Environmental Management Guidelines for Industry Trade & Investment Resources & Energy EDG13 Exploration Licence Rehabilitation and Relinquishment Report Prior to the release of a security deposit on an Exploration Licence, the leaseholder must provide an assurance that rehabilitation has been completed and complies with licence conditions. In most circumstances an Environmental Officer from the Department will also conduct a site inspection prior to licence cancellation or release of the security bond. In general, rehabilitation should be consistent with accepted best practice and any guidelines noted on the Department's website. Rehabilitation must also be undertaken to the land holder's satisfaction. Where applicable or required, sealing of boreholes must be consistent with "Guidelines for Borehole Sealing Requirements" (on land and in water bodies — EDG01 and EDG02). THIS GUIDE MAY BE USED AS A PROFORMA FOR AN EXPLORATION LICENCE REHABILITATION AND RELINQUISHMENT REPORT, AND AS A CHECKLIST FOR REQUIRED ATTACHMENTS Where surface disturbing activities HAVE NOT been undertaken, complete Sections 1 and 2 and the Statutory Declaration on Page 4 ONLY. NSW Trade and Investment Page 1 of 1 EDG13 www.resources.nsw.gov.au
Transcript
Page 1: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

Environmental Management Guidelines for Industry

Trade & Investment Resources & Energy

EDG13 Exploration Licence

Rehabilitation and Relinquishment Report Prior to the release of a security deposit on an Exploration Licence, the leaseholder must provide an assurance that rehabilitation has been completed and complies with licence conditions. In most circumstances an Environmental Officer from the Department will also conduct a site inspection prior to licence cancellation or release of the security bond.

In general, rehabilitation should be consistent with accepted best practice and any guidelines noted on the Department's website. Rehabilitation must also be undertaken to the land holder's satisfaction. Where applicable or required, sealing of boreholes must be consistent with "Guidelines for Borehole Sealing Requirements" (on land and in water bodies — EDG01 and EDG02).

THIS GUIDE MAY BE USED AS A PROFORMA FOR AN EXPLORATION LICENCE REHABILITATION AND RELINQUISHMENT REPORT, AND AS A CHECKLIST FOR REQUIRED ATTACHMENTS

Where surface disturbing activities HAVE NOT been undertaken, complete Sections 1 and 2 and the Statutory Declaration on Page 4 ONLY.

NSW Trade and Investment Page 1 of 1 EDG13 www.resources.nsw.gov.au

Page 2: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

tre/ANSW

Submission Form Coal and Mineral Exploration Licences

ESB-F05

Trade & Investment Resources & Energy

Exploration Rehabilitation and Relinquishment Report This form must be used to submit a Rehabilitation and Relinquishment Report as described in EDG13 and within the Exploration Licence Conditions for the Title.

1 Licence Particulars Title(s): PEL 458— Fullerton-3 (FT003C)

Licence Holder: Dart Energy (Apollo) Pty Ltd

Contact Address: Level 9, Waterfront Place, 1 Eagle Street, Brisbane, OLD 4000

GPO Box 3120, Brisbane, OLD, 4001

Manager:

Site Supervisor:

Telephone: 07 3149 2100 Mobile: 1

Facsimile: 07 3149 2101 Email:

2 Location Details Region in which operations are located: (refer to Information for Titleholders or websile for map showing regions if unsure)

Broken Hill • Orange

0 Singleton NI Wollongong

Local Government Area: Lismore

Topa Map Sheet(s): Horton (8937) I Boundary Point / Grid Ref: -30.152687c', 150.046738''

A map showing location of activities and proposed site layout must be attached: I Map is attached

Area of disturbance of the program / activity described (ha): <1ha

Note: Where surface disturbance activities have except for Sections 1 and 2 above and the Statutory

not occurred, no further information is required, on Page 4. Declaration

3 Landholder Satisfaction

Indicate if a landholder satisfaction form (ESB-F06) has been sent, received and/or appended

Property Name Landholder / Contact Phone Sent Verbal Appended

II 0 ,

• • 0

III 0

III 0 II

NSW Trade & Investment Page 1 of 1 ESB-F06 October 2012 www.resources.nsw.gov.au

Page 3: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

4 Drillhole Sealing and Backfilling (Refer to EDGOI and EDG02) Drilling Contractor(s): Lucas Drilling (Rig DRS060)

Address L3, 394 Lane Cove Road, Macquarie Park, NSW 2113

Telephone: 02 9490 4000

5 Reporting Requirements

Please attach a report which contains the following information.

A plan which shows:

N exploration licence boundaries.

N land occupier boundaries.

E land use.

E the location of each surface disturbing activity, or activities if closely grouped, including drillholes.

a the relationship of exploration activities to natural features and improvements.

For each surface disturbing activity, or activities if closely grouped, attach descriptions of: (activities may be grouped into those of a similar nature and tabulated if convenient).

the activity.

Cal a brief description of pre-activity slope, landform and vegetation.

EE the nature and extent of vegetation and ground disturbance caused by the activity, including photographs.

E capping and sealing details of drillholes.

E for sealed or filled boreholes, the contractors name and address. Attach documents from the contractor describing sealing works undertaken and amounts of sealant used (refer to EDG01 and EDGO2 for specific requirements for coal operations).

N rehabilitation works undertaken including, if applicable, spoil disposal, reshaping, topsoil placement, vegetation, weed control, post rehabilitation erosion control.

for any disturbance not fully rehabilitated, the nature of remaining disturbance, the reason rehabilitation is not required or has not been undertaken, and partial rehabilitation or stabilisation works undertaken.

N rehabilitation outcomes including photographs of rehabilitation success and photographs of remaining disturbances.

0 while not mandatory, landholder/occupier letters may greatly expedite the Department's assessment and lease relinquishment processes. Attach a signed letter from each landowner/occupier whose land has been disturbed to indicate the landowners' or occupiers' satisfaction with rehabilitation (Refer to ES13-F06 Landholder/Occupier Rehabilitation Statement).

E the attached statutory declaration.

Department of Primary Industries Page 2 of 4 ESB-F06 2006-07 www.dpi.nsw.gov.au

Page 4: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

6 FURTHER INFORMATION

Mailing Address

The Administration Officer Environmental Sustainability Unit NSW Trade & Investment . Division of Resources and Energy PO Box 344 Hunter Region Mail Centre NSW 2310

Email

minres.environmentOindustry.nsw.gov.au (currently a 5MB size limit for lodgement by email)

Enquiries

Phone: (02) 4931 6605 Fax: (02) 4931 6790 Email: minres.environmentOindustry.nsw.gov.au Web: www.resources.nsw.00v.au

Department of Primary Industries Page 3 of 4 ESB-F06 2006-07 www.dpi.nsw.gov.au

Page 5: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART.ENERGY

EDG13 - Support Document

Fullerton-3 FT003C

EDG13 Exploration Licence

Rehabilitation and Relinquishment Report

The document supports NSW - Investment, Resources & Energy EDG13 Exploration Licence Rehabilitation and Relinquishment Form.

Prepared by

Dart Energy (AU) Ltd, Level 9, Waterfront Place,

2015

02/12/2015 First Draft

3 08/12/2015 15/12/2015

Reviewed FINAL

NO

Created 20151202 Updated 201512152 0151210

Author =In Modified by

Office Brisbane

Subject Area EDG13 Page 10129

Page 6: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART=.--7ENERGY

EDG13 — Support Document

Contents 1 Section 4 3

1.1 Land Use 4 2 Section 5 5

2.1 Activity 5 2.2 Pre-Activity Slope, Landform & Vegetation 5 2.3 Extent of Ground Disturbance 5 2.4 Capping and Sealing of Drill holes 13 2.5 Drilling Contractor's Details 15 2.6 Rehabilitation Undertaken 15 2.7 Description of any Rehabilitation not fully completed 16 2.8 Rehabilitation Outcomes 16 2.9 Landholder Approval 17

Appendix A - Water Test Results 18 Appendix B - Soil Test Results 24

Figures Figure 1: Exploration Licence Boundaries 3 Figure 2: Land Occupier Boundaries & Wellsite Location 4 Figure 3: 2010 - Working Site 5 Figure 4: 2011 - Partial Rehab — pits backfilled 6 Figure 5: 2014 - Prior to P&A — location of backfilled pits identifiable 6 Figure 6:2014 - During P&A 7 Figure 7:2014 - Bunding surrounding equipment 8 Figure 8: 20150212 - Cellar + soils from top of old pits removed and backfilled 8 Figure 9: 20150318 - Rehab. of site — Black soil and grass seed spread over site 9 Figure 10: 20150318- Rehab broadly complete 9 Figure 11:20150318 - TransPacific - Waste Data Form 10 Figure 12: 20150414 - Grass seed taking hold (1) — cattle causing some damage 10 Figure 13: 20150414 - Grass seed taking hold (2) — cattle causing some damage 11 Figure 14:20150414 - Some slumping at location of backfilled cellar - 1/2m3 black soil added11 Figure 15:20150623 - Low spots identified in location of old pits 12 Figure 16: 20150812 - Additional levelled fill — followed by reseeding 12 Figure 17: 20151119 — Area greening - soil and water samples taken by Transpacific 13 Figure 18: Plug and Abandonment Record - submitted 14 Figure 19: Landholder Approval 17

Tables Table 1: Activity 5 Table 2: Pre-activity summary 5 Table 3: Ground Disturbance 5 Table 4: Capping and Sealing 13 Table 5: Drilling Contractor's Details 15 Table 6: P&A Contractors Details 15 Table 7: Cementing Contractor's Details 15 Table 8: Items Remaining at Landholders Request 16

Created 20151202 Updated 201512152 0151210

Author Modified by OEM

Office Brisbane

Subject Area EDG13 Page 2 of 29

Page 7: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART•ENERGY

EDG13 — Support Document

1 Section 4

Figure 1: Exploration Licence Boundaries

Created 20151202 Updated 201512152 0151210

Author IIMINII Modified by

Office Brisbane

Subject Area EDG13 Page 3 of 29

Page 8: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

Figure 2: Land Occupier Boundaries & Wellsite Location

DARMENERGY

EDG13 — Support Document

1.1 Land Use Open field - cattle

Created 20151202 Updated 201512152 0151210

Author MMII Modified by NM=

Office Brisbane

Subject Area EDG13 Page 4 0129

Page 9: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART=-,ENERGY

EDG13 — Support Document

2 Section 5

2.1 Activity Drilling of an exploration Coal Seam Gas (CSG) well.

Maly— , likUperit

Core 852.90m

Table 1: Activity

2.2 Pre-Activity Slope, Landform & Vegetation

sloi

Yetretati:OfiL,

Rolling Paddock, broad drainage channels

Grass & Tussock

Table 2: Pre-activity summary

2.3 Extent of Ground Disturbance

ITWIdttr <100m

<100m Approx. 3 mud pits

long, 2m wide and 1.5m deep With an adjoining rill running along the back

1 flare pit =5m long, 7m wide and 1.5m deep

Table 3: Ground Disturbance

Figure 3: 2010 -Working Site

Created 20151202 Updated 201512152 0151210

Author Modified by

Office Brisbane

Subject Area EDG13 Page 5o1 29

Page 10: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

EDG13 — Support Document DARPOENERGY

Figure 4:2011 - Partial Rehab — pits backfIlled

Figure 5: 2014 - Prior to P&A — location of backfilled pits identifiable

Created 20151202 Updated 201512152 0151210

Author MM Modified by MIMI

Office Brisbane

Subject Area EDG13 Page 6 of 29

Page 11: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DARMENERGY

EDG13 — Support Document

Figure 6: 2014 - During P&A

Created 20151202 Updated 201512152 0151210

Author =MI Modified by IMMi

Office Brisbane

Subject Area EDG13 Page 7 of 29

Page 12: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

EDG13 — Support Document DARMENERGY

Figure?; 2014 - Bunding surrounding equipment

Figure 8: 20150212 - Cellar + soils from top of old pits removed and backfilled

Created 20151202 Updated 201512152 0151210

Author IMIEB Modified by Min

Office Brisbane

Subject Area E0013 Page 8 of 29

Page 13: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

EDG13 — Support Document DART.ENERGY

Figure 9: 20150318- Rehab. of site — Black soil and grass seed spread over site

Figure 10: 20150318 Rehab broadly complete

Created 20151202 Updated 201512152 0151210

Author MEM Modified by

Office Brisbane

Subject Area EDG13 Page 9 of 29

Page 14: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

EDG13 — Support Document DARMENERGY

Figure 11: 20150318 - TransPacific - Waste Data Form

Figure 12: 20150414 - Grass seed taking hold (1)— cattle causing some damage

Created 20151202 Updated 201512152 0151210

Author IMMI Modified by

Office Brisbane

Subject Area EDG13 Page 10 of 29

Page 15: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DARTI,ENERGY

EDG13 — Support Document

Figure 13: 20150414. Grass seed taking hold (2) — cattle causing some damage

• pts itt-t-4:.,, • •

• ▪ , -

, 4- od

r • " 1r *,'• • • :

.• ..

""a • •• ••••• - - at5.- -

• "A• • • , 0

e 4- A • X* .

7

T ..t ' ' . 4 . - , ' -'43,..‘4" Ili- 3.-4. - - - - fits , .4--,,

,. _ ..-A4,.-....1..,...ia.: - ---F-;) ?wriPr_...... - •{,.- --,13" - 1, zn '.: i- -.!7 t%r ezq..:

Figure 14: 20150414- Some slumping at location of backfilled cellar - 1/2m3 black 'SOH added

Created 20151202 Updated 201512152 0151210

Author MI= Modified by

Office Brisbane

Subject Area EDG13 Page 11 of 29

Page 16: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

EDG13 - Support Document DARMENERGY

Figure 15: 20150623 - Low spots identified in location of old pits

Figure 16: 20150812 • Additional levelled fill — followed by reseeding

Created 20151202 Updated 201512152 0151210

Author M. Modified by

Office Brisbane

Subject Area EDG13 Page 12 of 29

Page 17: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART--"ENERGY

EDG13 — Support Document

Figure 17: 20151119 — Area greening - soil and water samples taken by Transpacific

24 Capping and Sealing of Drill holes

7.Completect-.2-' .

13/01/2015 (Submission of P&A Record)

Table 4: Capping and Sealing

Created 20151202 Updated 201512152 0151210

Author NM Modified by

Office Brisbane

Subject Area EDG13 Page 13 0129

Page 18: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART.ENERGY

EDG13 — Support Document

ift Trade & Investment

jM Mine Safety

PLUG AND ABANDONMENT RECORD PEL

All Information to be filled out if applicable, If not use NA

Well Name Fullerton-003 Location PEL 458 Operator Dart Energy Total Depth 852m

Date drilling commenced

13th March 2010 Date Drilling Completed

3Dm July 2010

Surface Casing TO 156.73m Production Csg TD NA Open-hole Intervals 156.73m to 852.90m Perforated hole intervals NA

Fluid used to circulate

Water Fluid left in hole Cement

Cementing Contractor

Trican Cementing date 9" to 13'' Jan -2015

Cement Plugs (No. sacks)

Interval(metres) Wt Test(#) Pressure Test(psi)

1.42 cub 814m to 625m 1000kgs NA 1.42 mint 675m to 415m 1500kgs NA' 1.42 cub 415m to 228rn 2000kgs NA 1.10 cuhn 228m to 9Dm 2000kgs 800 1.30 aft 90m to surface NA NA

Cement Squeeze (Na. sacks)

Interval Final Pressure(psi) Reversed out(Y/N)

NA NA NA NA Depth casings cut NA Date NA Description of any

non-drillable junk left In Aoki

NA Depth of Junk NA

DECLARATION I am acquainted with of the plugging operations as reflected by the intonation on this report and declare they are as Indicted,

Rig Supervisor

Service Company Supervisor [SIGNATURE & COMPANY NAME]

11111111 Figure 18: Plug and Abandonment Record - submitted

Created 20151202 Updated 201512152 0151210

Office Brisbane

Author Subtect Area EDG13

Modified by MI= Page 14 0129

Operator's Representative

Titleholder's Representative

Page 19: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

Gas Field Services (GFS) 91836 Bruce Highway, Alligator Creek, 4740

07 4943 1265

iIltfá dresta

Tel h ?kW

DART.-ENERGY EDG13 — Support Document

2.5 Drilling Contractor's Details

cthtor AlldifilteCTZ;": Te I h`c in- 67:

Mitchell Drilling (Lucas Drilling) L3, 394 Lane Cove Road, Macquarie Park, NSW 2113

(02) 9490 4000 Table 5: Drilling Contractors Details

Table 6: P&A Contractor's Details

fablifi; Trican Well Services Pty Level 5, 196 Wharf Street, Spring Hill, Queensland, Australia

07 3222 3600

Table 7: Cementing Contractor's Details

2.6 Rehabilitation Undertaken • At the landholder's request remaining underlying gravels remain — creating a hardstand

in an otherwise marshy field. • Topsoil removed from previously backfilled pits and disposed of at a licenced waste

facility. • Well casing cut >1.5m below ground level. A depth significantly below till level. • Name plate attached to the remaining casing. • Steel cellar and surrounding soils removed — soils disposed of at a licenced waste

facility — no visible areas of pollution remain • Backfilling of cellar and pits. • Subsequent site visit — addition of black soil, grading to encourage drainage into

existing surrounding culverts & seeding. • Fences and gates removed unless asked by landholder that they remain — remaining

gates related to Fullerton Cove Pilot Project • Upon landholder satisfaction a request to the landholder(s) that they provide a signed

landholder approval attaining to the quality of the rehabilitation work undertaken (14/04/2015).

• Ongoing conversation with landholder

Since last submitting an EDG13 (14/05/2015) expected additional slumping has occurred where recent excavation has taken place (cutting of the casing >1.5m below ground level). Additional fill was added on the 23rd June 2015 and the 121h August 2015.

During the site visit on the 23rd June 2015 (see Figure 15) it was noted that in order to improve drainage additional fill was required in the vicinity of the old pits. This was subsequently completed on the 12th August (see Figure 16) and the entire area reseeded.

During a final site visit on the lgh November 2015 (see Figure 17) no slumping or low spots were identified. Soil samples (see Appendix B - Soil Test Results) taken by Transpacific were taken from the vicinity of the rehabilitated pits and another from the locality of the rehabilitated cellar. A water sample (see Appendix A - Water Test Results) was taken from the nearby drainage channel. Results, returned on the 2nd December 2015, showed no contaminants had been identified. A conversation with the landowner confirmed that he remained satisfied with the rehabilitation.

Created 20151202 Updated 201512152 0151210

Author iMMI Modified by

Office Brisbane

Subject Area EDG13 Page 15 of 29

Page 20: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DARM-ENERGY

EDG13 — Support Document

2.7 Description of any Rehabilitation not fully completed Some areas of the site continue to have sparse vegetative cover but it is predicted that these areas will form thicker cover given the passage of time.

2.8 Rehabilitation Outcomes The casing has been cut below surface, the cellar and surrounding contaminated soils removed and the resultant hole back filled. Expected slumping has been backfilled on at least three occasions. An area of poor drainage was identified and subsequently rectified.

As a result of the additional fill and subsequent grading, the area drains well into the existing surrounding culverts and no longer puddles water. No further slumping is expected to occur in the area of the old muds pits as they were first backfilled during 2011 and so have likely settled. No visible areas of pollution remain.

The addition of black soil has provided the grass seed (kyunki and rye grasses) a substrate from which to develop. The grasses are becoming increasingly well established. Their remains thin cover in some parts — it is expected that these areas will form thicker cover given the passage of time. Cattle roam freely over the rehabilitated area and cause some damage to the young grass.

It is predicted that the site requires no further rehabilitation work. Monitoring of the site will continue and should additional work be required it is expected to be minor but if identified will be rectified quickly. Maximum estimated expenditure of remaining works rehabilitation - $0.

Fence:Iirie'-., None None

Table 8: Items Remaining at Landholders Request

Created 20151202 Updated 201512152 0151210

Author Modified by

Office Brisbane

Subject Area EDG13 Page 16 of 29

Page 21: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART,ENERGY

EDG13— Support Document

2.9 Landholder Approval

46441 NSW

Submission Form Coal and Mineral Exploration Licences

ESB-F06

Trade & Investment Resources & Energy

Landowner/Occupier Rehabilitation Statement

This form allows the holder of an exploration licence to ascertain whether rehabilitation of land disturbed by activities during the course of the licence has been to the satisfaction of the land owner or occupier,

Provided that the licence holder has rehabilitated exploration disturbance on your property to your satisfaction, please sign and return this form to the licence holder The licence holder will attach it to the Exploration Licence Rehabilitation and Relinquishment Report required by the Department If rehabilitation is not to your satisfaction, do not sign this form, and discuss outstanding Issues with the licence holder If an agreement cannot be reached, or you have any queries. please contact your regional office on the numbers provided below

Regional Office Contact d eta i Is: htt egivNAviresources.nsw.gov.aulenv lronm en ticonta cts

Northern Region (02) 4931 6505. Central Western Region (02) 6350 5333, Southern Region (02) 4222 8333, Western Region (08)8088 9300, Lightning Ridge (02) 6829 9200

To be completed by the Exploration Licence Holder

1 Licence Particulars (to be completed by licence holder)

Title(s) Petroleum Exploration Licence 458 Fulierton-3 (FT003C)

Licence Holder Dart Energy (Apollo) Pty Ltd

Contact Name

Contact Address Level 9 Waterfront Place 1 Eagle Street Brisbane. OLD 4000

Telephone: 07 3149 2100 Mobile

Facsimile 07 3149 2101 Emil

Affected Property Name

Affected Property Address

To be completed by the Land Owner / Occupier

2 I am satisfied with the state in which the exploration licen-c-elioFder h-as left friy grope-Hy-- --end tlitraffrdM Of-rehabilitation which has been achieved.

NSW Trade S investment Page 1 of 1 ESB-F08 October 2012 WV/W fe501aCeS new gin 31.1

Figure 19: Landholder Approval

Created 20151202 Updated 201512152 0151210

Office Brisbane

Author Subject Area EDG13 Modified by Page 17 of 29

Page 22: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

NATA Transpacific Technical Unica, 12 Raven St Koorsgang NOW 2304

MAT* Accnstad AcoslitatIon *mese 1241

Nrstar12.11

114nwria Of111.11te catrasaamm. govatememag e en man. mom. • +awe...1m...

4,041•11MIT•••1

DART*--ENERGY

EDG13 — Support Document

Appendix A - Water Test Results

eurofins mgt

Certificate of Analysis

Mention.

Report 41105or•W Procct name ITS SAMPLES Resolved Delo Nov 23 2015

Client Semple ID Sample Matrix

Eurolins I mot Simple No.

Clete Sampled

TestRdentrate LOR

' SSW I Water

M15-No17533

Nov it 2015

Un11 [Total Recoverable Hydrocarbons • 1a1118 NEPM Fractions

1TRI1 CA-C9 002 mot < 0 02 114H C10-C14 015 mDfL < 0 35

1 TRH CIS-C28 0,1 mot. '0.1 !TRH C29-C35 0.1 moil. v0.1 1TRH C10•35 (Total) 11.1 mot <0.1 BTEX

Sonoma 0 001 nutUL < 0 001 Toluene 0 001 ma <0001 Elhylbentone 0601 rank. . Et 001

map•Xyierica oXylans

0.002 0.001

moil, < 0 002 < 0 001 - man.

XyliMes • Total 0.003 mot < 0 003 4-13romonvorobentena ( turr ) 1 % 88

ITotel Recoverable Hydrocarbons • 2013 NEPM Fractions I Naphlhalsoe' 001 mot < 0 01 TRH C&010 0 02 rogA. <0 62 1R11 CS-CIO iess 1410) (I, $ ;,,c-. 002 ;non '002 TRH oC16C113 less Nastith erne (F2r. 005 mon. < 0 05 PolycyclIc Aroma& Hydrotarbons I Acanapishene 0.001 mon. < 0.091 Acenaphtylene 0 001 mot < 0 001 Anoracona 0 001 mg& < 0 001 DonaNtanthracene 0 001 mot < 0 001 Benzo{s}pyrene 0 001 mg& < 0 001 Banza(b&DI1uorsninentio' 0001 rook , < 0 001 Banzo(D.113)perylene 0 001 moi. < 0 001 BenzoR)fiuorarMene 0 001 mot < 0 001 Gnaws 0.001 mg.11. < 0 001 INhonrfa-f5arrinramse 0001 mg& < 0 001 Fuorenthene 0901 mol. < 0 001 Fluorens 0.001 rho& < 0 001 'ill 2.3-cd)pyreno 0001 mmil. < 0 001 INophtheane OVA .0, <pool

P.11snanthr000 0001 rrgfL < 0 001

!Nume 0 001 mot <0001 !Total PAH 0 001 mot < 0 001

ON. 2-5,C,, e. 23 e

der Actoccos, otav GCS INed 57, retarftro .0 , 3 as+ =6 AKA.* 4504 6.150

Created 20151202 Updated 201512152 0151210

Author =MO Modified by

Office Brisbane

Subject Area EDG13 Page 18 of 29

Page 23: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART•ENERGY

EDG13 — Support Document

45: eurofins mgt

Client Sample ID Sample Meets

Euroflne I Mgt Sample No.

Data Sampled

LOR Unil ,Test/Reterence

8560

Water

M1544017833

Noe 19.2015

1PolycyclIc Aromatic Hydrocarbons

2•Fleorobiphenyl [sum) 1 % 79

0-Terphenek/14 Mar) I 96 105 'Phenols (Halogenation

2 Chorophanc: 0 003 rVI. < 0 003 2 443 chletrophenol 0 033 mg& 4 0 003 2 4 6 Tnallorophenor 001 mg/L < 0 01

2 4.6-Tschlomphend 0.01 mg/L < 0 01 2 6.0chlorophenol 0 003 mg& < 0 003 4 Choro.3 methylphenol 0 01 mg& < 0 01 Pernachoroplenol 001 Mak < 001 Tetrachlorophencis Total 003 mg/L < 003 Total Halosenr.ed Phenol 0.01 mg& < 001 'Phenols (non.Haloganated) 1 2- Cytiohexyl.4 6-dinitroptenol 01 mg& <0 1 2-Melhy1-4 6-d nitroyhend 003 mg& < 003 2 Methyl', hew 03 Cresol) 0 003 mg/. < 0 003 2-Nitrophend 001 106/1. < 0 01 2 4.0 methy phenol 0 003 mg& < 0 003

2 4 0 nitaphenol 003 mg& < 0 03 3A4•Methylphenol (map-Cresol) 0 006 ingn. < 0 006 A Nita:Thema 003 mull < 0 03 Dincseb 0.1 mg/1 < 0 1 Phenol 0 003 mg& < 0 003 Total Non-Halcoenated Phenol' 01 ingIL < 0 1 Phenol-06 (ear) 1 % 66

(Total Recoverable Hydrocarbons .2012 NEM Fractions I TRH >ciacie 005 mg& < 0 05 'TRH .C16-C34 01 me& < 0 1 TRH >C34440 0.1 mg& '01

11 i PH 01 pH Unite 81

'Heavy Metals I Arsenic 0 001 m0/1. 0 003 Cacarsurn 0 0002 mg/L 011009 Chromium 0 001 mg& <0001 Copper 0 001 mg& 0 002 Lead 0 001 sign. '0.001 Memory 0 0001 mg& < 0 0061 Nickel 0 -001 mg& 0 022

Se mom 0 001 mg& <0.001 Lac 0 031 mg& 0.038

Cat Rfttoeser May 30. MIS

EffrAll nv 2 3 AtInottan Term [kJ* Ora•41 Verria AufuLtr. 31 el Fno:es du oarWS 121 T.laptow .13 ES6I 5000FICSIMAI *if 31161 S040 Roost hkelq.- 184507

Created 20151202 Updated 201512152 0151210

Author NEM Modified by 11111111111

Office Brisbane

Subject Area EDG13 Page 19 cif 29

Page 24: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DARTivENERGY

EDG13 — Support Document

eurofins mgt

Sample History Ihr-pra we** arc suarrivbinchnerdevel crweal Own.. trusale el n ard way. resw.e. Arm. 'crowdoot LAAS hal rIndo arfov. dxfo=t1. e!urts acCal Idexillakaa, Ova ea Ks. wrne of tle matted 'thrones kiintra rim en roaoto has thaved. iloturer labatardroe change Ns been nude :a oatatatwy 2.13.2%..230 es suck ttara ,c) ertarve nrlematdry at curter. Damns recwIts trepan.; MCI q.cMy an2 KATA secredealcr* vf Me dr. NW tsv•IsarvIn2 eat PmIK1.0.4 La xorgorroa ref toovemlle troot000ñ.d itsda mcafil lestrp owbonod axake thy merrawtliKlittadng Laes

Description Testing Sito Extracted Holding Time Total Recoverable HydrocarbOns • 1999 NEPM Fred OnS Mebourre Nov 25, 2015 7 Day %WNW 1CM L1t.l-OStG00 tG

Total Recoverable Hydrocarbons- 2013 NEPM Fract ons Melbourne Nov 23.2015 7 Day Method TILI CO C10 1.111-MG 2010 Total Reowerabla Hydrocarbons. 2013 NEPM frac! ons Melbourne Nov 25. 2015 7 Day Mcrdad TRH GO C,2 0104202G-21110

STEX Melbourne Nov 23.2015 14 Day New tOnCO-C,3 LI1S050-2010 Polycycite Aromatic Hydrocarbon Melbourne Nov 20,2015 7 Day Mttloa USEPA 5270 Pam*: Nwne.

PH Melbourne Nov 23. 2015 SHouts Vat,. ;TM GEN MO 01 law CPOSE

Heavy Melts Melbourne Nov 23.2015 150 Day ewes tl4ME000WWs0rcbyOPu2S

Pleads (PARG 6211

Phenols (Heoperatedi Mebourre Nay 25 2015 7 Day • MilthoS USEPA 2270Plmenols

Peewit; (non-Halogenated) MrAhouire Nov 25 2015 7 Day • MM.. USEM Unftenalf.

Ecru., Prot 2 5 Palpg..7 Tom Ma. C•eldoiwt 14.2orla Ateutako. 3100 Pro 3r10 Dee Nar 1-Z1015 ABM 300X OM 12 reeprxe *0; S 0261 6.20014c0090 Sat StOOd 5090 toPIe ilunbac 4865014.1

Created 20151202 Updated 201512152 0151210

Author Modified by OMMi

Office Brisbane

Subject Area E0G13 Page 20 of 29

Page 25: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

--- Y11.110101. 74Crear See. Dole' Ka .04112 Remote Noor23 .1)I5 B IINJ IP Re. :t Dee. e 402307 Me la x 701. Knotows. Tem Pnx,Pre 5 Ory 115W233, Fx. a +ON Id31 Ceetan 14.r

Pro.. Dare 5Th 54111F-5 Lootes I Mee Lamp

&err. O.. 1.

libteevy .am FS*. is cm...

131110...t24erem • RATA SO 8175. .011 5

X X X

3511121 Laborawry. DX. el.1,7 Smarm Lepers.. PLATA Otte 3111.

Eger. I aloaestory 6401-Wt.

IMO 15.11 50:3 1.161 liv II, 21:5

Wla

Sampan, It1.16 LAO .3

1413413.5193 X ke34/3,7114 X 1.115.5e 7115 X

X X

X SO

X X

X x

()ARM-ENERGY

EDG13 — Support Document

4‘.7 eurofins nigi

gy. rILITITV:r .....06.11•111.11 • lea •••••••••••••••••

Ogno......1411,..••• 11.11•01.11.../P .11.1MIAIS Cenel..•

Created 20151202 Updated 201512152 0151210

Author =III Modified by =I=

Office Brisbane

Subject Area EDG13 Page 21 of 29

Page 26: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART•ENERGY

EDG13 - Support Document

eurofins mgt

Internal Quality Control Review and Geesety

General I Lebontore CC tnIt• II, 1440110e abr. Curer-4n. Men Opt., a04 Labenn Cema, benbs • le enema the OC noel nen anent Arinamai CC On net be Anne on

nun. 2 Al es, resin are ropoten on an, Inn nese nen. own, 3 Anal CO% ere nen; depend.. Own LORs'rns: te aired nine bent Innen ve !An 41 se Co -,4•Irecerans 4 Ones ere tncerrond in neC.siabe 4.646,4 rbor47444, 5 SVOC reatesle en realm ere pertessol on flereneenbed utfOcee semen nen nen Menne • flernee.re enobled on en m.o. ben 7 Ove nntrenne ny n wan pre.trel lene

Holding Times Rem refer In 'Sank Rosman and Conlon 0-ae1iO4 tuallm Itnief (00um) Fee reo,a5m navel on. Int en of retlec nennon or Ilnans ten•ernen Non tem nen recnite et fen 6 non p.orna urban bent de•dInre al enter cr. ete Son* Penel Acw=re.

teseann 441.10,041. Si Wenn. Ir An 'entree Inn, end I...se aly mar Inborn Ans. ArAbly nano nnob fr. al be morn rnev Llaa091 nen nta of mono nr•tx• cons4Ance to Inner.! an enere lanatery• arr.

741 WO.. ate 'twee a 972209 NO, o: 1110

Units regrew inOsnurb Per KilCgan ogn: eivorerre peT ppb: Pen int Nion we Dank Ovanna xl (CC trilitc• UP71/1461•44 On Preen& blarenol coryerierri be. 100 -44:11s

rept telegram! per Ilbe pen Pen pee Melon 14: Armen, WU: Nanonnen. Tuner, Urine

Torres Venr erre:env h..SIa drionne oor.i nye*. ten up•nsoe n • el be.

1.04 Una of benne 111413C onnen 0104 altattla 10 th• ancte In.4wdn petce.p• mar. RSV FOer. Puma Dttletano benne two Darnels pen* a' antynt LCI Lateraing ConniSeccit • wain al Per...,1 many CRM Ca•bin Ran non Wane • nap•cal as 2.4r11 nanny Method Mare n cm at 44141 Ian*. N. 111.1 pproltrad In istaanOle, main den sans

III Iiw01051711110 .tndil!Inn0. anknon 444341*4 wale, Sort -Stung. The 00744 07 Lie cznotard tt Inn wukla Ann ard rented ernboresc• losere'l Dap*. A wood nee el In•bn Inn Tv son swot pep menu] n the len ie. ea 4.• roul I.en••roontstb Han Onleeta Asaecn nol et enebse Inn 'nen out. ern riorta bon Wang. but An ntin the bboreAr• ben e ornpa ban 'MAE 214...bonr• nponsi on • ra-ns. Imo 4.41144 Oro onal• nun surpMa Opus e40ur 17 • 01bc..4 bon of ern.. 113E6A 4111el Oen teesetonele Premeo Penn 41440 :Wenn Punt Heat. Assotlaxn 45LP Salad Loading Ptend•r *14443231 SLID Cnennentic Lerch r Noon. COC Char,' Cnbe6 AAA Dunn Receipt...In CP Cana Prarra - CC was pattern., on sanpn pen rme to On non 00 None 1. Prent prth rrvI annoy rad porting Iv 2 :rocrl. CC b Annean ml a.m.. 0. ben Mel ebb Abney wore nen* Ian- TEO Task Enenny Own.

QC • Acceptance Criteria • 12.2414.0. Glebe RPD lAspla>es dppr44en, Verda ie SC% Invan• 0e tdowing mcoar. 5541. Sr., lIt KNOT a10444014 Ranks 01041.6 01. LOR 11. 0000

Ras* bawler. 10-70 Ines tte LOR RP12 ran la Innen 0-503i Ftrulls 42P arms tbr LOR RPD ntat betnern (3 32% Sony in Redettern ReCtrOMIS esst:1 In Woven :011101I ffiltroto 20-13rA

OC Data General Carnreords lree.e • .3444 ..”1•34.44 • 4•4 211.4 19 444. dna tn• ontinnw LOP 743. 4..4 la tan non 00151101011 or -vet donne net urn et..• Ineoronn• bentenuml nob ”n14. Pa eareb. Huh mins emen or ••••_bi•of Sari* porini

2 Durien 9.0 den (An the r•otri 17...14s 01. ern 11420, .4 • Ona• Onlat• bet-, condo nunrando art*InS n)it• [email protected], Cal 10 1110. 11.• P.C. 444 Mann.: data now.. dna inn y••••••••444

3 0114.4.4•••• antpo -nun 'owl% LOS Cola TonplAno I Citordsre rat ntled P. LEO 4 Oianooterne airairais • veleta np..43 Con on 7euerine I nal MA. la Pe soka 5 law otscoerstio netrnances -wee ropteno Sits LOS 2411. sok sane carmen:LT .4". tan 412Cusb most tar. tt 012-030,0 Mere OW n1444 Rean.ts repined

In neClOtta no 00 74. Report • p. era Fn. Cintna a013044 in Me latertny Any. non nu moaners eon 30 roves at Par pep ThOmlan :gentry anyth nnot7 Oa be =Vend wen 7.41240 Ore

Ans/na t4te ber es soon .0 901.106* ern bunk rec./ 7 RKpreir, ciao lSal4 ilunapass; • PS. evernaaprunc AKINS. nes an elow The otensrptat 41'Rn:wry th tom INT" spa. Knot (147 4111)14 0 PeannstInane 1)124e104 ira 014064 04(6, Into Ainbbi • 2413142n11a SAPS and LCS.• 9 Fel !Arbil Sate end trunt tt nab • in Len resod 1,..17S Me re Knelt innt• en •44 oddt to et• 001.171:. IC Ont.. RPO4 er• 15104.124 from ow. *nobly& data On an 4assiSt hme bre ern e d.

On RAW.. Me 20. PM Egre4v PTV 2 StWvec, Tyres: dam oeureen 112101. Awstuka 3166 Pew 5 of

MIN 50 DO Oa WI Tottnnten 401 3 MU D703 44924434 01, 3 /CM b0f40 Rwer Nulbw 434307.W

Created 20151202 Updated 201512152 0151210

Author EMI Modified by

Office Brisbane

Subject Area EDG13 Page 22 of 29

Page 27: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DARTWNERGY

EDG13 — Support Document

eurofins mgt

Comments

Sample Integrity CsaIsof 5.111 lose If sus' NIA Agessl Ie C1111,45soNlent Yes SorN• sytecIS pasene0 Yes FArcolott tors* osttosen hos Sem wad Vol Ssngo oraersrs O usSI.Se trutrsa tectstrts re ens nal sows.. yes seepa, iseiww sess FiN1es2trre Yes Sane um-As Saw begs saccroachto sly

Qualifier Codes/Comments Code Description

F2 is mitosista ty soysettray sub,. ra Pa ...40,14F116. VOA,SOP ttt ,C10 C:ff . valps The IssosessOsenlye umd a out calasons y soar. Yam solssIes NCI (P.ne Too ray.)

%%Sere Is fuse nosts1 an: m.4 IPSI GOSS1 i-4 Wrr.r.4•L• GCMS) nssImarre dra ro,wn nay Mt iftrl.e. 4micled LTC Farm Wiese satooris Roo beat Itylbect ya-7 abwred orlforerces r rooks Si. tkery b b4flJo Si possOL.S cameras wits" rrm,Pad. Refits determirea by tr.n haSIIRses 05.0 pawed 1,42 SO OFOt ruparea ca Nee • too Ns lestiryOy•st4 Flit 0.nrindYS by erinrystsoly ostrodsto sw ISA gr..X".ayy Nun tne-Cra-C1b. VIL• TM 11ToW BILK. rato• I. °Cured or risrrine In,.,MaIM, 00 5750 FFN510 ThttSCItv*alt =sneer, cuestralre sort U assless cl "mod trosselevItTs ineSses Muse N. • Noes No PM Yam.., ebs.y. .o054o u,rP. mcal art.:Ter., grasses manses .1005th th• nroorligSsrvartraYm wan TECI; sg.4. spade-Mt/1s 0057 501VoOSAt1g Olgts

015 fra OKI YOXIal p2P109 5•ToltsIrrq 0 SC • Acosay.-co 5tess2 OFSTFC into Irsro210.1511y Cordsd Rot.. av Gems, R010154 rryorl

Authorised By

onirni.s Sesseee Messost SOINANONLOl50IY101 Solite Artalyst•Stosts2 (005; Solis /veers Ms. NC) Senor kyks•ssotossic

Natfonal Opetad.ris Manager raid resat • Oss Sews sprees any P.I.A.Vir frmad Fuss,

lrilsltNwlRtoaaad • 11501101 Nara 1...,esera., ria 1. =rag Pt prrtrmanb. 050 WV.

Uscstarty &es estittsls on tovest

-

DOI< %SLOW. i053fl 2015 Ekmar,-, int 2-0 K-N-tion Toys Coos OetIoss .0sral1e. 2,60 P55yy 10'5

201 52 CO2 Ors TS! Iro550rz •Or 3 eUe N2/24Fo=inyTy et, !SS, bsPO Scowl Nortoty 4M007W

tiCA

Created 20151202 Updated 201512152 0151210

Author iMil. Modified by

Office Brisbane

Subject Area EDG13 Page 23 of 29

Page 28: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DARMENERGY

EDG13 — Support Document

Appendix B - Soil Test Results

eurofins mgt

Transpacific Technical Services 111 Rayon St Kogan NSW 2304

Attention.

NATA

...001.0111111

Certificate of Analysis

sassotostud Xcndkrliort Movinc 12S1 Ms lbs-WM 1234

Wansorn .l.St?1t 1155 Ms must d.,•sia.taara. nerearamets mob p Morrst re two.*

•as.h....tovate.

Report 4005074

Proier-1 name TTS SAMPLES Received Delo Nov 23 2015

Client Semple 113

Sainte Natoli

Eurolins i mat Sample No

Dale Sampled

Tos509elerence LOR

6551 Soil

MIS-No171131

HaV 19, 2015

WI

11562 1 Soli

111941o17835

Nov 19. 2015

'Total Recoverable Hydrocarbons -1999 NEPM Fractions 1 1 TRH CS-C9 20 mrake (20 < 20 TRH C10014 20 men '20 '20 TRH C15 C28 SD morn '50 c50

TRH C213.C36 SD morke '50 .50 TRH C10-38 (Total) 50 mokb '50 < so

IBM 1 1 Benzene " 0 1 , m_0111_ < 0.1 < 0 1 Toluene 01 n.....sez < 0 1 'CI Etyma-Jane 01 maim. < D.1 < 0 1 mboXy1enn 02 moles <12 < 0 2 o-Xybano 0 1 TOT • 0 1 0 1

Xylenes - Total 03 rnolic < 0 3 < 0 3 4-Bromolluorobencent (sun) 1 % 57 89

ITotal Rceoyors Me Hydrocarbons - 2013 NEPA1 Fractions I I Hapelhaienem 05 mice (5.5 < 0 5 TRH C5-C10 20 mote '20 -- '20 — TRH C8-C10 lesal3TEX (F i). 20 mo5s '20 '20 TRH .C10416 less Naphthalene (F21''' 50 make < 50 < 50

!Polycyclic Aromatic Hydrocarbon 1 I 13enzo(a)pgrene TEO Cower bound) • 05 tr45p e 0 5 <0 5 Benco(a)pyrene TEO (medium bound) • 05 mots Ll 0 09 Benage)pyrono 1E0 (upper Coosa) ' 05 1001.9 12 52 AcenP51111ne 05 1 maka 'OS 'OS Accnaphliylese 05 rrig59 < 0 5 < 0 5

Antincene 05 rrtolcs < 05 < 05 Benge)ardhracene 05 m0115 < 0 5 < 0 5 Benzo(eipyrem 00 mokp 'OS < 0 5 Benzo855Jl0uoreneientr" 05 moire < 0 5 < 0 5 Berso(2.h.l)peryiene 05 oleic < 0 5 < 0 5 . Eterrobfk)ducronehene 05 mako < 0 5 'CS Claysena CS makp '0.5 ‘ 0 5 Dibenz(a Nan-Di/wen 05 moire '05 < 0 5 Fltrorandiene 05 model '00 < C 5 Floorana 05 Ingle '05 < 0 5 In5eno(12 3-crl)cyrene 05 I make . 0 5 , 0 5 NaprwmNsne 05 1 109541 ' 5 5 COO

Eavfna I rrol 2.3 ln Tow/ C:avata&10C lextla katenia 65 Pagel &IS

Ca Rwo,r1 5o 15 nIl agy 50 CV CtS &Z. 7weg.tx,e .61 C IMA Facer. CIS MI woo 110111 (l11l 4d05:7-5

Created 20151202 Updated 201512152 0151210

Author MEM Modified by MOM

Office Brisbane

Subject Area EDG13 Page 24 of 29

Page 29: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART3--ENERGY

EDG13 — Support Document

eurofins mgt

Client Sample ID Sample ritatrle

Curdling I mot Sample No

Data Sampled

Test/Reference LOP unit

8661 Soil

(415.No17/134

Nov 10, 2015

8602 I Soil

M15-No1/835

Nov 19, 2015

[PolycyclIc Aromatic Hydrocarbons I Phenanthmne 0.5 MAO < 0 5 < 0 5 Pyrene 0 5 ffight0 < 0 5 < 0 5 Tot& PAH' 05 motim < 0 5 < 0 5 2.Pluocataphen 1 yl (sort ) % 81 105

(surr I 1 ,p-Terphenykila % 81 103

'Phenols (Halogenated) 1 2•CNotopherrol 0.5 MU, v 05 < 0 6 2 4•Didlorophonol 05 mg85 < 0 5 < 0 5 2.4.5-TrI014orophen01 1.0 mgiluj <1 < 5 2 4.6-Trttgorop1(end 10 010810 • 1 <1 2 6.7cflorophand OS m198,0 < 0 S <0 5 4-Ctioto-3-rne7uyIphenol 1 0 =AO < 1 < 1 Pernachicrophenol 1 0 m0010 < 1 <I Tetrecitiorophemis - Total 1.0 maArl < 1 <1 . Total lielononated Phenol' 1 mg/kg . I < 1

[Phenols (non•Ralagenated) —1 2-Cycichexy4 8-clInilrophenci 20 nbAll <20 <20 2-Methyl-4 6-dnitrophenol 5 rrleilq1 . 5 <S 2.tilelltylphenor (0-CrOs01) 0,2 mgrim 002 < 0 2 2-Ntfrophend 1 0 m9/1.2 < 1 < I 2.4-D reethylphenN 0.5 'NOM <0 5 < 0 S 2.4-D.rthropheriol 6 inona < 5 <5 384 Metny1P0el0 (rn8P-Clesci) 0.4 naYko < 0 4 < 0 4 444:trophend S n100,0 . 5 <5 Olnoseb 23 mcliko ' <20 < 20 Phenol 0.5 010010 < 0 5 < 0 5 Total Wm-Halogenated Pnenee 23 meg < 20 <23 Phonol 1 .c5 (eun,) % 78 72—

'Total Recoverable Hydrocarbon,. 2013 NEM Fraction, I TRH >C10-C 16 50 mg/kg < 50 <50 TRH >C16 C34 100 mg/kg 0500 0 100 TRH >fs'ul.f:40 100 1110,002 0 103 4100

I I p1-1 (1:5 Aquoous curbed) 0.1 011 lines 73 77 % MOiSIUM 0) % 49 77

!Heavy tiefals —1 Arsenic 2 nayaq <2 02 Cadmium 04 mg/kg < 5 4 < 0 4 Chromium 5 moqm . 5 <5 Copper 5 mialho 45 05 Lead 5 mance . 5 <5 Mew), 0.1 mg/kg . 0 1 '0 1 Nickel 5 mcglag <5 <5

Seen urn 2 moran • 2 <2 Zinc 5 maybe 82 91

Dat• 4.14 M 0015 angina I rt.0 2 510.9000 1131m Cbs• 004444 10000.....00000. 3,50 0000 2S0

A50 50 005005 551 Te10002.0 0013 3<04 XXV F•czeoSe .01 MP 5050 qv...rm....bre 4051507

Created 20151202 Updated 201512152 0151210

Author 11 Modified by

Office Brisbane

Subject Area EDG13 Page 25 of 29

Page 30: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART•ENERGY

EDG13 — Support Document

eurofins mgt

Sample History, Melt attain aro stesrired4rolysed earr %wawa! days, One laa daga araaaar. and aszya cow. A macs airier af ota LASS has masa at au =room c• cladkailor aroma inerivd iferaltarkra. Dra8.00 scre tha mealod ralararca it'eareariar 08 aaara iltel.anasa. Harem no raastanave mama as Ian ma, ta tabemIcey nava, tt ab war Cum la an tamp eDitvat..0 Ont000a peasuz re.. Mar.; WO quay and KAM soarVatan) 20080. ma Ira a8 arca% am rat worded Ire La Ccalory all rat be letrarstra campnartad tesars 100l:1 lavang ba Warm., als.::• tly mcorartandat roam brn•

Description Testing Sits Extracted Holding Ilext DX& Recoverable Hydrocarbons -1960 NEPM Fraclons Melbourne Net 23.2015 /4 Day • Mama: 1118 CS CM LASCRG.2010 Total Recoverable Hydrocarbons- 2013 NEM Fracions Melbourne Nov 23,2015 14 00y • SKS.: TRH Ca CO UM CRC MO

Total Recoverable Hycrocarbons - 2013 NEPM Fraclens MabOUrra3 Nov 23.2015 14 Day • 1.5ePaa: Mt CS-CAD . 1,17A-0054010 EiTEX tAabourre No., 23,2015 14 Day • What MN Ca-C8D LTA.000.4010 Po.ycycac Artimetic Hydrocarbons Melbourne Nev 23.2015 14 Day • moms: LISEPA 5215 Parnarcscaranala Prearzarca, pH (1:5 Aqueous ext•a* Melbourne NM. 23.2015 7 Day

- tilts: LT/AGM-MO pal la so, W ISE

Heavy Metals Mebourre Noy 23.2015 150 Day -mtacx1DIAtitoCD IC.P.CES Orartia ISPOES Di Marary)

Phenols (IWRG 621) Phenols (H11109cr Wed) Mcibotare No 23.2015 14 Day

Whoa L/SEPA 1310 Plum's

Phenols (non-Halogenaled) Mebcume Nov 23.2015 14 Day Mee. =CPA WO Para,

%Moisture Mc bourne Nov 23, 2015 14 Day rt4-GEN 1000 ObStill

Oat Rep.*, ht., X5 2010 .00 Euolv I oryit 2 5a-tapes ram =am. Oardakal NOM. Atri.tray. 32.4 Ng a 3 a 6

Sa ao5 aela tc1 roWeane .61 3 V504 WOO 101.01l0, eel 32353 5095 Rea. Malbra 031007

Created 20151202 Updated 201512152 0151210

Author SEMI Modified by

Office Brisbane

Subject Area EDG13 Page 26 of 29

Page 31: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

Cans., Pyre .XostIrm

ninMets% 5L101 10 9smn 04 •ComaSme 74200 3374

PreMcl hams: MS SAMPLES

NO.• SMISS Repot C x00007 MOW Ft= CS 4422

Retehmet 20723 2210 1170 W.20 2018

Pre.", 074w Corr.! tame:

X

X

X‘ X

t

X X

X X X

Created 20151202 Updated 201512152 0151210

Author Modified by

DART3-ENERGY

EDG13 — Support Document

45; eurofins mitt

.14.801% ',rat

"I•1 1410,11.33. •••• • 1:jtnter...r. wt.•

171 •

""7.1;0"••:?:''

EsPallm ix,' CII•M Mcvear

z

ism* Owl

5

3.

LxIssemars vetem m•stmJs x•Mmx.

16411.11.061.1bOralSly • HATA Me .12114 tint X Srlary Monitory • NATA sm• *1*217 linspam LAU OWN • MAU lisx X MT%

A

X XIX

Essammi IM•mamr, 5x-,1.115 X.,* Dow Samplirp MAxla LAM ra

him 'LeL5 111, 22t3

Kay IP 2015

%Yalu 1111100 7133 X 501 1115405111.41 X

1415.1.713$ X X X

X

Anexce.A, Su. XXX

Office Brisbane

Subject Area EDG13 Page 27o1 29

Page 32: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DARTKNERGY

EDG13 — Support Document

4!: eurofins mgt

Internal Quality Control Review and Glossary

General I Lanni/Pr DC names Pa &SOW Mares Doeciers 10011 603.1. ant Leecrens Calm: SeAeles re haelee P5401 tepee Veen eeeranble 0441470 CC MCrray be male. en

Mame

• bl to rte43s an manse wed/ bens Wen .0504.22.0.

kneel LOP" trepan, dome. C.= LORs nee be need *Pere um, pers. ere repidan to Penannote

4 Paph repreere Ier pleb apSer amemen eserniem.

I SVOCabeSsis ensnare we penmen aneeresembed entree serer, pans rrner othenese

6 Peacent ere papaw on et'. menet! Men 7 Pis ppon mean,. eAr 64470, ,06,66 A6000146,07

3160th 119 TIMOS Pepe neet Wenner. Presarreamn Cambener Ourne Pr PP., Ones (O53.33)

PS simple gusset or be PP tes Cl 7011021 Pre nter411M lflalrç retweerneets roan Pee bent nesnme IT hetty WU:Speer 03 Umbra none eeedlarts is rale en Pe UP* plane MP.

15. Lebenlay e,d MY MO'. Op plannesm lilT. rerperes Lapeer.. eel warns P eV*, Nees* spar SeCater panne res06 ron MP be repared

nlaner Lees peen leer It. Oen er s5e1e11, tretekne apenersue Stem, rue pande Pe a Preens coneal

ANOTE: gen dePreen pe repented re a Woe P07 es RAO

Units Burka rtilverrmMl 1003011

ark perpeparns per ley

opt, Pep per biters

psi Nene Oopene per 103 nights

eleiteniner. Paean, Kanter ai argeresen per 103 rerrlem

.1441: 11130115 pie Say

ppm: P115... mance

it: Penmen.

PITS; fillbtelanlet‘ TmearPn Urim

TOmis CIT Wien • eras,. Es Pea gibesseed om end ear:Pete mania cs pawl onIdly Dans.

100 On! Peeene0

SPICE AClICcAIVO Pepe 1171613051.501551111 es penentep peppy

RAO Preen Pentil Dower. Winer 0014.550 peces MVPs

1111 Lateratere Cenral Semple • nverted ee eerpm mann,

CRIS Cretin Ream este Menial - needed se perPre

ermense PPM le Pa une Ci..ld reenerm Is.., perrremel on War terther dean eende 500,. Pee CT ally Nene. Pree ear pedenred denennal maw

Pm leonine 77e .31710 IFS Its pepped Ls the 113510 131511 pd TIvend prreenege maven

Panaceas PP.11 pets el Preene 601,05 10(5 twpl,tTIMIIOtIPI seen area ee De 5140 1. seem wer44 sera

awe O05S6r6r A Pepe peps IT Peep,n ern s ereple WIPP tee rierr PPP a. tenpin bee ern mein Ia bberatery bent IT cub..

PPP SPIKE rlocensfy nparrd or sem* Arm abbe 11 (1* Perle PPP AT areelee Cul tun rellen the blenemPs Web or Lunen

PUPA Were Gees Spenneenel AnleCon 501T61

AMA Ames. PLOP enelhAssecieders

ARLP A•nenap bleembee Lop569 Prandure 441447.1 75111 Torben Cestedeonit LeePirs Peccadwe

60C CPT d CaPeter

SRI Sens* Pecep Pence

CP OPP Penn CC was Weer.: 07 UV., pertinV IS ten repel

PCP HpeClent Penn- C7C pedormod can Iambs eat DS =lino 1a Pie wan COP releesenbren Of Pe Perpen. ret PP, OP Pen persevere. tl3481 TEC Trent Ebeineeney 0006.2

QC -Acceptance Criteria IPSO Dealates Clenbel RAD Oureans reteetinte Cleerle iS 30%1..6 the Uwe, eibeererc• tekeines tIe eprely apicklie

Reerea .10 tree UT. LOP 141 11071

Reset whew 6.22*,..‘ Ii, LOP /PO ,06 1. Peeps 03646

AcIaltt .21 Pao Po LOIS nan benne 033%

Smerespee Pespsnes Penmen. mar 015110.0,10 13.616 Menne 71 13016

QC Data Gantral Comments I yew. I lot STTM st • Ws 516 (15 rupme Pen Pe penman LOP 6 wa Pm le eithe, Pep *1111,1 0110. 137•0 railen rebind dn le inhafmnemme terbeiven Ira* PPP

Ill ennle. Kph recipe IIT1045 reerbeere ems* penned

Ontimen deb Were .4415 4.. newt ter Pens At mord Tenn. re it aril, Nakao Ser. PAPP, ef Inn P-60617401 6.1 pane Ps Weeny, sPetea PPP el el 10 rate Ti, Pepe end Dteketo dela therm ie net PP h en yew unpin.

Orponoceseee Peeples enetwe- vrene sappeng LIZ den Tortpmea Ceeensee es .lTed3MlClr.ICR

Orpenembano Peetrede weenie- *Pen rendre Epee este. %Pepe. Is ser bided lIP. 606

1061 Reecre1aL50*1loraiton3 veleni 11..12 Said A 1114111 I PPP ono te Pawner Sernscpbee pneurri Pr* IIPSTIICIPCTO nalled ore re Tote Retorere s repene I1fltCIT3CIC cel of Pe Pepe&

pH aM Crittfiv Mahn. grt 1,do labrawy- en,t. WI me, u19. rein 50 Meares nr terneent Tepees Plenary spline ts wen) le se neatened mann Serra erre Pa*. elif Pao ea aeon ma peambie etp urtop. raceipt.

0a...reran OPP" Weeper.) - epee preerneenehis perernere namely Poe Ae appear-44km P Reaper/ Pe term nefr semen ebeinsOrel PPP.

I Panne... Enbeeps are sPkve reny lemn0 Area. 126041 PPP SPert Pe LC51

S Mean Spars ere LCS resmP • rob ',In Pe noun mane Pe Wean enlivens Pre mCled alT, DC lentre

Ompleate RP1Ts .1102250 75-1 eas serener dPs ten 815 750. Is 3.• 1.05 .51 Pere

Gaft Re6erher Nor 20, 2345

asSrut 11,0 2-3 Kk-gst0, Mau, 0551$1 01:50, Austral?. 3506 PPP 3 el MN 30006085331 Weenton .613 0564 5002 faci.09 .8 23 eSes 5090 Root Numbo 409507.3

Created 20151202 Updated 201512152 0151210

Author =NM Modified by

Office Brisbane

Subject Area EDG13 Page 28 of 29

Page 33: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

DART-*-ENERGY

EDG13 — Support Document

Ceurofins 1 mgt

Cosrrnents

Sample Integ

Lattoly Seals Mac! (Ewa; fol:F Athilhlll C2f2 was ewer( Yet &raft ennetly mar.. Yes

Foomplete terba orearen re been used Yes

Salm. babartY1 TX raUe orehne Meal eV nesliFe.91 Yes Saves osetnee0 MP. atainglam Yes Tree lee.041 ha. been wlt.:Ted he

Qualifier Codes/ Comments

Code Description F2 o batmae* be at-uraboalb lammarg lee ,sabbalene ask. boa ...CIO CIO aka The nboaaebe bola auk albs ca.:aria it matte ban baama

1031 (Page 1 Trep babes).

Ware sta bev• McFall teb. barb MST GEMS: va area:WA IGO15) reenensere On Mega ffuly rata. IC*V1CIII babied were samba 'andel; CIA.1=11 Taro Wee latatetg ObarbeeClboran r resdu • j1a02 be 0.1 10 pTa0sal deafen:es retal eta, meffsedbow limbs Cearbeve by tea lethabab boa peaked

b02 (240C eeebearce tralVit Ord we eaaal, adaasey sea

File aaarthed by aamasiaany SJitIlMrE the nail !TEXT ell.• her Ile MSS IS eisa. Tho Taal STEXT as., ireaval by sabring :be wnereweee BTEX erwre, The 'Ca-C.,0" 000.11 eth'ethel o Cearbratna gem 5 beam d fhitee arcaratehsptct antylet (bubo tate • ITSPP4 let PAM eCelert WW1, et, situ vac at rtall conttaxrcy ra4ln babas end tablas mooned tenbearsan ale no TED, ocely ibeetabb

1497 she 10:3101inerw tereiarop beilt

Authorised By

2504

Nuyael SlArillthLINDOr

sv.iimeryst-onarit ono)

S. ese__arrraloeintYvat,lorASI

Any, mt,

Stale AralAbarroic 0+`

National Operations Manager Fina It.. Papal impacts rp pa+. 0y teeal rasa..

• Inlasurs 21.0 Flamatd

T Mara MU Asa:loan boa rel abb Ye eartbabase d tee tery

UreerilkIty e2:31 0.11.1.10 Or FIt Arst

E..octru Ave 2.5 nytIcr, Tou, Ct., Ow A.caLit SF00 Faye I ee

Dr!e Recortre Nay ii :5 48.1 50 003 0e3 SZ 1 lea9k-be .8 5lli5is Fvene.,liheflte3dlO FabalMabar .20597-5

Created 20151202 Updated 201512152 0151210

Author MIS Modified by

Office Brisbane

Subject Area EDG13 Page 29 of 29

Page 34: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

Submission Form Coal and Mineral Exploration Licences

ESB-F06

Trade & Investment Resources & Energy

Landowner/Occupier Rehabilitation Statement

This form allows the holder of an exploration licence to ascertain whether rehabilitation of land disturbed by activities during the course of the licence has been to the satisfaction of the land owner or occupier.

Provided that the licence holder has rehabilitated exploration disturbance on your property to your satisfaction, please sign and return this form to the licence holder. The licence holder will attach it to the Exploration Licence Rehabilitation and Relinquishment Report required by the Department. If rehabilitation is not to your satisfaction, do not sign this form, and discuss outstanding issues with the licence holder. If an agreement cannot be reached, or you have any queries, please contact your regional office on the numbers provided below.

Regional Office Contact details: httgalwww.resources.nsw.gov.aufenvironmenticontacts

Northern Region (02) 4931 6605, Central Western Region (02) 6360 5333, Southern Region (02) 4222 8333, Western Region (08) 8088 9300, Lightning Ridge (02) 6829 9200.

To be completed by the Exploration Licence Holder

i Licence Particulars (to be completed by licence holder)

Title(s): Petroleum Exploration Licence 458 Fullerton-3 (FT003C)

Limrice Holder Dart Energy (Apollo) Pty-Ltd

Contact-Name:

-CdriWt-Ad-dress: Level 9. Waterfront Place-1 Eagle Street, Brisbane, OLD 4000

-Teleph-an-e: 07-3-1492/00 Mobile

Facsimile: 07 3149 2101 Email:

Affected Property Name:

Affected Property Address:

To be completed by the Land Owner / Occupier

- lam satisfied with the state in and-Vie-standard ofTehabiliTaticin

which the exploration libence holder ha- SRA-my proptrty- whith has Veen achieved. _ -

LandtWAde-r7Occupier Name:

Coht-al Address (if different-fro,

Telephone: Mobile:

Signed:

Date: AO , --/ ..

NSW Trade & Investment Page 1 of 1 ESB-F06 October 2012 www.resources.nsw gov.au

Page 35: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

STATUTORY DECLARATION New South Wales

STATUTORY DECLARATION OATHS ACT 1900

EIGHTH SCHEDULE -

of in the State of New South Wales Queensland solemnly and sincerely declare as follows:

1. I am the duly appointed Exploration Project Manager for Exploration Licence 458, Fullerton-3 (FT003C).

2. I am authorised to make this Declaration on behalf of the Exploration Licence Holder, Dart Energy (Apollo) Pty Ltd, A.C.N 113 972 473.

3. All operations carried out under the Exploration Licence comply with the conditions of the Title.

4. Those operations also comply with the conditions of all other relevant Government Agency approvals and Licences granted in respect of them.

5. Details of Fullerton-3 (FT003C) all--d-Fiale-les-,--ex-oevatto-Fts-and-ethef-raUffaGeStUrbaRCeS made by the Exploration Licence Holder within the area of the Title are described in the attached report.

6. I confirm that all of the works referred to in the previous paragraph lie wholly within the area of the Exploration Licence. I also confirm that the details contained in the attached report are true, complete and accurate.

7. The exploration activities listed in the attached report have been rehabilitated as described and in accordance with:

a) the conditions of the Exploration Licence;

b) any directions from an Inspector of Mines or Environmental Officer;

c) the conditions of any other applicable Government Agency approval or licence.

1. Any works not rehabilitated are listed and described in the attached report. I confirm that the reasons for not doing so are true and correct.

2. On the basis of the evidence contained in this Declaration, I request GaRoetlatio+4 of the Exploration Licence and/or [doiete-36,q- c-c4,-ssaryi refund of the security deposit held by the Department.

And I make this solemn Declaration, conscientiously believing the same to be true and by virtue of the provisions of the Oaths Act 1900.

NSW Trade & Investment Pa e 1 of 1 ESS-F06 October 2012 www.resources.nsw,gov au

Page 36: EDG13 Exploration Licence Rehabilitation and ...€¦ · Created 20151202 Updated 201512152 0151210 Author =In Modified by Office Brisbane Subject Area EDG13 Page 10129 . DART=.-7ENERGY

Declared at Level 9, Waterfront Place, 1 Eagle Street, Brisbane 4000 in the State of New Se-LAWN-ales Queensland

on 1-0Th day of December in the year 20T5

in the presence of an authorised witness, who states: Donna Leanne Langley (e CI, 41.14,1

kr.;r 7i1 0

I I , a fta(1,Pl'i r.,,,,43.,•...tz-:,3.3:,.••.•• , ....z.. ‹,,4,

[name of authorised witness] [qualification of authorised-Wit i

certify the following matters concerning the making of this statutory declaration by the person who made it: [* please cross out any text that does not apply]

1. *I saw the face of the person OF l did-Rat-see-tbe-face-e-f-the-peisen-besauee-the -peffiefi-was-weafing-a-face--coveri-Figr-but-I-a-m---satisflod-that-the-per-se-R-had-a-speol-a-1 justificatie-R-fer-Ret-ren4eviag-the-GeveFiRg7 and

2, *I have known the person for at least 12 months OR *I have net-knewn thc person fer-at least 12 riamitlis, but I have cunficnieki-the--p-efsecils-identity---tisint-aii-identifiaa-Wn El-oeurnent-ernei-tke-Eleau-nient-I-Felied-e-i-i-was

[signature of authorised witness] [date]

Department of Primary Industries Page 2 of 2 ESB-F06 2006-07 www.dpi.nsw.gov.au


Recommended