, with many successfully performed tests.

Highly or fully automated vehicles, which are today in a prototype stage (but partly involving testing on public roads), heavily rely on infrastructure data, which is today restricted mainly to GPS and partly traffic information broadcasted by available radio systems, to some extend also communication to proprietary back-end servers. It can be expected, that these highly or fully automated vehicles would benefit from car-to-car communication as well (if the car-to-car communication is not already part of the automation

Page 33: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 33 of 111

function itself, as is the case in platooning or cooperative ACC settings) – but this is hampered today by the lack of a sufficient amount of Car2X enabled vehicles on the roads today.

As there are no series vehicles on the market equipped with highly automated and networked functions, it is not possible to determine the state of the practice regarding design, safety analysis and safety case generation for such systems. The AMASS project, in particular as applied to Case Study 3, is part of a large stream of industrial and academic research projects aiming at defining the state of practice for the future.

Nevertheless, already today it is possible to derive requirements for the future solution and to extrapolate the current state of practice in development of highly automated and/or networked vehicle function. As the author of this section has worked as a consultant with 10+ major carmakers and automotive suppliers, there is a sound and consistent impression of vehicle function development in industrial practice: formally, the vast majority of carmakers and suppliers adheres to the V-model as defined e.g. in the Automotive SPICE standard ISO 15504 and in ISO 26262 for safety-related systems. But even for traditional mechatronic systems, the distribution of the V-model process across carmaker and one or several suppliers is not sufficiently mastered, in particular when it comes to the integration of safety analyses and the safety case across different companies, or when it comes to reusing pre-existing components in new contexts. Proposals that have been elaborated in cooperation with industry partners do exist, but have not yet made their way into practice in a broad range [21][22]. Using contracts as a mean of doing so has been proposed by the author to different industry companies, and attracted some attention, but not yet practices in any project to the author’s knowledge.

Regarding runtime-safety certification, which would be required for cooperative systems (systems-of systems, that constitute themselves at runtime) there is no existing approach throughout the industry, to the author’s best knowledge. As many of these innovative functions make their way directly from corporate research departments into test vehicles, even the V-model and ISO 26262 have sometimes not been observed so far and it seems a challenge to compensate for this when taking the new functions into series vehicles requiring safety-certification. The approach of using runtime contracts for safety certification of systems-of-systems in the automotive domain, as discussed in the AMASS consortium, has never been applied in industry, nor is there any other commonly accepted approach to address the same tasks.

2.3.4.1 Workflow

Table 9. CS3 Workflow

DEVELOPMENT PHASE ACTIVITY

Case Study Specification Specification of the necessary artefacts

Requirement specification

Item definition & Architecture design

Hazard analysis and risk assessment

Case Study Implementation and Benchmarking

Implementation of a physical platform of 3 model cars

Benchmarking for a CACC enabling to group the vehicles into platoons at runtime

During each phase the following process steps are taken into consideration:

• System/SW/HW requirements (based on contracts) • System/SW/HW design • System/SW/HW analysis (based on contracts) • System modelling • System/SW/HW verification

Page 34: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 34 of 111

2.3.4.2 Assessment

Assessments will be done by persons within the participating organizations with the corresponding competence.

2.3.4.3 Involved roles

6-7 persons will be involved by B&M in this case study with the following roles:

• Project manager (monitoring the case study development)

• System-architect (designing the architecture of the system)

• System and safety engineers (design-concept for the case study and model cars including safety aspects)

• Hardware/Software engineers (HW/SW-development for the CS)

2.3.4.4 Tools and Tool chains

2.3.4.4.1 Used tools and methods (included guidelines)

Tools:

• MATLAB / Simulink

• MATLAB Embedded Coder

• Microsoft Visual Studio

• Savona (to be developed tool within AMASS project) Methods:

• Model-based safety and systems engineering for a distributed networked system

• Contract-based modelling and formulation of requirements

• Safety assurance during runtime based on the cooperation of the members in the network

2.3.4.4.2 Tool chain

For safety analysis and requirements management currently, only Visio (ViConEx) and Excel are used. AMASS tools and methods will be applied in the course of the project; especially the tool Savona, which is under development right now. This will be used for modelling and architecture design and formulation of semi-formal contracts. Furthermore, MATLAB/Simulink is used for modelling of the system and controller design purposes. MATLAB Embedded Coder is used for automatic code generation.

2.3.5 Expected technical improvements

The focus of the CS3 is on the automation of cooperative vehicle features, which enables a partly autonomous longitudinal and lateral control of vehicles in a network and during runtime. This CS will help assess the following objectives: STO1 (System Architecture-driven Assurance), STO2 (Multi-concern assurance), and STO3 (Seamless Tool Interoperability).

The following improvements within the defined objectives are also purposed:

2.3.5.1 STO1. Architecture-driven Assurance

The use of a model-based approach based on contracts and defined patterns will allow a systematic analysis and creation of functional and technical safety for cooperative system-of-systems during runtime.

2.3.5.2 STO2. Multi-concern Assurance

Formulation of different types of concerns via contracts is possible and the verification and validation of requirements by checking the contracts will be improved.

Page 35: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 35 of 111

2.3.5.3 STO3. Seamless Interoperability

A platform for the evaluation of the objectives based on the running car instances and the interactions of multiple autonomous cars interplaying with each other will be provided.

2.3.5.4 STO4. Cross/Intra-Domain Reuse

N/A

2.3.6 Business needs

CS3 along with the results from other WPs could cover all the AMASS goals with reservations regarding the mentioned metrics in the goals. This is to still to be analysed and found out within the evolution of the project.

2.3.6.1 AMASS Goal 1

G1: to demonstrate a potential gain for design efficiency of complex CPS by reducing their assurance and certification/qualification effort by 50%.

This goal is addressed within CS3 via the proposed model-based safety and systems engineering methods based on contracts for a distributed networked system (system-of-systems) and via the development of advanced driver assistance systems (e.g., Traffic Sign Recognition (TSR) systems).

2.3.6.2 AMASS Goal 2 and Goal 3

G2: to demonstrate a potential reuse of assurance results (qualified or certified before), leading to 40% of cost reductions for component/product (re)certification/qualification activities.

G3: to demonstrate a potential raise of technology innovation led by 35% reduction of assurance and certification/qualification risks of new CPS products.

These goals could be addressed by means of the proposed systematic creation of functional and technical safety concepts based on contracts for cooperative system-of-systems and during runtime.

2.3.6.3 AMASS Goal 4

G4: to demonstrate a potential sustainable impact in CPS industry by increasing the harmonization and interoperability of assurance and certification/qualification tool technologies by 60%.

This goal can be addressed by the introduced development of advanced driver assistance systems for cooperative systems (e.g., Cooperative Adaptive Cruise Control) and their physical implementation and also by the validation and verification of the developed methods and tools (e.g., Savona) within the AMASS project.

Page 36: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 36 of 111

2.3.7 Usage scenarios

Table 10, Table 11, Table 12 and Table 13 show the 16 usage scenarios related to Case Study 3. Table 10. CS3 B&M usage scenarios

ID: B&M UsageScenario 1 B&M UsageScenario 2 B&M UsageScenario 3 B&M UsageScenario 4

Related CaseStudy CS3 CS3 CS3 CS3

Addressed Domains Automotive Automotive Automotive Automotive

Scenario Name CS3Modelling CS3Safety CS3SafetyRuntime CS3ADAS

Short Description Model-based safety and systems

engineering based on contracts for a

distributed networked system

(system-of-systems)

Systematic creation of functional

and technial safety concepts based

on contracts

Systematic creation of functional

and technial safety concepts based

on contracts for cooperative system-

of-systems during runtime

Development of advanced driver

assistance systems (e.g., Traffic Sign

Recognition (TSR) systems)

Stakeholders System engineers

Safety engineers

Safety engineers Safety engineers System engineers

Stakeholder constraints None None None None

Addressed Business Goals: G1

(with reservations reg. The metrics)

G2, G3

(with reservations reg. The metrics)

G2, G3

(with reservations reg. The metrics)

G1, G3

(with reservations reg. The metrics)

Process Steps Product development on system

level concerning

-System requirements (based on

contracts)

-System design

-System analysis (based on

contracts)

-System modelling

-System verification

Product development on system

level concerning

-System requirements (based on

contracts)

-System design

-System analysis (based on

contracts)

-System modelling

-System verification

Product development on system

level concerning

-System requirements (based on

contracts)

-System design

-System analysis (based on

contracts)

-System modelling

-System verification

Product development on system

level concerning

-System requirements (based on

contracts)

-System design

-System analysis (based on

contracts)

-System modelling

-System verification

Concerns Safety

Systems Engineering

Safety

Systems Engineering

Safety

Systems Engineering

Safety

Systems Engineering

Cross-system certification

Cross-domain certification

Engineering Environment

(Interoperability)

MATLAB / Simulink

Savona (to be developed tool within

AMASS project)

Savona (to be developed tool within

AMASS project)

Savona (to be developed tool within

AMASS project)

MATLAB / Simulink

Savona (to be developed tool within

AMASS project)

Challenges Contract-based modelling and

formulation of requirements,

Safety assurance during runtime

and based on the cooperation of the

members in the network

Contract-based modelling and

formulation of requirements,

Safety assurance during runtime

and based on the cooperation of the

members in the network

Contract-based modelling and

formulation of requirements,

Safety assurance during runtime

and based on the cooperation of the

members in the network

Contract-based modelling and

formulation of requirements,

Safety assurance during runtime

and based on the cooperation of the

members in the network

Standards ISO 26262 ISO 26262 ISO 26262 ISO 26262

Any wishes for usage scenario N/A N/A N/A N/A

Any known constraints for usage

scenario

N/A N/A N/A N/A

Page 37: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 37 of 111

Table 11. CS3 B&M and TEC usage scenarios

ID: B&M UsageScenario 5 B&M UsageScenario 6 TEC Usage Scenario 7 TEC Usage Scenario 8 TEC Usage Scenario 9

Related CaseStudy CS3 CS3 CS3 CS3 CS3

Addressed Domains Automotive Automotive Automotive Automotive Automotive

Scenario Name CS3CooperativeSystems CS3V&V Assurance/Certification

Management Tool

Fault Injection for Safety and

Controllability Evaluation of

Cooperative System of Systems

Architectural patterns for assurance

Short Description Development of advanced driver

assistance systems for cooperative

systems(e.g., Cooperative Adaptive

Cruise Control) and their physical

implementation

Validation and verificationof the

developed methods and tools (e.g.,

Savona) within AMASS-project

Compliance with Standards/ product

and process assurance/certification

management tool to support the

compliance assessment and

certification

1) calculate the FTTI which is directly

related to the controllability of

vehicles

2) evaluate and improve the

robustness of automated functions

3)early V&V of safety concepts

4) obtain trade-off evaluation results

between safety and cost issues,

already at concept level.

Creation of arguments for fault

tolerance and specific technologies

Stakeholders System engineers

Software engineers

System engineers

Safety engineers

Safety/Security Manager

Assurance Manager

Quality Manager

Safety Assessor

System engineer

Safety engineer

Security engineer

Verification/Test Engineer

Safety/Security Engineer

System Engineer

Stakeholder constraints None None None None None

Addressed Business Goals: G4

(with reservations reg. The metrics)

G4

(with reservations reg. The metrics)

G4 G4, G1, G3 G1, G2, G3, G4

Process Steps Product development on system

level concerning

-System requirements (based on

contracts)

-System design

-System analysis (based on

contracts)

-System modelling

-System verification

Product development on system

level concerning

-System requirements (based on

contracts)

-System design

-System analysis (based on

contracts)

-System modelling

-System verification

N/A N/A N/A

Concerns Safety

Systems Engineering

Safety

Systems Engineering

Safety and Security Safety and Security Safety and Security

Cross-system certification electric vehicle sub-system (CS2) No No No

Cross-domain certification No No No

Engineering Environment

(Interoperability)

MATLAB / Simulink

Savona (to be developed tool within

AMASS project)

Savona (to be developed tool within

AMASS project)

Open Source tools

AMASS tools when available for use

and evaluation

Open Source tools

AMASS tools when available for use

and evaluatio

Open Source tools

AMASS tools when available for use

and evaluation

Challenges Contract-based modelling and

formulation of requirements,

Safety assurance during runtime

and based on the cooperation of the

members in the network

Contract-based modelling and

formulation of requirements,

Safety assurance during runtime

and based on the cooperation of the

members in the network

Certification challenges on SoS,

architectural/technological patterns

Safety and Security co-engineering,

FI in SoS, FI addressing ADAS for

cooperative systems

Creation of argument patterns per

system component for fault

tolerance and specific technologies

Standards ISO 26262 ISO 26262 ISO 26262, J3061 ISO 26262, J3061 ISO 26262, J3061

Any wishes for usage scenario N/A N/A N/A N/A N/A

Any known constraints for

usage scenario

The implentation is planned to be an

indoor fleet of 3 small-sized vehicles.

N/A N/A N/A N/A

Page 38: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 38 of 111

Table 12. CS3 KMT, MDH, AIT and ViF usage scenarios

ID: KMT UsageScenario 3 MDH UsageScenario 1 AIT UsageScenario 2 ViF UsageScenario 1

Related CaseStudy CS3 CS3 CS3 CS3

Addressed Domains Automotive Automotive Automotive Automotive

Scenario Name Model-Based Multi-concern Analysis

and Assurance Case Generation

Safety & security co-analysis of

autonomous and collaborative

vehicles

MBS3E

Short Description Modeling and analysis of the system

incl. architecture model, functions,

requirements & safety goals +

required safety analysis with focus

on re-use (e.g. component libraries)

and multi concern aspects (especially

security). The CS3 is based on CS2.

Support for Safety and Security

Analysis

Argumentation (SACM/GSN)

Contract-based assurance cases

Configuration-aware contracts

Product-based reuse

Safety and Security co-analysis, co-

design following

- Safety (ISO26262)

- Security (J3061)

Model-based System, Safety, and

Security Engineering

Support for Safety and Security

Analysis (FMEA & FMEVA and FTA &

ATA)

Contract-based Design for System

Architecture by Safety and Security

Contracts

Stakeholders Safety Manager

Requirments Engineer

System engineer

Safety engineer

Security engineers

N/A Risk analyzer

Safety engineer

Security engineer

G1, G4

Stakeholder constraints None N/A None Product development on system

level concerning safety/security

-System requirements

-System design

-System analysis

-System modelling

-System verification

-System argumentation

Addressed Business Goals: G1, G4 G1, G2 G1, G2, G3, G4 System engineer

Safety engineer

Security engineer

Process Steps Product development on system/HW

level concerning safety and security

-System/HW requirements

-System/HW design

-System/HW analysis

-System/HW modelling

Product development on system

level concerning safety/security

-System requirements

-System design

-System analysis

-System modelling

-System argumentation

Development process, mainly

focusing on requirement elicitation,

support of implementation of

combined safety&security concept

None

Concerns Safety & Security Safety and Security Safety and Security Safety and Security

Cross-system certification potentially yes Yes No •Control Vehicle by Smartphone

Application( e.g. Intelligent battery

charging)

•ECU updating over-the-air(e.g.

Update of battery management unit)

Cross-domain certification none No No No

Engineering Environment

(Interoperability)

medini analyze, Rhapsody or EA, any

requirement management tool,

Testing tools, Office tools

Open Source tools

AMASS tools when available for use

and evaluation

Toolinteraction MBSE Tools-

Safety/Security Analyses Tool and

V&V Tools + industry-required tools

when appropriate

safety and security analysis tool;

assurance workflow engine (?tbd)

MBSE by EA

Tool interaction MBSE Tools-

Safety/Security Analyses Tool

Challenges multi concern design, tool

interoperability

Safety and Security co engineering,

Commonality & Variability

systematization

Safety and security co-engineering

and interaction points

Safety and Security co engineering

Standards ISO 26262 ISO 26262 ISO 26262

SAE J3061

ISO 26262

SAE J 3061

Any wishes for usage scenario System design done with SysML.

Case study owner has to provide

models and requirements to support

safety analysis

Reuse of established safety methods

for security topic

Offer the possiblity to conduct

security&safety tests on the

intended demonstrator, e.g. inject

threats and demonstrate correct,

e.g. safe, system reaction

Reuse of established safety methods

for security topic

Any known constraints for

usage scenario

none Not so far Restricted size (max. 3 vehicles) will

not allow load tests and may hide

issues with scaling.

Only certified tools in the company

allowed

Page 39: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 39 of 111

Table 13. CS3 ViF and A4T usage scenarios

ID: ViF UsageScenario 2 ViF UsageScenario 3 A4T UsageScenario 2

Related CaseStudy CS3 CS3 CS3

Addressed Domains Automotive Automotive Automotive

Scenario Name S2oPL P2S2A Safety & security co-analysis of

autonomous and collaborative

vehicles

Short Description Safety- and Security-oriented

Process Line

Process Modelling Framework that

supports

- QualityManagment (ASPICE),

-Safety (ISO26262) and

- Security (J3061) Aspects

Process- and Product-based Safety

and Security Assurance

• Safety and Security Argumentation

Modelling in GSN

• Process and Product-based

Arguments

• Patterns support reuse of

argumentation

Model Based Safety Analysis (MBSA)

with safety demonstration

Stakeholders G2 G2, G3 System engineer

Safety engineer

Security engineer

Stakeholder constraints Supporting of process management

for company and project specific

aspects

Safety and security argumentation

on concept and system level

None

Addressed Business Goals: Process manager

Safety engineer

Security engineer

Quality Assurance Manager

Safety engineer

Security engineer

G1 - G2 - G3

Process Steps None None Product development on system

level concerning safety/security

-System requirements

-System design

-System argumentation

Concerns Safety and Security Safety and Security Safety and Security

Cross-system certification •Control Vehicle by Smartphone

Application( e.g. Intelligent battery

charging)

•ECU updating over-the-air(e.g.

Update of battery management unit)

•Control Vehicle by Smartphone

Application( e.g. Intelligent battery

charging)

•ECU updating over-the-air(e.g.

Update of battery management unit)

Between system components

Cross-domain certification No No No

Engineering Environment

(Interoperability)

WEFACT(AIT),

EPF-C

Prosurance(TEC);

PTC-Integrity

MBSE approach + Safety Architect

Challenges Safety and Security co engineering Safety and Security co engineering Safety and Security co engineering -

collaborative work between system

architect and safety and security

analysts

Standards ISO 26262

SAE J 3061

ASPICE

ISO 26262

SAE J 3061

ASPICE

Iso 26262

Any wishes for usage scenario Reduce engineering process

activities for safety and security

engineering

Reusable argumentation patterns for

safety and security aspects

N/A

Any known constraints for usage

scenario

Different standards use different

terms and definitions -->

Harmonisation

no joint approach for common

safety and security assessment

N/A

Page 40: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 40 of 111

2.4 CS4: Design and safety assessment of on-board software applications in Space Systems

2.4.1 Short description of the case study

The space domain case study CS4 aims to evaluate the current processes of On Board Software (OBSW) applications design and safety analysis by comparing them with a model-based design approach adding specific safety characteristics. The Space Agencies and the Space Industrial effort are focusing on advancing the design of critical OBSW applications towards a model-based approach. This approach shall allow the Software and Safety Engineers:

1. To include dependability and safety aspects early in the development process

2. The reuse of components from one mission to another

3. To reduce time and costs, increasing development efficiency

This use case will be based on the OBSW developed for the Ocean & Land Colour Instrument (OLCI) used in the satellite Sentinel-3.

2.4.1.1 Sentinel-3 description

The Sentinel-3 satellite is part of the European Commission’s Copernicus programme, an environmental monitoring programme that tackles the effects of climate change and safeguard everyday lives.

The Sentinel-3 satellite will measure Earth’s oceans, land, ice and atmosphere to monitor and understand large-scale global dynamics. It will also provide information in near-real time for ocean and weather forecasting.

This mission is based on two identical satellites orbiting in constellation. The first satellite (Sentinel-3A) was launched on 16 February 2016 capturing the first images two weeks after the launch [9].

Figure 13. Iberian Peninsula [9]

2.4.1.2 OLCI description

The Ocean & Land Colour Instrument (OLCI) is a multi-spectral optical camera for Ocean and Land Colour. The Instrument Control Module (ICM) is part of the OLCI Electronics Unit (OEU). ICM is mainly responsible

Page 41: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 41 of 111

for global managing the OLCI elements and supporting the OEU ICM SW, which runs on an ERC32 microprocessor with SPARC v7 architecture.

The OEU ICM SW running is divided in two parts:

• Basic Software (BSW): provides bootstrap and I/O drivers.

• Application Software (APPSW): implements the mission functionality.

2.4.2 Technical description of the case study

This case study will focus on some functionalities of the Application Software (APPSW) of the OEU ICM SW. Namely, the OEU ICM SW implements the algorithm for controlling the Video Acquisition Module (VAM) and the Focal Plane Assembly (FPA), that provide the Science Video Frames for creating the Science Report, which are part of the equipment telemetry.

Figure 14. OLCI instrument

2.4.2.1 Technical description of the “Component Reuse”

The CS4 activities will aim to identify software Building Blocks which can be reused in different missions. This shall cover:

• The way the Building Block is defined (e.g., inputs, outputs)

• The non-functional parameters that can be configured (in particular the safety parameters) and allow the SW Engineer to tailor the Building Block according to the requirements of a mission.

The CS4 will identify potential Building Blocks and will assess the feasibility to be used in different operational missions.

2.4.2.2 Technical description of the “Re-qualification”

During the CS4, the impact of a software re-qualification due to a change in the execution platform (e.g., the processor, the communication buses, memory type or size, etc.) will be measured.

Currently the ICM has the following main elements:

• ERC32 processor with PROM, EEPROM and SRAM

• 1553 bus coupler

• RS-422

Page 42: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 42 of 111

• On-board Time (OBT) register

2.4.2.3 Technical description of the “Safety analysis with the AMASS platform”

Currently, safety assessment is manually performed. The CS4 will conduct different safety analyses based on the software model. This implies that the safety information has to be present in the model.

The benefits of taking into account the safety information (requirements and constraints) in the early phases of a Software development will be assessed.

2.4.3 Case study state of the art

Standardization is one of the key factors for the ESA (European Space Agency) in order to develop space critical applications. Therefore, the ESA created a series of standards named ECSS (The European Cooperation for Space Standardization) which include standards (normative), handbooks (non-normative) and technical memorandum (non-normative). They include processes for:

• Space project management

• Space product assurance

• Space engineering

The ECSS also addresses dependability and safety processes at system and software level. Here are listed some of these standards:

• ECSS-Q-ST-30 defines the requirements for a dependability assurance programme for space projects.

• ECSS-Q-ST-40 includes the safety programme and the technical safety requirements for critical applications.

• ECSS-E-ST-40 states the principles and requirements applicable to space software engineering.

• ECSS-Q-ST-80 defines the software product assurance programme for space projects. It assesses the need of a SW critical analysis and measures establishment for assuring the reliability of critical software.

The standards are tailored according to the specific needs and requirements of each project and guide the activities to be performed.

2.4.3.1 Model-based design and safety assurance

Nowadays the complexity and functionality of safety critical systems is increasing more and more. This leads to a higher demand of safety and dependability software components for Safety Critical Systems and new software design paradigms.

In this scenario, the ESA is evaluating requirements, techniques and methods to develop space applications based on:

• Model-driven architectures

• Component-based design

• Decoration of models with non-functional attributes

• Modelling both the static and dynamic architecture

• Execution of analysis (e.g., performance, safety, dependability) at model-level

• Code generation from system models

• Qualification

2.4.4 Case study state of the practice

The space use case CS4 focuses on the requirements specification, design and model analysis phases. In the real Sentinel-3 mission these phases were implemented as explained below:

Page 43: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 43 of 111

• Requirements specification. The requirements were defined and compiled using DOORS and expressed using natural language. Apart from the formulation of the system and software requirements, DOORS included not only the trace among them but also the trace to the design entities and test cases. Furthermore, DOORS stored the FMEA (Failure Modes and Effects Analysis) information and the links among the failure modes/compensation provisions and the corresponding requirements, design entities and test cases.

• Design. The design was developed using Borland Together tool and HRT-UML (Hard-Real Time – Unified Modelling Language). This language defines an extension profile of UML. It is used to model generic architectures and it is especially useful for modelling hard-real time systems.

• Model analysis: Taking advantage of HRT-UML, the CPU load and schedulability analyses were directly performed. The method selected to analyse the feasibility of the proposed architecture was the Response Time Analysis.

Despite using a model-driven approach for the architecture design, the design did not include safety information (e.g., safety contracts). The FMEA tables were manually generated and stored in DOORS. Only the FMEA traces to requirements and design entities were automatically generated. The rest of the information provided in the Safety Critical Analysis Report (SCAR) was prepared without any tool support.

Table 14 includes the development phases covered by the space use case CS4 highlighting the tools used in each of them. Table 14. State of practice of Sentinel-3 OEU ICM SW

DEVELOPMENT PHASE ACTIVITY TOOLS USED

Requirements Specification

(Requirements baseline and technical specification)

Specification DOORS

Traceability DOORS

Architecture Design

/ Detail design

Static design HRT-UML

Dynamic behaviour Borland Together (sequence diagrams)

Model Analysis Schedulability analysis HRT-UML

CPU load HRT-UML

FMEA/FTA Manual

Page 44: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 44 of 111

2.4.4.1 Workflow

The following figure shows the standard software lifecycle for space operational projects.

Figure 15. Development life-cycle

The dependability and safety analyses run either in parallel or in conjunction with the software development process. To carry out an efficient software dependability and safety analysis two different techniques can be used:

• Inductive Bottom-Up approach: from identified software failures, the hazards that could arise from them are assessed (e.g. SFMECA technique).

• Deductive Top-Down approach: starts analysing identified hazards-events with the purpose of finding out the potential causes (e.g. SFTA technique).

2.4.4.2 Assessment

These are the different assessment of the embedded operational projects:

• Verification report

• Validation report

• Independent verification and validation process (depending on the criticality level)

• Software critical Analysis report

• Budget report

2.4.4.3 Involved roles

These are the main roles involved in the assessment process:

Page 45: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 45 of 111

• System Engineer

• Software Engineer

• Avionics Engineer

• Safety Engineer

• Test or V&V Engineer

2.4.4.4 Used tools and methods (included guidelines)

2.4.4.4.1 Tool chain

Table 14 includes the tools used for the development of the ICM instrument.

Other tools commonly used in Space Systems are the following:

• Requirements specification: DOORS, Requisitepro.

• Design/Development: Eclipse, Enterprise Architect, Rational Software Modeller, MagicDraw, SolidWorks, Qt, Tcl, Oxygen, Matlab, Gcc, Gdb, J2SE, etc.

• Tests: AdaTest, Cppunit, Cxxtesst, VectorCaset, etc.

2.4.5 Expected technical improvements

The following objectives are pursued:

• Assess the feasibility of components reuse (e.g., using different execution platforms). Evaluation of how the software components shall be configured (i.e., variants in the product line) to be reused from one mission to another, as well as assess the cost and time reduction during the re-qualification process.

• Analyse, at model level, the impact on the re-qualification when the hardware platform is modified (e.g., partitions, multicore, etc.).

• Analyse the system safety, performance, reliability and availability requirements using the AMASS platform to: o Evaluate its applicability in the Space Domain (compliance with ECSS standards). o Comparison to current process and practices. o Proposals for improvements.

2.4.5.1 STO1. Architecture-driven Assurance

• Introducing the safety concerns in the early phases of the Software development (i.e., software design) will reduce the time for qualifying the final product.

• The use of a model driven approach will facilitate the design and Software reuse and less time will be needed for re-qualification that Software.

2.4.5.2 STO2. Multi-concern Assurance

• The Verification and Validation of safety-related requirements will be improved.

2.4.5.3 STO3. Seamless Interoperability

• Feedback from the activities and tools will be provided to the technical work packages for completing the AMASS platform.

2.4.5.4 STO4. Cross/Intra-Domain Reuse

• N/A

Page 46: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 46 of 111

2.4.6 Business needs

2.4.6.1 AMASS Goal 1

G1: to demonstrate a potential gain for design efficiency of complex CPS by reducing their assurance and certification/qualification effort by 50%.

Methodology and Model driven design approach to create safety case (ECSS standards based).

2.4.6.2 AMASS Goal 2

G2: to demonstrate a potential reuse of assurance results (qualified or certified before), leading to 40% of cost reductions for component/product (re)certification/qualification activities.

Identification of space building blocks which can be tailored and reused from one mission to another. Generation of safety evidences for space building blocks.

2.4.6.3 AMASS Goal 3

G3: to demonstrate a potential raise of technology innovation led by 35% reduction of assurance and certification/qualification risks of new CPS products.

To check different architecture choices at design level (e.g., architectural trade-offs based on the model analysis results).

2.4.6.4 AMASS Goal 4

G4: to demonstrate a potential sustainable impact in CPS industry by increasing the harmonization and interoperability of assurance and certification/qualification tool technologies by 60%.

Integration of all development tools in a single environment, providing fully interoperability among them.

Page 47: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 47 of 111

2.4.7 Usage scenarios

Table 15 and Table 16 show the 9 usage scenarios related to Case Study 4. Table 15. CS4 GMV and TEC usage scenarios

ID: GMV UsageScenario 1 GMV UsageScenario 2 GMV UsageScenario 3 TEC UsageScenario 10

Related CaseStudy CS4 CS4 CS4 CS4

Addressed Domains Space Space Space Space

Scenario Name Component Reuse Re-qualification Safety analysis with AMASS platform Model-Based Development

Short Description This usage scenario aims to assess

the feasibility of components reuse

using different execution platforms

This usage scenario aims to analyse

at model level, the impact of a re-

qualification when the HW platform

is modified

Analyse the system safety,

performance, reliability and

availability requirements using the

AMASS platform

1) Support for Model-based System,

Safety, and Security Co-Engineering

2) Support for Safety and Security Co-

Analysis

3) Support for Safety and Security

V&V

4) Support for Contract-based Design

for System Architecture by Safety

and Security Contracts

4) Architectural patterns: trade-off

based on analysis and certification

requirements

5) Fault Injection

Stakeholders System Engineer

Software Engineer

Avionics Engineer

Safety Engineer

Test Engineer

System Engineer

Safety Engineer

Test Engineer

System Engineer

Safety Engineer

Test Engineer

System engineer

Safety engineer

Security engineer

Stakeholder constraints None None None None

Addressed Business Goals: G1

G2

G1

G4

G1

G2

G3

G4

G4, G1, G3

Process Steps · Requirements specification

· Design

· Model Analysis

· Traceability

· Requirements specification

· Design

· Model Analysis

· Traceability

· Requirements specification

· Design

· Model Analysis

· Traceability

Product development on system

level concerning safety/security

-System requirements

-System design

-System analysis

-System modelling

-System verification

-System argumentation

Concerns Safety Safety Safety Safety, Security, Reliability,

Availability, Maintainability

Cross-system certification No No No Yes

Cross-domain certification No No No No

Engineering Environment

(Interoperability)

· Requirements and Desing: CHESS

· Model Analysis (with tools

integrated with CHESS, e.g., MAST,

OCRA, xSAP, etc.).

- Schedulability analysis.

- Safety contracts.

- FMEA/FTA.

· Requirements and Desing: CHESS

· Model Analysis (with tools

integrated with CHESS, e.g., MAST,

OCRA, xSAP, etc.).

- Schedulability analysis.

- Safety contracts.

- FMEA/FTA.

· Requirements and Desing: CHESS

· Model Analysis (with tools

integrated with CHESS, e.g., MAST,

OCRA, xSAP, etc.).

- Schedulability analysis.

- Safety contracts.

- FMEA/FTA.

Open Source tools

AMASS tools when available for use

and evaluation

Toolinteraction MBSE Tools-

Safety/Security Analyses Tool and

V&V Tools

Challenges Improve the reuse based on

software and hardware co-design.

Improve the re-qualification process. Safety analysis at model design. Safety and Security co-engineering,

innovative fail-operational concepts,

Safety and Security and Function

Availability co-engineering, definition

of architectural patterns

Standards ECSS-M-ST-80C

ECSS-Q-ST-10C

ECSS-Q-ST-80C

ECSS-E-70-41A

ECSS-E-ST-10C

ECSS-E-ST-40C

ECSS-E-ST-30C

ECSS-E-ST-40C

ECSS-M-ST-80C

ECSS-Q-ST-10C

ECSS-Q-ST-80C

ECSS-E-70-41A

ECSS-E-ST-10C

ECSS-E-ST-40C

ECSS-E-ST-30C

ECSS-E-ST-40C

ECSS-M-ST-80C

ECSS-Q-ST-10C

ECSS-Q-ST-80C

ECSS-E-70-41A

ECSS-E-ST-10C

ECSS-E-ST-40C

ECSS-E-ST-30C

ECSS-E-ST-40C

ECSS-Q-ST-30, ECSS-Q-ST-40, ECSS-Q-

ST-80

Any wishes for usage scenario - - - Reuse of established safety methods

for security topic

Any known constraints for

usage scenario

- - - Not so far

Page 48: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 48 of 111

Table 16. CS4 TEC, FBK, INT and TAS-E usage scenarios

ID: TEC UsageScenario 11 TEC UsageScenario 12 FBK UsageScenario CS4 INT UsageScenario 1 TAS-E UsageScenario 1

Related CaseStudy CS4 CS4 CS4 CS4, CS10, CS11 CS4

Addressed Domains Space Space Space Space Space

Scenario Name Reuse of components Assurance/Certification

Management

ToolAssurance/certification tool

CS4FBK INT-US1 OLCI

Short Description Reuse of components from one

mission to another

Compliance with Standards/ product

and process assurance/certification

management tool to support the

compliance assessment and

certification

1) Specification of a subset of

standard components used in space

systems (including parameters and

contracts)

2) Modeling of the system

architecture using the library of

components

3) Formalization of requirements and

their refinement

4) Contract-based verification of the

requirements refinement

5) Change architecture by changing

decomposition and parameter

values

6) Compare different architectures

based on soft requirements and fault

trees

Model-based System, Safety,

and Security Engineering

Support for Safety and

Schedulability Analysis

Contract-based Design for

System Architecture by Safety

and Security Contracts,

Contract refinement formal

verification

In-flight SW

Stakeholders System engineer

Safety engineer

Security engineer

Quality Assurance Manager

Quality Assurance Manager

Safety engineer

Security engineer

System engineer, Safety & Security

engineer, ModelBased Safety

researcher, Verification & validation

researcher

System engineer

Safety engineer

Assurance engineer

Software Engineer

Stakeholder constraints None None None None

Addressed Business Goals: G2 G4 G3 G1, G2, G3 G1, G2

Process Steps system requirements

system design

system analysis

system modeling

system verification

evidence for system argumentation

System requirements

System design

System verification

System argumentation

Product development on

system level concerning

safety/security

-System requirements

-System design

-System analysis

-System modelling

-System verification

-System argumentation

Concerns Safety, Security, Reliability,

Availability, Maintainability

Safety, Security, Reliability,

Availability, Maintainability

Safety Security Reliability Safety Reliability & safety

Cross-system certification Yes Yes

Cross-domain certification No No No Space & Avionics

Engineering Environment

(Interoperability)

Open Source tools

AMASS tools when available for use

and evaluation

Open Source tools

AMASS tools when available for use

and evaluation

CHESS interacting with analysis tools

(OCRA, nuXmv, xSAP) and with

OpenCert:

Modeling in SySML or AADL using

CHESS

Formalization using CHESS/OCRA

integration

Validation and Refinement checked

with OCRA

Model checking with nuXmv

FTA/FMEA with xSAP

Collection of evidence for

argumentation with OpenCert

CHESS and integration with

analysis tools.

CHESS tool supported

activities are: Design,

Dependability (usage of MDH

tool) and Schedulability

Analysis (usage of the MAST

tool), Ada Code generation.

Integration with OCRA and

xSAP fro contracts verification

and further dependability

analysis support.

Use of OpenCert AMASS

environment to manage

process, evidence, assurance

case information.

• Architecture and Modelling:

o Melody Advance

o Microsoft Visio

• Software Design:

o Enterprise Architect

o Rhapsody

o Melody CCM

• Software development:

o Eclipse

• Continuous integration:

o Thales Control

• Source control:

o SVN

o Git/Stash

• Project and task

management:

o Jira

• Requirements:

o Doors

Challenges Reuse of components targeting

items of different SILs (&security

levels)

argumentation patterns for fault

tolerance, argumentation patterns

for specific technologies

Reuse of components

Comparison of architectures

Application of formal methods

Generation and reuse of evidence

Standards ECSS-Q-ST-30, ECSS-Q-ST-40, ECSS-Q-

ST-80

ECSS-Q-ST-30, ECSS-Q-ST-40, ECSS-Q-

ST-80

ECSS, SAVOIR-FAIRE ECSS-E-ST-40C

ECSS-Q-ST-80C

Any wishes for usage scenario Reuse of established safety methods

for security topic

Reuse of established safety methods

for security topic

N/A N/A N/A

Any known constraints for

usage scenario

Not so far Not so far N/A N/A N/A

Page 49: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 49 of 111

2.5 CS5: Platform Screen Doors Controller

2.5.1 Short description of the case study

With the increase of the urban population in the world, more people need to be transported underground while existing infrastructure cannot be enlarged. The current solution to this problem, the reduction of the time interval between trains, requires adopting (semi-)automatic metros for the most crowded lines. However, these automatic trains have to stop at predefined positions on platforms in front of so-called platform screen doors, ensuring optimal passengers transfer between train and platform while avoiding passengers to fall on tracks at peak hours.

Figure 16. Example of combined systems to ensure safety at a metro platform

ClearSy develops safety critical systems that are often specified with a very concise requirement: “ensure a function at a safety level of {SIL2, SIL3 or SIL4} in less than xx milliseconds”. The systems engineering phase consists in refining this requirement into a set of functions that are distributed over an architecture that includes sensors, computers and actuators. Then the design phase and safety demonstration are performed in parallel in order to iteratively obtain a working, reliable and safe-enough system. System engineering is mainly based on human experience and expertise, Microsoft tools and sometimes on formal methods when some tricky aspects need to be managed or when trustworthy software is required. The combination of formal models of both discrete controllers and continuous physical environment helps to better analyse (some dimensions of) the system that could be animated/checked earlier. ClearSy develops both hardware and software of these systems in conformance with EN50126, 8 & 9 standards, including devices for fine-tuning sensors and supervision facilities. These systems have to provide safety functions that require cross-domain skills and knowledge, and dedicated/diverse engineering tooling.

2.5.2 Technical description of the case study

COPPILOT System controls PSD and is based on system detection. It includes a lot of sensors to be installed on the track side, and it doesn’t require any installation on board. It is a safety SIL3 system developed by ClearSy.

2.5.2.1 System description

To open the platform screen doors COPPILOT needs to know:

• If there is a train (F1)

• If the train is stopped (F2)

Page 50: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 50 of 111

• If the train is at the right position (F3)

• If the train doors are opening (F4)

The opening control function is SIL3.

To close the platform screen doors COPPILOT needs to know:

• If the train doors are closing (F5)

The closing control function doesn’t need to be safe.

Figure 17. Platform screen doors COPPILOT

F1: If there is a train

COPPILOT must not open the PSD if the train is not stopped and is not in the right position range.

F2: If the train is stopped

COPPILOT must not open the PSD if the train is not stopped. The train is stopped if its speed is under 0,5km/h (speed limit fixed in COPPILOT).

Because COPPILOT has no inboard equipment, COPPILOT can’t stop the train. So, the train must be stopped at the right place when the driver or another system opens the PSD.

F3: If the train is in the right position

COPPILOT must open the door only if the train is in the right position range. This range is given by METRO (PAR). This range cannot exceed the length of an unprotected door by the train (SPAR).

F4: If the train doors are opening

When COPPILOT detects that the train doors are opening, if all three previous functions are true, then COPPILOT controls the opening of the PSD.

The duration of this action is 6 seconds maximum. COPPILOT controls the PSD opening until the opened PSD input is set or the 6 seconds delay has ended.

While the three functions are true COPPILOT can open the PSD with no limitation of time, each time it detects that the train doors are opening.

Page 51: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 51 of 111

It’s not dangerous to open the PSD even if the train doors are not opened while the three functions are true, just because it’s not possible to fall in the tracks when there is a train stopped in the right position, in front of the PSD.

As it is not possible to make detection without delay, the PSD opening speed must be higher than the train doors opening speed if synchronisation of the doors is required. It’s almost true if the PSD lengths are higher of the train doors length, because the PSD have more distance to open.

F5: If the train doors are closing

When F1 and F2 and F3 are true, and if F4 occurs, COPPILOT is waiting for a train doors closing. When it detects this action then COPPILOT controls the PSD closure.

The duration of this action is 15 seconds maximum. COPPILOT controls the PSD closure until the closed PSD input is set or the 15 second delay is ending.

If during this closed action COPPILOT detects a train Doors opening, also COPPILOT stops the closing control and controls the PSD opening. As it is not possible to make detection without delay, the PSD closing speed must be higher than the train doors closing speed if synchronisation of the doors is required. It is almost true if the PSD length is higher than the train door length, because the PSD have more distance to close.

2.5.2.2 System architecture overview

COPPILOT SP is a safety system. The main function « open the PSD » is a SIL3 function.

Thus, the COPPILOT SP architecture is specified to match this requirement.

Figure 18. COPPILOT SP architecture

COPPILOT has no on-board element. COPPILOT uses sensors to detect all the events we need.

COPPILOT provides functions F1, F2, F3 and F4 by analysing the data given by each sensor. All these data are creating a “pattern”. This pattern is compared and validated to perform the functions in safety.

In case of two type trains or more, which include different distance between bogies or between cars, it would be possible that COPPILOT needs more than two-wheel sensors to validate that the train is inside the SPAR.

Page 52: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 52 of 111

2.5.3 Case study state of the art

The platform screen door controller is a safety critical system. Its safety related requirements are in relation to EN50126, 50128 and 50129 standards. These standards describe at different levels what is expected for the target system, taking into account best practices accumulated over several decades.

2.5.4 Case study state of the practice

Development is made of two V cycles:

• Development cycle. A traditional process is used (system first, then hardware and software development in parallel). An early prototype, without any safety insurance, is built as a proof of concept for the target system. Traceability is ensured all along the process while requirements are kept as a low number (only main functions and safety requirements are selected). Development is based on PIC32 Microchip IDE and on Atelier B for the safety critical software. Documentation is made with Microsoft tools (Word, Visio, PowerPoint) while traceability is managed with Excel.

• Safety cycle. This cycle executes in parallel of the development cycle, by independent team. During this cycle, intense exchanges occur between the two teams, in order to consider all safety aspects early and to avoid deeply modifying the system later on. Analyses are made with Microsoft tools (Word, Excel, Visio).

2.5.4.1 Workflow

The safety team is in charge of ensuring a safety integrity level in line with the system requirement, as expressed by the final customer.

The main deliverable is the safety case. The document is divided in several sections:

• Hazard analysis, where risks are analyzed and safety functions are determined accordingly to their SIL level.

• Safety demonstration, where the proof of safety for the chosen safety function is provided at system level.

• Conclusion and exported constraints, where the global safety conclusions are started together with the necessary global exported constraints.

2.5.4.2 Assessment

Assessment is performed by a third party, namely CERTIFER French not-for-profit association.

This assessment is based on existing documentation that is provided during the lifetime of the project (and not all at once at its end). Several meetings are organized in order to share understanding and to address early possible.

2.5.4.3 Involved roles

Four different parties are involved:

• The design team in charge of developing and verifying the system, including the project manager, several software and electronic engineers.

• The validation team, made of several validation engineers.

• The safety team (one safety expert).

• The third-party assessor (ISA) from CERTIFER.

Page 53: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 53 of 111

2.5.4.4 Tools and Tool chains

2.5.4.4.1 Used tools and methods (included guidelines)

Tools used are:

• Microsoft tools (Word, Excel, Visio, PowerPoint) • PIC32 Microchip IDE • Atelier B • FIDES

2.5.4.4.2 Tool chain

Safety analysis is purely a text-based process. The resulting document, the safety case, can be considered as a thesis where the safety is demonstrated (regarding safety requirements) while considering a number of assumptions that are precisely described.

Figure 19. COPPILOT SP languages

Development is performed by using two different technical environments:

• Microchip IDE, for developing and compiling non-safety related software (C language),

• Atelier B, for safety-related software. Two different code generators are used: o A C code generator (C4B) o An Hex compiler, producing a binary file

Requirements management is performed with Excel. A strong focus is put on reducing the number of requirements to be considered in the development (something like 30 or 40 requirements for a system). The idea is not to be lost when managing hundreds or thousands of requirements but to focus on what is really important. Design documentation is cross-read, critical code reviews are performed on safety related software, requirements traceability is verified through tables (traceability, coverage) among / between design documents and testing documents.

Page 54: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 54 of 111

There is no need to have a qualified tool, hence none of the ones used for the development are qualified. In the safety case, we have to make clear how possible mistakes are handled by the development / safety process.

2.5.5 Expected technical improvements

2.5.5.1 STO1. Architecture-driven Assurance

• N/A

2.5.5.2 STO2. Multi-concern Assurance

• Preliminary steps to integrate security concerns into safety concerns (not currently required by railways standards but an evolution on this aspect is forecasted in the coming years).

2.5.5.3 STO3. Seamless Interoperability

• Better level of confidence on the C code generation process that would ease / speed up critical code reviews (generation of assertions from B models to enable program proof with Frama-C).

2.5.5.4 STO4. Cross/Intra-Domain Reuse

• N/A

2.5.6 Business needs

2.5.6.1 AMASS Goal 1

G1: to demonstrate a potential gain for design efficiency of complex CPS by reducing their assurance and certification/qualification effort by 50%.

Improving the code review process to lower verification costs and risks (better level of confidence in the software).

2.5.6.2 AMASS Goal 2

G2: to demonstrate a potential reuse of assurance results (qualified or certified before), leading to 40% of cost reductions for component/product (re)certification/qualification activities.

N/A (improvements on code review are expected to be fully automatic and hence replay-able at will, so reusing previous assurance results is not particularly interesting).

2.5.6.3 AMASS Goal 3

G3: to demonstrate a potential raise of technology innovation led by 35% reduction of assurance and certification/qualification risks of new CPS products.

N/A

2.5.6.4 AMASS Goal 4

G4: to demonstrate a potential sustainable impact in CPS industry by increasing the harmonization and interoperability of assurance and certification/qualification tool technologies by 60%.

N/A

Page 55: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 55 of 111

2.5.7 Usage scenarios

Table 17 and Table 18 show the 6 usage scenarios related to Case Study 5. Table 17. CS5 CLS and AIT usage scenarios

ID: CLS UsageScenario 1 CLS UsageScenario 2 AIT UsageScenario 3

Related CaseStudy CS5 CS5 CS5

Addressed Domains Railway Railway Railway

Scenario Name Proven-source-code System-level-model Automated train systems, platform

doors

Short Description Generation of Frama-C asserted C

code from B models

Support for system-level model,

including safety and security aspects,

and test cases generation

system modelling and

safety/reliability analyses attached

to the system models, including

system architecture, patterns of

assurance and test case generation

from system model

Stakeholders Software developer

Safety engineer

System engineer

Safety engineer

System engineer

Risk analyzer

Safety engineer

Security engineer

Test engineer

Stakeholder constraints None None None

Addressed Business Goals: G1: to improve the level of

confidence of the software

application that runs on the

execution platform (qualitative

objective)

G1: to demonstrate the ability to

fully analyze existing designs

G2: to demonstrate the ability to

perform both safety and security

analyses

G1, G2, G4

Process Steps Software design

Software modelling

Code generation

System design

System analysis

System verification (test)

System modelling

Development and Assurance Process

Concerns Safety Safety and security Safety, Security and Timing

Cross-system certification N/A N/A No

Cross-domain certification No No No

Engineering Environment

(Interoperability)

Atelier B, Frama-C, Why3 Safety Architect Tecnalia is not mentioned as

participant in CS5

Challenges N/A N/A includation of effect on timing from

safety and security, during analysis

and system design

Standards EN50128 EN50129 EN50126/8/9 and new approaches

(draft standard) towards usage of

IEC62443 in railway domain

Any wishes for usage scenario N/A N/A We should define used system

models (modeling language and

tools) as soon as possible

Any known constraints for

usage scenario

N/A N/A Since communication based railway

systems can be very complex,

(multiple levels and trains) we would

prefer if the scope could be clearly

defined, e.g. one train at a station

communicating with station

Page 56: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 56 of 111

Table 18. CS5 FBK, A4T and CEA usage scenarios

ID: FBK UsageScenario CS5 A4T UsageScenario 3 CEA UsageScenario 1

Related CaseStudy CS5 CS5 CS5

Addressed Domains Railway Railways Railway

Scenario Name CS5FBK Automated train systems, platform

doors

Short Description 1) Modeling of the system

architecture and behavior

2) Formalization of the system

requirements

3) Validation of the requirements

4) Model checking

5) Fault injection and FTA/FMEA

Model Based testing of Safety Model-based System, Safety, and

Security Engineering

Support for Safety and Security

Analysis

Code-level verification

Stakeholders System engineer, Safety & Security

engineer, ModelBased Safety

researcher, Verification & validation

researcher

System engineer

Safety engineer

System engineer, Safety & Security

engineer, ModelBased Safety

researcher, Verification & validation

researcher

Stakeholder constraints None None None

Addressed Business Goals: G3 G1 - G2 G3,G4

Process Steps system requirements

system design

system analysis

system modeling

system verification

evidence for system argumentation

Product development on system

level concerning safety

-System requirements

-System design

-System verification

-System argumentation

Product development on system

level concerning safety/security

-System requirements

-System design

-System analysis

-System modelling

- code-level verification

-System safety assurance case

Concerns Safety

Security

Reliability

Safety Safety

Security

Safety and Security

Cross-system certification N/A Between system components N/A

Cross-domain certification No No No

Engineering Environment

(Interoperability)

CHESS interacting with analysis tools

(OCRA, nuXmv, xSAP) and with

OpenCert:

Modeling in SySML or AADL using

CHESS

Formalization using CHESS/OCRA

integration

Validation and Refinement checked

with OCRA

Model checking with nuXmv

FTA/FMEA with xSAP

Collection of evidence for

argumentation with OpenCert

MBSE + MaTeLo + Requirements

engineering + Test benches

Papyrus and Sophia extension for

safety/security analyses

Frama-c for code level verification

Challenges Application of formal methods

Generation of formal proofs as

evidence for the argumentation

Safety and test co-engineering -

reusability

Safety and Security co engineering

Standards EN 5012x EN 5012x

ISO 26262

Any wishes for usage scenario N/A N/A Reuse of established safety methods

for security topic and for co-

assurance of safety and security

Any known constraints for

usage scenario

N/A N/A N/A

Page 57: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 57 of 111

2.6 CS6: Automatic Train Control Formal Verification

2.6.1 Short description of the case study

Alstom Signalling develops safety critical signalling systems for railway application (mass transit or main lines). These systems shall comply with international safety standards such as CENELEC EN50126/8/9, specific regional safety regulations and technical specification for interoperability (e.g. ERTMS specification in Europe).

The Alstom's signalling solutions portfolio contains several applications and technologies which comply with these safety standards. Each Alstom's signalling solution has its own safety demonstration based on Generic Application Safety Case (compliant with EN 50129 structure) that shall be instantiated by application engineering for each project. This instantiation releases a Specific Application Safety Case (SASC as per EN 50129 standard). Basically, the functional and engineering processes safety demonstrations are in the GASC while the specific application data and process assurance safety demonstrations are in the SASC. Both GASC and SASC shall be submitted to assessment bodies such as the Independent Safety Assessor (ISA).

The case study focuses on the application of formal method in safety demonstration of signalling systems. The goal is to industrialize safety properties modelling and capitalize processes, argumentation and artefacts of such kind of demonstration. A specific application of formal method at signalling system level will be provided to illustrate the proposed solutions.

2.6.2 Technical description of the case study

Some safety demonstrations stem from formal methods verification & validation activities. Formal method means in this context: strong mathematical foundation and precise without ambiguity. Formal Proof is verification or validation technique based on a formal method that determines the absence of errors. As examples of formal method applications for the Alstom Urbalis 400 Communication Based Train Control (CBTC), the Automatic Train Protection (ATP) is proven with the B-method, the system level application data are verified by means of constraint solver and interlocking (IXL) is verified with model checking techniques. All these applications of formal methods require the identification and modelling of safety properties that the system/subsystem shall fulfil. And all these applications of formal methods require to be assessed by certification bodies.

A CBTC system involves an Automatic Train Control subsystem (ATC) that involves itself two subsystems. A carborne controller (CC) installed on-board of each train made of an Automatic Train Operation (ATO) that controls the movement of the train and of the on-board part of the ATP that monitors the position and kinetics of the train and prevents it from exceeding its limits of movement and speed. And a zone controller (ZC), the part of the ATP installed in a technical room at trackside, which monitors the movements of all trains in the rail network, calculates their respective limits of movement and transmits them to the CCs.

Depending on the size of the railway network and the number of trains to be monitored, one or more ZCs may be installed. In the latter case, each of the ZCs monitors a particular zone of the network and exchanges information with the ZCs of the adjacent zones in order to ensure, as and when trains move from one zone to another, a correct, safe and continuous monitoring of train and calculation of limits of movement.

The case study will be the formal analysis of the communication between adjacent ZCs in order to demonstrate that in all circumstances and track configurations when a train is moving from a zone A to a zone B then the information exchanged between the ZCs in charge of these zones ensure that both ZCs know precisely (to the nearest error margin) the location of the train in the inter-ZC zones (i.e. the part of zone A bordering zone B that is known to the ZC of zone B and the part of zone B bordering zone A that is known to the ZC of zone A).

Page 58: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 58 of 111

This case study intends to apply formal method on system or subsystem level functions to improve system specification or verify exhaustively the safe behaviour of the system/subsystem. Although these methods are now well known, they all shall identify the set of formal safety properties that the system, subsystem or data shall fulfil. Nowadays, there are no common methods to develop these formal safety properties. The primary objective of this case study is to develop a common method to derive formal safety properties of a signalling system/subsystem and to capture the refinement process and artefact into the certification framework. As far as possible, this method and the corresponding certification framework infrastructure shall be applicable to all kind of use of formal methods used for the verification or validation of safety properties within the development or deployment of a signalling solution.

This case study is under the responsibility of Alstom. AMASS partners may be involved in considering required data structures and method processes to be included in AMASS developments.

During the AMASS project the following points are planned to be performed within this railway case study:

• Methodology definition

• Data structures specification

• Safety analysis modelling

• Use Case application to a specific system proof

• Analysis of V&V and other cost reduction

• Integration of the proposed methodology within existing signalling solutions (inclusion in the Generic Application Safety Cases and ISA strategy).

2.6.3 Case study state of the art

CENELEC standards EN50126, EN50128 and EN50129 provide a set of requirements on processes, organization and techniques with which the development, deployment and maintenance of the railway signalling systems shall comply.

Standard EN50126 provides a process which enables the implementation of a consistent approach to the management of reliability, availability, maintainability and safety (denoted by the acronym RAMS) of total railway systems (including but not restricted to signalling). This Standard:

• Defines RAMS in terms of reliability, availability, maintainability and safety and their interaction;

• Defines a process, based on the system life-cycle and tasks within it, for managing RAMS;

• Enables conflicts between RAMS elements to be controlled and managed effectively;

• Defines a systematic process for specifying requirements for RAMS and demonstrating that these requirements are achieved.

Standard EN50128 provides a set of requirements with which the development, deployment and maintenance of any safety-related software intended for railway control and protection applications shall comply. It defines requirements concerning organizational structure, the relationship between organizations and the division of responsibility involved in the development, deployment and maintenance activities. Criteria for the qualification and expertise of personnel are also provided in this Standard.

Standard EN50129 provides a set of requirements that shall be satisfied in order that a safety critical railway system/subsystem/equipment can be accepted as adequately safe for its envisioned application.

The documentary evidence that these requirements have been satisfied shall be included in a structured safety justification document, known as the Safety Case. The Safety Case forms part of the overall documentary evidence to be submitted to the relevant safety authority in order to obtain safety approval for a generic product, a class of application or a specific application.

Alstom’s case study for AMASS project shall comply, for its concerned parts, with these standards.

Many case studies and applications of formal methods have been carried out in the past ([26],[27],[28]). Of all of them, the most relevant and inspiring for our case study is [28]. This is a safety analysis that

Page 59: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 59 of 111

demonstrated that the “no collision” safety property of a complete railway signalling system is ensured based on the safety properties that each of the sub-systems of this system ensures. The analysis used formal models of the relevant parts of the complete system and subsystems and a significant part of the demonstration was brought by formal proof. Formal modelling was done with Event-B ([29]) and the proof was done with Atelier B.

In Alstom’s case study we shall follow a similar approach and we shall use the same technology.

2.6.4 Case study state of the practice

The figure below gives a simplified representation of Alstom’s CBTC development life-cycle.

Figure 20. Alstom’s CBTC development life-cycle

The purpose of system specification and design phase is to define CBTC’s system requirements and architecture, and to allocate requirements on system components (subsystems). Functional decomposition and semi-formal structured methods are employed for this phase.

The subsystem specification and design phase has the same purpose and employs the same methods as the previous phase but at subsystem level. It is during this phase that ATC subsystem is specified and designed.

The purpose of subsystem implementation and validation phase is to define the requirements on the hardware and software products that implement the subsystems, to implement and test those products and to validate those products according to their requirements.

As written above, Alstom employs formal methods for the development and/or verification of some of Urbalis 400’s subsystems, i.e. the B Method ([23]) and the Atelier B tool ([24]) are used to design, implement and proof the software of on-board and trackside parts of Urbalis 400’s ATP, and HLL and the S3 tool ([25]) are used to verify formally that Urbalis 400’s IXL complies with safety requirements.

So, regarding our case study, presently we can demonstrate that the software of ZC complies with its formal specification but, as there is not a formal analysis at system or subsystem levels there is not a formal model of communicating ZCs and we cannot demonstrate formally that the communication of adjacent ZCs ensures both safe monitoring of trains and safe calculation of limits of movement.

2.6.4.1 Workflow

The objective of the ALSTOM case study is to create a safety assurance project for an Automatic Train Control signalling system that includes formal proof demonstration for an Automatic Train Control railway signalling system. The aim of the formal proof is to increase the early discovering of bugs and the general safety of the project. It can also replace a part of the functional tests, as all functional tests related to the proved property can be avoided, if and only if it is proved that the implementation of the system specification (Sw) is consistent with the formal model that has been proved.

System specification and design

Subsystem specification and

design

Subsystem implementation and

validation

Subsystem Integration

System validation

Page 60: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 60 of 111

As per any Signalling Railway safety demonstration, several standards are generally applicable. In Europe and, usually for international projects, the use of EN 50126, EN 50128 and EN 50129 are mandatory.

The safety assurance project shall include all artefacts required by the EN 50129 Generic Application Safety Case. These artefacts could be a reference to a document, table, diagram or text.

The application of the EN 50129 requires independence between the designer, the verifier (V&V) and the safety validation team.

The overall workflow of the system development is shown in Figure 21. The objective of the case study is to manage the safety evidences required by the standards for this specific application.

Figure 21. CS6 Workflow

The Design actors propose system specifications (system requirements specifications of ATC and ZC, System Interface Description between two adjacent ZC). Then they model formally these specifications. In parallel, the safety actors identify the safety objectives and targets for the system, select the appropriate standards and initiate a clause by clause table. The second activity of the safety actors is to prepare the strategy of demonstration in the Safety Plan. At this step, they answer the standard clause by clause analysis with estimated evidence (not already performed but planned). Considering the system specifications, the safety engineers perform system hazard analysis and identified the safety properties that the system shall fulfil. These properties are integrated within the system formal model (either by safety actor or design actor). These last two activities may require several iterations.

When the model is ready, the V&V actors have two main activities to perform:

• The verification of the model: this activity shall demonstrate that the formal model is consistent with the system specifications, and, that the safety properties are consistent with the system hazard analysis;

• The proof: by means of formal proof assistant, the V&V actors perform the proof of the model. There are two possible outputs:

o The proof fails, one or several counter-example disclose the safety properties: the system specifications or the system formal model shall be reworked (and, the verification of the model);

o The proof succeeds.

At this step, the safety assurance project has demonstrated that the system specifications are safe. The design team can start the implementation of the system (the safe implementation evidence is out of the scope of this case study).

Page 61: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 61 of 111

The safety assurance manager prepares the Hazard Log and the safety case with the evidences provided by the proof. He performs the final clause by clause analysis and provides for each safety property the result of the related proof obligation(s).

2.6.4.2 Assessment

The safety assessment is performed by an independent safety assessor. It consists in the evaluation of all the documents delivered for the system baseline (Design, V&V and Safety). A safety assessment report and a certificate of type (conformance with EN 50129 and EN 50128) are produced.

A safety assessment is an analysis to form a judgement, based on evidence that the System meets the specified safety requirements. The safety assessment addresses:

• The correct application of the safety management process (confirming that the activities are done in compliance with the defined requirements and process, including suitability of Safety Plan and related safety organization with respect to EN50126, EN50129, EN50128).

• The results of this application: checking that the results of the application of the above-mentioned process reaches the planned safety objectives of the new or modified system and checking that relevant limits of safety use are clearly and unambiguously expressed (i.e. completeness of safety-related application conditions, including restrictions and mitigations if necessary).

The assessor performs a review of all assurance project documents and transitively of all referenced documents. The assessor verifies the conformance of evidences provided for the EN 50129 and EN 50128.

2.6.4.3 Involved roles

The roles involved in this Case Study follows the prescription of the EN 50129 standards for SIL3 or SIL4 development (see Figure 22):

• Design actors (DI in 50129):

o Write a specification of the system and its interfaces.

o Model the specification within its environment in formal language.

o After the verification of the specification by formal proof, the designers implement the system (but this is out of scope of this Case Study).

• V&V actors (VER in 50129):

o Perform model verification (including traceability between the specifications and the model).

o Perform the formal proof activity (if counter examples are found, the system specification. or the system model shall be updated, if the proof is set it authorizes the implementation of the specification).

• Safety actors (VAL in 50129): o Records the safety objectives & targets of the system.

o Identify the applicable standards (we will consider in the CS6, the EN 50128:2011 and EN 50129 only), and initiate a clause by clause table (only standards requirement capture).

o Write the de safety plan (organization, safety activities, fulfill the estimated clause by clause evidences).

o Perform the process hazard analysis of the validation process of the system specifications (i.e. conformity with the EN 50128:2011 tool classes).

o Perform the safety analysis of the system specifications which leads to the identification and the modelling of the safety properties to prove.

o Write the Hazard-Log and the safety case that includes the evidences that the system specification is safe.

• Independent Safety Assessor (ASSER):

Page 62: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 62 of 111

o Assess the safety assurance project

o Write the safety assessment report

o Deliver a certificate of type for the developed system

Figure 22. EN 50129 organization

2.6.4.4 Tools and Tool chains

2.6.4.4.1 Used tools and methods (included guidelines)

For formal modelling, we shall use Event-B and the Atelier B toolset.

Event-B is a formal language that allows users to model systems in terms of a state made of variables and a set of triggerable events that modify the value of the variables and proof that the events preserve the characteristic properties of the variables. It is possible to decompose Event-B systems in subsystems and proof that the decomposition preserves the characteristic properties of the decomposed system.

Atelier B provides the tools that check the syntax and the types the models written in Event-B language; that generates the proof obligations created by Event-B models; and that discharge these proof obligations.

2.6.4.4.2 Tool chain

Not Applicable.

2.6.5 Expected technical improvements

This CS will benchmark:

• Seamless link to system modelling (behaviour, safety, timing, signalling parameters).

• Methodological support and guidelines.

• Compliance management for safety standards for the Railway Domain.

• Tool support for impact analysis (safety analyses what ifs, etc.).

• Tool development to enhance, improve and enable the assurance case generation (safety).

• Arguments/Evidences reuse.

2.6.5.1 STO1. Architecture-driven Assurance

The benefits provided by this case study are to provide to the project team a systematic workflow for the safety assurance process. By means of the workflow assistant and the status of the achievements, some of the quality evidences are automatically recorded.

2.6.5.2 STO2. Multi-concern Assurance

Not applicable.

Page 63: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 63 of 111

2.6.5.3 STO3. Seamless Interoperability

The AMASS platform will provide support for better interaction between each actor involved in the safety assurance project. It also insures by means of credentials setting the independence between the categories of actors as per standard requirements prescriptions.

2.6.5.4 STO4. Cross/Intra-Domain Reuse

Several things may be reused:

• EN 50129 and EN 50128 Clause by Clause (empty or estimated), as compliance management reuse

• Workflow of safety assurance project related to system level formal proof evidence

• Safety Plan Template

• Safety Case Template

• Hazard Log Template

• Safety Assurance Project Structure.

2.6.6 Business needs

2.6.6.1 AMASS Goal 1

G1: to demonstrate a potential gain for design efficiency of complex CPS by reducing their assurance and certification/qualification effort by 50%.

The case study helps the adoption of formal method techniques at system level safety demonstration. The AMASS platform provides support for EN 50129, EN 50128 standards compliance allowing designers, verifiers and safety assurance managers to concentrate their effort on their best added values.

The adoption of formal method at system level would reduce considerably the late discovering of bugs in the final phases of the V-Lifecycle. The experiences of classical workbench test shows that lot of bugs are discovered in the ascendant phase of the V-Lifecycle. This leads to very costly rework of the system. The adoption of formal method at system level in early design phase of the development allows 30% effort reduction.

The standards compliance management is very costly when performed manually. The Clause by Clause is usually initiated for each new project; the workflow deviation may lead to several reworks (due to process owner audit and verification). The methodological support helps better understanding of the project process (workflow) and compliance requirements (clause by clause artefacts) and seamless interoperability leads to 20% effort reduction.

2.6.6.2 AMASS Goal 2

G2: to demonstrate a potential reuse of assurance results (qualified or certified before), leading to 40% of cost reductions for component/product (re)certification/qualification activities.

Reuse is a key improvement in this case study. The formal method technique argumentation to comply with the EN 50129 and EN 50128 could be easily reused. The clause by clause analysis could also be fully reused for all projects using or not the formal method technique at system level.

2.6.6.3 AMASS Goal 3

G3: to demonstrate a potential raise of technology innovation led by 35% reduction of assurance and certification/qualification risks of new CPS products.

The raise of technology innovation is improved mainly by adoption of early validation techniques of system development. It allows better understanding of system need and environment enacting new way of thinking.

Page 64: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 64 of 111

2.6.6.4 AMASS Goal 4

G4: to demonstrate a potential sustainable impact in CPS industry by increasing the harmonization and interoperability of assurance and certification/qualification tool technologies by 60%.

This case study will develop a complete safety assurance project for an argumentation pattern at system level that could be standardized at company level and company and independent safety assessor level.

Page 65: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 65 of 111

2.6.7 Usage scenarios

Table 19 shows the 4 usage scenarios related to Case Study 6. Table 19. CS6 ALS usage scenarios

ID: ALS UsageScenario 1 ALS UsageScenario 2 ALS UsageScenario 3 ALS UsageScenario 4

Related CaseStudy: CS6 CS6 CS6 CS6

Addressed Domains: Railway Railway Railway Railway

Scenario Name: Assurance Project Creation System Design, V&V and

Dependability Assessment

Evidence Management Compliance Management

Short Description: This activity is related to the creation

and the setting of the assurance

project in the AMASS platform.

The output shall be:

• Creation of the roles and definition

of credentials (implementation of the

independence between Design, V&V

and Safety roles).

• Workflow definition and allocation:

define the stream of activities and

allocate activities to actors.

• Creation of the assurance project

artefact structure: reference to a

document, table, text, diagram, etc.

• EN 50129 and EN 50128 clauses

hierarchically captured (Hypothesis:

Standards are recorded in the AMASS

platform within a library for reuse

purpose).

This is the basic usage; the actors

follow the process with the

workflow assistant and provide

their baseline artefacts when

necessary.

Description Recording and

retrieving of consistent artefacts

for a baseline system

specification.

The compliance management is

performed by Safety Assurance

manager directly within the EN

50128 and EN 50129 tables. For

each clause, the Safety Assurance

manager provides a justification

(not applicable because …) or an

artefact of one baseline process

assurance project (reference to a

document, table, text or diagram).

For each clause of the standards

provide an estimated response or

the realized response.

Stakeholders AMASS Platform Administrator –

Safety Assurance Manager – Design

leader, V&V Leader.

Safety Assurance Manager –

Design leader, V&V Leader.

Safety Assurance Manager –

Design leader, V&V Leader.

Safety Assurance Manager

Stakeholder constraints The credentials shall insure EN 50129

independence between category of

actors. The standards clauses are

uploaded in the project and shared

with all actors.

The credentials shall insure EN

50129 independence between

category of actors. The standards

clauses are uploaded in the

project and shared with all actors.

The credentials shall insure EN

50129 independence between

category of actors. The standards

clauses are uploaded in the

project and shared with all actors.

N/A

Addressed Business Goals: G1 ; G2 ; G3 ; G4 G1 ; G2 ; G3 ; G4 G1 ; G2 ; G3 ; G4 G1 ; G2 ; G3 ; G4

Process Steps: • Assurance project creation.

• General information about the

project: Name, schedule (T0, Tend,

date of safety case delivery,

customer, independent safety

assessor name).

• Project actor information:

o Name, Telephone, email

o Category: Designer, V&V or Safety

• Workflow: setting the activities,

their interdependency, allocation to

actors.

• Artefact structure creation

(reference to a document, table, text

or diagram).

• Credential settings: regarding the

category of each actor, allow

read/write credential to each project

object within the AMASS platform.

• Upload EN 50128 and EN 50129

clauses from library.

1. If needed, create a new

baseline: the Design leader

provides the new system

specifications, the V&V Leader

and the Safety Assurance

Manager perform their impact

analysis [the impact analysis may

be automatized if artefacts are

traced each other].

2. Each actor provides his

artefacts at each step of the

safety assurance process.

The actors shall be able to store

their artefact and their links with

requirements of the safety

assurance project. Configuration

management shall allow actors to

work on local or working copy of

these artefacts before freezing

them into a system baseline.

The actors shall be able to

request the AMASS platform for

retrieving a specific artefact

(included in the project structure)

related to a system specifications

baseline.

There are two steps in the CS6

process to perform compliance:

• During the Safety Plan

redaction: to perform estimated

standards compliance (the plan to

reach the compliance).

• During the safety case

redaction: to perform the

resulted standards compliance

(how the project reach the

compliance).

For each clause, the safety

assurance manager provides an

artefact from the on-going

baseline of the safety assurance

project (reference to a document,

table, text or diagram).

Concerns: Safety Safety Safety Safety

Cross-system certification: Automatic Train Control Automatic Train Control Automatic Train Control Automatic Train Control

Cross-domain certification: no no no no

Engineering Environment

(Interoperability):

MBSE for artefact recording and

argument structure

Formal Method MBSE and Formal Method MBSE and Formal Method

Challenges : early validation early validation & formal method

argumentation at system level for

50129 compliance

reuse of early validation & formal

method arguments

Accurate compliance

management. Facilitate safety

assessment acceptance.

Standards: EN 50128 et EN 50129 EN 50128 et EN 50129 EN 50128 et EN 50129 EN 50128 et EN 50129

Any wishes for usage

scenario

N/A To manage configuration

management (ie. baseline of the

studied system)

N/A To manage configuration

management (ie. baseline of the

studied system)

Any known constraints for

usage scenario

N/A N/A N/A N/A

Page 66: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 66 of 111

2.7 CS7: Safety Assessment of Multi-Modal Interactions in Cockpits

2.7.1 Short Description of the Case Study

The current market indicates significant push to decrease the pilot workload and to further increase the operational safety. With the advent of human machine interface (HMI) beyond legacy displays, new safety assessment methods are required which both handle increased complexity and at the same time allow leveraging truly independent means of cockpit/pilot communication. The trend is to integrate touch screens, speech recognition systems and gaze tracking systems into new cockpit generation. Even though these technologies are mature enough in consumer markets, they have not found its way into avionics due to unresolved safety constraints. The suggested case study aims at handling the safety case in a progressive and flexible manner and alleviating from all potential safety hazards. This case study will be driven by Honeywell (HON). Masaryk University (UOM) and Fondazione Bruno Kessler (FBK) will contribute by providing methods and tools for automatic formal verification and validation and formal safety analysis. TEC will contribute to this case study by providing its experience from the OPENCOSS case study for avionics.

IFX and LAN will join in the aerospace case study with focus on aviation. The criticality class for aviation (class or Design Assurance Level – DAL C and D) may be compatible with the ASIL class B for automotive vehicles where Infineon will use its experience in automotive safety to exploit it in aerospace aviation. LAN will conduct research on the energy supply (APU – Auxiliary Power Units), the board network of aircrafts and their interaction with a central computing system within the Aviation Design Assurance Level DAL C and D. RPT will provide support for ensuring performance requirements can be met in practice.

2.7.2 Technical Description of the Case Study

When electronic displays are used as reconfigurable multifunction controls, the unique Human Machine Interface (HMI) is created allowing functions not possible with only traditional dedicated knobs, controls or physical hardware. Multifunction Controls could be cursor control devices, menu-based controls, touch screens, voice recognition and voice activated controls.

Figure 23. Multifunction controls

Touch screens are based on different technologies – acoustic, capacitive, infrared, resistive or strain gauge. Touch screen contains touch panel for crew input using gestures or touches with the touch targets displayed on the Liquid Crystal Display (LCD). Each target is defined as an active area of the touch panel. When such area is contacted by cockpit crew it initiates an action. The LCD also displays aircraft system information to provide the crew with information that can be used to guide control actions or to provide situational awareness.

Filter component combines inputs from multiple modalities and produces high-integrity interaction output. This way some failures, for example unintentional touch, are detected and ignored. The faults can be injected automatically to enable verification of the system. The recognizer component recognizes touch events and individual gestures.

Page 67: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 67 of 111

This Case Study 7 will focus mainly on the following 3 Usage Scenarios:

• US1: Application of aerospace industrial standards for safety assessments

• US2: Automation of the verification objectives

• US3: Reuse of assurance artefacts from automotive technology into the avionics domains

US1 and US2 will consist of the following activities:

• Case study requirements (safety, performance, behavioural) will be captured and formalized.

• The formalized requirements will be automatically analysed including change impact analysis. Verification whether high-level requirements are covered by low-level requirements will be performed. Automatic detection of partially redundant and inconsistent formalized high-level requirements will be deployed.

• High-level system will be modelled and the corresponding (i.e. high-level) requirements will be formally verified against the low-level requirements written in Simulink or C system design using model checking and testing.

• Safety and dependability analyses of the multi modal interactions will be performed in order to generate Fault Tree analysis and FMEA. Some of these activities will be automated using AMASS tools.

The US3 will be performed independently by IFX and LAN and will concentrate on the reuse of certification artefacts of automotive components in the aviation domain. IFX semiconductor components like microcontrollers, energy supply circuits and highly efficient switching parts are used in huge amounts in the automotive domain. As a result, high reliability is proven in practice in a mass market in opposite to the aviation domain with small or medium quantities of units. The advantages of having such experience by using certification aspects of these parts in the aviation domain are obvious in respect of safety and reliability. Therefore, IFX and LAN will research if a cross domain reuse of evidence and artefacts from automotive assurance processes can be assisted by using AMASS tools and methods. IFX will analyse which models, documents and other kind of artefacts are available and transfer them together with LAN for usage in the AMASS environment. The intention of LAN is to use this work for further certifying activities of a new small aircraft with electrical propulsion.

Furthermore, LAN will investigate during the project how the AMASS tool platform supports the usage of automotive components and thereon based development for aviation purpose in terms of evidence management, traceability and seamless integration.

2.7.3 Case Study State of the Art

The safety assessment is done in conformance with the guidelines provided in ARP4761, Guidelines and Methods for Conducting the Safety Assessment Process on Civil Airborne Systems and Equipment, Honeywell Product-Level Safety Assessment Work Instruction document, Federal Aviation Administration (FAA) regulations, and European Aviation Safety Agency (EASA) regulations. The EASA is the successor of the European Joint Aviation Authorities (JAA) and JAA is still used in ARP4761. Some EASA regulations are inconsistent with FAA regulations or in addition to FAA regulations.

Issues beyond state of the art:

• Multifunction controls bring new challenges about how to prevent inadvertent operations.

• Multifunction control may not have its location fixed and may need to be located by navigating through various menus or pages. When a control activates multiple different functions based on gestures or selections each function shall be distinctively marked.

• Reliability and formal verification of gesture recognition, conflicting gestures avoidance and reliable recognition of a set of gestures is a challenge.

• Open question is how to describe the failure model for the system and for the gesture recognition.

Page 68: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 68 of 111

• Multi-touch technology requires engineers to write the code for filtering, recognizing, and matching of custom library of gestures. The challenge is to reliably determine the complete set of gestures and to determine if the new gesture conflicts with the existing ones. Possible solution is to use regular expressions to represent multi-touch gestures as suggested in paper [10].

2.7.4 Case study state of the practice

In aerospace domain, FAA requires that all electronic hardware in airborne systems qualify to RTCA DO-160 specifications.

The safety assessment is based on a functional assessment that includes development of safety assumptions and mitigations, identification of hazards applicable to the multi modal interactions in cockpit, development of safety requirements based on the identified hazards, Fault Tree Analysis (FTA), Failure Modes and Effects Analyses (FMEA), Common Mode Analysis (CMA), Design Assurance analysis, Single Event Effects (SEE) analysis, and partitioning analysis. The plan is to leverage of Models-Based Safety Assessment (MBSA) annex to the ARP 4761.

Current state of the practice, at least at Honeywell, is that these artefacts are developed mostly manually using Microsoft Office.

2.7.4.1 Workflow

The workflow for AMASS related aspects of the case study is under development and is captured in the documents [11], [12], [13] and [14].

Other development activities are summarized in the following tables. Table 20 summarizes the current state of the practice in Honeywell, the baseline of the activities and tools that were used for development of the case study before AMASS. The second Table 21 lists activities and tools that will be used during AMASS to demonstrate AMASS platform benefits. The metrics from baseline development process will be compared to metrics gathered from AMASS development process for evaluation of the AMASS contributions.

Table 20. CS7 Workflow – baseline – tools used for development before AMASS

DEVELOPMENT PHASE ACTIVITY TOOLS (Initial proposal) of the AMASS Reference Architecture

Requirements Specification & Architectural Design

Requirement Authoring MS Word, DOORS

Requirement Formalization Not performed at all

Traceability Excel spreadsheet, references

Detailed Design and Code Generation

Model-based design and code generation

Matlab/Simulink, HAM

Validation & Verification Consistency, redundancy & vacuity checking

Manual reviews

Model checking Not performed at all

Test generation HiLiTE

Safety Assessment MS Word

Table 21. CS7 Workflow – expected tools to be used for development thanks to AMASS

DEVELOPMENT PHASE ACTIVITY TOOLS (Initial proposal) of the AMASS Reference Architecture

Requirements Specification & Architectural Design

Requirement Authoring MS Word, DOORS, Property Manager

Requirement Formalization Property Manager

Page 69: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 69 of 111

Traceability Excel spreadsheet, references, Evidence Manager

Detailed Design and Code Generation

Model-based design and code generation

Matlab/Simulink, HAM

Validation & Verification Consistency, redundancy & vacuity checking

V&V Manager and Verification Servers

Model checking V&V Manager and Verification Servers

Test generation V&V Manager or HiLiTE

Safety Assessment MS Word or CHESS

Traceability links shall represent the bridges between various related artefacts, inevitably also between the developed analysis/design/code on one side and the assurance related products on the other.

2.7.4.2 Assessment

Display and Graphics centre of excellence (independent Honeywell department) will benefit from the formal verification and safety assessment results and will evaluate the benefits of AMASS results. The return in investment analysis will be performed to assess whether it makes sense to deploy proposed technology.

2.7.4.3 Involved roles

The following roles will be involved:

• System Engineer

• Verification and Validation Engineer

• Safety Engineer

• Avionics Engineer (LAN only)

• Quality Assurance Manager (TEC only)

2.7.4.4 Tools and Tool chains

2.7.4.4.1 Used tools and methods (included guidelines)

These standards contain the relevant guidelines: RTCA DO-178C, ARP 4761, IEC 61508, RTCA DO-254, RTCA DO-278A, and SAE-ARP 4754.

The tools listed in the Table 22 are employed in the Case Study 7. Table 22. Tools used in Case Study 7

Tool Functionality Interoperates with tools

MS Word Requirements authoring, safety assessment

MATLAB/Simulink, HAM

Architecture definition, design, automatic code generation

JIRA Problem reporting

SVN Configuration management

HiLiTE Test vector generation MATLAB/Simulink, HAM

Property Manager Requirement authoring and requirement formalization

V&V Manager Consistency, redundancy & vacuity checking, Model checking, Safety Assessment

Page 70: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 70 of 111

When Honeywell Auto-code Manager (HAM) library is used in Simulink, Honeywell HiLiTE tool is qualified for selected programs and to be used for design assurance level A and Tool Qualification Level 4 (TQL-4) for automated test generation and test harness.

2.7.4.4.2 Tool Chain

AMASS tools and methods will be applied during the whole process as appropriate. There is currently no usage of the Eclipse platform in the original tool chain, whose constituent parts are presented in the Table 22. Therefore, it is necessary to define the mapping of the AMASS-unaware development artefacts and procedures to the elements provided by the AMASS project and streamline the development through both (so far separate) platforms.

2.7.5 Expected technical improvements

Perform assessment of STO1 (System Architecture-driven Assurance), STO2 (Multi-concern assurance), and STO4 (Cross-Domain and Intra-Domain Reuse). More concretely, this CS will benchmark:

• Seamless link to System Modelling (Behaviour, Safety, Timing, etc.).

• Tool support for formal verification and analysis (including impact analysis).

• Formal safety analysis tools and methods – leverage of Models-Based Safety Assessment (MBSA) annex to the ARP 4761, which is the safety assessment guideline for aerospace.

• Cross-domain reuse activities supported by the AMASS platform.

• Methodological support and guidelines.

Masaryk University (UOM) and Fondazione Bruno Kessler (FBK) will contribute by providing methods and tools for automatic formal verification and validation and formal safety analysis.

COMPASS Tool set was previously evaluated by Honeywell.

Table 23. Proposed tool chain to be deployed for Case Study 7

Tool Functionality Interoperates with tools

MS Word Requirements authoring ForReq

ForReq Requirements authoring, formalization, and formal verification

MS Word, MATLAB/Simulink, HAM, DIVINE, NuSMV, nuXmv

MATLAB/Simulink, HAM

Architecture definition, design, automatic code generation

ForReq

DIVINE Model checking ForReq

nuXmv, NuSMV Model checking ForReq

OCRA, xSAP Safety assessment

Acacia Realizability checking ForReq

JIRA Problem reporting

SVN Configuration management

2.7.5.1 STO1. Architecture-driven Assurance

• Extension of the SysML modelling of safety and system architecture (Enterprise Architect). Honeywell 3 View System Engineering.

2.7.5.2 STO2. Multi-concern Assurance

• Automated Assurance – Semantic Verification of the Formal requirements.

• Verification and Validation of behavioral formal requirements and safety requirements against the system architecture and the system design.

Page 71: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 71 of 111

2.7.5.3 STO3. Seamless Interoperability

• Seamlessly integrated tool chain to automate formal verification and safety assessment. Based on OSLC.

• Evaluate benefits of ModelBus.

2.7.5.4 STO4. Cross/Intra-Domain Reuse

• Reuse of the existing artifacts within aerospace domain.

2.7.6 Business needs

2.7.6.1 AMASS Goal 1

G1: to demonstrate a potential gain for design efficiency of complex CPS by reducing their assurance and certification/qualification effort by 50%.

• Methodology and SysML modelling tools to perform safety assessment.

• Methodology of seamless connection between the different tools (e.g. ForReq, Simulink, SysML modelling tools, verification and safety assessment tools).

• Methodology and tools to semantically analyse the requirements.

• Methodology and tools to formally verify the requirements against system architecture and system design.

• Methodology and tools to perform safety assessment.

2.7.6.2 AMASS Goal 2

G2: to demonstrate a potential reuse of assurance results (qualified or certified before), leading to 40% of cost reductions for component/product (re)certification/qualification activities.

• Automated safety assessment results reuse.

• Reuse of formal verification results.

• Safety assessment argumentation methods.

2.7.6.3 AMASS Goal 3

G3: to demonstrate a potential raise of technology innovation led by 35% reduction of assurance and certification/qualification risks of new CPS products.

• Methodology and tools to semantically analyse the requirements and reduce the propagated defects.

• Methodology and tools to formally verify the requirements against system architecture and system design and to reduce propagated defects.

• Methodology and tools to perform safety assessment at least semi-automatically.

2.7.6.4 AMASS Goal 4

G4: to demonstrate a potential sustainable impact in CPS industry by increasing the harmonization and interoperability of assurance and certification/qualification tool technologies by 60%.

• Methodology and tools to semantically analyse the requirements.

• Methodology and tools to formally verify the requirements against system architecture and system design.

• Methodology and tools to perform safety assessment.

2.7.7 Usage scenarios

Table 24, Table 25 and Table 26 show the 11 usage scenarios related to Case Study 7.

Page 72: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 72 of 111

Table 24. CS7 HON and TEC usage scenarios

Page 73: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 73 of 111

Table 25. CS7 TEC, FBK and INT usage scenarios

Page 74: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 74 of 111

Table 26. CS7 UOM and LAN usage scenarios

Page 75: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 75 of 111

2.8 CS8: Telematics Function

2.8.1 Short description of the case study

This case study will investigate a telematics function providing position and time, and which is aimed at use in automated and connected vehicles. For automated vehicles, positioning may be used as part of the autonomous drive (AD) pilot function, which has implications for safety. However, functional safety is also increasingly susceptible to security threats from malicious adversaries. There are multiple attack vectors, including direct tampering with the equipment and remote attacks. Wireless communication and positioning using global navigation satellite systems (GNSS) are examples where an attacker can pose a threat even without physical access to the vehicle. Positioning can be provided using GNSS and, in order to increase precision, additional information provided using vehicle-to-vehicle or vehicle-to-infrastructure communication (V2X) or cloud-based services.

Current prototype AD vehicles typically rely on a range of sensors, to provide both positioning and object detection. These sensors are often expensive, but for mass-market introduction, the cost of components will be an important factor. Thus, there will be a demand for reducing the amount and cost of sensors. Positioning that relies on GNSS and V2X may be a cost-effective component to provide position and accurate time for the AD pilot, if the safety requirements can be met. The case study will focus on remote attacks and the security implications for safety, as well as the trade-offs between safety, security and performance for the positioning function.

2.8.2 Technical description of the case study

Figure 24 show a logical view of a telematics function with tree different wireless interfaces. IF-1 is a GNSS signal. IF-2 and IF-3 may be data from other vehicles or cloud-based services, for instance via cellular networks such as 4G/LTE or vehicular ad hoc networks (VANETs) such as 802.11p, using communication standards such as ETSI C-ITS or OEM proprietary interfaces. Within the vehicle, a consumer function (C) receives information from the wireless network interface provider (P). The consumer can act on the physical environment by releasing or withholding energy, e.g. accelerating, braking or steering a vehicle. If these actions are based on the information provided by P, they can be dangerous for the environment i.e. safety critical. If so, this system should be subject to a functional safety analysis.

Figure 24. Logical view of telematics functions for a connected vehicle.

The case study will consider safety and security concerns focused on the wireless interfaces, which can be the subject of both malicious attacks and other failures. The aim of the demonstrator is to act as a testbed for a multi-concern assurance case and investigations on verification of safety and security related mechanisms. Therefore, it will be gradually evolved in three iterations based on the needs defined in the previous iteration.

Page 76: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 76 of 111

2.8.2.1 First iteration (Core)

For the first (core) iteration of AMASS a very simple telematics function, on which to base a first multi-concern assurance case, will be used. The function is described in Figure 25. It consists of a GPS receiver and (simulated) wheel speed sensor which give input to a function block (implemented in a Raspberry Pi single-board computer) acting as producer (P) of position, time, and ok/nok signals to consumer functions. The ok/nok signal will show if the position and time signals are currently reliable. An example of a malicious attack can be jamming or spoofing of a GPS signal, which at a typical signal power of −127.5 dBm is highly susceptible to such attacks.

The function will be developed and assessed as a safety element out of context (SEooC) with a safety and a cybersecurity case.

Figure 25. Positioning function for Core iteration.

2.8.2.2 Second and third iteration (P1 and P2)

For the second and third iterations the case study will be extended. The goal for the third iteration is to provide an industry-relevant function based on current standards. The specifications will be refined based on the findings in the previous iterations but the current plan, illustrated in Figure 26, includes:

• RTK-GPS for accurate positioning. This involves an additional wireless interface (e.g. 4G/LTE cellular) to provide internet access to RTK reference stations. This additional interface presents another possible attack vector for a malicious adversary. Also, IMU for improved correlation possibilities in the positioning function.

• Integrating an ITS facility that sends CAM messages according to the ETSI C-ITS standard. Adding a second element will also include ensuring the compatibility between the two SEooC components: the positioning function and the ITS facility. The aim is to use AMASS component contracts (to be developed in WP3 and WP4) for this purpose.

Page 77: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 77 of 111

Figure 26. Positioning function and ITS facility for P1/P2 iterations.

2.8.3 Case study state of the art

For functional safety in the automotive domain the ISO 26262:2011 standard is used by all major OEMs. For security, the SAE J3061 Cybersecurity Guidebook for Cyber-Physical Vehicle Systems was recently released (January 2016) and, while not an international standard, it is the so far most ambitious work to create a systematic security process. The framework is also similar to that of ISO 26262. An ISO working group has been initiated to create an international standard for security for road vehicles and may base this work on J3061. In addition, many research projects and methods from the research community have been working on methods for managing the security in the automotive domain, for instance the EVITA and HEAVENS projects and the SAHARA methodology.

Furthermore, the standards for differential GNSS (RTK-GPS), and the standard for C-ITS may be used in the case study.

2.8.4 Case study state of the practice

The positioning function was originally developed in an iterative fashion for use in non-safety-critical self-driving test vehicles, i.e. without safety practices. An improved version is under development following most (but not all) of ISO 26262 and SAE J3061 with traditional development methods as described in this section. This version will constitute the baseline for the case study.

2.8.4.1 Workflow

The workflow is illustrated in Figure 27, and logically follows the V-models for both safety (according to ISO 26262) and security (according to SAE J3061). In practice, the work is performed iteratively and not in a waterfall fashion. Hardware (i.e. 26262, part 5) is currently omitted in the safety work. The safety and security cases are created and managed independently.

Page 78: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 78 of 111

Figure 27. V-model for safety and security

2.8.4.2 Assessment

The goal for this system is not certification, as it is used for test purposes and is not a commercial product. The assurance activities are performed to increase quality of the system, i.e. the measures prescribed by the ISO 26262 and J3061 standards are applied. However, the safety and security cases are not complete; for instance, hardware and tool qualification is not included. Partial assessment is carried out internally by persons within the developing organizations that have not been directly involved with development of the system, but have assessment competence. This means there is some degree of independence, though not to the extent needed for actual certification.

2.8.4.3 Involved roles

The following roles are involved in:

• Development team – Develops the system and is responsible for architecture, development, test and documentation.

• Functional safety manager – Responsible for functional safety assurance activities.

• Cybersecurity manager – Responsible for security assurance activities.

• Assessors.

The functional safety and security managers are also part of the development team. The assessment is partial and the objective for assessment is explained in Section 2.8.4.2.

2.8.4.4 Tools and tool chains

2.8.4.4.1 Used tools and methods (included guidelines)

For development, mainly open source tools are used. No qualified tools or dedicated assurance tools are currently used. Use of better methods and tools is an expected result from the AMASS project.

2.8.4.4.2 Tool chain

The following tools are used:

• Requirements: MS Excel

• System documentation: MS Word, MS Excel

• Configuration and change management: SVN, Git, Jira

• SW and test documentation: Doxygen

• SW development: Eclipse, CMake, Jenkins

Page 79: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 79 of 111

• SW test: CTest, CUnit, PC-Lint

2.8.5 Expected technical improvements

2.8.5.1 STO1. Architecture-driven Assurance

• N/A

2.8.5.2 STO2. Multi-concern Assurance

• Improved methods to analyse, create assurance cases, and assess systems with multiple concerns, specifically for interplay between safety, security, and performance.

2.8.5.3 STO3. Seamless Interoperability

• Provide feedback to tool providers on tool efficiency and tool interoperability for use in a multi-concern assurance case.

2.8.5.4 STO4. Cross/Intra-Domain Reuse

• Re-use of e.g. analysis and verification results between concerns in a multi-concern assurance case.

2.8.6 Business needs

2.8.6.1 AMASS Goal 1

G1: to demonstrate a potential gain for design efficiency of complex CPS by reducing their assurance and certification/qualification effort by 50%.

Methodology and tools for efficient management of multi-concern assurance, e.g. ISO 26262, SAE J3061 and possibly additional standards. Multi-concern verification including re-use for efficiency.

2.8.6.2 AMASS Goal 2

G2: to demonstrate a potential reuse of assurance results (qualified or certified before), leading to 40% of cost reductions for component/product (re)certification/qualification activities.

Methodology for handling interplay between concerns and/or re-use between concerns for multi-concern assurance and assessment for multiple standards.

2.8.6.3 AMASS Goal 3

G3: to demonstrate a potential raise of technology innovation led by 35% reduction of assurance and certification/qualification risks of new CPS products.

N/A

2.8.6.4 AMASS Goal 4

G4: to demonstrate a potential sustainable impact in CPS industry by increasing the harmonization and interoperability of assurance and certification/qualification tool technologies by 60%.

N/A

Page 80: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 80 of 111

2.8.7 Usage scenarios

Table 27 shows the 3 usage scenarios related to Case Study 8.

Table 27. CS8 SPS and COM usage scenarios

ID: SPS UsageScenario 1 SPS UsageScenario 2 COM UsageScenario 1

Related CaseStudy CS8 CS8 CS8

Addressed Domains Automotive Automotive Automotive

Scenario Name MCAC MCASS SAASSA

Short Description Creating multi-concern assurance

case focusing on safety and security,

in particular security impact on

safety. Use of existing standards ISO

26262 and SAE J 3061 (HEAVENS

security model). Suitability of

standards and tools, multi-concern

Multi-concern assessment.

Practicability and efficiency of co-

assessment of several standards for

the same product based on a multi-

concern assurance case.

Multi concern Specification, Analysis

and Assurance of Safety, Security

and Availability for a CPS-subsystem

.

The practicality and suitability of

existing standards and development

tools will be investigated when

Stakeholders System engineer

Functional safety manager

Security manager?

Safery engineer

Security engineer

Test manager

Assessors (safery assessor and

security assessor)

Functional safety manager

Test manager

Security manager?

System Engineer

Safety Engineer

Security Engineer

Verification&Validation Engineer

Safety Manager

Securiy Manager

Safety Assessor

Security Assessor

Stakeholder constraints None None None

Addressed Business Goals: G1, (G2) G1 G1

Process Steps Product development on system

level concerning safety/security

-System requirements

-System design

-System analysis

-System modelling

-System verification

-System argumentation

Assessment Product development on system

level concerning

safety/security/availability

-System requirements

-System design

-System analysis

-System modelling

-System verification

Concerns Safety and security, possibly also

influence on safety of other

concerns such as availability and

Safety and Security Safety and Security and Function

Availability

Cross-system certification No No No

Cross-domain certification No No No

Engineering Environment

(Interoperability)

Open source tools, OpenCert and

use/evaluation of tools from other

AMASS partners. Modifi (internal

TBD Open Source tools TBD

AMASS tools when available for use

and evaluation

Challenges Safety and Security co engineering Safety and Security co assessment Safety and Security and Function

Availability co-engineering

Standards ISO 26262

SAE J 3061

IEC 62443 (possibly?)

ISO 26262

SAE J 3061

IEC 62443 (possibly?)

ISO 26262

SAE J3061

Any wishes for usage scenario Use of AMASS partner tools for

assurance case.

No No

Any known constraints for usage No No No

Page 81: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 81 of 111

2.9 CS9: Safety-Critical SW Lifecycle of a Monitoring System for NavAid (ATM domain)

2.9.1 Short description of the case study

Within Air Traffic Management (ATM) domain, the radio-navigation equipment (often defined NavAids and including radio-beacons such as DME, TACAN, VOR, ILS etc.) are currently the most widespread systems for providing aircrafts with exact location in space and time. They are CPS based on the joint contribution from the physical electromagnetic fields which govern the positioning mechanism and sophisticated computation processes.

Among such systems, the DME system is a Distance Measuring Equipment which provides pilots with distance information between the aircraft and the location of the DME ground equipment. Basically, the airborne DME transmitter interrogates the DME ground station, which replies after a fixed and known delay. An additional, variable delay is proportional to the distance between the airborne interrogator and the ground station: from this variable delay it is possible to compute such distance. The system is used for both en-route and terminal area guidance.

DME, as well as other navaid systems, is subject to the strict ICAO (International Civil Aviation Organization) accuracy requirements and to severe constraints in terms of service integrity/continuity/availability. This makes some aspects of DME design technology (requirement-to-design mapping, testing, validation, certification) predominate issues. This is especially true for the core subsystem dedicated to assure the integrity of the system, the Monitoring subsystem: it measures the quality and the performance of the radiated signal, as well as the internal parameters of the equipment. On the basis of such assessment the subsystem automatically and autonomously defines the reliability of the positioning service provided to aircrafts, extending such assessment to making the service unavailable.

For a safety-critical system such as DME, model-based formal approaches to the validation and verification of SW design (and re-design) represent an answer to the issues mentioned above and result in an increase in overall safety and maintainability of such CPS.

The ATM dept. of Thales Italia (THI) will drive an industrial case study aimed to re-engineer, through the usage of tools and methods provided by the AMASS project, both the SW of the DME Monitoring subsystem and the SW development processes, applying the CNS/ATM safety certification standards (EUROCAE ED-109', 'RTCA DO-278', 'EUROCAE ED-153').

2.9.2 Technical description of the case study

The new approach, provided by AMASS for the THI CS, to the lifecycle management process will be evaluated applying specific process metrics and compared (in terms of effort, quality and safety assurance) to the previous generation approach: improvement will be estimated by analysing current and historical process effort records. This will be also beneficial in assessing the maturity of the framework methodologies and of the relevant tools (e.g.: automatic “safe” code generation, automatic tests generation etc.). The focus with associated contributors (such as INT, TEC, etc.) will thus be on requirement analysis, design (modelling, simulation), early validation, and performance verification phases. The SW development process, in order to incorporate the new methodologies provided by AMASS framework, will be also focused, in association with the contributors, on the modular and on the incremental certification on the product subsystems when safety certification standards apply (EUROCAE ED-109', 'RTCA DO-278', 'EUROCAE ED-153').

The methods and the tools, associated to the main phases of the processes just mentioned, can be summarized as follows:

1. Requirement analysis phase: supported by formal methods for requirements definition and by tools for requirement analysis. Resulting artefact: SRS (Software Requirements Specification).

Page 82: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 82 of 111

2. Software design phase: supported by tools for software modelling and software simulation. Formal methods for early model validation and advanced tools for requirements-to-design traceability will also contribute to this phase.

3. Software implementation phase: supported by model-to-code translation tool for automatic code generation.

4. Software verification phase: supported by tools for automatic test case generation (including component testing, integration testing and formal tests) and by tools for code-coverage testing. The collection of result artefacts will result in a Test Report.

THI CS will benchmark:

a. Tools and methodologies for satisfying both the safety requirements and the performance of the related processes.

b. Methodology for developing software requirements and a resulting architecture that reduces certification effort (and re-certification effort, in case of code changes).

c. Tools and metrics for performance analysis.

d. Tools and methodologies for demonstrating and verifying the compliance of the architecture with the requirements and of the implementation with the architecture (required for safety aspects).

e. Tools and methodologies for demonstrating and verifying the traceability of test cases with source code and requirements (required for safety aspects).

f. Early verification methods to anticipate the detection of possible problems especially linked to safety and performance requirements.

Moving to model-based development (reference to DO-278A model-based design supplement) and to O.O./C++ (reference to DO-278A O.O. supplement) and the usage of Automatic “safe” Code and Tests Generation Tool, is expected to help in achieving the aforesaid goals.

2.9.3 Case study state of the art

According to the EUROCONTROL Safety Assessment Methodology (SAM), the complete software-lifecycle safety assurance is covered by the following ATM regulations, norms and standards:

• RTCA Inc. DO-178B. Software Considerations in Airborne Systems and Equipment Certification. RTCA Inc. / EUROCAE. DO-178B/ED-12B. 1992.

• RTCA, EUROCAE. DO-278 / ED-109. Guidelines for Communication, Navigation, Surveillance, and Air Traffic Management (CNS/ATM) Systems Software Integrity Assurance. RTCA Inc. / EUROCAE. DO-278/ED-109. 3/5/2002.

• RTCA Inc. / EUROCAE. DO-278A/ED-109A. Software Integrity Assurance Considerations for Communication, Navigation, Surveillance and Air Traffic Management (CNS/ATM) Systems. December 2011.

• Eurocontrol. ESARR6. Eurocontrol Safety Regulatory Requirement 6 Software in ATM Functional Systems. May 2010.

• Eurocontrol. ESARR4. Eurocontrol Safety Regulatory Requirement 4 Risk Assessment and Mitigation in ATM. April 2001.

• EUROCAE. ED-153. Guidelines for ANS Software Safety Assurance. August 2009.

• RTCA Inc. / EUROCAE. DO-178C / ED-12B. Software Considerations in Airborne Systems and Equipment Certification. December 2011.

• RTCA Inc. / EUROCAE. DO-330 / ED-215. Software Tool Qualification Considerations. December 2011 - January 2012.

• RTCA Inc. / EUROCAE. DO-331 / ED-216. Model-Based Development and Verification Supplement to DO-178C and DO-278A / Model-Based Development and Verification Supplement to ED-12B and ED-109A. December 2011 - January 2012.

Page 83: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 83 of 111

• RTCA Inc. / EUROCAE. DO-332 / ED-217. Object-Oriented Technology and Related Techniques Supplement to DO-178C and DO-278A / Object-Oriented Technology and Related Techniques Supplement to ED-12C and ED-109A. December 2011 - January 2012.

• RTCA Inc. DO-333 / ED-218. Formal Methods Supplement to DO-178C and DO-278A / Model-Based Development and Verification Supplement to ED-12C and ED-109A. December 2011.

2.9.4 Case study state of the practice

The software development lifecycle is in accordance with the DO-254 / ED-109 objectives:

• Software plans and standards are defined.

• System requirements, through system functional architecture, are allocated to hardware and software items.

• Software requirements cover all the system requirements and the functions defined in system architecture.

• Software architecture is defined according to the software requirements and then, depending on assurance level, low level software requirements are defined.

• Test procedures are defined to cover all the high and low level requirements: the code coverage is performed only when required by the assurance level.

• External and internal ICDs are defined for each software item.

• Reviews with all the involved stakeholders are performed for all the documents and for the source code (when needed).

The current lifecycle, described above, shall benefit from the tools provided by AMASS and currently not (or partially) available, according to the workflow represented in Figure 28.

2.9.4.1 Workflow

Figure 28. CS9 workflow

2.9.4.2 Assessment

Not applicable.

Page 84: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 84 of 111

2.9.4.3 Involved roles

The following job roles will be involved in the CS9:

• System Engineers and SW Engineers in the Requirement Analysis phase

• SW Engineers and Safety Engineers in the Design phase

• SW Engineers and HW Engineers in the Implementation phase

• System Engineers, SW Engineers and HW Engineers in the Verification phase

2.9.4.4 Tools and Tool chains

2.9.4.4.1 Used tools and methods (included guidelines)

• DOORS is used for the system requirements, software requirements, architecture and test procedures.

• Rhapsody is used for system and software architecture and partially for automatic code generation.

• IVV Manager tool for test campaign management will be used in the next months.

• Software configuration management tool in use is ClearCase in conjunction with Bugzilla for problem reporting.

2.9.4.4.2 Tool Chain

The tool chain has been already represented in Figure 28, where methods and the tools are associated to the main phases of the software development process:

• Design-Requirements Traceability is currently managed, inside THI, through DOORS.

• SW Modelling and Model/Code translation for Automatic Code Generation are currently managed, inside THI, through Rhapsody; already available (inside AMASS) alternatives could be CHESS plus OCRA (which include formal methods for defining contracts among architectural components).

• CHESS plus OCRA should be able to perform also a Fault Tree Analysis during the early phases of the workflow represented in Figure 28.

All the (other) tools/methods are expected to be provided by AMASS Project.

The information exchange between DOORS and RHAPSODY takes place through text documents.

ClearCase is just a repository for the various software releases.

IVV Manager stores text reports too.

None of the mentioned tools is qualified.

2.9.5 Expected technical improvements

Improvements are expected in terms of:

• reduced design effort (cost)

• time-to-market

• system performance

The technical objects, assessed within the case study will be:

• STO1 (System Architecture-driven Assurance)

• STO2 (Multi-concern assurance)

2.9.5.1 STO1. Architecture-driven Assurance

• Architecture-driven modelling to fulfil both technical/functional and dependability requirements.

• Assurance patterns specification for compliance with standards and early introduction of safety concerns.

Page 85: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 85 of 111

2.9.5.2 STO2. Multi-concern Assurance

• Safety assurance automation through requirement analysis tools.

• Improvement of V&V phase for safety requirements.

• Complete traceability from the DO-278 / ED-109 objectives to the source code through all the artefacts.

2.9.5.3 STO3. Seamless Interoperability

• N/A

2.9.5.4 STO4. Cross/Intra-Domain Reuse

• N/A

2.9.6 Business needs

2.9.6.1 AMASS Goal 1

G1: to demonstrate a potential gain for design efficiency of complex CPS by reducing their assurance and certification/qualification effort by 50%.

• Tools and methods for the early introduction, into the development process, of safety requirements.

• Methods for early model validation and for verification; tools for code-coverage testing.

2.9.6.2 AMASS Goal 2

G2: to demonstrate a potential reuse of assurance results (qualified or certified before), leading to 40% of cost reductions for component/product (re)certification/qualification activities.

• Methods, for generating software architecture and requirements, which can reduce certification effort.

• Tools for automatic generation of reports, checklists and evidences to support the certification. Automatic check to verify that all the DO-278 / ED-109 objectives have been satisfied.

2.9.6.3 AMASS Goal 3

G3: to demonstrate a potential raise of technology innovation led by 35% reduction of assurance and certification/qualification risks of new CPS products.

• N/A

2.9.6.4 AMASS Goal 4

G4: to demonstrate a potential sustainable impact in CPS industry by increasing the harmonization and interoperability of assurance and certification/qualification tool technologies by 60%.

• N/A

Page 86: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 86 of 111

2.9.7 Usage scenarios

Table 28 and Table 29 show the 5 usage scenarios related to Case Study 9. Table 28. CS9 THI usage scenarios

ID: THI UsageScenario 1 THI UsageScenario 2 THI UsageScenario 3

Related CaseStudy CS9 CS9 CS9

Addressed Domains ATM (Air Traffic Management) ATM (Air Traffic Management) ATM (Air Traffic Management)

Scenario Name SWRA SWD SWI

Short Description From System to SW

requirements by using the

following methods and tools

provided by AMASS:

• formal methods for

requirements definition

• requirements analysis tools

From SW requirements to SW

design by using the following

methods, tools and models

provided by AMASS:

• SW modelling tools

• models simulation

• tools for requirements

traceability into design

• formal methods for early

SW implementation supported

by a model-to-code

translation tool provided by

AMASS, for automatic code

generation.

Stakeholders N/A N/A N/A

Stakeholder constraints N/A N/A N/A

Addressed Business Goals: G1

G3

G1

G3

G1

G3

Process Steps System requirements.

SW requirements.

SW modelling.

SW design.

SW implementation.

Concerns Safety. Safety. Safety.

Cross-system certification - - -

Cross-domain certification No No No

Engineering Environment

(Interoperability)

Doors - Microsoft Visio

- Rhapsody

- Eclipse

- Thales Control

- ClearCase

- Bugzilla

Challenges Improved safety assurance. Improved SW-HW co-design. Automation of code

generation.

Standards EUROCAE ED-109', 'RTCA DO-

278', 'EUROCAE ED-153'

EUROCAE ED-109', 'RTCA DO-

278', 'EUROCAE ED-153'

EUROCAE ED-109', 'RTCA DO-

278', 'EUROCAE ED-153'

Any wishes for usage scenario Use of AMASS-partners tools

and methods to improve

safety assurance and

development efficiency.

Use of AMASS-partners tools

and methods to improve

safety assurance and

development efficiency.

Use of AMASS-partners tools

and methods to improve

safety assurance and

development efficiency.

Any known constraints for N/A N/A C/C++ only.

Page 87: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 87 of 111

Table 29. CS9 THI and INT usage scenarios

ID: THI UsageScenario 4 INT UsageScenario 2

Related CaseStudy CS9 CS9

Addressed Domains ATM (Air Traffic Management) ATM

Scenario Name SWV INT-US2

Short Description SW verification and validation

supported by the following

tools and methods provided by

AMASS:

• automatic test code

generator

• test code coverage

assessment

• complete traceability from

Model-based System, Safety

Engineering

Support for Safety and

Schedulability Analysis

Contract-based Design for

System Architecture by Safety

Contracts, Contract

refinement formal verification

Stakeholders N/A System engineer

Safety engineer

System and safety engineers

collaborate together to

definition of requirements and

to the building of the

architecture.

Safety enginner coolaborates

with assurance engineer to

Stakeholder constraints N/A N/A

Addressed Business Goals: G1

G3

G1, G2, G3

Process Steps SW verification.

SW certification.

System requirements

System design

System verification

System argumentation

Concerns Safety. Safety

Cross-system certification - N/A

Cross-domain certification No

Engineering Environment

(Interoperability)

IVV Manager CHESS and integration with

analysis tools.

CHESS tool supported

activities are: Design,

Dependability (usage of MDH

tool) and Schedulability

Analysis (usage of the MAST

Challenges Automation of verification and

validation process.

N/A

Standards EUROCAE ED-109', 'RTCA DO-

278', 'EUROCAE ED-153'

DO-178B/C

Any wishes for usage scenario Use of AMASS-partners tools

and methods to improve

safety assurance and

development efficiency.

N/A

Any known constraints for N/A N/A

Page 88: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 88 of 111

2.10 CS10: Certification basis to boost the usage of MPSoC architectures

2.10.1 Short description of the case study

The target of this Case Study is to prove the validity of the different architectures and related development methodologies and tool chains proposed by AMASS project and previous projects such as OPENCOSS and SafeCer, opening new application domains to the use of multicores. This use case will be clearly targeted to a final product application and, therefore, it must be guaranteed not only compliance with the functional requirements, but also, to non-functional requirements currently peculiar to space applications, pushing forward these non-functional requirements pointing to the larger flexibility provided by heterogeneous systems.

The Case Study of TAS-E is mainly focalized in including multicore architectures capable of in-flight reconfiguration in actual payload data processing equipment, both for video processing and for telecommunication regenerative payloads. The target is to replace legacy designs in actual flight missions using multicore improved performances to overcome the limitations imposed by classic ASIC designs. To achieve this, TAS-E will define the requirements derived from actual mission scenarios in terms of performances and certification needs and will support the architecture definition and validation activities. Once selected the architectures, TAS-E will implement them in the available processing modules based on the multicore elements both HW and SW.

The different elements developed in the technical tasks will be implemented in the corresponding test benches, one for SSDP and other for Reconfigurable FPGA, implementing the proposed architectures and certification procedures. These test benches will be designed to reproduce as close as possible the actual environmental and operational conditions that will be found in an actual commercial space project to guarantee representatively. The proposed certification techniques and procedures will be compared against previous solutions in the space domain as well as against state of the art solutions in other domains.

2.10.2 Technical description of the case study

This Case Study will be focused on the multicore architectures presently available in the market and the possibilities of implementing them in Space Worth systems that are capable of withstanding the space environment and that can follow the stringent design rules specified for Space equipment. In the same way, in-flight reconfiguration techniques, either by SW modifications for SSDP or by FPGA reconfiguration for Xilinx Virtex5 SIRF, will be covered.

The core of the proposed architectures will be the processor selected by the European Space Agency for the next generation of data handling systems for space applications, i.e. the LEON3 FT which is based on a SPARC-V8 RISC architecture. This processor will be used as base to implement the Scalable Sensor Data Processor Breadboard (SSDP) architecture already under development for ESA to satisfy the needs of the applications that request the fast processing of a high amount of data for smart sensors to be used in future space exploration missions. This architecture combines fixed point DSP IP with a LEON controller. The inherent scalability of the Network-on-chip (NoC) architecture, as well as the efficient combination of GPP and DSP processor cores are very interesting for future large and ultra-powerful processor ASICs, however, a strict validation and certification strategy will be key to allow the widespread usage of such a powerful device in different scenarios with very different criticality constraints.

2.10.3 Case study state of the art

Design of data handling systems and data processing systems for space applications is currently introducing technologies quite new to the space market as multi-core processors or MPSoC. In the space business, the MPSoC are newcomers that are entering the market at an extremely slow speed, especially when compared with the promised advantages that such systems may bring in terms of performances

Page 89: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 89 of 111

improvement. The main reason for this small adoption ratio is the criticality of the space borne systems and the associated validation and certification procedures. One of the elements blocking this certification is the lack of predictability of critical parameters and therefore lack of deterministic certification tools and procedures. There is a lack of methodologies and tools to support the exploitation of these new technologies in the scope of systems which are compliant to the strict requirements of power consumption, performance under critical conditions, safety, timeliness, security and reliability peculiar to the space applications.

2.10.4 Case study state of the Practice

Test and validation is the core of the stringent discipline of the Space Domain. However, present T&V procedures follow old standards and are not aligned to face the new challenges risen by new paradigms such as in-flight reconfiguration or MPSoC architectures required for future Scientific missions (Rovers, Planetary probes) and advanced telecommunication payloads. The data processing capacity of Satellite data processors is estimated well above the 10 GFLOPs processing mark for the coming decade. To release the full potential of this power it is necessary to evolve present extensive certification procedures to more intelligent techniques and methodologies able to cope efficiently with multi-parallel threading, mixed criticality SW systems and in flight reconfigurable hardware.

Every time some element needs to be modified during the flight, requires a complete phase of modification and validation, implying validation and certification of every single element or block; even though by itself works fine or has no contact with the modified parts of the project.

Nowadays the whole project must be stopped and has to be restarted and treated as a new one, in terms of certification and revalidation of every single line of code and every procedure. These in in-flight missions make them not reachable. In the present, no in-flight mission has the possibility to be reconfigurable; all expeditions are with frozen code with no chance of modification or corrections.

Regarding safety and security into the case study 10 the next tools and methods are being used:

• Safety established development process methodology starting with strict requirements from the clients, consortiums and agencies in reconfigurable in-flight methodologies, finishing with the implementation and the verification and validation.

• Safety management tool that assures the completely and whole working throughout the entire lifecycle.

• Security development process methodology based on the safety process.

• Systematic security methodology to identify and analyse the threats early in the design development phase based on the architecture definitions, including a classification of the threats to risk levels.

2.10.4.1 Workflow

During the development process every single new step achieved will be evaluated in terms of accomplishing the strict standards in the space domain.

Every completed valuable block will be checked and fully validated in terms of security based in safety processes.

2.10.4.2 Assessment

Internally TAS-E has been working and studying the integration of FPGAs inserted in “in-flight” products. No experience from TAS-E and partners in reconfigurable FPGAs during the mission due to the strict requirements specified by the owner and agencies. The reconfigurable FPGAs are still not available due to the space specification, and the impossibility of being re-validated and re-certified with every change.

Page 90: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 90 of 111

2.10.4.3 Involved roles

For this case study will work the following people from the partners:

• TAS-E: o Technical and CS Leader o Technical and WP Leader o Project Manager o Assurance engineer o Safety engineer

• GMV: o Technical consultor & contributor

• TEC: o Technical consultor & contributor

• INT: o Technical consultor & contributor

• FBK: o Technical consultor & contributor

2.10.4.4 Tools and Tool chains

2.10.4.4.1 Used tools and methods (included guidelines)

All the developments, methods and tools have the specific requirement to accomplish the standards:

• ECSS-E-ST-40C

• ECSS-Q-ST-80C

Which works as guidelines in the whole process, spreading it into different categories:

• Architecture and Modelling o Melody Advance o Microsoft Visio

• Software Design o Enterprise Architect o Rhapsody o Melody CCM

• Software development o Eclipse

• Continuous integration o Thales Control

• Source control o SVN o Git/Stash

• Project and task management o Jira

• Requirements o Doors

2.10.4.4.2 Tool Chain

Some of the tools used for SW development exchange information, in particular those tools related to the continuous integration and SW validation process.

The traceability of SW development to requirements is currently done manually using Excel spreadsheets.

Page 91: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 91 of 111

The output of all these tools is required in order to certificate the SW, from the gathering of requirements to the validation and integration tests before the SW is released to the mission. The ECSS standard defines at what step of the development process each output is required.

2.10.5 Expected technical improvements

The proposed solutions will be used to recode and test the performances of Video Compression algorithms commonly used in the space domain, such as CCSDS122 and 123 which are specialized versions of the JPEG2000 standards. Being a multilayer compression algorithm, it is prone to be parallelized into an MPSoC structure and, as such, AMASS results should show a clear impact on the overall validation and certification of the algorithm. The architecture is prone to parallelization and modularization and as such can be easily linked to in-flight reconfiguration procedures to adapt it to the particularities of the processed images as well as to the evolution of customer needs.

A second application will be data cyphering for on board communications using AES cyphering algorithms presently available. Once more, these algorithms are ready to be parallelized and will show a clear impact of the developments in AMASS.

2.10.5.1 STO1. Architecture-driven Assurance

• Reuse approach of architectural patterns and models on space domain.

• Safety and security of reliable models (timing, efficiency…) with reuse approach to enable cost/time efficient analysis of a system’s dependability under consideration of current available process standards.

2.10.5.2 STO2. Multi-concern Assurance

• Creation of an automated Assurance Case to fulfill requirements in an efficient way.

• Objective evaluation of use case functions with focus to functional safety and security.

• Verification and Validation of safety-related and security-related developed measures (methodology, cost efficient test coverage…).

2.10.5.3 STO3. Seamless Interoperability

• Introduction of tool environment to achieve safety and security activates in an economic efficient and consistent way to obey requirements of standards, guaranteeing the validation of independent blocks without the necessity of the whole systems to be revalidated.

2.10.5.4 STO4. Cross/Intra-Domain Reuse

• Objective assessment of security analyzing methods and algorithms. Assure the re-qualification, reuse or enhancement of current methods.

2.10.6 Business needs

Due to the neediness of the everyday more complex space sector, products must be more flexible each day and cheaper. Most of the costs are related to the time involved in the certification and re-evaluation of blocks that have not changed but have been included in a high-level method or algorithm.

With CS10 it is covered the necessity of adaptively basic in such a variable sector in terms of technology and business requirements in the entire time slot (15 years), with reconfigurable in-flight software without the obligation of being re-validated and re-qualified the whole system with every single change.

In economic terms, all these scenarios results will mean for TAS-E:

Page 92: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 92 of 111

• AMASS will allow to multiply by 4 the Space Routers accessible market, from 12 to 50M€ accessible per year.

• With present market share, AMASS improvements will allow increasing Space Router Sales from 8M€ to 32M€ by 2020.

2.10.6.1 AMASS Goal 1

G1: to demonstrate a potential gain for design efficiency of complex CPS by reducing their assurance and certification/qualification effort by 50%.

Currently in the space industry, all new designs must go through an exhaustive certification and qualification process which can take years of effort and engineering resources. Reducing this certification time is a key aspect to reduce total cost and overall development time.

The technology developed under the AMASS project will allow to reduce the certification effort by starting the certification process at the system architecture level. This will help reduce the overall assurance and certification effort significantly.

2.10.6.2 AMASS Goal 2

G2: to demonstrate a potential reuse of assurance results (qualified or certified before), leading to 40% of cost reductions for component/product (re)certification/qualification activities.

Another key aspect to reduce the certification effort is by reusing pre-qualified components, or components that have been certified in a previous space mission. Current limitation is the lack of clear guidelines of how pre-qualified components can be reused at the system architecture level. The AMASS project will help to define techniques and methods to improve the reusability of components at the system level, reducing the cost of qualification activities.

2.10.6.3 AMASS Goal 3

G3: to demonstrate a potential raise of technology innovation led by 35% reduction of assurance and certification/qualification risks of new CPS products.

Some of the existing and well-known techniques to improve the performance of HW/SW CPS systems cannot be applied to the space industry due to the lack of the corresponding certification processes or the enormous amount of effort that the qualification would take. A clear example of this limitation is the usage of multiprocessor systems. Although multicore CPUs have been available for many years, its usage in space missions is very restricted due to the difficulties they present from the assurance and qualification point of view. Another clear example is the usage of reconfigurable FPGAs, which is currently restricted in space missions.

The technology developed in the AMASS project will allow the space industry to benefit from the usage of multicore CPUs and reprogrammable FPGAs, increasing the performance, flexibility and reducing the assurance and certification effort.

2.10.6.4 AMASS Goal 4

G4: to demonstrate a potential sustainable impact in CPS industry by increasing the harmonization and interoperability of assurance and certification/qualification tool technologies by 60%.

N/A

Page 93: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 93 of 111

2.10.7 Usage scenarios

Table 30 and Table 31 show the 7 usage scenarios related to Case Study 10. Table 30. CS10 TAS-E and TEC usage scenarios

ID: TAS-E UsageScenario 2 TAS-E UsageScenario 3 TEC UsageScenario 16 TEC UsageScenario 17

Related CaseStudy CS10 CS10 CS10 CS10

Addressed Domains Space Space Space Space

Scenario Name SSDP Reconfigurable FPGA Model-Based Development Assurance/Certification

Management Tool

Short Description In-flight SW on MPSoC In-flight SW on MPSoC

Reconfigurable FPGA

1) Support for model-based System,

Safety, and Security Engineering

2) Support for Safety and Security

Analysis

3) Support for Safety and Security

V&V

4) Support for contract-based design

for system architecture by safety

and security contracts

5) Fault Injection

6) Support for the use of

architectural and technology

patterns for MPSoC: trade-off based

on analysis and certification

requirements

Compliance with Standards/ product

and process assurance/certification

management tool to support the

compliance assessment and

certification

1) Create semi automated assurance

case

2) Address certification issues

regarding MPSoC e.g. reconfigurable

FPGA

3) Support for Safety and Security

Argumentation (GSN)

Stakeholders System engineer System Engineer System engineer

Safety engineer

Security engineer

Quality Assurance Manager

Safety engineer

Security engineer

Stakeholder constraints None None None None

Addressed Business Goals: G1, G2, G3 G1, G2, G3 G4, G1, G3? G4

Process Steps Product development on system

level concerning safety/security

-System requirements

-System design

-System analysis

-System modelling

-System verification

-System argumentation

Product development on system

level concerning safety/security

-System requirements

-System design

-System analysis

-System modelling

-System verification

-System argumentation

Product development on system

level concerning safety/security

-System requirements

-System design

-System analysis

-System modelling

-System verification

-System argumentation

Concerns Reliability & performance Reliability & safety Safety, Security, Reliability,

Availability, Maintainability

Safety, Security, Reliability,

Availability, Maintainability

Cross-system certification No No

Cross-domain certification Space & Avionics Space & Avionics No No

Engineering Environment

(Interoperability)

• Architecture and Modelling:

o Melody Advance

o Microsoft Visio

• Software Design:

o Enterprise Architect

o Rhapsody

o Melody CCM

• Software development:

o Eclipse

• Continuous integration:

o Thales Control

• Source control:

o SVN

o Git/Stash

• Project and task management:

o Jira

• Requirements:

o Doors

• Architecture and Modelling:

o Melody Advance

o Microsoft Visio

• Software Design:

o Enterprise Architect

o Rhapsody

o Melody CCM

• Software development:

o Eclipse

• Continuous integration:

o Thales Control

• Source control:

o SVN

o Git/Stash

• Project and task management:

o Jira

• Requirements:

o Doors

Open Source tools

AMASS tools when available for use

and evaluation

Toolinteraction MBSE Tools-

Safety/Security Analyses Tool and

V&V Tools

Open Source tools

AMASS tools when available for use

and evaluation

Challenges N/A N/A Safety and Security co- engineering,

innovative fail-operational concepts,

Safety and Security and Function

Availability co-engineering, definition

of architectural patterns

Certification challenges w.r.t MPSoC

argumentation patterns for fault

tolerance, argumentation patterns

for specific technologies

Standards ECSS-E-ST-40C

ECSS-Q-ST-80C

ECSS-E-ST-40C

ECSS-Q-ST-80C

ECSS-Q-ST-30, ECSS-Q-ST-40, ECSS-Q-

ST-80

ECSS-Q-ST-30, ECSS-Q-ST-40, ECSS-Q-

ST-80

Any wishes for usage scenario N/A N/A Reuse of established safety methods

for security topic

Reuse of established safety methods

for security topic

Any known constraints for

usage scenario

N/A N/A Not so far Not so far

Page 94: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 94 of 111

Table 31. CS10 INT and RPT usage scenarios

ID: INT UsageScenario 1 RPT UsageScenario 1 RPT UsageScenario 2

Related CaseStudy CS4, CS10, CS11 CS10 CS10

Addressed Domains Space Space Space

Scenario Name INT-US1 N/A N/A

Short Description Model-based System, Safety, and

Security Engineering

Support for Safety and

Schedulability Analysis

Contract-based Design for System

Architecture by Safety and Security

Contracts, Contract refinement

formal verification

N/A N/A

Stakeholders System engineer

Safety engineer

System and safety engineers

collaborate together to definition of

requirements and to the building of

the architecture.

Safety enginner coolaborates with

assurance engineer to realize the

architecture driven assurance.

Software Engineer

Test Engineer

Software Engineer Test Engineer

Stakeholder constraints N/A N/A N/A

Addressed Business Goals: G1, G2, G3 G4: Reduce certification effort by

improving traceability support from

HLR to test and SCA results.

G4: Automation of the verification

processes (testing, SCA, timing

anlysis) within continuous

integration systems.

Process Steps System requirements

System design

System verification

System argumentation

System tests

Unit tests

System tests

Unit tests

Concerns Safety Safety Safety

Cross-system certification N/A N/A N/A

Cross-domain certification N/A N/A N/A

Engineering Environment

(Interoperability)

CHESS and integration with analysis

tools.

CHESS tool supported activities are:

Design, Dependability (usage of MDH

tool) and Schedulability Analysis

(usage of the MAST tool), Ada Code

generation. Integration with OCRA

and xSAP fro contracts verification

and further dependability analysis

support.

Use of OpenCert AMASS

environment to manage process,

evidence, assurance case

information.

N/A N/A

Challenges N/A N/A N/A

Standards ECSS, SAVOIR-FAIRE DO178 DO178

Any wishes for usage scenario N/A Ada/C/C++ Ada/C/C++

Any known constraints for N/A N/A N/A

Page 95: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 95 of 111

2.11 CS11: Design and efficiency assessment of model based Attitude and Orbit Control software development

2.11.1 Short description of the case study

OHB Sweden is responsible for developing the attitude and orbit control subsystem (AOCS) used for a number of different telecommunication satellite platforms. Attitude control is controlling the orientation of the satellite with respect to an inertial frame of reference or other entity. Orbit control is controlling the positioning of the satellite in orbit. Controlling the attitude and orbit requires sensors to measure the satellite orientation, actuators to apply the torques needed to re-orient the satellite to desired attitude and/or orbit and algorithms to command the actuators based on sensor measurements and specification of desired attitude and/or orbit.

The development of critical on-board software applications such as AOCS is continuously becoming more complex as space missions become more autonomous. At the same time, it is expected that the pressure on budget and schedule will continue to increase such that the demand for efficient software development still ensuring dependability and safety will increase.

This Case Study will be based on the AOCS SW developed for the telecommunication satellite platform Electra. Electra is a public-private partnership under the ESA ARTES 33 program serving the purpose of providing the satellite communications industry with innovative products and systems.

Figure 29. Electra, Telecommunication satellite

The Case Study will exploit the benefits of using the AMASS platform in order to allow for re-use of design, software and process components between different missions with different customer demands. Also, the case study will assess how OSLC can allow for interoperability and seamless integration of model-based system engineering tools with the aim to reduce the cost of assurance activities and evidence management.

2.11.2 Technical description of the case study

This Case Study will focus on selected components of the AOCS SW that will be developed for Electra. The selection of the component(s) shall be based on certain criteria in order to fit the Case Study.

The aim is to identify components that can be reused in different missions. This will require following criteria:

• Generic requirements common for all telecommunication satellite platforms.

• Parameters that can be configured to tailor the components to the requirements of a mission.

Page 96: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 96 of 111

The Case Study will assess the effort of developing a reusable component according to ECSS with the help of the AMASS framework.

The Case Study will also assess how OSLC can allow for seamless integration of model-based system engineering tools during the different steps in the development cycle. The development cycle used when developing the AOCS SW for Electra is depictured in Figure 30.

Figure 30. AOCS SW Development Cycle

Given the seamless integrated tool-chain, the aim is to automate evidence management performed during verification activities and assess the benefits of the automation.

2.11.3 Case study state of the art

In European space project the development of any SW must be fully compliant to at least the following ECSS standards:

• ECSS-E-ST-40C Software general requirements

• ECSS-Q-ST-80C Software product assurance

There are a number of additional standards for management processes:

• ECSS-M-ST-10C_Rev.1 Project planning and implementation (6March2009)

• ECSS-M-ST-40C_Rev.1 Configuration and information management (6March2009)

• ECSS-M-ST-60C Cost & schedule management (31July2008)

• ECSS-M-ST-80C Risk management (31July2008)

The ECSS also addresses dependability and safety processes on system and software level:

• ECSS-Q-ST-30C Dependability (6March2009)

• ECSS-Q-ST-40C Safety (6March2009)

For critical on-board SW application such as the software associated with AOCS, the mentioned standards require high level of assurance activities and provisions of evidence that SW fulfils system- and ECSS standard requirements.

With model-based design in MATLAB Simulink, a major step has been taken to reduce development time and cost. Model-based design allows developers to prove the design by simulation in MATLAB Simulink before automatically generating the code and avoiding the introduction of manually coded errors while doing so.

One challenge is to avoid re-design of similar components/functions or validation/verification frameworks when creating AOCS SW for different satellite platforms. Another challenge is to semi-automate the assurance activities through seamless integration of the engineering tools used in the development of AOCS SW.

Page 97: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 97 of 111

2.11.4 Case study state of the practice

The following methods and tools are already used during the development of the herein described Case Study regarding safety, reliability, availability and maintainability:

• Requirements engineering and architectural design: Established model-based design process using DOORS for requirement tracing and Simulink to create and analyse the architectural design.

• Detailed design (incl. Code Generation & Validation vs TS (Unit/Integration tests incl. Code Coverage):

o Established model-based design techniques to implement and simulate the control algorithms in Simulink blocks. Also generation of the code.

o Implementation of Unit/Integration tests including Code Coverage tests.

• Validation & Qualification (Validation vs RB): Scenario testing of the complete AOCS SW with the use of a simulated environment (sensors and actuators, environment and dynamics models).

2.11.4.1 Workflow

This is a description of the workflow of this Case Study and an initial selection of tools. Table 32. CS11 Workflow

Phase Activity Tool

FMECA & FDIR design Reliability assurance DOORs

Requirements engineering & architectural design

Specification (Contract based assurance composition)

DOORs & Simulink

Traceability DOORs Attribute

Detailed design (incl. Code Generation) & Validation vs TS (Unit/Integration Tests incl. Code Coverage)

Model-based design & Code Generation Code Coverage Test generation.

Simulink Matlab Embedded Coder Gcc, gcov

Traceability DOORs Attribute

Validation vs RB Scenario test using Satsim (Satellite Simulator)

Matlab Satsim

Traceability DOORs Attribute

2.11.4.2 Assessment

The results of the Case Study will be assessed as follows:

• Evaluation of the benefits to re-use SW components in accordance with ECSS, by comparing the results obtained following the AMASS project (contract bases assurance) compared to the ad-hoc clone and own method used in the Electra project.

• Evaluation of the benefits to automate evidence management during verification activities, by comparing the results obtained following the AMASS workflow with the results obtained in the Electra project.

2.11.4.3 Involved roles

Roles Responsibilities

AOCS Engineer • FMECA & FDIR design

• Requirements engineering (AOCS aspects)

• Analysis and design of AOCS control algorithms

• Validation vs TS

• Validation vs RB

Software Engineer • Requirements engineering (SW aspects)

Page 98: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 98 of 111

• Setup and maintain SW framework

• Validation vs TS (Code Coverage)

Quality Assurance Engineer • Monitors development process to ensure design quality and making sure the SW adheres to standards.

2.11.4.4 Tools and Tool chains

2.11.4.4.1 Tool chains

The table below lists the tools to be used in the Case Study.

Table 33. CS11 Tool Chain

Activity Tools Interfacing tools

FMECA & FDIR design • IBM Rational DOORS • Matlab

• Simulink

Requirements Engineering & Architectural design

• IBM Rational DOORS • Matlab

• Simulink

Detailed Design & Validation vs TS • Matlab

• Simulink

• IBM Rational DOORS

Detailed Design & Validation vs TS • TSim

• Gcc

• gcov

• IBM Rational DOORS

• Simulink

Validation vs RB • Matlab

• Simulink

• DOORS

The following steps are currently integrated manually in the Electra project:

• Requirements and Design traceability. Currently the developer manually types into DOORS which components the requirements are traced to. Traceability matrices and statistics are generated from DOORS.

• Requirements and Unit/Integration tests traceability. Currently the developer manually types into DOORS which tests validate which requirements. Traceability matrices and statistics are generated from DOORS.

• Implementation of Code Coverage tests are currently performed manually. MATLAB is used to verify code coverage.

• Requirements and Scenario tests traceability. Currently the developer manually types into DOORS which tests validate which requirements. Traceability matrices and statistics are generated from DOORS.

2.11.5 Expected technical improvements

The aim is to increase efficiency and reduce cost through:

• Re-use of methods, components and tests.

• Semi-automation of producing the evidence in relation to the assurance activities.

2.11.5.1 STO1. Architecture-driven Assurance

Contract-Based Assurance Composition for argumentation that the architecture is compliant with the system properties. In case of a system property change event, contract-based assurance composition can also be used for identification of affected architecture/components. Combination of model-based design and contract-based architecture should aim at creating a modular, configurable and re-usable architecture suitable for a general telecom satellite platform.

Page 99: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 99 of 111

The AOCS SW is developed using model-based design with MATLAB Simulink.

2.11.5.2 STO2. Multi-concern Assurance

N/A

2.11.5.3 STO3. Seamless Interoperability

Tool Integration Management of development tools (using OSLC and AMASS platform). Create a tool environment to perform semi-automated verification activities in a cost-efficient way to fulfil requirements of standards like ECSS-Q-ST-80C. Since MATLAB Simulink is the tool used for model-based design, it is in our interest to explore the possibility to integrate MATLAB Simulink with a test tool using OSLC with the aim of automatically generating quality assurance evidence.

2.11.5.4 STO4. Cross/Intra-Domain Reuse

Contract-based argumentation for systematic reuse of process and product-based engineering and assurance artifacts. Using the AMASS platform with the aim to understand whether re-use of the assurance assets is possible or determine what further analysis is required to justify compliance.

2.11.6 Business needs

The needs are to find methods and tools to increase efficiency and to reduce cost of developing AOCS SW.

2.11.6.1 AMASS Goal 1

G1: to demonstrate a potential gain for design efficiency of complex CPS by reducing their assurance and certification/qualification effort by 50%.

Methods and tools to support argumentation for identification of reusable components and assessments.

2.11.6.2 AMASS Goal 2

G2: to demonstrate a potential reuse of assurance results (qualified or certified before), leading to 40% of cost reductions for component/product (re)certification/qualification activities.

Reuse of components from one mission to another as well as reuse of process-related artefacts from one mission to another.

2.11.6.3 AMASS Goal 3

G3: to demonstrate a potential raise of technology innovation led by 35% reduction of assurance and certification/qualification risks of new CPS products.

N/A

2.11.6.4 AMASS Goal 4

G4: to demonstrate a potential sustainable impact in CPS industry by increasing the harmonization and interoperability of assurance and certification/qualification tool technologies by 60%.

Methodology of seamless integration of the development tool chain (e.g. DOORS, Simulink, Jenkins (or other test tools from AMASS platform), Hansoft and development tools such as MS Visual Studio or Eclipse.

Page 100: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 100 of 111

2.11.7 Usage scenarios

Table 34, Table 35 and Table 36 show the 9 usage scenarios related to Case Study 11. Table 34. CS11 OHB and MDH usage scenarios

ID: OHB UsageScenario 1 OHB UsageScenario 2 MDHD5UsageScenario2 MDH UsageScenario 3

Related CaseStudy CS11 CS11 CS11 CS11

Addressed Domains Space Space Space Space

Scenario Name Contract based Architectural Design Seamless integration of tool chain Product (component) and process

reuse

Seamless interoperability

Short Description Contract-based design for System

Architecture by safety, availability

and maintainability assurance and

argumentation.

Seamless integration of model-based

engineering tools for safety and

reliability assurance.

Reuse of components from one

mission to another as well as reuse

of process-related artifacts from

mission to another

N/A

Stakeholders System Engineer - Software Engineer

Software Engineer - Assurance

Engineer

Software Engineer - Test Engineer

System Engineer - Test Engineer

System Engineer - Software Engineer

Software Engineer - Assurance

Engineer

Software Engineer - Test Engineer

System Engineer - Test Engineer

N/A N/A

Stakeholder constraints None None N/A N/A

Addressed Business Goals: G1, G2, G4 G1, G4 G2 G4

Process Steps - Requirements Engineering and

Architectural Design

- Detail Design & Code Generation

- Validation vs Technical

Specification (Unit/Integration tests

incl Code Coverage)

- Validation vs Requirement Baseline

(Scenario Tests)

- Verification

- Requirements Engineering and

Architectural Design

- Detail Design & Code Generation

- Validation vs Technical

Specification (Unit/Integration tests

incl Code Coverage)

- Validation vs Requirement Baseline

(Scenario Tests)

- Verification

N/A N/A

Concerns Safety Safety Safety Safety

Cross-system certification No No Yes Yes

Cross-domain certification No No No No

Engineering Environment

(Interoperability)

- Requirements Engineering - DOORS

- Design & Code Generation -

Simulink

- Validation vs TS & Code Coverage -

Matlab/Alten Code Coverage

Generation Tool

- Validation vs RB - Matlab & Satsim

- Requirements Engineering - DOORS

- Design & Code Generation -

Simulink

- Validation vs TS & Code Coverage -

Matlab/Alten Code Coverage

Generation Tool

- Validation vs RB - Matlab & Satsim

Open Source tools

AMASS tools when available for use

and evaluation

Toolinteraction MBSE Tools- Safety

Analyses Tool and V&V Tools +

industry-required tools when

appropriate

Open Source tools

AMASS tools when available for use

and evaluation

Toolinteraction MBSE Tools- Safety

Analyses Tool and V&V Tools +

industry-required tools when

appropriate

Challenges Create contract based method for

- re-use argumentation compliant to

ECSS.

- Consistency analysis

Improve assurance activities through

automation of evidence

management.

Safety engineering Commonality &

Variability systematization

AMASS tools when available for use

and evaluation

Standards ECSS-E-ST-40C

ECSS-Q-ST-80C

ECSS-Q-ST-30C

ECSS-Q-ST-40C

ECSS-E-ST-10-02C

ECSS-E-ST-40C

ECSS-Q-ST-80C

ECSS-Q-ST-30C

ECSS-Q-ST-40C

ECSS-E-ST-10-02C

ECSS-E-ST-40C

ECSS-Q-ST-80C

ECSS-Q-ST-30C

ECSS-Q-ST-40C

ECSS-E-ST-10-02C

ECSS-E-ST-40C

ECSS-Q-ST-80C

ECSS-Q-ST-30C

ECSS-Q-ST-40C

ECSS-E-ST-10-02C

Any wishes for usage scenario - - Re-use and automation of

verification activities.

Toolinteraction MBSE Tools- Safety

Analyses Tool and V&V Tools +

Process-modeling tools + industry-

required tools when appropriate

Any known constraints for

usage scenario

Matlab simulink is a required tool for

design, simulations and code

generation.

Matlab simulink is a required tool for

design, simulations and code

generation.

Not so far Not so far

Page 101: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 101 of 111

Table 35. CS11 MDH, FBK and INT usage scenarios

ID: MDH UsageScenario 4 FBK UsageScenario CS11 INT UsageScenario 1

Related CaseStudy CS11 CS11 CS4, CS10, CS11

Addressed Domains Space Space Space

Scenario Name Automation of safety analysis and

generation of argument fragments

CS11FBK INT-US1

Short Description N/A 1) Modeling of a spacecraft

architecture with standard AOCS

components and

telecommands/telemetry

communication

2) Contract-based specification of

components

3) Validation of contracts

4) Verification of contract

refinement

5) Compare architectures of

different missions based on soft

requirements and fault trees

Model-based System, Safety, and

Security Engineering

Support for Safety and

Schedulability Analysis

Contract-based Design for System

Architecture by Safety and Security

Contracts, Contract refinement

formal verification

Stakeholders N/A System engineer, Safety & Security

engineer, ModelBased Safety

researcher, Verification & validation

researcher

System engineer

Safety engineer

System and safety engineers

collaborate together to definition of

requirements and to the building of

the architecture.

Safety enginner coolaborates with

assurance engineer to realize the

architecture driven assurance.

Stakeholder constraints N/A None N/A

Addressed Business Goals: G1, G4 G3 G1, G2, G3

Process Steps N/A system requirements

system design

system analysis

system modeling

system verification

evidence for system argumentation

System requirements

System design

System verification

System argumentation

Concerns Safety Safety

Security

Reliability

Safety

Cross-system certification Yes N/A N/A

Cross-domain certification No No N/A

Engineering Environment

(Interoperability)

Open Source tools

AMASS tools when available for use

and evaluation

Toolinteraction MBSE Tools- Safety

Analyses Tool and V&V Tools +

industry-required tools when

appropriate

CHESS interacting with analysis tools

(OCRA, nuXmv, xSAP) and with

OpenCert:

Modeling in SySML or AADL using

CHESS

Formalization using CHESS/OCRA

integration

Validation and Refinement checked

with OCRA

Model checking with nuXmv

FTA/FMEA with xSAP

Collection of evidence for

argumentation with OpenCert

CHESS and integration with analysis

tools.

CHESS tool supported activities are:

Design, Dependability (usage of MDH

tool) and Schedulability Analysis

(usage of the MAST tool), Ada Code

generation. Integration with OCRA

and xSAP fro contracts verification

and further dependability analysis

support.

Use of OpenCert AMASS

environment to manage process,

evidence, assurance case

information.

Challenges Re-use and automation of analysis

and verification activities.

Reuse of components

Comparison of architectures

Application of formal methods

Generation and reuse of evidence

N/A

Standards ECSS-E-ST-40C

ECSS-Q-ST-80C

ECSS-Q-ST-30C

ECSS-Q-ST-40C

ECSS-E-ST-10-02C

N/A ECSS, SAVOIR-FAIRE

Any wishes for usage scenario Re-use and automation of

verification activities.

N/A N/A

Any known constraints for

usage scenario

Not so far N/A N/A

Page 102: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 102 of 111

Table 36. CS11 RPT usage scenarios

ID: RPT UsageScenario 3 RPT UsageScenario 4

Related CaseStudy CS11 CS11

Addressed Domains Space Space

Scenario Name N/A N/A

Short Description N/A N/A

Stakeholders Software Engineer Test Engineer Software Engineer

Test Engineer

Stakeholder constraints N/A N/A

Addressed Business Goals: G4: Reduce certification effort by improving traceability support from HLR to test and SCA results.G4: Automation of the verification

processes (testing, SCA, timing

anlysis) within continuous

integration systems.

Process Steps System tests

Unit tests

System tests

Unit tests

Concerns Safety Safety

Cross-system certification N/A N/A

Cross-domain certification N/A N/A

Engineering Environment

(Interoperability)

N/A N/A

Challenges N/A N/A

Standards N/A N/A

Any wishes for usage scenario Ada/C/C++ Ada/C/C++

Any known constraints for

usage scenario

N/A N/A

Page 103: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 103 of 111

3. Questionnaire Evaluation

The aim of the questionnaire was to get more information about the AMASS project partners and to obtain independent information about the partners. The questionnaire was structured in 5 parts: Part 1 covered general questions; the subsequent parts focused on the development process, the assurance process, and the certification process; finally, Part 5 covered questions related to WP5 regarding tools and evidence management. The results of part 5 are used as input for WP5.

Figure 31 provides an overview about which domains are relevant for the AMASS partners. The three main domains are automotive, rail and avionics, and some partners are working on more than one domain.

Figure 31. Relevant domains for the AMASS partners

The professional categories of the AMASS partners are present in Figure 32, whereas Figure 33 shows the number of company employees. Industry and scientific are the main professional categories and more than the half of AMASS partners have more than 250 employees.

Figure 32. Professional categories of AMASS

partners

Figure 33. Overview of number employees of AMASS

partners

Page 104: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 104 of 111

The partners’ activities in the development process are shown in Figure 34. Verification and validation are the most frequent activities and the hardware activities are the least usual activities.

Figure 34. Partners activities in the development process

Figure 35 presents the partners’ activities in the assurance process. Most AMASS partners have activities related to safety. The activities related to security are in the contrast less frequent.

Figure 35. Partners activities in the assurance process

Page 105: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 105 of 111

Figure 36 provides an overview of the AMASS partners’ activities in the certification process. The activities regarding the assessment in the certification process are the most frequent activities performed by AMASS partners.

Figure 36. Partners activities in the certification process

Page 106: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 106 of 111

4. Conclusions

This deliverable has presented the 11 industrial Case Studies of the AMASS project. For each case study, a technical description of the case study has been provided and the state of the art and the state of the practice regarding the case study have been described. Furthermore, a description of the expected improvements in the case studies by the end of the AMASS project has been provided. Figure 37 shows an overview of which AMASS Scientific and Technical Objectives (STOs) are covered by the AMASS case studies. The evaluation shows that every AMASS STO is covered at least from 8 case studies, which is a promising commitment.

Figure 37. Scientific and Technical Objectives (STOs) covered by AMASS case studies

A description of the specific business needs has been elaborated to improve each of the case studies and show which AMASS goals are covered. The evaluation shows that every AMASS goal is covered by at least 6 case studies (see Figure 38).

Figure 38. AMASS goals covered by case studies

Finally, the AMASS partners have defined specific usage scenarios for each case study. This has resulted in 87 usage scenarios describing the case study stakeholders and the practices developed by the stakeholders related to those case studies.

Page 107: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 107 of 111

Abbreviations and Definitions

ACC Adaptive Cruise Control AD Autonomous Drive ADAS Advanced Driver Assistance Systems AES Advanced Encryption Standard AOCS Attitude and Orbit Control Subsystem APPSW Application Software AR PSD Authorized Range Area: train position Area where the PSD are authorized to open (decided

by the customer) ARM Advanced RISC Machine ASIC Application-Specific Integrated Circuit ASIL Automotive Safety Integrity Level ATC Automatic Train Control ATM Air Traffic Management ATO Automatic Train Operation ATP Automatic Train Protection AUTOSAR AUTomotive Open System ARchitecture BCM Body Control Module BSW Basic Software CACC Cooperative Adaptive Cruise Control CAN Controller Area Network CAM Cooperative Awareness Message CBTC Communication Based Train Control CENELEC European Committee for Electrotechnical Standardization CMA Common Mode Analysis CPS Cyber Physical System CS Case Study DME Distance Measuring Equipment DSP Digital Signal Processor DSRC Dedicated Short-Range Communication EASA European Aviation Safety Agency ECSS European Cooperation for Space Standardization ECU Electronic Control Unit EEPROM Electrically Erasable Programmable Read-Only Memory EMC Electromagnetic Compatibility EPCIP European Programme for Critical Infrastructure Protection ERTMS European Rail Traffic Management System ESA European Space Agency FAA Federal Aviation Administration FMEA Failure Modes and Effects Analyses FMEDA Failure Modes, Effects and Diagnostic Analysis FPA Focal Plane Assembly FPGA Field Programmable Gate Array FTA Fault Tree Analysis FTTI Fault Tolerant Time Interval GASC Generic Application Safety Case GNSS Global Navigation Satellite Systems GPP General-Purpose Pre-processor GPS Global Positioning System HAM Honeywell Autocode Manager

Page 108: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 108 of 111

HARA Hazard Analysis and Risk Assessment HCU Hybrid Powertrain Controller HMI Human Machine Interface HRT Hard-Real Time HSM Hardware Security Modules HVAC High Voltage Air Conditioning IACS Industrial and Automation Control Systems ICAO International Civil Aviation Organization ICM Instrument Control Module IED Intelligent Electronic Device IMA Integrated Modular Avionics IMU Inertial Measurement Unit ISA Independent Safety Assessor ITS Intelligent Transport System IXL Interlocking JAA Joint Aviation Authorities LAN Local Area Network LCD Liquid Crystal Display MBSA Models-Based Safety Assessment MCU Multiple Control Unit MIT Module Inspection Test MPSoC Multiprocessor System-on-Chip MTBF Mean Time Between Failures NoC Network-on-Chip OBSW On Board Software OBT On-board Time OEM Original Equipment Manufacturer OEU OLCI Electronics Unit OLCI Ocean & Land Colour Instrument OTA Over-The-Air PDC Park Distance Control PROM Programmable Read-only Memory PSD Platform Screen Doors RAMS Reliability, Availability, Maintainability, and Safety RISC Reduced Instruction Set Computer RTK Real Time Kinematic RTU Remote Terminal Units SASC Specific Application Safety Case SCADA Supervisory Control And Data Acquisition SCAR Safety Critical Analysis Report SEE Single Event Effects SEooC Safety Element out of Context SIL Safety Integrity Level SOC State Of Charge SPAR Safety PSD Authorized Range Area: train position Area where the PSD opening is not dangerous,

because the train protects the track side falling. (The SPAR is bigger or equal to the PAR). SRAM Static Random Access Memory SRS Software Requirements Specification SSDP Scalable Sensor Data Processor Breadboard STO Scientific and Technical Objective SysML Systems Modelling Language TARA Threat Assessment and Remediation Analysis

Page 109: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 109 of 111

TCU Telematic Control Unit UML Unified Modelling Language US Usage Scenarios TSR Traffic Sign Recognition VAM Video Acquisition Module V&V Verification and Validation ZC Zone Controller

Page 110: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 110 of 111

References

[1] CAR 2 CAR Communication Consortium Manifesto

[2] Design and Experimental Evaluation of CACC

[3] Analysis and design of controllers for cooperative and automated driving

[4] Vehicular-2-X Communication

[5] Handbuch Fahrerassistenzsysteme

[6] New E-Class talks

[7] Highway Pilot Connect

[8] Daimler Mercedes Trucks Highway Pilot Connect - Test Drive

[9] http://www.esa.int/Our_Activities/Observing_the_Earth/Copernicus/Sentinel-3

[10] http://graphics.pixar.com/library/ProtonChi/paper.pdf

[11] Presentation: “System Component Specification (SCS) – use cases for the core prototype”, available at https://services-medini.kpit.com/svn/AMASS_collab/WP3/SystemComponentSpecification/SCS_useCases_corePrototype.pptx

[12] Presentation: “Assurance Case Specification – use cases for the core prototype”, available at https://services-medini.kpit.com/svn/AMASS_collab/WP4/AssuranceCaseSpecification/UseCases_corePrototype_AssuranceCase.pptx

[13] Presentation: “Evidence Management (EM): Use Cases for the Core Prototype”, available at https://services-medini.kpit.com/svn/AMASS_collab/WP5/D5.2_in_progress/Use_Cases/EM_UseCases_CorePrototype.pptx

[14] Presentation: “Compliance Management (CM) – use cases for the core prototype”, available at https://services-

medini.kpit.com/svn/AMASS_collab/WP6/Compliance%20Management%20Specification/CM_useCases_corePrototype_MDH.pptx .

[15] “Impact of IEC 61508 Standards on Intelligent Electrical Networks and Safety Improvement”; M. Bonnet, M. Laforge, J-B Samuel, Schneider Electric. White paper, 21-Feb-2014

[16] http://spes2020.informatik.tu-muenchen.de/spes_xt-home.html

[17] Ruiz, A., Juez, G., Schleiss, P., & Weiss, G. (2015). A safe generic adaptation mechanism for smart cars. 2015 IEEE 26th International Symposium on Software Reliability Engineering (ISSRE), 161-171.

[18] Mariani, R., Kuschel, T., & Shigehara, H. (2010). A flexible microcontroller architecture for fail-safe and fail-operational systems.

[19] U.S. Department of Transportation, National Highway Traffic Safety Administration (NHTSA), Assessment of Safety Standards for Automotive Electronic Control Systems, June 2016, https://www.nhtsa.gov/sites/nhtsa.dot.gov/files/812285_electronicsreliabilityreport.pdf

[20] “Out of control: Why control systems go wrong and how to prevent failure”; Health & Safety Executive, UK 2003

[21] Laustsen, B. and Kaiser, B., and Meyer, J.: Modular Replaces Monolithic – New Approaches towards Reusable Safety Concepts. ATZ 2014

[22] Kaiser, B. and Augustin, B. and Baumann, C.: Von der Komponenten- zur Funktionsorientierten Entwicklung in der Funktionalen Sicherheit. 16. Internationaler Kongress Elektronik im Fahrzeug Baden-Baden 2013

[23] The B-Book by J.-R. Abrial. Cambridge University Press, 1996

[24] Atelier B by ClearSy : Parc de la Duranne, 320, avenue Archimède, Les Pléiades III – Bât A, 13857 Aix-en-Provence – France

[25] Systerel Smart Solver by Systerel : Les Portes de l’Arbois, Bâtiment A, 1090 rue René Descartes, 13100 Aix-en-Provence – France

[26] Formal Methods: Practice and Experience by J. Woodcock, P. G. Larsen, J. Bicarregui, J. Fitzgerald. ACM Computing Surveys, Vol. 41, No. 4, October 2009

[27] Formal Methods Case Studies for DO-333 by D. Cofer and S. P. Miller. NASA/CR–2014-218244

Page 111: ECSEL Research and Innovation actions (RIA)...Case studies description and business impact D1.1 V1.3 H2020-JTI-ECSEL-2015 # 692474 Page 7 of 111 Executive Summary The deliverable D1.1

AMASS Case studies description and business impact D1.1 V1.3

H2020-JTI-ECSEL-2015 # 692474 Page 111 of 111

[28] Using formal proof and B Method at system level for industrial projects by D. Sabatier. Proceedings of the 1st International Conference on Reliability, Safety and Security of Railway Systems, Paris, 2016, Springer-Verlag

[29] Modelling in Event-B by J.-R. Abrial. Cambridge University Press, 2010