Effect of work study & time study on production and quality.
Southeast University
Our Project Title On:
2
Md.Tipu Sultan,Supervising Teacher,
Department of Textile Engineering.Southeast University
Prepared By: Name ID Batch
• Shehab Uddin Mazumder 2009100400008 11th
• Md. Azharul Hossain 2009100400011 11th
• Md. Tanvir Hasan 2009100400017 11th
Southeast UniversitySupervised By:
3
Objectives of project work:
To implement of work study charts to obtain maximum utilization of the resources and to optimize workplace by changing.
Southeast University
4
Role of industrial engineering department in apparel industry:
Importance of industrial engineering (IE) tools that can be used to improve upon the productivity and thus enhance the profits. Very few companies have been operating with a full fledged industrial engineering department and even those which boast of as an industrial engineering department(IED) are not allowing freedom and scope to function to its full capabilities. The role of IED is important for the garments industry for the following two
reasons:It’s highly labor –intensive industry. Effective planning is emerging as one of the key factors for the garments manufacturing industry.
Southeast University
5
Garments manufacturing diagram:
Fabric from stores
Cutting section
Sewing section
Finishing section
Finished garments to warehouse
Southeast University
6
Southeast University
7
Work Study
Method Study Work Measurement
What is work study?
Work study is mainly concerned with the examination of human work.
There are two parts of work study:
Southeast University
8
• To eliminate wastage of time and labor.• To reduce fatigue and boredom of work by avoiding
unnecessary movements.• To find a best way of doing a job.• To have more utilization of materials, machines and
workers.• To improve the design of work place layout.• To train the individual operator in its practice as per
standardized methods.
Why work study?Southeast University
9
• Set target• Manpower allocation• Calculate efficiency• Production planning and
control• Determine cost
Why Work Measurement is Important?
Southeast University
10
Method study:
The main purpose of method study is to
eliminate the unnecessary operations and to achieve the best method of performing the operation.
Southeast University
11
Time Study:
To determine the time it should take for a qualified worker to perform a specific task using a specified method by directly observing an operator.
Southeast University
12
Time Study Sheet of IE Department:Southeast University
13
Observed time X
3. Compute the basic time
Basic Time = • 4. Compute the standard minute value
SMV = Basic Time + Allowance
Standard rating
How it Works?
Observed rating
Southeast University
14
Southeast University
15
In this case, we need to follow PDCA process improvement chart which can give us a solution.
PDCA
Figure : The Shewhart Cycle is a fundamental idea for continuous process improvement.
Southeast University
16
Quality:Quality means customer satisfaction
17
Benefits of TQM: The benefits of TQM can be classified into the following two categories:1. Customer satisfaction oriented benefits.2. Economic improvements oriented benefits.
1. Customer satisfaction oriented benefits: The benefits under this category are listed below:(a) Improvement in product quality.(b) Improvement in product design.(c) Improvement in production flow.
2. Economic improvements oriented benefits: The benefits under this category are as follows: (a) Reductions in operating costs.(b) Reductions in operating losses.(c) Reductions in field service costs.(d) Reductions in liability exposure.
18
Time Study Exercise
Process Name = Side Seam
Observed Time = 35.27 SecObserved Rating = 92%Allowance = 25%
Basic Time = (35.27 X 0.92) Sec= 32.45 Sec
SMV = 32.45 + (32.45 X 0.25) Sec= 40.56 Sec
Capacity = (3600 ÷ 40.56) Pcs/ Hour= 88 Pcs/ Hour
19
Product enhancements Design innovations
Standardizing design Investing in training and the development of employees.
Investing in better plant and equipment.
Management – WorkerImproving the planning or work
Improving methods of production Effective worker selection process
Some Suggestion
20
Ways of improving productivity
– improving worker effectiveness– Providing workers with
adequate training– Improving morale– Rewarding success– Improving attendance levels– Reducing labour turnover– Effective communications– Measuring the performance.
Southeast University
21
Conclusion WITH THE APPLICATION OF WORK STUDY CHARTS IN APPAREL MANUFACTURING, THE EFFECTIVE UTILIZATION OF RESOURCES ( MAN, MATERIAL & MACHINES) CAN BE ACHIEVED.
THE COST INVOLVED IN USING THESE CHARTS ARE VERY MINIMUM AND A SOLUTION CAN BE DERIVED IN A SHORT PERIOD OF TIME.
Southeast University
22
THANKS EVERYBODY