EE/CS 480/481 1 03/27/22 11:24 AM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System Team Arturo Bimrose Troy Heynderickx Jon Sakkos Advisor Dr. Wayne Lu, Dr. Ken Lulay Industry Representative Mr. Jonathan Fant
Transcript
Page 1: EE/CS 480/481 19/17/2015 10:28:58 PM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System Team.

EE/CS 480/481

104/19/23 04:15 PM University of Portland School of Engineering

Project BurnsideProgrammable Logic Solar Radiant

Heating System

TeamArturo Bimrose

Troy Heynderickx

Jon Sakkos

AdvisorDr. Wayne Lu, Dr. Ken Lulay

Industry RepresentativeMr. Jonathan Fant

Page 2: EE/CS 480/481 19/17/2015 10:28:58 PM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System Team.

EE/CS 480/481

2University of Portland School of Engineering

Overview

• Introduction

• Scorecard

• Additional Accomplishments

• Plans

• Issues/Concerns

• Conclusions

04/19/23 04:15 PM

Page 3: EE/CS 480/481 19/17/2015 10:28:58 PM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System Team.

EE/CS 480/481

3University of Portland School of Engineering

Introduction

04/19/23 04:15 PM

Programmable

Logic Solar

Radiant Heating

System

Page 4: EE/CS 480/481 19/17/2015 10:28:58 PM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System Team.

EE/CS 480/481

4University of Portland School of Engineering

Scorecard• Previously:

– Received LCD, controller, sensors

– Got programmer

– Got many misc. components

• Completed:– TOps finished

• “Your team has chosen a great project and you are doing a first-rate job with the design and engineering.”

– LCD programming

– Defined ME construction space

• Shortcomings:– No serial bus testing, no pump/valve routines tested.

– No keypad, transformer, solid state relays/transistors and diodes (mosfet)

– U of P did not provide us with facilities to construct mechanical portion

04/19/23 04:15 PM

Page 5: EE/CS 480/481 19/17/2015 10:28:58 PM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System Team.

EE/CS 480/481

5University of Portland School of Engineering

Additional Accomplishments• ME construction started

• Gathered important materials for ME construction

• Two possible pumps

• Resolved budget issues

04/19/23 04:15 PM

Page 6: EE/CS 480/481 19/17/2015 10:28:58 PM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System Team.

EE/CS 480/481

6University of Portland School of Engineering

Plans

• Construct major mechanical components

• Construct microcontroller portion to work with keypad, LCD, and pumps

• Integration

04/19/23 04:15 PM

Page 7: EE/CS 480/481 19/17/2015 10:28:58 PM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System Team.

EE/CS 480/481

7University of Portland School of Engineering

MilestonesNumber Description Original

09 Oct 08Previous28 Jan 09

Present24 Feb 09

4 Define Controller Routines 17 Nov 08 25 Nov 08 25 Nov 08

5 Circuit Design 17 Nov 08 17 Nov 08 17 Nov 08

6 Theory of Operations Draft 24 Nov 08 25 Nov 08 25 Nov 08

7 Order Electronics 29 Nov 08 29 Nov 08 29 Nov 08

8 ToOps version 1.0 30 Jan 09 30 Jan 09 7 Feb 09

9Start Constructing Mechanical System

01 Feb 09 01 Feb 09 01 Feb 09

10 Receive Electronics 16 Feb 09 16 Feb 09 21 Feb 09

11 Construct Controller 23 Feb 09 23 Feb 09 23 Feb 09

12 System Integration 15 Mar 09 15 Mar 09 15 Mar 09

04/19/23 04:15 PM

Page 8: EE/CS 480/481 19/17/2015 10:28:58 PM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System Team.

EE/CS 480/481

8University of Portland School of Engineering

Concerns/Issues

• “Tweakers” stealing copper from project

• Serial bus issues

04/19/23 04:15 PM

Page 9: EE/CS 480/481 19/17/2015 10:28:58 PM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System Team.

EE/CS 480/481

9University of Portland School of Engineering

Conclusions

• Assured by industry representative

• Pump obscurity now clear

• Project completely compartmentalized– Everyone is getting components done

04/19/23 04:15 PM