Office of Design Page 1 of 2 2016 002 January 1, 2016 R EFUSE C HUTES / C OMPACTOR S TACKS This Standard Notice addresses the Procedure and Criteria to be considered regarding the rehabilitation the Refuse Chutes/Incinerator Stacks. INTRODUCTION The following Code references apply to Refuse Chutes/Incinerator Stacks: 2014 NYC Building Code Chapters 14, 16, 17, and 21 2014 NYCBC RCNY §16-01 (Inspection of Existing Structures During Construction Operations) 2014 NYCBC RCNY §24-01 (Refuse Chutes & Refuse Rooms) Section (c), …’any existing refuse chute that is built of 8” minimum thick brick masonry and extends from the compactor room to at least 6’-0” above the roof may continue to be used as such…’. 2014 NYC Mechanical Code, Chapter 8 §801 In the early 1980s when New York City banned the use of incinerators for the burning of waste the New York City Housing Authority started converting all existing incinerator flues in its developments to refuse chutes (aka compactor stacks). These compactor stacks typically extend from the basement to approximately 10 feet or more above the main roof surface. The walls of the compactor stacks are typically made of 8 inch fire brick masonry. A spark arrestor is installed at the top of the stack on concrete coping stones. NYCHA has also abandoned the Ash Settling Chambers (aka Smoke Rooms) located on the roof of the buildings; the stacks are connected to these chambers via two openings. As the name suggests, the purpose of these chambers was to allow larger ash particles left over from the combustion process to settle before the gases were exhausted. At the roof level, the compactor stacks are either freestanding, installed adjacent to bulkheads, inside of bulk heads and protruding through bulkhead roofs, or inside of water tank towers. Historically, these brick compactor stacks have required frequent repairs due to leaks. Typical repairs consist of repointing, the replacement of the top 4 feet of brickwork, as well as the coping stones, and the spark arrestors. Ongoing brick masonry maintenance on its buildings comes at a substantial cost to NYCHA. The elimination of brick masonry from the NYCHA portfolio will reduce future expenses associated with repointing and replacement. This Notice outlines the standard procedures for the repair of roof top structures such as compactor stacks and smoke rooms.
Transcript
Page 1: EFUSE CHUTES COMPACTOR S - New York...developments to refuse chutes (aka compactor stacks). These compactor stacks typically extend from the basement to approximately 10 feet or more

Office of Design Page 1 of 2

2016 002 January 1, 2016

REFUSE CHUTES / COMPACTOR STACKS This Standard Notice addresses the Procedure and Criteria to be considered regarding the rehabilitation the Refuse Chutes/Incinerator Stacks.

INTRODUCTION

The following Code references apply to Refuse Chutes/Incinerator Stacks:

• 2014 NYC Building Code Chapters 14, 16, 17, and 21 • 2014 NYCBC RCNY §16-01 (Inspection of Existing Structures During Construction

Operations) • 2014 NYCBC RCNY §24-01 (Refuse Chutes & Refuse Rooms) Section (c), …’any

existing refuse chute that is built of 8” minimum thick brick masonry and extends from the compactor room to at least 6’-0” above the roof may continue to be used as such…’.

• 2014 NYC Mechanical Code, Chapter 8 §801

In the early 1980s when New York City banned the use of incinerators for the burning of waste the New York City Housing Authority started converting all existing incinerator flues in its developments to refuse chutes (aka compactor stacks). These compactor stacks typically extend from the basement to approximately 10 feet or more above the main roof surface. The walls of the compactor stacks are typically made of 8 inch fire brick masonry. A spark arrestor is installed at the top of the stack on concrete coping stones. NYCHA has also abandoned the Ash Settling Chambers (aka Smoke Rooms) located on the roof of the buildings; the stacks are connected to these chambers via two openings. As the name suggests, the purpose of these chambers was to allow larger ash particles left over from the combustion process to settle before the gases were exhausted. At the roof level, the compactor stacks are either freestanding, installed adjacent to bulkheads, inside of bulk heads and protruding through bulkhead roofs, or inside of water tank towers. Historically, these brick compactor stacks have required frequent repairs due to leaks. Typical repairs consist of repointing, the replacement of the top 4 feet of brickwork, as well as the coping stones, and the spark arrestors. Ongoing brick masonry maintenance on its buildings comes at a substantial cost to NYCHA. The elimination of brick masonry from the NYCHA portfolio will reduce future expenses associated with repointing and replacement. This Notice outlines the standard procedures for the repair of roof top structures such as compactor stacks and smoke rooms.

Page 2: EFUSE CHUTES COMPACTOR S - New York...developments to refuse chutes (aka compactor stacks). These compactor stacks typically extend from the basement to approximately 10 feet or more

– 2 –

Office of Design Page 2 of 2

DESIGN TO REPAIR APPROACH

OoD has developed a standard approach for all compactor stacks in building envelope repair projects that include a roof replacement. Stacks are to be removed and capped, which will decrease the quantities of future brick repair. This will greatly reduce all LL11 issues as well as long-term water leaking associated with these stacks. Where feasible, all obsolete smoke rooms are to be removed in order to avoid future expenses associated with brick and roofing maintenance and repair. It is proposed to remove the reinforced concrete smoke shelf inside the stack where it is practical as well. Table 1 – NYC BC Requirements for Chimney Repairs & Alterations

Abandoned Incinerator Stack /

Chimney

Incinerator Stack converted to Refuse Chute

Chimney w/ Active Flue

Special Inspection Required

No No Yes

Height Above nearest Roof

May be shortened to 0'-0" above highest roof and capped.

6'-0" per NYCBC RCNY §24-01

Dependent on exhaust temp.

Spark Arrestor N/A Yes No

Sprinkler N/A No if brick thickness

complies with minimum required.

No

Cap N/A Yes No, unless part of flue design

Attached are standard details addressing typical stack configurations throughout the NYCHA portfolio. In general, stacks should be cut above the roofs and capped off; stationary metal louvers backed with a wire mesh (acting as a spark arrestor) are to be provided on multiple sides (as required for ventilation, typically with the net area equal to the existing stack opening). Attachments: Drawing A.011 – Typical Refuse Chute Roofing / Flashing Details Drawing S.011 – Typical Compactor Stack Modification Details - I Drawing S.012 – Typical Compactor Stack Modification Details - II

***End of Standard Notice CPDDESIGN2016002***

Page 3: EFUSE CHUTES COMPACTOR S - New York...developments to refuse chutes (aka compactor stacks). These compactor stacks typically extend from the basement to approximately 10 feet or more

A-011

PROVIDE CONTINUOUS STAINLESS STL TERMINATION BAR & SEALANT

TO SEAL OFF THE TOP

WALL IN SEALANT MASTIC

SET NEW THROUGH THE

FASTENERW/WASHER 6" OC.

CORROSIVE RESISTANT

NAIL BASE FLASH w/NEW

X

X

X

X

X

X

X

X

X

1/2" ROXOL OVERLAY BOARD

POLY-ISO INSULATION

6" 8"

EXIST. ROOFING TO REMAIN

A-I

C-III

D-IV

B-I

B-II

C-I

C-II

D-I

D-III

D-II

B-III

B-IV

OVERLAPS OF NEW ROOFING OVER EXIST

SLABCONCRETE EXISTING

FLASHING WITH LEAD WEDGE AND MORTARNEW REGLETED STAINLESS STEEL CAP JOINT TO ALLOW INSTALLATION OF SAW CUT 2 1/4" DEEP INTO THE BRICK

6"

WOOD BLOKING.NEW TREATED

NEW GRAVEL

EXISTING CONCRETE ROOF SLAB

EXISTING BRICK WALL

ROOF SLAB.EXISTING BULKHEAD

24" T

YP

SUMPPREMANUFACTURED

7" 10"7"

LEADER

SPLASH BLOCKNEW CONCRETE

12"

1'-6"

4"

12"

1

ROOFING & FASCIAREMOVE AND REPLACE

6" MIN

PERMANENT VAPOR BARRIERAFTER ABATEMENT AND RETAIN ASTORCH DOWN SBS WATERPROOFING

PERMANENT ROOFING INSTALLATION WATERPROOFING TO REMAIN ASSET IN ADHESIVE DURING TEMP NEW TAPERED POLY ISO INSULATION

ROOFING ADHESIVEPOLYISO COMPATIBLE TO INSULATION w/DENSE DECK ADHERED 1/2" ROXOL OR PRIMED

LOW HEIGHT FLASHINGPLY LIQUID APPLIED PROVIDE NEW SINGLE

FLASHING CEMENT IN COLD APPLIED 2 PARTS RESET SCRAPED BACK GRAVELAFTER ROOFING IS INSTALLED

ROOF SLAB.BULKHEAD EXISTING

PERMANENT ROOFING INSTALLATION WATERPROOFING TO REMAIN AS

SET IN ADHESIVE DURING TEMP NEW TAPERED POLY ISO INSULATION

ROOFING ADHESIVEPOLYISO COMPATIBLE

TO INSULATION w/DENSE DECK ADHERED 1/2" ROXOL OR PRIMED

ROOFING ADHESIVEPOLYISO COMPATIBLE

TO INSULATION w/DENSE DECK ADHERED 1/2" ROXOL OR PRIMED

CEMENTROOFING

LOW HEIGHT FLASHINGPLY LIQUID APPLIED PROVIDE NEW SINGLE

PERMANENT ROOFING INSTALLATION WATERPROOFING TO REMAIN ASSET IN ADHESIVE DURING TEMP NEW TAPERED POLY ISO INSULATION

PERMANENT VAPOR BARRIERAFTER ABATEMENT AND RETAIN ASTORCH DOWN SBS WATERPROOFING

8"

4" (MIN.)

6" (MIN.)

6" (MIN.)

8"

GRANULATED SBS TORCH DOWN.8" UP WALL & OVERLAP TOP LAYER

VAPOR BARRIERBOTTOM SBS TORCH DOWN2" UP WALL & 6" OVERLAP

WALL TO REMAINEXISTING BULKHEAD

FLASHING CEMENT IN COLD APPLIED 2 PARTS

RESET SCRAPED BACK GRAVELAFTER ROOFING IS INSTALLED

ROOFING ADHESIVEPOLYISO COMPATIBLE TO INSULATION w/DENSE DECK ADHERED 1/2" ROXOL OR PRIMED

SBS SHEET AS PART OF PERMANENT ROOFING INSTALLATIONNEW FINAL TOP LAYER OF GRANULATED WHITE TORCH DN

PERMANENT ROOFING INSTALLATIONTO BE RETORCHED TO ACT AS BASE SHEET DURING NEW TOP LAYER OF TORCH DOWN SBS WATERPROOFING

CEMENTWITH 2 PARTS FLASHING NEW CONTINUOUS BEAD

INSTALL NEW ROOFINGTO BE SCRAPED BACK TO EXTENT OF ROOFING GRAVEL

PERMANENT VAPOR BARRIEREXIST ROOFING AND RETAIN ASAFTER ABATEMENT LAPPED 6" ONTO TORCH DOWN SBS WATERPROOFING

PERMANENT ROOFING INSTALLATION WATERPROOFING TO REMAIN ASSET IN ADHESIVE DURING TEMP NEW TAPERED POLY ISO INSULATION

ROOFING REMOVAL DOWN TO SLAB2"-0" MIN ABATEMENT AND/OR

SMOKE ROOMDOWN TO SLAB AROUND AND/OR ROOFING REMOVAL 2"-0" MIN ABATEMENT

EXTENT OF NEW ROOFING

-

2-

3-

6-

4-

4a-

5-

& ROOFENCLOSUREWATER TANK

MAIN ROOF

E.J.

BULKHEAD

BULKHEAD

TYPACM

E.J.

-

6

-

-

2

-

1

- -

(TYP.)

(SIM.)

6

45 ANGLE

NEW ROXOL CANT BUILD UP TO OBTAIN

NEW ROXOL CANT

EXISTING EXPANSION JOINT

ROOFING ADHESIVETO INSULATION w/ POLYISO COMPATIBLE 1/2" ROXOL OR PRIMED DENSE DECK ADHERED

-

-

-2

-2

-5

5

4

CAP FLASHING

ROOFING MEMBRANETORCH DOWN NEW GRANULATED

4a

4a

5

4

4a

ROOF DRAIN, BUT NOT CLOSE TO EXISTING BULKHEAD DOORS.NEARESTTO WATER DIRECT TO ASSEMBLY NEW LOCATE

EXISTS, SUMP/LEADER NO WHERE EXISTING. AS LOCATION SAME IN GO TO ASSEMBLY LEADER WITH SUMP REPLACEMENT

NOTES:

F

OR O

PE

NIN

G R

EQ

UIR

ED

VA

RIE

S - S

EE N

OTES O

N S-0

11

REFER TO STRUCTURAL DRAWINGNET OPENING OF LOUVER3/4" MAXIMUM CLEAR OPENINGGAGE: 14, REFER TO CODEMTL. SCREEN;INTEGRAL GALVANIZEDALUMINUM LOUVER WITH

AT C-III CONDITIONNO ROOFING WORKC-III SIMILAR TO A-I

ROOF SLABAPPROX. 4'-7" ABOVE

SMOKE SHELF TO REMAIN STACK AND CONCRETE EXISTING COMPACTOR

ASBESTOS ABATEMENT NOTES:

NEW SLOT WEEP HOLE(S) @ 24" O.C.

IF RAGGLE BLOCK EXISTS,REPLACE WITH TWO

COURSE OF BRICK

COMPACTOR STACK LOCATIONS

SCHEMATIC ROOF PLAN WITH DIFFERENT

A-

B-

8"8"

8"

ROOM ENTIRELYREMOVE SMOKEIN SOME LOCATIONS& SMOKE SHELFSMOKE ROOM

AT DET. 3 TYP.REFER TO NOTES FLASHING,FOR EXTENT OF NEW

8"

CO

MP

AC

TO

R S

TA

CK

SEE DET. 4 FOR MORE INFORMATIONNEW THROUGH THE WALL FLASHING WITH WEEP HOLEREMOVE 4 COURSES OF BRICK AND PROVIDE

PROVIDE CONTINUOUS STAINLESS STL TERMINATION BAR & SEALANT TO SEAL OFF THE TOP

SBS SHEET AS PART OF PERMANENT ROOFING INSTALLATIONNEW TOP LAYER OF GRANULATED WHITE TORCH DN

CO

NC. E

DG

E(T

YP.)

EN

TIR

E F

RO

NT O

F

HEIG

HT T

O C

OV

ER

AS DIRECTED BY SAFETY ENGINEERREMOVE AND REPLACE BRICK COURSES IN SMALL SECTIONS HILTI EPOXY ANCHORED PINS WITHIN VERTICAL MORTAR JOINTS@ 16" O.C.PIN THIS COURSE 4" INTO BACK UP MASONRY W/ STAINLESS STEEL PRIOR TO REMOVAL OF 3 BRICK COURSES BELOW,

RECEIVER (EMBEDED) LEG TO CAP 12" O.C.FOR ALL 2 PIECE CAP FLASHING POP RIVET NOTE:

CO

NC. E

DG

E(T

YP.)

HEIG

HT T

O C

OVE

R E

NTIR

E

SEALANT MASTIC

THE WALL IN

SET NEW THROUGH

DET.5 AT SOLID WALL AT CAVITY WALL AND

V.I.F. REFER TO DET. 4EXISTING FLASHING

NEW FLASHING 6" BEYONDDOES NOT EXIST. OVERLAP

WHERE EXISTING FLASHINGPROVIDE NEW FLASHING

8"

VAPOR BARRIERAND RETAIN AS PERMANENT

TORCH DOWN SBS WATERPROOFING

SIMOPP.

TO INSTALL NEW 2 PIECE THROUGH WALL FLASHING w/ WEEP HOLES,

SET NEW THROUGH WALL FLASHING IN TROWELED SILICONE SEALANT(MASTIC)

W/ CONTINUOUS STAINLESS STEEL TERMINATION BAR.

FASTEN TERMINATION BAR MAKING SURE THAT SEALANT IS

FORCED TO THE TOP TO FORM A CONTINUOUS BEAD OF SEALANT

ALONG TOP EDGE OF TERMINATION BAR & CAPTURED FLASHING

BEHIND . ADD ADDITIONAL SEALANT ALONG TOP TO MAKE SURE CONTINUOUS

WATERPROOF BARRIER IS FORMED. PUT BACK THE 3 COURSES OF REMOVED

BRICK & INSTALL SLOT WEEP HOLES 24" OC.

SBS SHEET AS PART OF PERMANENT ROOFING INSTALLATIONNEW TOP LAYER OF GRANULATED WHITE TORCH DN

AS PART OF PERMANENT ROOFING INSTALLATIONNEW LAYER OF TORCH DN SBS SHEET

PERFORMED AS PER ASBESTOS ABATEMENTFLASHING AND MASTIC PROCEDURES MUST BE THEREFORE REMOVAL OF BRICK AND EXISTING AND MASTIC IS ASBESTOS CONTAMINATED AND ASSUME THAT ALL EXIST THROUGHWALL FLASHING

ROOFING INSTALLATIONSBS SHEET AS PART OF PERMANENT NEW LAYER OF TORCH DN

12" (

TYP.)

8"(T

YP.)

METAL COUNTER FLASHINGHOLES TO PROTECT TOP OF WALL FLASHING WITH WEEP

PROVIDE NEW THROUGH CONC. SMOKE SHELF AND

BRICK ABOVE EXISTING REMOVE 4 COURSES OF

FOR CAVITY WALL,

SEE DET. ABLOCKDOWN SPOUT CONNECTED TO SPLASH STOP, LEADER AND STAINLESS STEELFASCIA SUMP SCUPPER WITH GRAVELNEW STAINLESS STEEL INTERRATED

FOR REMAINING FASCIASUMP-CLEAT IS SIMILAR INTEGRAL FASCIA CLEAT PROFILE OF

WATER TO FLOW EDGE TO PERMIT BREAK IN FASCIA

FASTENER EVERY 2'-0" O.C. (VERTICALLY)WITH STAINLESS STEEL NEW STAINLESS STEEL BRACKETS

SEE DET. BNEW SPLASH BLOCK

NEW SBS WALK-PAD

NEW S.S. GRAVEL STOP. BEYOND SUMP

STAINLESS STEEL FASTENER 12" O.C.

ANCHOR CLEAT

POST REMOVAL / ABATEMENT ROOFING SPLICE DETAIL (CONCRETE DECK)

ISOMETRIC VIEW OF STAIR BULKHEAD & COMPACTOR STACK

FLASHING DETAIL @ COMPACTOR STACK WALL

ROOF FASCIA DETAIL

N.T.S.

SECTION DETAIL @ COMPACTOR STACK, LOUVER & ROOFING MEMBRANE

N.T.S.

FASCIA SUMP DETAIL

PRE-MANUFACTURERED

ISOMETRIC ONE PIECE

N.T.S.

BLOCK DETAIL (TYP.)

ISOMETRIC CONC. SPLASH

N.T.S.

DOWNSPOUT DETAIL @ BULKHEAD ROOF (TYP.)

N.T.S.

N.T.S.

N.T.S.

N.T.S. N.T.S. N.T.S.

FLASHING DETAIL @ BULKHEAD WALLS

NEW SBS WALK-PAD

8" 8"

6"

NEW DOWN SPOUT

NEW EXPANSION JOINT

TWO PART ROOFING CEMENT

NEW STAINLESS STEEL FASCIA COVER

STAINLESS STEEL ANCHOR CLEAT

STAINLESS STEEL FASTENER 12" O.C.

BLOCKING. (AS REQUIRED)NEW TREATED WOOD

EXISTING BRICK WALL

PERMANENT ROOFING INSTALLATIONTO BE RETORCHED TO ACT AS BASE SHEET DURING

NEW LAYER OF TORCH DOWN SBS WATERPROOFING

PERMANENT ROOFING INSTALLATIONTO BE RETORCHED TO ACT AS BASE SHEET DURING

NEW LAYER OF TORCH DOWN SBS WATERPROOFING

SBS SHEET AS PART OF PERMANENT ROOFING INSTALLATIONNEW TOP LAYER OF GRANULATED WHITE TORCH DN

SBS SHEET AS PART OF PERMANENT ROOFING INSTALLATIONNEW TOP LAYER OF GRANULATED WHITE TORCH DN

PERMANENT ROOFING INSTALLATION WATERPROOFING TO REMAIN AS

SET IN ADHESIVE DURING TEMP NEW TAPERED POLY ISO INSULATION

VAPOR BARRIERAND RETAIN AS PERMANENT

TORCH DOWN SBS WATERPROOFING

LEGEND

*REFER TO DWG. S-011.00 FOR ABBREVIATIONS

ROOFING/FLASHING DETAILSREFUSE CHUTE

PROPOSED TYPICAL

DRAWING) STRUCTURAL CAP (REFER TO PC. CONCRETE NEW CIP OR

BACKER ROD AND SEALANT

09/23/20150

N E V Y O R K C I T YV

HOUSINGAUTHORITY

BROOKLYN / STATEN ISLAND

PROGRAM UNIT:

Designated Space For D

OB Em

ployee Sta

mps & Signatures

DIVISIONCAPITAL PROJECTS

O F F I C E of D E S I G NTEL. 212.306.3000 FAX 212.306.5160

Block No.:

E.D.P. No.:

Development No.:

Zone No.:

Lot No.:

Zoning Map No.:

Drawing Title:

Contract No.:

Drawing No.:

Scale:

Date:

Checked By:

Drawn By:

Seal & Signature:

Contract Title:

VARIOUS

VARIOUS

VARIOUS

00x

BW1432622

Development:

Building Address:

Building No.(s):

Borough of: ORACLE No.:

VARIOUS

VARIOUS

VARIOUS 7681

VARIOUS

Key/Location Plan

New York, New York 1000790 Church Street

Date

BYRev. No. Submissions

Sheet of

.00

VARIOUS

VARIOUS

O. OSTERWIND

JANUARY 15, 2015

Page 4: EFUSE CHUTES COMPACTOR S - New York...developments to refuse chutes (aka compactor stacks). These compactor stacks typically extend from the basement to approximately 10 feet or more

3/8" = 1'-0"

S-011

TOP OF BULKHEAD

ROOF

TOP OF BULKHEAD

ROOF

SIM.

SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

ROOF SLABOF BULKHEAD UNDERSIDE

A-I

C-III

D-IV

B-I

B-II

C-I

C-II

D-I

D-III

SCHEMATIC ROOF PLAN WITH DIFFERENT

D-II

I

I

II

1

FLASHING/WATERPROOFINGBRICK WORK REF. DET.

I

II

III WALLSDETACHED FROM OUTSIDE

- PENETRATING MAIN ROOFA

- OUTSIDE OF BULKHEADB

I

II

III

IV

- INSIDE OF BULKHEADC

2

3

4

4

SIM.

1 SIM.

2

1 SIM.

SIM.

2 SIM.

- CUT TO 2'-0" ABOVE MAIN ROOF SLAB

- REBUILD WALLS WITH LOUVERS

BULKHEAD ROOF FORM DECK, SLOPED TO MATCH (E)- CAP WITH (N) CIP CONCRETE CAP, USING

SLAB- CUT TO UNDERSIDE OF BULKHEAD ROOF

BULKHEAD ROOF FORM DECK, SLOPED TO MATCH (E)- CAP WITH (N) CIP CONCRETE CAP, USING

TO MATCH BULKHEAD ROOF- EXTEND ROOFING OVER (N) CAP, SLOPE

- CUT (E) BULKHEAD WALL AS REQUIRED

SIDES4 (FOUR)- INSTALL LOUVERS ON

BRICKWORK STEPSA-I- FOLLOW

SIDES3 (THREE)- INSTALL LOUVERS ON

SIDES(THREE) 3 - REBUILD WALLS WITH LOUVERS ON

LOUVER AT EXTERIOR WALL1 (ONE) - INSTALL

BRICKWORK STEPSC-I- FOLLOW

) SIDES2 (TWO- PROVIDE LOUVERS ON

BRICKWORK STEPSA-I- FOLLOW

BRICKWORK STEPSA-I- FOLLOW

WALLSLOUVERS AT EXTERIOR 2 (TWO) - INSTALL

BRICKWORK STEPSA-I- FOLLOW

BRICKWORK STEPSB-I- FOLLOW

2 SIM.

BRICKWORK STEPSB-I- FOLLOW

B-III

TOP OF BULKHEAD

ROOF

UNDERSIDE OF

SMOKE ROOM ROOF

(N) BRICKWORK

(E) E.J. (E) E.J.

ENCLOSUREWATER TANK

CONCRETE CAP(N) PRECAST OR CIP

CONCRETE CAP(N) PRECAST OR CIP

(N) CIP CONCRETE CAP

BULKHEAD ROOFSLOPE TO MATCH (E)

6" MIN

E.J

SMOKE ROOM

(E) E.J.

III

WITH SMOKE ROOM

5

6

TO REMAINWALLBULKHEAD

INNER WYTHE OF

SMOKE ROOM TOBE DEMOLISHED

B-IV

IV

SIM.

ROOF SLABOF BULKHEAD

UNDERSIDE

CH

UTE IN

CLU

DIN

G S

PA

RK A

RR

EST

OR

RE

MO

VE P

OR

TIO

N O

F (E) R

EF

USE

CH

UTE T

O R

EM

AIN

PO

RTIO

N O

F (E) R

EF

USE

(N) CIP CONCRETE CAP

(TYP)ROOFING S.A.DEXTENT OF (E)

TO BE REBUILTNEW BULKHEAD WALL

(N) BRICKWORKTO BE INSTALLED INTO(4) - (N) LOUVERS BEYOND

(3) - (N) LOUVERS BEYONDTO BE INSTALLED INTO (N) BRICKWORK

-DEMOLISH SMOKE ROOM.

BULKHEAD ROOFTOP OF

AND 3 ON A-011SEE ARCHITECTURE DETAILS 2

S-011 A-011

T.MELNIKOV / M.ELZOGHABY

AND SEALANTJOINT W/BACKER RODREBUILD EXPANSION

S.A.D.(N) ROOFING

MAIN ROOF SLAB LEVEL MAIN ROOF SLAB LEVEL

MAIN ROOF SLAB LEVEL

AS REQUIRED AT SMOKE ROOM.-REMOVE/ABATE (E) TOPPING SLAB

FOR ASBESTOSE.J TESTED POSITIVE

ACM REQUIRED WHEN

COMPACTOR STACK ELEVATION WITH (N) LOUVERS IN (E) BRICKWORK

TABLE 1 - COMPACTOR STACK MODIFICATIONS BY CONDITION

COMPACTOR STACK CONDITION

COMPACTOR STACK ELEVATION WITH (N) BRICKWORK COMPACTOR STACK ELEVATION WITH (N) BRICKWORK(E) COMPACTOR STACK ELEVATION

COMPACTOR STACK STANDS ALONE ON MAIN ROOF

(E) COMPACTOR STACK ELEVATION

COMPACTOR STACK ADJACENT TO BULKHEAD (DETACHED, WITH E.J.)

TO R

EM

AIN

PO

RTIO

N O

F (E) C

OM

PA

CT

OR S

TA

CK

(E) COMPACTOR STACK ELEVATION

COMPACTOR STACK INSIDE OF BULKHEADCOMPACTOR STACK ADJACENT TO BULKHEAD (ATTACHED)

COMPACTOR STACK ELEVATION WITH (E) BRICKWORK (E) COMPACTOR STACK ELEVATION COMPACTOR STACK ELEVATION WITH (E) BRICKWORK(E) COMPACTOR STACK ELEVATION

COMPACTOR STACK ADJACENT TO BULKHEAD (DETACHED, WITH E.J.) COMPACTOR STACK ADJACENT TO BULKHEAD (ATTACHED)

COMPACTOR STACK LOCATIONS

MAIN ROOF SLAB LEVEL MAIN ROOF SLAB LEVEL

(N) LOUVER (TYP)

AS REQUIREDAND RESTORE ROOFINGINSTALL (N) GRAVEL STOP

TO MATCH BULKHEAD ROOF- EXTEND ROOFING OVER (N) CAP, SLOPE

TO B

E R

EM

OVE

DC

ON

C. S

MO

KE S

HELF

FOR ASBESTOS E.J. TESTED POSITIVE

REQUIRED WHENACM ABATEMENT

AFTER STACK REMOVALBRICKWORK EXPOSED

RESTORE AND REPOINT

TO B

ELO

W S

MO

KE S

HELF

ST

AC

K IN

CLU

DIN

G SP

AR

K A

RR

EST

OR

RE

MO

VE P

OR

TIO

N O

F (E) C

OM

PA

CT

OR

REQUIREDPROVIDE SHORING AS

OF BULKHEAD WALL REMOVE OUTER WYTHE

TO B

ELO

W S

MO

KE S

HELF

ST

AC

K IN

CLU

DIN

G SP

AR

K A

RR

EST

OR

RE

MO

VE P

OR

TIO

N O

F (E) C

OM

PA

CT

OR

WITHOUT ROOFINGAND 5 ON A-011SEE ARCHITECTURE DETAILS 2

STRUCTURES.NO ADJACENT ROOF

ON A-011SEE ARCHITECTURE DETAILS 1 & 4a, AND 6

SMOKE ROOM.AND ENCLOSED INSIDEWITH EXPANSION JOINTFLUSH WITH OUTSIDE WALL

2 , AND 3, ON A-011SEE ARCHITECTURAL DETAILS

WITH EXPANSION JOINT.FLUSH WITH OUTSIDE WALL

EXPANSION JOINT.STACK WALLWITHOUTINTEGRAL WITH OUTSIDE

THRU WALL FLASHING.2, 3, 4 AND 4a ON A-011 FORSEE ARCHITECTURE DETAILS

WALL OUTSIDE ONEINTEGRAL WITH

SEE ARCHITECTURE 1,4a, AND 6 ON A-011

WALLS OUTSIDE TWOINTEGRAL WITH

WITH EXPANSION JOINT.OR OUTSIDE ENCLOSUREWALL, DETACHED, INSIDE

ENCLOSURE ONE FLUSH W/

WITH EXPANSION JOINT.WALLS, DETACHED, INSIDE

ENCLOSURE TWO FLUSH W/

JOINT.DETACHED WITH EXPANSIONINSIDE ENCLOSURE,

RO

OM E

NTIR

ELY

RE

MO

VE (E) S

MO

KE

MODIFICATION DETAILS-ICOMPACTOR STACK PROPOSED TYPICAL

TESTED POSITIVE FOR ACMWHERE ROOFING COMPONENTSACM ABATEMENT REQUIRED

ST

AC

K IN

CLU

DIN

G S

PA

RK A

RR

EST

OR

RE

MO

VE P

OR

TIO

N O

F (E) C

OM

PA

CT

OR

ROOF SLAB. WALL 1'-6" TO UNDERSIDE OF BULKHEAD SIDES OF COMPACTOR STACK. CUT BULKHEAD BULKHEAD ROOF SLAB ON 3 EXTERIOR - CUT +/- 1'-6" BELOW THE UNDERSIDE OF

ENCLOSURE.INSIDE WATER TOWER

- ADJACENT TO AND D

TESTING RESULTS FNYCHA TO PROVIDE ACMBE DEMOLISHED/ABATED(E) TOPPING SLAB TO

TESTED POSITIVE FOR ACMWHERE ROOFING COMPONENTSACM ABATEMENT REQUIRED

SMOKE ROOM.JOINT AND ENCLOSED WALL WITHOUT EXPANSIONINTEGRAL WITH OUTSIDE

PENETRATING ROOF.INSIDE ENCLOSURE,

SEE ARCHITECTURE 1,4a, AND 6 ON A-011

SCALE: 3/4" = 1'-0"

1 2

3 4

5 6

S-012

1

S-012

2

SCALE: 3/4" = 1'-0" WITH SMOKE ROOM SCALE: 3/4" = 1'-0"

(N) BRICKWORK

FASCIA COVER S.A.D.(N) ROOFING AND

S-012

BS-012

3

SIM.S-012

4

S-012

B

WITH (E) OPENING BELOWSTACK TO REMAIN TOGETHERPORTION OF (E) COMPACTOR

VERIFY IN FIELD TYPE OF BULKHEAD WALL CONSTRUCTION.NOTE: (E) BULKHEAD WALL IS SHOWN AS CAVITY WALL.

UNDERSIDE OF

SMOKE ROOM ROOF

TOP OF SMOKE

ROOM ROOF

VERIFY IN FIELD TYPE OF BULKHEAD WALL CONSTRUCTION.NOTE: (E) BULKHEAD WALL IS SHOWN AS CAVITY WALL.

MASONRY TO BE REMOVED

(E) MASONRY TO BE RETAINED

NEW BRICKWORK

CIP

E.J.

- CAST IN PLACE

- EXPANSION JOINT

(E)

(N)

- EXISTING

- NEW

S.A.D - SEE ARCHITECTURE DRAWINGS

S.S - STAINLESS STEEL

LEGEND:

ABBREVIATIONS:

E.J.

E.J.

E.J.

BULKHEAD

BULKHEAD

(TYP.)ACM

09/23/2015

+/- 6'-0" (MIN.)

+/- 6'-0" (MIN.)

TOP OF BULKHEAD

ROOF

SIM.

(E) E.J.

CONCRETE CAP(N) PRECAST OR CIP

(N) BRICKWORKTO BE INSTALLED INTO(3) - (N) LOUVERS BEYOND

AND SEALANTJOINT W/BACKER RODREBUILD EXPANSION

AS REQUIREDAND RESTORE ROOFINGINSTALL (N) GRAVEL STOP

AFTER STACK REMOVALBRICKWORK EXPOSED

RESTORE AND REPOINT

S-012

2

+/- 6'-0" (MIN.)

TO REMAINCOMPACTOR STACK

PORTION OF (E)

V.I.F.

SP

AR

K A

RR

EST

OR

RE

MO

VE P

OR

TIO

N O

F (E) C

OM

PA

CT

OR S

TA

CK IN

CLU

DIN

G

V.I.F.

TO REMAINCOMPACTOR STACKPORTION OF (E)S

PA

RK A

RR

EST

OR

RE

MO

VE P

OR

TIO

N O

F (E) C

OM

PA

CT

OR S

TA

CK IN

CLU

DIN

G

+/- 2'-0" (MIN.)

+/- 2'-0" (MIN.)

(N) BRICKWORK

(N) BRICKWORKTO BE INSTALLED INTO(4) - (N) LOUVERS BEYOND

0

(N) BRICKWORK (N) BRICKWORK

(N) BRICKWORKTO BE INSTALLED INTO(4) - (N) LOUVERS BEYOND

TOP OF BULKHEAD

ROOF

SIM.S-012

2CONCRETE CAP(N) PRECAST OR CIP

AS REQUIREDAND RESTORE ROOFINGINSTALL (N) GRAVEL STOP

+/- 6'-0" (MIN.)

EVERY 4TH COURSETYPE 2 SIDES RODS) ATREINFORCEMENT (TRUSSHORIZONTAL S.S JOINT

WYTHE TO BE REBUILTBULKHEAD WALL OUTER

REPAIR ROOF EDGE S.A.D

STAGGEREDHORIZONTALLY O.C 18"

16" O.C VERTICALLY ABDSPACEDROD PENCIL

W/D.STIES VENEER (N)

AS REQUIREDPROVIDE SHORING

OF BULKHEAD WALL REMOVE OUTER WYTHE

(E) BULKHEAD ROOFSLOPE TO MATCH

(N) LOUVERS BEYONDTO BE INSTALLED

INTO (E) BRICKWORK

TO B

E R

EM

OVE

D(E) C

ON

C. S

MO

KE S

HELF

TEST RESULTSNYCHA TO PROVIDE ACM DEMOLISHED/ABATED. (E) TOPPING SLAB TO BER

OO

M E

NTIR

ELY

RE

MO

VE (E) S

MO

KE

(E) COMPACTOR STACK ELEVATION COMPACTOR STACK ELEVATION WITH (N) BRICKWORK

CIP CONCRETE CAP USING FORM DECK- CAP WITH (N) PRECAST CAP SLOPED, OR

AS NEEDED.-CUT STACK TO UNDERSIDE OF SMOKE SHELF

INSTALL LOUVERS ON 3 SIDES. IN EXISITING BRICKS AS REQUIRED.-MAKE NEW OPENING WV/LOUVER

CIP CONCRETE CAP USING FORM DECK- CAP WITH (N) PRECAST CAP SLOPED, OR

CIP CONCRETE CAP USING FORM DECK- CAP WITH (N) PRECAST CAP SLOPED, OR

-INSTALL CAP AS INDICATED ABOVE.PORTION OF BULKHEAD ROOF SLAB.REBUILD BULKHEAD VENEER AND -THAT IS INTEGRAL WITH STACK.BULKHEAD EXTERIOR BRICK VENEER CONCRETE SHELF INCLUDING DEMOLISH STACK TO TOP SIDE OF (E) -DEMOLISH SMOKE ROOM.-REQUIRED AT SMOKE ROOMREMOVE /ABATE (E) TOPPING SLAB AS -

N E V Y O R K C I T YV

HOUSINGAUTHORITY

BROOKLYN / STATEN ISLAND

PROGRAM UNIT:

Designated Space For D

OB Em

ployee Sta

mps & Signatures

DIVISIONCAPITAL PROJECTS

O F F I C E of D E S I G NTEL. 212.306.3000 FAX 212.306.5160

Block No.:

E.D.P. No.:

Development No.:

Zone No.:

Lot No.:

Zoning Map No.:

Drawing Title:

Contract No.:

Drawing No.:

Scale:

Date:

Checked By:

Drawn By:

Seal & Signature:

Contract Title:

VARIOUS

VARIOUS

VARIOUS

00x

BW1432622

Development:

Building Address:

Building No.(s):

Borough of: ORACLE No.:

VARIOUS

VARIOUS

VARIOUS 7681

VARIOUS

Key/Location Plan

New York, New York 1000790 Church Street

Date

BYRev. No. Submissions

Sheet of

.00

VARIOUS

VARIOUS

O. OSTERWIND

JANUARY 15, 2015

Page 5: EFUSE CHUTES COMPACTOR S - New York...developments to refuse chutes (aka compactor stacks). These compactor stacks typically extend from the basement to approximately 10 feet or more

S-012

TYP.

V.I.F.

BOTTOM OF LOUVER

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

(N) LOUVERS (TYP)

ALIGN

V.I.F.6"

4"

3"

1'-10" 8"

8"

1'-10"

1'-1" 1'-0"

+/- 1'-6"

1'-10"

1'-10"

1'-10"

1'-10"

3"

"43

2"

"211

"21

GROUT AS NEEDED

(N) LOUVER OPENING

2"

6"6"

BULKHEAD ROOFSLOPE TO MATCH (E)

(E) BULKHEAD ROOF#4 @ 12" DOWELS INTO

(N) CIP CONCRETE CAP

SLAB(E) BULKHEAD ROOF

CONCRETE CAP(N) PRECAST OR CIP

(N) CONCRETE CAP

TO REMAINBULKHEAD WALL

6"

3"

+/- 1'-6"

(N) LOUVER OPENING

BULKHEAD WALL

CONCRETE CAP ABOVE(N) PRECAST OR CIP

1'-10"

WALL (TYP)BULKHEAD BACKUP

E.J

BULKHEAD WALL

(TYP)CONCRETE CAP ABOVE(N) PRECAST OR CIP 0

"

(N) 2 WYTHESOF BRICK (TYP)

ADDITIONAL DOWELSAS REQUIRED SEE NOTESBELOW

BRICK (TYP)(N) TWO WYTHES OF

DETAIL A FOR CONNECTIONCONCRETE CAP SEE(N) PRECAST OR CIP

S.A.D (TYP)FOR SIZE AND NOTES (N) LOUVERS BELOW

DEMOLISH BRICKS INTOOTH PATTERN TO ALLOW FOR INSTALLATIONOF NEW FLASHING

DOWELS (TYP.)#4 (N) RESIN

(N) DOWELSTREAT WITH BONDING AGENTROUGHEN SURFACE TO 1/4" AMPLITUDE

1'-10"

GALVANIZED MESH (TYP)WWF 6X6-D6

T.MELNIKOV / M.ELZOGHABY

B

H

2

(TYP) SEE NOTES BELOW(N) DOWELS @ 4 CORNERS

(TYP) SEE NOTES BELOWDOWELS @ 4 CORNERS (N) # 4 2'-0" LONG S.S THREADED

BE REBUILT (N)1'-6" OF CHUTE TO

BULKHEAD WALL OUTER WYTHE OF

LOUVER INSTALLATION (TYP)AS REQUIRED FOR CREATE NEW OPENING

V.I.F.TYP.

BULKHEAD ROOF

MODIFICATION DETAILS -IICOMPACTOR STACK PROPOSED TYPICAL

DETAILFOR ROOFINGS.A.D. A-011

OF BULKHEAD WALLWYTHEINNER (E)

ROOF SLAB(E) BULKHEAD

SEE DETAIL B(N) DOWEL

ECCNYC 2014VALUEPRESCRIBEDCODE

COMMENTS

BUILDING SYSTEM.OR OVERLOAD EXISTINGCREATE HAZARD ---COMPLIANCE WOULDDEMONSTRATE ---COMPLY IF APPLICANT CANREPAIR WORK NEED NOTALTERATIONS, REPAIRS ---TO ADDITIONS, NYCECC WITH REGARDSSECTION 101.4.3 OFINTERPRETATION OFBB2010-0153.NYCDOB TECH BULLETIN

BEAMS.SPANDREL REPAIR ATMASONRY

ENVELOPE.

DESCRIPTIONITEM

LOCATIONWORK

DESIGN VALUEPROPOSED

T-001.00ON DWG.DOB NOTEREFER TOROOFING.TEMPORARYBEAM.& SPANDRELROOF EDGE N/A N/A

FILED SEPARATELY.ROOFING DRAWINGSREFER TO ARCHITECTURAL TO REPLACE PARAPET.MEANS AND METHODSSYSTEM.TEMPORARY ROOFING

1SCALE: 1 1/2" = 1'-0"

2SCALE: 1 1/2" = 1'-0"

PLAN SECTION BELOW (N) PRECAST/CIP CONCRETE CAP PLAN SECTION BELOW (E) SMOKE SHELF 3SCALE: 1 1/2" = 1'-0"

PLAN SECTION BELOW (N) PRECAST/CIP CONCRETE CAP 4SCALE: 1 1/2" = 1'-0"

PLAN SECTION OF (N) BRICKWORK WITH 2 LOUVERS

5SCALE: 1 1/2" = 1'-0"

(N) BRICKWORK AND PRECAST CAP SECTION 6SCALE: 1 1/2" = 1'-0"

(N) BRICKWORK AND PRECAST CAP SECTION

A (N) PRECAST CAP DETAILSCALE: 3" = 1'-0"

BSCALE: 3" = 1'-0"

(N) PRECAST CAP ANCHORING DETAIL

A

V.I.F.

BOTTOM OF LOUVER

FREE AIR AREA (IN )COMPACTOR STACK

BXHONE SIDE LOUVER

BXHTWO SIDES LOUVERS

BXHFOUR SIDES LOUVERS

BXHTHREE SIDES LOUVERS

LESS THAN 500

500-1000

1000-1200

2'-0" X 2'-0"

2'-0" X 3'-6"

2'-0" X 4'-6"

2'-0" X 2'-0"

2'-0" X 3'-6"

3'-0" X 3'-0"

2'-0" X 1'-6"

2'-0" X 2'-6"

3'-0" X 2'-0"

1'-6" X 1'-6"

2'-0" X 2'-0"

2'-6" X 2'-0"

NOTES:

BUILDING ENVELOPE.WORK DESCRIBED HERE DOES NOT PERMANENTLY AFFECT ENERGY PERFORMANCE OF 18.

THIS SITUATION ARISE THE REQUIREMENTS OF THE CURRENT NYCECC MUST BE CONSIDERED.SURFACES ARE COINCIDENT WITH THE EXTERIOR ENVELOPE OF THE MAIN BUILDING. SHOULD THESE DETAILS DO NOT COVER COMPACTOR STACKS WHEN ONE OR MORE OF THEIR EXTERIOR 17.

LOUVER, IT MAY BE ROTATED 90° IF REQUIRED.WHERE THE DIMENSIONS OF THE STACK DOES NOT ALLOW PROPOSED ORIENTATION OF 16.

SHALL BE MAINTAINED TO ALLOW FOR LOUVER ANCHORAGE TO BRICK WALL.9" MIN. MEASURED HORIZONTALLY FROM LOUVER FRAME TO EDGE OF COMPACTOR STACK 15.

STACK WIDTH AND LENGTH.TO DETERMINE POSSIBLE DIMENSIONAL VARIATIONS, FIELD VERIFY SPECIFIC COMPACTOR 14.

PROVIDE WIRE MESH AND INSTALL IN FRAME BEHIND LOUVER AS SPARK ARRESTOR.13.

USE STANDARD LOUVER GREENHECK MODEL ESD-635X OR EQUAL.12.

OPPOSING FACES.WHERE POSSIBLE TWO LOUVERS MAX. ARE TO BE USED, THEY ARE TO BE INSTALLED ON 11.

DETAIL 1/S-011.00.TOP OF COMPACTOR STACK VENT CAP TO BE 6'-0" ABOVE FINISHED MAIN ROOF SURFACE, SEE 10.

COMPACTOR ROOM IF CONSTRUCTED OF 8" MIN. BRICK MASONRY.PER RCNY 24-01, EXISTING COMPACTOR STACK DO NOT REQUIRE SPRINKLER IN STACK ABOVE 9.

ALL WORK INDICATED IS SUBJECT TO MASONRY SPECIAL INSPECTION.8.

FLASHING, SNOW DRIFT, LOUVERS CAN BE ACCOMMODATED.HEIGHT OF COMPACTOR STACK VENT ABOVE NEAREST ROOF TO BE SUCH THAT ROOFING 7.

(N) LOUVERS TO BE GALVANIZED STEEL OR ALUMINUM.6.

OF THE COMPACTOR STACK.THE TOTAL NET CROSS SECTION AREA OF THE NEW LOUVERS IS TO MATCH INSIDE OPEN AREA 5.

NEW BRICK WORK.PROVIDE STAINLESS STEEL HORIZONTAL WALL REINFORCEMENT AT EVERY FOUR COURSE OF 4.

BRICKWORK AT 16" O.C. EACH WAY.STAINLESS STEEL DURO-WALL HB-5213 14 GA TIES OR EQUAL TO BE INSTALLED FOR NEW 3.

EQUAL FOR CONCRETE WITH 6" MIN. EMBEDMENT.DOWELS TO BE #4 S.S. BARS SET IN HILTI HY 70 OR EQUAL FOR MASONRY , HILTI HY 200 OR 2.

FEET, INSTALL ADDITIONAL DOWELS AT 18" O.C.PROVIDE DOWELS AT EACH CORNER OF NEW STACK. IF STACK DIMENSION EXCEEDS THREE 1.

TABLE 1 - REQUIRED LOUVER SIZES BASED ON 50% FREE AIR (ADJUST DIMENSIONS AS NEEDED)

TABLE 2 - ENERGY ANALYSIS FOR ALTERATION - CLIMATE ZONE 4A (ENVELOPE ONLY)

5 6

CAP ABOVEAND (N) PRECAST/CIP ABOVE TO BE REMOVEDEXIST. SMOKE SHELF

S.A.D (TYP)FOR SIZE AND NOTES (N) LOUVERS BELOW

009/23/2015

MASONRY TO BE REMOVED

(E) MASONRY TO BE RETAINED

NEW BRICKWORK

LEGEND:

CIP

E.J.

- CAST IN PLACE

- EXPANSION JOINT

(E)

(N)

- EXISTING

- NEW

S.A.D - SEE ARCHITECTURE DRAWINGS

S.S - STAINLESS STEEL

ABBREVIATIONS:

N E V Y O R K C I T YV

HOUSINGAUTHORITY

BROOKLYN / STATEN ISLAND

PROGRAM UNIT:

Designated Space For D

OB Em

ployee Sta

mps & Signatures

DIVISIONCAPITAL PROJECTS

O F F I C E of D E S I G NTEL. 212.306.3000 FAX 212.306.5160

Block No.:

E.D.P. No.:

Development No.:

Zone No.:

Lot No.:

Zoning Map No.:

Drawing Title:

Contract No.:

Drawing No.:

Scale:

Date:

Checked By:

Drawn By:

Seal & Signature:

Contract Title:

VARIOUS

VARIOUS

VARIOUS

00x

BW1432622

Development:

Building Address:

Building No.(s):

Borough of: ORACLE No.:

VARIOUS

VARIOUS

VARIOUS 7681

VARIOUS

Key/Location Plan

New York, New York 1000790 Church Street

Date

BYRev. No. Submissions

Sheet of

.00

VARIOUS

VARIOUS

O. OSTERWIND

JANUARY 15, 2015