Educational and Facilities Master Plan EXECUTIVE SUMMARY | JULY 2020 Prepared by:
Transcript
  • Educational and Facilities Master PlanEXECUTIVE SUMMARY | JULY 2020

    Prepared by:

  • Letter from the ChancellorThe world as we know it, including higher education, changes faster than ever before. Many days it feels as if we’re moving from one challenge to the next with little time to look holistically at what we do.

    Creating a document like the North Orange County Community College District’s 2020 Educational and Facilities Master Plan (EFMP) gives us a chance, every ten years, to reflect and dream big.

    The development of an integrated, forward-thinking Educational and Facilities Master Plan provided the NOCCCD community with an opportunity to envision our desired future as educators and to redefine how we serve students.

    Keeping the needs of the whole student at the forefront and designing facilities that allow them to learn, engage, and feel welcome will set our direction for the next decade.

    This NOCCCD 2020 Educational and Facilities Master Plan was written after personal engagement with more than 7,000 District and campus community members, including students, faculty, staff, alumni, administrators, business partners and residents. Opinions and stories were shared in many ways: some people participated in an online survey, some attended one or more of the 15 on-campus forum sessions facilitated by our EFMP consultants Brailsford & Dunlavey and Moore Ruble Yudell Architects and Planners, some reached out to a favorite professor to exchange ideas.

    The NOCCCD EFMP Steering Committee, made up of 30 representatives from the three campuses and District Services, might have had the hardest task. The Steering Committee members were asked to develop the Strategic Directions and Goals that will guide this District for the next ten years, and they certainly proved to be an enormous source of wisdom and clarity throughout the process. My deepest thanks go to the EFMP Steering Committee, whose members have given countless hours to the planning

    and content of this document over the past 12 months. They have been incredible leaders, ensuring that the opinions of students, faculty, staff, and administrators were incorporated into this final document.

    We are confident that the results of this District-wide effort are here in the NOCCCD 2020 Educational and Facilities Master Plan. This plan is intended to guide the continual development of an educational and facilities program that is available and relevant to the communities that we serve. It is our hope that through these well-planned initiatives, we can positively affect the work lives of our staff members, and the success of our students.

    We look forward to implementing the EFMP recommendations and continuing to develop the excellent foundation of quality education and facilities that exists on each of our campuses.

    Sincerely,

    Dr. Cheryl Marshall Chancellor, NOCCCD

    01

    02

    03

    04

    05

    06

    MASTER PLAN MID-TERM UPDATE

    It would be irresponsible not to directly acknowledge the significant impacts faced by the NOCCCD campus community at the time of publication of this Educational and Facilities Master Plan (EFMP).

    During March 2020, the state of California issued a “shelter-in-place order” in response to the COVID-19 pandemic, which forced many across the state to make drastic changes to their daily lives to mitigate the exposure and slow the spread of the virus. The District immediately closed down all campuses and moved to online instruction and remote work to keep students, faculty and staff safe, while continuing to meet its educational goals and commitments.

    Due to the continued uncertainty of the short-and long-term effects of COVID-19, the initiatives set forth in the EFMP will be re-visited on an annual basis with a planned mid-term update during the 2022-2023 academic year to ensure that the initiatives contained in this document remain relevant through 2030.

    Table of ContentsMaster Plan Process.............................................................................................4

    Strategic Directions & Goals...........................................................................12

    Educational Initiatives.......................................................................................14

    Cypress College Facilities Plans...................................................................18

    Fullerton College Facilities Plans................................................................22

    NOCE Facilities Plans........................................................................................26

    Educational and Facilities Master Plan Summary 32 North Orange County Community College District

  • Data Collection

    Resource Allocation

    Plan Implementation

    Plan Development

    Assessment of Outcomes

    AnalysesProgram Improvement

    The District’s Integrated

    Planning Cycle

    MASTER PLAN PROCESS MASTER PLAN PROCESS

    Though guided by planners and architects, the Master Plan is, at its core, a District, campus, and community effort. A successful plan combines critical input from students, faculty, staff, administrators, and community members, and all of these groups have been intrinsically involved in this document’s creation.

    As such, within the EFMP, any reference to the District represents the campus communities of Cypress College, Fullerton College, North Orange Continuing Education, and District Services. This includes students, faculty, staff, and administrators.

    EDUCATIONAL MASTER PLAN

    A good plan requires a strong framework, with flexibility in its application. As the world changes, this plan will need to be revisited in order to keep it current. The Educational Master Plan was developed with collaboration across the District and with community members for the purposes of:

    • Projecting the long-term development of programs and services

    • Developing District-wide strategic directions and goals

    • Providing a framework for the development of the Facilities Master Plan, as well as other plans such as strategic plans and program reviews

    • Informing the public of NOCCCD’s intentions and garnering support for the services provided in and to the community

    • Providing a common foundation for discussion about NOCCCD programs

    • Supporting accreditation and demonstrating compliance with accreditation standards

    Past plans, program reviews, strategic plans, and data collected by the District provided the foundation for the new EFMP.

    Purpose of the Educational and Facilities Master Plan

    Developed collaboratively with a vibrant and engaged three-campus community, the purpose of this document is to guide the District through 2030, and serve as the measuring stick by which future educational programs and facilities investments will be evaluated.

    The EFMP is grounded in internal realities, such as the current systems and programs, and integrates external influences, such as demographic trends and the community’s educational interests and workforce needs.

    The EFMP is comprised of two parts: The primary driver is the Educational Master Plan (EMP), and its directions and needs are supported by the Facilities Master Plan (FMP). Combined, these elements create a ten-year roadmap for NOCCCD, which will guide planning efforts, strategic plans, program reviews, and allocation of resources.

    FACILITIES MASTER PLAN

    The Facilities Master Plan (FMP) will evaluate and determine the physical plan across all campuses in the District.

    The objective is to appraise current and future spatial needs, identify building and facility sustainability requirements, establish priorities related to instructional and support spaces, formulate project costs, and recommend a resource allocation plan for each campus.

    The FMP acknowledges planning and construction already underway and builds upon previous facilities plans.

    Based on the directions set forth in the EMP, the Facilities Master Plan also provides high level space planning for all of the campuses and centers through 2030.

    Educational and Facilities Master Plan Summary 54 North Orange County Community College District

  • MASTER PLAN PROCESS

    Process & Engagement OverviewRESEARCH & PAST PLANS

    As part of the overall planning process, the EFMP acknowledges and incorporates prior educational and facilities planning documents in order to ensure that the 2020 EFMP aligns with past efforts.

    The EFMP also utilized key research and data metrics from regional resources, such as the Orange County Business Council, Orange County Centers of Excellence for Labor Market Research report, and EMSI labor market reports.

    CAMPUS ENGAGEMENT

    In total, 7,000 people participated in one or more components of the EFMP planning process during 2019 and 2020. The planning team was guided by a District-wide Steering Committee, made up of 30 members representing all campuses. The committee met a total of nine times over 12 months to write the Strategic Directions and Goals, to discuss the results of the surveys and campus forums, and to review and provide input to the educational and facilities components of the plan.

    In addition, reviews and recommendations were given by the Steering Committee and campus

    PAST PLANS REVIEWED

    District and Campus Strategic Plans

    Institutional Effectiveness Reports

    Measure J Updates

    Guided Pathways Campus Plans

    District’s Program Reviews

    Student Equity Achievement Integrated Plans

    Strong Workforce Program

    Sustainability & Technology Plans

    State-level Initiatives: Vision for Success, Guided Pathways Student Centered Funding Formula

    Student Success Metrics Strong Workforce Program

    OC Business Council Regional Reports

    5-Year Construction Plans

    Space Inventory Reports

    Capacity/Load Ratio Assessments

    MASTER PLAN PROCESS

    Campus Forums

    Student Engagement

    Faculty, Staff & Administrators

    Past Plans

    Survey Analysis

    Demographic Data & Research

    Final Strategic

    Directions

    Final EFMP

    EFMP Steering

    CommitteeDCC

    ApprovalBoT

    Approval

    Draft Strategic

    Directions

    Draft EFMP

    stakeholders for refinement of the EFMP, prior to its review by the District Consultation Council and Board of Trustees.

    The team spent a significant amount of time engaging the campus community through forums and stakeholder meetings with students, faculty, classified staff, and campus and District administrators. A District-wide online survey also gathered opinions and observations from a large number of students, employees, alumni, and community members.

    FACILITIES PROCESS

    In conjunction with the Educational Master Plan process, the Facilities Master Plan is based on a three-phase approach: engagement; identifying gaps and building strategies; and master plan development. Each phase plays an integral role in the creation of a District FMP that serves students, faculty, staff, and the surrounding community.

    Engagement

    Engagement refers to the process of having relevant, productive conversations with key stakeholders so that we may learn about the specific needs of those who utilize the campuses

    every day, such as students, faculty, staff and campus leadership. These conversations took many forms, including one-on-one sessions, stakeholder meetings, workshops, activities and campus-wide forums. No matter the setting, the goal remained the same: hear from as diverse a group of individuals and organizations as possible in order to ensure that everyone’s needs are being addressed as we move forward.

    Identifying Gaps & Building Strategies

    Identifying potential gaps in the physical environment of the District’s campuses is an essential aspect for creating a ten-year FMP roadmap. One by one, an assessment of each campus’s existing and anticipated gaps was completed to determine where potential opportunities may exist.

    In collaboration with the Steering Committee, exercises in problem-solving and prioritization were completed to provide solutions for small, medium, and large capital projects that can be implemented by the District. The primary goal of this phase was to develop strategies with the highest possible reward at an appropriate level of expenditure for the District.

    Master Plan Development

    After key stakeholders were engaged and strategies were developed, the master plan development process began to take shape. The FMP builds upon existing initiatives and findings from the Educational Master Plan, which both serve together as a roadmap to guide the District towards the brightest possible future. In consultation with the Steering Committee, final recommendations that outline the project strategies and facilities best practices for the District were memorialized.

    Educational and Facilities Master Plan Summary 76 North Orange County Community College District

  • Vision

    Our diverse learners will be prepared to shape their futures and become engaged in our democracy.

    Mission

    The mission of the North Orange County Community College District is to serve and enrich our diverse communities by providing a comprehensive program of educational opportunities that are accessible, relevant, and academically excellent. We are unequivocally committed to student success and lifelong learning.

    Cypress College and Fullerton College will offer associate degrees, career and technical education (vocational) certificates, and transfer education, as well as developmental instruction and a broad array of specialized training. Additionally, Cypress College will offer a baccalaureate degree. North Orange Continuing Education will offer non-college credit programs including high school diploma completion, basic skills, career and technical education (vocational) certificates, and self-development courses. Specific activities in both the Colleges and North Orange Continuing Education will be directed toward economic development within the community.

    The Mission, Vision, and core values statements are revised every three years. This section will be revisited in Fall 2020.

    By the Numbers

    1,047In-Person Participants

    151Fullerton College Stakeholders

    143Cypress College Stakeholders

    122NOCE Stakeholders

    631District-Wide Stakeholders

    STAKEHOLDER MEETINGS

    445Forum Participants

    129Fullerton College Participants

    207Cypress College Participants

    109NOCE Participants

    CAMPUS FORUMS

    5,768Survey Respondents

    4,791Students Across Campuses

    609Employees Across Campuses

    368Alumni/Community Members

    CAMPUS SURVEYS

    255Remote Participants

    40Cypress College Participants

    28Fullerton College Participants

    114NOCE Participants

    73District-wide Participants

    REMOTE WORKSHOPS

    MASTER PLAN PROCESS MASTER PLAN PROCESS

    Educational and Facilities Master Plan Summary 98 North Orange County Community College District

  • MASTER PLAN PROCESS

    Core Values

    123

    ServiceWe contribute to a vital and prosperous community through our educational and training services. We promote engaged and ethical participation in global, civil society.

    High StandardsWe uphold high standards in academics and promote joy in teaching, learning, and work.

    AdaptabilityWe respond to the changing needs of our communities in a global environment through continuous improvement and creative innovation.

    4

    5

    6

    7ProfessionalismWe hold high standards for our faculty and staff and create an environment in which staff development and other continuing education are valued and promoted.

    StewardshipWe uphold the responsibility for public trust of our mission and resources.

    RespectWe cultivate an atmosphere of courtesy, civility, and collegiality with all students and employees in the District by promoting a willingness to collaborate and a responsibility for all to be engaged as collegial partners in carrying out the District’s mission.

    InclusivenessWe welcome and respect the diverse backgrounds and beliefs of our students, faculty, and staff, and the many communities we serve.

    Educational and Facilities Master Plan Summary 1110 North Orange County Community College District

  • STRATEGIC DIRECTIONS & GOALSSTRATEGIC DIRECTIONS & GOALS

    Student Experience & Success

    NOCCCD will provide comprehensive support, equitable opportunities, co-curricular programming, and clear pathways to ensure that students achieve their educational and career goals.

    Stewardship of Resources

    NOCCCD will promote a shared vision of responsible stewardship of District resources through transparent and inclusive decision-making and integrated planning.

    Collective Impact & Partnerships

    NOCCCD will develop and sustain collaborative projects and partnerships with educational institutions, community-based organizations, and businesses to create positive change in the region.

    Physical Environment

    NOCCCD will be a leader in creating accessible and sustainable facilities that support student and employee success.

    Employee Experience

    NOCCCD will provide an inclusive, equitable, and welcoming environment to support the well-being and professional growth of all employees.

    These Strategic Directions and Goals were crafted by the EFMP Steering Committee and are intended to guide the development of each program, project, or initiative within the District for the next ten years:

    GOALS

    The District will guide students to successfully navigate pathways for completion and lifelong learning.

    The District will regularly analyze data in order to identify and document internal barriers that inhibit student success and will develop action plans to reduce opportunity gaps among students.

    The District will expand opportunities for lifelong learning, volunteerism, civic engagement, and student leadership.

    The District will support programs, provide spaces, and bolster student life in order to encourage student engagement and inclusivity.

    GOALS

    The District will allocate resources based on data, integrated planning, and transparent decision-making.

    The District will maximize its resources through sound fiscal planning, responsible management, and diversification of revenue sources.

    The District will encourage intra-district collaboration to improve efficiencies of resources.

    GOALS

    The District will partner with regional public and private entities to create opportunities for internships, mentorships, and employment.

    The District will develop a strong brand identity that promotes its institutions and is recognizable throughout the local community, region, and state.

    The District will advocate at the state and national levels for legislation that supports student experience and success.

    The District will grow capacity to expand external partnerships.

    GOALS

    The District will develop and maintain environmentally sustainable and accessible facilities and practices.

    The District will build physical and technological capacity to make education accessible to all students in the region.

    The District will honor the character of each campus through thoughtful design of indoor and outdoor spaces.

    The District will educate employees and students about its environmental stewardship efforts and promote participation in sustainable practices.

    GOALS

    The District will support all employees in the essential elements of wellbeing—career, social, financial, physical, and community.

    The District will regularly offer professional development and training opportunities.

    The District will regularly evaluate and address salaries and benefits to ensure fair compensation for all employees.

    The District will empower all employees to participate fully in collegial governance.

    The District will promote and engage in a culture of respect, unity, and inclusiveness.

    The District will take steps to enhance the diversity of the employees to reflect the diverse student populations we serve.

    12 North Orange County Community College District Educational and Facilities Master Plan Summary 13

  • EDUCATIONAL INITIATIVES EDUCATIONAL INITIATIVES

    Student Success and Completion Student Experience & Learning

    01 02Diversity, Equity, Inclusion & Anti-Racism

    03Workforce Development

    05Enrollment Management

    04Online Learning

    06

    HOUSING INSECURITY, HOMELESSNESS, AND HUNGER

    Implement Guided Pathways

    Continue to Explore the Need for Student Housing

    Connect Students With Community and Government Programs

    Provide Meal Vouchers to On-campus Vendors

    Centralize Assistance Programs

    TRANSPORTATION & PARKING

    Consolidate Programs at One Campus to Minimize Travel Time

    Expand Online or Hybrid Class Offerings

    Help Students Get to Campus Without a Car

    Increase Parking at Fullerton College, and Create Safe Access to Existing Parking at NOCE

    Educational Initiatives

    CHILD CARE

    Form Partnerships Utilizing Existing and New Partnerships

    Help Students to Form “Parent Clubs”

    Schedule Class Sections for Different Times of Day

    Expand Online Class Offerings

    BEHAVIORAL HEALTH

    Expand the Mindful Growth Initiative to All Campuses

    Decentralize Counseling Services

    Create a “Where Can I?” App so Students Can Find the Spaces and Services They Want

    Modernize Instructional Space

    Strengthen Student Life & Campus Pride

    Enhance Student Programs and Services That Promote Student Life

    Improve District-wide Access to Technology and Infrastructure

    Include Additional Employee Office & Support Spaces

    Develop a District-wide Diversity, Equity, Inclusion, and Anti-Racism Council

    Develop a Common Vocabulary for DEI&A Concepts and Components

    Incorporate DEI&A Into Facilities Planning and Implementation

    Provide Equity and Anti-Racism Training to Faculty and Staff

    Create a Virtual Student Success Center

    Engage Students in Service Learning

    Complete Mid-term Enrollment Management Update (3 Years)

    Broaden Online Education Options

    Expand Workforce Development Partnerships

    Continue to Explore Bachelor’s Degree Programs

    Continue Developing External Partnerships

    Expand Branding & Marketing of District-wide Programs

    Evaluate Programs to Align With Student Success Metrics

    Focus on Priority Middle-Skills Job Sector

    Prioritize Training for In-Demand Skills Sought by Local & Regional Industries

    Create a Plan for Diversity, Equity, and Inclusion in the Online Environment

    Provide Educational Opportunities for Faculty and Staff Throughout the Year

    Create and Run Prototype Tests

    Build Content Creation Labs

    Review Curriculum and Schedule to Identify Online Opportunities

    Update Policies Regarding Working From Home

    Create Equity In Online Learning

    Educational and Facilities Master Plan Summary 1514 North Orange County Community College District

  • Facilities Plans

    16 North Orange County Community College District Educational and Facilities Master Plan Summary 17

  • In-Construction & In-Planning Projects

    LEGEND

    CYPRESS COLLEGE FACILITIES PLANS

    1

    2

    3 5

    7

    9

    8

    8

    10

    10

    4

    11

    4

    Lincoln Ave

    Valley V

    iew S

    t

    Ho

    lder S

    t

    Orange Ave

    Cypress College

    CYPRESS COLLEGE FACILITIES PLANS

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    50

    50

    50

    50

    50

    5005

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    5555

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    5956.74

    5858.12

    5655.73

    5550.78

    5349.68

    5157.84

    PIPE

    BEN

    CH

    BENCHBE

    NCH

    HC

    NEBH

    CNEB

    HC

    NEB

    POOL

    POOL

    STAIRS

    STAIRS

    STAIRS

    STAIRS

    STAIRS

    LO

    OP

    DIRT PILES

    POOL

    CATWALK

    CATWALK

    STAIR

    RIATS

    STAIR

    STAIR

    STAIR

    FLAG

    FLAG

    FLAG

    PP

    PP

    PP PP PP

    PP

    PP

    PP

    PP

    PP

    PP

    PP

    PPPP

    PP

    PP

    PP

    PP

    PPPP

    PP

    PP

    PP

    PP

    PPPP

    PPPP

    PPPP

    PP

    PPPP

    PP

    PPPP

    PP

    PP

    PPPPPP

    PPPP

    DIRT PILE

    DIRT PILE

    DIRT PILE

    DIRT PILE

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    DI

    HUMANITIES

    SCIENCEENGINEERINGMATH

    LECTUREHALL

    FINE ARTS

    THEATERARTS

    CYPRESSCOLLEGECOMPLEX

    STUDENTCENTER

    BOOKSTORE

    TECHNICALEDUATION

    BUSINESS

    TECHNICALEDUCATION 2

    TECHNICALEDUCATION3

    GYM 1

    GYM 2

    LIBRARY/LEARNINGRESOURCE

    NOCE

    LOT 4

    LOT 5 SOUTH

    LOT 5 NORTH

    LOT 1

    LOT 2

    LOT 3

    LOT 7 EXPANSION

    LOT 8

    LOT 9

    LOT 6 WEST

    LOT 6 EAST

    BASEBALL FIELD

    SOFTBALL FIELD

    PRACTICE FIELD

    TENNIS

    PRACTICE FIELD

    RAY HAASSOCCER FIELD

    LOT 2

    VCR

    NEW SCIENCEENGINEERING MATH

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    50

    50

    50

    50

    50

    5005

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    5555

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    5956.74

    5858.12

    5655.73

    5550.78

    5349.68

    5157.84

    PIPE

    BEN

    CH

    BENCHBE

    NCH

    HC

    NEBH

    CNEB

    HC

    NEB

    POOL

    POOL

    STAIRS

    STAIRS

    STAIRS

    STAIRS

    STAIRS

    LO

    OP

    DIRT PILES

    POOL

    CATWALK

    CATWALK

    STAIR

    RIATS

    STAIR

    STAIR

    STAIR

    FLAG

    FLAG

    FLAG

    PP

    PP

    PP PP PP

    PP

    PP

    PP

    PP

    PP

    PP

    PP

    PPPP

    PP

    PP

    PP

    PP

    PPPP

    PP

    PP

    PP

    PP

    PPPP

    PPPP

    PPPP

    PP

    PPPP

    PP

    PPPP

    PP

    PP

    PPPPPP

    PPPP

    DIRT PILE

    DIRT PILE

    DIRT PILE

    DIRT PILE

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    DI

    HUMANITIES

    SCIENCEENGINEERINGMATH

    LECTUREHALL

    FINE ARTS

    THEATERARTS

    CYPRESSCOLLEGECOMPLEX

    STUDENTCENTER

    BOOKSTORE

    TECHNICALEDUCATION

    BUSINESS

    TECHNICALEDUCATION 2

    TECHNICALEDUCATION3

    GYM 1

    GYM 2

    LIBRARY/LEARNINGRESOURCE

    NOCE

    LOT 4

    LOT 5 SOUTH

    LOT 5 NORTH

    LOT 1

    LOT 2

    LOT 3

    LOT 7 EXPANSION

    LOT 8

    LOT 9

    LOT 6 WEST

    LOT 6 EAST

    SOFTBALL FIELD

    PRACTICE FIELD

    TENNIS

    PRACTICE FIELD

    RAY HAASSOCCER FIELD

    LOT 2

    VCR

    NEW SCIENCEENGINEERING MATH

    0 40002000 6000N

    GYM 2

    GYM 1

    BASEBALL FIELD

    TECHNICALEDUCATION 2

    NEW SCIENCEENGINEERING MATH

    FINE ARTS

    TECHNICALEDUCATION

    TECHNICAL

    EDUCATION3

    1

    In-Construction & In-Planning Projects

    LEGEND

    1

    2

    3 5

    7

    9

    8

    8

    10

    10

    4

    11

    4

    1. New Science Engineering Math (SEM) Building

    New building to house classrooms, labs, conference rooms, workrooms, and offices.

    2. New Veterans Resource Center and Student Activities Center Expansion

    New addition and renovated building to provide additional spaces for Veterans and student activities.

    3. Pond RefurbishmentPond maintenance repairs and the addition of a bridge to connect existing SEM building with VRC.

    4. Piazza RepairsMaintenance repairs including waterproofing and painting handrails.

    5. Baseball Clubhouse & Field Fencing Replacement

    Safety and other improvements required to obtain DSA Certification.

    6. Network RefreshCampus-wide and District-wide infrastructure upgrades, including broader and faster WiFi and addressing wired, wireless, voice, and video networks.

    IN-CONSTRUCTION PROJECTS IN-PLANNING PROJECTS

    7. Renovation of Fine Arts BuildingRenovations will include functional and adequate recording arts, rehearsal and performance spaces for music instruction, spaces for student study near departmental faculty and other resources, and the reuse of existing vacant spaces currently not configured for instruction.

    8. Renovation / Modernization of Technical Education Buildings I and III

    Renovations will include building systems, furniture, equipment, and interior finishes.

    9.Renovation / Modernization of Technical Education Building II

    Renovations will include building systems, furniture, equipment, and interior finishes.

    10. Gym 1 & 2 ADA Improvements and Minor Renovations

    Modest renovation of both buildings for accessibility improvements.

    11. Pool RepairsPool lining refinishing and new or repaired pool equipment.

    12. Mechanical Infrastructure ImprovementsUpgrades to central plant and associated infrastructure to address capacity and loads.

    13. Mass Communications & Security Systems Upgrades

    Campus-wide and District-wide upgrades to security and alarm systems.

    Lincoln Ave

    Valley V

    iew S

    t

    Ho

    lder S

    t

    The projects shown in blue on the map, along with those listed on the following page, include current major projects Cypress College has been planning and implementing. Some projects are actively in design or construction, while others are in the queue. This new Master Plan confirms that these previously identified projects remain priorities for the College and District.

    Current Planning Projects

    Educational and Facilities Master Plan Summary 1918 North Orange County Community College District

  • CYPRESS COLLEGE FACILITIES PLANS

    Future Opportunity Sites

    CYPRESS COLLEGE FACILITIES PLANS

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    50

    50

    50

    50

    50

    5005

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    5555

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    5956.74

    5858.12

    5655.73

    5550.78

    5349.68

    5157.84

    PIPE

    BEN

    CH

    BENCHBE

    NCH

    HC

    NEBH

    CNEB

    HC

    NEB

    POOL

    POOL

    STAIRS

    STAIRS

    STAIRS

    STAIRS

    STAIRS

    LO

    OP

    DIRT PILES

    POOL

    CATWALK

    CATWALK

    STAIR

    RIATS

    STAIR

    STAIR

    STAIR

    FLAG

    FLAG

    FLAG

    PP

    PP

    PP PP PP

    PP

    PP

    PP

    PP

    PP

    PP

    PP

    PPPP

    PP

    PP

    PP

    PP

    PPPP

    PP

    PP

    PP

    PP

    PPPP

    PPPP

    PPPP

    PP

    PPPP

    PP

    PPPP

    PP

    PP

    PPPPPP

    PPPP

    DIRT PILE

    DIRT PILE

    DIRT PILE

    DIRT PILE

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    DI

    HUMANITIES

    SCIENCEENGINEERINGMATH

    LECTUREHALL

    FINE ARTS

    THEATERARTS

    CYPRESSCOLLEGECOMPLEX

    STUDENTCENTER

    BOOKSTORE

    TECHNICALEDUATION

    BUSINESS

    TECHNICALEDUCATION 2

    TECHNICALEDUCATION3

    GYM 1

    GYM 2

    LIBRARY/LEARNINGRESOURCE

    NOCE

    LOT 4

    LOT 5 SOUTH

    LOT 5 NORTH

    LOT 1

    LOT 2

    LOT 3

    LOT 7 EXPANSION

    LOT 8

    LOT 9

    LOT 6 WEST

    LOT 6 EAST

    BASEBALL FIELD

    SOFTBALL FIELD

    PRACTICE FIELD

    TENNIS

    PRACTICE FIELD

    RAY HAASSOCCER FIELD

    LOT 2

    VCR

    NEW SCIENCEENGINEERING MATH

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    50

    50

    50

    50

    50

    5005

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    5555

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    5956.74

    5858.12

    5655.73

    5550.78

    5349.68

    5157.84

    PIPE

    BEN

    CH

    BENCHBE

    NCH

    HC

    NEBH

    CNEB

    HC

    NEB

    POOL

    POOL

    STAIRS

    STAIRS

    STAIRS

    STAIRS

    STAIRS

    LO

    OP

    DIRT PILES

    POOL

    CATWALK

    CATWALK

    STAIR

    RIATS

    STAIR

    STAIR

    STAIR

    FLAG

    FLAG

    FLAG

    PP

    PP

    PP PP PP

    PP

    PP

    PP

    PP

    PP

    PP

    PP

    PPPP

    PP

    PP

    PP

    PP

    PPPP

    PP

    PP

    PP

    PP

    PPPP

    PPPP

    PPPP

    PP

    PPPP

    PP

    PPPP

    PP

    PP

    PPPPPP

    PPPP

    DIRT PILE

    DIRT PILE

    DIRT PILE

    DIRT PILE

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    DI

    HUMANITIES

    SCIENCEENGINEERINGMATH

    LECTUREHALL

    FINE ARTS

    THEATERARTS

    CYPRESSCOLLEGECOMPLEX

    STUDENTCENTER

    BOOKSTORE

    TECHNICALEDUCATION

    BUSINESS

    TECHNICALEDUCATION 2

    TECHNICALEDUCATION3

    GYM 1

    GYM 2

    LIBRARY/LEARNINGRESOURCE

    NOCE

    LOT 4

    LOT 5 SOUTH

    LOT 5 NORTH

    LOT 1

    LOT 2

    LOT 3

    LOT 7 EXPANSION

    LOT 8

    LOT 9

    LOT 6 WEST

    LOT 6 EAST

    SOFTBALL FIELD

    PRACTICE FIELD

    TENNIS

    PRACTICE FIELD

    RAY HAASSOCCER FIELD

    LOT 2

    VCR

    NEW SCIENCEENGINEERING MATH

    NOCE

    TECHNICALEDUCATION 2

    0 40002000 6000N

    TECHNICALEDUCATION

    TECHNICALEDUCATION3

    NEW SCIENCEENGINEERING MATH

    BASEBALL FIELD

    FINE ARTS

    C8b

    C8a

    Fine Arts

    C13

    C12

    C15C3

    C7C7

    C7

    C7

    C7

    C7

    C7

    C14

    C2

    C6

    C1

    C11

    C11C4

    C5

    C10

    C16

    C9

    LEGENDPotential Building Sites

    Public Realm Potential Sites

    PV PanelsPotential Property Acquisitions

    Electric Vehicle Charging Stations

    Each project within the master plan framework has been established based on educational and facility needs, construction staging and sequencing considerations, and potential for funding opportunities. The projects preserve the flexibility to accommodate future unforeseen implementation opportunities and challenges as they arise. The projects shown in orange represent new building and existing building renovation opportunities. The areas shown in green represent new public realm opportunities. While the Master Plan does not identify specific priorities or establish a timeline, the new opportunities have been organized by construction costs to assist the District in determining the implementation schedule:

    • Small Capital Projects are those less than $2 million

    • Medium Capital Projects are those ranging between $2 – 30 million

    • Large Capital Projects are those greater than $30 million

    Long-Range Projects, a fourth category, identifies aspirational projects which are important to the Master Plan but may not be feasible to implement by 2030; they are not defined by cost as that is a variable of time.

    C11. Gym 1 & Gym 2 RenovationBuilding systems, interior materials, and furniture enhancements. Includes Kinesiology Division Integrated Center.• Faculty & Adjunct Faculty Offices • Testing Lab• Multi-Use Space

    C12. Cypress Continuing Education Center Located at Cypress College Expansion & Cypress Bistro RelocationExpansions to accommodate both NOCE growth needs and relocation of Cypress Bistro and Culinary Arts program back to Cypress campus.

    C13. New Aquatic Center & South HubRelocate and expand pool to Olympic-size and develop new center for recreation and aquatic program support.

    C14. New Campus Housing Purchase adjacent motel site and renovate into student housing.

    C15. New Community Linear ParkPurchase adjacent abandoned railroad property and convert to a linear campus and community park.

    C16. Existing SEM Upper Floor Renovation• Seismic Upgrades• Health Sciences Relocation to L2 and L3

    SMALL CAP: < $2 M MEDIUM CAP CONTINUED: $2 M - $30 M

    MEDIUM CAP: $2 M - $30 M

    LONG-RANGE PROJECTS

    C1. Library Outdoor Study GardenExterior enhancements including paving, canopy for shade, and furniture with power to provide additional outdoor study space.

    C2. Cafeteria EnhancementsReorient the “front door” to the east towards the new VRC. Provide outdoor seating with power, shade canopy, and signage. Interior enhancements of the cafeteria include new furniture, TVs, and removal or replacement of the window blinds.

    C3. New Beach Volleyball CourtsFour new courts to bring existing program on campus.

    Campus-Wide Enhancements: C9. Student Engagement HubRenovate existing SEM building to include ground floor student services, such as a Social Justice Center and Student Cultural Spaces, reservable study spaces, Grab & Go food options and health services. Enhancements include adding a L1 / L2 interconnecting stair. Piazza enhancements include new paving, potted landscape, shade canopy, and furniture with power.• Piazza with Shading Structure• Shared and reservable Social Justice Conference Rooms

    C4. Existing Pool EnhancementsExisting pool enhancements and new pool equipment to integrate safety, accessibility, and sustainability measures.

    C5. Lecture Hall RenovationBuilding systems, interior materials, and furniture enhancements.• ADA Upgrades

    C6. Lot 2 Conversion to Auto School ExpansionAdditional covered exterior vehicle bays

    C7. Integrated ParkingParking enhancements to integrate safety, accessibility, and sustainability measures.

    C8. New Drop-off AreasDevelop one of two options into a centralized vehicle, bus, and ride share drop-off zone including new covered waiting area and bike storage.• Traffic Study should be completed first

    In-Construction and In-Planning Projects

    Opportunity Sites

    Long-Range Projects

    Parking

    Lincoln Ave

    Valley V

    iew S

    t

    Ho

    lder S

    t

    Orange Ave

    • Piazza Enhancements

    • Signage Enhancements

    • Outdoor Shading Devices + Power

    • Transparent and/or Movable Walls

    • Tutoring Space

    • Grab & Go Food Options

    • Faculty Offices and Adjunct Faculty Shared Offices

    • Multi-Disciplinary Skills Lab• Flexible High-Tech Classrooms

    • Faculty and Adjunct Faculty Offices• Additional restrooms

    • Content Creation Center

    • Bike Lockers Enhancement

    • Mobile Printing Stations and ePrint Program

    • Community Garden

    • Campus Path Enhancements

    C10. Tech 1 & 3 Renovation and New Connection

    LARGE CAP: > $30 M

    Educational and Facilities Master Plan Summary 2120 North Orange County Community College District

  • FULLERTON COLLEGE FACILITIES PLANS

    Fullerton College

    Current Planning Projects

    FULLERTON COLLEGE FACILITIES PLANS

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONCCONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    POOL

    POOL

    PARKING STRUCTURE

    STAIR

    STAIR

    TS

    TS

    TS

    TS

    TS

    STAIR

    STAIR

    STAIR

    STAIR

    STAIR

    STAIR

    STAIR

    TS

    TS

    TS

    FLAG

    FLAG

    FLAG

    FLAGFLAG

    175

    175

    571

    170170 170

    170

    170

    175180

    185

    190

    190

    591

    200

    205

    012

    512

    220

    225

    230225

    220215

    235

    235

    230

    522

    220

    215

    210

    205

    200

    195

    200

    205

    210

    512220

    522

    190 195

    195

    190

    185

    081

    175

    175

    571

    571

    175

    571

    180

    180

    180

    180

    180

    180

    180180

    180

    185

    185

    581

    175

    170

    170

    ASPH

    STRUCTURENEW PARKING

    N PO

    MO

    NA A

    VE

    E WILSHIRE AVE

    N L

    EMO

    N S

    T

    N LA

    WRE

    NCE

    AVE

    N BERKELEY AVE

    N BERKELEY AVE

    N BE

    RKEL

    EY A

    VEN

    BERK

    ELEY

    AVE

    N L

    EMO

    N S

    TN

    LEM

    ON

    ST

    NUTWOOD

    PLLP DOOWTUN

    E CHAPMAN AVEE CHAPMAN AVEE CHAPMAN AVE

    E WILSHIRE AVE

    N L

    EMO

    N S

    T

    POOL

    BERKELEYCENTER

    3000

    LEMON STREETPARKING

    STRUCTURE

    TECHNOLOGY &ENGINEERING

    700

    TECHNOLOGYENGINEERING

    900

    SOCIALSCIENCES

    1400

    FIELDHOUSE

    NORTH GYM1200

    SOUTH GYMFACULTYLOUNGE / OFFICES

    Wel

    lnes

    sCe

    nter

    Storage/Locker

    1200

    LIBRARY800

    CAMPUS SERVICE

    HUMANITIES500

    BUSINESS300

    SCIENCE400

    COLLEGE CENTER200

    ADMIN

    Welcome Center

    100

    THEATRE ARTS1300

    CAMPUSSAFETY1500

    MATH600

    FINE ARTS/ART GALLERY

    Instructional Building

    1000

    PHYSICALEDUCATION

    1200

    WILSHIRE THEATRE2100

    WILSHIRE CENTERW200

    W.C.W300

    W.C.W100

    PROPOSEDPERFORMING ARTS

    COMPLEX

    LOT E

    PLUMMER STRUCTURE

    LOT A LOT 7

    LOT B-2 EAST

    LOT C EAST

    LOT C WEST

    LOT 6

    SHERBECK FIELD

    BASEBALL FIELD

    SOFTBALL FIELD

    SOCCER

    TENNIS COURTS

    NOC3100

    BERKELEYCENTER

    LOT

    FULLERTON UNIONHIGH SCHOOL

    HORTICULTURE1600 CLASSROOM

    SWING SPACE1800

    1810

    18201830

    LOT 5

    existing bus stop

    NEWINSTRUCTION

    BUILDING

    NEW CENTRALPLANT

    NEW PARKINGSTRUCTURENEW M&O

    BUILDING

    PE COURT

    N PO

    MO

    NA A

    VE

    E WILSHIRE AVE

    N L

    EMO

    N S

    T

    N LA

    WRE

    NCE

    AVE

    N BERKELEY AVE

    N BERKELEY AVE

    N BE

    RKEL

    EY A

    VEN

    BERK

    ELEY

    AVE

    N L

    EMO

    N S

    TN

    LEM

    ON

    ST

    NUTWOOD

    PLLP DOOWTUN

    E CHAPMAN AVEE CHAPMAN AVEE CHAPMAN AVE

    N L

    EMO

    N S

    T

    POOL

    BERKELEYCENTER

    3000

    LEMON STREETPARKING

    STRUCTURE

    TECHNOLOGY &ENGINEERING

    700

    TECHNOLOGYENGINEERING

    900

    SOCIALSCIENCES

    1400

    FIELDHOUSE

    NORTH GYM1200

    LIBRARY800

    CAMPUS SERVICE

    HUMANITIES500

    BUSINESS300

    SCIENCE400

    COLLEGE CENTER200

    ADMIN100

    CAMPUSSAFETY1500

    MATH600

    FINE ARTS/ART GALLERY1000

    CLASSROOMS

    PHYSICALEDUCATION

    1200

    CLASSROOMS

    STUDENT SERVICES2000

    WILSHIRE THEATRE2100

    WILSHIRE CENTERW200

    W.C.W300

    W.C.W100

    LOT 10

    LOT E

    PLUMMER STRUCTURE

    CLASSROOMS

    LOT A LOT 8 LOT 7

    LOT B-2 EAST

    LOT C EAST

    LOT 6

    SHERBECK FIELD

    BASEBALL FIELD

    SOFTBALL FIELD

    SOCCER

    TENNIS COURTS

    NOC3100

    BERKELEYCENTER

    LOT

    FULLERTON UNIONHIGH SCHOOL

    CLASSROOMSWING SPACE

    1800

    1810

    18201830

    LOT 5

    existing bus stop

    PROPOSEDSERVICE

    YARD

    NEWINSTRUCTION

    BUILDING

    NEW CENTRALPLANT

    NEW M&OBUILDING

    PE COURT

    THEATRE ARTS1300

    MUSIC BUILDING1100

    HUMANITIES500

    BUSINESS300

    STUDENT SERVICES2000

    NEWINSTRUCTION

    BUILDING

    NEW CENTRALPLANT

    NEW M&OBUILDING

    NEW PARKINGSTRUCTURE

    Certified STEM& Lab School

    New Lab School

    PROPOSEDPERFORMING ARTS

    COMPLEX

    0 40002000 6000N

    In-Construction & In-Planning Projects

    5

    6

    1012

    11

    12

    12

    8 9

    7

    5

    1

    LEGEND

    The projects shown in blue on the map, along with those listed on the following page, include current major projects Fullerton College has been planning and implementing. Some projects are actively in design or construction, while others are in the queue. This new Master Plan confirms that these previously identified projects remain priorities for the College and District.

    E Chapman Ave E Chapman Ave

    Lemo

    n St

    N B

    erkeley Ave

    N Berk

    eley A

    ve

    N Berkeley Ave

    Lemo

    n St

    1. New Instructional BuildingThe building will accommodate more than 40 classrooms and the division office services including staff offices.

    2. Central Plant Expansion Addition to Central Plant building to upgrade campus infrastructure.

    3. Network RefreshCampus-wide and District-wide infrastructure upgrades, including broader and faster WiFi and addressing wired, wireless, voice, and video networks.

    4. Infrastructure ImprovementsIncludes new sewer lines and other infrastructure preparation for 300 and 500 Building renovations.

    5. Renovation of 300 and 500 BuildingsTotal renovation of Buildings 300 and 500, including historic consideration of Building 300. The renovated buildings will contain general classrooms, CIS laboratories, ACT laboratories, photography laboratories, Dean and faculty offices, shared laboratories, and a lecture hall.

    6. New Parking Structure or Other Parking SolutionsAdd 840 parking spaces by building a new parking structure, purchasing or leasing adjacent surface parking lots, or by another solution.

    7. New Maintenance & Operations (M&O) Building, Central Plant Expansion, and Thermal Energy Storage (TES)

    Project includes the replacement and expansion of the existing central plant to accommodate three 600-ton high-efficiency water chillers and cooling towers.

    8. New STEM Vocational CenterNew building to house and replace temporary buildings for Horticulture, includes renaming and expanding the program to include other STEM programs.

    9. New CDES Lab School BuildingNew building to house and replace temporary buildings for Lab School.

    10. New Performing Arts ComplexNew gateway building on the corner of Chapman Avenue and Lemon Street for a new performing arts center for music and drama programs. Includes classrooms, offices, study rooms, and support spaces.

    11. New Welcome CenterNew gateway building on the corner of Chapman Avenue and Lemon Street to house visitor information and Student Services, such as Social Justice Conference Room and Student Cultural Spaces.

    12. Demolition of Buildings 1100, 1300, and 2000 In order to accommodate space for the Welcome Center, buildings 1100 and 1300 will need to be demolished. Once the Welcome Center is built to relocate the Student Services programs, Building 2000 will be demolished.

    13. Sherbeck Field EnhancementsThe addition of bleacher seating and stadium lighting.

    14. Accessibility EnhancementsImplementing accessibility improvements throughout campus, such as ramps, lifts, handrails, or restroom accessories.

    15. Mass Communications & Security Systems Upgrades

    Campus-wide and District-wide upgrades to security and alarm systems.

    IN-CONSTRUCTION PROJECTS

    IN-CONSTRUCTION PROJECTS

    IN-PLANNING PROJECTS CONTINUED

    Educational and Facilities Master Plan Summary 2322 North Orange County Community College District

  • FULLERTON COLLEGE FACILITIES PLANS

    Future Opportunity Sites

    FULLERTON COLLEGE FACILITIES PLANS

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONCCONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    POOL

    POOL

    PARKING STRUCTURE

    STAIR

    STAIR

    TS

    TS

    TS

    TS

    TS

    STAIR

    STAIR

    STAIR

    STAIR

    STAIR

    STAIR

    STAIR

    TS

    TS

    TS

    FLAG

    FLAG

    FLAG

    FLAGFLAG

    175

    175

    571

    170170 170

    170

    170

    175180

    185

    190

    190

    591

    200

    205

    012

    512

    220

    225

    230225

    220215

    235

    235

    230

    522

    220

    215

    210

    205

    200

    195

    200

    205

    210

    512220

    522

    190 195

    195

    190

    185

    081

    175

    175

    571

    571

    175

    571

    180

    180

    180

    180

    180

    180

    180180

    180

    185

    185

    581

    175

    170

    170

    ASPH

    STRUCTURENEW PARKING

    N PO

    MO

    NA A

    VE

    E WILSHIRE AVE

    N L

    EMO

    N S

    T

    N LA

    WRE

    NCE

    AVE

    N BERKELEY AVE

    N BERKELEY AVE

    N BE

    RKEL

    EY A

    VEN

    BERK

    ELEY

    AVE

    N L

    EMO

    N S

    TN

    LEM

    ON

    ST

    NUTWOOD

    PLLP DOOWTUN

    E CHAPMAN AVEE CHAPMAN AVEE CHAPMAN AVE

    E WILSHIRE AVE

    N L

    EMO

    N S

    T

    POOL

    BERKELEYCENTER

    3000

    LEMON STREETPARKING

    STRUCTURE

    TECHNOLOGY &ENGINEERING

    700

    TECHNOLOGYENGINEERING

    900

    SOCIALSCIENCES

    1400

    FIELDHOUSE

    NORTH GYM1200

    SOUTH GYMFACULTYLOUNGE / OFFICES

    Wel

    lnes

    sCe

    nter

    Storage/Locker

    1200

    LIBRARY800

    CAMPUS SERVICE

    HUMANITIES500

    BUSINESS300

    SCIENCE400

    COLLEGE CENTER200

    ADMIN

    Welcome Center

    100

    THEATRE ARTS1300

    CAMPUSSAFETY1500

    MATH600

    FINE ARTS/ART GALLERY

    Instructional Building

    1000

    PHYSICALEDUCATION

    1200

    WILSHIRE THEATRE2100

    WILSHIRE CENTERW200

    W.C.W300

    W.C.W100

    PROPOSEDPERFORMING ARTS

    COMPLEX

    LOT E

    PLUMMER STRUCTURE

    LOT A LOT 7

    LOT B-2 EAST

    LOT C EAST

    LOT C WEST

    LOT 6

    SHERBECK FIELD

    BASEBALL FIELD

    SOFTBALL FIELD

    SOCCER

    TENNIS COURTS

    NOC3100

    BERKELEYCENTER

    LOT

    FULLERTON UNIONHIGH SCHOOL

    HORTICULTURE1600 CLASSROOM

    SWING SPACE1800

    1810

    18201830

    LOT 5

    existing bus stop

    NEWINSTRUCTION

    BUILDING

    NEW CENTRALPLANT

    NEW PARKINGSTRUCTURENEW M&O

    BUILDING

    PE COURT

    N PO

    MO

    NA A

    VE

    E WILSHIRE AVE

    N L

    EMO

    N S

    T

    N LA

    WRE

    NCE

    AVE

    N BERKELEY AVE

    N BERKELEY AVE

    N BE

    RKEL

    EY A

    VEN

    BERK

    ELEY

    AVE

    N L

    EMO

    N S

    TN

    LEM

    ON

    ST

    NUTWOOD

    PLLP DOOWTUN

    E CHAPMAN AVEE CHAPMAN AVEE CHAPMAN AVE

    N L

    EMO

    N S

    T

    POOL

    BERKELEYCENTER

    3000

    LEMON STREETPARKING

    STRUCTURE

    TECHNOLOGY &ENGINEERING

    700

    TECHNOLOGYENGINEERING

    900

    SOCIALSCIENCES

    1400

    FIELDHOUSE

    NORTH GYM1200

    LIBRARY800

    CAMPUS SERVICE

    HUMANITIES500

    BUSINESS300

    SCIENCE400

    COLLEGE CENTER200

    ADMIN100

    CAMPUSSAFETY1500

    MATH600

    FINE ARTS/ART GALLERY1000

    CLASSROOMS

    PHYSICALEDUCATION

    1200

    CLASSROOMS

    STUDENT SERVICES2000

    WILSHIRE THEATRE2100

    WILSHIRE CENTERW200

    W.C.W300

    W.C.W100

    LOT 10

    LOT E

    PLUMMER STRUCTURE

    CLASSROOMS

    LOT A LOT 8 LOT 7

    LOT B-2 EAST

    LOT C EAST

    LOT 6

    SHERBECK FIELD

    BASEBALL FIELD

    SOFTBALL FIELD

    SOCCER

    TENNIS COURTS

    NOC3100

    BERKELEYCENTER

    LOT

    FULLERTON UNIONHIGH SCHOOL

    CLASSROOMSWING SPACE

    1800

    1810

    18201830

    LOT 5

    existing bus stop

    PROPOSEDSERVICE

    YARD

    NEWINSTRUCTION

    BUILDING

    NEW CENTRALPLANT

    NEW M&OBUILDING

    PE COURT

    0 40002000 6000

    NOC3100

    HUMANITIES500

    BUSINESS300

    STUDENT SERVICES2000

    NEWINSTRUCTION

    BUILDING

    NEW CENTRALPLANT

    NEW M&OBUILDING

    NEW PARKINGSTRUCTURE

    Certified STEM& Lab School

    New Lab School

    PROPOSEDPERFORMING ARTS

    COMPLEX

    New Welcome Center

    N

    F13

    F14

    F14

    F12

    F8

    F2

    F10

    F10

    F7

    F11

    F9

    F10

    F6

    F1

    F4

    F9

    F7

    F3

    F5

    LEGENDPotential Building Sites

    Public Realm Potential Sites

    In-Construction and In-Planning Projects

    PV PanelsPotential Property Acquisitions

    Opportunity SitesParking

    Electric Vehicle Charging Stations

    Long-Range Projects

    E Chapman Ave E Chapman Ave

    N B

    erkeley Ave

    N Berkeley Ave

    N Berkeley Ave

    Lemo

    n St

    F13. Demo & New Gym 1200 BuildingDemolish existing building and develop new Gym.

    F14. New Fine Arts South of ChapmanDemolish existing Fine Arts 1000 building and develop new Fine Arts building South of E. Chapman Avenue.• New Landscape Visual Connection with new Performing Arts

    Complex and the Quad

    None

    SMALL CAP: < $2 M MEDIUM CAP CONTINUED: $2 M - $30 M

    MEDIUM CAP: $2 M - $30 M

    LONG-RANGE PROJECTS

    LARGE CAP: > $30 M

    Pilot Projects: Campus-Wide Enhancements• Signage Enhancements • Outdoor Leisure Seating• Outdoor Study Spaces• Faculty Offices and Adjunct Faculty Shared Offices• Content Creation Center• Constellation Classroom• Social Justice Conference Room and Student Cultural Spaces• Bike Lockers Enhancement• Art Installation

    F1. North Library Historic Courtyard RenovationExterior enhancements including paving and electrified furniture.• Shading and Seating Renovation • Grab & Go (Starbucks)

    F2. Quad Seating & Shading• Additional Seating and Shade Trees for Better Thermal Comfort

    F3. Strength Lab RenovationBetter space utilization and new equipment

    F4. Faculty Lounge & Health Center RenovationPartial building renovation to provide building systems, lighting, interior materials, and furniture enhancements

    F8. New Lockers & Showers & Parking ImprovementsNew locker and shower rooms at pool, and parking enhancements to include safer parking drive entrance, accessibility, lighting, and sustainability measures

    F9. Surface Parking ExpansionDemolish 3000 Building and convert to additional surface parking• PV Panels• ADA Upgrades• Lighting & Safety Upgrades

    F10. Integrated ParkingParking enhancements to integrate safety, accessibility, and sustainability measures

    F11. Veterans Resource Center (VRC) / Instructional / Student ResourcesRelocate / demolish four houses and develop new building to include VRC, Health Services, Student Resources, and Instructional Programs• Additional Surface Parking

    F12. Wilshire Theater 2100 Renovation Building systems, interior materials, and furniture enhancements• Theater Renovation• Faculty Offices • Content Creation Center• ADA upgrades

    F5. Math 600 Building RenovationBuilding systems, interior materials, and furniture enhancements.• Classrooms Renovation• Faculty Offices • Content Creation Center

    F6. North Campus SpineF7. New Mobility Hubs

    Two new hubs, on either side of E. Chapman Avenue, to provide consolidated vehicle, bus, and ride share drop-off areas including new covered waiting areas and bike storage.• Front Door Landscape• ADA Upgrades• Lighting & Safety Upgrades

    Each project within the master plan framework has been established based on educational and facility needs, construction staging and sequencing considerations, and potential for funding opportunities. The projects preserve the flexibility to accommodate future unforeseen implementation opportunities and challenges as they arise. The projects shown in orange represent new building and existing building renovation opportunities. The areas shown in green represent new public realm opportunities. While the Master Plan does not identify specific priorities or establish a timeline, the new opportunities have been organized by construction costs to assist the District in determining the implementation schedule:

    • Small Capital Projects are those less than $2 million

    • Medium Capital Projects are those ranging between $2 – 30 million

    • Large Capital Projects are those greater than $30 million

    Long-Range Projects, a fourth category, identifies aspirational projects which are important to the Master Plan but may not be feasible to implement by 2030; they are not defined by cost as that is a variable of time.

    Educational and Facilities Master Plan Summary 2524 North Orange County Community College District

  • NOCE FACILITIES PLANS

    NOCE

    Current Planning Projects

    NOCE FACILITIES PLANS

    Xre

    f .\

    R-1

    st-f

    lr_

    serv

    .dw

    g

    U

    U

    S

    S

    S

    S

    MECH

    ANIC

    ALEQ

    UIP.

    CONC

    .DI

    RT

    P.A.

    P.A.

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    MOTORCYCLEPARKING ONLY

    x

    xx

    x

    CONC

    CONC

    CONC

    CONC. WALL

    STORM

    DR. BO

    X

    FLOW

    3.4'W'LY

    CURB

    NAV

    BASI

    N TO

    REM

    AIN

    EXIS

    TING

    CAT

    CH

    N WOD P MAR ' 02

    N WOD P MAR ' 02N WOD P MAR ' 02

    N WOD P MAR ' 02

    N WOD P MAR

    RAMP

    DOW

    N

    N WOD P MAR ' 21N WOD P MAR ' 02

    AREA

    DROPOFF

    STOP

    STOP

    STOP

    POTS

    STOP

    POTS

    STOP

    STOP

    UPSTAI

    R #1

    ELEV

    .EL

    EV.

    ELEV

    .

    ELEV

    .

    UP

    STAI

    R #2

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SEGE

    NERA

    L PUR

    POSE

    E.S.

    L.E.

    S.L.

    SHAR

    ED L

    AB

    D.S.

    P.S.

    GENE

    RAL P

    URPO

    SE

    GED

    LAB

    E.S.

    L. L

    AB

    HIGH

    SCH

    OOL

    BOAR

    D RO

    OM

    BOAR

    D CO

    NF. R

    OOM

    A.V.

    / TE

    LECO

    M.

    TELE

    CONF

    EREN

    CE TH

    EATE

    RWO

    MEN

    MEET

    ING

    ROOM

    MEET

    ING

    ROOM

    INFO

    .

    MULT

    IPUR

    POSE

    DINI

    NG /

    WAR

    EHOU

    SE

    CAFE

    TERI

    A / M

    ULTI

    PURP

    OSE

    CLAS

    SROO

    M

    E.S.

    L.E.

    S.L.

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SE

    MEN

    PRIN

    T SE

    RV.

    RECE

    PTIO

    N

    DIRE

    CTOR

    BREA

    K AR

    EA

    SURP

    LUS

    WAR

    EHOU

    SEMA

    NAGE

    R

    OUTG

    OING

    RECE

    IVIN

    G

    MAI

    N PR

    INT

    /RE

    PROG

    RAPH

    ICS

    E.S.

    L.

    UNIO

    N OF

    FICE

    OFFIC

    E

    STOR

    AGE

    DEPT

    .GR

    APHI

    C

    DARK

    ROO

    M

    PRE-

    PRES

    S

    MAIL

    ROOM

    COPY

    EQUI

    PMEN

    TCO

    NFER

    ENCE

    ROO

    M

    HEAL

    TH/M

    EDIC

    AL/

    TELE

    COM.

    WOME

    N

    MEN

    GENE

    RAL P

    URPO

    SE

    CLAS

    SROO

    M

    INST

    RUCT

    OR

    TECH

    .

    TELE

    PHON

    ESPU

    BLIC

    UNIO

    N

    STOR

    AGE

    MENS

    LOCK

    ER

    TECH

    . 2

    DELIV

    ERY

    BAKE

    RYST

    ORAG

    E

    VEND

    ING

    ROOM

    WOME

    NSLO

    CKER

    ROOM

    MULT

    I-PUR

    POSE

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SEGE

    NERA

    L PUR

    POSE

    GENE

    RAL P

    URPO

    SE

    MEN

    WOME

    N

    ELEC

    .

    JAN.

    KITC

    HEN

    ELEC

    .

    ELEC

    .

    STOR

    .OF

    FICE

    UNIO

    N

    MEET

    ING

    ROOM

    FOY

    ER

    STOR

    AGE

    OFFIC

    E EC

    ONOM

    ICDI

    RECT

    OR

    STOR

    AGE

    COOR

    D.ES

    L

    WOR

    K AR

    EA

    TECH

    . 1

    REF.

    LIB

    RARY

    RECE

    PT.

    ASSI

    ST.

    PROG

    RAM

    SPEC

    IAL

    PROJ

    ECTS

    DEVE

    LOPM

    ENT

    BUS.

    RES

    OURC

    EMT

    G. R

    M.TD

    I OFF

    ICES

    OFFIC

    E

    FITN

    ESS

    LAB

    ELEC

    .

    8" W

    ALL

    8" W

    ALL

    DIRE

    CTOR

    JAN.

    BAKE

    RY

    COOL

    ER

    COOL

    ER

    FREE

    ZER

    SERV

    ING

    COUN

    TER TO

    ILET

    TOILE

    T

    A.T.

    M.

    GENE

    RAL O

    FFIC

    ES

    CORR

    IDOR

    CORR

    IDOR

    CORR

    .

    CORR

    .

    KITC

    HEN

    ELEC

    .

    OFFIC

    ES

    8" W

    ALL

    KITC

    HEN/

    LAUD

    .

    CLAS

    SROO

    M 1

    CLAS

    SROO

    M 2

    CLAS

    SROO

    M 3

    AREA

    PREP

    .TO

    ILET

    JAN.

    JAN.

    STOR

    AGE

    FIRE

    CON

    TROL

    ROO

    M

    VEST

    .

    VEST

    .

    UP

    STAI

    R #4

    BOAR

    D DI

    AS.

    TOILE

    T

    OFFI

    CE 1

    TOILE

    T

    ELEC

    .JA

    N.

    HALL

    WAY

    RECE

    PT.

    WAI

    TING

    /

    TOILE

    T

    OFFI

    CE 2

    MULT

    IPUR

    POSE

    HALL

    WAY

    100

    090

    089

    091

    086

    079

    080

    078

    075

    074

    077

    073

    084 08

    5

    094 0

    97

    095

    096

    098

    001

    002

    109

    112

    117

    129

    133

    130

    124

    125 1

    34

    136

    156

    024

    023

    022

    020

    013

    017

    018

    015

    014

    012

    008

    003

    004

    005

    006

    007

    011

    016

    019

    026

    027

    143

    144

    135

    127

    128

    118

    110

    102

    065

    062

    126

    137

    138

    028

    029

    030

    146

    147

    148

    149

    055

    054

    057

    056

    053

    06006

    4

    063 05

    9

    072

    071

    070

    069

    067

    058

    052

    031

    032

    068

    142

    025

    099

    082

    083

    088 0

    9209

    3

    145

    051

    101

    010

    081

    087

    107

    108

    132

    041

    049

    048 03

    8

    034

    040

    042

    042

    103

    104

    021

    066

    061

    -

    009

    033

    043

    046

    035

    021

    036

    047

    045

    044

    037

    050

    CAN

    WAS

    H

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    A.T.M

    .(N

    .I.C.

    )

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.F.

    E.C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    1/6.

    022

    34

    1/6.

    0112

    34

    2/6.

    0212

    3

    3/6.

    02 3

    4/6.

    024

    5/6.

    021

    6/6.

    022

    7/6.

    024

    8/6.

    024

    9/6.

    021

    10/6

    .02

    1

    11/6

    .02

    112

    /6.0

    21

    12/6

    .02

    113

    /6.0

    21

    13/6

    .02

    114

    /6.0

    21

    14/6

    .02

    1

    1/6.

    031

    2/6.

    032

    4/6.

    032

    6/6.

    032

    5/6.

    032

    7/6.

    034

    8/6.

    032

    49/

    6.031

    23

    4

    6/6.

    042

    11/6

    .03

    23

    11/6

    .03

    2

    12/6

    .03

    4

    13/6

    .03

    4

    14/6

    .03

    12

    4

    10/6

    .03

    2

    1/6.

    041 3

    2/6.

    042

    3/6.

    042

    4/6.

    042

    4/6.

    042

    1/6.

    061

    9/6.

    061 34

    3/6.

    031

    NO

    CC

    CD

    Anaheim

    Campus

    2011 Comprehensive M

    aster Plan // H

    MC A

    rchitects7-22

    NN0

    FEET 64

    128 FEET

    EXISTING TO

    WER ZO

    NINGD

    ISTRIC

    T ADM

    INISTR

    ATIVE OFFIC

    ESC

    E ADM

    INISTR

    ATION

    SCE IN

    STRU

    CTIO

    NAL

    SCE IT

    SCE STU

    DEN

    T SERVIC

    ES / ACTIVITIES

    DISTR

    ICT SER

    VICE

    STOR

    AGE

    DISTR

    ICTW

    IDE IN

    FOR

    MATIO

    N SER

    VICE

    UN

    DEVELO

    PED / VAC

    ANT

    OTH

    ERSER

    VICE

    MEZZA

    NIN

    E

    SECON

    D FLO

    OR

    M102

    M101

    M117M

    116

    M114

    M113

    M112B

    M110

    216

    214213

    215

    212C212B

    212212A

    211

    210

    209

    207

    206

    202

    302

    402

    502

    201

    200

    200A

    206A

    M109

    M108

    M107

    189185

    M112A

    M106

    M105 176

    183

    M115

    188

    189

    168

    193

    196

    N 0 20001000

    PhysicalPlant

    TowerUpperParking

    BLD

    G B

    W R

    omne

    ya

    BLD

    G A

    Landscape Enhancements

    Upper Deck Parking Repair

    ADA Entrance Path Enhancements

    LEGEND

    The projects shown on the map, along with those listed on the following page, include current major projects NOCE has been planning and implementing. Some projects are actively in design or construction, while others are in the queue. This new Master Plan confirms that these previously identified projects remain priorities for the College and District.

    2 3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    4

    4

    4

    4

    Anaheim

    Sho

    resW

    Ro

    mn

    eya Dr

    W M

    edical C

    enter Dr

    Coronet Ave

    Campus Boundary

    IN-CONSTRUCTION PROJECTS

    1. Network RefreshCampus-wide and District-wide infrastructure upgrades, including broader and faster WiFi and addressing wired, wireless, voice, and online learning technologies.

    IN-PLANNING PROJECTS

    2. Upper Deck Parking RepairsMaintenance of the parking deck including waterproofing and resurfacing.

    3. Landscape EnhancementsLandscape replacement and enhancements along W. Romneya Drive and at parking medians.

    4. Accessible Entrance Path EnhancementsADA improvements throughout Anaheim grounds and tower interior. Includes enhanced pathway from W. Romneya Drive to tower Level 1 entrance.

    5. Signage EnhancementsInterior and exterior signage improvements for directional and wayfinding clarity.

    Educational and Facilities Master Plan Summary 2726 North Orange County Community College District

  • NOCE FACILITIES PLANS

    Future Opportunity Sites

    NOCE FACILITIES PLANS

    Xre

    f .\

    R-1

    st-f

    lr_

    serv

    .dw

    g

    U

    U

    S

    S

    S

    S

    MECH

    ANIC

    ALEQ

    UIP.

    CONC

    .DI

    RT

    P.A.

    P.A.

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    COMP

    ACT

    MOTORCYCLEPARKING ONLY

    x

    xx

    x

    CONC

    CONC

    CONC

    CONC. WALL

    STORM

    DR. BO

    X

    FLOW

    3.4'W'LY

    CURB

    NAV

    BASI

    N TO

    REM

    AIN

    EXIS

    TING

    CAT

    CH

    N WOD P MAR ' 02

    N WOD P MAR ' 02N WOD P MAR ' 02

    N WOD P MAR ' 02

    N WOD P MAR

    RAMP

    DOW

    N

    N WOD P MAR ' 21N WOD P MAR ' 02

    AREA

    DROPOFF

    STOP

    STOP

    STOP

    POTS

    STOP

    POTS

    STOP

    STOP

    UPSTAI

    R #1

    ELEV

    .EL

    EV.

    ELEV

    .

    ELEV

    .

    UP

    STAI

    R #2

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SEGE

    NERA

    L PUR

    POSE

    E.S.

    L.E.

    S.L.

    SHAR

    ED L

    AB

    D.S.

    P.S.

    GENE

    RAL P

    URPO

    SE

    GED

    LAB

    E.S.

    L. L

    AB

    HIGH

    SCH

    OOL

    BOAR

    D RO

    OM

    BOAR

    D CO

    NF. R

    OOM

    A.V.

    / TE

    LECO

    M.

    TELE

    CONF

    EREN

    CE TH

    EATE

    RWO

    MEN

    MEET

    ING

    ROOM

    MEET

    ING

    ROOM

    INFO

    .

    MULT

    IPUR

    POSE

    DINI

    NG /

    WAR

    EHOU

    SE

    CAFE

    TERI

    A / M

    ULTI

    PURP

    OSE

    CLAS

    SROO

    M

    E.S.

    L.E.

    S.L.

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SE

    MEN

    PRIN

    T SE

    RV.

    RECE

    PTIO

    N

    DIRE

    CTOR

    BREA

    K AR

    EA

    SURP

    LUS

    WAR

    EHOU

    SEMA

    NAGE

    R

    OUTG

    OING

    RECE

    IVIN

    G

    MAI

    N PR

    INT

    /RE

    PROG

    RAPH

    ICS

    E.S.

    L.

    UNIO

    N OF

    FICE

    OFFIC

    E

    STOR

    AGE

    DEPT

    .GR

    APHI

    C

    DARK

    ROO

    M

    PRE-

    PRES

    S

    MAIL

    ROOM

    COPY

    EQUI

    PMEN

    TCO

    NFER

    ENCE

    ROO

    M

    HEAL

    TH/M

    EDIC

    AL/

    TELE

    COM.

    WOME

    N

    MEN

    GENE

    RAL P

    URPO

    SE

    CLAS

    SROO

    M

    INST

    RUCT

    OR

    TECH

    .

    TELE

    PHON

    ESPU

    BLIC

    UNIO

    N

    STOR

    AGE

    MENS

    LOCK

    ER

    TECH

    . 2

    DELIV

    ERY

    BAKE

    RYST

    ORAG

    E

    VEND

    ING

    ROOM

    WOME

    NSLO

    CKER

    ROOM

    MULT

    I-PUR

    POSE

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SE

    GENE

    RAL P

    URPO

    SEGE

    NERA

    L PUR

    POSE

    GENE

    RAL P

    URPO

    SE

    MEN

    WOME

    N

    ELEC

    .

    JAN.

    KITC

    HEN

    ELEC

    .

    ELEC

    .

    STOR

    .OF

    FICE

    UNIO

    N

    MEET

    ING

    ROOM

    FOY

    ER

    STOR

    AGE

    OFFIC

    E EC

    ONOM

    ICDI

    RECT

    OR

    STOR

    AGE

    COOR

    D.ES

    L

    WOR

    K AR

    EA

    TECH

    . 1

    REF.

    LIB

    RARY

    RECE

    PT.

    ASSI

    ST.

    PROG

    RAM

    SPEC

    IAL

    PROJ

    ECTS

    DEVE

    LOPM

    ENT

    BUS.

    RES

    OURC

    EMT

    G. R

    M.TD

    I OFF

    ICES

    OFFIC

    E

    FITN

    ESS

    LAB

    ELEC

    .

    8" W

    ALL

    8" W

    ALL

    DIRE

    CTOR

    JAN.

    BAKE

    RY

    COOL

    ER

    COOL

    ER

    FREE

    ZER

    SERV

    ING

    COUN

    TER TO

    ILET

    TOILE

    T

    A.T.

    M.

    GENE

    RAL O

    FFIC

    ES

    CORR

    IDOR

    CORR

    IDOR

    CORR

    .

    CORR

    .

    KITC

    HEN

    ELEC

    .

    OFFIC

    ES

    8" W

    ALL

    KITC

    HEN/

    LAUD

    .

    CLAS

    SROO

    M 1

    CLAS

    SROO

    M 2

    CLAS

    SROO

    M 3

    AREA

    PREP

    .TO

    ILET

    JAN.

    JAN.

    STOR

    AGE

    FIRE

    CON

    TROL

    ROO

    M

    VEST

    .

    VEST

    .

    UP

    STAI

    R #4

    BOAR

    D DI

    AS.

    TOILE

    T

    OFFI

    CE 1

    TOILE

    T

    ELEC

    .JA

    N.

    HALL

    WAY

    RECE

    PT.

    WAI

    TING

    /

    TOILE

    T

    OFFI

    CE 2

    MULT

    IPUR

    POSE

    HALL

    WAY

    100

    090

    089

    091

    086

    079

    080

    078

    075

    074

    077

    073

    084 08

    5

    094 0

    97

    095

    096

    098

    001

    002

    109

    112

    117

    129

    133

    130

    124

    125 1

    34

    136

    156

    024

    023

    022

    020

    013

    017

    018

    015

    014

    012

    008

    003

    004

    005

    006

    007

    011

    016

    019

    026

    027

    143

    144

    135

    127

    128

    118

    110

    102

    065

    062

    126

    137

    138

    028

    029

    030

    146

    147

    148

    149

    055

    054

    057

    056

    053

    06006

    4

    063 05

    9

    072

    071

    070

    069

    067

    058

    052

    031

    032

    068

    142

    025

    099

    082

    083

    088 0

    9209

    3

    145

    051

    101

    010

    081

    087

    107

    108

    132

    041

    049

    048 03

    8

    034

    040

    042

    042

    103

    104

    021

    066

    061

    -

    009

    033

    043

    046

    035

    021

    036

    047

    045

    044

    037

    050

    CAN

    WAS

    H

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    VEND

    ING

    (N.I.

    C.)

    A.T.M

    .(N

    .I.C.

    )

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.F.

    E.C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    F.E.

    C.

    1/6.

    022

    34

    1/6.

    0112

    34

    2/6.

    0212

    3

    3/6.

    02 3

    4/6.

    024

    5/6.

    021

    6/6.

    022

    7/6.

    024

    8/6.

    024

    9/6.

    021

    10/6

    .02

    1

    11/6

    .02

    112

    /6.0

    21

    12/6

    .02

    113

    /6.0

    21

    13/6

    .02

    114

    /6.0

    21

    14/6

    .02

    1

    1/6.

    031

    2/6.

    032

    4/6.

    032

    6/6.

    032

    5/6.

    032

    7/6.

    034

    8/6.

    032

    49/

    6.031

    23

    4

    6/6.

    042

    11/6

    .03

    23

    11/6

    .03

    2

    12/6

    .03

    4

    13/6

    .03

    4

    14/6

    .03

    12

    4

    10/6

    .03

    2

    1/6.

    041 3

    2/6.

    042

    3/6.

    042

    4/6.

    042

    4/6.

    042

    1/6.

    061

    9/6.

    061 34

    3/6.

    031

    NO

    CC

    CD

    Anaheim

    Campus

    2011 Comprehensive M

    aster Plan // H

    MC A

    rchitects7-22

    NN0

    FEET 64

    128 FEET

    EXISTING TO

    WER ZO

    NINGD

    ISTRIC

    T ADM

    INISTR

    ATIVE OFFIC

    ESC

    E ADM

    INISTR

    ATION

    SCE IN

    STRU

    CTIO

    NAL

    SCE IT

    SCE STU

    DEN

    T SERVIC

    ES / ACTIVITIES

    DISTR

    ICT SER

    VICE

    STOR

    AGE

    DISTR

    ICTW

    IDE IN

    FOR

    MATIO

    N SER

    VICE

    UN

    DEVELO

    PED / VAC

    ANT

    OTH

    ERSER

    VICE

    MEZZA

    NIN

    E

    SECON

    D FLO

    OR

    M102

    M101

    M117M

    116

    M114

    M113

    M112B

    M110

    216

    214213

    215

    212C212B

    212212A

    211

    210

    209

    207

    206

    202

    302

    402

    502

    201

    200

    200A

    206A

    M109

    M108

    M107

    189185

    M112A

    M106

    M105 176

    183

    M115

    188

    189

    168

    193

    196

    N 0 20001000

    PhysicalPlant

    TowerUpperParking

    BLD

    G B

    W R

    omne

    ya

    BLD

    G A

    LEGENDPotential Project Sites

    Public Realm Potential Sites

    Potential Property Acquisitions

    Opportunity Sites

    New Entrance

    Long-Range Projects

    N5

    N5

    N5

    N2

    N2

    N2

    N3

    N6

    N4

    N1

    N5

    Anaheim

    Sho

    resW

    Ro

    mn

    eya Dr

    W M

    edical C

    enter Dr

    Coronet Ave

    Campus Boundary

    The next era of campus facilities planning takes into consideration the reality of unforeseen challenges to implementation. Each project within the master plan framework has been established based on educational and facility needs, construction staging and sequencing considerations, and potential for funding opportunities while preserving the flexibility to accommodate future unforeseen implementation opportunities and challenges as they arise. The projects shown in orange in planning exhibits represent new building and existing building renovation opportunities. The areas shown in green represent new public realm opportunities. While the Master Plan does not identify specific priorities or establish a timeline, the new opportunities have been organized by construction cost to assist the District in determining the implementation schedule:

    • Small Capital Projects are those less than $2 million

    • Medium Capital Projects are those ranging between $2 – 30 million

    • Large Capital Projects are those greater than $30 million

    Long-Range Projects, a fourth category, identifies aspirational projects which are important to the Master Plan but may not be feasible to implement by 2030; they are not defined by cost as that is a variable of time.

    N5. Upper Parking Deck & Entrance RenovationsParking deck demolition and reconstruction to make building weatherproof and structurally sound. The maintenance repairs and enhancements include garden spaces, enclosed spaces, and furniture. Renovate south patio with new covered canopy and furniture with power; provide new food service options at Culinary Arts corner with connection to outdoor seating. Renovate interior at entrances to include new L1 / L2 connecting stair, new interior materials, and furniture with power.• Campus Heart Amphitheater

    N6. New Mixed-Use BuildingDemolish two existing temporary buildings and develop new mixed-use building and CAEP offices, including new exterior children’s play area.• Front Garden• Faculty and Adjunct Faculty Offices

    SMALL CAP: < $2 M MEDIUM CAP: $2 M - $30 M

    LARGE CAP: > $30 M

    LONG-RANGE PROJECTS

    Pilot Projects: Campus-Wide Enhancements• Signage Enhancements

    • Tutoring Space

    • Faculty Offices and Adjunct Faculty Shared Offices

    • Content Creation Center

    • Hallway Enhancements

    • Social Justice Conference Room and Student Cultural Spaces

    • Bike Lockers Enhancement

    • Safety or Health Barrier at Open Counters

    • Charging stations throughout the building

    • Student Study Space

    • Outdoor Leisure Seating

    N1. West Parking Pedestrian ConnectionPathway enhancements to better connect west parking lot and existing entry off W. Romneya Drive to include safety, lighting, and accessibility measures.

    N2. Separate Vehicle & Pedestrian Zone RedesignMove main vehicular entrance to two separated entrances, east for staff and west for students.• Children’s Playground Converted to Surface Parking• ADA Upgrades• Lighting & Safety Upgrades

    F3. Integrated ParkingParking enhancements to integrate safety, accessibility, and sustainability measures.

    N4. New Drop-off AreasConsolidated vehicle and bus drop-off area including new covered waiting area and bike storage.• ADA Upgrades• Lighting & Safety Upgrades

    Educational and Facilities Master Plan Summary 2928 North Orange County Community College District

  • Cypress Continuing Education Center Located at Cypress College

    Wilshire Continuing Education Center Located at Fullerton College

    NOCE FACILITIES PLANS NOCE FACILITIES PLANS

    NOCE

    Cypress Continuing Education Center Located at Cypress College

    Wilshire Continuing Education Center Located at Fullerton College

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    50

    50

    50

    50

    50

    5005

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    5555

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    55

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    ASPH

    5956.74

    5858.12

    5655.73

    5550.78

    5349.68

    5157.84

    PIPE

    BEN

    CH

    BENCHBE

    NCH

    HC

    NEBH

    CNEB

    HC

    NEB

    POOL

    POOL

    STAIRS

    STAIRS

    STAIRS

    STAIRS

    STAIRS

    LO

    OP

    DIRT PILES

    POOL

    CATWALK

    CATWALK

    STAIR

    RIATS

    STAIR

    STAIR

    STAIR

    FLAG

    FLAG

    FLAG

    PP

    PP

    PP PP PP

    PP

    PP

    PP

    PP

    PP

    PP

    PP

    PPPP

    PP

    PP

    PP

    PP

    PPPP

    PP

    PP

    PP

    PP

    PPPP

    PPPP

    PPPP

    PP

    PPPP

    PP

    PPPP

    PP

    PP

    PPPPPP

    PPPP

    DIRT PILE

    DIRT PILE

    DIRT PILE

    DIRT PILE

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    CONC

    DI

    HUMANITIES

    SCIENCEENGINEERINGMATH

    LECTUREHALL

    FINE ARTS

    THEATERARTS

    CYPRESSCOLLEGECOMPLEX

    STUDENTCENTER

    BOOKSTORE

    TECHNICALEDUATION

    BUSINESS

    TECHNICALEDUCATION 2

    TECHNICALEDUCATION3

    GYM 1

    GYM 2

    LIBRARY/LEARNINGRESOURCE

    NOCE

    LOT 4

    LOT 5 SOUTH

    LOT 5 NORTH

    LOT 1

    LOT 2

    LOT 3

    LOT 7 EXPANSION

    LOT 8

    LOT 9

    LOT 6 WEST

    LOT 6 EAST

    BASEBALL FIELD

    SOFTBALL FIELD

    PRACTICE FIELD

    TENNIS


Recommended