AEC PLATFORM 05 OCTOBER 2012 | © KIERANTIMBERLAKE
NEW WORK PLAN PARADIGM
TYPI
CAL
WO
RKP
LAN
EEB
HUB
CO
LLAB
OR
ATIV
E W
OR
KPLA
N
AEC PLATFORM 05 OCTOBER 2012 | © KIERANTIMBERLAKE
Legend
IDG Not Applicable
Project Team
Building Steering Committee
Work Planning Meeting
Cost Meeting
Additional Meetings
TRADITIONAL PROGRAMMING/SCHEMATIC DESIGN PHASE, MEETING/WORKSHOPS
AEC PLATFORM 05 OCTOBER 2012 | © KIERANTIMBERLAKE
TYPICAL CONCEPTUALIZATION/CRITERIA DESIGN, MONTHLY WORK PLAN
AEC PLATFORM 05 OCTOBER 2012 | © KIERANTIMBERLAKE
Legend
Integrated Design Group (IDG)
Integrated Project Team (IPT)
Building Steering Committee (BSC)
Work Planning Meeting
Cost Meeting
Additional Meetings
Red Report
Navy Yard DRAC Navy Yard Planning Mtg
Expert Report Sustainability Mtg
Pull Planning Session Values/Decision Session
BIM Execution IDMEP Kick-off
Showcase Workshop
PSU Design Review
PSU Design Review
PSU Design Review
PSU Design Review
DRAC Presentation
PSU VP
PSU Design Review
CONCEPTUALIZATION/CRITERIA DESIGN, MEETINGS/WORKSHOPS
AEC PLATFORM 05 OCTOBER 2012 | © KIERANTIMBERLAKE
GROSS AREA 25,250 SF PROGRAM NET AREA 15,750 SF NET/GROSS RATIO 62.4% AREA DESIGNATED FOR SHELL: 4,500 SF
GROSS AREA 35,293 SF PROGRAM NET AREA 21,200 SF
Building 7R Building 661
PROGRAM
AEC PLATFORM 05 OCTOBER 2012 | © KIERANTIMBERLAKE
Building 661: Concepts
EXISTING STRUCTURE VISITOR CIRCULATION PROGRAM DISTRIBUTION
ORGANIZATIONAL CONCEPTS
AEC PLATFORM 05 OCTOBER 2012 | © KIERANTIMBERLAKE
FLOOR PLANS, BUILDING 661
FIRST FLOOR PLAN SECOND FLOOR PLAN
Building 661: Plans
AEC PLATFORM 05 OCTOBER 2012 | © KIERANTIMBERLAKE
Area System Summary
MECHANICAL SYSTEMS DESIGN
Perimeter Fin Tube
AREA 1 SYSTEM AREA 2 SYSTEM AREA 3 SYSTEM
AEC PLATFORM 05 OCTOBER 2012 | © KIERANTIMBERLAKE
Area Locations
MECHANICAL SYSTEMS DESIGN
FIRST FLOOR PLAN
AEC PLATFORM 05 OCTOBER 2012 | © KIERANTIMBERLAKE
MECHANICAL SYSTEMS DESIGN
SECOND FLOOR PLAN
Area Locations