Efficiency Improvement and GHG reduction in Thermal Power Stations Praveen Gupta Central Electricity Authority New Delhi 8 th March, 2013
Transcript
Page 1: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Efficiency Improvementand GHG reductionin Thermal Power Stations

Praveen GuptaCentral Electricity Authority

New Delhi8th March, 2013

Page 2: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Gas, 18903.05,

9.0%

Diesel, 1200, 0.6%

R.E.S 25856.14,

12.3%

Coal, 120873.38

57.3%

Hydro, 39339.40,

18.6%Nuclear, 4780, 2.3

%

Hydro

Coal

Gas

Diesel

Nuclear

R.E.S

Installed Capacity = 2,10,951.72 MW

Installed Capacity as on 31.12.2012

(Type Wise)

Page 3: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

GROWTH OF ELECTRICITY GENERATION IN INDIA (Utility Only)

2011-12 – 876888 GWh

Page 4: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

COAL BASED GENERATION AND

PLF OF PLANTS

• Generation 2011-12 -876 BU (102.5% of the target)

• Comprises Coal/lignite based 612.7BU (69.9%), Gas

= 93.4BU(10.6%)

Page 5: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Status of power generation in the country

Generation Achievement (2012-13) (MUs)

0.62%3.60%

12.99%

82.79%

Thermal

Hydro

Nuclear

Bhutan (Imp)

762BU

(As on 31.1.2013)

Target -930 BU

Page 6: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

(in MW)

Capacity addition target during 11th Plan 78,700

Capacity addition likely as per Mid Term Assessment 62,374

Capacity Commissioned during 11th Plan 54,964 MW

43384 MW coal

5156MW gas

5544MW hydro

CAPACITY ADDITION DURING 11TH PLAN (2007-2012)

Page 7: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

(in MW)

Capacity addition target during 12th Plan 88,537

Capacity already Commissioned during 12th Plan

(as on 31 Jan 2013)

Total- 10731

10,055 coal

250 gas

426 hydro

CAPACITY ADDITION DURING 12TH PLAN (2012-2017)

Page 8: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Size Steam Parameter Design

Efficiency

Year

MW ata/C/C (%)

30-50 60/ 482 ~31 1950

60-100 90/ 535 32-33 1960

110 to150 130/ 535/535 35-36 1970

200/210 130,150/535/535 36.3,37.8 1977

250 150/535/535 38.3 1995

500 170/ 538/538 38.5 1984

500 170/535/565 38.7 2010

660 247/535/565 ~39.5 2010

660/800 247/565/593 40.5 2012

Efficiency on HHV basis

Major Unit Sizes and Steam parameters

Page 9: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

53.9 55

.3 57.1

61

60

63 6

4.4

64.

7

64.

6

67.

3 69

69.

9 72.2

72.

7 74.8

74.

3

77.0

3

77.2

77.4

8

76.

873

.3278.

61

48

53

58

63

68

73

78

19

90

-91

19

91

-92

19

92

-93

19

93

-94

19

94

-95

19

95

-96

19

96

-97

19

97

-98

19

98

-99

19

99

-20

00

20

00

-01

20

00

-02

20

02

-03

20

03

-04

20

04

-05

20

05

-06

20

06

-07

20

07

-08

20

08

-09

20

09

-10

20

10

-11

20

11

-12

YEARS

PL

F (

%)

ALL INDIA PLANT LOAD FACTOR OF COAL BASED POWER PLANTS (%)

Page 10: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

PLF of Power Plants

• PLF (2011-12)of – State sector – 68.43%

– Central Sector –82.12%

– Pvt -76.19%

– IPPS –67.27%

• Reduction in PLF of coal based plants due to

– Coal shortage

– Receipt of poor coal quality

– Low schedules from beneficiaries

– Increased Hydro generation

Page 11: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

PLF% GroupwiseSno Capacity

Group(MW)

No. of

Units

Capacity

in MW

PLF% in

2011-12

1 660-800 4 2640 44.31

1 450-600 57 29105 78.38

2 300-330 20 6120 72.26

3 250 40 10000 81.75

4 210 143 30030 78.67

5 195-200 25 4990 74.98

6 100-150 90 10550 49.11

7 25-99 75 4333 55.46

8 Total 454* 97768 73.32

* No of units reviewed (Total commissioned – 490 units)

Page 12: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

All India Station Heat Rate Deviations

S.No

.

Particulars 2011-12

1. Total Stations analyzed 74

2. Capacity (MW) 74234

3. Weighted Average Design SHR

(kcal/kWh)

2335

4. Weighted Average Operating

SHR (kcal/kWh)

2603.2

5. % Operating SHR Deviation

with respect to Design SHR

11.49

Page 13: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Actual Heat Rate Deviations

S.No

.

Particulars 2011-12

1. Total Stations analyzed 74

2. No. of Stations in the range of

SHR deviation(0-5%)

20

3. No. of Stations in the range of

SHR deviation(5-10%)

17

4. No. of Stations in the range of

SHR deviation(10-20%)

21

5. No. of Stations with SHR

deviation of more than 20%

16

Page 14: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

NTPC Station Heat Rate Deviations

S.No

.

Particulars 2011-12

1. Total Stations analyzed 15

2. Capacity (MW) 27035

3. Weighted Average Design SHR

(kcal/kWh)

2287.8

4. Weighted Average Operating

SHR (kcal/kWh)

2414.7

5. % Operating SHR Deviation

with respect to Design SHR

5.55

Page 15: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Efforts towards

improvement in

Efficiency of Thermal

Power Generation

Page 16: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Adoption of Supercritical

Technology• Efficiency gain of about 2 % is possible over sub

critical units

• First Supercritical unit of 660 MW Commissioned in

Dec-2010,800 MW in July,12

• 15 Units with total capacity 10,460 MW operating

• Supercritical to constitute ~40%(~25000MW) coal

fired capacity addition in 12th Plan (2012-17)

• 100% coal fired capacity addition in 13th Plan and

beyond to be supercritical

Page 17: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Advance Ultra Supercritical Technology– Efforts underway for indigenous development of

700 deg C technology

– MoU between IGCAR, NTPC & BHEL

– Indigenous design and manufacturing of

materials proposed

Page 18: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

PAT Scheme• Perform, Achieve and Trade scheme- aim is to

improve Efficiency of the thermal plants both coal & gas based.

• Total Target Set for thermal power stations= 3.2 MTOE out of total 6.686 MTOE

• Threshold limit to be DC = 30,000 tons of oil equivalent (TOE) per annum ( all power plants above 11-12 MW will be covered in PAT scheme)

• MOP notified net heat rate reduction targets to 144 Thermal power Stations.

• Stations to achieve the targets within 3 years from date of notification i.e by 31.3.2015

• Penalty for non achievement

Page 19: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Thermal Power Plant Groups under PAT

Scheme

Thermal Power Plants

[DC :144 Nos]

Coal/Lignite [97]

Gas [40]Diesel [7]

Page 20: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Target Setting for Reduction of NHRDeviation in Net Station Heat Rate from Design Net Heat Rate

Reduction Target for Deviation in Net Station Heat Rate (%)

Up to 5 % 10 %

More than 5% and Up to 10 %

17 %

More than 10% and Up to 20%

21 %

Page 21: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Renovation & Modernization of

old thermal power stations

• CEA has prepared a National Enhanced

Efficiency Renovation and Modernization

Program for implementation during 11th and

12th Plans. This covers R&M of 4971 MW and

LE of 16532 MW during 12th Plan

Page 22: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

RENOVATION AND MODERNISATION/LE PROGRAMME

• 200 MW and above size units, barring few, performing at national average PLF

• Some 200 MW units crossed economic life of 25 years and have high specific fuel consumption.

• Such units suitable for capacity uprating and extended period of operation –R&M an economical option to supplement capacity addition programme for increased power availability.

• R&M programme primarily aimed at generation sustenance and overcoming problems due to generic defects, design deficiencies/ modifications, obsolescence of equipments / systems, inadequacies due to poor quality of coal, change in terminal parameters w.r.t. design, stringent environmental conditions and safety requirements.

• LE programme focuses on plant operation beyond original design life after carrying out specific life assessment studies of critical components.

Page 23: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

•Retirement in a systematic manner an ongoing

activity with focus on closing down

•Small and Old units

•Units of non-reheat type

•Units having very low design efficiencies

•Units having very low actual efficiency

RETIREMENT OF POWER PLANTS

Page 24: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Present Methodology for

Retirement of units

• Units deviating more from design to retire first

• Retirement is linked to commissioning of new units

• In case of Gas based , Technology changing rapidly. Faster retirement could be considered to keep abreast with technology development

Page 25: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

RETIREMENTS OF OLD UNITS

• Details of Retirements :

�11th Plan - 2398 MW has already been retired

comprising mainly of small size ( <100 MW) ,old

and non reheat units

� 12th Plan( Planned)- 4075 MW (< 100 MW coal

units, > 35 years old Gas stations)

�13th Plan (Planned) – about 4000MW

Page 26: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Establishment of Excellence Enhancement Centre for Indian Power sector

• Established under Indo German Energy Forum

• Member driven society

• Objective to provide a common platform for sharing best

practices in power sector

• Governing body chaired by Chairperson, CEA with

members from NTPC,BEE,CBIP etc

• Projects presently under finalization:

1. Compendium of best practices in coal based thermal power stations.

2. Combustion optimization for coal based plants.

3. Condenser optimization

4. Efficient use of Water in thermal power stations

Page 27: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

GHG REDUCTION IN POWER SECTOR

Page 28: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Per Capita CO2 Emissions

(t CO2/capita)

• World – 4.29

• India - 1.37

• China – 5.13

• Germany – 9.16

• France – 5.49

• USA - 16.90

(Source: IEA key world Energy Statistics 2011)

Page 29: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Main Sources of GHG Emissions

–Energy Sector - Power

–Transport Sector

–Agriculture Sector

–Industrial Sector

• Power sector is estimated to

contribute around 50% of total CO2 Emissions

Page 30: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

CO2 Emissions from Power Sector

•CEA is carrying out studies to calculate total CO2 emission from all grid connected power stations since the year 2000-01

•The database along with the user guide is available on CEA website

•www.cea.nic.in

Page 31: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Absolute CO2 Emissions from

Indian Power Sector

469.7 494.7 520.5 548.3 579.8 597.5 637.0

0.0

100.0

200.0

300.0

400.0

500.0

600.0

700.0

2005-06 2006-07 2007-08 2008-

09

2009-10 2010-11 2011-12

Year

Millio

n t

CO

2

Emissions are from Grid Connected power stations

Page 32: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Average CO2 Emissions per unit (Based on Net Generation)

Grid Average kg CO2/kWh

2010-11 2011-12

NEWNE 0.80 0.78

Southern 0.75 0.76

India 0.79 0.78

NEWNE – Northern, Eastern, Western and North Eastern Grid

Page 33: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

Average Emissions in Kg CO2/kwh(net) from coal based power plants

NTPC Stations – 0.97 kg CO2/Kwh (from coal plants) in 2011-12

1.081.07

1.061.05

0.8

0.9

1

1.1

1.2

2008-09 2009-10 2010-11 2011-12

kg

CO

2/k

wh

Page 34: Efficiency Improvement and GHG reduction in Thermal · PDF fileGHG reduction in Thermal Power Stations ... Efficiency Renovation and Modernization Program for implementation during

THANKS