EE/CS 480/481
104/19/23 04:15 PM University of Portland School of Engineering
Project BurnsideProgrammable Logic Solar Radiant
Heating System
TeamArturo Bimrose
Troy Heynderickx
Jon Sakkos
AdvisorDr. Wayne Lu, Dr. Ken Lulay
Industry RepresentativeMr. Jonathan Fant
EE/CS 480/481
2University of Portland School of Engineering
Overview
• Introduction
• Scorecard
• Additional Accomplishments
• Plans
• Issues/Concerns
• Conclusions
04/19/23 04:15 PM
EE/CS 480/481
3University of Portland School of Engineering
Introduction
04/19/23 04:15 PM
Programmable
Logic Solar
Radiant Heating
System
EE/CS 480/481
4University of Portland School of Engineering
Scorecard• Previously:
– Received LCD, controller, sensors
– Got programmer
– Got many misc. components
• Completed:– TOps finished
• “Your team has chosen a great project and you are doing a first-rate job with the design and engineering.”
– LCD programming
– Defined ME construction space
• Shortcomings:– No serial bus testing, no pump/valve routines tested.
– No keypad, transformer, solid state relays/transistors and diodes (mosfet)
– U of P did not provide us with facilities to construct mechanical portion
04/19/23 04:15 PM
EE/CS 480/481
5University of Portland School of Engineering
Additional Accomplishments• ME construction started
• Gathered important materials for ME construction
• Two possible pumps
• Resolved budget issues
04/19/23 04:15 PM
EE/CS 480/481
6University of Portland School of Engineering
Plans
• Construct major mechanical components
• Construct microcontroller portion to work with keypad, LCD, and pumps
• Integration
04/19/23 04:15 PM
EE/CS 480/481
7University of Portland School of Engineering
MilestonesNumber Description Original
09 Oct 08Previous28 Jan 09
Present24 Feb 09
4 Define Controller Routines 17 Nov 08 25 Nov 08 25 Nov 08
5 Circuit Design 17 Nov 08 17 Nov 08 17 Nov 08
6 Theory of Operations Draft 24 Nov 08 25 Nov 08 25 Nov 08
7 Order Electronics 29 Nov 08 29 Nov 08 29 Nov 08
8 ToOps version 1.0 30 Jan 09 30 Jan 09 7 Feb 09
9Start Constructing Mechanical System
01 Feb 09 01 Feb 09 01 Feb 09
10 Receive Electronics 16 Feb 09 16 Feb 09 21 Feb 09
11 Construct Controller 23 Feb 09 23 Feb 09 23 Feb 09
12 System Integration 15 Mar 09 15 Mar 09 15 Mar 09
04/19/23 04:15 PM
EE/CS 480/481
8University of Portland School of Engineering
Concerns/Issues
• “Tweakers” stealing copper from project
• Serial bus issues
04/19/23 04:15 PM
EE/CS 480/481
9University of Portland School of Engineering
Conclusions
• Assured by industry representative
• Pump obscurity now clear
• Project completely compartmentalized– Everyone is getting components done