1
Presentation on
Wookyoung Electrolysis System Co., Ltd.
November 2010
is committed to world leadership in Technology & Innovative products.
2. Track Record
2
1. Introduction
Content
is committed to world leadership in Technology & Innovative products.
Main Business, History, Organization, Manpower
Domestic, Overseas
1. Introduction
3is committed to world leadership in Technology & Innovative products.
Insoluble Anodes, Electrolysers,Electrochlorination System
Main Field of Business
1.Product
2.ServiceRe-coating & Refurbishment of electrodesEngineering Commissioning & Start-upSupervisingTraining, etc.
4
1. Introduction
is committed to world leadership in Technology & Innovative products.
1993Founded
1997Incorpo-
rated
1998POSCO
1999Patent
* High efficiency
* Extended life of insoluble anodes
2000Utility models
* Electrolyzer
* Transparent Electrolyzer
* Components etc.
2001Register
-ed
Qualified Supplier
By Korea Electric Power Co. (KEPCO)
and their subsidiaries
2002R & D Center
History in Brief
5
1. Introduction
is committed to world leadership in Technology & Innovative products.
Certificate of Registration in a qualified supplier
6
History in Brief
1. Introduction
is committed to world leadership in Technology & Innovative products.
2003Certificate
Promising Export Firm
2005Export
ITM O&M Co.– U.A.E
2004Acquired
ISO 9001 : 2000
2003Export
ACG s.r.l– Italy
2006M.O.U
Babcock, - GermanyUEME – U.A.E
2009Turn-KeyProject
Hyundai Green Power Plant– KoreaKEPCO Lebanon– Lebanon2010
BranchOffice PT. Wookyoung
internationalin Indonesia
2010Ongoing
PLTU Muara KarangPlant in Indonesia
→ Manufacturing, Engineering, installation, Supervising etc.
2008Export
CMS Power Co.– U.A.E
7
1. Introduction
is committed to world leadership in Technology & Innovative products.
8
CEO & President
R & D Center
Laboratory
Investment
Co-Operative R&D
H.O & Factory # 1
Planning
QA/QC
Administration
Procurement
# 1 Production
# 2 Production
Sales & Marketing
Licensing
Plant & Electrodes
Factory #2, 3
Production
Procurement
Administration
QA/QC
8
1. Introduction
is committed to world leadership in Technology & Innovative products.
OrganizationAudit Quality Control Committee
9
1. Introduction
is committed to world leadership in Technology & Innovative products.
Manpower
Division NumberSales 3
Customer Service 2Engineering 5
R & D 5Production 16Purchasing 2QA / QC 3
Other 2TOTAL 38
10
1. Introduction
is committed to world leadership in Technology & Innovative products.
ManpowerDivision Name
General manager Sang-soo, KIM
Sales manager Grace, PARK
Customer Service manager Haejin, KIM
Engineering manager Tae-heum, HONG
Production manager Tae-hyo, KIM
Purchasing manager In-hwa, LEE
QA / QC manager Hyun-chul, Byun
EHS manager Sang-soo, HAN
R & D manager Sung-soo, KIM
11
1. Introduction
is committed to world leadership in Technology & Innovative products.
Facility
Engineering, Fabrication & Coating
55 % of Manpower
Sales & Marketing,Production
30 % of Fabrication Load
15 %
Fabrication & Coating
Production
25 %
30 %
Fabrication & Coating
Production
45 %
Size : 1,655 m2 Size : 3,738 m2 Size : 990 m2
Factory # 3In Gyungju
H.O & Factory # 1In Changwon
Factory # 2In Haman
⊙ no.3 factory
⊙ Seoul office
⊙ H.O & no.1 factory
⊙no.2
factory
Kwangyang office ⊙
12
1. Introduction
is committed to world leadership in Technology & Innovative products.
Over view
H.O & Factory # 1 in Changwon
13
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop
R & D Shop
Welding Shop
Storage Shop
Over view
14
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop
R & D Shop
Welding Shop
Storage Shop
Over view
Over view
15
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop
R & D Shop
Welding Shop
Storage Shop
Over view
16
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop
R & D Shop
Welding Shop
Storage Shop
Over view
17
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop
R & D Shop
Welding Shop
Storage Shop
Heating Furnaces
for heat treatment of electrode
18
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop
R & D Shop
Welding Shop
Storage Shop
19
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop
R & D Shop
Welding Shop
Storage Shop
Over view
20
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop
R & D Shop
Welding Shop
Storage Shop
Over view
21
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop
R & D Shop
Welding Shop
Storage Shop
Over view
22
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop- facility
R & D Shop
Welding Shop
Storage Shop
Machining for housing of an electrolyzer
Machining for Components of an electrolyzer
23
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop
R & D Shop
Welding Shop
Storage Shop
Over view
Titanium raw material, sheet
etc.
24
1. Introduction
is committed to world leadership in Technology & Innovative products.
H.O & Factory # 1 in Changwon
Coating Shop
Fabrication Shop
R & D Shop
Welding Shop
Storage Shop
Over view
25
1. Introduction
is committed to world leadership in Technology & Innovative products.
Factory # 2 in Haman
Over view Testing Benches
26
1. Introduction
is committed to world leadership in Technology & Innovative products.
Factory # 2 in Haman
Auto Sand / Blast Machine
for surface treatment of electrodes
27
1. Introduction
is committed to world leadership in Technology & Innovative products.
Factory # 2 in Haman
Heating Furnaces for electrodes Machining
28
1. Introduction
is committed to world leadership in Technology & Innovative products.
Factory # 2 in Haman
Chemical site
29
1. Introduction
is committed to world leadership in Technology & Innovative products.
Factory # 3 in Gyungju
Over View
30
1. Introduction
is committed to world leadership in Technology & Innovative products.
Factory # 3 in Gyungju
Over View
31
1. Introduction
is committed to world leadership in Technology & Innovative products.
Factory # 3 in Gyungju
Electric Furnace (Continuous Type)
for Electrodes
Electric Furnace (Box Type)
for Electrodes
1. Introduction
Certificate of R & D Center
is committed to world leadership in Technology & Innovative products.
32
1. Introduction
R & D Center in Changwon
Laboratory “A”
is committed to world leadership in Technology & Innovative products.
33
Instruments for Coating Thickness Measurement and Materials Testing
X-Ray Spectrometer for Quantitative Analysis
1. Introduction
R & D Center in Changwon
Laboratory “A”
34
Digital Rotary Evaporatortor for Platinoid Sol. Fume scrubber
1. Introduction
R & D Center in Changwon
Laboratory “A”
is committed to world leadership in Technology & Innovative products.
35
IncubatorElectrode samples for Test
1. Introduction
R & D Center in Changwon
Laboratory “B”
is committed to world leadership in Technology & Innovative products.
36Over view
1. Introduction
R & D Center in Changwon
Laboratory “B”
is committed to world leadership in Technology & Innovative products.
37
Over view
38
1. Introduction
is committed to world leadership in Technology & Innovative products.
Certificate (ISO 9001 : 2008, 14001 : 2004)
39
1. Introduction
is committed to world leadership in Technology & Innovative products.
Certificate (NEP : New Excellent Product)
40
1. Introduction
Certificate of Registration in Construction
is committed to world leadership in Technology & Innovative products.
2. Track Record
41
1. Introduction
Content
is committed to world leadership in Technology & Innovative products.
Main Business, History, Organization, Manpower
Domestic, Overseas
42
2. Track Records (Domestic)
is committed to world leadership in Technology & Innovative products.
CLASS. YEAR PROJECT END USER /PURCHASER
LOCATION /COUNTRY Q'ty CAPA'
(Kg Cl2/hr)Contract Delivery Design manuf
actureinstalla
tioncommissioning
Guarantee
DAELIM2009 Hyundai Green
Power PlantDaelim
Industrial Company
Dangjin,Choongnam
Province2 units 60 - Sep. O O O O 5 years
2008 TAEANThermal Pow er
Plant
WP (Korea WesternPower Co., Ltd)
Taean,Choongnam
Province7 cell 35 03.24 04.23 O O 5 years
SEOULThermal Pow er
Plant
KOMIPO (Korea MidlandPower Co., Ltd.) Seoul city 14 cell 70 04.03
w ithin 50days O O O O 5 years
SAMCHEONPOThermal Pow er
Plant
KOSEP(Korea SouthEast Power Co,.Ltd.)
Gosung,GyungnamProvince
144 cell 108 01.13w ithin 50
days O O O 5 years
2009 WOOLSANCombined Cycle
& Thermal
KOEWP (Korea East &West Power Co., Ltd.)
WoolsanMetropolitan
City3 cell 30 04.30 07.09 O O O O 5 years
SEOCHONThermal Pow er
Plant
KOMIPO (Korea MidlandPower Co., Ltd.)
Seochon,Choongnam
Province6 cell 60 09.30
w ithin 60days O O O O 5 years
2010 HADONGThermal Pow er
Plant
KOSPO (Korea SouthernPower Co., Ltd)
Hadong,GyungnamProvince
12 cell 60 05.03w ithin 40
days O O O O 5 years
DANGJINThermal Pow er
Plant
KOEWP (Korea East &West Power Co., Ltd.)
Dangjin,Choongnam
Province6 cell 30 05.12 06.16 O O O O 5 years
2009 WOOLJINNuclear Pow er
Plant
Korea Hydro-NuclearPower Co., Ltd.
Wooljin,GyungbukProvince
56 cell 280 03.05 04.10 O O 5 years
2010 KORINuclear Pow er
Plant
Korea Hydro-NuclearPower Co., Ltd.
Busan,metropolitan
city2 cell 10 05.11 06.10 O O 5 years
POSCO GwangyangSteam Pow er
Plant # 1POSCO
Gw angyang,GeonnamProvince
1 unit 36 - Feb. O O O 5 years
POHANGLNG Pow er
PlantPOSCO
Pohang,GyungbukProvince
2 units 15 - Mar. O O O 5 years
POHANGSteam Pow er
Plant #2,3POSCO
Pohang,GyungbukProvince
2 units 45 - May O O O 5 years
2008
KoreaHydro-
NuclearPower
Co.
KoreaElectricPower
Co.
Domestic
DAELIM Industrial Co.Korea Electric Power Co.Korea Gas CorporationPOSCO
43
2-1 Main Customer (Domestic)
•Type : Mono-Polar Plate Type,Hyundai Green Power Plant Capacity : 30 Kg Cl2/hr/unit x 2 Units, September. 2009
is committed to world leadership in Technology & Innovative products.
Design Manufacture Installation Commissioning
O O O O
2. Track Records
Domestic
DAELIM Industrial Co.Korea Electric Power Co.Korea Gas CorporationPOSCO
44
2-1 Main Customer (Domestic)
•Type : Mono-Polar Plate Type,Hyundai Green Power Plant Capacity : 30 Kg Cl2/hr/unit x 2 Units, September. 2009
is committed to world leadership in Technology & Innovative products.
Design Manufacture Installation Commissioning
O O O O
2. Track Records
Domestic
DAELIM Industrial Co.
Korea Electric Power Co.Korea Gas CorporationPOSCO
45
2-1 Main Customer (Domestic)
•Type : Mono-Polar Plate Type, HADONG Thermal Power PlantCapacity : 60 Kg Cl2/hr/unit x 2 Units, January. 2010
is committed to world leadership in Technology & Innovative products.
Design Manufacture Installation Commissioning
O
2. Track Records
Domestic
DAELIM Industrial Co.
Korea Electric Power Co.Korea Gas CorporationPOSCO
46
2-1 Main Customer (Domestic)
•Type : Tubular type, Samcheonpo Thermal Power PlantCapacity :108 Kg Cl2/hr/unit x 1 Unit, April. 2008
is committed to world leadership in Technology & Innovative products.
Design Manufacture Installation Commissioning
O O O
2. Track Records
Domestic
DAELIM Industrial Co.Korea Electric Power Co.
Korea Gas CorporationPOSCO
47
2-1 Main Customer (Domestic)
•Type : Mono-Polar Plate Type,INCHEON Producing CenterCapacity : 40 Kg Cl2/hr/unit x 1 Unit, September. 2009
is committed to world leadership in Technology & Innovative products.
Design Manufacture Installation Commissioning
O
2. Track Records
Domestic
DAELIM Industrial Co.Korea Electric Power Co.Korea Gas Corporation
POSCO
48
2-1 Main Customer (Domestic)
•Type : MHI Electrolytic Cell (L-type)POSCO Steam Power Plant #1Capacity : 36 Kg Cl2/hr/unit x 1 Unit, February. 2008
is committed to world leadership in Technology & Innovative products.
3. Experience
Design Manufacture Installation Commissioning
O O O
Domestic
DAELIM Industrial Co.Korea Power Generation Co.Korea Gas Corporation
POSCO
49
2-1 Main Customer (Domestic)
•Type : Bi-Polar typePOSCO LNG Power PlantCapacity : 15 Kg Cl2/hr/unit x 2 Units, March. 2008
is committed to world leadership in Technology & Innovative products.
Design Manufacture Installation Commissioning
O O O
2. Track Records
Domestic
DAELIM Industrial Co.Korea Power Generation Co.Korea Gas Corporation
POSCO
50
2-1 Main Customer (Domestic)
•Type : (MHI) Bi-Polar typePOSCO LNG Power PlantCapacity : 45 Kg Cl2/hr/unit x 2 Units, March. 2008
is committed to world leadership in Technology & Innovative products.
2. Track Records
Design Manufacture Installation Commissioning
O O O
Domestic
DAELIM Industrial Co.Korea Power Generation Co.Korea Gas Corporation
POSCO
51
2-1 Main Customer (Domestic)
•Type : (MHI) Bi-Polar typePOSCO LNG Power PlantCapacity : 45 Kg Cl2/hr/unit x 2 Units, March. 2008
is committed to world leadership in Technology & Innovative products.
2. Track Records
Design Manufacture Installation Commissioning
O O O
52is committed to world leadership in Technology & Innovative products.
2. Track Records (Overseas)
YEAR PROJECT END USER /PURCHASER
LOCATION /COUNTRY DESCRIPTION Q'ty CAPA'
(Kg Cl2/hr)Contract Delivery Design manuf
actureinstalla
tioncommissioning
Guarantee
Umm Al NarWater & Power
Plant
ITM O&MCompany
Abu Dhabi,UAE
Housing Cell, Transparent Housignfor Electrolyser BP-Ⅳ 12 sets 50.4 06.12 08.30 O 5 years
ditto ditto dittoElectrode Assembly (w ithout
housing) 12 sets 50.4 06.19 08.30 O 5 years
Umm Al NarWater & Power
Plant
ITM O&MCompany
Abu Dhabi,UAE
Electrode Assembly (w ithouthousing) 6 sets 25.2 04.21 07.10 O 5 years
ditto ditto dittoElectrode Assembly (w ithout
housing) 6 sets 25.2 12.28 03.20 O 5 years
HypochloriantionPlant
Azienda chimicaGenovese s.r.l
Genova,Italy Electrolyzer skid 1 set 10 03.27 06.01 O 5 years
Deir AmarPower Plant
KELECO / KEPCOLebanon S.A.R.L Lebanon Electrochlorination System 1 unit 40 03.31 08.05 O O O O 5 years
Al Taweelah A2Power &
Desalination Plant
Emirates CMSPower Co.
Abu Dhabi,UAE
Electrolytic cells w ith non -Transparent Housing 8 sets 33.6 08.11 08.25 O 5 years
HypochloriantionPlant
PREMABERGOITALIANA stl ITALY Electrolytic Cell 1 set 2 12.23 02.19 O 5 years
HypochloriantionPlant
Umm Al NarWater & Power
Plant
Abu Dhabi,UAE Spare Parts for electrolytice Cell
section1 - 06.07 08.01 O 5 years
ditto ditto ditto Spare Parts for electrolytice Cellsection
2 - 06.07 12.10 O 5 years
2008
2009
2010
Overseas
53
KELECO (Lebanon)ITM O&M Co. (U.A.E)ACG s.r.l. (Italy)Premabergo (Italy)PLTU MuaraKarang (Indonesia)
2-2 Main Customer (Overseas)
•Type : Tubular-type Deir Amar Power Plant (Lebanon)Capacity : 40 Kg Cl2/hr/unit x 1 Unit, July. 2009
is committed to world leadership in Technology & Innovative products.
2. Track Records
Design Manufacture Installation Commissioning
O O O
Overseas
54
KELECO (Lebanon)
ITM O&M Co. (U.A.E)ACG s.r.l. (Italy)Premabergo (Italy)PLTU MuaraKarang (Indonesia)
2-2 Main Customer (Overseas)
•Type : PEPCON Type BP-ⅣUmm Al Nar Power & Desalination “B” (U.A.E)Capacity : 5 Kg Cl2/hr/unit x 36 Sets, November. 2004
is committed to world leadership in Technology & Innovative products.
2. Track Records
Design Manufacture Installation Commissioning
O
Overseas
55
KELECO (Lebanon)ITM O&M Co. (U.A.E)
ACG s.r.l. (Italy)Premabergo (Italy)PLTU MuaraKarang (Indonesia)
2-2 Main Customer (Overseas)
Type : Bi-polar typeCapacity : 10 Kg Cl2/hr/unit x 1 Sets, May, 2009
is committed to world leadership in Technology & Innovative products.
2. Track Records
Design Manufacture Installation Commissioning
O
Overseas
56
KELECO (Lebanon)ITM O&M Co. (U.A.E)ACG s.r.l. (Italy)
Premabergo (Italy)PLTU MuaraKarang (Indonesia)
2-2 Main Customer (Overseas)
•Type : Tubular-type Capacity : 2 Kg Cl2/hr/unit x 1 Set, February. 2010
is committed to world leadership in Technology & Innovative products.
Design Manufacture Installation Commissioning
O
2. Track Records
Overseas
57
KELECO (Lebanon)ITM O&M Co. (U.A.E)ACG s.r.l. (Italy)Premabergo (Italy)
PLTU MuaraKarang (Indonesia)
2-2 Main Customer (Overseas)
•Type : Daiki type –monopolarCapacity : 65 Kg Cl2/hr/unit x 2 Units, February. 2011 (off the ground)
is committed to world leadership in Technology & Innovative products.
Design Manufacture Installation Commissioning
O O O
2. Track Records
58
Thank you !
Q & A
is committed to world leadership in Technology & Innovative products.